Amps X 100 E4-ISN-02N-BARRA (Nom. kV=0.48, Plot Ref. kV=0.

48)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K
E4-IC-M1
ABB SACE PR212
500 E4-TT-02N/E
E4-IC-M1-BARRA
E4SUM-F E4TT02NE-F1 E4-ISN-02N-BARRA Sensor = 400 500
Ampacity Ampacity LT Pickup = 0.75 (300 Amps)
LT Band = Curve A E4-ISN-02N
300 300
ST Pickup = 3 (1200 Amps)
ST Band = Curve A (I^x)t = IN
TT02N
Inst.SACE
ABB PickupPR123/P
= 1.5 (600 Amps)
(IEC)
E4-ISN-02N Frame = 1000 Plug = 800 Amps
100
I1 = 0.75 (600 Amps) 100
t1 = 12 LT Band = k/I^2 E4-ISN-02N-BARRA
I2 = 1.1 (880 Amps) E4TT02NE-F1
t2 = 0.09 (I^x)t = IN
50 50
9-1/C 500
30 30
E4-TT-02N/E

TT02N

10 10
E4TT02NE-F1 - P

5 5
Seconds

Seconds
3 3
E4SUM-F

6-1/C 500

1 1

E4-IC-M1
.5 .5
E4-IC-M1-BARRA

.3 .3

.1 .1
E4SUM-F - P

.05 .05
E4-ISN-02N-BARRA - Source PD Ia
E4-TT-02N/E - Source PD Ia
E4-IC-M1-BARRA - Source PD Ia 7.333kA @ 0.48kV
.03 .03
E4-IC-M1 - 3P
4.375kA @ 0.48kV
(Sym)

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 100 E4-ISN-02N-BARRA (Nom. kV=0.48, Plot Ref. kV=0.48)


ETAP Star 19.0.1C

MOTRIZ 3 ZONA 1

Project: CABLEBUS LINEA 1_E4_CAMPOS Date: 08-25-2021


Location: ALCALDIA GAM, CIUDAD DE MEXICO SN:
Contract: Rev: Base
Engineer: ING FEDERICO ALDANA A Fault: Phase
Filename: D:\CABLEBUS AGOSTO\MOTRIZ 3\MOTRIZ3.OTI