1 Item: INSTALACION DE FAENAS 1.

00 glb
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M00) - OBRAS PRELIMINARES Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - VARIOS MATERIALES INST CMDAD glb 1.00 10,000.00 10 000.0000 10,000.00 10,000.00 10,000.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 10 000.0000 (A) = 10,000.00
B MANO DE OBRA
1 - ALBAÑIL hr 50.00 18.75 937.50 18.75 18.75 937.50
2- AYUDANTE hr 60.00 15.00 900.00 6.45 6.45 387.00
3- PEON hr 80.00 10.00 800.00 4.70 4.70 376.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 2 637.5000 (B) = 1,700.50
F Cargas Sociales 65.00% de (E) = 1 714.3750 65.00% de (E) = 1,105.33
O Impuesto al Valor Agregado 14.94% de (E+F) = 650.17 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 5 002.0451 (E+F+O) = 2,805.83
C EQUIPO, MAQUINARIA Y HERRAMIEN
1- VOLQUETA hr 30.00 200.00 6 000.0000 200.00 200.00 6,000.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 250.10 5.00% de (G) = 140.29
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 6 250.1023 (C+H) = 6,140.29
> J SUB TOTAL (D+G+I) = 21 252.1474 (D+G+I) = 18,946.12
L Gastos grales. y administrativ 10.00% de (J) = 2 125.2147 10.00% de (J) = 1,894.61
M Utilidad 10.00% de (J+L) = 2 337.7362 10.00% de (J+L) = 2,084.07
> N PARCIAL (J+L+M) = 25 715.0983 (J+L+M) = 22,924.80
P Impuesto a las Transacciones 3.09% de (N) = 794.60 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 26 509.6948 (N+P) = 22,924.80


> PRECIO ADOPTADO: 26 509.69 22,924.80
Son: Veintiseis Mil Quinientos Nueve con 69/100 Bolivianos
2 Item: LETRERO DE OBRA 1.00 pza
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M00) - OBRAS PRELIMINARES Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - MADERA DE CONSTRUCCION p² 110.00 7.00 770.00 7.00 7.00 770.00
2 - CLAVOS kg 0.80 15.00 12.00 15.00 15.00 12.00
3 - PINTURA LATEX galó 0.50 120.00 60.00 120.00 120.00 60.00
4 - CEMENTO PORTLAND kg 25.00 1.20 30.00 1.20 1.20 30.00
5 - ARENA COMUN m³ 0.40 140.00 56.00 140.00 140.00 56.00
6 - GRAVA COMUN m³ 0.60 140.00 84.00 140.00 140.00 84.00
7 - PIEDRA BRUTA m³ 1.00 100.00 100.00 100.00 100.00 100.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 1 112.0000 (A) = 1,112.00
B MANO DE OBRA
1 - ALBAÑIL hr 5.00 18.75 93.75 18.75 18.75 93.75
2 - AYUDANTE hr 10.00 15.00 150.00 6.45 6.45 64.50
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 243.75 (B) = 158.25
F Cargas Sociales 65.00% de (E) = 158.44 65.00% de (E) = 102.86
O Impuesto al Valor Agregado 14.94% de (E+F) = 60.09 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 462.27 (E+F+O) = 261.11
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 23.11 5.00% de (G) = 13.06
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 23.11 (C+H) = 13.06
> J SUB TOTAL (D+G+I) = 1 597.3880 (D+G+I) = 1,386.17
L Gastos grales. y administrativ 10.00% de (J) = 159.74 10.00% de (J) = 138.62
M Utilidad 10.00% de (J+L) = 175.71 10.00% de (J+L) = 152.48
> N PARCIAL (J+L+M) = 1 932.8395 (J+L+M) = 1,677.26
P Impuesto a las Transacciones 3.09% de (N) = 59.72 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 1 992.5643 (N+P) = 1,677.26


> PRECIO ADOPTADO: 1 992.56 1,677.26
Son: Un Mil Novecientos Noventa y Dos con 56/100 Bolivianos
3 Item: LIMPIEZA GENERAL Y RETIRO DE ESCOMBROS 1.00 glb
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M00) - OBRAS PRELIMINARES Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 0.00 (A) = 0.00
B MANO DE OBRA
1 - ALBAÑIL hr 160.00 18.75 3 000.0000 18.75 18.75 3,000.00
2- AYUDANTE hr 160.00 15.00 2 400.0000 6.45 6.45 1,032.00
3- PEON hr 160.00 10.00 1 600.0000 4.70 4.70 752.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 7 000.0000 (B) = 4,784.00
F Cargas Sociales 65.00% de (E) = 4 550.0000 65.00% de (E) = 3,109.60
O Impuesto al Valor Agregado 14.94% de (E+F) = 1 725.5700 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 13 275.5700 (E+F+O) = 7,893.60
C EQUIPO, MAQUINARIA Y HERRAMIEN
1- VOLQUETA hr 40.00 200.00 8 000.0000 200.00 200.00 8,000.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 663.78 5.00% de (G) = 394.68
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 8 663.7785 (C+H) = 8,394.68
> J SUB TOTAL (D+G+I) = 21 939.3484 (D+G+I) = 16,288.28
L Gastos grales. y administrativ 10.00% de (J) = 2 193.9348 10.00% de (J) = 1,628.83
M Utilidad 10.00% de (J+L) = 2 413.3283 10.00% de (J+L) = 1,791.71
> N PARCIAL (J+L+M) = 26 546.6116 (J+L+M) = 19,708.82
P Impuesto a las Transacciones 3.09% de (N) = 820.29 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 27 366.9019 (N+P) = 19,708.82


> PRECIO ADOPTADO: 27 366.90 19,708.82
Son: Veintisiete Mil Trescientos Sesenta y Seis con 90/100 Bolivianos
4 Item: PROV. Y COLOC. PLACA DE ENTREGA DE OBRA 1.00 pza
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M00) - OBRAS PRELIMINARES Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - PLACA DE ENTREGA pza 1.50 650.00 975.00 650.00 650.00 975.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 975.00 (A) = 975.00
B MANO DE OBRA
1 - ALBAÑIL hr 4.00 18.75 75.00 18.75 18.75 75.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 75.00 (B) = 75.00
F Cargas Sociales 65.00% de (E) = 48.75 65.00% de (E) = 48.75
O Impuesto al Valor Agregado 14.94% de (E+F) = 18.49 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 142.24 (E+F+O) = 123.75
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 7.11 5.00% de (G) = 6.19
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 7.11 (C+H) = 6.19
> J SUB TOTAL (D+G+I) = 1 124.3502 (D+G+I) = 1,104.94
L Gastos grales. y administrativ 10.00% de (J) = 112.44 10.00% de (J) = 110.49
M Utilidad 10.00% de (J+L) = 123.68 10.00% de (J+L) = 121.54
> N PARCIAL (J+L+M) = 1 360.4637 (J+L+M) = 1,336.97
P Impuesto a las Transacciones 3.09% de (N) = 42.04 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 1 402.5020 (N+P) = 1,336.97


> PRECIO ADOPTADO: 1 402.50 1,336.97
Son: Un Mil Cuatrocientos Dos con 50/100 Bolivianos
5 Item: REPLANTEO DE ESTRUCTURAS 1.00 m²
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M01) - MEJORAMIENTO OBRA DE TOMA Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - ESTACAS (2"X2"X0,30) pza 4.00 1.00 4.00 1.00 1.00 4.00
2- CLAVOS kg 0.10 15.00 1.50 15.00 15.00 1.50
3- CAL P/BLANQUEO kg 0.15 0.50 0.08 0.50 0.50 0.08
4- HILO NYLON m 1.00 5.00 5.00 5.00 5.00 5.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 10.58 (A) = 10.58
B MANO DE OBRA
1 - ALBAÑIL hr 0.15 18.75 2.81 18.75 18.75 2.81
2- AYUDANTE hr 0.25 15.00 3.75 6.45 6.45 1.61
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 6.56 (B) = 4.43
F Cargas Sociales 65.00% de (E) = 4.27 65.00% de (E) = 2.88
O Impuesto al Valor Agregado 14.94% de (E+F) = 1.62 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 12.45 (E+F+O) = 7.30
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 0.62 5.00% de (G) = 0.37
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 0.62 (C+H) = 0.37
> J SUB TOTAL (D+G+I) = 23.64 (D+G+I) = 18.24
L Gastos grales. y administrativ 10.00% de (J) = 2.36 10.00% de (J) = 1.82
M Utilidad 10.00% de (J+L) = 2.60 10.00% de (J+L) = 2.01
> N PARCIAL (J+L+M) = 28.61 (J+L+M) = 22.07
P Impuesto a las Transacciones 3.09% de (N) = 0.88 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 29.49 (N+P) = 22.07


> PRECIO ADOPTADO: 29.49 22.07
Son: Veintinueve con 49/100 Bolivianos
6 Item: EXCAVACION EN ROCA 1.00 m³
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M01) - MEJORAMIENTO OBRA DE TOMA Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - DINAMITA carg 1.00 3.00 3.00 3.00 3.00 3.00
2 - NITRATO kg 0.25 8.50 2.13 8.50 8.50 2.13
3 - GUIA m 3.50 3.50 12.25 3.50 3.50 12.25
4 - FULMINANTE pza 1.05 2.50 2.63 2.50 2.50 2.63
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 20.00 (A) = 20.00
B MANO DE OBRA
1 - AYUDANTE hr 1.00 15.00 15.00 6.45 6.45 6.45
2 - ESPECIALISTA hr 0.60 20.00 12.00 20.00 20.00 12.00
3- PERFORISTA hr 1.00 18.75 18.75 18.75 18.75 18.75
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 45.75 (B) = 37.20
F Cargas Sociales 65.00% de (E) = 29.74 65.00% de (E) = 24.18
O Impuesto al Valor Agregado 14.94% de (E+F) = 11.28 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 86.77 (E+F+O) = 61.38
C EQUIPO, MAQUINARIA Y HERRAMIEN
1- COMPRESORA ATLAS COPCO hr 0.25 100.00 25.00 100.00 100.00 25.00
2- EQUIPO DE PERFORACIÓN hr 0.25 35.00 8.75 35.00 35.00 8.75
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 4.34 5.00% de (G) = 3.07
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 38.09 (C+H) = 36.82
> J SUB TOTAL (D+G+I) = 144.85 (D+G+I) = 118.20
L Gastos grales. y administrativ 10.00% de (J) = 14.49 10.00% de (J) = 11.82
M Utilidad 10.00% de (J+L) = 15.93 10.00% de (J+L) = 13.00
> N PARCIAL (J+L+M) = 175.27 (J+L+M) = 143.02
P Impuesto a las Transacciones 3.09% de (N) = 5.42 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 180.69 (N+P) = 143.02


> PRECIO ADOPTADO: 180.69 143.02
Son: Ciento Ochenta con 69/100 Bolivianos
7 Item: EXCAVACION (0-2 M.) S. DURO (MANUAL) 1.00 m³
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M01) - MEJORAMIENTO OBRA DE TOMA Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 0.00 (A) = 0.00
B MANO DE OBRA
1 - PEON hr 6.00 10.00 60.00 4.70 4.70 28.20
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 60.00 (B) = 28.20
F Cargas Sociales 65.00% de (E) = 39.00 65.00% de (E) = 18.33
O Impuesto al Valor Agregado 14.94% de (E+F) = 14.79 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 113.79 (E+F+O) = 46.53
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 5.69 5.00% de (G) = 2.33
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 5.69 (C+H) = 2.33
> J SUB TOTAL (D+G+I) = 119.48 (D+G+I) = 48.86
L Gastos grales. y administrativ 10.00% de (J) = 11.95 10.00% de (J) = 4.89
M Utilidad 10.00% de (J+L) = 13.14 10.00% de (J+L) = 5.37
> N PARCIAL (J+L+M) = 144.57 (J+L+M) = 59.12
P Impuesto a las Transacciones 3.09% de (N) = 4.47 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 149.04 (N+P) = 59.12


> PRECIO ADOPTADO: 149.04 59.12
Son: Ciento Cuarenta y Nueve con 04/100 Bolivianos
8 Item: PICADO Y COLODADO DE SIKA ADHERENTE 1.00 m
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M01) - MEJORAMIENTO OBRA DE TOMA Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - SIKA ADHERENTE l 0.10 130.00 13.00 130.00 130.00 13.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 13.00 (A) = 13.00
B MANO DE OBRA
1 - AYUDANTE hr 0.07 15.00 1.05 6.45 6.45 0.45
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 1.05 (B) = 0.45
F Cargas Sociales 65.00% de (E) = 0.68 65.00% de (E) = 0.29
O Impuesto al Valor Agregado 14.94% de (E+F) = 0.26 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 1.99 (E+F+O) = 0.74
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 0.10 5.00% de (G) = 0.04
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 0.10 (C+H) = 0.04
> J SUB TOTAL (D+G+I) = 15.09 (D+G+I) = 13.78
L Gastos grales. y administrativ 10.00% de (J) = 1.51 10.00% de (J) = 1.38
M Utilidad 10.00% de (J+L) = 1.66 10.00% de (J+L) = 1.52
> N PARCIAL (J+L+M) = 18.26 (J+L+M) = 16.68
P Impuesto a las Transacciones 3.09% de (N) = 0.56 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 18.82 (N+P) = 16.68


> PRECIO ADOPTADO: 18.82 16.68
Son: Dieciocho con 82/100 Bolivianos
9 Item: Hº Cº (1:2:4) 50 % PD P/ESTRUCTURAS 1.00 m³
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M01) - MEJORAMIENTO OBRA DE TOMA Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1- CEMENTO PORTLAND kg 145.00 1.20 174.00 1.20 1.20 174.00
2- ARENA COMUN m³ 0.25 140.00 35.00 140.00 140.00 35.00
3- GRAVA COMUN m³ 0.35 140.00 49.00 140.00 140.00 49.00
4- PIEDRA BRUTA m³ 0.50 100.00 50.00 100.00 100.00 50.00
5- MADERA DE CONSTRUCCION p² 18.00 7.00 126.00 7.00 7.00 126.00
6- ALAMBRE DE AMARRE kg 0.60 15.00 9.00 15.00 15.00 9.00
7- CLAVOS kg 0.60 15.00 9.00 15.00 15.00 9.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 452.00 (A) = 452.00
B MANO DE OBRA
1 - ENCOFRADOR hr 1.50 18.75 28.13 18.75 18.75 28.13
2- ALBAÑIL hr 5.50 18.75 103.13 18.75 18.75 103.13
3- AYUDANTE hr 6.00 15.00 90.00 6.45 6.45 38.70
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 221.25 (B) = 169.95
F Cargas Sociales 65.00% de (E) = 143.81 65.00% de (E) = 110.47
O Impuesto al Valor Agregado 14.94% de (E+F) = 54.54 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 419.60 (E+F+O) = 280.42
C EQUIPO, MAQUINARIA Y HERRAMIEN
1 - MEZCLADORA hr 1.00 20.00 20.00 20.00 20.00 20.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 20.98 5.00% de (G) = 14.02
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 40.98 (C+H) = 34.02
> J SUB TOTAL (D+G+I) = 912.58 (D+G+I) = 766.44
L Gastos grales. y administrativ 10.00% de (J) = 91.26 10.00% de (J) = 76.64
M Utilidad 10.00% de (J+L) = 100.38 10.00% de (J+L) = 84.31
> N PARCIAL (J+L+M) = 1 104.2254 (J+L+M) = 927.39
P Impuesto a las Transacciones 3.09% de (N) = 34.12 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 1 138.3460 (N+P) = 927.39


