Está en la página 1de 9

CALCULO HIDRAULICO DE LA RED DE CONDUCCION - REPORTE DE NODOS

Proyecto : "AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO DE LA


Localidad LOCALIDAD
: PROGRESODE EL PROGRESO, DISTRITO DE PROGRESO - GRAU - APURIMAC"
Ubicación : APURIMAC - GRAU - PROGRESO
Fecha : OCTUBRE-2019

Gradiente
Elevacion Presión (m
Nodos Demanda (L/s) Hidraulica
(m) H2O)
(m)
N-17 4,232.84 4.350 4,239.51 7
N-86 4,014.45 1.090 4,037.08 23
N-101 3,960.78 9.930 3,988.59 28
N-87 4,014.45 8.840 4,035.33 21
N-18 4,232.84 4.480 4,258.71 26
N-102 3,958.42 0.000 3,988.70 30
N-100 3,961.92 0.000 3,988.93 27
N-79 4,021.25 0.000 4,042.12 21
N-74 4,039.00 0.000 4,067.40 28
N-71 4,044.41 0.000 4,076.26 32
N-63 4,061.01 0.000 4,088.80 28
N-45 4,083.72 0.000 4,096.79 13
N-43 4,100.02 0.000 4,103.46 3
N-83 4,016.21 0.000 4,036.04 20
N-94 3,991.30 0.000 4,037.48 46
N-97 3,982.84 0.000 4,038.13 55
N-99 3,977.61 0.000 4,040.13 62
N-98 3,981.58 0.000 4,040.59 59
N-96 3,985.57 0.000 4,042.62 57
N-95 3,986.19 0.000 4,043.05 57
N-93 3,991.34 0.000 4,043.56 52
N-90 4,000.92 0.000 4,045.69 45
N-91 3,997.42 0.000 4,046.19 49
N-89 4,003.03 0.000 4,047.16 44
N-88 4,004.99 0.000 4,048.19 43
N-84 4,014.81 0.000 4,050.81 36
N-85 4,014.45 0.000 4,051.36 37
N-81 4,017.19 0.000 4,051.86 35
N-82 4,016.97 0.000 4,052.40 35
N-80 4,019.41 0.000 4,052.94 33
N-78 4,023.39 0.000 4,053.51 30
N-77 4,025.82 0.000 4,054.01 28
N-76 4,032.79 0.000 4,054.57 22
N-73 4,039.98 0.000 4,055.20 15
N-69 4,045.82 0.000 4,055.61 10
N-67 4,051.43 0.000 4,055.95 5
N-72 4,044.24 0.000 4,056.62 12
N-75 4,034.53 0.000 4,057.70 23
N-70 4,044.68 0.000 4,059.05 14
N-65 4,053.37 0.000 4,060.45 7
N-64 4,053.49 0.000 4,060.98 7
N-66 4,052.53 0.000 4,061.53 9
N-57 4,068.22 0.000 4,103.17 35
N-58 4,066.01 0.000 4,103.43 37
N-61 4,063.35 0.000 4,104.25 41
N-59 4,064.55 0.000 4,104.88 40
N-56 4,070.50 0.000 4,105.11 35
N-53 4,073.56 0.000 4,105.43 32
N-55 4,072.63 0.000 4,106.09 33
N-50 4,077.03 0.000 4,106.36 29
N-52 4,074.23 0.000 4,107.13 33
N-49 4,078.41 0.000 4,107.63 29
N-48 4,078.76 0.000 4,108.07 29
N-54 4,073.19 0.000 4,108.80 36
N-62 4,062.61 0.000 4,109.43 47
N-60 4,064.08 0.000 4,109.74 46
N-51 4,075.47 0.000 4,110.93 35
N-44 4,088.15 0.000 4,111.37 23
N-47 4,080.93 0.000 4,112.86 32
N-46 4,082.87 0.000 4,113.44 31
N-40 4,104.94 0.000 4,114.07 9
N-38 4,109.97 0.000 4,114.65 5
N-36 4,111.69 0.000 4,115.69 4
N-39 4,107.53 0.000 4,116.05 9
N-42 4,102.50 0.000 4,116.82 14
N-41 4,103.45 0.000 4,117.25 14
N-37 4,110.59 0.000 4,117.81 7
N-35 4,128.38 0.000 4,168.54 40
N-34 4,128.61 0.000 4,169.31 41
N-32 4,154.48 0.000 4,171.12 17
N-33 4,154.24 0.000 4,171.44 17
N-31 4,163.02 0.000 4,172.25 9
N-29 4,177.10 0.000 4,222.90 46
N-28 4,177.28 0.000 4,223.29 46
N-30 4,174.71 0.000 4,223.71 49
N-26 4,179.43 0.000 4,224.39 45
N-27 4,178.38 0.000 4,225.19 47
