ITEM DESCRIPCIÓN UND METRADO

01 OBRAS PROVISIONALES
01.01 CARTEL DE IDENTIFICACION DE OBRA 3.60X2.40 M glb 1.00
01.02 ALQUILER DE ALMACEN INCLUIDO OFICINA mes 6.00
01.03 CAMPAMENTO PROVISIONAL DE OBRA CAMP. 3.00
02 CAPTACION - BOCATOMA (03 SECTORES)
02.01 CAPTACION - DESARENADOR (SECTOR MALA NOCHE)
02.01.01 TRABAJOS PRELIMINARES
02.01.01.01 LIMPIEZA DEL TERRENO MANUAL m2 132.00
02.01.01.02 TRAZO Y REPLANTEO m2 112.46
02.01.01.03 DESVIO PROVISIONAL DE AGUAS m3 48.60
02.01.01.04 EXCAVACION BAJO AGUA m3 12.60
02.01.02 MOVIMIENTO DE TIERRAS
02.01.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 74.84
02.01.02.02 CORTE ROCA FIJA m3 19.12
02.01.02.03 RELLENO CON MATERIAL PROPIO m3 16.03
02.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE DIST./PROM=40 M m3 19.12
02.01.03 OBRAS DE CONCRETO SIMPLE
02.01.03.01 SOLADO DE CONCRETO DE 4'' MEZCLA 1:12 C-H m2 71.49
02.01.03.02 CONCRETO f'c=175 kg/cm2 +30% PM EN BARRAJE,BANQUETA m3 8.07
02.01.03.03 ENCOFRADO Y DESENCOFRADO EN ESTRUCTURAS DE CAP m2 4.16
02.01.03.04 MAMPOSTERIA E=0.40 ASENTADO EN FC m3 5.44
02.01.04 OBRAS DE CONCRETO ARMADO
02.01.04.01 CONCRETO f´c = 210 kg/cm2 MUROS, DESARENADOR Y CANA m3 46.21
02.01.04.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 MUROS, D m3 1,373.65
02.01.04.03 ENCOFRADO Y DESENCOFRADO EN ESTRUCTURAS DE CAP m2 147.47
02.01.05 REVOQUES ENLUCIDOS Y MOLDURAS
02.01.05.01 TARRAJEO CON IMPERMEABILIZANTES EN CAPTACION - D m2 158.10
02.01.06 JUNTAS Y ENSAYOS
02.01.06.01 JUNTAS WATER STOP E=6.00'' m 10.39
02.01.06.02 ENSAYO DE RESISTENCIA DE COMPRENSION DE CONCRET und 5.00
02.01.07 CARPINTERIA METALICA
02.01.07.01 SUMINISTRO Y COLOCACION DE COMPUERTA METAL DE 0.90 und 2.00
02.01.07.02 SUMINISTRO Y COLOCACION DE COMPUERTA METAL DE 0.40 und 3.00
02.01.07.03 REJILLA DE PROTECCION Fº LISO 1/4'' COCADAS 1 1/2''X1 1/2' und 2.00
02.01.07.04 COMPUERTA DE ACERO TIPO TARJETA 0.40X0.60 E=6 MM und 1.00
02.01.07.05 REJILLA DE CAPTACION DE FONDO und 1.00
02.01.08 VARIOS
02.01.08.01 ESCOLLERA E=0.30 (RELLENO CON PIEDRA GRANDE ACOM m2 14.82
02.01.08.02 TUBERIA DE DRENAJE PVC SAL DE 4'' m 14.50
02.01.08.03 TAPA DE CONCRETO und 2.00
02.02 CAPTACION - DESARENADOR (SECTOR GOCHOPATA)
02.02.01 TRABAJOS PRELIMINARES
02.02.01.01 LIMPIEZA DEL TERRENO MANUAL m2 158.88
02.02.01.02 TRAZO Y REPLANTEO m2 135.16
02.02.01.03 DESVIO PROVISIONAL DE AGUAS m3 48.60
02.02.01.04 EXCAVACION BAJO AGUA m3 12.60
02.02.02 MOVIMIENTO DE TIERRAS
02.02.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 74.84
02.02.02.02 CORTE ROCA FIJA m3 39.49
02.02.02.03 RELLENO CON MATERIAL PROPIO m3 19.90
02.02.02.04 ELIMINACION DE MATERIAL EXCEDENTE DIST./PROM=40 M m3 39.49
02.02.03 OBRAS DE CONCRETO SIMPLE
02.02.03.01 SOLADO DE CONCRETO DE 4'' MEZCLA 1:12 C-H m2 75.91
02.02.03.02 CONCRETO f'c=175 kg/cm2 +30% PM EN BARRAJE,BANQUETA m3 8.07
02.02.03.03 ENCOFRADO Y DESENCOFRADO EN ESTRUCTURAS DE CAPT m2 4.16
02.02.03.04 MAMPOSTERIA E=0.40 ASENTADO EN FC m3 5.44
02.02.04 OBRAS DE CONCRETO ARMADO
02.02.04.01 CONCRETO f´c = 210 kg/cm2 MUROS, DESARENADOR Y CANA m3 48.91
02.02.04.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 MUROS, D m3 1,454.00
02.02.04.03 ENCOFRADO Y DESENCOFRADO EN ESTRUCTURAS DE CAP m2 150.85
02.02.05 REVOQUES ENLUCIDOS Y MOLDURAS
02.02.05.01 TARRAJEO CON IMPERMEABILIZANTES EN CAPTACION m2 168.39
02.02.06 JUNTAS Y ENSAYOS
02.02.06.01 JUNTAS WATER STOP E=6.00'' m 10.39
02.02.06.02 ENSAYO DE RESISTENCIA DE COMPRENSION DE CONCRET und 5.00
02.02.07 CARPINTERIA METALICA
02.02.07.01 SUMINISTRO Y COLOCACION DE COMPUERTA METAL DE 0.90 und 2.00
02.02.07.02 SUMINISTRO Y COLOCACION DE COMPUERTA METAL DE 0.40 und 3.00
02.02.07.03 REJILLA DE PROTECCION Fº LISO 1/4'' COCADAS 1 1/2''X1 1/2' und 2.00
02.02.07.04 COMPUERTA DE ACERO TIPO TARJETA 0.40X0.40 E= 6 MM und 1.00
02.02.07.05 REJILLA DE CAPTACION DE FONDO und 1.00
02.02.08 VARIOS
02.02.08.01 ESCOLLERA E=0.30 (RELLENO CON PIEDRA GRANDE ACOM m2 14.82
02.02.08.02 TUBERIA DE DRENAJE PVC SAL DE 4'' m 14.50
02.02.08.03 TAPA DE CONCRETO und 2.00
02.03 CAPTACION - DESARENADOR (SECTOR ACHIRA)
02.03.01 TRABAJOS PRELIMINARES
02.03.01.01 LIMPIEZA DEL TERRENO MANUAL m2 150.48
02.03.01.02 TRAZO Y REPLANTEO m2 123.86
02.03.01.03 DESVIO PROVISIONAL DE AGUAS m3 48.60
02.03.01.04 EXCAVACION BAJO AGUA m3 12.60
02.03.02 MOVIMIENTO DE TIERRAS
02.03.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 74.84
02.03.02.02 CORTE ROCA FIJA m3 26.35
02.03.02.03 RELLENO CON MATERIAL PROPIO m3 18.65
02.03.02.04 ELIMINACION DE MATERIAL EXCEDENTE DIST./PROM=40 M m3 26.35
02.03.03 OBRAS DE CONCRETO SIMPLE
02.03.03.01 SOLADO DE CONCRETO DE 4'' MEZCLA 1:12 C-H m2 72.25
02.03.03.02 CONCRETO f'c=175 kg/cm2 +30% PM EN BARRAJE,BANQUETA m3 8.07
02.03.03.03 ENCOFRADO Y DESENCOFRADO EN ESTRUCTURAS DE CAPT m2 4.16
02.03.03.04 MAMPOSTERIA E=0.40 ASENTADO EN FC m3 5.44
02.03.04 OBRAS DE CONCRETO ARMADO
02.03.04.01 CONCRETO f´c = 210 kg/cm2 MUROS, DESARENADOR Y CANA m3 46.97
02.03.04.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 MUROS, D m3 1,412.20
02.03.04.03 ENCOFRADO Y DESENCOFRADO EN ESTRUCTURAS DE CAP m2 271.88
02.03.05 REVOQUES ENLUCIDOS Y MOLDURAS
02.03.05.01 TARRAJEO CON IMPERMEABILIZANTES EN CAPTACION m2 170.20
02.03.06 JUNTAS ENSAYOS
02.03.06.01 JUNTAS WATER STOP E=6.00'' m 10.39
02.03.06.02 ENSAYO DE RESISTENCIA DE COMPRENSION DE CONCRET und 5.00
02.03.07 CARPINTERIA METALICA
02.03.07.01 SUMINISTRO Y COLOCACION DE COMPUERTA METAL DE 0.90 und 2.00
02.03.07.02 SUMINISTRO Y COLOCACION DE COMPUERTA METAL DE 0.40 und 3.00
02.03.07.03 REJILLA DE PROTECCION Fº LISO 1/4'' COCADAS 1 1/2''X1 1/2' und 2.00
02.03.07.04 COMPUERTA DE ACERO TIPO TARJETA 0.40X0.60 E= 6 MM und 1.00
02.03.07.05 REJILLA DE CAPTACION DE FONDO und 1.00
02.03.08 VARIOS
02.03.08.01 ESCOLLERA E=0.30 (RELLENO CON PIEDRA GRANDE ACOM m2 14.82
02.03.08.02 TUBERIA DE DRENAJE PVC SAL DE 4'' m 14.50
02.03.08.03 TAPA DE CONCRETO und 2.00
03 RESERVORIO DE 550 M3 (02 UND.)
03.01 TRABAJOS PRELIMINARES
03.01.01 LIMPIEZA DEL TERRENO MANUAL m2 600.00
03.01.02 TRAZO Y REPLANTEO m2 409.00
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 880.36
03.02.02 CORTE ROCA FIJA m3 528.22
03.02.03 REFINE NIVELACION Y COMPACTACION m2 440.18
03.02.04 ELIMINACION DE MATERIAL EXCEDENTE m3 880.36
03.03 OBRAS DE CONCRETO SIMPLE
03.03.01 SOLADO DE CONCRETO DE 4'' MEZCLA 1:12 C-H m2 442.18
03.04 OBRAS DE CONCRETO ARMADO
03.04.01 CONCRETO f'c=210 kg/cm2 m2 568.96
03.04.02 ENCOFRADO Y DESENCOFRADO EN LOSAS Y MUROS m2 393.41
03.04.03 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 12,227.26
03.05 REVOQUES ENLUCIDOS Y MOLDURAS
03.05.01 TARRAJEO INTERIOR CON IMPERMEABILIZANTE m2 713.45
03.05.02 TARRAJEO EN EXTERIORES m2 236.04
03.06 CARPINTERIA METALICA
03.06.01 TAPA METALICA T-1 CON MECANISMO DE SEGURIDAD und 4.00
03.07 INSTALACION DE ACCESORIOS
03.07.01 INSTALACION DE ACCESORIOS PVC glb 2.00
03.08 VARIOS
03.08.01 CANASTILLA PVC DE 4'' und 2.00
03.08.02 VALVULA COMPUERTA DE BRONCE DE 6'' und 2.00
03.08.03 VALVUA COMPUERTA DE BRONCE DE 4'' und 6.00
03.08.04 WATER STOP DE 6 " PROVISION E INSTALACION und 72.26
04 RESERVORIO DE 57 M3 (01 UND.)
04.01 TRABAJOS PRELIMINARES
04.01.01 LIMPIEZA DEL TERRENO MANUAL m2 27.20
04.01.02 TRAZO Y REPLANTEO m2 27.20
04.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION MANUAL EN ROCA SUELTA m3 94.08
04.02.02 CORTE ROCA FIJA m3 29.76
04.02.03 REFINE NIVELACION Y COMPACTACION m3 26.88
04.02.04 ELIMINACION DE MATERIAL EXCEDENTE DIST./PROM=40 M m3 40.32
04.03 OBRAS DE CONCRETO EN RESERVORIO
04.03.01 SOLADO DE CONCRETO DE 4'' MEZCLA 1:12 C-H m2 26.88
04.03.02 CONCRETO ARMADO f'c=210 kg/cm2 m3 31.30
04.03.03 ACERO ESTRUCTURAL DE REFUERZO FY=4200KG/CM2 DE 1/2'' kg 2,170.08
04.04 OBRAS DE CONCRETO EN CAJA DE CONTROL DE RESERVORIO
04.04.01 SOLADO DE CONCRETO DE 4'' MEZCLA 1:12 C-H m2 0.49
04.04.02 CONCRETO ARMADO f'c=175 kg/cm2 m3 0.30