> PRECIO ADOPTADO: 1 138.35 927.39
Son: Un Mil Ciento Treinta y Ocho con 35/100 Bolivianos
10 Item: PROV COLOC DE TAPA METALICA 0.80x0.80m 1.00 pza
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M01) - MEJORAMIENTO OBRA DE TOMA Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - PLANCHA METALICA 1/8" m² 0.64 220.00 140.80 220.00 220.00 140.80
2 - BISAGRAS D=1/2" pza 2.00 25.00 50.00 25.00 25.00 50.00
3- ELECTRODOS kg 0.20 25.00 5.00 25.00 25.00 5.00
4- FE LISO D=1/2" m 0.50 6.00 3.00 6.00 6.00 3.00
5- PINTURA ANTICORROSIVA lt 0.80 45.00 36.00 45.00 45.00 36.00
6- CANDADO pza 1.00 30.00 30.00 30.00 30.00 30.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 264.80 (A) = 264.80
B MANO DE OBRA
1 - ESP. CARPINTERIA METALICA hr 3.00 20.00 60.00 20.00 20.00 60.00
2 - ALBAÑIL hr 0.50 18.75 9.38 18.75 18.75 9.38
3- AYUDANTE hr 0.50 15.00 7.50 6.45 6.45 3.23
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 76.88 (B) = 72.60
F Cargas Sociales 65.00% de (E) = 49.97 65.00% de (E) = 47.19
O Impuesto al Valor Agregado 14.94% de (E+F) = 18.95 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 145.79 (E+F+O) = 119.79
C EQUIPO, MAQUINARIA Y HERRAMIEN
1 - MAQUINA DE SOLDAR hr 0.50 20.00 10.00 20.00 20.00 10.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 7.29 5.00% de (G) = 5.99
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 17.29 (C+H) = 15.99
> J SUB TOTAL (D+G+I) = 427.88 (D+G+I) = 400.58
L Gastos grales. y administrativ 10.00% de (J) = 42.79 10.00% de (J) = 40.06
M Utilidad 10.00% de (J+L) = 47.07 10.00% de (J+L) = 44.06
> N PARCIAL (J+L+M) = 517.74 (J+L+M) = 484.70
P Impuesto a las Transacciones 3.09% de (N) = 16.00 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 533.74 (N+P) = 484.70


> PRECIO ADOPTADO: 533.74 484.70
Son: Quinientos Treinta y Tres con 74/100 Bolivianos
11 Item: PROV COLOC ACCESORIOS OBRA DE TOMA D=6" 1.00 pza
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M01) - MEJORAMIENTO OBRA DE TOMA Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1- COLADOR BR 6'' pza 1.00 720.00 720.00 720.00 720.00 720.00
2- UNION UNIVERSAL FG D=6" pza 1.00 850.00 850.00 850.00 850.00 850.00
3- NIPLE EXAGONAL DE FG 6" pza 1.00 725.00 725.00 725.00 725.00 725.00
4- LLAVE DE PASO FG 6" pza 1.00 2,650.00 2 650.0000 2,650.00 2,650.00 2,650.00
5- ADAPTADOR PVC E-40 D=6" pza 1.00 85.00 85.00 85.00 85.00 85.00
6- TUBERIA F.G. D= 6" m 0.50 325.00 162.50 325.00 325.00 162.50
7- REDUCCION FG 6" A 4" pza 1.00 250.00 250.00 250.00 250.00 250.00
8- UNION UNIVERSAL 4" pza 1.00 660.00 660.00 660.00 660.00 660.00
9- NIPLE EXAGONAL 4" pza 1.00 220.00 220.00 220.00 220.00 220.00
10 - LLAVE DE PASO FºGº 4" pza 1.00 800.00 800.00 800.00 800.00 800.00
11 - TUBERIA F.G. D= 4" m 0.50 160.00 80.00 160.00 160.00 80.00
12 - CINTA TEFLON roll 5.00 3.00 15.00 3.00 3.00 15.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 7 217.5000 (A) = 7,217.50
B MANO DE OBRA
1 - PLOMERO hr 9.00 18.75 168.75 18.75 18.75 168.75
2- AYUDANTE hr 9.00 15.00 135.00 6.45 6.45 58.05
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 303.75 (B) = 226.80
F Cargas Sociales 65.00% de (E) = 197.44 65.00% de (E) = 147.42
O Impuesto al Valor Agregado 14.94% de (E+F) = 74.88 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 576.06 (E+F+O) = 374.22
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 28.80 5.00% de (G) = 18.71
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 28.80 (C+H) = 18.71
> J SUB TOTAL (D+G+I) = 7 822.3682 (D+G+I) = 7,610.43
L Gastos grales. y administrativ 10.00% de (J) = 782.24 10.00% de (J) = 761.04
M Utilidad 10.00% de (J+L) = 860.46 10.00% de (J+L) = 837.15
> N PARCIAL (J+L+M) = 9 465.0655 (J+L+M) = 9,208.62
P Impuesto a las Transacciones 3.09% de (N) = 292.47 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 9 757.5360 (N+P) = 9,208.62


> PRECIO ADOPTADO: 9 757.54 9,208.62
Son: Nueve Mil Setecientos Cincuenta y Siete con 54/100 Bolivianos
12 Item: PROV Y COLOC. TUBO BARBACANA PVC D=6" C-9 1.00 m
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M01) - MEJORAMIENTO OBRA DE TOMA Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - LIMPIADOR l 0.10 40.00 4.00 40.00 40.00 4.00
2- PEGAMENTO l 0.05 35.00 1.75 35.00 35.00 1.75
3- TUBERIA DE PVC D=6" C-9 m 1.05 85.00 89.25 85.00 85.00 89.25
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 95.00 (A) = 95.00
B MANO DE OBRA
1 - PLOMERO hr 1.00 18.75 18.75 18.75 18.75 18.75
2 - AYUDANTE hr 1.00 15.00 15.00 6.45 6.45 6.45
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 33.75 (B) = 25.20
F Cargas Sociales 65.00% de (E) = 21.94 65.00% de (E) = 16.38
O Impuesto al Valor Agregado 14.94% de (E+F) = 8.32 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 64.01 (E+F+O) = 41.58
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 3.20 5.00% de (G) = 2.08
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 3.20 (C+H) = 2.08
> J SUB TOTAL (D+G+I) = 162.21 (D+G+I) = 138.66
L Gastos grales. y administrativ 10.00% de (J) = 16.22 10.00% de (J) = 13.87
M Utilidad 10.00% de (J+L) = 17.84 10.00% de (J+L) = 15.25
> N PARCIAL (J+L+M) = 196.27 (J+L+M) = 167.78
P Impuesto a las Transacciones 3.09% de (N) = 6.06 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 202.34 (N+P) = 167.78


> PRECIO ADOPTADO: 202.34 167.78
Son: Doscientos Dos con 34/100 Bolivianos
13 Item: PROV Y COLOC ACCESORIOS FG D=4" (TOMA 1) 1.00 pza
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M01) - MEJORAMIENTO OBRA DE TOMA Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - UNION UNIVERSAL 4" pza 1.00 660.00 660.00 660.00 660.00 660.00
2 - ADAPTADOR DE PVC E-40 D=4" pza 1.00 45.00 45.00 45.00 45.00 45.00
3 - COLADOR BR 4" pza 1.00 590.00 590.00 590.00 590.00 590.00
4- NIPLE EXAGONAL 4" pza 1.00 220.00 220.00 220.00 220.00 220.00
5- LLAVE DE PASO FºGº 4" pza 1.00 800.00 800.00 800.00 800.00 800.00
6- TUBO DE FºGº 4" m 3.50 230.00 805.00 230.00 230.00 805.00
7- CINTA TEFLON roll 5.00 3.00 15.00 3.00 3.00 15.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 3 135.0000 (A) = 3,135.00
B MANO DE OBRA
1 - PLOMERO hr 6.00 18.75 112.50 18.75 18.75 112.50
2 - AYUDANTE hr 6.00 15.00 90.00 6.45 6.45 38.70
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 202.50 (B) = 151.20
F Cargas Sociales 65.00% de (E) = 131.63 65.00% de (E) = 98.28
O Impuesto al Valor Agregado 14.94% de (E+F) = 49.92 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 384.04 (E+F+O) = 249.48
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 19.20 5.00% de (G) = 12.47
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 19.20 (C+H) = 12.47
> J SUB TOTAL (D+G+I) = 3 538.2454 (D+G+I) = 3,396.95
L Gastos grales. y administrativ 10.00% de (J) = 353.82 10.00% de (J) = 339.70
M Utilidad 10.00% de (J+L) = 389.21 10.00% de (J+L) = 373.66
> N PARCIAL (J+L+M) = 4 281.2770 (J+L+M) = 4,110.31
P Impuesto a las Transacciones 3.09% de (N) = 132.29 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 4 413.5684 (N+P) = 4,110.31


> PRECIO ADOPTADO: 4 413.57 4,110.31
Son: Cuatro Mil Cuatrocientos Trece con 57/100 Bolivianos
14 Item: PROV Y COLOC ACCESORIOS FG D=4" (TOMA 2) 1.00 pza
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M01) - MEJORAMIENTO OBRA DE TOMA Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - UNION UNIVERSAL 4" pza 1.00 660.00 660.00 660.00 660.00 660.00
2 - ADAPTADOR DE PVC E-40 D=4" pza 1.00 45.00 45.00 45.00 45.00 45.00
3 - COLADOR BR 4" pza 1.00 590.00 590.00 590.00 590.00 590.00
4- NIPLE EXAGONAL 4" pza 2.00 220.00 440.00 220.00 220.00 440.00
5- LLAVE DE PASO FºGº 4" pza 1.00 800.00 800.00 800.00 800.00 800.00
6- CODO FG 4" pza 2.00 255.00 510.00 255.00 255.00 510.00
7- TUBO DE FºGº 4" m 4.20 230.00 966.00 230.00 230.00 966.00
8- TEE F.G. D=4* pza 1.00 550.00 550.00 550.00 550.00 550.00
9- CINTA TEFLON roll 5.00 3.00 15.00 3.00 3.00 15.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 4 576.0000 (A) = 4,576.00
B MANO DE OBRA
1 - PLOMERO hr 10.00 18.75 187.50 18.75 18.75 187.50
2 - AYUDANTE hr 10.00 15.00 150.00 6.45 6.45 64.50
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 337.50 (B) = 252.00
F Cargas Sociales 65.00% de (E) = 219.38 65.00% de (E) = 163.80
O Impuesto al Valor Agregado 14.94% de (E+F) = 83.20 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 640.07 (E+F+O) = 415.80
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 32.00 5.00% de (G) = 20.79
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 32.00 (C+H) = 20.79
> J SUB TOTAL (D+G+I) = 5 248.0757 (D+G+I) = 5,012.59
L Gastos grales. y administrativ 10.00% de (J) = 524.81 10.00% de (J) = 501.26
M Utilidad 10.00% de (J+L) = 577.29 10.00% de (J+L) = 551.38
> N PARCIAL (J+L+M) = 6 350.1716 (J+L+M) = 6,065.23
P Impuesto a las Transacciones 3.09% de (N) = 196.22 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 6 546.3919 (N+P) = 6,065.23


> PRECIO ADOPTADO: 6 546.39 6,065.23
Son: Seis Mil Quinientos Cuarenta y Seis con 39/100 Bolivianos
15 Item: REPLANTEO Y TRAZADO LINEAL 1.00 m
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M02) - RED DE ADUCCION Y DISTRIBUCION Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - ESTACAS (2"X2"X0,30) pza 0.20 1.00 0.20 1.00 1.00 0.20
2 - PINTURA AL ACEITE CON BRILLO l 0.01 45.00 0.36 45.00 45.00 0.45
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 0.56 (A) = 0.65
B MANO DE OBRA
1 - TOPÓGRAFO hr 0.01 20.00 0.20 20.00 20.00 0.20
2- ALARIFE hr 0.01 15.00 0.15 6.45 6.45 0.06
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 0.35 (B) = 0.26
F Cargas Sociales 65.00% de (E) = 0.23 65.00% de (E) = 0.17
O Impuesto al Valor Agregado 14.94% de (E+F) = 0.09 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 0.66 (E+F+O) = 0.44
C EQUIPO, MAQUINARIA Y HERRAMIEN
1- ESTACIÓN TOTAL hr 0.00 30.00 0.06 30.00 30.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 0.03 5.00% de (G) = 0.02
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 0.09 (C+H) = 0.02
> J SUB TOTAL (D+G+I) = 1.32 (D+G+I) = 1.11
L Gastos grales. y administrativ 10.00% de (J) = 0.13 10.00% de (J) = 0.11
M Utilidad 10.00% de (J+L) = 0.14 10.00% de (J+L) = 0.12
> N PARCIAL (J+L+M) = 1.59 (J+L+M) = 1.34
P Impuesto a las Transacciones 3.09% de (N) = 0.05 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 1.64 (N+P) = 1.34


> PRECIO ADOPTADO: 1.64 1.34
Son: Uno con 64/100 Bolivianos
16 Item: EXCAVACION EN ROCA 1.00 m³
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M02) - RED DE ADUCCION Y DISTRIBUCION Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - DINAMITA carg 1.00 3.00 3.00 3.00 3.00 3.00
2 - NITRATO kg 0.25 8.50 2.13 8.50 8.50 2.13
3 - GUIA m 3.50 3.50 12.25 3.50 3.50 12.25
4 - FULMINANTE pza 1.05 2.50 2.63 2.50 2.50 2.63
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 20.00 (A) = 20.00
B MANO DE OBRA
1 - AYUDANTE hr 1.00 15.00 15.00 6.45 6.45 6.45
2 - ESPECIALISTA hr 0.60 20.00 12.00 20.00 20.00 12.00
3- PERFORISTA hr 1.00 18.75 18.75 18.75 18.75 18.75
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 45.75 (B) = 37.20
F Cargas Sociales 65.00% de (E) = 29.74 65.00% de (E) = 24.18
O Impuesto al Valor Agregado 14.94% de (E+F) = 11.28 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 86.77 (E+F+O) = 61.38
C EQUIPO, MAQUINARIA Y HERRAMIEN
1- COMPRESORA ATLAS COPCO hr 0.25 100.00 25.00 100.00 100.00 25.00
2- EQUIPO DE PERFORACIÓN hr 0.25 35.00 8.75 35.00 35.00 8.75
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 4.34 5.00% de (G) = 3.07
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 38.09 (C+H) = 36.82
> J SUB TOTAL (D+G+I) = 144.85 (D+G+I) = 118.20
L Gastos grales. y administrativ 10.00% de (J) = 14.49 10.00% de (J) = 11.82
M Utilidad 10.00% de (J+L) = 15.93 10.00% de (J+L) = 13.00
> N PARCIAL (J+L+M) = 175.27 (J+L+M) = 143.02
P Impuesto a las Transacciones 3.09% de (N) = 5.42 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 180.69 (N+P) = 143.02


> PRECIO ADOPTADO: 180.69 143.02
Son: Ciento Ochenta con 69/100 Bolivianos
17 Item: EXCAVACION (0-2 M.) S. SEMIDURO (MANUAL) 1.00 m³
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M02) - RED DE ADUCCION Y DISTRIBUCION Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 0.00 (A) = 0.00
B MANO DE OBRA
1 - PEON hr 3.60 10.00 36.00 4.70 4.70 16.92
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 36.00 (B) = 16.92
F Cargas Sociales 65.00% de (E) = 23.40 65.00% de (E) = 11.00
O Impuesto al Valor Agregado 14.94% de (E+F) = 8.87 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 68.27 (E+F+O) = 27.92
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 3.41 5.00% de (G) = 1.40
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 3.41 (C+H) = 1.40
> J SUB TOTAL (D+G+I) = 71.69 (D+G+I) = 29.31
L Gastos grales. y administrativ 10.00% de (J) = 7.17 10.00% de (J) = 2.93
M Utilidad 10.00% de (J+L) = 7.89 10.00% de (J+L) = 3.22
> N PARCIAL (J+L+M) = 86.74 (J+L+M) = 35.47
P Impuesto a las Transacciones 3.09% de (N) = 2.68 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 89.42 (N+P) = 35.47


