Está en la página 1de 45

Sanchez Constructora

Queru Queru , Pasaje C


Cercado- Cochabamba
79966447
Direccion: Zona Arocagua- Calle Final Maravillas
Fecha: Mayo de 2019
Moneda: Bolivianos
Tipo de cambio:6,96

Ventas y Pre - Ventas Edificio Multifamiliar VATICANO II

Precio Precio de Importe


Precio Unitario Porcentaje Porcentaje a
Descripción Extención Mtr2 Comprador convenido pre venta Pagado Saldo ($us)
por m2 ($us) pagado (%) pagar
($us) ($us) ($us)
A 114.85 Mtr Helen Veizaga 531.13 61,000.00 61,000.00 21,000.00 34.43% 40,000.00 66%
Planta Baja
B 97.42 Mtr 630.00 61,374.60 0.00% 61,374.60 100%
1A 109.32 Mtr 630.00 68,871.60 0.00% 68,871.60 100%
Primer piso 1B 81.71 Mtr 630.00 51,477.30 0.00% 51,477.30 100%
1C 48.90 Mtr Jhanet Vasquez 470.35 23,000.00 23,000.00 23,000.00 100.00% 0.00 0%
2A 109.32 Mtr 630.00 68,871.60 0.00% 68,871.60 100%
Segundo piso 2B 81.71 Mtr Sonia Vidovic 611.92 50,000.00 50,000.00 15,000.00 30.00% 35,000.00 70%
2C 48.90 Mtr Lourdes Salazar 572.60 28,000.00 20,000.00 20,000.00 71.43% 8,000.00 29%
3A 109.32 Mtr 630.00 68,871.60 0.00% 68,871.60 100%
Tercer piso 3B 81.71 Mtr Lalo Rodriguez 550.73 45,000.00 45,000.00 20,000.00 44.44% 25,000.00 56%
3C 48.90 Mtr Federico Damani 572.60 28,000.00 28,000.00 25,000.00 89.29% 3,000.00 11%
4A 109.74 Mtr Jhanet Vasquez 501.18 55,000.00 55,000.00 3,000.00 5.45% 52,000.00 95%
Cuarto piso 4B 81.71 Mtr Lalo Rodriguez 550.73 45,000.00 45,000.00 10,000.00 22.22% 35,000.00 78%
4C 48.90 Mtr Marcelo Melgar 552.15 27,000.00 27,000.00 10,000.00 37.04% 17,000.00 63%
5A 90.00 Mtr 630.00 56,700.00 0.00% 56,700.00 100%
Quinto piso
5B 81.71 Mtr 630.00 51,477.30 0.00% 51,477.30 100%
Parqueo 1 15.00 Mtr 5,000.00 5,000.00 0.00% 5,000.00 100%
Parqueo 2 15.00 Mtr 5,000.00 5,000.00 0.00% 5,000.00 100%
Internos Parqueo 3 15.00 Mtr 5,000.00 5,000.00 0.00% 5,000.00 100%
Parqueo 4 15.00 Mtr 5,000.00 5,000.00 0.00% 5,000.00 100%
Parqueo 5 15.00 Mtr Lalo Rodriguez 3B 5,000.00 5,000.00 5,000.00 0.00% 5,000.00 100%
Parqueo 1 15.00 Mtr 4,000.00 4,000.00 0.00% 4,000.00 100%
Parqueo 2 15.00 Mtr 4,000.00 4,000.00 0.00% 4,000.00 100%
Externos
Parqueo 3 15.00 Mtr 4,000.00 4,000.00 0.00% 4,000.00 100%
Parqueo 4 15.00 Mtr 4,000.00 4,000.00 0.00% 4,000.00 100%
TOTALES 830,644.00 147,000.00 17.37% 683,644.00 83%
Sanchez Constructora
Queru Queru , Pasaje C
Cercado- Cochabamba
79966447
Direccion: Zona Arocagua- Calle Final Maravillas
Fecha: Mayo de 2019
Moneda: Bolivianos
Tipo de cambio:6,96

Ventas y Pre - Ventas Edificio Multifamiliar VATICANO II

Precio Importe
Precio Unitario PAGO
Descripción Extención Mtr2 Comprador convenido Pagado Saldo ($us) PAGO BMSC
por m2 ($us) CONSTRUCTORA
($us) ($us) SALDO Banco ConstructorREAL
A 115.30 Mtr Helen Veizaga 529.05 61,000.00 21,000.00 40,000.00 28000 12000 40000 28000 12000 12000
Planta Baja
B 96.70 Mtr 630.00 60,921.00 60,921.00 0 0 0 0
1A 108.40 Mtr 630.00 64,000.00 64,000.00 64000 0 0 64000
Primer piso 1B 81.37 Mtr 630.00 51,263.10 51,263.10 21000 0 0
1C 49.90 Mtr Jhanet Vasquez 460.92 23,000.00 23,000.00 0.00 0 0 0
2A 108.40 Mtr Nataly Nery 630.00 64,000.00 2,000.00 62,000.00 43400 10600 62000 43400 10600 10600
Segundo piso 2B 81.37 Mtr Sonia Vidovic 614.48 50,000.00 15,000.00 35,000.00 24500 35000 24500 10500 10500
2C 49.90 Mtr Lourdes Salazar 561.12 28,000.00 20,000.00 8,000.00 5600 0 5600 0 0
3A 108.40 Mtr 630.00 68,292.00 68,292.00 0 0 0 0
Tercer piso 3B 81.37 Mtr Lalo Rodriguez 553.03 45,000.00 20,000.00 25,000.00 17500 25000 17500 7500 7500
3C 49.90 Mtr Federico Damani 561.12 28,000.00 25,000.00 3,000.00 2100 nardi 0 2100 0 0
4A 108.40 Mtr Jhanet Vasquez 507.38 55,000.00 3,000.00 52,000.00 36400 22000 0
Cuarto piso 4B 81.71 Mtr Lalo Rodriguez 550.73 45,000.00 10,000.00 35,000.00 24500 35000 24500 10500 10500
4C 48.90 Mtr Marcelo Melgar 552.15 27,000.00 10,000.00 17,000.00 11900 15000 0 4100
5A 93.58 Mtr 630.00 58,955.40 58,955.40 gualberto 10000 0 10000 0
Quinto piso
5B 82.14 Mtr 630.00 51,748.20 51,748.20 50000 0 0
Parqueo 1 16.55 Mtr 5,000.00 5,000.00 5,000.00 gualberto 0 0 0
Parqueo 2 15.55 Mtr 5,000.00 5,000.00 5,000.00 5000 0 0
Internos Parqueo 3 15.55 Mtr 5,000.00 5,000.00 5,000.00 5000 0 0
Parqueo 4 15.55 Mtr 5,000.00 5,000.00 5,000.00 chapaco 0 0 0
Parqueo 5 15.55 Mtr Lalo Rodriguez 3B 5,000.00 5,000.00 5,000.00 3500 Sonia 5000 3500 1500
Parqueo 6 15.15 Mtr 4,000.00 4,000.00 4,000.00 0 0 0
Parqueo 7 15.00 Mtr 4,000.00 4,000.00 4,000.00 0 0 0
Externos
Parqueo 8 15.00 Mtr 4,000.00 4,000.00 4,000.00 0 0 0
Parqueo 9 15.00 Mtr 4,000.00 4,000.00 4,000.00 0 0 0
TOTALES 822,179.70 149,000.00 673,179.70 197,400.00 394000 149100 62600
Sanchez Constructora
Queru Queru , Pasaje C
Cercado- Cochabamba
79966447
Direccion: Zona Arocagua- Calle Final Maravillas
Fecha: Noviembre de 2019
Moneda: Bolivianos
Tipo de cambio:6,96

Ventas y Pre - Ventas Edificio Multifamiliar VATICANO II

Precio Importe
Descripción Extención Mtr2 Comprador convenido Pagado Saldo ($us) PAGO BMSC
($us) ($us) OBSERVACION
A 115.30 Mtr Helen Veizaga 61,000.00 21,000.00 40,000.00 28,000.00 BANCO UNION AG. AMERICA
Planta Baja
B 96.70 Mtr 55,000.00 200.00 54,800.00 BANCO MERCANTIL AG.AMERICA Y LIBERTADOR 55000
1A 108.40 Mtr 62,000.00 200.00 61,800.00 BANCO MERCANTIL AG.AMERICA Y LIBERTADOR 62000
Primer piso 1B 81.37 Mtr 51,748.00 51,748.00
1C 49.90 Mtr Jhanet Vasquez 23,000.00 23,000.00 0.00 0.00
2A 108.40 Mtr Nataly Nery 64,000.00 2,000.00 62,000.00 43,400.00 BANCO UNION AG. AMERICA
Segundo piso 2B 81.37 Mtr Sonia Vidovic 50,000.00 15,000.00 35,000.00 24,500.00 BANCO MERCANTIL AG. PRADO
2C 49.90 Mtr Lourdes Salazar 28,000.00 20,000.00 8,000.00 5,600.00 PAGO EN EFECTIVO
3A 108.40 Mtr 64,000.00 64,000.00
Tercer piso 3B 81.37 Mtr Lalo Rodriguez 45,000.00 20,000.00 25,000.00 17,500.00
3C 49.90 Mtr Federico Damani 28,000.00 25,000.00 3,000.00 2,100.00 PAGO EN EFECTIVO
4A 108.40 Mtr Jhanet Vasquez 55,000.00 3,000.00 52,000.00 36,400.00 BANCO UNION AG. AMERICA 59000 EVELYN QUISPE
Cuarto piso 4B 81.71 Mtr Lalo Rodriguez 45,000.00 10,000.00 35,000.00 24,500.00 PAGO EN EFECTIVO
4C 48.90 Mtr Marcelo Melgar 27,000.00 10,000.00 17,000.00 11,900.00
5A 93.58 Mtr 58,000.00 58,000.00
Quinto piso
5B 82.14 Mtr 51,748.00 51,748.00
Parqueo 1 16.55 Mtr 5,000.00 5,000.00
Parqueo 2 15.55 Mtr Jhanet Vasquez 5,000.00 500.00 4,500.00 BANCO UNION AG. AMERICA 5000
Internos Parqueo 3 15.55 Mtr 5,000.00 5,000.00
Parqueo 4 15.55 Mtr 5,000.00 5,000.00
Parqueo 5 15.55 Mtr Lalo Rodriguez 3B 5,000.00 5,000.00 3,500.00
Parqueo 6 15.15 Mtr 4,000.00 4,000.00
Parqueo 7 15.00 Mtr 4,000.00 4,000.00
Externos
Parqueo 8 15.00 Mtr 4,000.00 4,000.00
Parqueo 9 15.00 Mtr 4,000.00 4,000.00
TOTALES 197,400.00
Sanchez Constructora
Queru Queru , Pasaje C
Cercado- Cochabamba
79966447
Direccion: Zona Arocagua- Calle Final Maravillas
Fecha: Mayo de 2019
Moneda: Bolivianos
tipo de cambio:6,96