04.04.03 ACERO ESTRUCTURAL DE REFUERZO FY=4200KG/CM2 DE 3/8'' kg 21.78
04.05 TARRAJEO INTERIOR CON IMPERMEABILIZANTE
04.05.01 TARRAJEO INTERIOR CON IMPERMEABILIZANTE m2 71.80
04.06 TARRAJEO EN EXTERIORES
04.06.01 TARRAJEO EN EXTERIORES m2 89.65
04.07 ENCOFRADO Y DESENCOFRADO
04.07.01 ENCOFRADO Y DESENCOFRADO m2 150.40
04.08 CARPINTERIA METALICA
04.08.01 TAPA METALICA ESTRIADA CON MECANISMO DE SEGURIDAD T- und 1.00
04.08.02 TAPA METALICA ESTRIADA CON MECANISMO DE SEGURIDAD T-I und 1.00
04.08.03 ESCALERA DE GATO und 2.00
04.09 INSTALACION DE TUBERIAS Y ACCESORIOS
04.09.01 INSTALACION DE TUBERIAS Y ACCESORIOS glb 1.00
05 LINEA DE ADUCCION
05.01 TRABAJOS PRELIMINARES
05.01.01 TRAZO Y REPLANTEO m2 1,320.00
05.01.02 LIMPIEZA DEL TERRENO MANUAL m2 2,640.00
05.02 MOVIMIENTO DE TIERRAS
05.02.01 EXCAVACION MANUAL EN TIERRA COMPAC. CANAL ENTUBADO m3 591.36
05.02.02 CORTE ROCA SUELTA m3 147.84
05.02.03 REFINE NIVELACION DE FOND. PARA TUB. EN TERRENO DE MA m2 924.00
05.02.04 CAMA DE APOYO PARA CANAL CON TUBERIA PVC CON MATERI m3 92.40
05.02.05 RELLENO COMPACTADO DE ZANJAS CON MATERIALPROPIO m3 369.60
05.03 SUMINISTRO E INSTALACION DE TUBERIAS DE TUBERIA PVC
05.03.01 SUMINISTRO E INSTALACION DE TUBERIA PVC UF ISO 4422 DE Ø m 1,320.00
05.04 INSTALACION DE ACCESORIOS
05.04.01 CODO PVC ISO 4422 UF C-10 DE 90º DE Ø 6'' und 35.00
05.04.02 CODO PVC ISO 4422 UF C-10 DE 45º DE Ø 6'' und 42.00
05.04.03 CODO PVC ISO 4422 UF C-10 DE 22.5º DE Ø 6'' und 81.00
05.05 PRUEBA HIDRAULICA
05.05.01 PRUEBA HIDRAULICA EN TUBERIAS m 1,320.00
06 LINEA DE CONDUCCION
06.01 TRABAJOS PRELIMINARES
06.01.01 TRAZO Y REPLANTEO m2 3,991.00
06.01.02 LIMPIEZA DEL TERRENO MANUAL m2 7,982.00
06.02 MOVIMIENTO DE TIERRAS
06.02.01 EXCAVACION MANUAL EN TIERRA COMPAC. CANAL ENTUBADO m3 1,787.97
06.02.02 CORTE ROCA SUELTA m3 446.99
06.02.03 REFINE NIVELACION DE FOND. PARA TUB. EN TERRENO DE MA m2 2,793.70
06.02.04 CAMA DE APOYO PARA CANAL CON TUBERIA PVC CON MATERI m3 279.37
06.02.05 RELLENO COMPACTADO CON MATERIAL PROPIO m3 1,117.48
06.03 INSTALACION DE TUBERIAS
06.03.01 SUMINISTRO E INSTALACION DE TUBERIA PVC UF ISO 4422 DE 4' m 3,991.00
06.04 INSTALACION DE ACCESORIOS
06.04.01 CODO PVC ISO 4422 UF C-10 DE 22.5º DE Ø 4'' und 195.00
06.04.02 CODO PVC ISO 4422 UF C-10 DE 45º DE Ø 4'' und 208.00
06.04.03 CODO PVC ISO 4422 UF C-10 DE 90º DE Ø 4'' und 182.00
06.04.04 TEE PVC ISO 4422 UF C-10 DE Ø 4'' und 17.00
06.04.05 REDUCCION PVC ISO 4422 UF C-10 DE Ø 4'' A 3'' und 17.00
06.05 PRUEBA HIDRAULICA
06.05.01 PRUEBA HIDRAULICA EN TUBERIAS m 3,991.00
07 LINEA DE DISTRIBUCION PRIMARIA
07.01 TRABAJOS PRELIMINARES
07.01.01 TRAZO Y REPLANTEO m2 10,809.00
07.01.02 LIMPIEZA DEL TERRENO MANUAL m2 21,618.00
07.02 MOVIMIENTO DE TIERRAS
07.02.01 EXCAVACION MANUAL EN TIERRA COMPAC. CANAL ENTUBADO m3 4,053.38
07.02.02 REFINE NIVELACION DE FOND. PARA TUB. EN TERRENO DE MA m2 5,404.50
07.02.03 CAMA DE APOYO PARA CANAL CON TUBERIA PVC CON MATERI m3 1,080.90
07.02.04 RELLENO COMPACTADO DE ZANJAS CON MATERIAL PROPIO m3 2,161.80
07.03 INSTALACION DE TUBERIAS
07.03.01 SUMINISTRO E INSTALACION DE TUBERIA PVC UF ISO 4422 DE 3' m 10,809.00
07.04 INSTALACION DE ACCESORIOS
07.04.01 CODO PVC ISO 4422 UF C-10 DE 90º DE Ø 3'' und 307.00
07.04.02 CODO PVC ISO 4422 UF C-10 DE 45º DE Ø 3'' und 177.00
07.04.03 TEE PVC ISO 4422 UF C-10 DE Ø 3'' und 77.00
07.04.04 REDUCCION PVC ISO 4422 UF C-10 DE Ø 3'' A 2'' und 77.00
07.05 PRUEBA HIDRAULICA
07.05.01 PRUEBA HIDRAULICA EN TUBERIAS m 10,809.00
08 LINEA DE DISTRIBUCION SECUNDARIA
08.01 TRABAJOS PRELIMINARES
08.01.01 TRAZO Y REPLANTEO m2 15,544.53
08.01.02 LIMPIEZA DEL TERRENO MANUAL m2 31,089.05
08.02 MOVIMIENTO DE TIERRAS
08.02.01 EXCAVACION MANUAL EN TIERRA COMPAC. CANAL ENTUBADO m3 4,974.25
08.02.02 REFINE NIVELACION DE FOND. PARA TUB. EN TERRENO DE MA m2 6,217.81
08.02.03 CAMA DE APOYO PARA CANAL CON TUBERIA PVC CON MATERI m3 1,243.56
08.02.04 RELLENO COMPACTADO DE ZANJAS CON MATERIALPROPIO m3 2,487.12
08.03 INSTALACION DE TUBERIAS
08.03.01 SUMINISTRO E INSTALACION DE TUBERIA PVC UF ISO 4422 DE 2' m 15,544.53
08.04 INSTALACION DE ACCESORIOS
08.04.01 CODO PVC ISO 4422 UF C-10 DE 22.5º DE Ø 2'' und 234.00
08.04.02 CODO PVC ISO 4422 UF C-10 DE 45º DE Ø 2'' und 210.00
08.04.03 TEE PVC ISO 4422 UF C-10 DE Ø 2'' und 237.00
08.04.04 REDUCCION PVC ISO 4422 UF C-10 DE Ø 2'' A 3/4'' und 237.00
08.05 PRUEBA HIDRAULICA
08.05.01 PRUEBA HIDRAULICA EN TUBERIAS m 15,544.53
09 CAMARA ROMPE PRESION
09.01 TRABAJOS PRELIMINARES
09.01.01 LIMPIEZA DEL TERRENO MANUAL m2 135.20
09.01.02 TRAZO Y REPLANTEO m2 135.20
09.02 MOVIMIENTO DE TIERRAS
09.02.01 EXCAVACION A MANO EN TERRENO NORMAL m3 16.40
09.03 CONCRETO ARMADO
09.03.01 SOLADO DE CONCRETO DE 4'' MEZCLA 1:12 C-H m2 79.48
09.03.02 CONCRETO f'c=175 kg/cm2 m3 57.92
09.03.03 ENCOFRADO Y DESENCOFRADO m2 685.20
09.03.04 ACERO fy = 4200 kg/cm2 GRADO 60 kg 1,817.09
09.03.05 SUMINISTRO E INSTALACION DE ACCESORIOS glb 1.00
09.03.06 TARRAJEO INTERIOR Y EXTERIORES m2 570.00
09.04 TAPA METALICA
09.04.01 INSTALACION DE TAPA METALICA CON MECANISMO DE SEGURI und 40.00
10 CAJAS DE HIDRANTES
10.01 TRAZO Y REPLANTEO m2 76.32
10.02 EXCAVACION A MANO EN TERRENO NORMAL m3 30.53
10.03 ENCOFRADO Y DESENCOFRADO m2 339.20
10.04 SOLADO DE CONCRETO DE 4'' MEZCLA 1:12 C-H m2 76.32
10.05 CONCRETO SIMPLE f´c = 175 kg/cm2 m3 27.98
10.06 TARRAJEO INTERIOR Y EXTERIORES m2 339.20
10.07 INSTALACION DE ACCESORIOS PVC - H glb 1.00
10.08 INSTALACION DE TAPA METALICA CON MECANISMO DE SEGURIDAD und 212.00
11 CAJAS DE PURGA
11.01 TRAZO Y REPLANTEO m2 36.36
11.02 EXCAVACION A MANO EN TERRENO NORMAL m3 14.54
11.03 ENCOFRADO Y DESENCOFRADO m2 161.60
11.04 SOLADO DE CONCRETO DE 4'' MEZCLA 1:12 C-H m2 36.36
11.05 CONCRETO SIMPLE f´c = 175 kg/cm2 m3 11.72
11.06 TARRAJEO INTERIOR Y EXTERIORES m2 161.60
11.07 INSTALACION DE ACCESORIOS glb 1.00
11.08 INSTALACION DE TAPA METALICA CON MECANISMO DE SEGURIDAD und 101.00
12 CAJAS DE CONTROL
12.01 TRABAJOS PRELIMINARES
12.01.01 TRAZO Y REPLANTEO m2 36.26
12.02 MOVIMIENTO DE TIERRAS
12.02.01 EXCAVACION A MANO EN TERRENO NORMAL m3 25.38
12.03 OBRAS DE CONCRETO
12.03.01 SOLADO DE CONCRETO DE 4'' MEZCLA 1:12 C-H m2 36.26
12.03.02 CONCRETO f'c=175 kg/cm2 m3 14.50
12.03.03 ACERO FY= 4200 kg/cm2 kg 1,630.96
12.03.04 ENCOFRADO Y DESENCOFRADO m2 248.64
12.04 TAPA METALICA
12.04.01 INSTALACION DE TAPA METALICA E=2.5MM 0.40X0.4CON MECA und 74.00
12.05 ACCESORIOS
12.05.01 SUMINISTRO E INSTALACION DE ACCESORIOS DE C-CTRL EN L und 25.00
12.05.02 SUMINISTRO E INSTALACION DE ACCESORIOS DE C-CTRL EN L und 82.00
13 MODULO DE RIEGO POR ASPERSION
13.01 MODULO DE RIEGO POR ASPERSION mod. 180.00
14 INSTALACION DE TUBERIA DE LIMPIA Y REBOSE
14.01 INSTALACION DE TUBERIAS
14.01.01 SUMINISTRO E INSTALACION DE TUBERIA PVC UF ISO 4422 DE 4'' m 2,840.00
15 FLETE
15.01 FLETE TERRESTRE glb 1.00
15.02 FLETE RURAL glb 1.00
16 CAPACITACION
16.01 CAPACITACION EN MANEJO DE RECURSOS HIDRICOS cap. 2.00
16.02 CAPACITACION EN OPERACION Y MANTENIMIENTO cap. 2.00
17 IMPLEMENTACION DE LA JUNTA DE USUARIOS
17.01 IMPLEMENTACION DE LA JUNTA DE USUARIOS glb 1.00
18 MITIGACION AMBIENTAL
18.01 PROGRAMA DE PREVENCION - MITIGACION ser 3.00
18.02 PROGRAMA DE VEGETACION Y REVEGETACION glb 1.00
19 CERCO PERIMETRCO (2.00 UND)
19.01 OBRAS PRELIMINARES
19.01.01 LIMPIEZA DEL TERRENO MANUAL m2 38.00
19.01.02 TRAZO Y REPLANTEO m2 38.00
19.02 MOVIMIENTO DE TIERRAS
19.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 6.05
19.02.02 ELIMINACION DE MATERIAL EXCEDENTE m3 6.05
19.03 OBRAS DE CONCRETO SIMPLE
19.03.01 CONCRETO f'c=175 kg/cm2 m3 6.76
19.03.02 ENCOFRADO Y DESENCOFRADO m2 35.04
19.04 CARPINTERIA METALICA
19.04.01 CERCO CON MALLA CUADRADA m2 304.00
19.04.02 PUERTA METALICA SEGUN DISEÑO und 2.00
19.04.03 TUBO DE Fº GALVANIZADO DE 2 1/2'' m 156.60
19.04.04 TUBO DE Fº GALVANIZADO DE 1 1/2'' m 540.00
COSTO DIRECTO
GASTOS GENERALES 10.00%
UTILIDADES 7.00%