N-24 4,191.17 0.000 4,225.75 35
N-23 4,203.16 0.000 4,226.41 23
N-22 4,212.64 0.000 4,227.57 15
N-19 4,216.50 0.000 4,228.16 12
N-21 4,213.79 0.000 4,229.75 16
N-20 4,216.16 0.000 4,230.91 15
N-16 4,233.30 0.000 4,240.02 7
N-13 4,263.77 0.000 4,290.60 27
N-12 4,268.43 0.000 4,291.20 23
N-7 4,278.19 0.000 4,293.81 16
N-6 4,282.59 0.000 4,294.62 12
N-5 4,287.53 0.000 4,295.03 7
N-4 4,288.05 0.000 4,295.43 7
N-2 4,294.09 0.000 4,296.37 2
N-3 4,288.87 0.000 4,296.06 7
N-1 4,296.21 0.000 4,296.84 2
N-25 4,182.07 0.000 4,225.38 43
N-8 4,277.52 0.000 4,292.96 15
N-9 4,276.43 0.000 4,292.51 16
N-10 4,275.37 0.000 4,291.99 17
N-11 4,274.48 0.000 4,291.60 17
N-15 4,239.46 0.000 4,258.89 19
N-68 4,050.61 0.000 4,059.45 9
N-92 3,995.32 0.000 4,044.69 49
N-943 4,238.99 0.000 4,240.47 3
N-103 3,565.71 0.000 3,577.50 12
N-104 3,565.40 0.000 3,577.78 12
N-105 3,565.39 0.000 3,577.91 12
N-106 3,565.00 0.000 3,577.33 12
N-107 3,564.89 0.000 3,577.57 13
N-108 3,563.68 0.000 3,577.07 13
N-109 3,563.52 0.000 3,577.42 14
N-110 3,562.19 0.000 3,576.95 15
N-111 3,561.42 0.000 3,576.85 15
N-112 3,559.96 0.000 3,576.58 17
N-113 3,558.64 0.000 3,576.30 18
N-114 3,558.29 0.000 3,575.92 18
N-115 3,557.51 0.000 3,576.12 19
N-116 3,557.03 0.000 3,575.68 19
N-117 3,556.19 0.000 3,575.46 19
N-118 3,555.39 0.000 3,575.31 20
N-119 3,554.26 0.000 3,575.05 21
N-120 3,554.08 0.000 3,574.80 21
N-121 3,553.30 0.000 3,574.68 21
N-122 3,552.38 0.000 3,574.43 22
N-123 3,550.28 0.000 3,574.22 24
N-124 3,548.97 0.000 3,574.07 25
N-125 3,548.64 0.000 3,573.81 25
N-126 3,544.93 0.000 3,573.55 29
N-127 3,541.32 0.000 3,573.16 32
N-128 3,540.86 0.000 3,573.24 32
N-129 3,540.18 0.000 3,572.98 33
N-130 3,538.50 0.000 3,572.76 34
N-131 3,536.02 0.000 3,539.26 3
N-132 3,535.90 0.000 3,539.41 3
N-133 3,535.75 0.000 3,539.58 4
N-134 3,535.73 0.000 3,539.12 3
N-135 3,532.87 0.000 3,538.82 6
N-136 3,530.69 0.000 3,538.64 8
N-137 3,530.16 0.000 3,538.59 8
N-138 3,527.50 0.000 3,538.44 11
N-139 3,526.55 0.000 3,538.12 12
N-140 3,525.34 0.000 3,537.91 13
N-141 3,524.96 0.000 3,537.77 13
N-142 3,524.96 0.000 3,536.55 12
N-143 3,524.94 0.000 3,537.20 12
N-144 3,524.40 0.000 3,537.36 13
N-145 3,523.72 0.000 3,537.44 14
N-146 3,523.66 0.000 3,535.53 12
N-147 3,523.44 0.000 3,537.29 14
N-148 3,522.89 0.000 3,536.73 14
N-149 3,522.88 0.000 3,534.92 12
N-150 3,521.92 0.000 3,535.91 14
N-151 3,521.83 0.000 3,535.46 14
N-152 3,520.99 0.000 3,534.62 14
N-153 3,517.75 0.000 3,533.91 16
N-154 3,513.74 1.490 3,533.68 20
N-155 3,513.50 0.000 3,533.73 20
N-156 3,512.72 0.000 3,533.70 21
CALCULO HIDRAULICO DE LA RED DE CONDUCCION - REPORTE DE
NODOS
Proyecto : "AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO DE
LA LOCALIDAD DE EL PROGRESO, DISTRITO DE PROGRESO - GRAU - APURIMAC"
Localidad : PROGRESO
Ubicación : APURIMAC - GRAU - PROGRESO
Fecha :OCTUBRE-2019