COSTO DEL PROYECTO


COSTO DEL TERRENO 507,636.82
COSTO CONSTRUCTIVO 4,085,667.85
GASTOS ADMINISTRATIVOS 201,344.20
GASTOS DE PUBLICIDAD 10,800.00

TOTAL Bs 4,805,448.87
Sanchez Constructora
Queru Queru , Pasaje C
Cercado -Cochabamba
79966447
Proyecto: EDIFICIO MULTIFAMILIAR "VATICANO II"
Dirección: Zona AROCAGUA
Fecha: Mayo de 2019
Moneda: Bolivianos

CUADRO 2.1
TERRENO

CONCEPTO UNIDAD CANTIDAD PRECIO UNITARIO (Bs) COSTO TOTAL (Bs)


Valor del Lote m2 457.71 1,100.69 503,796.82
Gastos Notariales Global 1.00 500.00 500.00
Transferencia y Visado de la alcaldía Global 1.00 2,100.00 2,100.00
Gastos DDRR Global 1.00 1,240.00 1,240.00
TOTAL Bs507,636.82

CUADRO 2.2
PROYECTO

CONCEPTO UNIDAD CANTIDAD PRECIO UNITARIO (Bs) COSTO TOTAL (Bs)


Estudio de Suelos Global 1.00 2,700.00 2,700.00
Calculo Estructural m2 1834 4.10 7,519.40
Manifiesto Ambiental m2 1834 2.20 4,034.80
Proyecto Arquitectónico m2 1834 13.00 23,842.00
Proyecto P.H. m2 1834 7.00 12,838.00
TOTAL Bs50,934.20

CUADRO 2.3
APROBACIÓN DE PLANOS, DIVISION E INSCRIPCIÓN CATASTRAL

CONCEPTO UNIDAD CANTIDAD PRECIO UNITARIO (Bs) COSTO TOTAL (Bs)


Permiso de Construcción Global 1.00 50.00 50.00
Pago Valorados y Legalizaciones Global 1.00 8,500.00 8,500.00
Pago Aprobación de Construcción y P.H. Global 1.00 3,500.00 3,500.00
Pago P.H. Derechos Reales Global 1.00 9,000.00 9,000.00
Inscripción Catastral P.H. Global 1.00 22,000.00 22,000.00
TOTAL Bs43,050.00

CUADRO 2.4
SERVICIOS BÁSICOS

CONCEPTO UNIDAD CANTIDAD PRECIO UNITARIO (Bs) COSTO TOTAL (Bs)


Agua Global 28.00 170.00 4,760.00
Luz ELFEC Global 14.00 250.00 3,500.00
Telefonía Global 14.00 400.00 5,600.00
TOTAL Bs13,860.00

CUADRO 2.5
SUELDOS ADMINISTRATIVOS

CONCEPTO UNIDAD CANTIDAD PRECIO UNITARIO (Bs) COSTO TOTAL (Bs)


Dirección de Obra Meses 17.00 5,500.00 93,500.00
Encargado Administrativo y Ventas Meses 17.00 4,000.00 68,000.00
TOTAL Bs93,500.00

CUADRO 2.6
PUBLICIDAD

CONCEPTO UNIDAD CANTIDAD PRECIO UNITARIO COSTO TOTAL


Publicidad Global 6 900 5,400.00
Letreros Publicitario y Prensa Global 6 900 5,400.00
TOTAL Bs10,800.00
Sanchez Constructora
Queru Queru , Pasaje C
Cercado- Cochabamba
79966447
Direccion: Zona Arocagua- Calle Final Maravillas
Fecha: Mayo de 2019
Moneda: Bolivianos
tipo de cambio:6,96

PRESUPUESTO GENERAL

Nro ITEM UNIDAD CANTIDAD PRECIO UNITARIO Bs PRECIO TOTAL Bs SUB TOTAL
1 Instalación de faenas Global 1.00 21,374.50 21,374.50
2 Tanque bajo H°A° excavación m3 18.45 90.69 1,673.18
3 Tanque bajo H°A° hormigon pobre m3 1.00 584.75 584.75
4 Tanque bajo H°A° muro de contención m3 9.10 1,869.41 17,011.65
5 Tanque bajo H°A° revoque de paredes impermeables m2 48.72 81.73 3,981.64
6 Replanteo y trazado Global 1.00 833.25 833.25
7 Excavación de fundaciones m3 220.00 30.00 6,598.90
8 Relleno y compactación de materiales m3 140.00 30.99 4,338.25 56,396.13
9 Muro de contención m3 6.15 1,843.21 11,335.76
10 Hormigón pobre para nivelación m2 118.31 56.72 6,709.95
11 Zapatas m3 81.67 2,311.55 188,784.29
12 Columnas de H° A° m3 52.35 4,539.91 237,664.42
13 Viga de cadena H° A° m3 119.06 1,813.63 215,930.19
14 Escalera de H°A° m3 16.19 2,366.61 38,315.46
15 Losa llena de H°A° m3 5.97 2,356.93 14,070.84
16 Losa alivianada en un solo sentido m2 1,307.15 309.72 404,844.78
17 Rampa de hormigón armado m3 8.11 2,139.60 17,352.16 1,135,007.84
18 Contrapiso de cemento sobre losa m2 1,441.84 56.44 81,377.52
19 Muro de ladrillo hueco "R 6" de 12 cm m2 2,675.25 91.99 246,089.38
20 Cielo falso de yeso (Placas + Aislante acústico) m2 1,175.47 85.00 99,914.86
21 Cielo raso sobre losa m2 180.77 85.97 15,541.35
22 Revoque de paredes interior con yeso m2 2,708.69 65.70 177,960.74
23 Revestimiento cerámico m2 688.31 163.92 112,824.66
24 Piso ceramico m2 1,611.14 168.43 271,356.31
25 Zocalos de ceramica mL 1,301.71 46.34 60,314.73
26 Ventanas de aluminio de vidrio de 6 mm m2 348.39 441.10 153,674.83
27 Revoque exterior m2 1,654.64 119.66 197,989.77
28 Pintura latex interior Sinteplast m2 3,569.29 28.82 102,866.85
29 Pintura latex exterior Sinteplast m2 2,074.34 32.92 68,287.40
30 Puerta placa interior + marcos Pza 56.00 1,326.00 74,256.00
31 Puerta exterior metálica Pza 17.00 2,015.00 34,255.00
32 Muebles de ropero m2 133.94 580.00 77,685.20
33 Muebles de cocina mL 90.00 550.00 49,500.00
34 Revoque c/mortero baños y cocina m2 960.02 103.48 99,342.87
35 Revoque de muros sótano m2 142.75 105.17 15,012.30
36 Juegos de baño Pza 22.00 3,500.00 77,000.00
37 Lavaplatos de 2 ollas Pza 16.00 670.00 10,720.00
38 Grifería de lavamanos Pza 22.00 280.00 6,160.00
39 Ducha Pza 21.00 300.00 6,300.00
40 Griferia de cocina Pza 16.00 450.00 7,200.00
41 Mesones de cocina mL 53.50 890.00 47,615.00
42 Lavanderías Pza 12.00 680.00 8,160.00
43 Grifo de lavanderías Pza 12.00 250.00 3,000.00 2,104,404.76
44 Instalación hidráulica y sanitaria Pts 1.00 121,605.12 121,605.12
45 Instalación eléctrica Pts 1.00 200,656.80 200,656.80
46 Ascensor Pza 1.00 250,560.00 250,560.00 572,821.92
47 Piso de cemento empedrado m2 434.51 114.05 49,553.69
48 Limpieza general Global 1.00 50,000.00 50,000.00
49 Cerrajería Global 1.00 117,483.50 117,483.50 217,037.19
TOTAL 4,085,667.85
NOMBRE CLIENTE : ROSALIO JOSE SANCHEZ GARCIA
NOMBRE DEL EDIFICIO : EDIFICIO MULTIFAMILIAR "VATICANO II"

RESUMEN PRESUPUESTO GENERAL Y CRONOGRAMA

TIEMPO ESTIMADO
ETAPA DE CONSTRUCCIÓN COSTO PRESUPUESTADO (Bs) DURACIÓN (días)
fecha inicio fecha final
PRELIMINARES 56,396.13 4/2/2018 8/18/2018 117
OBRA GRUESA 1,135,007.84 4/22/2018 6/7/2019 208
OBRA FINA 2,104,404.76 10/1/2018 8/30/2019 286
INSTALACIONES 572,821.92 2/2/2019 8/27/2019 182
OBRAS COMPLEMENTARIAS 217,037.19 1/2/2019 31/08/19 208
TOTAL Bs4,085,667.85
COMPUTOS METRICOS
ITEM: 19 CONTRAPISOS