SUB TOTAL
IGV
PLAN COVID

PRESUPUESTO TOTAL DE OBRA


SETIEMBRE OCTUBRE

PRECIO S/ PARCIAL S/ METRADO PARCIAL S/ METRADO PARCIAL S/

31,508.24
1,256.15 1,256.15 - -
900.00 5,400.00 0.50 450.00 0.50 450.00
8,284.03 24,852.09 0.25 2,071.01 0.50 4,142.02
240,092.90 - -
74,667.24 - -
5,600.13 - -
3.06 403.92 132.00 403.92 -
4.43 498.20 112.46 498.20 -
61.19 2,973.83 - -
136.84 1,724.18 - -
6,708.07 - -
39.33 2,943.46 - -
142.02 2,715.42 - -
38.09 610.58 - -
22.94 438.61 - -
6,752.12 - -
32.97 2,357.03 - -
459.32 3,706.71 - -
53.38 222.06 - -
85.72 466.32 - -
36,250.67 - -
445.28 20,576.39 - -
5.68 7,802.33 - -
53.38 7,871.95 - -
12,660.65 - -
80.08 12,660.65 - -
704.23 - -
53.42 555.03 - -
29.84 149.20 - -
2,860.00 - -
510.00 1,020.00 - -
230.00 690.00 - -
295.00 590.00 - -
268.00 268.00 - -
292.00 292.00 - -
3,131.37 - -
139.30 2,064.43 - -
31.51 456.90 - -
305.02 610.04 - -
81,166.50 - -
5,782.94 - -
3.06 486.17 - -
4.43 598.76 - -
61.19 2,973.83 - -
136.84 1,724.18 - -
10,215.72 - -
39.33 2,943.46 - -
142.02 5,608.37 - -
38.09 757.99 - -
22.94 905.90 - -
6,897.84 - -
32.97 2,502.75 - -
459.32 3,706.71 - -
53.38 222.06 - -
85.72 466.32 - -
38,089.73 - -
445.28 21,778.64 - -
5.68 8,258.72 - -
53.38 8,052.37 - -
13,484.67 - -
80.08 13,484.67 - -
704.23 - -
53.42 555.03 - -
29.84 149.20 - -
2,860.00 - -
510.00 1,020.00 - -
230.00 690.00 - -
295.00 590.00 - -
268.00 268.00 - -
292.00 292.00 - -
3,131.37 - -
139.30 2,064.43 - -
31.51 456.90 - -
305.02 610.04 - -
84,259.16 - -
5,707.18 - -
3.06 460.47 - -
4.43 548.70 - -
61.19 2,973.83 - -
136.84 1,724.18 - -
8,000.54 - -
39.33 2,943.46 - -
142.02 3,742.23 - -
38.09 710.38 - -
22.94 604.47 - -
6,777.17 - -
32.97 2,382.08 - -
459.32 3,706.71 - -
53.38 222.06 - -
85.72 466.32 - -
43,449.05 - -
445.28 20,914.80 - -
5.68 8,021.30 - -
53.38 14,512.95 - -
13,629.62 - -
80.08 13,629.62 - -
704.23 - -
53.42 555.03 - -
29.84 149.20 - -
2,860.00 - -
510.00 1,020.00 - -
230.00 690.00 - -
295.00 590.00 - -
268.00 268.00 - -
292.00 292.00 - -
3,131.37 - -
139.30 2,064.43 - -
31.51 456.90 - -
305.02 610.04 - -
587,952.53 - -
3,647.87 - -
3.06 1,836.00 - -
4.43 1,811.87 - -
131,858.25 - -
39.33 34,624.56 - -
142.02 75,017.80 - -
4.59 2,020.43 - -
22.94 20,195.46 - -
14,578.67 - -
32.97 14,578.67 - -
380,821.09 - -
504.12 286,824.12 - -
53.38 21,000.23 - -
5.97 72,996.74 - -
41,000.16 - -
47.83 34,124.31 - -
29.13 6,875.85 - -
1,168.00 - -
292.00 1,168.00 - -
4,875.88 - -
2,437.94 4,875.88 - -
10,002.61 - -
285.00 570.00 - -
1,405.45 2,810.90 - -
876.00 5,256.00 - -
18.90 1,365.71 - -
195,125.74 - -
203.73 - -
3.06 83.23 27.20 83.23 -
4.43 120.50 27.20 120.50 -
18,227.77 - -
137.68 12,952.93 94.08 12,952.93 75.60 10,408.61
142.02 4,226.52 29.76 4,226.52 8.60 1,221.37
4.59 123.38 26.88 123.38 -
22.94 924.94 40.32 924.94 167.72 3,847.50
158,160.60 - -
32.97 886.23 - 26.88 886.23
561.17 17,564.62 - 12.00 6,734.04
64.38 139,709.75 - 1,205.60 77,616.53
291.97 - -
32.97 16.16 - -
485.93 145.78 - -
5.97 130.03 - -
3,434.19 - -
47.83 3,434.19 - -
2,611.50 - -
29.13 2,611.50 - -
8,028.35 - -
53.38 8,028.35 - 12.72 678.99
2,327.00 - -
292.00 292.00 - -
235.00 235.00 - -
900.00 1,800.00 - -
1,840.63 - -
1,840.63 1,840.63 - -
229,404.29 - -
13,926.00 - -
4.43 5,847.60 200.00 886.00 -
3.06 8,078.40 400.00 1,224.00 -
45,847.59 - -
34.42 20,354.61 95.10 3,273.34 -
137.68 20,354.61 15.20 2,092.74 -
2.75 2,541.00 79.10 217.53 -
14.59 1,348.12 7.91 115.41 -
3.38 1,249.25 31.64 106.94
129,056.40 - -
97.77 129,056.40 113.00 11,048.01 -
36,601.10 - -
253.45 8,870.75 - 11.00 2,787.95
225.45 9,468.90 - 14.00 3,156.30
225.45 18,261.45 - 27.00 6,087.15
3,973.20 - -
3.01 3,973.20 - 113.00 340.13
474,163.41 - -
42,105.05 - -
4.43 17,680.13 640.00 2,835.20 -
3.06 24,424.92 1,280.00 3,916.80 -
203,220.80 - -
34.42 61,541.93 336.00 11,565.12 105.00 3,614.10
137.68 61,541.58 22.40 3,084.03 7.00 963.76
2.75 7,682.68 399.00 1,097.25 -
14.59 4,076.01 39.90 582.14 -
61.19 68,378.60 159.60 9,765.92
152,057.10 - -
38.10 152,057.10 490.00 18,669.00 -
64,767.55 - -
135.45 26,412.75 - 15.00 2,031.75
150.45 31,293.60 - 60.00 9,027.00
25.45 4,631.90 - 50.00 1,272.50
81.45 1,384.65 - -
61.45 1,044.65 - -
12,012.91 - -
3.01 12,012.91 - 490.00 1,474.90
900,987.61 - -
114,034.95 - -
4.43 47,883.87 600.00 2,658.00 -
3.06 66,151.08 1,200.00 3,672.00 -
177,456.93 - -
34.42 139,517.34 210.00 7,228.20 105.00 3,614.10
2.75 14,862.38 300.00 825.00 150.00 412.50
14.59 15,770.33 60.00 875.40 30.00 437.70
3.38 7,306.88 - 180.00 608.40
551,907.54 - -
51.06 551,907.54 600.00 30,636.00 300.00 15,318.00
25,053.10 - -
40.45 12,418.15 - 90.00 3,640.50
34.45 6,097.65 - 16.00 551.20
26.45 2,036.65 -
58.45 4,500.65 - -
32,535.09 - -
3.01 32,535.09 - 900.00 2,709.00
960,863.19 - -
163,994.76 - -
4.43 68,862.27 - 900.00 3,987.00
3.06 95,132.49 - 1,800.00 5,508.00
214,862.68 - -
34.42 171,213.69 - 288.00 9,912.96
2.75 17,098.98 - 360.00 990.00
14.59 18,143.54 - 72.00 1,050.48
3.38 8,406.47 - 144.00 486.72
515,456.61 - -
33.16 515,456.61 - 900.00 29,844.00
19,760.10 - -
34.45 8,061.30 - 50.00 1,722.50
17.45 3,664.50 - 50.00 872.50
17.45 4,135.65 - -
16.45 3,898.65 - -
46,789.04 - -
3.01 46,789.04 - 900.00 2,709.00
171,804.06 - -
1,012.65 - -
3.06 413.71 - 13.52 41.37
4.43 598.94 - 13.52 59.89
752.76 - -
45.90 752.76 - -
151,146.65 - -
32.97 2,620.46 - -
456.39 26,434.11 - -
53.38 36,575.98 - -
6.84 12,428.90 - -
41,161.50 41,161.50 - -
56.01 31,925.70 - -
18,892.00 - -
472.30 18,892.00 - - 44 und
124,703.99 - -
4.43 338.10 - -
45.90 1,401.33 - -
53.38 18,106.50 - -
32.97 2,516.27 - -
390.52 10,926.75 - -
56.01 18,998.59 - -
14,688.85 14,688.85 - -
272.30 57,727.60 - - 262 und
101,995.24 - -
4.43 161.07 - -
45.90 667.39 - -
53.38 8,626.21 - -
32.97 1,198.79 - -
390.52 4,576.89 - -
56.01 9,051.22 - -
51,928.37 51,928.37 - -
255.30 25,785.30 - -
95,051.10 - -
160.63 - -
4.43 160.63 - -
1,164.94 - -
45.90 1,164.94 - -
30,512.61 - -
32.97 1,195.49 - -
501.39 7,270.16 - -
5.38 8,774.56 - -
53.38 13,272.40 - -
19,854.20 - -
268.30 19,854.20 - -
43,358.72 - -
474.96 11,874.00 - -
383.96 31,484.72 - -
307,310.40 - -
1,707.28 307,310.40 - -
292,832.40 - -
292,832.40 - -
103.11 292,832.40 - -
563,536.40 - -
100,764.50 100,764.50 0.10 10,076.45 0.10 10,076.45
462,771.90 462,771.90 0.10 46,277.19 0.10 46,277.19
33,190.44 - -
11,063.48 22,126.96 - -
5,531.74 11,063.48 - -
3,500.00 - -
3,500.00 3,500.00 - -
24,373.04 - -
1,700.00 5,100.00 - -
19,273.04 19,273.04 - -
58,986.52 - -
284.62 - -
3.06 116.28 - -
4.43 168.34 - -
376.74 - -
39.33 237.95 - -
22.94 138.79 - -
4,955.64 - -
456.39 3,085.20 - -
53.38 1,870.44 - -
53,369.52 - -
81.13 24,663.52 - -
988.00 1,976.00 - -
50.00 7,830.00 - -
35.00 18,900.00 - -
5,397,381.50 184,709.43 287,443.16
539,738.15 18,470.94 28,744.32
377,816.71 12,929.66 20,121.02
------------------------
6,314,936.36 216,110.03 336,308.50
1,136,688.54 38,899.81 60,535.53
118,722.00 29,680.50 7,420.13
==============
7,570,346.90 284,690.33 404,264.15
Metrado Precio Parcial
8,284.03

1 8,284.03 8284.03
81,166.50

81,166.50
5782.94
158.88 3.06 486.17
135.16 4.43 598.76
48.60 61.19 2973.83
12.60 136.84 1724.18
10,215.72
74.84 39.33 2943.46
39.49 142.02 5608.37
19.90 38.09 757.99
39.49 22.94 905.9
6897.84
75.91 32.97 2502.75
8.07 459.32 3706.71
4.16 53.38 222.06
5.44 85.72 466.32
38,089.73
48.91 445.28 21778.64
1,454.00 5.68 8258.72
150.85 53.38 8052.37
13,484.67
168.39 80.08 13484.67
704.23
10.39 53.42 555.03
5.00 29.84 149.2
2860
2.00 510.00 1020
3.00 230.00 690
2.00 295.00 590
1.00 268.00 268
1.00 292.00 292
3,131.37
14.82 139.30 2064.43
14.50 31.51 456.9
2.00 305.02 610.04
293,976.78
1,823.94
300.00 3.06 918.00
204.50 4.43 905.94
65,929.12
440.18 39.33 17,312.28
264.11 142.02 37,508.90
220.09 4.59 1,010.21
440.18 22.94 10,097.73
7,289.34
221.09 32.97 7,289.34
190,410.81
284.48 504.12 143,412.06
196.71 53.38 10,500.38
6,113.63 5.97 36,498.37
20,500.32
356.73 47.83 17,062.40
118.02 29.13 3,437.92
584.00
2.00 292.00 584.00
2,437.94
1.00 2,437.94 2,437.94
5,001.31
1.00 285.00 285.00
1.00 1,405.45 1,405.45
3.00 876.00 2,628.00
36.13 18.90 682.86
99,669.22
6,330.00
600.00 4.43 2,658.00
1,200.00 3.06 3,672.00
20,839.82
268.80 34.42 9,252.10
67.20 137.68 9,252.10
420.00 2.75 1,155.00
42.00 14.59 612.78
168.00 3.38 567.84
58,662.00
600.00 97.77 58,662.00
12,031.40
11.00 253.45 2,787.95
14.00 225.45 3,156.30
27.00 225.45 6,087.15
1,806.00
600.00 3.01 1,806.00
76,039.38
5,602.05
531.00 4.43 2,352.33
1,062.00 3.06 3,249.72
27,038.22
237.89 34.42 8,188.17
59.47 137.68 8,187.83
371.70 2.75 1,022.18
37.17 14.59 542.31
148.68 61.19 9,097.73
20,231.10
531.00 38.10 20,231.10
21,569.70
65.00 135.45 8,804.25
69.00 150.45 10,381.05
60.00 25.45 1,527.00
6.00 81.45 488.70
6.00 61.45 368.70
1,598.31
531.00 3.01 1,598.31
494,590.85
63,300.00
6,000.00 4.43 26,580.00
12,000.00 3.06 36,720.00
98,505.00
2,250.00 34.42 77,445.00
3,000.00 2.75 8,250.00
600.00 14.59 8,754.00
1,200.00 3.38 4,056.00
306,360.00
6,000.00 51.06 306,360.00
8,365.85
102.00 40.45 4,125.90
59.00 34.45 2,032.55
26.00 26.45 687.70
26.00 58.45 1,519.70
18,060.00
6,000.00 3.01 18,060.00
37,971.38
6,963.00
660.00 4.43 2,923.80
1,320.00 3.06 4,039.20
9,122.78
211.20 34.42 7,269.50
264.00 2.75 726.00
52.80 14.59 770.35
105.60 3.38 356.93
21,885.60
660.00 33.16 21,885.60