> PRECIO ADOPTADO: 89.42 35.47
Son: Ochenta y Nueve con 42/100 Bolivianos
18 Item: EJECUCION DE CAMA DE ARENA 1.00 m³
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M02) - RED DE ADUCCION Y DISTRIBUCION Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - ARENA COMUN m³ 1.00 140.00 140.00 140.00 140.00 140.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 140.00 (A) = 140.00
B MANO DE OBRA
1 - AYUDANTE hr 2.00 15.00 30.00 6.45 6.45 12.90
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 30.00 (B) = 12.90
F Cargas Sociales 65.00% de (E) = 19.50 65.00% de (E) = 8.39
O Impuesto al Valor Agregado 14.94% de (E+F) = 7.40 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 56.90 (E+F+O) = 21.29
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 2.84 5.00% de (G) = 1.06
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 2.84 (C+H) = 1.06
> J SUB TOTAL (D+G+I) = 199.74 (D+G+I) = 162.35
L Gastos grales. y administrativ 10.00% de (J) = 19.97 10.00% de (J) = 16.23
M Utilidad 10.00% de (J+L) = 21.97 10.00% de (J+L) = 17.86
> N PARCIAL (J+L+M) = 241.69 (J+L+M) = 196.44
P Impuesto a las Transacciones 3.09% de (N) = 7.47 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 249.15 (N+P) = 196.44


> PRECIO ADOPTADO: 249.15 196.44
Son: Doscientos Cuarenta y Nueve con 15/100 Bolivianos
19 Item: RELLENO Y COMPACTADO MANUAL 1.00 m³
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M02) - RED DE ADUCCION Y DISTRIBUCION Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - AGUA l 20.00 0.05 1.00 0.05 0.05 1.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 1.00 (A) = 1.00
B MANO DE OBRA
1 - PEON hr 1.30 10.00 13.00 4.70 4.70 6.11
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 13.00 (B) = 6.11
F Cargas Sociales 65.00% de (E) = 8.45 65.00% de (E) = 3.97
O Impuesto al Valor Agregado 14.94% de (E+F) = 3.20 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 24.65 (E+F+O) = 10.08
C EQUIPO, MAQUINARIA Y HERRAMIEN
1 - COMPACTADORA hr 0.20 35.00 7.00 35.00 35.00 7.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 1.23 5.00% de (G) = 0.50
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 8.23 (C+H) = 7.50
> J SUB TOTAL (D+G+I) = 33.89 (D+G+I) = 18.59
L Gastos grales. y administrativ 10.00% de (J) = 3.39 10.00% de (J) = 1.86
M Utilidad 10.00% de (J+L) = 3.73 10.00% de (J+L) = 2.04
> N PARCIAL (J+L+M) = 41.00 (J+L+M) = 22.49
P Impuesto a las Transacciones 3.09% de (N) = 1.27 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 42.27 (N+P) = 22.49


> PRECIO ADOPTADO: 42.27 22.49
Son: Cuarenta y Dos con 27/100 Bolivianos
20 Item: PROV Y TENDIDO TUBO PVC D=6" C-9 1.00 m
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M02) - RED DE ADUCCION Y DISTRIBUCION Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - LIMPIADOR l 0.10 40.00 4.00 40.00 40.00 4.00
2 - PEGAMENTO l 0.05 35.00 1.75 35.00 35.00 1.75
3- TUBERIA DE PVC D=6" C-9 m 1.00 85.00 85.00 85.00 85.00 85.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 90.75 (A) = 90.75
B MANO DE OBRA
1 - PLOMERO hr 0.45 18.75 8.44 18.75 18.75 8.44
2 - AYUDANTE hr 0.45 15.00 6.75 6.45 6.45 2.90
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 15.19 (B) = 11.34
F Cargas Sociales 65.00% de (E) = 9.87 65.00% de (E) = 7.37
O Impuesto al Valor Agregado 14.94% de (E+F) = 3.74 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 28.80 (E+F+O) = 18.71
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 1.44 5.00% de (G) = 0.94
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 1.44 (C+H) = 0.94
> J SUB TOTAL (D+G+I) = 120.99 (D+G+I) = 110.40
L Gastos grales. y administrativ 10.00% de (J) = 12.10 10.00% de (J) = 11.04
M Utilidad 10.00% de (J+L) = 13.31 10.00% de (J+L) = 12.14
> N PARCIAL (J+L+M) = 146.40 (J+L+M) = 133.58
P Impuesto a las Transacciones 3.09% de (N) = 4.52 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 150.93 (N+P) = 133.58


> PRECIO ADOPTADO: 150.93 133.58
Son: Ciento Cincuenta con 93/100 Bolivianos
21 Item: PROV Y TENDIDO TUBO PVC D=4" C-9 1.00 m
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M02) - RED DE ADUCCION Y DISTRIBUCION Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1- LIMPIADOR l 0.08 40.00 3.20 40.00 40.00 3.20
2- PEGAMENTO l 0.04 35.00 1.40 35.00 35.00 1.40
3- TUBERIA DE PVC D=4" C-9 m 1.00 55.00 55.00 55.00 55.00 55.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 59.60 (A) = 59.60
B MANO DE OBRA
1 - PLOMERO hr 0.45 18.75 8.44 18.75 18.75 8.44
2- AYUDANTE hr 0.45 15.00 6.75 6.45 6.45 2.90
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 15.19 (B) = 11.34
F Cargas Sociales 65.00% de (E) = 9.87 65.00% de (E) = 7.37
O Impuesto al Valor Agregado 14.94% de (E+F) = 3.74 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 28.80 (E+F+O) = 18.71
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 1.44 5.00% de (G) = 0.94
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 1.44 (C+H) = 0.94
> J SUB TOTAL (D+G+I) = 89.84 (D+G+I) = 79.25
L Gastos grales. y administrativ 10.00% de (J) = 8.98 10.00% de (J) = 7.92
M Utilidad 10.00% de (J+L) = 9.88 10.00% de (J+L) = 8.72
> N PARCIAL (J+L+M) = 108.71 (J+L+M) = 95.89
P Impuesto a las Transacciones 3.09% de (N) = 3.36 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 112.07 (N+P) = 95.89


> PRECIO ADOPTADO: 112.07 95.89
Son: Ciento Doce con 07/100 Bolivianos
22 Item: REPLANTEO DE ESTRUCTURAS 1.00 m²
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M03) - TANQUE DE ALMACENAMIENTO Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - ESTACAS (2"X2"X0,30) pza 4.00 1.00 4.00 1.00 1.00 4.00
2- CLAVOS kg 0.10 15.00 1.50 15.00 15.00 1.50
3- CAL P/BLANQUEO kg 0.15 0.50 0.08 0.50 0.50 0.08
4- HILO NYLON m 1.00 5.00 5.00 5.00 5.00 5.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 10.58 (A) = 10.58
B MANO DE OBRA
1 - ALBAÑIL hr 0.15 18.75 2.81 18.75 18.75 2.81
2- AYUDANTE hr 0.25 15.00 3.75 6.45 6.45 1.61
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 6.56 (B) = 4.43
F Cargas Sociales 65.00% de (E) = 4.27 65.00% de (E) = 2.88
O Impuesto al Valor Agregado 14.94% de (E+F) = 1.62 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 12.45 (E+F+O) = 7.30
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 0.62 5.00% de (G) = 0.37
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 0.62 (C+H) = 0.37
> J SUB TOTAL (D+G+I) = 23.64 (D+G+I) = 18.24
L Gastos grales. y administrativ 10.00% de (J) = 2.36 10.00% de (J) = 1.82
M Utilidad 10.00% de (J+L) = 2.60 10.00% de (J+L) = 2.01
> N PARCIAL (J+L+M) = 28.61 (J+L+M) = 22.07
P Impuesto a las Transacciones 3.09% de (N) = 0.88 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 29.49 (N+P) = 22.07


> PRECIO ADOPTADO: 29.49 22.07
Son: Veintinueve con 49/100 Bolivianos
23 Item: EXCAVACION (0-2 M.) S. SEMIDURO (MANUAL) 1.00 m³
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M03) - TANQUE DE ALMACENAMIENTO Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 0.00 (A) = 0.00
B MANO DE OBRA
1 - PEON hr 3.60 10.00 36.00 4.70 4.70 16.92
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 36.00 (B) = 16.92
F Cargas Sociales 65.00% de (E) = 23.40 65.00% de (E) = 11.00
O Impuesto al Valor Agregado 14.94% de (E+F) = 8.87 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 68.27 (E+F+O) = 27.92
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 3.41 5.00% de (G) = 1.40
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 3.41 (C+H) = 1.40
> J SUB TOTAL (D+G+I) = 71.69 (D+G+I) = 29.31
L Gastos grales. y administrativ 10.00% de (J) = 7.17 10.00% de (J) = 2.93
M Utilidad 10.00% de (J+L) = 7.89 10.00% de (J+L) = 3.22
> N PARCIAL (J+L+M) = 86.74 (J+L+M) = 35.47
P Impuesto a las Transacciones 3.09% de (N) = 2.68 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 89.42 (N+P) = 35.47


> PRECIO ADOPTADO: 89.42 35.47
Son: Ochenta y Nueve con 42/100 Bolivianos
24 Item: Hº Cº (1:2:4) 50 % PD P/ESTRUCTURAS 1.00 m³
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M03) - TANQUE DE ALMACENAMIENTO Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - CEMENTO PORTLAND kg 145.00 1.20 174.00 1.20 1.20 174.00
2- ARENA COMUN m³ 0.25 140.00 35.00 140.00 140.00 35.00
3- GRAVA COMUN m³ 0.35 140.00 49.00 140.00 140.00 49.00
4- PIEDRA BRUTA m³ 0.50 100.00 50.00 100.00 100.00 50.00
5- MADERA DE CONSTRUCCION p² 18.00 7.00 126.00 7.00 7.00 126.00
6- ALAMBRE DE AMARRE kg 0.60 15.00 9.00 15.00 15.00 9.00
7- CLAVOS kg 0.60 15.00 9.00 15.00 15.00 9.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 452.00 (A) = 452.00
B MANO DE OBRA
1 - ENCOFRADOR hr 1.50 18.75 28.13 18.75 18.75 28.13
2- ALBAÑIL hr 5.50 18.75 103.13 18.75 18.75 103.13
3- AYUDANTE hr 6.00 15.00 90.00 6.45 6.45 38.70
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 221.25 (B) = 169.95
F Cargas Sociales 65.00% de (E) = 143.81 65.00% de (E) = 110.47
O Impuesto al Valor Agregado 14.94% de (E+F) = 54.54 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 419.60 (E+F+O) = 280.42
C EQUIPO, MAQUINARIA Y HERRAMIEN
1- MEZCLADORA hr 1.00 20.00 20.00 20.00 20.00 20.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 20.98 5.00% de (G) = 14.02
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 40.98 (C+H) = 34.02
> J SUB TOTAL (D+G+I) = 912.58 (D+G+I) = 766.44
L Gastos grales. y administrativ 10.00% de (J) = 91.26 10.00% de (J) = 76.64
M Utilidad 10.00% de (J+L) = 100.38 10.00% de (J+L) = 84.31
> N PARCIAL (J+L+M) = 1 104.2254 (J+L+M) = 927.39
P Impuesto a las Transacciones 3.09% de (N) = 34.12 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 1 138.3460 (N+P) = 927.39


> PRECIO ADOPTADO: 1 138.35 927.39
Son: Un Mil Ciento Treinta y Ocho con 35/100 Bolivianos
25 Item: REVOQUE CON ADITIVO IMPERMEABILIZANTE 1.00 m²
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M03) - TANQUE DE ALMACENAMIENTO Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1- CEMENTO PORTLAND kg 30.00 1.20 36.00 1.20 1.20 36.00
2- ARENA FINA m³ 0.05 150.00 7.50 150.00 150.00 7.50
3- IMPERMEABILIZANTE l 0.20 15.00 3.00 15.00 15.00 3.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 46.50 (A) = 46.50
B MANO DE OBRA
1 - ALBAÑIL hr 1.50 18.75 28.13 18.75 18.75 28.13
2- AYUDANTE hr 1.50 15.00 22.50 6.45 6.45 9.68
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 50.63 (B) = 37.80
F Cargas Sociales 65.00% de (E) = 32.91 65.00% de (E) = 24.57
O Impuesto al Valor Agregado 14.94% de (E+F) = 12.48 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 96.01 (E+F+O) = 62.37
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 4.80 5.00% de (G) = 3.12
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 4.80 (C+H) = 3.12
> J SUB TOTAL (D+G+I) = 147.31 (D+G+I) = 111.99
L Gastos grales. y administrativ 10.00% de (J) = 14.73 10.00% de (J) = 11.20
M Utilidad 10.00% de (J+L) = 16.20 10.00% de (J+L) = 12.32
> N PARCIAL (J+L+M) = 178.25 (J+L+M) = 135.51
P Impuesto a las Transacciones 3.09% de (N) = 5.51 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 183.75 (N+P) = 135.51


> PRECIO ADOPTADO: 183.75 135.51
Son: Ciento Ochenta y Tres con 75/100 Bolivianos
26 Item: PROV. Y ARMADO ACERO ESTRUCTURAL FY 4200 1.00 kg
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M03) - TANQUE DE ALMACENAMIENTO Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - FIERRO CORRUGADO kg 1.00 9.50 9.50 9.50 9.50 9.50
2 - ALAMBRE DE AMARRE kg 0.05 15.00 0.75 15.00 15.00 0.75
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 10.25 (A) = 10.25
B MANO DE OBRA
1 - ARMADOR hr 0.10 18.75 1.80 18.75 18.75 1.88
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 1.80 (B) = 1.88
F Cargas Sociales 65.00% de (E) = 1.17 65.00% de (E) = 1.22
O Impuesto al Valor Agregado 14.94% de (E+F) = 0.44 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 3.41 (E+F+O) = 3.09
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 0.17 5.00% de (G) = 0.15
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 0.17 (C+H) = 0.15
> J SUB TOTAL (D+G+I) = 13.83 (D+G+I) = 13.50
L Gastos grales. y administrativ 10.00% de (J) = 1.38 10.00% de (J) = 1.35
M Utilidad 10.00% de (J+L) = 1.52 10.00% de (J+L) = 1.48
> N PARCIAL (J+L+M) = 16.74 (J+L+M) = 16.33
P Impuesto a las Transacciones 3.09% de (N) = 0.52 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 17.26 (N+P) = 16.33


> PRECIO ADOPTADO: 17.26 16.33
Son: Diecisiete con 26/100 Bolivianos
27 Item: HºSº P/ELEMENTOS ESTRUCTURALES 1.00 m³
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M03) - TANQUE DE ALMACENAMIENTO Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - CEMENTO PORTLAND kg 175.00 1.20 210.00 1.20 1.20 210.00
2 - ARENA COMUN m³ 0.45 140.00 63.00 140.00 140.00 63.00
3- GRAVA COMUN m³ 0.95 140.00 133.00 140.00 140.00 133.00
4- MADERA DE CONSTRUCCION p² 40.00 7.00 280.00 7.00 7.00 280.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 686.00 (A) = 686.00
B MANO DE OBRA
1 - ALBAÑIL hr 10.00 18.75 187.50 18.75 18.75 187.50
2 - AYUDANTE hr 12.00 15.00 180.00 6.45 6.45 77.40
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 367.50 (B) = 264.90
F Cargas Sociales 65.00% de (E) = 238.88 65.00% de (E) = 172.19
O Impuesto al Valor Agregado 14.94% de (E+F) = 90.59 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 696.97 (E+F+O) = 437.09
C EQUIPO, MAQUINARIA Y HERRAMIEN
1 - MEZCLADORA hr 1.00 20.00 20.00 20.00 20.00 20.00
2- VIBRADORA hr 0.75 10.00 7.50 10.00 10.00 7.50
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 34.85 5.00% de (G) = 21.85
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 62.35 (C+H) = 49.35
> J SUB TOTAL (D+G+I) = 1 445.3158 (D+G+I) = 1,172.44
L Gastos grales. y administrativ 10.00% de (J) = 144.53 10.00% de (J) = 117.24
M Utilidad 10.00% de (J+L) = 158.98 10.00% de (J+L) = 128.97
> N PARCIAL (J+L+M) = 1 748.8321 (J+L+M) = 1,418.65
P Impuesto a las Transacciones 3.09% de (N) = 54.04 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 1 802.8710 (N+P) = 1,418.65