PLANTA BAJA -A- SUPERFICIE - mL m2


Dormitorio Suite 4.13 3.76 15.53
Sala 3.88 4.28 16.61
Cocina y Comedor 6.34 4.93 31.26
Baño 1.50 3.20 4.80
Dormitorio 1 3.04 3.60 10.94
Baño Suite 1.50 3.26 4.89
Dormitorio 2 5.31 2.83 15.03
TOTAL 99.05

PLANTA BAJA -B- SUPERFICIE - mL m2


Cocina, Comedor y Living 5.00 5.99 29.95
Pasillo 1.50 4.04 6.06
Pasillo 1.40 1.44 2.02
Baño 3.77 1.44 5.43
Dormitorio 1 5.69 3.10 17.64
Dormitorio 2 3.37 4.95 16.68
Patio exterior 7.04 2.00 14.08
TOTAL 91.86

PLANTA TIPO -A- SUPERFICIE - mL m2


Dormitorio Suite 3.53 4.13 14.58
Baño Suite 1.50 2.75 4.13
Dormitorio 1 3.72 4.28 15.92
Baño Común 1.50 3.72 5.58
Pasillo 1.96 1.20 2.35
Patio Servicio 1.40 3.75 5.25
Cocina y Comedor 6.30 5.20 32.76
Pasillo 1.50 1.00 1.50
Pasillo 1.70 0.90 1.53
Living 3.90 1.40 5.46
Total * Dpto 89.06
Dpto 3
TOTAL 3 DPTO 267.17

PLANTA -4A- SUPERFICIE - mL m2


TOTAL 73.23

PLANTA TIPO -C- SUPERFICIE - mL m2


Baño Común 1.29 3.75 4.84
Dormitorio 1 4.52 2.96 13.38
Cocina 3.51 1.95 6.84
Living Comedor 3.10 3.74 11.59
Pasillo 4.17 1.93 8.05
Total * Dpto 44.70
Dpto 4
TOTAL DPTOS 178.81

PLANTA TIPO-B- SUPERFICIE - mL m2


Dormitorio 2 4.14 2.97 12.30
Baño Común 1.40 2.86 4.00
Dormitorio 1 5.17 3.00 15.51
Área de Servicio 2.20 1.90 4.18
LIving Comedor 6.50 5.40 35.10
Pasillo 2.00 1.79 3.58
Total * Dpto 74.67
Dpto 4
TOTAL 4 DPTOS 298.68

PLANTA QUINTO PISO -A- SUPERFICIE - mL m2


Balcón 9.10 1.50 13.65
Living 5.19 7.40 38.41
Living 3.60 0.40 1.44
Living 1.10 1.40 1.54
Baño 1.50 3.10 4.65
Dormitorio 2 3.30 1.90 6.27
Dormitorio 2 2.50 1.00 2.50
Dormitorio 2 1.90 2.10 3.99
Dormitorio 1 4.50 2.00 9.00
Dormitorio 1 0.80 3.30 2.64
TOTAL 1 DPTO 84.09

PLANTA QUINTO PISO -B- SUPERFICIE - mL m2


Baño 3.80 1.10 4.18
Baño 1.80 0.60 1.08
Living 7.30 3.50 25.55
Living 3.20 2.00 6.40
Living 1.10 1.30 1.43
Dormitorio 1 4.40 2.40 10.56
Dormitorio 1 3.20 0.70 2.24
Dormitorio 2 3.90 2.30 8.97
Dormitorio 2 3.20 0.70 2.24
Dormitorio 2 0.40 0.80 0.32
TOTAL 1 DPTO 62.97

SALON COPROPIETARIOS SUPERFICIE - mL m2


3.70 5.30 19.61
TOTAL 19.61

PATIO LAVANDERIA SUPERFICIE - mL m2


4.60 1.50 6.90
6.10 1.30 7.93
1.83 1.21 2.21
2.80 0.20 0.56
TOTAL 17.60

TANQUE DE AGUA SUPERFICIE - mL m2


3.80 7.00 26.60
TOTAL 26.60

GRADA (HALL LAVANDERÍA) SUPERFICIE - METROS m2


2.50 1.55 3.88
1.40 1.96 2.74
1.20 2.50 3.00
(0.48*1.2) 0.58 17.00 9.79
TOTAL 19.41

GRADA TIPO SUPERFICIE - METROS m2


1.40 4.56 6.38
2.50 1.55 3.88
1.20 2.50 3.00
0.58 17.00 9.79
Total 23.05
Nivel 7
TOTAL 7 PISOS 161.36

HALL INGRESO SUPERFICIE - METROS m2


20.70 2.00 41.40
TOTAL 41.40

TOTAL CONTRAPISOS TOTAL m2


1441.84

ITEM: 20 COLOCADO DE LADRILLO "R-6"


ALTU RA DE
PLANTA BAJA -A- mL MURO (H) m L TOTAL m2
7.80
3.80
3.40
3.80
5.20
5.30
13.80
13.40
3.00
10.80
TOTAL 70.30 2.60 182.78

ALTU RA DE
PLANTA BAJA -B- mL MURO (H) m L TOTAL m2
5.30
10.50
3.80
3.80
5.00
1.30
4.00
3.80
5.20
5.50
11.80
TOTAL 60.00 2.60 156

ALTU RA DE
PLANTA TIPO -A- mL MURO (H) m L TOTAL m2
9.00
1.40
1.60
3.80
3.50
3.80
4.20
3.50
4.00
10.20
10.50
5.30
12.00
Total * Dpto 72.80 2.60 189.28
Dpto 4
TOTAL 4 DPTOS 757.12

ALTU RA DE
PLANTA TIPO -C- mL MURO (H) m L TOTAL m2
3.50
4.60
4.60
5.30
5.80
4.50
6.40
Total * Dpto 34.70 2.60 90.22
Dpto 4
TOTAL 4 DPTOS 360.88

ALTU RA DE
PLANTA TIPO -B- mL MURO (H) m L TOTAL m2
5.30
2.40
4.80
5.30
12.00
8.50
1.50
1.20
2.90
1.80
2.00
1.80
Total * Dpto 49.50 2.60 128.70
Dpto 4
TOTAL 4 DPTOS 514.80

ALTU RA DE
PLANTA QUINTO PISO -A- mL MURO (H) m L TOTAL m2
3.80
4.00
3.80
3.20
6.00
2.60
7.50
2.00
4.90
1.80
7.50
Total 47.10 2.60 105.77
PARAPETO 12.39 1.2 14.87
TOTAL 1 DPTO 120.64

ALTU RA DE
PLANTA QUINTO PISO -B- mL MURO (H) m L TOTAL m2
9.50
1.00
4.00
3.20
12.00
6.00
1.50
1.80
2.40
2.00
1.70
6.80
TOTAL 1 DPTO 51.90 2.60 124.15

ALTU RA DE
PARAPETO DE AGUA mL MURO (H) m L TOTAL m2
22.00
TOTAL 22.00 1.60 35.2

ALTU RA DE
GRADA Y HALL (7 PISOS) mL MURO (H) m L TOTAL m2
59.50
30.00
10.00
TOTAL 99.50 2.60 258.7

ALTU RA DE
HALL INGRESO mL MURO (H) m L TOTAL m2
22
TOTAL 22 2.50 55

ALTU RA DE
SEMISÓTANO mL MURO (H) m L TOTAL m2
20.00
13.00
3.30
6.00
TOTAL 42.30 2.6 109.98

TOTAL m2
TOTAL COLOCADO DE LADRILLO "R-6" 2675.25

ITEM: 21 CIELO FALSO DE YESO (PLACAS + AISLANTE ACÚSTICO)

C IELO FALSO D E YESO (PLA CAS + A ISLAN TE


A CÚSTICO) m2
Planta baja -A- 99.05
Planta baja -B- 91.86
Planta tipo - A- 267.17
Planta tipo - 4A- 73.23
Planta tipo - C- 178.81
Planta tipo - B- 298.68
Planta Quinto Piso -A- 84.09
Planta Quinto Piso -B- 62.97
Salon copropietarios 19.61
TOTAL 1175.47

ITEM: 22 CIELO RASO SOBRE LOSA

CIELO RASO m2 NIVEL TOTAL m2


Grada Hall 19.41 1 19.41
Grada 23.05 7 161.36
TOTAL 180.77

ITEM: 23 REVOQUE DE PAREDES INTERIOR CON YESO


ALTU RA DE TOTAL MUROS
PLANTA BAJA -A- mL MURO (H) m L (m2)
15.78
13.60
16.26
8.80
30.38
TOTAL * 1 DPTO 84.82 2.30 195.09

ALTU RA DE TOTAL MUROS


PLANTA BAJA -B- mL MURO (H) m L (m2)
5.50
4.00
4.00
1.40
5.00
4.00
1.00
2.00
17.58
16.67
TOTAL 61.15 2.30 140.65

ALTU RA DE TOTAL MUROS


PLANTA TIPO -A- mL MURO (H) m L (m2)
13.72
15.32
14.60
27.80
Total 71.44 2.30 164.31
Dpto 4
TOTAL DPTOS 657.25

ALTU RA DE TOTAL MUROS


PLANTA TIPO -C- mL MURO (H) m L (m2)
15.04
28.33
Total 43.37 2.30 99.75
Dpto 4
TOTAL DPTOS 399.00
ALTU RA DE TOTAL MUROS
PLANTA TIPO -B- mL MURO (H) m L (m2)
14.54
16.44
15.80
14.19
Total 60.97 2.30 140.23
Dpto 4
TOTAL DPTOS 560.92

ALTU RA DE TOTAL MUROS


PLANTA QUINTO PISO -A- mL MURO (H) m L (m2)
21.20
13.30
12.50
Total 47.00 2.30 108.10
Dpto 1
TOTAL DPTOS 108.10

ALTU RA DE TOTAL MUROS


PLANTA QUINTO PISO -B- mL MURO (H) m L (m2)
23.30
13.80
13.90
Total 51.00 2.30 117.30
Dpto 1
TOTAL DPTOS 117.30