98,133.23
632.91
84.50 3.06 258.57
84.50 4.43 374.34
470.48
10.25 45.90 470.48
85,222.34
51.25 32.97 1,689.71
15.38 456.39 7,019.28
428.25 53.38 22,859.99
1,135.68 6.84 7,768.05
0.63 41,161.50 25,931.75
356.25 56.01 19,953.56
11,807.50
25.00 472.30 11,807.50
47,638.58
2.88 4.43 12.76
1.15 45.90 52.79
12.8 53.38 683.26
2.88 32.97 94.95
1.06 390.52 413.95
12.8 56.01 716.93
0.05 14,688.85 734.44
165 272.30 44,929.50
4,577.83
1.44 4.43 6.38
0.58 45.90 26.62
6.4 53.38 341.63
1.44 32.97 47.48
0.46 390.52 179.64
6.4 56.01 358.46
0.05 51,928.37 2,596.42
4 255.30 1,021.20
66,668.43
132.41
29.89 4.43 132.41
960.23
20.92 45.90 960.23
25,150.93
29.89 32.97 985.47
11.95 501.39 5,991.61
1344.44 5.38 7,233.09
204.96 53.38 10,940.76
16,366.30
61 268.30 16,366.30
24,058.56
7 474.96 3,324.72
54 383.96 20,733.84

281,768.20
0.5 100,764.50 50382.25
0.50 462,771.90 231385.95
1,590,484.41
-
-
------------------------
1,590,484.41
286,287.19
29,680.50
==============
1,906,452.10

