Está en la página 1de 2

Trabajo Practico Estructura de Datos

Sem I/2020 18/04/2020


VICTOR DANIEL LOPEZ GARCIA
ρ (B + CX + EDX) = A + X + DX
ρB + ρCX + ρEDX = A + X + DX
ρB – A = X + DX – ρCX – ρDX
ρB – A = X (1 + D – ρC – ρED)
DATOS
D = 0.12
ρ = 15.5 LB/GAL
C = 0.1200 GAL/LB
E = 0.0453 GAL/LB
ρ B− A ρ B− A
X= 1+ D−ρ C−ρ ED X= 1+ D−ρ(C + ED)
( 15.5∗4.0908 )−99.2356
X= 1+ 0.12−15.5(0.12+ 0.0453+ 0.12)
= 43.4672 Lb

A + X + DX 99.253+93.4672+0.12∗43.4672
ρ= B+CX + EDX = 4.0908+012∗43.4672+0.0453∗0.12∗43.4672 = 15.5 LB/GAL
Peso Vol Abs Vol
Concentracion Unidad (LB) (gal/lb) (Gal)
Cemento clase A 94 0,0382 3,5908
D081 gal/sco 5,23560209 0,0955 0,5

Subtotal A 99,2356021 4,0908 B

Agua (API) BWOC 43,4672 0,1200 5,2161


sal 12% BWOC 5,2161 0,0953 0,2363
Total 147,918902 9,5432

Densidad 15,50 lb/gal

Chequeo de la densidad= 147,9189 15,4999266


9,5432

También podría gustarte