ALTU RA DE TOTAL MUROS


SALON mL MURO (H) m L (m2)
TOTAL 20.6 2.30 47.38
DPTOS 1
TOTAL DPTOS 47.38

ALTU RA DE TOTAL MUROS


GRADA mL MURO (H) m L (m2)
TOTAL 30 2.30 69.00
NIVEL 7
TOTAL PISOS 483.00

TOTAL REVOQUE DE PAREDES INTERIOR CON YESO TOTAL m2


2708.69

ITEM: 24 REVESTIMIENTO CERÁMICO

PLANTA BAJA -A- MUROS (mL) ALTURA TOTAL (m2)


Baño Común 15.00 2.30 34.50
Baño Suite 15.00 2.30 34.50
Cocina 6.00
TOTAL 75.00

PLANTA BAJA -B- MUROS (mL) ALTURA TOTAL (m2)


Baño Suite 12.00 2.30 27.60
Cocina 6.00
TOTAL 33.60

PLANTA TIPO -A- MUROS (mL) ALTURA TOTAL (m2)


Baño Suite 13.00 2.30 29.90
Baño Común 13.00 2.30 29.90
Cocina 6.00
Total * Dpto 65.80
Dpto 3
TOTAL 3 DPTOS 197.4

PLANTA TIPO -4A- MUROS (mL) ALTURA TOTAL (m2)


Baño Suite 13.00 2.30 29.90
Baño Común 13.00 2.30 29.90
Patio 8.28
Cocina 6.00
TOTAL * DPTO 74.08

PLANTA TIPO -C- MUROS (mL) ALTURA TOTAL (m2)


Baño 13.00 2.30 29.90
Cocina 6.00
Total * Dpto 35.90
Dpto 4
TOTAL 4 DPTOS 143.60

PLANTA TIPO -B- MUROS (mL) ALTURA TOTAL (m2)


Baño 7.72 2.30 17.76
Cocina 6.00
Muro Patio 0.00 0.00 0.00
Total * Dpto 23.76
Dpto 4
TOTAL 4 DPTOS 95.024

PLANTA QUINTO PISO -A- MUROS (mL) ALTURA TOTAL (m2)


Baño 9.10 2.30 20.93
Cocina 6.00
Total * Dpto 26.93
Dpto 1
TOTAL 4 DPTOS 26.93

PLANTA QUINTO PISO -B- MUROS (mL) ALTURA TOTAL (m2)


Baño 8.65 2.30 19.90
Cocina 6.00
Total * Dpto 25.90
Dpto 1
TOTAL 4 DPTOS 25.90

PATIO SERVICIO MUROS (mL) ALTURA TOTAL (m2)


Baño 6.17 2.30 14.19
TOTAL * DPTO 14.19

LAVANDERÍA MUROS (mL) ALTURA TOTAL (m2)


Muro 4.32 0.60 2.59
TOTAL 2.59

TOTAL (m2)
TOTAL REVESTIMIENTO CERAMICO 688.31

ITEM: 25 PISO CERAMICO

PLANTA O NIVEL m2 DPTOS TOTAL m2


Planta baja -A- 127.05 1 127.05
Planta baja -B- 99.86 1 99.86
Planta tipo - A- 96.06 3 288.18
Planta tipo - 4A- 96.06 1 96.06
Planta tipo - C- 49.70 4 198.80
Planta tipo - B- 82.76 4 331.04
Planta Quinto piso -A- 90.06 1 90.06
Planta Quinto piso -B- 82.76 1 82.76
Salon Copropietarios 49.61 1 49.61
Patio Lavanderia 17.60 1 17.60
Grada Hall y Lavandería 50.41 1 50.41
Grada Tipo 23.05 6 138.31
Hall Ingreso 41.40 1 41.40
TOTAL 1611.14

ITEM: 26 ZOCALO DE CERAMICA

TOTAL
PLANTA O NIVEL ZOCALOS (mL) DPTOS ZOC ALOS (mL)
Planta baja -A- 84.82 1 84.82
Planta baja -B- 61.15 1 61.15
Planta tipo - A- 71.44 4 285.76
Planta tipo - C- 43.37 4 173.48
Planta tipo - B- 60.97 4 243.88
Planta Quinto piso -A- 47.00 1 47.00
Planta Quinto piso -B- 51.00 1 51.00
Salon Copropietarios 20.60 1 20.60
Lavandería 17.42 1 17.42
Grada Hall y Lavandería 10.00 1 10.00
Grada Tipo 30.00 9 270.00
Hall Ingreso 36.60 1 36.60
TOTAL 1301.71

ITEM: 27 VENTANAS DE ALUMINIO

PLANTA m2 DPTOS TOTAL (m2)


Planta baja -A- 16.72 1 16.72
Planta baja -B- 10.11 1 10.11
Grada Hall 1.56 1 1.56
Planta tipo - A- 20.18 4 80.72
Planta tipo - B- 15.31 4 61.24
Planta tipo - C- 6.42 4 25.68
Planta Quinto piso -A- 16.69 1 16.69
Planta Quinto piso -B- 8.97 1 8.97
Salon Copropietarios 12 1 12
Grada Tipo 22.94 5 114.7
TOTAL 348.39

ITEM: 28 REVOQUE EXTERIOR


ALTURA DE
SALON Y TANQUE DE AGUA mL MURO (H) m L TOTAL m2
TOTAL 37.85 4.20 158.97

ALTURA DE
REVOQUE EXTERIOR ESTE mL MURO (H) m L TOTAL m2
4.97
0.60
5.10
0.80
5.20
0.80
3.10
0.50
5.50
TOTAL 26.57 12.60 334.78

ALTURA DE
REVOQUE EXTERIOR OESTE mL MURO (H) m L TOTAL m2
TOTAL 24.00 12.60 302.40

ALTURA DE
REVOQUE EXTERIOR NORTE mL MURO (H) m L TOTAL m2
TOTAL 10.57 12.60 133.18

ALTURA DE
REVOQUE EXTERIOR SUD mL MURO (H) m L TOTAL m2
TOTAL 11.50 15.30 175.95

ALTURA DE
PLANTA BAJA mL MURO (H) m L TOTAL m2
22.50
24.50
7.84
TOTAL 54.84 2.60 142.58

ALTURA DE
PLANTA QUINTO PISO mL MURO (H) m L TOTAL m2
19.09 3.06 58.42
9.34 3.06 28.58
21.00 3.06 64.26
3.20 3.06 9.79
12.36 3.06 37.82
TOTAL 198.87

ALTURA DE
SÓTANO HALL Y LAVANDERÍAS mL MURO (H) m L TOTAL m2
29.00 2.60 75.40
20.00 2.60 52.00
24.50 1.40 34.30
22.00 2.10 46.20
TOTAL 207.90

TOTAL REVOQUE EXTERIOR TOTAL m2


1654.64

ITEM: 29 PINTURA LATEX INTERIOR

PINTURA INTERIOR CIELO RAZO Y CIELO FALSO m2 DPTOS TOTAL m2


Planta baja -A- 99.05 1 99.05
Planta baja -B- 91.86 1 91.86
Planta tipo - A- 89.06 3 267.17
Planta tipo - 4A- 73.23 1 73.23
Planta tipo - C- 44.70 4 178.81
Planta tipo - B- 74.67 4 298.68
Planta quinto piso -A- 84.09 1 84.09
Planta quinto piso -B- 62.97 1 62.97
Salon Copropietarios 19.61 1 19.61
Grada hall 19.41 1 19.41
Grada Tipo 48.03 6 288.18
TOTAL 1483.06

MUROS (PINTURA INTERIOR)


DESCU ENTO
VENTANAS Y
PLANTA BAJA -A- PUERTAS TOTAL m2
Puertas (2.1+11.34+3.36) 16.80
Ventanas 16.72
Total 33.52
TOTAL NETO (195.09-33.52) 161.57
DESCU ENTO
VENTANAS Y
PLANTA BAJA -B- PUERTAS TOTAL m2
Puertas(2.10+11.34+1.68) 15.12
Ventanas 10.50
Total 25.62
TOTAL NETO (141-25.62) 115.03
DESCU ENTO
VENTANAS Y
PLANTA TIPO -A- PUERTAS TOTAL m2
Puertas (2.1+15.12+3.36) 20.58
Ventanas 20.14
Total 40.72
Total Neto (164.31-40.72) 123.59
Dpto 4
TOTAL 4 DPTOS 494.37
DESCU ENTO
VENTANAS Y
PLANTA TIPO -B- PUERTAS TOTAL m2
Puertas (2.1+11.34+1.68) 15.12
Ventanas 9.31
Total 24.43
Total Neto (140.23-24.43) 115.80
Dpto 4
TOTAL 4 DPTOS 463.20
DESCU ENTO
VENTANAS Y
PLANTA TIPO -C- PUERTAS TOTAL m2
Puertas (2.1+3.78+1.68) 7.56
Ventanas 5.38
Total 12.94
Total Neto (99.75-12.94) 86.81
Dpto 4
TOTAL 4 DPTOS 347.24

DESCU ENTO
VENTANAS Y
PLANTA QUINTO PISO -A- PUERTAS TOTAL m2
Puertas (2.1+3.78+1.68) 7.56
Ventanas 16.69
Total 24.25
Total Neto (108.10-12.94) 83.85
Dpto 1
TOTAL 4 DPTOS 83.85

DESCU ENTO
VENTANAS Y
PLANTA QUINTO PISO -B- PUERTAS TOTAL m2
Puertas (2.1+3.78+1.68) 7.56
Ventanas 8.97
Total 16.53
Total Neto (117.30-12.94) 100.77
Dpto 1
TOTAL 4 DPTOS 100.77

DESCU ENTO
VENTANAS Y
SALON PUERTAS TOTAL m2
Puertas 4.18
Ventanas 4.48
Total 8.66
TOTAL NETO (47.38-8.66) 38.72
DESCU ENTO
VENTANAS Y
GRADA PUERTAS TOTAL m2
Ventanas 16.90
TOTAL NETO (395.78-16.9) 466.10