25.18%
ITEM DESCRIPCIÓN UND METRADO PRECIO S/

01 OBRAS PROVISIONALES
01.01 CARTEL DE IDENTIFICACION DE OBRA 3.60X2.40 M glb 1.00 1,256.15
01.02 ALQUILER DE ALMACEN INCLUIDO OFICINA mes 6.00 900.00
01.03 CAMPAMENTO PROVISIONAL DE OBRA CAMP. 3.00 8,284.03
02 CAPTACION - BOCATOMA (03 SECTORES)
02.01 CAPTACION - DESARENADOR (SECTOR MALA NOCHE)
02.01.01 TRABAJOS PRELIMINARES
02.01.01.01 LIMPIEZA DEL TERRENO MANUAL m2 132.00 3.06
02.01.01.02 TRAZO Y REPLANTEO m2 112.46 4.43
02.01.01.03 DESVIO PROVISIONAL DE AGUAS m3 48.60 61.19
02.01.01.04 EXCAVACION BAJO AGUA m3 12.60 136.84
02.01.02 MOVIMIENTO DE TIERRAS
02.01.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 74.84 39.33
02.01.02.02 CORTE ROCA FIJA m3 19.12 142.02
02.01.02.03 RELLENO CON MATERIAL PROPIO m3 16.03 38.09
02.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE DIST. m3 19.12 22.94
02.01.03 OBRAS DE CONCRETO SIMPLE
02.01.03.01 SOLADO DE CONCRETO DE 4'' MEZCLA 1:12 C-H m2 71.49 32.97
02.01.03.02 CONCRETO f'c=175 kg/cm2 +30% PM EN BARRA m3 8.07 459.32
02.01.03.03 ENCOFRADO Y DESENCOFRADO EN ESTRUCTU m2 4.16 53.38
02.01.03.04 MAMPOSTERIA E=0.40 ASENTADO EN FC m3 5.44 85.72
02.01.04 OBRAS DE CONCRETO ARMADO
02.01.04.01 CONCRETO f´c = 210 kg/cm2 MUROS, DESAREN m3 46.21 445.28
02.01.04.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 6 m3 1,373.65 5.68
02.01.04.03 ENCOFRADO Y DESENCOFRADO EN ESTRUCTU m2 147.47 53.38
02.01.05 REVOQUES ENLUCIDOS Y MOLDURAS
02.01.05.01 TARRAJEO CON IMPERMEABILIZANTES EN CAP m2 158.10 80.08
02.01.06 JUNTAS Y ENSAYOS
02.01.06.01 JUNTAS WATER STOP E=6.00'' m 10.39 53.42
02.01.06.02 ENSAYO DE RESISTENCIA DE COMPRENSION und 5.00 29.84
02.01.07 CARPINTERIA METALICA
02.01.07.01 SUMINISTRO Y COLOCACION DE COMPUERTA MEund 2.00 510.00
02.01.07.02 SUMINISTRO Y COLOCACION DE COMPUERTA MEund 3.00 230.00
02.01.07.03 REJILLA DE PROTECCION Fº LISO 1/4'' COCADAS 1und 2.00 295.00
02.01.07.04 COMPUERTA DE ACERO TIPO TARJETA 0.40X0. und 1.00 268.00
02.01.07.05 REJILLA DE CAPTACION DE FONDO und 1.00 292.00
02.01.08 VARIOS
02.01.08.01 ESCOLLERA E=0.30 (RELLENO CON PIEDRA G m2 14.82 139.30
02.01.08.02 TUBERIA DE DRENAJE PVC SAL DE 4'' m 14.50 31.51
02.01.08.03 TAPA DE CONCRETO und 2.00 305.02
02.02 CAPTACION - DESARENADOR (SECTOR GOCHOPATA)
02.02.01 TRABAJOS PRELIMINARES
02.02.01.01 LIMPIEZA DEL TERRENO MANUAL m2 158.88 3.06
02.02.01.02 TRAZO Y REPLANTEO m2 135.16 4.43
02.02.01.03 DESVIO PROVISIONAL DE AGUAS m3 48.60 61.19
02.02.01.04 EXCAVACION BAJO AGUA m3 12.60 136.84
02.02.02 MOVIMIENTO DE TIERRAS
02.02.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 74.84 39.33
02.02.02.02 CORTE ROCA FIJA m3 39.49 142.02
02.02.02.03 RELLENO CON MATERIAL PROPIO m3 19.90 38.09
02.02.02.04 ELIMINACION DE MATERIAL EXCEDENTE DIST. m3 39.49 22.94
02.02.03 OBRAS DE CONCRETO SIMPLE
02.02.03.01 SOLADO DE CONCRETO DE 4'' MEZCLA 1:12 C-H m2 75.91 32.97
02.02.03.02 CONCRETO f'c=175 kg/cm2 +30% PM EN BARRA m3 8.07 459.32
02.02.03.03 ENCOFRADO Y DESENCOFRADO EN ESTRUCTUR m2 4.16 53.38
02.02.03.04 MAMPOSTERIA E=0.40 ASENTADO EN FC m3 5.44 85.72
02.02.04 OBRAS DE CONCRETO ARMADO
02.02.04.01 CONCRETO f´c = 210 kg/cm2 MUROS, DESAREN m3 48.91 445.28
02.02.04.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 6 m3 1,454.00 5.68
02.02.04.03 ENCOFRADO Y DESENCOFRADO EN ESTRUCTU m2 150.85 53.38
02.02.05 REVOQUES ENLUCIDOS Y MOLDURAS
02.02.05.01 TARRAJEO CON IMPERMEABILIZANTES EN CAP m2 168.39 80.08
02.02.06 JUNTAS Y ENSAYOS
02.02.06.01 JUNTAS WATER STOP E=6.00'' m 10.39 53.42
02.02.06.02 ENSAYO DE RESISTENCIA DE COMPRENSION und 5.00 29.84
02.02.07 CARPINTERIA METALICA
02.02.07.01 SUMINISTRO Y COLOCACION DE COMPUERTA MEund 2.00 510.00
02.02.07.02 SUMINISTRO Y COLOCACION DE COMPUERTA MEund 3.00 230.00
02.02.07.03 REJILLA DE PROTECCION Fº LISO 1/4'' COCADAS 1und 2.00 295.00
02.02.07.04 COMPUERTA DE ACERO TIPO TARJETA 0.40X0.4 und 1.00 268.00
02.02.07.05 REJILLA DE CAPTACION DE FONDO und 1.00 292.00
02.02.08 VARIOS
02.02.08.01 ESCOLLERA E=0.30 (RELLENO CON PIEDRA G m2 14.82 139.30
02.02.08.02 TUBERIA DE DRENAJE PVC SAL DE 4'' m 14.50 31.51
02.02.08.03 TAPA DE CONCRETO und 2.00 305.02
02.03 CAPTACION - DESARENADOR (SECTOR ACHIRA)
02.03.01 TRABAJOS PRELIMINARES
02.03.01.01 LIMPIEZA DEL TERRENO MANUAL m2 150.48 3.06
02.03.01.02 TRAZO Y REPLANTEO m2 123.86 4.43
02.03.01.03 DESVIO PROVISIONAL DE AGUAS m3 48.60 61.19
02.03.01.04 EXCAVACION BAJO AGUA m3 12.60 136.84
02.03.02 MOVIMIENTO DE TIERRAS
02.03.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 74.84 39.33
02.03.02.02 CORTE ROCA FIJA m3 26.35 142.02
02.03.02.03 RELLENO CON MATERIAL PROPIO m3 18.65 38.09
02.03.02.04 ELIMINACION DE MATERIAL EXCEDENTE DIST. m3 26.35 22.94
02.03.03 OBRAS DE CONCRETO SIMPLE
02.03.03.01 SOLADO DE CONCRETO DE 4'' MEZCLA 1:12 C-H m2 72.25 32.97
02.03.03.02 CONCRETO f'c=175 kg/cm2 +30% PM EN BARRA m3 8.07 459.32
02.03.03.03 ENCOFRADO Y DESENCOFRADO EN ESTRUCTUR m2 4.16 53.38
02.03.03.04 MAMPOSTERIA E=0.40 ASENTADO EN FC m3 5.44 85.72
02.03.04 OBRAS DE CONCRETO ARMADO
02.03.04.01 CONCRETO f´c = 210 kg/cm2 MUROS, DESAREN m3 46.97 445.28
02.03.04.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 6 m3 1,412.20 5.68
02.03.04.03 ENCOFRADO Y DESENCOFRADO EN ESTRUCTU m2 271.88 53.38
02.03.05 REVOQUES ENLUCIDOS Y MOLDURAS
02.03.05.01 TARRAJEO CON IMPERMEABILIZANTES EN CAP m2 170.20 80.08
02.03.06 JUNTAS ENSAYOS
02.03.06.01 JUNTAS WATER STOP E=6.00'' m 10.39 53.42
02.03.06.02 ENSAYO DE RESISTENCIA DE COMPRENSION und 5.00 29.84