> PRECIO ADOPTADO: 1 802.87 1,418.65
Son: Un Mil Ochocientos Dos con 87/100 Bolivianos
28 Item: H°A° P/LOSAS PEQUEÑAS 1.00 m³
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M03) - TANQUE DE ALMACENAMIENTO Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1- CEMENTO PORTLAND kg 350.00 1.20 420.00 1.20 1.20 420.00
2- FIERRO CORRUGADO kg 80.00 9.50 760.00 9.50 9.50 760.00
3- ARENA COMUN m³ 0.50 140.00 70.00 140.00 140.00 70.00
4- GRAVA COMUN m³ 0.70 140.00 98.00 140.00 140.00 98.00
5- MADERA DE CONSTRUCCION p² 60.00 7.00 420.00 7.00 7.00 420.00
6- CLAVOS kg 0.20 15.00 3.00 15.00 15.00 3.00
7- ALAMBRE DE AMARRE kg 0.20 15.00 3.00 15.00 15.00 3.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 1 774.0000 (A) = 1,774.00
B MANO DE OBRA
1 - ENCOFRADOR hr 6.00 18.75 112.50 18.75 18.75 112.50
2- ARMADOR hr 8.00 18.75 150.00 18.75 18.75 150.00
3- ALBAÑIL hr 8.00 18.75 150.00 18.75 18.75 150.00
4- AYUDANTE hr 10.00 15.00 150.00 6.45 6.45 64.50
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 562.50 (B) = 477.00
F Cargas Sociales 65.00% de (E) = 365.63 65.00% de (E) = 310.05
O Impuesto al Valor Agregado 14.94% de (E+F) = 138.66 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 1 066.7869 (E+F+O) = 787.05
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 53.34 5.00% de (G) = 39.35
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 53.34 (C+H) = 39.35
> J SUB TOTAL (D+G+I) = 2 894.1262 (D+G+I) = 2,600.40
L Gastos grales. y administrativ 10.00% de (J) = 289.41 10.00% de (J) = 260.04
M Utilidad 10.00% de (J+L) = 318.35 10.00% de (J+L) = 286.04
> N PARCIAL (J+L+M) = 3 501.8927 (J+L+M) = 3,146.49
P Impuesto a las Transacciones 3.09% de (N) = 108.21 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 3 610.1012 (N+P) = 3,146.49


> PRECIO ADOPTADO: 3 610.10 3,146.49
Son: Tres Mil Seiscientos Diez con 10/100 Bolivianos
29 Item: PROV Y COLOC ACCESORIOS ESTANQUE D=4" 1.00 pza
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M03) - TANQUE DE ALMACENAMIENTO Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - UNION UNIVERSAL 4" pza 3.00 660.00 1 980.0000 660.00 660.00 1,980.00
2- ADAPTADOR DE PVC E-40 D=4" pza 2.00 45.00 90.00 45.00 45.00 90.00
3- COLADOR BR 4" pza 1.00 590.00 590.00 590.00 590.00 590.00
4- NIPLE EXAGONAL 4" pza 3.00 220.00 660.00 220.00 220.00 660.00
5- LLAVE DE PASO FºGº 4" pza 2.00 800.00 1 600.0000 800.00 800.00 1,600.00
6- CODO FG 4" pza 2.00 255.00 510.00 255.00 255.00 510.00
7- TUBO DE FºGº 4" m 4.20 230.00 966.00 230.00 230.00 966.00
8- LLAVE DE PASO FG 3" pza 1.00 420.00 420.00 420.00 420.00 420.00
9- NIPLE EXAGONAL FG 3" pza 3.00 75.00 225.00 75.00 75.00 225.00
10 - UNION UNIVERSAL FG 3" pza 1.00 295.00 295.00 295.00 295.00 295.00
11 - TEE DE FG 3" pza 1.00 170.00 170.00 170.00 170.00 170.00
12 - CODO FG 3" pza 3.00 145.00 435.00 145.00 145.00 435.00
13 - TUBERIA F.G. D= 3" m 4.80 110.00 528.00 110.00 110.00 528.00
14 - CINTA TEFLON roll 5.00 3.00 15.00 3.00 3.00 15.00
0.00 0.00
> D TOTAL MATERIALES (A) = 8 484.0000 (A) = 8,484.00
B MANO DE OBRA
1 - PLOMERO hr 13.00 18.75 243.75 18.75 18.75 243.75
2 - AYUDANTE hr 13.00 15.00 195.00 6.45 6.45 83.85
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 438.75 (B) = 327.60
F Cargas Sociales 65.00% de (E) = 285.19 65.00% de (E) = 212.94
O Impuesto al Valor Agregado 14.94% de (E+F) = 108.16 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 832.09 (E+F+O) = 540.54
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 41.60 5.00% de (G) = 27.03
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 41.60 (C+H) = 27.03
> J SUB TOTAL (D+G+I) = 9 357.6984 (D+G+I) = 9,051.57
L Gastos grales. y administrativ 10.00% de (J) = 935.77 10.00% de (J) = 905.16
M Utilidad 10.00% de (J+L) = 1 029.3468 10.00% de (J+L) = 995.67
> N PARCIAL (J+L+M) = 11 322.8151 (J+L+M) = 10,952.40
P Impuesto a las Transacciones 3.09% de (N) = 349.88 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 11 672.6901 (N+P) = 10,952.40


> PRECIO ADOPTADO: 11 672.69 10,952.40
Son: Once Mil Seiscientos Setenta y Dos con 69/100 Bolivianos
30 Item: EXCAVACION (0-2 M.) S. SEMIDURO (MANUAL) 1.00 m³
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M04) - OBRAS DE ARTE Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 0.00 (A) = 0.00
B MANO DE OBRA
1 - PEON hr 3.60 10.00 36.00 4.70 4.70 16.92
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 36.00 (B) = 16.92
F Cargas Sociales 65.00% de (E) = 23.40 65.00% de (E) = 11.00
O Impuesto al Valor Agregado 14.94% de (E+F) = 8.87 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 68.27 (E+F+O) = 27.92
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 3.41 5.00% de (G) = 1.40
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 3.41 (C+H) = 1.40
> J SUB TOTAL (D+G+I) = 71.69 (D+G+I) = 29.31
L Gastos grales. y administrativ 10.00% de (J) = 7.17 10.00% de (J) = 2.93
M Utilidad 10.00% de (J+L) = 7.89 10.00% de (J+L) = 3.22
> N PARCIAL (J+L+M) = 86.74 (J+L+M) = 35.47
P Impuesto a las Transacciones 3.09% de (N) = 2.68 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 89.42 (N+P) = 35.47


> PRECIO ADOPTADO: 89.42 35.47
Son: Ochenta y Nueve con 42/100 Bolivianos
31 Item: RETIRO Y REPOSICION DE CARPETA ASFALTICA 1.00 m²
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M04) - OBRAS DE ARTE Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - MEZCLA ASFALTICA m³ 0.10 1,200.00 120.00 1,200.00 1,200.00 120.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 120.00 (A) = 120.00
B MANO DE OBRA
1 - ESPECIALISTA hr 1.00 20.00 20.00 20.00 20.00 20.00
2 - ALBAÑIL hr 0.50 18.75 9.38 18.75 18.75 9.38
3- PEON hr 1.00 10.00 10.00 4.30 4.30 4.30
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 39.38 (B) = 33.68
F Cargas Sociales 65.00% de (E) = 25.59 65.00% de (E) = 21.89
O Impuesto al Valor Agregado 14.94% de (E+F) = 9.71 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 74.68 (E+F+O) = 55.56
C EQUIPO, MAQUINARIA Y HERRAMIEN
1- CORTADORA DE ASFALTO hr 1.00 20.00 20.00 20.00 20.00 20.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 3.73 5.00% de (G) = 2.78
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 23.73 (C+H) = 22.78
> J SUB TOTAL (D+G+I) = 218.41 (D+G+I) = 198.34
L Gastos grales. y administrativ 10.00% de (J) = 21.84 10.00% de (J) = 19.83
M Utilidad 10.00% de (J+L) = 24.03 10.00% de (J+L) = 21.82
> N PARCIAL (J+L+M) = 264.27 (J+L+M) = 239.99
P Impuesto a las Transacciones 3.09% de (N) = 8.17 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 272.44 (N+P) = 239.99


> PRECIO ADOPTADO: 272.44 239.99
Son: Doscientos Setenta y Dos con 44/100 Bolivianos
32 Item: Hº Cº (1:2:4) 50 % PD P/ESTRUCTURAS 1.00 m³
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M04) - OBRAS DE ARTE Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - CEMENTO PORTLAND kg 145.00 1.20 174.00 1.20 1.20 174.00
2- ARENA COMUN m³ 0.25 140.00 35.00 140.00 140.00 35.00
3- GRAVA COMUN m³ 0.35 140.00 49.00 140.00 140.00 49.00
4- PIEDRA BRUTA m³ 0.50 100.00 50.00 100.00 100.00 50.00
5- MADERA DE CONSTRUCCION p² 18.00 7.00 126.00 7.00 7.00 126.00
6- ALAMBRE DE AMARRE kg 0.60 15.00 9.00 15.00 15.00 9.00
7- CLAVOS kg 0.60 15.00 9.00 15.00 15.00 9.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 452.00 (A) = 452.00
B MANO DE OBRA
1 - ENCOFRADOR hr 1.50 18.75 28.13 18.75 18.75 28.13
2- ALBAÑIL hr 5.50 18.75 103.13 18.75 18.75 103.13
3- AYUDANTE hr 6.00 15.00 90.00 6.45 6.45 38.70
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 221.25 (B) = 169.95
F Cargas Sociales 65.00% de (E) = 143.81 65.00% de (E) = 110.47
O Impuesto al Valor Agregado 14.94% de (E+F) = 54.54 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 419.60 (E+F+O) = 280.42
C EQUIPO, MAQUINARIA Y HERRAMIEN
1- MEZCLADORA hr 1.00 20.00 20.00 20.00 20.00 20.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 20.98 5.00% de (G) = 14.02
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 40.98 (C+H) = 34.02
> J SUB TOTAL (D+G+I) = 912.58 (D+G+I) = 766.44
L Gastos grales. y administrativ 10.00% de (J) = 91.26 10.00% de (J) = 76.64
M Utilidad 10.00% de (J+L) = 100.38 10.00% de (J+L) = 84.31
> N PARCIAL (J+L+M) = 1 104.2254 (J+L+M) = 927.39
P Impuesto a las Transacciones 3.09% de (N) = 34.12 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 1 138.3460 (N+P) = 927.39


> PRECIO ADOPTADO: 1 138.35 927.39
Son: Un Mil Ciento Treinta y Ocho con 35/100 Bolivianos
33 Item: HºSº P/ELEMENTOS ESTRUCTURALES 1.00 m³
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M04) - OBRAS DE ARTE Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1- CEMENTO PORTLAND kg 175.00 1.20 210.00 1.20 1.20 210.00
2- ARENA COMUN m³ 0.45 140.00 63.00 140.00 140.00 63.00
3- GRAVA COMUN m³ 0.95 140.00 133.00 140.00 140.00 133.00
4- MADERA DE CONSTRUCCION p² 40.00 7.00 280.00 7.00 7.00 280.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 686.00 (A) = 686.00
B MANO DE OBRA
1 - ALBAÑIL hr 10.00 18.75 187.50 18.75 18.75 187.50
2- AYUDANTE hr 12.00 15.00 180.00 6.45 6.45 77.40
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 367.50 (B) = 264.90
F Cargas Sociales 65.00% de (E) = 238.88 65.00% de (E) = 172.19
O Impuesto al Valor Agregado 14.94% de (E+F) = 90.59 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 696.97 (E+F+O) = 437.09
C EQUIPO, MAQUINARIA Y HERRAMIEN
1- MEZCLADORA hr 1.00 20.00 20.00 20.00 20.00 20.00
2- VIBRADORA hr 0.75 10.00 7.50 10.00 10.00 7.50
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 34.85 5.00% de (G) = 21.85
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 62.35 (C+H) = 49.35
> J SUB TOTAL (D+G+I) = 1 445.3158 (D+G+I) = 1,172.44
L Gastos grales. y administrativ 10.00% de (J) = 144.53 10.00% de (J) = 117.24
M Utilidad 10.00% de (J+L) = 158.98 10.00% de (J+L) = 128.97
> N PARCIAL (J+L+M) = 1 748.8321 (J+L+M) = 1,418.65
P Impuesto a las Transacciones 3.09% de (N) = 54.04 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 1 802.8710 (N+P) = 1,418.65


> PRECIO ADOPTADO: 1 802.87 1,418.65
Son: Un Mil Ochocientos Dos con 87/100 Bolivianos
34 Item: PROV. Y ARMADO ACERO ESTRUCTURAL FY 4200 1.00 kg
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M04) - OBRAS DE ARTE Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - FIERRO CORRUGADO kg 1.00 9.50 9.50 9.50 9.50 9.50
2 - ALAMBRE DE AMARRE kg 0.05 15.00 0.75 15.00 15.00 0.75
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 10.25 (A) = 10.25
B MANO DE OBRA
1 - ARMADOR hr 0.10 18.75 1.80 18.75 18.75 1.88
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 1.80 (B) = 1.88
F Cargas Sociales 65.00% de (E) = 1.17 65.00% de (E) = 1.22
O Impuesto al Valor Agregado 14.94% de (E+F) = 0.44 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 3.41 (E+F+O) = 3.09
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 0.17 5.00% de (G) = 0.15
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 0.17 (C+H) = 0.15
> J SUB TOTAL (D+G+I) = 13.83 (D+G+I) = 13.50
L Gastos grales. y administrativ 10.00% de (J) = 1.38 10.00% de (J) = 1.35
M Utilidad 10.00% de (J+L) = 1.52 10.00% de (J+L) = 1.48
> N PARCIAL (J+L+M) = 16.74 (J+L+M) = 16.33
P Impuesto a las Transacciones 3.09% de (N) = 0.52 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 17.26 (N+P) = 16.33


> PRECIO ADOPTADO: 17.26 16.33
Son: Diecisiete con 26/100 Bolivianos
35 Item: PROV Y COLOC. TUBO FG D=6" 1.00 m
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M04) - OBRAS DE ARTE Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - CUPLA FG 6" pza 0.17 895.00 152.15 895.00 895.00 152.15
2 - TUBERIA F.G. D= 6" m 1.05 325.00 341.25 325.00 325.00 341.25
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 493.40 (A) = 493.40
B MANO DE OBRA
1 - PLOMERO hr 0.50 18.75 9.38 18.75 18.75 9.38
2 - AYUDANTE hr 0.50 15.00 7.50 6.45 6.45 3.23
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 16.88 (B) = 12.60
F Cargas Sociales 65.00% de (E) = 10.97 65.00% de (E) = 8.19
O Impuesto al Valor Agregado 14.94% de (E+F) = 4.16 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 32.00 (E+F+O) = 20.79
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 1.60 5.00% de (G) = 1.04
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 1.60 (C+H) = 1.04
> J SUB TOTAL (D+G+I) = 527.00 (D+G+I) = 515.23
L Gastos grales. y administrativ 10.00% de (J) = 52.70 10.00% de (J) = 51.52
M Utilidad 10.00% de (J+L) = 57.97 10.00% de (J+L) = 56.68
> N PARCIAL (J+L+M) = 637.67 (J+L+M) = 623.43
P Impuesto a las Transacciones 3.09% de (N) = 19.70 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 657.38 (N+P) = 623.43