TOTAL m2
TOTAL PINTURA INTERIOR
3569.29

ITEM: 30 PINTURA LATEX EXTERIOR (OBRA VENDIDA)

DETALLE FACHADAS TOTAL m2


Salon y Tanque de Agua 158.97
Este 334.78
Oeste 302.40
Norte 133.18
Sud 175.95
Planta baja 280.58
Planta Quinto piso 280.58
Sótano Hall y Lavanderías 407.90
TOTAL 2074.34

ITEM: 31 PUERTA PLACA INTERIOR + MARCOS

PLANTA UNIDAD CANTIDAD DPTOS TOTAL PIEZAS


Planta baja -A- PIEZA 6.00 1 6.00
Planta baja -B- PIEZA 3.00 1 3.00
Planta tipo - A- PIEZA 5.00 4 20.00
Planta tipo - B- PIEZA 4.00 4 16.00
Planta tipo - C- PIEZA 1.00 4 4.00
Planta quinto piso -A- PIEZA 3.00 1 3.00
Planta quinto piso -B- PIEZA 3.00 1 3.00
Salon Copropietarios PIEZA 1.00 1 1.00
TOTAL 56.00

ITEM: 32 PUERTA EXTERIOR METÁLICA

DETALLE PIEZA
Puerta exterior metálica de 1 * 2.05 17.00

ITEM: 33 MUEBLES DE ROPERO (CON PROFORMA)


(OBRA
ROP VENDIDA)
ERO SU ITE TOTAL m2 *
PLANTA O NIVEL (m 2) ROPERO 1 (m2) ROPERO 2 (m2) TOTAL m2 DPTOS DPTO
Planta baja -A- 5.46 4.68 5.20 15.34 1 15.34
Planta baja -B- 0.00 5.20 4.68 9.88 1 9.88
Planta tipo - A- 5.20 3.50 4.68 13.38 4 53.52
Planta tipo - B- 0.00 3.50 5.00 8.50 4 34.00
Planta tipo - C- 0.00 3.50 0.00 3.50 4 14.00
Planta Quinto piso -A- 1.80 1.80 0.00 3.60 1 3.60
Planta Quinto piso-B- 1.80 1.80 0.00 3.60 1 3.60
TOTAL 133.94

ITEM: 34 MUEBLES DE COCINA (CON PROFORMA)


CAJ ON ERIA CAJ ON ERIA TOTAL m L *
PLANTA O NIVEL BAJ A ALTA TOTAL mL DPTOS DPTO
Planta baja -A- 3.80 2.30 6.10 1 6.10
Planta baja -B- 4.80 3.80 8.60 1 8.60
Planta tipo - A- 3.80 2.70 6.50 4 26.00
Planta tipo - B- 3.10 1.40 4.50 4 18.00
Planta tipo - C- 3.10 1.60 4.70 4 18.80
Planta quinto piso -A- 3.20 4.10 7.30 1 7.30
Planta quinto piso -B- 2.90 2.30 5.20 1 5.20
TOTAL 90.00

ITEM :35 REVOQUE C/MORTERO BAÑOS Y COCINA

PLANTA BAJA -A- perímetro alto TOTAL m2


Baño privado 15.40 2.50 38.50
Baño común 12.52 2.50 31.30
Cocina 18.00
TOTAL 87.80

PLANTA BAJA -B- LARGO ANCHO TOTAL m2


Baño 10.60 2.50 26.50
Cocina 18.00
TOTAL 44.50

PLANTA TIPO -A- 1-2-3 LARGO ANCHO TOTAL m2


Baño privado 8.50 2.50 21.25
Baño común 10.20 2.50 25.50
Área de servicio 10.20 2.50 25.50
Cocina 18.00
Total 90.25
Dpto 3
TOTAL 3 DPTOS 270.75

PLANTA -4A- LARGO ANCHO TOTAL m2


Baño privado 8.24 2.50 20.60
Baño común 9.00 2.50 22.50
Cocina 18.00
TOTAL 61.10

PLANTA TIPO -B- 1-2-3-4- LARGO ANCHO TOTAL m2


Baño común 8.80 2.50 22.00
Área de servicio 6.80 2.50 17.00
Cocina 18.00
Total 57.00
Dpto 4
TOTAL 4 DPTOS 228.00

PLANTA TIPO -C-1-2-3-4- LARGO ANCHO TOTAL m2


Baño común 10.10 2.50 25.25
Cocina 18.00
Total 43.25
Dpto 4
TOTAL 4 DPTOS 173.00

PLANTA QUINTO PISO -A- LARGO ANCHO TOTAL m2


Baño común 21.85
Cocina 18.00
Total 39.85
Dpto 1
TOTAL 1 DPTOS 39.85

PLANTA QUINTO PISO -B- LARGO ANCHO TOTAL m2


Baño común 18.51
Cocina 18.00
Total 36.51
Dpto 1
TOTAL 1 DPTOS 36.51

PATIO SERVICIO LARGO ANCHO TOTAL m2


Baño común 30.20 2.30 18.51
TOTAL 18.51

TOTAL m2
TOTAL REVOQUE C/MORTERO BAÑOS Y COCINA 960.02

ITEM :36 REVOQUE MUROS SEMI -SÓTANO

SÓTANO m2 ALTURA (H) TOTAL m2


21.20
12.90
9.00
2.20
6.80
5.00
TOTAL REVOQUE SEMISÓTANO 57.10 2.50 142.75

ITEM :37 JUEGOS DE BAÑO

PLANTA O NIVEL CANTIDAD DPTOS TOTAL JUEGOSTOTAL SIFÓN TOTAL CERA


Planta baja -A- 2.00 1 2.00 2.00 2.00
Planta baja -B- 1.00 1 1.00 1.00 1.00
Planta tipo - A- 2.00 4 8.00 8.00 8.00
Planta tipo - B- 1.00 4 4.00 4.00 4.00
Planta tipo - C- 1.00 4 4.00 4.00 4.00
Planta quinto piso 1.00 2 2.00 2.00 2.00
Patio servicio 1.00 1 1.00 1.00 1.00
TOTAL 22.00 22.00 22.00

ITEM :38 LAVAPLATOS DE 2 OLLAS

PLANTA O NIVEL CANTIDAD DPTOS TOTAL PIEZAS


Planta baja -A- 1.00 1 1.00
Planta baja -B- 1.00 1 1.00
Planta tipo - A- 1.00 4 4.00
Planta tipo - B- 1.00 4 4.00
Planta tipo - C- 1.00 4 4.00
Planta quinto piso 1.00 2 2.00
TOTAL 16.00

ITEM :39 GRIFERÍA DE LAVAMANOS

PLANTA O NIVEL CANTIDAD DPTOS TOTAL PIEZAS


Planta baja -A- 2.00 1 2.00
Planta baja -B- 1.00 1 1.00
Planta tipo - A- 2.00 4 8.00
Planta tipo - B- 1.00 4 4.00
Planta tipo - C- 1.00 4 4.00
Planta quinto piso 1.00 2 2.00
Patio servicio 1.00 1 1.00
TOTAL 22.00

ITEM :40 DUCHA ELECTRICA

PLANTA O NIVEL CANTIDAD DPTOS TOTAL PIEZAS


Planta baja -A- 2.00 1 2.00
Planta baja -B- 1.00 1 1.00
Planta tipo - A- 2.00 4 8.00
Planta tipo - B- 1.00 4 4.00
Planta tipo - C- 1.00 4 4.00
Planta quinto piso 1 2 2.00
TOTAL 21.00

ITEM :41 GRIFERIA DE COCINA

PLANTA O NIVEL CANTIDAD DPTOS TOTAL PIEZAS


Planta baja -A- 1.00 1 1.00
Planta baja -B- 1.00 1 1.00
Planta tipo - A- 1.00 4 4.00
Planta tipo - B- 1.00 4 4.00
Planta tipo - C- 1.00 4 4.00
Planta quinto piso 1.00 2 2.00
TOTAL 16.00

ITEM :42 MESONES DE GRANITO

MESONES DE GRANITO TOTAL mL DPTO TOTAL mL


Planta baja -A- 3.80 1 3.80
Planta baja -B- 4.80 1 4.80
Planta tipo - A- 3.80 4 15.20
Planta tipo - B- 3.10 4 12.40
Planta tipo - C- 2.80 4 11.20
Planta quinto piso -A- 3.20 1 3.20
Planta quinto piso -B- 2.90 1 2.90
TOTAL 53.50

ITEM :43 LAVANDERÍAS

DETALLE TOTAL
Planta baja -A-
Planta baja -B-
Planta tipo - A-
Planta tipo - B-
Planta tipo - C-
Planta tipo 5 to piso
TOTAL 12.00

ITEM :44 GRIFO DE LAVANDERÍAS

DETALLE TOTAL
Planta baja -A-
Planta baja -B-
Planta tipo - A-
Planta tipo - B-
Planta tipo - C-
Planta tipo 5 to piso
TOTAL 12.00

ITEM :45 INSTALACIÓN HIDRÁULICA Y SANITARIA

DETALLE TOTAL Bs
Instalación 121605.12
TOTAL 121605.12

ITEM: 46 INSTALACIÓN ELÉCTRICA

DETALLE TOTAL Bs
Instalación 200656.80
TOTAL 200656.80

ITEM :50 ASCENSOR

DETALLE TOTAL Bs
PRECIO DEL ASCENSOR 250560.00

ITEM: 48 PISO DE CEMENTO Y EMPEDRADO

PISO DE CEMENTO Y EMPEDRADO mL mL PARQUEOS TOTAL m2


4.50 5.00 1 22.50
3.15 5.00 1 15.75
3.00 5.00 7 105.00
Contrapiso semisótano 291.26
TOTAL 434.51