02.03.07 CARPINTERIA METALICA
02.03.07.01 SUMINISTRO Y COLOCACION DE COMPUERTA MEund 2.00 510.00
02.03.07.02 SUMINISTRO Y COLOCACION DE COMPUERTA MEund 3.00 230.00
02.03.07.03 REJILLA DE PROTECCION Fº LISO 1/4'' COCADAS 1und 2.00 295.00
02.03.07.04 COMPUERTA DE ACERO TIPO TARJETA 0.40X0.6 und 1.00 268.00
02.03.07.05 REJILLA DE CAPTACION DE FONDO und 1.00 292.00
02.03.08 VARIOS
02.03.08.01 ESCOLLERA E=0.30 (RELLENO CON PIEDRA G m2 14.82 139.30
02.03.08.02 TUBERIA DE DRENAJE PVC SAL DE 4'' m 14.50 31.51
02.03.08.03 TAPA DE CONCRETO und 2.00 305.02
03 RESERVORIO DE 550 M3 (02 UND.)
03.01 TRABAJOS PRELIMINARES
03.01.01 LIMPIEZA DEL TERRENO MANUAL m2 600.00 3.06
03.01.02 TRAZO Y REPLANTEO m2 409.00 4.43
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 880.36 39.33
03.02.02 CORTE ROCA FIJA m3 528.22 142.02
03.02.03 REFINE NIVELACION Y COMPACTACION m2 440.18 4.59
03.02.04 ELIMINACION DE MATERIAL EXCEDENTE m3 880.36 22.94
03.03 OBRAS DE CONCRETO SIMPLE
03.03.01 SOLADO DE CONCRETO DE 4'' MEZCLA 1:12 C-H m2 442.18 32.97
03.04 OBRAS DE CONCRETO ARMADO
03.04.01 CONCRETO f'c=210 kg/cm2 m2 568.96 504.12
03.04.02 ENCOFRADO Y DESENCOFRADO EN LOSAS Y MUR m2 393.41 53.38
03.04.03 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 12,227.26 5.97
03.05 REVOQUES ENLUCIDOS Y MOLDURAS
03.05.01 TARRAJEO INTERIOR CON IMPERMEABILIZANTE m2 713.45 47.83
03.05.02 TARRAJEO EN EXTERIORES m2 236.04 29.13
03.06 CARPINTERIA METALICA
03.06.01 TAPA METALICA T-1 CON MECANISMO DE SEGURI und 4.00 292.00
03.07 INSTALACION DE ACCESORIOS
03.07.01 INSTALACION DE ACCESORIOS PVC glb 2.00 2,437.94
03.08 VARIOS
03.08.01 CANASTILLA PVC DE 4'' und 2.00 285.00
03.08.02 VALVULA COMPUERTA DE BRONCE DE 6'' und 2.00 1,405.45
03.08.03 VALVUA COMPUERTA DE BRONCE DE 4'' und 6.00 876.00
03.08.04 WATER STOP DE 6 " PROVISION E INSTALACION und 72.26 18.90
04 RESERVORIO DE 57 M3 (01 UND.)
04.01 TRABAJOS PRELIMINARES
04.01.01 LIMPIEZA DEL TERRENO MANUAL m2 27.20 3.06
04.01.02 TRAZO Y REPLANTEO m2 27.20 4.43
04.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION MANUAL EN ROCA SUELTA m3 94.08 137.68
04.02.02 CORTE ROCA FIJA m3 29.76 142.02
04.02.03 REFINE NIVELACION Y COMPACTACION m3 26.88 4.59
04.02.04 ELIMINACION DE MATERIAL EXCEDENTE DIST./PR m3 40.32 22.94
04.03 OBRAS DE CONCRETO EN RESERVORIO
04.03.01 SOLADO DE CONCRETO DE 4'' MEZCLA 1:12 C-H m2 26.88 32.97
04.03.02 CONCRETO ARMADO f'c=210 kg/cm2 m3 31.30 561.17
04.03.03 ACERO ESTRUCTURAL DE REFUERZO FY=4200KG/CMkg 2,170.08 64.38
04.04 OBRAS DE CONCRETO EN CAJA DE CONTROL DE RESERVORIO
04.04.01 SOLADO DE CONCRETO DE 4'' MEZCLA 1:12 C-H m2 0.49 32.97
04.04.02 CONCRETO ARMADO f'c=175 kg/cm2 m3 0.30 485.93
04.04.03 ACERO ESTRUCTURAL DE REFUERZO FY=4200KG/CMkg 21.78 5.97
04.05 TARRAJEO INTERIOR CON IMPERMEABILIZANTE
04.05.01 TARRAJEO INTERIOR CON IMPERMEABILIZANTE m2 71.80 47.83
04.06 TARRAJEO EN EXTERIORES
04.06.01 TARRAJEO EN EXTERIORES m2 89.65 29.13
04.07 ENCOFRADO Y DESENCOFRADO
04.07.01 ENCOFRADO Y DESENCOFRADO m2 150.40 53.38
04.08 CARPINTERIA METALICA
04.08.01 TAPA METALICA ESTRIADA CON MECANISMO DE SE und 1.00 292.00
04.08.02 TAPA METALICA ESTRIADA CON MECANISMO DE SE und 1.00 235.00
04.08.03 ESCALERA DE GATO und 2.00 900.00
04.09 INSTALACION DE TUBERIAS Y ACCESORIOS
04.09.01 INSTALACION DE TUBERIAS Y ACCESORIOS glb 1.00 1,840.63
05 LINEA DE ADUCCION
05.01 TRABAJOS PRELIMINARES
05.01.01 TRAZO Y REPLANTEO m2 1,320.00 4.43
05.01.02 LIMPIEZA DEL TERRENO MANUAL m2 2,640.00 3.06
05.02 MOVIMIENTO DE TIERRAS
05.02.01 EXCAVACION MANUAL EN TIERRA COMPAC. CANA m3 591.36 34.42
05.02.02 CORTE ROCA SUELTA m3 147.84 137.68
05.02.03 REFINE NIVELACION DE FOND. PARA TUB. EN TE m2 924.00 2.75
05.02.04 CAMA DE APOYO PARA CANAL CON TUBERIA PVC m3 92.40 14.59
05.02.05 RELLENO COMPACTADO DE ZANJAS CON MATERI m3 369.60 3.38
05.03 SUMINISTRO E INSTALACION DE TUBERIAS DE TUBERIA PVC
05.03.01 SUMINISTRO E INSTALACION DE TUBERIA PVC UF IS m 1,320.00 97.77
05.04 INSTALACION DE ACCESORIOS
05.04.01 CODO PVC ISO 4422 UF C-10 DE 90º DE Ø 6'' und 35.00 253.45
05.04.02 CODO PVC ISO 4422 UF C-10 DE 45º DE Ø 6'' und 42.00 225.45
05.04.03 CODO PVC ISO 4422 UF C-10 DE 22.5º DE Ø 6'' und 81.00 225.45
05.05 PRUEBA HIDRAULICA
05.05.01 PRUEBA HIDRAULICA EN TUBERIAS m 1,320.00 3.01
06 LINEA DE CONDUCCION
06.01 TRABAJOS PRELIMINARES
06.01.01 TRAZO Y REPLANTEO m2 3,991.00 4.43
06.01.02 LIMPIEZA DEL TERRENO MANUAL m2 7,982.00 3.06
06.02 MOVIMIENTO DE TIERRAS
06.02.01 EXCAVACION MANUAL EN TIERRA COMPAC. CANA m3 1,787.97 34.42
06.02.02 CORTE ROCA SUELTA m3 446.99 137.68
06.02.03 REFINE NIVELACION DE FOND. PARA TUB. EN TE m2 2,793.70 2.75
06.02.04 CAMA DE APOYO PARA CANAL CON TUBERIA PVC m3 279.37 14.59
06.02.05 RELLENO COMPACTADO CON MATERIAL PROPIO m3 1,117.48 61.19
06.03 INSTALACION DE TUBERIAS
06.03.01 SUMINISTRO E INSTALACION DE TUBERIA PVC UF IS m 3,991.00 38.10
06.04 INSTALACION DE ACCESORIOS
06.04.01 CODO PVC ISO 4422 UF C-10 DE 22.5º DE Ø 4'' und 195.00 135.45
06.04.02 CODO PVC ISO 4422 UF C-10 DE 45º DE Ø 4'' und 208.00 150.45
06.04.03 CODO PVC ISO 4422 UF C-10 DE 90º DE Ø 4'' und 182.00 25.45
06.04.04 TEE PVC ISO 4422 UF C-10 DE Ø 4'' und 17.00 81.45
06.04.05 REDUCCION PVC ISO 4422 UF C-10 DE Ø 4'' A 3'' und 17.00 61.45
06.05 PRUEBA HIDRAULICA
06.05.01 PRUEBA HIDRAULICA EN TUBERIAS m 3,991.00 3.01
07 LINEA DE DISTRIBUCION PRIMARIA
07.01 TRABAJOS PRELIMINARES
07.01.01 TRAZO Y REPLANTEO m2 10,809.00 4.43
07.01.02 LIMPIEZA DEL TERRENO MANUAL m2 21,618.00 3.06
07.02 MOVIMIENTO DE TIERRAS