> PRECIO ADOPTADO: 657.38 623.43
Son: Seiscientos Cincuenta y Siete con 38/100 Bolivianos
36 Item: PROV Y COLOC. TUBO FG D=4" 1.00 m
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M04) - OBRAS DE ARTE Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - CUPLA FG 4" pza 0.17 235.00 39.95 235.00 235.00 39.95
2 - TUBO DE FºGº 4" m 1.05 230.00 241.50 230.00 230.00 241.50
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 281.45 (A) = 281.45
B MANO DE OBRA
1 - PLOMERO hr 0.30 18.75 5.63 18.75 18.75 5.63
2- AYUDANTE hr 0.30 15.00 4.50 6.45 6.45 1.94
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 10.13 (B) = 7.56
F Cargas Sociales 65.00% de (E) = 6.58 65.00% de (E) = 4.91
O Impuesto al Valor Agregado 14.94% de (E+F) = 2.50 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 19.20 (E+F+O) = 12.47
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 0.96 5.00% de (G) = 0.62
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 0.96 (C+H) = 0.62
> J SUB TOTAL (D+G+I) = 301.61 (D+G+I) = 294.55
L Gastos grales. y administrativ 10.00% de (J) = 30.16 10.00% de (J) = 29.45
M Utilidad 10.00% de (J+L) = 33.18 10.00% de (J+L) = 32.40
> N PARCIAL (J+L+M) = 364.95 (J+L+M) = 356.40
P Impuesto a las Transacciones 3.09% de (N) = 11.28 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 376.23 (N+P) = 356.40


> PRECIO ADOPTADO: 376.23 356.40
Son: Trescientos Setenta y Seis con 23/100 Bolivianos
37 Item: PROV Y COLOC. SEGUROS P/PASOS DE QUEBRADAS 1.00 pza
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M04) - OBRAS DE ARTE Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - PLETINA 1 1/2" X1/4" m 0.90 12.00 10.80 12.00 12.00 10.80
2 - PERNOS J pza 2.00 5.50 11.00 5.50 5.50 11.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 21.80 (A) = 21.80
B MANO DE OBRA
1 - ALBAÑIL hr 0.40 18.75 7.50 18.75 18.75 7.50
2 - AYUDANTE hr 0.50 15.00 7.50 6.45 6.45 3.23
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 15.00 (B) = 10.73
F Cargas Sociales 65.00% de (E) = 9.75 65.00% de (E) = 6.97
O Impuesto al Valor Agregado 14.94% de (E+F) = 3.70 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 28.45 (E+F+O) = 17.70
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 1.42 5.00% de (G) = 0.88
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 1.42 (C+H) = 0.88
> J SUB TOTAL (D+G+I) = 51.67 (D+G+I) = 40.38
L Gastos grales. y administrativ 10.00% de (J) = 5.17 10.00% de (J) = 4.04
M Utilidad 10.00% de (J+L) = 5.68 10.00% de (J+L) = 4.44
> N PARCIAL (J+L+M) = 62.52 (J+L+M) = 48.86
P Impuesto a las Transacciones 3.09% de (N) = 1.93 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 64.45 (N+P) = 48.86


> PRECIO ADOPTADO: 64.45 48.86
Son: Sesenta y Cuatro con 45/100 Bolivianos
38 Item: PUENTE COLGANTE ACUEDUCTO (L=10 M) 1.00 pza
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M04) - OBRAS DE ARTE Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - MORDAZA MODIFICADA PARA D=1/2* pza 4.00 25.00 100.00 25.00 25.00 100.00
2 - MORDAZA PARA D=1/2* pza 24.00 25.00 600.00 25.00 25.00 600.00
3 - CABLE ACERADO D=1/2" m 30.00 25.00 750.00 25.00 25.00 750.00
4- TENSOR DE 7/8* pza 2.00 75.00 150.00 75.00 75.00 150.00
5- GUARDACABLE PARA D=1/2* pza 8.00 16.00 128.00 16.00 16.00 128.00
6- TUBO DE FºGº 4" m 20.00 230.00 4 600.0000 230.00 230.00 4,600.00
7- ELECTRODOS kg 3.00 25.00 75.00 25.00 25.00 75.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 6 403.0000 (A) = 6,403.00
B MANO DE OBRA
1 - ALBAÑIL hr 20.00 18.75 375.00 18.75 18.75 375.00
2 - PLOMERO hr 20.00 18.75 375.00 18.75 18.75 375.00
3- AYUDANTE hr 60.00 15.00 900.00 6.45 6.45 387.00
4- SOLDADOR hr 10.00 18.75 187.50 18.75 18.75 187.50
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 1 837.5000 (B) = 1,324.50
F Cargas Sociales 65.00% de (E) = 1 194.3750 65.00% de (E) = 860.93
O Impuesto al Valor Agregado 14.94% de (E+F) = 452.96 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 3 484.8371 (E+F+O) = 2,185.43
C EQUIPO, MAQUINARIA Y HERRAMIEN
1- MAQUINA DE SOLDAR hr 3.00 20.00 60.00 20.00 20.00 60.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 174.24 5.00% de (G) = 109.27
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 234.24 (C+H) = 169.27
> J SUB TOTAL (D+G+I) = 10 122.0790 (D+G+I) = 8,757.70
L Gastos grales. y administrativ 10.00% de (J) = 1 012.2079 10.00% de (J) = 875.77
M Utilidad 10.00% de (J+L) = 1 113.4287 10.00% de (J+L) = 963.35
> N PARCIAL (J+L+M) = 12 247.7156 (J+L+M) = 10,596.81
P Impuesto a las Transacciones 3.09% de (N) = 378.45 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 12 626.1700 (N+P) = 10,596.81


> PRECIO ADOPTADO: 12 626.17 10,596.81
Son: Doce Mil Seiscientos Veintiseis con 17/100 Bolivianos
39 Item: PUENTE COLGANTE ACUEDUCTO (L=15 M) 1.00 pza
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M04) - OBRAS DE ARTE Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - MORDAZA MODIFICADA PARA D=1/2* pza 5.00 25.00 125.00 25.00 25.00 125.00
2 - MORDAZA PARA D=1/2* pza 28.00 25.00 700.00 25.00 25.00 700.00
3 - CABLE ACERADO D=1/2" m 38.00 25.00 950.00 25.00 25.00 950.00
4- TENSOR DE 7/8* pza 2.00 75.00 150.00 75.00 75.00 150.00
5- GUARDACABLE PARA D=1/2* pza 9.00 16.00 144.00 16.00 16.00 144.00
6- TUBO DE FºGº 4" m 20.00 230.00 4 600.0000 230.00 230.00 4,600.00
7- ELECTRODOS kg 3.00 25.00 75.00 25.00 25.00 75.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 6 744.0000 (A) = 6,744.00
B MANO DE OBRA
1 - ALBAÑIL hr 20.00 18.75 375.00 18.75 18.75 375.00
2 - PLOMERO hr 20.00 18.75 375.00 18.75 18.75 375.00
3- AYUDANTE hr 60.00 15.00 900.00 6.45 6.45 387.00
4- SOLDADOR hr 5.00 18.75 93.75 18.75 18.75 93.75
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 1 743.7500 (B) = 1,230.75
F Cargas Sociales 65.00% de (E) = 1 133.4375 65.00% de (E) = 799.99
O Impuesto al Valor Agregado 14.94% de (E+F) = 429.85 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 3 307.0393 (E+F+O) = 2,030.74
C EQUIPO, MAQUINARIA Y HERRAMIEN
1- MAQUINA DE SOLDAR hr 3.00 20.00 60.00 20.00 20.00 60.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 165.35 5.00% de (G) = 101.54
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 225.35 (C+H) = 161.54
> J SUB TOTAL (D+G+I) = 10 276.3913 (D+G+I) = 8,936.27
L Gastos grales. y administrativ 10.00% de (J) = 1 027.6391 10.00% de (J) = 893.63
M Utilidad 10.00% de (J+L) = 1 130.4030 10.00% de (J+L) = 982.99
> N PARCIAL (J+L+M) = 12 434.4334 (J+L+M) = 10,812.89
P Impuesto a las Transacciones 3.09% de (N) = 384.22 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 12 818.6574 (N+P) = 10,812.89


> PRECIO ADOPTADO: 12 818.66 10,812.89
Son: Doce Mil Ochocientos Dieciocho con 66/100 Bolivianos
40 Item: PUENTE COLGANTE ACUEDUCTO (L=20 M) 1.00 pza
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M04) - OBRAS DE ARTE Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - MORDAZA MODIFICADA PARA D=1/2* pza 9.00 25.00 225.00 25.00 25.00 225.00
2 - MORDAZA PARA D=1/2* pza 44.00 25.00 1 100.0000 25.00 25.00 1,100.00
3 - CABLE ACERADO D=1/2" m 76.50 25.00 1 912.5000 25.00 25.00 1,912.50
4- TENSOR DE 7/8* pza 2.00 75.00 150.00 75.00 75.00 150.00
5- GUARDACABLE PARA D=1/2* pza 11.00 16.00 176.00 16.00 16.00 176.00
6- TUBO DE FºGº 4" m 20.00 230.00 4 600.0000 230.00 230.00 4,600.00
7- ELECTRODOS kg 3.00 25.00 75.00 25.00 25.00 75.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 8 238.5000 (A) = 8,238.50
B MANO DE OBRA
1 - ALBAÑIL hr 22.00 18.75 412.50 18.75 18.75 412.50
2 - PLOMERO hr 22.00 18.75 412.50 18.75 18.75 412.50
3- AYUDANTE hr 72.00 15.00 1 080.0000 6.45 6.45 464.40
4- SOLDADOR hr 5.00 18.75 93.75 18.75 18.75 93.75
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 1 998.7500 (B) = 1,383.15
F Cargas Sociales 65.00% de (E) = 1 299.1875 65.00% de (E) = 899.05
O Impuesto al Valor Agregado 14.94% de (E+F) = 492.71 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 3 790.6493 (E+F+O) = 2,282.20
C EQUIPO, MAQUINARIA Y HERRAMIEN
1- MAQUINA DE SOLDAR hr 3.00 20.00 60.00 20.00 20.00 60.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 189.53 5.00% de (G) = 114.11
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 249.53 (C+H) = 174.11
> J SUB TOTAL (D+G+I) = 12 278.6818 (D+G+I) = 10,694.81
L Gastos grales. y administrativ 10.00% de (J) = 1 227.8682 10.00% de (J) = 1,069.48
M Utilidad 10.00% de (J+L) = 1 350.6550 10.00% de (J+L) = 1,176.43
> N PARCIAL (J+L+M) = 14 857.2050 (J+L+M) = 12,940.72
P Impuesto a las Transacciones 3.09% de (N) = 459.09 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 15 316.2926 (N+P) = 12,940.72


> PRECIO ADOPTADO: 15 316.29 12,940.72
Son: Quince Mil Trescientos Dieciseis con 29/100 Bolivianos
41 Item: PUENTE COLGANTE ACUEDUCTO (L=25 M) 1.00 pza
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M04) - OBRAS DE ARTE Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - MORDAZA MODIFICADA PARA D=1/2* pza 9.00 25.00 225.00 25.00 25.00 225.00
2 - MORDAZA PARA D=1/2* pza 44.00 25.00 1 100.0000 25.00 25.00 1,100.00
3 - CABLE ACERADO D=1/2" m 81.50 25.00 2 037.5000 25.00 25.00 2,037.50
4- TENSOR DE 7/8* pza 2.00 75.00 150.00 75.00 75.00 150.00
5- GUARDACABLE PARA D=1/2* pza 11.00 16.00 176.00 16.00 16.00 176.00
6- TUBO DE FºGº 4" m 22.60 230.00 5 198.0000 230.00 230.00 5,198.00
7- ELECTRODOS kg 3.00 25.00 75.00 25.00 25.00 75.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 8 961.5000 (A) = 8,961.50
B MANO DE OBRA
1 - ALBAÑIL hr 22.00 18.75 412.50 18.75 18.75 412.50
2 - PLOMERO hr 22.00 18.75 412.50 18.75 18.75 412.50
3- AYUDANTE hr 72.00 15.00 1 080.0000 6.45 6.45 464.40
4- SOLDADOR hr 5.00 18.75 93.75 18.75 18.75 93.75
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 1 998.7500 (B) = 1,383.15
F Cargas Sociales 65.00% de (E) = 1 299.1875 65.00% de (E) = 899.05
O Impuesto al Valor Agregado 14.94% de (E+F) = 492.71 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 3 790.6493 (E+F+O) = 2,282.20
C EQUIPO, MAQUINARIA Y HERRAMIEN
1- MAQUINA DE SOLDAR hr 3.00 20.00 60.00 20.00 20.00 60.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 189.53 5.00% de (G) = 114.11
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 249.53 (C+H) = 174.11
> J SUB TOTAL (D+G+I) = 13 001.6818 (D+G+I) = 11,417.81
L Gastos grales. y administrativ 10.00% de (J) = 1 300.1682 10.00% de (J) = 1,141.78
M Utilidad 10.00% de (J+L) = 1 430.1850 10.00% de (J+L) = 1,255.96
> N PARCIAL (J+L+M) = 15 732.0350 (J+L+M) = 13,815.55
P Impuesto a las Transacciones 3.09% de (N) = 486.12 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 16 218.1549 (N+P) = 13,815.55


> PRECIO ADOPTADO: 16 218.15 13,815.55
Son: Dieciseis Mil Doscientos Dieciocho con 15/100 Bolivianos
42 Item: EXCAVACION (0-2 M.) S. SEMIDURO (MANUAL) 1.00 m³
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M05) - CAMARAS Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 0.00 (A) = 0.00
B MANO DE OBRA
1 - PEON hr 3.60 10.00 36.00 4.70 4.70 16.92
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 36.00 (B) = 16.92
F Cargas Sociales 65.00% de (E) = 23.40 65.00% de (E) = 11.00
O Impuesto al Valor Agregado 14.94% de (E+F) = 8.87 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 68.27 (E+F+O) = 27.92
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 3.41 5.00% de (G) = 1.40
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 3.41 (C+H) = 1.40
> J SUB TOTAL (D+G+I) = 71.69 (D+G+I) = 29.31
L Gastos grales. y administrativ 10.00% de (J) = 7.17 10.00% de (J) = 2.93
M Utilidad 10.00% de (J+L) = 7.89 10.00% de (J+L) = 3.22
> N PARCIAL (J+L+M) = 86.74 (J+L+M) = 35.47
P Impuesto a las Transacciones 3.09% de (N) = 2.68 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 89.42 (N+P) = 35.47


> PRECIO ADOPTADO: 89.42 35.47
Son: Ochenta y Nueve con 42/100 Bolivianos
43 Item: DEMOLICION MANUAL DE H°C° 1.00 m³
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M05) - CAMARAS Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 0.00 (A) = 0.00
B MANO DE OBRA
1 - PEON hr 8.00 10.00 80.00 4.70 4.70 37.60
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 80.00 (B) = 37.60
F Cargas Sociales 65.00% de (E) = 52.00 65.00% de (E) = 24.44
O Impuesto al Valor Agregado 14.94% de (E+F) = 19.72 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 151.72 (E+F+O) = 62.04
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 7.59 5.00% de (G) = 3.10
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 7.59 (C+H) = 3.10
> J SUB TOTAL (D+G+I) = 159.31 (D+G+I) = 65.14
L Gastos grales. y administrativ 10.00% de (J) = 15.93 10.00% de (J) = 6.51
M Utilidad 10.00% de (J+L) = 17.52 10.00% de (J+L) = 7.17
> N PARCIAL (J+L+M) = 192.76 (J+L+M) = 78.82
P Impuesto a las Transacciones 3.09% de (N) = 5.96 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 198.72 (N+P) = 78.82