ITEM:49 LIMPIEZA GENERAL

DETALLE TOTAL Bs
LIMPIEZA 50000.00

ITEM: 50 CERRAJERÍA

DETALLE TOTAL UNIDAD PRECIO TOTAL (Bs)


Cubierta de techo 287.00 m2 220.00 63140.00
Bajantes (7*15.6) 124.80 ML 60.00 7488.00
Canaletas 54.40 ML 75.00 4080.00
Puerta de Ingreso (1.8*2.15) 3.87 m2 298.00 1153.26
Puerta de Garaje (3*2.1)*9 56.70 m2 298.00 16896.60
Puerta dpto PB A (1.2*2.15) 2.58 m2 298.00 768.84
Barandas Grada 83.60 ML 240.00 20064.00
Baranda Balcon 16.22 ML 240.00 3892.80
TOTAL 117483.50
CRONOGRAMA DE AVANCE DE OBRA
PROYECTO: EDIFICIO MULTIFAMILIAR VATICANO II
MONEDA: Bolivianos
1 2 3 4

ITEM DESCRIPCION IMPORTE Apr-18 May-18 Jun-18 Jul-18


PRELIMINARES SEMANA 1 SEMANA 2 SEMANA3 SEMANA 4 SEMANA 1 SEMANA 2 SEMANA3 SEMANA 4 SEMANA 1 SEMANA 2 SEMANA3 SEMANA 4 SEMANA 1 SEMANA 2 SEMANA3 SEMANA 4 SEMANA 1
1 Instalación de faenas 21,374.50 21,374.50
2 Tanque bajo H°A° 23,251.23 9,300.49 13,950.74
3 Replanteo y trazado 833.25 833.25
4 Excavación y fundaciones 6,598.90 824.86 5,774.04
5 Relleno y compactación sin material 4,338.25 1,205.07 1,928.11 1,205.0
OBRA GRUESA
6 Muro de contención H°A° 11,335.76
7 Hormigón pobre para nivelación 6,709.95 838.74 5,871.21
8 Zapatas 188,784.29 26,969.18 107,876.74 53,938.37
9 Columnas de H°A° 237,664.42 29,708.05 59,416.10
10 Viga de cadena H°A° 215,930.19 43,186.04
11 Escalera de H°A° 38,315.46 2,947.34
12 Losa llena de H°A° 14,070.84
13 Losa alivianada en un solo sentido 404,844.78 80,968.96
14 Rampa de hormigón armado 17,352.16
OBRA FINA
15 Contrapiso de cemento sobre losa 81,377.52
16 Muro de ladrillo hueco 246,089.38
17 Cielo falso de yeso 99,914.86
18 Cielo raso sobre losa 15,541.35
19 Revoque de paredes interior con yeso 177,960.74
20 Revestimiento cerámico 112,824.66
21 Piso cerámico 271,356.31
22 Zócalos de cerámica 60,314.73
23 Ventanas de aluminio 153,674.83
24 Revoque exterior 197,989.77
25 Pintura látex interior 102,866.85
26 Pintura látex exterior 68,287.40
27 Puerta placa interior 74,256.00
28 Puerta exterior metálica 34,255.00
29 Muebles de ropero 77,685.20
30 Muebles de cocina 49,500.00
31 Revoque c/mortero baños y cocina 99,342.87
32 Revoque de muros sótano 15,012.30
33 Juegos de baño, Grifería y Ducha eléctrica 89,460.00
34 Lavaplatos de 2 ollas y Grifería 17,920.00
35 Mesones de cocina 47,615.00
36 Lavanderías y grifo 11,160.00
INSTALACION
37 Instalación hidráulica y sanitaria 121,605.12
38 Instalación eléctrica 200,656.80
39 Ascensor 250,560.00
OBRAS COMPLEMENTARIAS
40 Piso de cemento empedrado con refuerzo de fierro 49,553.69
41 Limpieza General 50,000.00
42 Cerrajería 117,483.50
MONTO PARCIAL UTILIZADO CON RECURSOS PROPIOS 2,528,881.80 57,644.18 124,324.33 96,496.74 188,446.55
MONTO PROYECTADO PARA LA CONCLUSION DEL PROYECTO 4,085,667.85 57,644.18 124,324.33 96,496.74 188,446.55
MONTO FALTANTE PARA LA TERMINACION DEL EDIFICIO 1,556,786.04
MONTO TOTAL FALTANTE 1,556,786.04

$587,021.24
5 6 7 8 9 10 11

Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19


SEMANA 2 SEMANA3 SEMANA 4 SEMANA 1 SEMANA 2 SEMANA3 SEMANA 4 SEMANA 1 SEMANA 2 SEMANA3 SEMANA 4 SEMANA 1 SEMANA 2 SEMANA3 SEMANA 4 SEMANA 1 SEMANA 2 SEMANA3 SEMANA 4 SEMANA 1 SEMANA 2 SEMANA3 SEMANA 4 SEMANA 1 SEMANA 2

1,205.07

59,416.10 59,416.10 29,708.05


57,581.38 57,581.38 57,581.38
11,789.37 11,789.37 11,789.37
2,814.17 11,256.67
107,958.61 107,958.61 107,958.61

16,275.50 16,275.50 12,206.63


36,913.41 36,913.41 36,913.41 36,913.41 36,913.41

26,694.11 44,490.18

49,497.44 49,497.44

36,481.54
50,164.20

2,500.00 2,500.00

237,950.54 236,745.47 246,764.99 48,170.08 53,188.91 131,880.46 232,253.4


237,950.54 236,745.47 246,764.99 48,170.08 53,188.91 131,880.46 232,253.4
11 12 13 14 15 16 17

b-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19 ago-19


SEMANA3 SEMANA 4 SEMANA 1 SEMANA 2 SEMANA3 SEMANA 4 SEMANA 1 SEMANA 2 SEMANA3 SEMANA 4 SEMANA 1 SEMANA 2 SEMANA3 SEMANA 4 SEMANA 1 SEMANA 2 SEMANA3 SEMANA 4 SEMANA 1 SEMANA 2 SEMANA3 SEMANA 4 SEMANA 1 SEMANA 2 SEMANA3

2,267.15 9,068.61

17,352.16

06.63 12,206.63 16,275.50 4,068.88 4,068.88


13.41 36,913.41 24,608.94
29,974.46 29,974.46 19,982.97 9,991.49 9,991.49
. 7,770.67 7,770.67
90.18 35,592.15 62,286.26 8,898.04
11,282.47 5,641.23 39,488.63 28,206.17 28,206.17
27,135.63 27,135.63 81,406.89 67,839.08 67,839.08
1,809.44 1,809.44 26,538.48 15,078.68 15,078.68
23,051.22 30,734.97 99,888.64
97.44 49,497.44 39,597.95 9,899.49
2,057.34 2,057.34 2,057.34 55,548.10 20,573.37 20,573.37
10,243.11 37,558.07 20,486.22
7,425.60 37,128.00 29,702.40
3,425.50 17,127.50 13,702.00
3,884.26 3,884.26 34,958.34 19,421.30 15,537.04
2,475.00 2,475.00 24,750.00 19,800.00
44,704.29 44,704.29 4,967.14 4,967.14
12,009.84 3,002.46
80,514.00 8,946.00
17,920.00
15,871.67 31,743.33
11,160.00

81.54 36,481.54 36,481.54 6,080.26 6,080.26


64.20 50,164.20 70,229.88 10,032.84 10,032.84 10,032.84
87,696.00 50,112.00 37,584.00 37,584.00 37,584.00

12,388.42 37,165.27
0.00 2,500.00 2,500.00 5,000.00 10,000.00 12,500.00 12,500.00
76,364.28 11,748.35 11,748.35 17,622.53
53.40 302,358.60 572,657.56
53.40 302,358.60 572,657.56 272,717.52 579,895.59 497,908.60 206,264.33
572,657.56 272,717.52 579,895.59 497,908.60 206,264.33
2,129,443.61
PORCENTAJE COSTO POR ITEM
SEMANA 4 AVANCE DE OBRA AVANCE DE OBRA
100% 21,374.50
100% 23,251.23
100% 833.25
100% 6,598.90
100% 4,338.25

20% 2,267.15
100% 6,709.95
100% 188,784.29
100% 237,664.42
100% 215,930.19
100% 38,315.46
100% 14,070.84
100% 404,844.78
0% 0.00

90% 73,239.77
100% 246,089.38
60% 59,948.91
0% 0.00
95% 169,062.70
10% 11,282.47
10% 27,135.63
3% 1,809.44
15% 23,051.22
95% 188,090.29
4% 4,114.67
15% 10,243.11
0% 0.00
0% 0.00
5% 3,884.26
5% 2,475.00
90% 89,408.58
0% 0.00
0% 0.00
0% 0.00
0% 0.00
0% 0.00

90% 109,444.61
85% 170,558.28
35% 87,696.00

0% 0.00
20% 10,000.00
65% 76,364.28
Bs2,528,881.80
EDIFICIO MULTIFAMILIAR VATICANO II

OBRA GRUESA
PRIMERA LOSA
DETALLE UNIDAD CANTIDAD
Columnas m3 7.62
Vigas m3 17.94
Carpeta de Compresión m3 11.52
Escalera m3 3.77
TOTAL 40.85

VIGUETAS m2 210.44

SEGUNDA LOSA
DETALLE UNIDAD CANTIDAD
Columnas m3 7.10
Vigas m3 18.68
Carpeta de Compresión m3 11.41
Escalera m3 2.07
TOTAL 39.26

VIGUETAS m2 209.20

TERCERA LOSA
DETALLE UNIDAD CANTIDAD
Columnas m3 6.57
Vigas m3 18.68
Carpeta de Compresión m3 11.41
Escalera m3 2.07
TOTAL 38.73

VIGUETAS m2 209.20

CUARTA LOSA
DETALLE UNIDAD CANTIDAD
Columnas m3 5.70
Vigas m3 18.68
Carpeta de Compresión m3 11.41
Escalera m3 2.07
TOTAL 37.86