Nodos Elevacion (m) Demanda Gradiente Presión (m


CAPTACION ÑAHUIÑAHUI N°1
N-1 4,296.21 0.000 4,296.84 2
N-2 4,294.09 0.000 4,296.37 2
N-3 4,288.87 0.000 4,296.06 7
N-4 4,288.05 0.000 4,295.43 7
N-5 4,287.53 0.000 4,295.03 7

N-6 4,282.59 0.000 4,294.62 12 DESCRIPCION


N-7 4,278.19 0.000 4,293.81 16 CAPT
N-8 4,277.52 0.000 4,292.96 15 ACIO
N-9 4,276.43 0.000 4,292.51 16 N
CAMARA DE REUNION N°1
N-10 4,275.37 0.000 4,291.99 17
N-11 4,274.48 0.000 4,291.60 17
N-12 4,268.43 0.000 4,291.20 23
N-13 4,263.77 0.000 4,290.60 27
CRP-6 N°1 4,259.41 4.480 4,290.16 31 DESCRIPCION
N-15 4,239.46 0.000 4,258.89 19 CAM
N-18 4,232.84 4.480 4,258.71 26 ARA
CAMARA DE REUNION N°1 DE
N-20 4,216.16 0.000 4,230.91 15
N-21 4,213.79 0.000 4,229.75 16
N-19 4,216.50 0.000 4,228.16 12
N-22 4,212.64 0.000 4,227.57 15 CAMARA DE REUNION N°3
N-23 4,203.16 0.000 4,226.41 23
N-24 4,191.17 0.000 4,225.75 35
N-25 4,182.07 0.000 4,225.38 43
N-27 4,178.38 0.000 4,225.19 47
N-26 4,179.43 0.000 4,224.39 45
N-30 4,174.71 0.000 4,223.71 49
N-28 4,177.28 0.000 4,223.29 46
N-29 4,177.10 0.000 4,222.90 46
CRP-6 N°2 4,172.95 8.840 4,222.61 50
N-31 4,163.02 0.000 4,172.25 9
N-33 4,154.24 0.000 4,171.44 17
N-32 4,154.48 0.000 4,171.12 17
N-34 4,128.61 0.000 4,169.31 41
N-35 4,128.38 0.000 4,168.54 40
CRP-6 N°3 4,118.17 8.840 4,167.64 49
N-37 4,110.59 0.000 4,117.81 7
N-41 4,103.45 0.000 4,117.25 14
N-42 4,102.50 0.000 4,116.82 14
N-39 4,107.53 0.000 4,116.05 9
N-36 4,111.69 0.000 4,115.69 4
N-38 4,109.97 0.000 4,114.65 5
N-40 4,104.94 0.000 4,114.07 9
N-46 4,082.87 0.000 4,113.44 31
N-47 4,080.93 0.000 4,112.86 32
N-44 4,088.15 0.000 4,111.37 23
N-51 4,075.47 0.000 4,110.93 35
N-60 4,064.08 0.000 4,109.74 46
N-62 4,062.61 0.000 4,109.43 47
N-54 4,073.19 0.000 4,108.80 36
N-48 4,078.76 0.000 4,108.07 29
N-49 4,078.41 0.000 4,107.63 29
N-52 4,074.23 0.000 4,107.13 33
N-50 4,077.03 0.000 4,106.36 29
N-55 4,072.63 0.000 4,106.09 33
N-53 4,073.56 0.000 4,105.43 32
N-56 4,070.50 0.000 4,105.11 35
N-59 4,064.55 0.000 4,104.88 40
N-61 4,063.35 0.000 4,104.25 41
N-58 4,066.01 0.000 4,103.43 37
N-57 4,068.22 0.000 4,103.17 35
CRP-6 N°4 4,062.37 8.840 4,102.36 40
N-66 4,052.53 0.000 4,061.53 9
N-64 4,053.49 0.000 4,060.98 7
N-65 4,053.37 0.000 4,060.45 7
N-68 4,050.61 0.000 4,059.45 9
N-70 4,044.68 0.000 4,059.05 14
N-75 4,034.53 0.000 4,057.70 23
N-72 4,044.24 0.000 4,056.62 12
N-67 4,051.43 0.000 4,055.95 5
N-69 4,045.82 0.000 4,055.61 10
N-73 4,039.98 0.000 4,055.20 15
N-76 4,032.79 0.000 4,054.57 22
N-77 4,025.82 0.000 4,054.01 28
N-78 4,023.39 0.000 4,053.51 30
N-80 4,019.41 0.000 4,052.94 33
N-82 4,016.97 0.000 4,052.40 35
N-81 4,017.19 0.000 4,051.86 35
N-85 4,014.45 0.000 4,051.36 37
N-84 4,014.81 0.000 4,050.81 36
N-89 4,003.03 0.000 4,047.16 44
N-91 3,997.42 0.000 4,046.19 49
N-90 4,000.92 0.000 4,045.69 45
N-92 3,995.32 0.000 4,044.69 49
N-93 3,991.34 0.000 4,043.56 52
N-95 3,986.19 0.000 4,043.05 57
N-96 3,985.57 0.000 4,042.62 57
N-98 3,981.58 0.000 4,040.59 59
N-99 3,977.61 0.000 4,040.13 62
N-97 3,982.84 0.000 4,038.13 55
N-94 3,991.30 0.000 4,037.48 46
N-83 4,016.21 0.000 4,036.04 20
N-87 4,014.45 8.840 4,035.33 21
CAMARA DE REUNION N°3
N-105 4,002.03 0.000 4,013.65 12
CRP-6 N°5 3,989.93 9.930 4,012.88 23
N-100 3,961.92 0.000 3,988.93 27
N-102 3,958.42 0.000 3,988.70 30
N-101 3,960.78 9.930 3,988.59 28
CALCULO HIDRAULICO DE LA RED DE CONDUCCION - REPORTE DE NODOS