> PRECIO ADOPTADO: 198.72 78.82
Son: Ciento Noventa y Ocho con 72/100 Bolivianos
44 Item: Hº Cº (1:2:4) 50 % PD P/ESTRUCTURAS 1.00 m³
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M05) - CAMARAS Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - CEMENTO PORTLAND kg 145.00 1.20 174.00 1.20 1.20 174.00
2- ARENA COMUN m³ 0.25 140.00 35.00 140.00 140.00 35.00
3- GRAVA COMUN m³ 0.35 140.00 49.00 140.00 140.00 49.00
4- PIEDRA BRUTA m³ 0.50 100.00 50.00 100.00 100.00 50.00
5- MADERA DE CONSTRUCCION p² 18.00 7.00 126.00 7.00 7.00 126.00
6- ALAMBRE DE AMARRE kg 0.60 15.00 9.00 15.00 15.00 9.00
7- CLAVOS kg 0.60 15.00 9.00 15.00 15.00 9.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 452.00 (A) = 452.00
B MANO DE OBRA
1 - ENCOFRADOR hr 1.50 18.75 28.13 18.75 18.75 28.13
2- ALBAÑIL hr 5.50 18.75 103.13 18.75 18.75 103.13
3- AYUDANTE hr 6.00 15.00 90.00 6.45 6.45 38.70
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 221.25 (B) = 169.95
F Cargas Sociales 65.00% de (E) = 143.81 65.00% de (E) = 110.47
O Impuesto al Valor Agregado 14.94% de (E+F) = 54.54 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 419.60 (E+F+O) = 280.42
C EQUIPO, MAQUINARIA Y HERRAMIEN
1- MEZCLADORA hr 1.00 20.00 20.00 20.00 20.00 20.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 20.98 5.00% de (G) = 14.02
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 40.98 (C+H) = 34.02
> J SUB TOTAL (D+G+I) = 912.58 (D+G+I) = 766.44
L Gastos grales. y administrativ 10.00% de (J) = 91.26 10.00% de (J) = 76.64
M Utilidad 10.00% de (J+L) = 100.38 10.00% de (J+L) = 84.31
> N PARCIAL (J+L+M) = 1 104.2254 (J+L+M) = 927.39
P Impuesto a las Transacciones 3.09% de (N) = 34.12 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 1 138.3460 (N+P) = 927.39


> PRECIO ADOPTADO: 1 138.35 927.39
Son: Un Mil Ciento Treinta y Ocho con 35/100 Bolivianos
45 Item: H°A° 1:2:3 P/ESTRUCTURAS 1.00 m³
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M05) - CAMARAS Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1- CEMENTO PORTLAND kg 350.00 1.20 420.00 1.20 1.20 420.00
2- FIERRO CORRUGADO kg 80.00 9.50 760.00 9.50 9.50 760.00
3- ARENA COMUN m³ 0.50 140.00 70.00 140.00 140.00 70.00
4- GRAVA COMUN m³ 0.70 140.00 98.00 140.00 140.00 98.00
5- MADERA DE CONSTRUCCION p² 60.00 7.00 420.00 7.00 7.00 420.00
6- CLAVOS kg 0.20 15.00 3.00 15.00 15.00 3.00
7- ALAMBRE DE AMARRE kg 0.20 15.00 3.00 15.00 15.00 3.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 1 774.0000 (A) = 1,774.00
B MANO DE OBRA
1 - ENCOFRADOR hr 6.00 18.75 112.50 18.75 18.75 112.50
2- ARMADOR hr 12.00 18.75 225.00 18.75 18.75 225.00
3- ALBAÑIL hr 12.00 18.75 225.00 18.75 18.75 225.00
4- AYUDANTE hr 12.00 15.00 180.00 6.45 6.45 77.40
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 742.50 (B) = 639.90
F Cargas Sociales 65.00% de (E) = 482.63 65.00% de (E) = 415.94
O Impuesto al Valor Agregado 14.94% de (E+F) = 183.03 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 1 408.1587 (E+F+O) = 1,055.84
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 70.41 5.00% de (G) = 52.79
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 70.41 (C+H) = 52.79
> J SUB TOTAL (D+G+I) = 3 252.5666 (D+G+I) = 2,882.63
L Gastos grales. y administrativ 10.00% de (J) = 325.26 10.00% de (J) = 288.26
M Utilidad 10.00% de (J+L) = 357.78 10.00% de (J+L) = 317.09
> N PARCIAL (J+L+M) = 3 935.6056 (J+L+M) = 3,487.98
P Impuesto a las Transacciones 3.09% de (N) = 121.61 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 4 057.2158 (N+P) = 3,487.98


> PRECIO ADOPTADO: 4 057.22 3,487.98
Son: Cuatro Mil Cincuenta y Siete con 22/100 Bolivianos
46 Item: HºSº P/ELEMENTOS ESTRUCTURALES 1.00 m³
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M05) - CAMARAS Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1- CEMENTO PORTLAND kg 175.00 1.20 210.00 1.20 1.20 210.00
2- ARENA COMUN m³ 0.45 140.00 63.00 140.00 140.00 63.00
3- GRAVA COMUN m³ 0.95 140.00 133.00 140.00 140.00 133.00
4- MADERA DE CONSTRUCCION p² 40.00 7.00 280.00 7.00 7.00 280.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 686.00 (A) = 686.00
B MANO DE OBRA
1 - ALBAÑIL hr 10.00 18.75 187.50 18.75 18.75 187.50
2- AYUDANTE hr 12.00 15.00 180.00 6.45 6.45 77.40
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 367.50 (B) = 264.90
F Cargas Sociales 65.00% de (E) = 238.88 65.00% de (E) = 172.19
O Impuesto al Valor Agregado 14.94% de (E+F) = 90.59 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 696.97 (E+F+O) = 437.09
C EQUIPO, MAQUINARIA Y HERRAMIEN
1 - MEZCLADORA hr 1.00 20.00 20.00 20.00 20.00 20.00
2- VIBRADORA hr 0.75 10.00 7.50 10.00 10.00 7.50
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 34.85 5.00% de (G) = 21.85
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 62.35 (C+H) = 49.35
> J SUB TOTAL (D+G+I) = 1 445.3158 (D+G+I) = 1,172.44
L Gastos grales. y administrativ 10.00% de (J) = 144.53 10.00% de (J) = 117.24
M Utilidad 10.00% de (J+L) = 158.98 10.00% de (J+L) = 128.97
> N PARCIAL (J+L+M) = 1 748.8321 (J+L+M) = 1,418.65
P Impuesto a las Transacciones 3.09% de (N) = 54.04 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 1 802.8710 (N+P) = 1,418.65


> PRECIO ADOPTADO: 1 802.87 1,418.65
Son: Un Mil Ochocientos Dos con 87/100 Bolivianos
47 Item: H°A° 1:2:3 P/LOSAS PEQUEÑAS 1.00 m³
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M05) - CAMARAS Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - CEMENTO PORTLAND kg 350.00 1.20 420.00 1.20 1.20 420.00
2 - FIERRO CORRUGADO kg 80.00 9.50 760.00 9.50 9.50 760.00
3- ARENA COMUN m³ 0.50 140.00 70.00 140.00 140.00 70.00
4- GRAVA COMUN m³ 0.70 140.00 98.00 140.00 140.00 98.00
5- MADERA DE CONSTRUCCION p² 60.00 7.00 420.00 7.00 7.00 420.00
6- CLAVOS kg 0.20 15.00 3.00 15.00 15.00 3.00
7- ALAMBRE DE AMARRE kg 0.20 15.00 3.00 15.00 15.00 3.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 1 774.0000 (A) = 1,774.00
B MANO DE OBRA
1 - ENCOFRADOR hr 6.00 18.75 112.50 18.75 18.75 112.50
2 - ARMADOR hr 8.00 18.75 150.00 18.75 18.75 150.00
3- ALBAÑIL hr 8.00 18.75 150.00 18.75 18.75 150.00
4- AYUDANTE hr 10.00 15.00 150.00 6.45 6.45 64.50
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 562.50 (B) = 477.00
F Cargas Sociales 65.00% de (E) = 365.63 65.00% de (E) = 310.05
O Impuesto al Valor Agregado 14.94% de (E+F) = 138.66 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 1 066.7869 (E+F+O) = 787.05
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 53.34 5.00% de (G) = 39.35
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 53.34 (C+H) = 39.35
> J SUB TOTAL (D+G+I) = 2 894.1262 (D+G+I) = 2,600.40
L Gastos grales. y administrativ 10.00% de (J) = 289.41 10.00% de (J) = 260.04
M Utilidad 10.00% de (J+L) = 318.35 10.00% de (J+L) = 286.04
> N PARCIAL (J+L+M) = 3 501.8927 (J+L+M) = 3,146.49
P Impuesto a las Transacciones 3.09% de (N) = 108.21 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 3 610.1012 (N+P) = 3,146.49


> PRECIO ADOPTADO: 3 610.10 3,146.49
Son: Tres Mil Seiscientos Diez con 10/100 Bolivianos
48 Item: PROV COLOC DE TAPA METALICA 0.60x0.60m 1.00 pza
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M05) - CAMARAS Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1- PLANCHA METALICA 1/8" m² 0.36 220.00 79.20 220.00 220.00 79.20
2- BISAGRAS D=1/2" pza 2.00 25.00 50.00 25.00 25.00 50.00
3- ELECTRODOS kg 0.20 25.00 5.00 25.00 25.00 5.00
4- FE LISO D=1/2" m 0.50 6.00 3.00 6.00 6.00 3.00
5- PINTURA ANTICORROSIVA lt 0.70 45.00 31.50 45.00 45.00 31.50
6- CANDADO pza 1.00 30.00 30.00 30.00 30.00 30.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 198.70 (A) = 198.70
B MANO DE OBRA
1 - ESP. CARPINTERIA METALICA hr 2.50 20.00 50.00 20.00 20.00 50.00
2- ALBAÑIL hr 0.50 18.75 9.38 18.75 18.75 9.38
3- AYUDANTE hr 0.50 15.00 7.50 6.45 6.45 3.23
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 66.88 (B) = 62.60
F Cargas Sociales 65.00% de (E) = 43.47 65.00% de (E) = 40.69
O Impuesto al Valor Agregado 14.94% de (E+F) = 16.49 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 126.83 (E+F+O) = 103.29
C EQUIPO, MAQUINARIA Y HERRAMIEN
1- MAQUINA DE SOLDAR hr 0.50 20.00 10.00 20.00 20.00 10.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 6.34 5.00% de (G) = 5.16
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 16.34 (C+H) = 15.16
> J SUB TOTAL (D+G+I) = 341.87 (D+G+I) = 317.15
L Gastos grales. y administrativ 10.00% de (J) = 34.19 10.00% de (J) = 31.72
M Utilidad 10.00% de (J+L) = 37.61 10.00% de (J+L) = 34.89
> N PARCIAL (J+L+M) = 413.66 (J+L+M) = 383.76
P Impuesto a las Transacciones 3.09% de (N) = 12.78 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 426.45 (N+P) = 383.76


> PRECIO ADOPTADO: 426.45 383.76
Son: Cuatrocientos Veintiseis con 45/100 Bolivianos
49 Item: PROV COLOC ACCESORIOS FG P/CAM PURGA LODO 1.00 pza
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M05) - CAMARAS Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - ADAPTADOR DE PVC E-40 D=4" pza 2.00 45.00 90.00 45.00 45.00 90.00
2- TEE F.G. D=4* pza 1.00 550.00 550.00 550.00 550.00 550.00
3- LLAVE DE PASO FºGº 4" pza 1.00 800.00 800.00 800.00 800.00 800.00
4- NIPLE EXAGONAL 4" pza 2.00 220.00 440.00 220.00 220.00 440.00
5- UNION UNIVERSAL 4" pza 1.00 660.00 660.00 660.00 660.00 660.00
6- TUBERIA PVC DE 1/2 m 0.60 6.00 3.60 6.00 6.00 3.60
7- CINTA TEFLON roll 5.00 3.00 15.00 3.00 3.00 15.00
8- TUBERIA F.G. D= 4" m 5.00 160.00 800.00 160.00 160.00 800.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 3 358.6000 (A) = 3,358.60
B MANO DE OBRA
1 - PLOMERO hr 8.00 18.75 150.00 18.75 18.75 150.00
2 - AYUDANTE hr 8.00 15.00 120.00 6.45 6.45 51.60
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 270.00 (B) = 201.60
F Cargas Sociales 65.00% de (E) = 175.50 65.00% de (E) = 131.04
O Impuesto al Valor Agregado 14.94% de (E+F) = 66.56 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 512.06 (E+F+O) = 332.64
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 25.60 5.00% de (G) = 16.63
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 25.60 (C+H) = 16.63
> J SUB TOTAL (D+G+I) = 3 896.2606 (D+G+I) = 3,707.87
L Gastos grales. y administrativ 10.00% de (J) = 389.63 10.00% de (J) = 370.79
M Utilidad 10.00% de (J+L) = 428.59 10.00% de (J+L) = 407.87
> N PARCIAL (J+L+M) = 4 714.4753 (J+L+M) = 4,486.53
P Impuesto a las Transacciones 3.09% de (N) = 145.68 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 4 860.1526 (N+P) = 4,486.53


> PRECIO ADOPTADO: 4 860.15 4,486.53
Son: Cuatro Mil Ochocientos Sesenta con 15/100 Bolivianos
50 Item: PROV COLOC ACCESORIOS FG P/CAM DERIV 4" 1.00 pza
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M05) - CAMARAS Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - ADAPTADOR DE PVC E-40 D=4" pza 3.00 45.00 135.00 45.00 45.00 135.00
2 - TEE F.G. D=4* pza 1.00 550.00 550.00 550.00 550.00 550.00
3 - NIPLE EXAGONAL 4" pza 2.00 220.00 440.00 220.00 220.00 440.00
4- LLAVE DE PASO FºGº 4" pza 1.00 800.00 800.00 800.00 800.00 800.00
5- UNION UNIVERSAL 4" pza 1.00 660.00 660.00 660.00 660.00 660.00
6- CINTA TEFLON roll 1.00 3.00 3.00 3.00 3.00 3.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 2 588.0000 (A) = 2,588.00
B MANO DE OBRA
1 - PLOMERO hr 8.00 18.75 150.00 18.75 18.75 150.00
2 - AYUDANTE hr 8.00 15.00 120.00 6.45 6.45 51.60
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 270.00 (B) = 201.60
F Cargas Sociales 65.00% de (E) = 175.50 65.00% de (E) = 131.04
O Impuesto al Valor Agregado 14.94% de (E+F) = 66.56 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 512.06 (E+F+O) = 332.64
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 25.60 5.00% de (G) = 16.63
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 25.60 (C+H) = 16.63
> J SUB TOTAL (D+G+I) = 3 125.6606 (D+G+I) = 2,937.27
L Gastos grales. y administrativ 10.00% de (J) = 312.57 10.00% de (J) = 293.73
M Utilidad 10.00% de (J+L) = 343.82 10.00% de (J+L) = 323.10
> N PARCIAL (J+L+M) = 3 782.0493 (J+L+M) = 3,554.10
P Impuesto a las Transacciones 3.09% de (N) = 116.87 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 3 898.9146 (N+P) = 3,554.10


> PRECIO ADOPTADO: 3 898.91 3,554.10
Son: Tres Mil Ochocientos Noventa y Ocho con 91/100 Bolivianos
51 Item: PROV COLOC ACCESORIOS FG P/CAM EMPALME 4" 1.00 pza
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M05) - CAMARAS Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - ADAPTADOR DE PVC E-40 D=4" pza 3.00 45.00 135.00 45.00 45.00 135.00
2 - TEE F.G. D=4* pza 1.00 550.00 550.00 550.00 550.00 550.00
3 - NIPLE EXAGONAL 4" pza 1.00 220.00 220.00 220.00 220.00 220.00
4- UNION UNIVERSAL 4" pza 1.00 660.00 660.00 660.00 660.00 660.00
5- CINTA TEFLON roll 1.00 3.00 3.00 3.00 3.00 3.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 1 568.0000 (A) = 1,568.00
B MANO DE OBRA
1 - PLOMERO hr 8.00 18.75 150.00 18.75 18.75 150.00
2 - AYUDANTE hr 8.00 15.00 120.00 6.45 6.45 51.60
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 270.00 (B) = 201.60
F Cargas Sociales 65.00% de (E) = 175.50 65.00% de (E) = 131.04
O Impuesto al Valor Agregado 14.94% de (E+F) = 66.56 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 512.06 (E+F+O) = 332.64
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 25.60 5.00% de (G) = 16.63
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 25.60 (C+H) = 16.63
> J SUB TOTAL (D+G+I) = 2 105.6606 (D+G+I) = 1,917.27
L Gastos grales. y administrativ 10.00% de (J) = 210.57 10.00% de (J) = 191.73
M Utilidad 10.00% de (J+L) = 231.62 10.00% de (J+L) = 210.90
> N PARCIAL (J+L+M) = 2 547.8493 (J+L+M) = 2,319.90
P Impuesto a las Transacciones 3.09% de (N) = 78.73 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 2 626.5778 (N+P) = 2,319.90