VIGUETAS m2 209.20

QUINTA LOSA
DETALLE UNIDAD CANTIDAD
Columnas m3 5.18
Vigas m3 18.68
Carpeta de Compresión m3 11.41
Escalera m3 2.07
TOTAL 37.34

VIGUETAS m2 209.20

SEXTA LOSA
DETALLE UNIDAD CANTIDAD
Columnas m3 5.18
Vigas m3 16.56
Carpeta de Compresión m3 10.80
Escalera m3 2.07
TOTAL 34.61

VIGUETAS m2 197.65

LOSA BASE TANQUE DE AGUA


DETALLE UNIDAD CANTIDAD
Columna m3 1.17
Losa Llena m3 3.60
Vigas m3 2.37
TOTAL 7.14

TOTALES DE LA OBRA GRUESA

DETALLE UNIDAD CANTIDAD


m2 118.31
Hormigón Pobre
m3 9.89

HORMIGÓN UNIDAD CANTIDAD


Zapatas m3 81.67
Columnas m3 52.35
Vigas m3 119.06
Carpeta de Compresión m3 71.25
Escalera m3 16.19

VIGUETA ALIVIANADA UNIDAD CANTIDAD


VIGUETA m2 1307.15
Losa llena m3 5.97
PRESUPUESTO INSTALACION SANITARIA

Detalle Cantidad Pts Precio ($) Total ($) Total (Bs)


Planta Baja -A- 1 35 26 910.00 6,333.60
Planta Baja -B- 1 36 26 936.00 6,514.56
Planta tipo -A- 4 43 26 4,472.00 31,125.12
Planta tipo -B- 4 31 26 3,224.00 22,439.04
Planta tipo -C- 4 23 26 2,392.00 16,648.32
Planta 5to piso-A- 1 29 26 754.00 5,247.84
Planta 5to piso-B- 1 29 26 754.00 5,247.84
Area de servicio 1 15 26 390.00 2,714.40
Instalacion de Bomba de agua 1 20 26 520.00 3,619.20
Instalacion de tanque elevado y bajantes 1 20 26 520.00 3,619.20
Instalacion alcantarilla 1 50 26 1,300.00 9,048.00
Colocado de artefactos 1 50 26 1,300.00 9,048.00
17,472.00 121,605.12

PRESUPUESTO INSTALACION ELECTRICA

Detalle Cantidad Pts Precio ($) Total ($) Total (Bs)


Planta Baja -A- 1 55 24 1,320.00 9,187.20
Planta Baja -B- 1 44 24 1,056.00 7,349.76
Planta tipo -A- 4 54 24 5,184.00 36,080.64
Planta tipo -B- 4 42 24 4,032.00 28,062.72
Planta tipo -C- 4 33 24 3,168.00 22,049.28
Planta 5to piso-A- 1 39 24 936.00 6,514.56
Planta 5to piso-B- 1 41 24 984.00 6,848.64
Generales - - - 12,150.00 84,564.00
28,830.00 200,656.80
Sanchez Constructora
Queru Queru , Pasaje C
Cercado- Cochabamba
79966447
Direccion: Zona Arocagua- Calle Final Maravillas
Fecha: Mayo de 2019
Moneda: Bolivianos
tipo de cambio:6,96

RESUMEN
FONDOS PROPIOS MONTO FALTANTE

MONTO FALTANTE
DESCRIPCION MONTO EN Bs MONTO EN $us TOTAL EN Bs TOTAL EN $us EN Bs
PRESUPUESTO GENERAL DE OBRA 4,085,667.85 587,021.24
COSTO TOTAL DELPROYECTO 4,805,448.87 690,438.06
VALOR DEL TERRENO 507,636.82 72,936.32
GASTOS INDIRECTOS 212,144.20 30,480.49
INVERSION EJECUTADA A LA FECHA DE OBRA 2,528,881.80 363,345.09
TOTAL 3,248,662.82 466,761.90 1,556,786.04
MONTO FALTANTE

MONTO FALTANTE
EN $us

223,676.16
Análisis de Precios Unitarios

Item: 18 CONTRAPISO SOBRE LOSA m2: 1,441.84


Proyecto: EDIFICIO MULTIFAMILIAR "VATICANO II" Fecha: 02/04/2018
Concepto: OBRA FINA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 27.04
Cemento Portland Kg 14.00 1.16 16.24
Arena m3 0.05 120.00 6.00
Gravilla m3 0.04 120.00 4.80
MANO DE OBRA 28.00
Albañil Maestro Hr 0.80 20.00 16.00
Ayudante Hr 0.80 15.00 12.00
EQUIPO, MAQUINARIA Y HERRAMIENTAS 1.40
Herramientas Menores 5% (TOTAL M.O.) 1.00 1.40 1.40
TOTAL PRECIO UNITARIO 56.44

Análisis de Precios Unitarios

Item: 19 MURO LADRILLO R-6 m2: 2,675.25


Proyecto: EDIFICIO MULTIFAMILIAR "VATICANO II" Fecha: 02/04/2018
Concepto: OBRA GRUESA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 47.84
Cemento Portland Kg 11.00 1.11 12.21
Arena Fina m3 0.05 136.50 6.83
Ladrillo 6 Huecos Pza 24.00 1.20 28.80
MANO DE OBRA 42.05
Albañil Maestro Hr 1.10 20.50 22.55
Ayudante Hr 1.30 15.00 19.50
EQUIPO, MAQUINARIA Y HERRAMIENTAS 2.10
Herramientas Menores 5% (TOTAL M.O.) 1.00 2.10 2.10
TOTAL PRECIO UNITARIO 91.99

Análisis de Precios Unitarios


Item: 20 CIELO FALSO DE YESO m2: 1,175.47
Proyecto: EDIFICIO MULTIFAMILIAR "VATICANO II" Fecha: 02/04/2018
Concepto: OBRA GRUESA Moneda: Bolivianos
PLACAS DE YESO CON
Insumo/Parámetro
AISLAMIENTO ACÚSTICO
Unidad Cantidad Precio Unitario Parcial VALOR TOTAL
(PROFORMA) 1.00 m2 85.00 85.00 85.00

Análisis de Precios Unitarios

Item: 21 CIELO RASO SOBRE LOSA m2: 180.77


Proyecto: EDIFICIO MULTIFAMILIAR "VATICANO II" Fecha: 02/04/2018
Concepto: OBRA FINA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 11.42
Estuco Kg 16.80 0.68 11.42
MANO DE OBRA 71.00
Albañil Maestro Hr 2.00 20.50 41.00
Ayudante Hr 2.00 15.00 30.00
EQUIPO, MAQUINARIA Y HERRAMIENTAS 3.55
Herramientas Menores 5% (TOTAL M.O.) 1.00 3.55 3.55
TOTAL PRECIO UNITARIO 85.97

Análisis de Precios Unitarios

Item: 22 REVOQUE DE PAREDES INTERIOR CON YESO m2: 2,708.69


Proyecto: EDIFICIO MULTIFAMILIAR "VATICANO II" Fecha: 02/04/2018
Concepto: OBRA FINA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 30.00
Yeso Kg 15.00 2.00 30.00
MANO DE OBRA 34.00
Albañil Maestro Hr 1.00 20.50 20.50
Ayudante Hr 0.90 15.00 13.50
EQUIPO, MAQUINARIA Y HERRAMIENTAS 1.70
Herramientas Menores 5% (TOTAL M.O.) 1.00 1.70 1.70
TOTAL PRECIO UNITARIO 65.70
Análisis de Precios Unitarios

Item: 23 REVESTIMIENTO CERÁMICO m2: 688.31


Proyecto: EDIFICIO MULTIFAMILIAR "VATICANO II" Fecha: 02/04/2018
Concepto: OBRA FINA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 121.39
Cemento Cola Kg 18.00 1.60 28.80
Ceramica Esmaltada 20*30 m2 1.10 80.90 88.99
Cemento Blanco Kg 0.60 6.00 3.60
MANO DE OBRA 40.50
Albañil Maestro Hr 1.00 24.50 24.50
Ayudante Hr 2.00 8.00 16.00
EQUIPO, MAQUINARIA Y HERRAMIENTAS 2.03
Herramientas Menores 5% (TOTAL M.O.) 1.00 2.03 2.03
TOTAL PRECIO UNITARIO 163.92

Análisis de Precios Unitarios

Item: 24 PISO CERAMICO m2: 1,611.14


Proyecto: EDIFICIO MULTIFAMILIAR "VATICANO II" Fecha: 02/04/2018
Concepto: OBRA FINA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 125.90
Cemento Cola Kg 18.00 1.60 28.80
Ceramica Esmaltada 20*30 m2 1.10 85.00 93.50
Cemento Blanco Kg 0.60 6.00 3.60
MANO DE OBRA 40.50
Albañil Maestro Hr 1.00 24.50 24.50
Ayudante Hr 2.00 8.00 16.00
EQUIPO, MAQUINARIA Y HERRAMIENTAS 2.03
Herramientas Menores 5% (TOTAL M.O.) 1.00 2.03 2.03
TOTAL PRECIO UNITARIO 168.43
Análisis de Precios Unitarios

Item: 25 ZOCALOS DE CERAMICA mL: 1,301.71


Proyecto: EDIFICIO MULTIFAMILIAR "VATICANO II" Fecha: 02/04/2018
Concepto: OBRA FINA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 25.13
Cemento Cola Kg 1.50 1.60 2.40
Zocalo de Ceramica m 1.05 16.50 17.33
Cemento Blanco Kg 0.90 6.00 5.40
MANO DE OBRA 20.20
Albañil Maestro Hr 0.40 20.50 8.20
Ayudante Hr 0.80 15.00 12.00
EQUIPO, MAQUINARIA Y HERRAMIENTAS 1.01
Herramientas Menores 5% (TOTAL M.O.) 1.00 1.01 1.01
TOTAL PRECIO UNITARIO 46.34