Proyecto : "AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO DE LA


LOCALIDAD DE EL PROGRESO, DISTRITO DE PROGRESO - GRAU - APURIMAC"
Localidad : PROGRESO
Ubicación : APURIMAC - GRAU - PROGRESO
Fecha :OCTUBRE-2019

Gradiente
Elevacion Demanda Presión (m
DESCRIPCION Nodos Hidraulica
(m) (L/s) H2O)
(m)
CAPTACION N-943 4,238.99 0.000 4,240.47 3
ÑAHUIÑAHUI N°2 N-16 4,233.30 0.000 4,240.02 7
CAMARA DE
N-17 4,232.84 4.350 4,239.51 7
REUNION N°1

Gradiente
Elevacion Demanda Presión (m
DESCRIPCION Nodos Hidraulica
(m) (L/s) H2O)
(m)
CAMARA DE N-43 4,100.02 0.000 4,103.46 3
REUNION N°2 N-45 4,083.72 0.000 4,096.79 13
N-63 4,061.01 0.000 4,088.80 28
N-71 4,044.41 0.000 4,076.26 32
N-74 4,039.00 0.000 4,067.40 28
N-79 4,021.25 0.000 4,042.12 21
CAMARA DE
N-86 4,014.45 1.090 4,037.08 23
REUNION N°3
CALCULO HIDRAULICO DE LA RED DE CONDUCCION - REPORTE
Proyecto : "AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y
SANEAMIENTO DE LA LOCALIDAD DE EL PROGRESO, DISTRITO DE PROGRESO -
GRAU - APURIMAC"
Localidad : PROGRESO
Ubicación : APURIMAC - GRAU - PROGRESO
Fecha : OCTUBRE-2019

Elevacion Demanda Velocidad Presión Elevacion Demanda Velocidad Presión


DESCRIPCION DESCRIPCION
(m) (L/s) (m/s) Salida (m) (L/s) (m/s) Llegada
CAP-N°1 4,297.00 4.40 0.81 0 CRP T6-1 4,259.41 4.40 0.81 31
CAMARA R.
CRP T6-1 4,259.41 4.40 0.81 0 N°1 4,232.84 8.05 0.81 26
CAMARA R. N°1 4,232.84 8.05 0.99 0 CRP T6-2 4,172.95 8.05 0.99 50
CRP T6-2 4,172.95 8.05 0.99 0 CRP T6-3 4,118.17 8.05 0.99 49
CRP T6-3 4,118.17 8.05 0.99 0 CRP T6-4 4,062.37 8.05 0.99 40
CAMARA R.
CRP T6-4 4,062.37 8.05 0.99 0 N°02 4,014.45 9.14 1.12 21
CAMARA R. N°2 4,014.45 9.14 1.12 0 CRP T6-5 3,989.93 9.14 1.12 23
Elevacion Demanda Velocidad Presión Elevacion Demanda Velocidad Presión
DESCRIPCION DESCRIPCION
(m) (L/s) (m/s) Salida (m) (L/s) (m/s) Llegada
CAMARA R.
CAP-N°2 4,240.71 3.65 0.67 0 N°1 4,232.84 8.05 0.99 7
Elevacion Demanda Velocidad Presión Elevacion Demanda Velocidad Presión
DESCRIPCION DESCRIPCION
(m) (L/s) (m/s) Salida (m) (L/s) (m/s) Llegada
CAMARA R.
CAMARA R. N°2 4,105.21 1.09 1.61 0 N°3 4,232.84 8.05 0.99 23