07.02.01 EXCAVACION MANUAL EN TIERRA COMPAC. CANA m3 4,053.38 34.42
07.02.02 REFINE NIVELACION DE FOND. PARA TUB. EN TE m2 5,404.50 2.75
07.02.03 CAMA DE APOYO PARA CANAL CON TUBERIA PVC m3 1,080.90 14.59
07.02.04 RELLENO COMPACTADO DE ZANJAS CON MATERIA m3 2,161.80 3.38
07.03 INSTALACION DE TUBERIAS
07.03.01 SUMINISTRO E INSTALACION DE TUBERIA PVC UF IS m 10,809.00 51.06
07.04 INSTALACION DE ACCESORIOS
07.04.01 CODO PVC ISO 4422 UF C-10 DE 90º DE Ø 3'' und 307.00 40.45
07.04.02 CODO PVC ISO 4422 UF C-10 DE 45º DE Ø 3'' und 177.00 34.45
07.04.03 TEE PVC ISO 4422 UF C-10 DE Ø 3'' und 77.00 26.45
07.04.04 REDUCCION PVC ISO 4422 UF C-10 DE Ø 3'' A 2'' und 77.00 58.45
07.05 PRUEBA HIDRAULICA
07.05.01 PRUEBA HIDRAULICA EN TUBERIAS m 10,809.00 3.01
08 LINEA DE DISTRIBUCION SECUNDARIA
08.01 TRABAJOS PRELIMINARES
08.01.01 TRAZO Y REPLANTEO m2 15,544.53 4.43
08.01.02 LIMPIEZA DEL TERRENO MANUAL m2 31,089.05 3.06
08.02 MOVIMIENTO DE TIERRAS
08.02.01 EXCAVACION MANUAL EN TIERRA COMPAC. CANA m3 4,974.25 34.42
08.02.02 REFINE NIVELACION DE FOND. PARA TUB. EN TE m2 6,217.81 2.75
08.02.03 CAMA DE APOYO PARA CANAL CON TUBERIA PVC m3 1,243.56 14.59
08.02.04 RELLENO COMPACTADO DE ZANJAS CON MATERI m3 2,487.12 3.38
08.03 INSTALACION DE TUBERIAS
08.03.01 SUMINISTRO E INSTALACION DE TUBERIA PVC UF IS m 15,544.53 33.16
08.04 INSTALACION DE ACCESORIOS
08.04.01 CODO PVC ISO 4422 UF C-10 DE 22.5º DE Ø 2'' und 234.00 34.45
08.04.02 CODO PVC ISO 4422 UF C-10 DE 45º DE Ø 2'' und 210.00 17.45
08.04.03 TEE PVC ISO 4422 UF C-10 DE Ø 2'' und 237.00 17.45
08.04.04 REDUCCION PVC ISO 4422 UF C-10 DE Ø 2'' A 3/4'' und 237.00 16.45
08.05 PRUEBA HIDRAULICA
08.05.01 PRUEBA HIDRAULICA EN TUBERIAS m 15,544.53 3.01
09 CAMARA ROMPE PRESION
09.01 TRABAJOS PRELIMINARES
09.01.01 LIMPIEZA DEL TERRENO MANUAL m2 135.20 3.06
09.01.02 TRAZO Y REPLANTEO m2 135.20 4.43
09.02 MOVIMIENTO DE TIERRAS
09.02.01 EXCAVACION A MANO EN TERRENO NORMAL m3 16.40 45.90
09.03 CONCRETO ARMADO
09.03.01 SOLADO DE CONCRETO DE 4'' MEZCLA 1:12 C-H m2 79.48 32.97
09.03.02 CONCRETO f'c=175 kg/cm2 m3 57.92 456.39
09.03.03 ENCOFRADO Y DESENCOFRADO m2 685.20 53.38
09.03.04 ACERO fy = 4200 kg/cm2 GRADO 60 kg 1,817.09 6.84
09.03.05 SUMINISTRO E INSTALACION DE ACCESORIOS glb 1.00 41,161.50
09.03.06 TARRAJEO INTERIOR Y EXTERIORES m2 570.00 56.01
09.04 TAPA METALICA
09.04.01 INSTALACION DE TAPA METALICA CON MECANISM und 40.00 472.30
10 CAJAS DE HIDRANTES
10.01 TRAZO Y REPLANTEO m2 76.32 4.43
10.02 EXCAVACION A MANO EN TERRENO NORMAL m3 30.53 45.90
10.03 ENCOFRADO Y DESENCOFRADO m2 339.20 53.38
10.04 SOLADO DE CONCRETO DE 4'' MEZCLA 1:12 C-H m2 76.32 32.97
10.05 CONCRETO SIMPLE f´c = 175 kg/cm2 m3 27.98 390.52
10.06 TARRAJEO INTERIOR Y EXTERIORES m2 339.20 56.01
10.07 INSTALACION DE ACCESORIOS PVC - H glb 1.00 14,688.85
10.08 INSTALACION DE TAPA METALICA CON MECANISMO D und 212.00 272.30
11 CAJAS DE PURGA
11.01 TRAZO Y REPLANTEO m2 36.36 4.43
11.02 EXCAVACION A MANO EN TERRENO NORMAL m3 14.54 45.90
11.03 ENCOFRADO Y DESENCOFRADO m2 161.60 53.38
11.04 SOLADO DE CONCRETO DE 4'' MEZCLA 1:12 C-H m2 36.36 32.97
11.05 CONCRETO SIMPLE f´c = 175 kg/cm2 m3 11.72 390.52
11.06 TARRAJEO INTERIOR Y EXTERIORES m2 161.60 56.01
11.07 INSTALACION DE ACCESORIOS glb 1.00 51,928.37
11.08 INSTALACION DE TAPA METALICA CON MECANISMO D und 101.00 255.30
12 CAJAS DE CONTROL
12.01 TRABAJOS PRELIMINARES
12.01.01 TRAZO Y REPLANTEO m2 36.26 4.43
12.02 MOVIMIENTO DE TIERRAS
12.02.01 EXCAVACION A MANO EN TERRENO NORMAL m3 25.38 45.90
12.03 OBRAS DE CONCRETO
12.03.01 SOLADO DE CONCRETO DE 4'' MEZCLA 1:12 C-H m2 36.26 32.97
12.03.02 CONCRETO f'c=175 kg/cm2 m3 14.50 501.39
12.03.03 ACERO FY= 4200 kg/cm2 kg 1,630.96 5.38
12.03.04 ENCOFRADO Y DESENCOFRADO m2 248.64 53.38
12.04 TAPA METALICA
12.04.01 INSTALACION DE TAPA METALICA E=2.5MM 0.40X und 74.00 268.30
12.05 ACCESORIOS
12.05.01 SUMINISTRO E INSTALACION DE ACCESORIOS DE C und 25.00 474.96
12.05.02 SUMINISTRO E INSTALACION DE ACCESORIOS DE C und 82.00 383.96
13 MODULO DE RIEGO POR ASPERSION
13.01 MODULO DE RIEGO POR ASPERSION mod. 180.00 1,707.28
14 INSTALACION DE TUBERIA DE LIMPIA Y REBOSE
14.01 INSTALACION DE TUBERIAS
14.01.01 SUMINISTRO E INSTALACION DE TUBERIA PVC UF ISOm 2,840.00 103.11
15 FLETE
15.01 FLETE TERRESTRE glb 1.00 100,764.50
15.02 FLETE RURAL glb 1.00 462,771.90
16 CAPACITACION
16.01 CAPACITACION EN MANEJO DE RECURSOS HIDRICOS cap. 2.00 11,063.48
16.02 CAPACITACION EN OPERACION Y MANTENIMIENTO cap. 2.00 5,531.74
17 IMPLEMENTACION DE LA JUNTA DE USUARIOS
17.01 IMPLEMENTACION DE LA JUNTA DE USUARIOS glb 1.00 3,500.00
18 MITIGACION AMBIENTAL
18.01 PROGRAMA DE PREVENCION - MITIGACION ser 3.00 1,700.00
18.02 PROGRAMA DE VEGETACION Y REVEGETACION glb 1.00 19,273.04
19 CERCO PERIMETRCO (2.00 UND)
19.01 OBRAS PRELIMINARES
19.01.01 LIMPIEZA DEL TERRENO MANUAL m2 38.00 3.06
19.01.02 TRAZO Y REPLANTEO m2 38.00 4.43
19.02 MOVIMIENTO DE TIERRAS
19.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 6.05 39.33
19.02.02 ELIMINACION DE MATERIAL EXCEDENTE m3 6.05 22.94
19.03 OBRAS DE CONCRETO SIMPLE
19.03.01 CONCRETO f'c=175 kg/cm2 m3 6.76 456.39
19.03.02 ENCOFRADO Y DESENCOFRADO m2 35.04 53.38
19.04 CARPINTERIA METALICA
19.04.01 CERCO CON MALLA CUADRADA m2 304.00 81.13
19.04.02 PUERTA METALICA SEGUN DISEÑO und 2.00 988.00
19.04.03 TUBO DE Fº GALVANIZADO DE 2 1/2'' m 156.60 50.00
19.04.04 TUBO DE Fº GALVANIZADO DE 1 1/2'' m 540.00 35.00
COSTO DIRECTO
GASTOS GENERALES 10.00%
UTILIDADES 7.00%