> PRECIO ADOPTADO: 2 626.58 2,319.90
Son: Dos Mil Seiscientos Veintiseis con 58/100 Bolivianos
52 Item: PROV Y COLOC ACCESORIOS FG P/CAM ROMPE PRESION1.00 pza
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M05) - CAMARAS Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - ADAPTADOR DE PVC E-40 D=4" pza 2.00 45.00 90.00 45.00 45.00 90.00
2 - COLADOR BR 4" pza 1.00 590.00 590.00 590.00 590.00 590.00
3 - LLAVE DE PASO FºGº 4" pza 2.00 800.00 1 600.0000 800.00 800.00 1,600.00
4- NIPLE EXAGONAL 4" pza 5.00 220.00 1 100.0000 220.00 220.00 1,100.00
5- UNION UNIVERSAL 4" pza 5.00 660.00 3 300.0000 660.00 660.00 3,300.00
6- TEE F.G. D=4* pza 1.00 550.00 550.00 550.00 550.00 550.00
7- CODO FG 4" pza 3.00 255.00 765.00 255.00 255.00 765.00
8- TUBERIA F.G. D= 4" m 5.00 160.00 800.00 160.00 160.00 800.00
9- CINTA TEFLON roll 5.00 3.00 15.00 3.00 3.00 15.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 8 810.0000 (A) = 8,810.00
B MANO DE OBRA
1 - PLOMERO hr 10.00 18.75 187.50 18.75 18.75 187.50
2 - AYUDANTE hr 10.00 15.00 150.00 6.45 6.45 64.50
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 337.50 (B) = 252.00
F Cargas Sociales 65.00% de (E) = 219.38 65.00% de (E) = 163.80
O Impuesto al Valor Agregado 14.94% de (E+F) = 83.20 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 640.07 (E+F+O) = 415.80
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 32.00 5.00% de (G) = 20.79
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 32.00 (C+H) = 20.79
> J SUB TOTAL (D+G+I) = 9 482.0757 (D+G+I) = 9,246.59
L Gastos grales. y administrativ 10.00% de (J) = 948.21 10.00% de (J) = 924.66
M Utilidad 10.00% de (J+L) = 1 043.0283 10.00% de (J+L) = 1,017.12
> N PARCIAL (J+L+M) = 11 473.3116 (J+L+M) = 11,188.37
P Impuesto a las Transacciones 3.09% de (N) = 354.53 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 11 827.8370 (N+P) = 11,188.37


> PRECIO ADOPTADO: 11 827.84 11,188.37
Son: Once Mil Ochocientos Veintisiete con 84/100 Bolivianos
53 Item: PROV COLOC ACCESORIOS CAMARAS PREDIALES D=4" 1.00 pza
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M05) - CAMARAS Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - TEE F.G. D=4* pza 1.00 550.00 550.00 550.00 550.00 550.00
2- ADAPTADOR DE PVC E-40 D=4" pza 2.00 45.00 90.00 45.00 45.00 90.00
3- UNION UNIVERSAL 4" pza 2.00 660.00 1 320.0000 660.00 660.00 1,320.00
4- NIPLE EXAGONAL FG 3" pza 2.00 75.00 150.00 75.00 75.00 150.00
5- LLAVE DE PASO FG 3" pza 1.00 420.00 420.00 420.00 420.00 420.00
6- CODO FG 3" pza 1.00 145.00 145.00 145.00 145.00 145.00
7- TUBERIA F.G. D= 3" m 0.60 110.00 66.00 110.00 110.00 66.00
8- CINTA TEFLON roll 5.00 3.00 15.00 3.00 3.00 15.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 2 756.0000 (A) = 2,756.00
B MANO DE OBRA
1 - PLOMERO hr 9.00 18.75 168.75 18.75 18.75 168.75
2 - AYUDANTE hr 9.00 15.00 135.00 6.45 6.45 58.05
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 303.75 (B) = 226.80
F Cargas Sociales 65.00% de (E) = 197.44 65.00% de (E) = 147.42
O Impuesto al Valor Agregado 14.94% de (E+F) = 74.88 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 576.06 (E+F+O) = 374.22
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 28.80 5.00% de (G) = 18.71
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 28.80 (C+H) = 18.71
> J SUB TOTAL (D+G+I) = 3 360.8682 (D+G+I) = 3,148.93
L Gastos grales. y administrativ 10.00% de (J) = 336.09 10.00% de (J) = 314.89
M Utilidad 10.00% de (J+L) = 369.70 10.00% de (J+L) = 346.38
> N PARCIAL (J+L+M) = 4 066.6505 (J+L+M) = 3,810.21
P Impuesto a las Transacciones 3.09% de (N) = 125.66 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 4 192.3100 (N+P) = 3,810.21


> PRECIO ADOPTADO: 4 192.31 3,810.21
Son: Cuatro Mil Ciento Noventa y Dos con 31/100 Bolivianos
54 Item: REPLANTEO Y TRAZADO LINEAL 1.00 m
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M06) - OBRA DE TOMA ATAJADO Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - ESTACAS (2"X2"X0,30) pza 0.20 1.00 0.20 1.00 1.00 0.20
2 - PINTURA AL ACEITE CON BRILLO l 0.01 45.00 0.36 45.00 45.00 0.45
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 0.56 (A) = 0.65
B MANO DE OBRA
1 - TOPÓGRAFO hr 0.01 20.00 0.20 20.00 20.00 0.20
2- ALARIFE hr 0.01 15.00 0.15 6.45 6.45 0.06
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 0.35 (B) = 0.26
F Cargas Sociales 65.00% de (E) = 0.23 65.00% de (E) = 0.17
O Impuesto al Valor Agregado 14.94% de (E+F) = 0.09 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 0.66 (E+F+O) = 0.44
C EQUIPO, MAQUINARIA Y HERRAMIEN
1- ESTACIÓN TOTAL hr 0.00 30.00 0.06 30.00 30.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 0.03 5.00% de (G) = 0.02
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 0.09 (C+H) = 0.02
> J SUB TOTAL (D+G+I) = 1.32 (D+G+I) = 1.11
L Gastos grales. y administrativ 10.00% de (J) = 0.13 10.00% de (J) = 0.11
M Utilidad 10.00% de (J+L) = 0.14 10.00% de (J+L) = 0.12
> N PARCIAL (J+L+M) = 1.59 (J+L+M) = 1.34
P Impuesto a las Transacciones 3.09% de (N) = 0.05 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 1.64 (N+P) = 1.34


> PRECIO ADOPTADO: 1.64 1.34
Son: Uno con 64/100 Bolivianos
55 Item: EXCAVACION (0-2 M.) S. SEMIDURO (MANUAL) 1.00 m³
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M06) - OBRA DE TOMA ATAJADO Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 0.00 (A) = 0.00
B MANO DE OBRA
1 - PEON hr 3.60 10.00 36.00 4.70 4.70 16.92
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 36.00 (B) = 16.92
F Cargas Sociales 65.00% de (E) = 23.40 65.00% de (E) = 11.00
O Impuesto al Valor Agregado 14.94% de (E+F) = 8.87 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 68.27 (E+F+O) = 27.92
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 3.41 5.00% de (G) = 1.40
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 3.41 (C+H) = 1.40
> J SUB TOTAL (D+G+I) = 71.69 (D+G+I) = 29.31
L Gastos grales. y administrativ 10.00% de (J) = 7.17 10.00% de (J) = 2.93
M Utilidad 10.00% de (J+L) = 7.89 10.00% de (J+L) = 3.22
> N PARCIAL (J+L+M) = 86.74 (J+L+M) = 35.47
P Impuesto a las Transacciones 3.09% de (N) = 2.68 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 89.42 (N+P) = 35.47


> PRECIO ADOPTADO: 89.42 35.47
Son: Ochenta y Nueve con 42/100 Bolivianos
56 Item: Hº Cº (1:2:4) 50 % PD P/ESTRUCTURAS 1.00 m³
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M06) - OBRA DE TOMA ATAJADO Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - CEMENTO PORTLAND kg 145.00 1.20 174.00 1.20 1.20 174.00
2- ARENA COMUN m³ 0.25 140.00 35.00 140.00 140.00 35.00
3- GRAVA COMUN m³ 0.35 140.00 49.00 140.00 140.00 49.00
4- PIEDRA BRUTA m³ 0.50 100.00 50.00 100.00 100.00 50.00
5- MADERA DE CONSTRUCCION p² 18.00 7.00 126.00 7.00 7.00 126.00
6- ALAMBRE DE AMARRE kg 0.60 15.00 9.00 15.00 15.00 9.00
7- CLAVOS kg 0.60 15.00 9.00 15.00 15.00 9.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 452.00 (A) = 452.00
B MANO DE OBRA
1 - ENCOFRADOR hr 1.50 18.75 28.13 18.75 18.75 28.13
2- ALBAÑIL hr 5.50 18.75 103.13 18.75 18.75 103.13
3- AYUDANTE hr 6.00 15.00 90.00 6.45 6.45 38.70
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 221.25 (B) = 169.95
F Cargas Sociales 65.00% de (E) = 143.81 65.00% de (E) = 110.47
O Impuesto al Valor Agregado 14.94% de (E+F) = 54.54 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 419.60 (E+F+O) = 280.42
C EQUIPO, MAQUINARIA Y HERRAMIEN
1- MEZCLADORA hr 1.00 20.00 20.00 20.00 20.00 20.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 20.98 5.00% de (G) = 14.02
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 40.98 (C+H) = 34.02
> J SUB TOTAL (D+G+I) = 912.58 (D+G+I) = 766.44
L Gastos grales. y administrativ 10.00% de (J) = 91.26 10.00% de (J) = 76.64
M Utilidad 10.00% de (J+L) = 100.38 10.00% de (J+L) = 84.31
> N PARCIAL (J+L+M) = 1 104.2254 (J+L+M) = 927.39
P Impuesto a las Transacciones 3.09% de (N) = 34.12 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 1 138.3460 (N+P) = 927.39


> PRECIO ADOPTADO: 1 138.35 927.39
Son: Un Mil Ciento Treinta y Ocho con 35/100 Bolivianos
57 Item: H°A° 1:2:3 P/LOSAS PEQUEÑAS 1.00 m³
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M06) - OBRA DE TOMA ATAJADO Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1- CEMENTO PORTLAND kg 350.00 1.20 420.00 1.20 1.20 420.00
2- FIERRO CORRUGADO kg 80.00 9.50 760.00 9.50 9.50 760.00
3- ARENA COMUN m³ 0.50 140.00 70.00 140.00 140.00 70.00
4- GRAVA COMUN m³ 0.70 140.00 98.00 140.00 140.00 98.00
5- MADERA DE CONSTRUCCION p² 60.00 7.00 420.00 7.00 7.00 420.00
6- CLAVOS kg 0.20 15.00 3.00 15.00 15.00 3.00
7- ALAMBRE DE AMARRE kg 0.20 15.00 3.00 15.00 15.00 3.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 1 774.0000 (A) = 1,774.00
B MANO DE OBRA
1 - ENCOFRADOR hr 6.00 18.75 112.50 18.75 18.75 112.50
2- ARMADOR hr 8.00 18.75 150.00 18.75 18.75 150.00
3- ALBAÑIL hr 8.00 18.75 150.00 18.75 18.75 150.00
4- AYUDANTE hr 10.00 15.00 150.00 6.45 6.45 64.50
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 562.50 (B) = 477.00
F Cargas Sociales 65.00% de (E) = 365.63 65.00% de (E) = 310.05
O Impuesto al Valor Agregado 14.94% de (E+F) = 138.66 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 1 066.7869 (E+F+O) = 787.05
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 53.34 5.00% de (G) = 39.35
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 53.34 (C+H) = 39.35
> J SUB TOTAL (D+G+I) = 2 894.1262 (D+G+I) = 2,600.40
L Gastos grales. y administrativ 10.00% de (J) = 289.41 10.00% de (J) = 260.04
M Utilidad 10.00% de (J+L) = 318.35 10.00% de (J+L) = 286.04
> N PARCIAL (J+L+M) = 3 501.8927 (J+L+M) = 3,146.49
P Impuesto a las Transacciones 3.09% de (N) = 108.21 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 3 610.1012 (N+P) = 3,146.49


> PRECIO ADOPTADO: 3 610.10 3,146.49
Son: Tres Mil Seiscientos Diez con 10/100 Bolivianos
58 Item: PROV COLOC DE TAPA METALICA 0.90x1.60m 1.00 pza
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M06) - OBRA DE TOMA ATAJADO Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1- PLANCHA METALICA 1/8" m² 1.44 220.00 316.80 220.00 220.00 316.80
2- BISAGRAS D=1/2" pza 2.00 25.00 50.00 25.00 25.00 50.00
3- ELECTRODOS kg 0.25 25.00 6.25 25.00 25.00 6.25
4- FE LISO D=1/2" m 0.50 6.00 3.00 6.00 6.00 3.00
5- PINTURA ANTICORROSIVA lt 1.00 45.00 45.00 45.00 45.00 45.00
6- CANDADO pza 1.00 30.00 30.00 30.00 30.00 30.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 451.05 (A) = 451.05
B MANO DE OBRA
1 - ESP. CARPINTERIA METALICA hr 5.00 20.00 100.00 20.00 20.00 100.00
2- ALBAÑIL hr 0.50 18.75 9.38 18.75 18.75 9.38
3- AYUDANTE hr 0.50 15.00 7.50 6.45 6.45 3.23
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 116.88 (B) = 112.60
F Cargas Sociales 65.00% de (E) = 75.97 65.00% de (E) = 73.19
O Impuesto al Valor Agregado 14.94% de (E+F) = 28.81 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 221.65 (E+F+O) = 185.79
C EQUIPO, MAQUINARIA Y HERRAMIEN
1 - MAQUINA DE SOLDAR hr 0.50 20.00 10.00 20.00 20.00 10.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 11.08 5.00% de (G) = 9.29
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 21.08 (C+H) = 19.29
> J SUB TOTAL (D+G+I) = 693.79 (D+G+I) = 656.13
L Gastos grales. y administrativ 10.00% de (J) = 69.38 10.00% de (J) = 65.61
M Utilidad 10.00% de (J+L) = 76.32 10.00% de (J+L) = 72.17
> N PARCIAL (J+L+M) = 839.48 (J+L+M) = 793.92
P Impuesto a las Transacciones 3.09% de (N) = 25.94 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 865.42 (N+P) = 793.92


> PRECIO ADOPTADO: 865.42 793.92
Son: Ochocientos Sesenta y Cinco con 42/100 Bolivianos
59 Item: PROV Y TENDIDO TUBO PVC D=4" C-9 1.00 m
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M06) - OBRA DE TOMA ATAJADO Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - LIMPIADOR l 0.08 40.00 3.20 40.00 40.00 3.20
2 - PEGAMENTO l 0.04 35.00 1.40 35.00 35.00 1.40
3- TUBERIA DE PVC D=4" C-9 m 1.00 55.00 55.00 55.00 55.00 55.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 59.60 (A) = 59.60
B MANO DE OBRA
1 - PLOMERO hr 0.45 18.75 8.44 18.75 18.75 8.44
2 - AYUDANTE hr 0.45 15.00 6.75 6.45 6.45 2.90
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 15.19 (B) = 11.34
F Cargas Sociales 65.00% de (E) = 9.87 65.00% de (E) = 7.37
O Impuesto al Valor Agregado 14.94% de (E+F) = 3.74 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 28.80 (E+F+O) = 18.71
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 1.44 5.00% de (G) = 0.94
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 1.44 (C+H) = 0.94
> J SUB TOTAL (D+G+I) = 89.84 (D+G+I) = 79.25
L Gastos grales. y administrativ 10.00% de (J) = 8.98 10.00% de (J) = 7.92
M Utilidad 10.00% de (J+L) = 9.88 10.00% de (J+L) = 8.72
> N PARCIAL (J+L+M) = 108.71 (J+L+M) = 95.89
P Impuesto a las Transacciones 3.09% de (N) = 3.36 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 112.07 (N+P) = 95.89