SUB TOTAL
IGV
PLAN COVID

PRESUPUESTO TOTAL DE OBRA


PARCIAL S/ METRADO PARCIAL S/
Metrado
31,508.24
1,256.15 -
5,400.00 -
24,852.09 0.50 4,142.02 1
240,092.90 -
74,667.24 -
5,600.13 -
403.92 132.00 403.92
498.20 112.46 498.20
2,973.83 -
1,724.18 -
6,708.07 -
2,943.46 -
2,715.42 -
610.58 -
438.61 -
6,752.12 -
2,357.03 -
3,706.71 -
222.06 -
466.32 -
36,250.67 -
20,576.39 -
7,802.33 -
7,871.95 -
12,660.65 -
12,660.65 -
704.23 -
555.03 -
149.20 -
2,860.00 -
1,020.00 -
690.00 -
590.00 -
268.00 -
292.00 -
3,131.37 -
2,064.43 -
456.90 -
610.04 -
81,166.50 -
5,782.94 -
486.17 - 158.88
598.76 - 135.16
2,973.83 - 48.60
1,724.18 - 12.60
10,215.72 -
2,943.46 - 74.84
5,608.37 - 39.49
757.99 - 19.90
905.90 - 39.49
6,897.84 -
2,502.75 - 75.91
3,706.71 - 8.07
222.06 - 4.16
466.32 - 5.44
38,089.73 -
21,778.64 - 48.91
8,258.72 - 1,454.00
8,052.37 - 150.85
13,484.67 -
13,484.67 - 168.39
704.23 -
555.03 - 10.39
149.20 - 5.00
2,860.00 -
1,020.00 - 2.00
690.00 - 3.00
590.00 - 2.00
268.00 - 1.00
292.00 - 1.00
3,131.37 -
2,064.43 - 14.82
456.90 - 14.50
610.04 - 2.00
84,259.16 -
5,707.18 -
460.47 -
548.70 -
2,973.83 -
1,724.18 -
8,000.54 -
2,943.46 -
3,742.23 -
710.38 -
604.47 -
6,777.17 -
2,382.08 -
3,706.71 -
222.06 -
466.32 -
43,449.05 -
20,914.80 -
8,021.30 -
14,512.95 -
13,629.62 -
13,629.62 -
704.23 -
555.03 -
149.20 -
2,860.00 -
1,020.00 -
690.00 -
590.00 -
268.00 -
292.00 -
3,131.37 -
2,064.43 -
456.90 -
610.04 -
587,952.53 -
3,647.87 -
1,836.00 - 300.00
1,811.87 - 204.50
131,858.25 -
34,624.56 - 440.18
75,017.80 - 264.11
2,020.43 - 220.09
20,195.46 - 440.18
14,578.67 -
14,578.67 - 221.09
380,821.09 -
286,824.12 - 284.48
21,000.23 - 196.71
72,996.74 - 6,113.63
41,000.16 -
34,124.31 - 356.73
6,875.85 - 118.02
1,168.00 -
1,168.00 - 2.00
4,875.88 -
4,875.88 - 1.00
10,002.61 -
570.00 - 1.00
2,810.90 - 1.00
5,256.00 - 3.00
1,365.71 - 36.13
195,125.74 -
203.73 -
83.23 27.20 83.23
120.50 27.20 120.50
18,227.77 -
12,952.93 94.08 12,952.93
4,226.52 29.76 4,226.52
123.38 26.88 123.38
924.94 -
158,160.60 -
886.23 -
17,564.62 -
139,709.75 -
291.97 -
16.16 -
145.78 -
130.03 -
3,434.19 -
3,434.19 -
2,611.50 -
2,611.50 -
8,028.35 -
8,028.35 -
2,327.00 -
292.00 -
235.00 -
1,800.00 -
1,840.63 -
1,840.63 -
229,404.29 -
13,926.00 -
5,847.60 200.00 886.00 600.00
8,078.40 400.00 1,224.00 1,200.00
45,847.59 -
20,354.61 48.00 1,652.16 268.80
20,354.61 - 67.20
2,541.00 200.00 550.00 420.00
1,348.12 20.00 291.80 42.00
1,249.25 - 168.00
129,056.40 -
129,056.40 130.00 12,710.10 600.00
36,601.10 -
8,870.75 - 11.00
9,468.90 - 14.00
18,261.45 - 27.00
3,973.20 -
3,973.20 - 600.00
474,163.41 -
42,105.05 -
17,680.13 640.00 2,835.20 531.00
24,424.92 1,280.00 3,916.80 1,062.00
203,220.80 -
61,541.93 153.60 5,286.91 237.89
61,541.58 - 59.47
7,682.68 - 371.70
4,076.01 - 37.17
68,378.60 - 148.68
152,057.10 -
152,057.10 - 531.00
64,767.55 -
26,412.75 - 65.00
31,293.60 - 69.00
4,631.90 - 60.00
1,384.65 - 6.00
1,044.65 - 6.00
12,012.91 -
12,012.91 - 531.00
900,987.61 -
114,034.95 -
47,883.87 600.00 2,658.00 6,000.00
66,151.08 1,200.00 3,672.00 12,000.00
177,456.93 -
139,517.34 72.00 2,478.24 2,250.00
14,862.38 - 3,000.00
15,770.33 - 600.00
7,306.88 - 1,200.00
551,907.54 -
551,907.54 - 6,000.00
25,053.10 -
12,418.15 - 102.00
6,097.65 - 59.00
2,036.65 - 26.00
4,500.65 - 26.00
32,535.09 -
32,535.09 - 6,000.00
960,863.19 -
163,994.76 -
68,862.27 - 660.00
95,132.49 - 1,320.00
214,862.68 -
171,213.69 - 211.20
17,098.98 - 264.00
18,143.54 - 52.80
8,406.47 - 105.60
515,456.61 -
515,456.61 - 660.00
19,760.10 -
8,061.30 -
3,664.50 -
4,135.65 -
3,898.65 -
46,789.04 -
46,789.04 -
171,804.06 -
1,012.65 -
413.71 - 84.50
598.94 - 84.50
752.76 -
752.76 - 10.25
151,146.65 -
2,620.46 - 51.25
26,434.11 - 15.38
36,575.98 - 428.25
12,428.90 - 1,135.68
41,161.50 - 0.63
31,925.70 - 356.25
18,892.00 -
18,892.00 - 44 und 25.00
124,703.99 -
338.10 - 2.88
1,401.33 - 1.15
18,106.50 - 12.8
2,516.27 - 2.88
10,926.75 - 1.06
18,998.59 - 12.8
14,688.85 - 0.05
57,727.60 - 262 und 165
101,995.24 -
161.07 - 1.44
667.39 - 0.58
8,626.21 - 6.4
1,198.79 - 1.44
4,576.89 - 0.46
9,051.22 - 6.4
51,928.37 - 0.05
25,785.30 - 4
95,051.10 -
160.63 -
160.63 - 29.89
1,164.94 -
1,164.94 - 20.92
30,512.61 -
1,195.49 - 29.89
7,270.16 - 11.95
8,774.56 - 1344.44
13,272.40 - 204.96
19,854.20 -
19,854.20 - 61
43,358.72 -
11,874.00 - 7
31,484.72 - 54
307,310.40 -
307,310.40 -
292,832.40 -
292,832.40 -
292,832.40 -
563,536.40 -
100,764.50 0.10 10,076.45 0.5
462,771.90 0.10 46,277.19 0.50
33,190.44 -
22,126.96 -
11,063.48 -
3,500.00 -
3,500.00 -
24,373.04 -
5,100.00 -
19,273.04 -
58,986.52 -
284.62 -
116.28 -
168.34 -
376.74 -
237.95 -
138.79 -
4,955.64 -
3,085.20 -
1,870.44 -
53,369.52 -
24,663.52 -
1,976.00 -
7,830.00 -
18,900.00 -
5,397,381.50 117,065.54
539,738.15 11,706.55
377,816.71 8,194.59
------------------------
6,314,936.36 136,966.68
1,136,688.54 24,654.00
118,722.00 29,680.50
==============
7,570,346.90 191,301.19
Precio Parcial
8,284.03

8,284.03 8284.03
81,166.50

81,166.50
5782.94
3.06 486.17
4.43 598.76
61.19 2973.83
136.84 1724.18
10,215.72
39.33 2943.46
142.02 5608.37
38.09 757.99
22.94 905.9
6897.84
32.97 2502.75
459.32 3706.71
53.38 222.06
85.72 466.32
38,089.73
445.28 21778.64
5.68 8258.72
53.38 8052.37
13,484.67
80.08 13484.67
704.23
53.42 555.03
29.84 149.2
2860
510.00 1020
230.00 690
295.00 590
268.00 268
292.00 292
3,131.37
139.30 2064.43
31.51 456.9
305.02 610.04
293,976.78
1,823.94
3.06 918.00
4.43 905.94
65,929.12
39.33 17,312.28
142.02 37,508.90
4.59 1,010.21
22.94 10,097.73
7,289.34
32.97 7,289.34
190,410.81
504.12 143,412.06
53.38 10,500.38
5.97 36,498.37
20,500.32
47.83 17,062.40
29.13 3,437.92
584.00
292.00 584.00
2,437.94
2,437.94 2,437.94
5,001.31
285.00 285.00
1,405.45 1,405.45
876.00 2,628.00
18.90 682.86
99,669.22
6,330.00
4.43 2,658.00
3.06 3,672.00
20,839.82
34.42 9,252.10
137.68 9,252.10
2.75 1,155.00
14.59 612.78
3.38 567.84
58,662.00
97.77 58,662.00
12,031.40
253.45 2,787.95
225.45 3,156.30
225.45 6,087.15
1,806.00
3.01 1,806.00
76,039.38
5,602.05
4.43 2,352.33
3.06 3,249.72
27,038.22
34.42 8,188.17
137.68 8,187.83
2.75 1,022.18
14.59 542.31
61.19 9,097.73
20,231.10
38.10 20,231.10
21,569.70
135.45 8,804.25
150.45 10,381.05
25.45 1,527.00
81.45 488.70
61.45 368.70
1,598.31
3.01 1,598.31
494,590.85
63,300.00
4.43 26,580.00
3.06 36,720.00
98,505.00
34.42 77,445.00
2.75 8,250.00
14.59 8,754.00
3.38 4,056.00
306,360.00
51.06 306,360.00
8,365.85
40.45 4,125.90
34.45 2,032.55
26.45 687.70
58.45 1,519.70
18,060.00
3.01 18,060.00
37,971.38
6,963.00
4.43 2,923.80
3.06 4,039.20
9,122.78
34.42 7,269.50
2.75 726.00
14.59 770.35
3.38 356.93
21,885.60
33.16 21,885.60

98,133.23
632.91
3.06 258.57
4.43 374.34
470.48
45.90 470.48
85,222.34
32.97 1,689.71
456.39 7,019.28
53.38 22,859.99
6.84 7,768.05
41,161.50 25,931.75
56.01 19,953.56
11,807.50
472.30 11,807.50
47,638.58
4.43 12.76
45.90 52.79
53.38 683.26
32.97 94.95
390.52 413.95
56.01 716.93
14,688.85 734.44
272.30 44,929.50
4,577.83
4.43 6.38
45.90 26.62
53.38 341.63
32.97 47.48
390.52 179.64
56.01 358.46
51,928.37 2,596.42
255.30 1,021.20
66,668.43
132.41
4.43 132.41
960.23
45.90 960.23
25,150.93
32.97 985.47
501.39 5,991.61
5.38 7,233.09
53.38 10,940.76
16,366.30
268.30 16,366.30
24,058.56
474.96 3,324.72
383.96 20,733.84

281,768.20
100,764.50 50382.25
462,771.90 231385.95
1,590,484.41
-
-
------------------------
1,590,484.41
286,287.19
29,680.50
==============
1,906,452.10

25.18%