> PRECIO ADOPTADO: 112.07 95.89
Son: Ciento Doce con 07/100 Bolivianos
60 Item: PROV. Y COLOC. REGILLA CAMARA (DIM.VARIABLE) 1.00 m²
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M06) - OBRA DE TOMA ATAJADO Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1- ANGULAR 2"X1/4 m 3.50 42.00 147.00 42.00 42.00 147.00
2- FE LISO D=1/2" m 12.00 6.00 72.00 6.00 6.00 72.00
3- FIERRO CORRUGADO kg 0.60 9.50 5.70 9.50 9.50 5.70
4- ELECTRODOS kg 0.75 25.00 18.75 25.00 25.00 18.75
5- PINTURA ANTICORROSIVA lt 0.20 45.00 9.00 45.00 45.00 9.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 252.45 (A) = 252.45
B MANO DE OBRA
1 - ESP. CARPINTERIA METALICA hr 8.00 20.00 160.00 20.00 20.00 160.00
2- ALBAÑIL hr 0.50 18.75 9.38 18.75 18.75 9.38
3- AYUDANTE hr 1.00 15.00 15.00 6.45 6.45 6.45
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 184.38 (B) = 175.83
F Cargas Sociales 65.00% de (E) = 119.84 65.00% de (E) = 114.29
O Impuesto al Valor Agregado 14.94% de (E+F) = 45.45 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 349.67 (E+F+O) = 290.11
C EQUIPO, MAQUINARIA Y HERRAMIEN
1- MAQUINA DE SOLDAR hr 4.00 20.00 80.00 20.00 20.00 80.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 17.48 5.00% de (G) = 14.51
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 97.48 (C+H) = 94.51
> J SUB TOTAL (D+G+I) = 699.60 (D+G+I) = 637.07
L Gastos grales. y administrativ 10.00% de (J) = 69.96 10.00% de (J) = 63.71
M Utilidad 10.00% de (J+L) = 76.96 10.00% de (J+L) = 70.08
> N PARCIAL (J+L+M) = 846.52 (J+L+M) = 770.85
P Impuesto a las Transacciones 3.09% de (N) = 26.16 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 872.68 (N+P) = 770.85


> PRECIO ADOPTADO: 872.68 770.85
Son: Ochocientos Setenta y Dos con 68/100 Bolivianos
61 Item: PROV Y COLOC ACCESORIOS FG P/TOMA ATAJADO 1.00 pza
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M06) - OBRA DE TOMA ATAJADO Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - UNION UNIVERSAL 4" pza 2.00 660.00 1 320.0000 660.00 660.00 1,320.00
2- ADAPTADOR DE PVC E-40 D=4" pza 1.00 45.00 45.00 45.00 45.00 45.00
3- COLADOR BR 4" pza 1.00 590.00 590.00 590.00 590.00 590.00
4- NIPLE EXAGONAL 4" pza 2.00 220.00 440.00 220.00 220.00 440.00
5- LLAVE DE PASO FºGº 4" pza 2.00 800.00 1 600.0000 800.00 800.00 1,600.00
6- TUBO DE FºGº 4" m 0.50 230.00 115.00 230.00 230.00 115.00
7- CINTA TEFLON roll 5.00 3.00 15.00 3.00 3.00 15.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 4 125.0000 (A) = 4,125.00
B MANO DE OBRA
1 - PLOMERO hr 13.00 18.75 243.75 18.75 18.75 243.75
2 - AYUDANTE hr 13.00 15.00 195.00 6.45 6.45 83.85
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 438.75 (B) = 327.60
F Cargas Sociales 65.00% de (E) = 285.19 65.00% de (E) = 212.94
O Impuesto al Valor Agregado 14.94% de (E+F) = 108.16 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 832.09 (E+F+O) = 540.54
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 41.60 5.00% de (G) = 27.03
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 41.60 (C+H) = 27.03
> J SUB TOTAL (D+G+I) = 4 998.6984 (D+G+I) = 4,692.57
L Gastos grales. y administrativ 10.00% de (J) = 499.87 10.00% de (J) = 469.26
M Utilidad 10.00% de (J+L) = 549.86 10.00% de (J+L) = 516.18
> N PARCIAL (J+L+M) = 6 048.4251 (J+L+M) = 5,678.01
P Impuesto a las Transacciones 3.09% de (N) = 186.90 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 6 235.3215 (N+P) = 5,678.01


> PRECIO ADOPTADO: 6 235.32 5,678.01
Son: Seis Mil Doscientos Treinta y Cinco con 32/100 Bolivianos
62 Item: PROVISION DE BOMBA 2 HP D=3" 1.00 pza
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M06) - OBRA DE TOMA ATAJADO Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - MOTOBOMBA 2HP D=3" pza 1.00 3,200.00 3 200.0000 3,200.00 3,200.00 3,200.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 3 200.0000 (A) = 3,200.00
B MANO DE OBRA
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 0.00 (B) = 0.00
F Cargas Sociales 65.00% de (E) = 0.00 65.00% de (E) = 0.00
O Impuesto al Valor Agregado 14.94% de (E+F) = 0.00 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 0.00 (E+F+O) = 0.00
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 0.00 5.00% de (G) = 0.00
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 0.00 (C+H) = 0.00
> J SUB TOTAL (D+G+I) = 3 200.0000 (D+G+I) = 3,200.00
L Gastos grales. y administrativ 10.00% de (J) = 320.00 10.00% de (J) = 320.00
M Utilidad 10.00% de (J+L) = 352.00 10.00% de (J+L) = 352.00
> N PARCIAL (J+L+M) = 3 872.0000 (J+L+M) = 3,872.00
P Impuesto a las Transacciones 3.09% de (N) = 119.64 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 3 991.6448 (N+P) = 3,872.00


> PRECIO ADOPTADO: 3 991.64 3,872.00
Son: Tres Mil Novecientos Noventa y Uno con 64/100 Bolivianos
63 Item: LETRERO SEÑALIZACION AMBIENTAL 1.00 pza
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M07) - MEDIDAS DE MITIGACION Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - PLANCHA METALICA 1/8" m² 0.42 220.00 92.40 220.00 220.00 92.40
2- TUBERIA F.G. D= 1 1/2 ML 2.00 53.08 106.16 53.08 53.08 106.16
3- PINTURA AL ACEITE (MATE) GAL 0.25 177.76 44.44 177.76 177.76 44.44
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 243.00 (A) = 243.00
B MANO DE OBRA
1 - ALBAÑIL hr 1.50 18.75 28.13 18.75 18.75 28.13
2- PEON hr 1.50 10.00 15.00 4.30 4.30 6.45
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 43.13 (B) = 34.58
F Cargas Sociales 65.00% de (E) = 28.03 65.00% de (E) = 22.47
O Impuesto al Valor Agregado 14.94% de (E+F) = 10.63 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 81.79 (E+F+O) = 57.05
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 4.09 5.00% de (G) = 2.85
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 4.09 (C+H) = 2.85
> J SUB TOTAL (D+G+I) = 328.88 (D+G+I) = 302.90
L Gastos grales. y administrativ 10.00% de (J) = 32.89 10.00% de (J) = 30.29
M Utilidad 10.00% de (J+L) = 36.18 10.00% de (J+L) = 33.32
> N PARCIAL (J+L+M) = 397.94 (J+L+M) = 366.51
P Impuesto a las Transacciones 3.09% de (N) = 12.30 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 410.24 (N+P) = 366.51


> PRECIO ADOPTADO: 410.24 366.51
Son: Cuatrocientos Diez con 24/100 Bolivianos
64 Item: REFORESTACION CON ESPECIES NATIVAS 1.00 m²
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M07) - MEDIDAS DE MITIGACION Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - PLANTINES DE ESPECIES NATIVAS pza 2.00 10.50 21.00 10.50 10.50 21.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 21.00 (A) = 21.00
B MANO DE OBRA
1 - PEON hr 0.50 10.00 5.00 4.70 4.70 2.35
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 5.00 (B) = 2.35
F Cargas Sociales 65.00% de (E) = 3.25 65.00% de (E) = 1.53
O Impuesto al Valor Agregado 14.94% de (E+F) = 1.23 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 9.48 (E+F+O) = 3.88
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 0.47 5.00% de (G) = 0.19
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 0.47 (C+H) = 0.19
> J SUB TOTAL (D+G+I) = 30.96 (D+G+I) = 25.07
L Gastos grales. y administrativ 10.00% de (J) = 3.10 10.00% de (J) = 2.51
M Utilidad 10.00% de (J+L) = 3.41 10.00% de (J+L) = 2.76
> N PARCIAL (J+L+M) = 37.46 (J+L+M) = 30.34
P Impuesto a las Transacciones 3.09% de (N) = 1.16 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 38.62 (N+P) = 30.34


> PRECIO ADOPTADO: 38.62 30.34
Son: Treinta y Ocho con 62/100 Bolivianos
65 Item: CONTENEDORES DE RESIDUOS SOLIDOS 1.00 pza
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M07) - MEDIDAS DE MITIGACION Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - CONTENEDOR DE RESIDUOS SOLIDOS 200 LT pza 1.00 450.00 450.00 450.00 450.00 450.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 450.00 (A) = 450.00
B MANO DE OBRA
1 - AYUDANTE hr 0.15 15.00 2.25 6.45 6.45 0.97
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 2.25 (B) = 0.97
F Cargas Sociales 65.00% de (E) = 1.46 65.00% de (E) = 0.63
O Impuesto al Valor Agregado 14.94% de (E+F) = 0.55 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 4.27 (E+F+O) = 1.60
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 0.21 5.00% de (G) = 0.08
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 0.21 (C+H) = 0.08
> J SUB TOTAL (D+G+I) = 454.48 (D+G+I) = 451.68
L Gastos grales. y administrativ 10.00% de (J) = 45.45 10.00% de (J) = 45.17
M Utilidad 10.00% de (J+L) = 49.99 10.00% de (J+L) = 49.68
> N PARCIAL (J+L+M) = 549.92 (J+L+M) = 546.53
P Impuesto a las Transacciones 3.09% de (N) = 16.99 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 566.91 (N+P) = 546.53


> PRECIO ADOPTADO: 566.91 546.53
Son: Quinientos Sesenta y Seis con 91/100 Bolivianos
66 Item: SEÑALIZACION DE AREA DE TRABAJO 1.00 m
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M07) - MEDIDAS DE MITIGACION Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - CINTA DE SEGURIDAD m 1.05 2.00 2.10 2.00 2.00 2.10
2 - MADERA DE CONSTRUCCION p² 1.50 7.00 10.50 7.00 7.00 10.50
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 12.60 (A) = 12.60
B MANO DE OBRA
1 - AYUDANTE hr 0.20 15.00 3.00 6.45 6.45 1.29
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 3.00 (B) = 1.29
F Cargas Sociales 65.00% de (E) = 1.95 65.00% de (E) = 0.84
O Impuesto al Valor Agregado 14.94% de (E+F) = 0.74 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 5.69 (E+F+O) = 2.13
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 0.28 5.00% de (G) = 0.11
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 0.28 (C+H) = 0.11
> J SUB TOTAL (D+G+I) = 18.57 (D+G+I) = 14.83
L Gastos grales. y administrativ 10.00% de (J) = 1.86 10.00% de (J) = 1.48
M Utilidad 10.00% de (J+L) = 2.04 10.00% de (J+L) = 1.63
> N PARCIAL (J+L+M) = 22.47 (J+L+M) = 17.95
P Impuesto a las Transacciones 3.09% de (N) = 0.69 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 23.17 (N+P) = 17.95


> PRECIO ADOPTADO: 23.17 17.95
Son: Veintitres con 17/100 Bolivianos
67 Item: CERCO ALAMBRE 5 HILERAS - POSTES C/3M. 1.00 m
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M07) - MEDIDAS DE MITIGACION Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1- POSTES.DE.MADERA-1.9M PZA 0.33 45.00 14.85 45.00 45.00 14.85
2- ALAMBRA DE PUAS m 5.00 3.00 15.00 3.00 3.00 15.00
3- GRAMPAS PARA ALAMBRE DE PUAS KG 0.04 22.00 0.88 22.00 22.00 0.88
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 30.73 (A) = 30.73
B MANO DE OBRA
1 - ALBAÑIL hr 0.80 18.75 15.00 18.75 18.75 15.00
2- PEON hr 0.80 10.00 8.00 4.70 4.70 3.76
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 23.00 (B) = 18.76
F Cargas Sociales 65.00% de (E) = 14.95 65.00% de (E) = 12.19
O Impuesto al Valor Agregado 14.94% de (E+F) = 5.67 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 43.62 (E+F+O) = 30.95
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 2.18 5.00% de (G) = 1.55
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 2.18 (C+H) = 1.55
> J SUB TOTAL (D+G+I) = 76.53 (D+G+I) = 63.23
L Gastos grales. y administrativ 10.00% de (J) = 7.65 10.00% de (J) = 6.32
M Utilidad 10.00% de (J+L) = 8.42 10.00% de (J+L) = 6.96
> N PARCIAL (J+L+M) = 92.60 (J+L+M) = 76.51
P Impuesto a las Transacciones 3.09% de (N) = 2.86 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 95.46 (N+P) = 76.51


> PRECIO ADOPTADO: 95.46 76.51
Son: Noventa y Cinco con 46/100 Bolivianos
68 Item: POZO ABSORVENTE + CAMARAS 1.00 pza
Proyecto: PU SISTEMA DE RIEGO LAZARETO
Módulo: (M07) - MEDIDAS DE MITIGACION Tipo de cambio: 6.96
1.14 1 1 0.43 0.47 0.23 Precio
Parcial (Bs)
Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs) RPC Divisa Bienes Locales RPC MOC RPC MOSC RPC MONCR RPC MONCU Productivo
A MATERIALES
1 - POZO ABSERBENTE DE 2 X 1.5 M pza 1.00 6,500.00 6 500.0000 6,500.00 6,500.00 6,500.00
2 - CAMARA SEPTICA 2X1.5X1 M pto 1.00 2,500.00 2 500.0000 2,500.00 2,500.00 2,500.00
3- ACCESORIOS PARA INSTALACION glb 1.00 1,500.00 1 500.0000 1,500.00 1,500.00 1,500.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
> D TOTAL MATERIALES (A) = 10 500.0000 (A) = 10,500.00
B MANO DE OBRA
1 - ALBAÑIL hr 22.00 18.75 412.50 18.75 18.75 412.50
2 - PEON hr 22.00 10.00 220.00 4.70 4.70 103.40
0.00 0.00
0.00 0.00
0.00 0.00
> E SUBTOTAL MANO DE OBRA (B) = 632.50 (B) = 515.90
F Cargas Sociales 65.00% de (E) = 411.13 65.00% de (E) = 335.34
O Impuesto al Valor Agregado 14.94% de (E+F) = 155.92 0.00% de (E+F) = 0.00
> G TOTAL MANO DE OBRA (E+F+O) = 1 199.5426 (E+F+O) = 851.24
C EQUIPO, MAQUINARIA Y HERRAMIEN
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
H Herramientas menores 5.00% de (G) = 59.98 5.00% de (G) = 42.56
> I TOTAL HERRAMIENTAS Y EQUIPO (C+H) = 59.98 (C+H) = 42.56
> J SUB TOTAL (D+G+I) = 11 759.5197 (D+G+I) = 11,393.80
L Gastos grales. y administrativ 10.00% de (J) = 1 175.9520 10.00% de (J) = 1,139.38
M Utilidad 10.00% de (J+L) = 1 293.5472 10.00% de (J+L) = 1,253.32
> N PARCIAL (J+L+M) = 14 229.0188 (J+L+M) = 13,786.49
P Impuesto a las Transacciones 3.09% de (N) = 439.68 0.00% de (N) = 0.00

> Q TOTAL PRECIO UNITARIO (N+P) = 14 668.6955 (N+P) = 13,786.49


> PRECIO ADOPTADO: 14 668.70 13,786.49
Son: Catorce Mil Seiscientos Sesenta y Ocho con 70/100 Bolivianos