Análisis de Precios Unitarios

Item: 26 VENTANA DE CARPINTERÍA DE ALUMINIO (obra vendida) m2: 348.39


Proyecto: EDIFICIO MULTIFAMILIAR "VATICANO II" Fecha: 02/04/2018
Concepto: OBRA FINA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 441.10
Ventana m2 1.00 441.10 441.10
TOTAL PRECIO UNITARIO 441.10

Análisis de Precios Unitarios

Item: 27 REVOQUE EXTERIOR m2: 1,654.64


Proyecto: EDIFICIO MULTIFAMILIAR "VATICANO II" Fecha: 02/04/2018
Concepto: OBRA FINA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 59.65
Cemento Portland Kg 15.00 1.11 16.65
Arena m3 0.30 130.00 39.00
Cal Kg 5.00 0.80 4.00
MANO DE OBRA 57.15
Albañil Maestro Hr 1.90 20.50 38.95
Ayudante Hr 2.60 7.00 18.20
EQUIPO, MAQUINARIA Y HERRAMIENTAS 2.86
Herramientas Menores 5% (TOTAL M.O.) 1.00 2.86 2.86
TOTAL PRECIO UNITARIO 119.66

Análisis de Precios Unitarios

Item: 28 PINTURA INTERIOR (obra vendida) m2: 3,569.29


Proyecto: EDIFICIO MULTIFAMILIAR "VATICANO II" Fecha: 02/04/2018
Concepto: OBRA FINA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 28.82
Pintura m2 1.00 28.82 28.82
MANO DE OBRA 0.00

EQUIPO, MAQUINARIA Y HERRAMIENTAS 0.00

TOTAL PRECIO UNITARIO 28.82

Análisis de Precios Unitarios

Item: 29 PINTURA EXTERIOR (obra vendida) m2: 2,074.34


Proyecto: EDIFICIO MULTIFAMILIAR "VATICANO II" Fecha: 02/04/2018
Concepto: OBRA FINA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 32.92
Pintura m² 1.00 32.92 32.92
MANO DE OBRA 0.00
EQUIPO, MAQUINARIA Y HERRAMIENTAS 0.00

TOTAL PRECIO UNITARIO 32.92

Análisis de Precios Unitarios

Item: 30 PUERTA PLACA INTERIOR + MARCOS Pza: 56.00


Proyecto: EDIFICIO MULTIFAMILIAR "VATICANO II" Fecha: 02/04/2018
Concepto: OBRA FINA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 1,053.00
Chapa interior Pza 1.00 120.00 120.00
Puerta Pza 1.00 405.00 405.00
Marco 3*2 (Bibosi) Pza 1.00 380.00 380.00
Bisagra -A- Simple Pza 3.00 6.00 18.00
Barniz Global 1.00 130.00 130.00
MANO DE OBRA 260.00
carpintero Global 1.00 260.00 260.00
EQUIPO, MAQUINARIA Y HERRAMIENTAS 13.00
Herramientas Menores 5% (TOTAL M.O.) 1.00 13.00 13.00
TOTAL PRECIO UNITARIO 1,326.00

Análisis de Precios Unitarios

Item: 31 PUERTA EXTERIOR METALICA + MARCO Pza: 17.00


Proyecto: EDIFICIO MULTIFAMILIAR "VATICANO II" Fecha: 02/04/2018
Concepto: OBRA FINA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 1,805.00
Puerta Pza 1.00 1,805.00 1,805.00
MANO DE OBRA 200.00
cerrajero Global 1.00 200.00 200.00
EQUIPO, MAQUINARIA Y HERRAMIENTAS 10.00
Herramientas Menores 5% (TOTAL M.O.) 1.00 10.00 10.00
TOTAL PRECIO UNITARIO 2,015.00

Análisis de Precios Unitarios

Item: 32 MUEBLES DE ROPERO m2: 133.94


Proyecto: EDIFICIO MULTIFAMILIAR "VATICANO II" Fecha: 02/04/2018
Concepto: OBRA FINA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MANO DE OBRA 580.00
Obra vendida m2 1.00 580.00 580.00
TOTAL PRECIO UNITARIO 580.00

Análisis de Precios Unitarios

Item: 33 MUEBLES DE COCINA mL: 90.00


Proyecto: EDIFICIO MULTIFAMILIAR "VATICANO II" Fecha: 02/04/2018
Concepto: OBRA FINA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MANO DE OBRA 550.00
Obra Vendida m2 1.00 550.00 550.00
TOTAL PRECIO UNITARIO 550.00

Análisis de Precios Unitarios

Item: 34 REVOQUE C/MORTERO BAÑOS, COCINA m2: 960.02


Proyecto: EDIFICIO MULTIFAMILIAR "VATICANO II" Fecha: 02/04/2018
Concepto: OBRA FINA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 15.28
Cemento Portland Kg 8.00 1.16 9.28
Arena Fina m3 0.05 120.00 6.00
MANO DE OBRA 84.00
Albañil Maestro Hr 2.40 20.00 48.00
Ayudante Hr 2.40 15.00 36.00
EQUIPO, MAQUINARIA Y HERRAMIENTAS 4.20
Herramientas Menores 5% (TOTAL M.O.) 1.00 4.20 4.20
TOTAL PRECIO UNITARIO 103.48

Análisis de Precios Unitarios

Item: 35 REVOQUE MUROS SÓTANO m2: 142.75


Proyecto: EDIFICIO MULTIFAMILIAR "VATICANO II" Fecha: 02/04/2018
Concepto: OBRA FINA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 16.44
Cemento Portland Kg 9.00 1.16 10.44
Arena Fina m3 0.05 120.00 6.00
MANO DE OBRA 84.50
Albañil Maestro Hr 1.70 25.00 42.50
Ayudante Hr 2.80 15.00 42.00
EQUIPO, MAQUINARIA Y HERRAMIENTAS 4.23
Herramientas Menores 5% (TOTAL M.O.) 1.00 4.23 4.23
TOTAL PRECIO UNITARIO 105.17

Análisis de Precios Unitarios

Item: 36 JUEGOS DE BAÑO (Obra Vendida) Jgo: 22.00


Proyecto: EDIFICIO MULTIFAMILIAR "VATICANO II" Fecha: 02/04/2018
Concepto: OBRA FINA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 3,500.00
Jgo de Baño Pza 1.00 3,500.00 3,500.00
TOTAL PRECIO UNITARIO 3,500.00

Análisis de Precios Unitarios


Item: 37 LAVAPLATOS DE 2 OLLAS (Obra Vendida) Jgo: 16.00
Proyecto: EDIFICIO MULTIFAMILIAR "VATICANO II" Fecha: 02/04/2018
Concepto: OBRA FINA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 670.00
Lavaplatos Pza 1.00 670.00 670.00
TOTAL PRECIO UNITARIO 670.00

Análisis de Precios Unitarios

Item: 38 GRIFERÍA DE LAVAMANOS (Obra Vendida) Jgo: 22.00


Proyecto: EDIFICIO MULTIFAMILIAR "VATICANO II" Fecha: 02/04/2018
Concepto: OBRA FINA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 280.00
Grifería Pza 1.00 280.00 280.00
TOTAL PRECIO UNITARIO 280.00

Análisis de Precios Unitarios

Item: 39 DUCHA (Obra Vendida) Jgo: 21.00


Proyecto: EDIFICIO MULTIFAMILIAR "VATICANO II" Fecha: 02/04/2018
Concepto: OBRA FINA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 300.00
Ducha Pza 1.00 300.00 300.00
TOTAL PRECIO UNITARIO 300.00

Análisis de Precios Unitarios

Item: 40 GRIFERIA DE COCINA (Obra Vendida) Jgo: 16.00


Proyecto: EDIFICIO MULTIFAMILIAR "VATICANO II" Fecha: 02/04/2018
Concepto: OBRA FINA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 450.00
Grifería Pza 1.00 450.00 450.00
TOTAL PRECIO UNITARIO 450.00

Análisis de Precios Unitarios

Item: 41 MESONES DE GRANITO (Obra Vendida) mL: 53.50


Proyecto: EDIFICIO MULTIFAMILIAR "VATICANO II" Fecha: 02/04/2018
Concepto: OBRA FINA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 890.00
Mesones de Granito mL 1.00 890.00 890.00
TOTAL PRECIO UNITARIO 890.00

Análisis de Precios Unitarios

Item: 42 LAVANDERÍA (Obra Vendida) mL: 12.00


Proyecto: EDIFICIO MULTIFAMILIAR "VATICANO II" Fecha: 02/04/2018
Concepto: OBRA FINA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 680.00
Lavandería Pza 1.00 680.00 680.00
TOTAL PRECIO UNITARIO 680.00

Análisis de Precios Unitarios

Item: 43 GRIFO DE LAVANDERÍA (Obra Vendida) mL: 12.00


Proyecto: EDIFICIO MULTIFAMILIAR "VATICANO II" Fecha: 02/04/2018
Concepto: OBRA FINA Moneda: Bolivianos
Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL
MATERIALES 250.00
Grifo Global 1.00 250.00 250.00
TOTAL PRECIO UNITARIO 250.00

Análisis de Precios Unitarios

Item: 44 INSTALACIÓN HIDRÁULICA Y SANITARIA Pts: 0


Proyecto: EDIFICIO MULTIFAMILIAR "VATICANO II" Fecha: 02/04/2018
Concepto: OBRA FINA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MANO DE OBRA 121,605.12
Eléctrico Global 1.00 121,605.12 121,605.12
TOTAL PRECIO UNITARIO 121,605.12

Análisis de Precios Unitarios

Item: 45 INSTALACIÓN ELÉCTRICA Pts: 0


Proyecto: EDIFICIO MULTIFAMILIAR "VATICANO II" Fecha: 02/04/2018
Concepto: OBRA FINA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MANO DE OBRA 200,656.80
Eléctrico Global 1.00 200,656.80 200,656.80
TOTAL PRECIO UNITARIO 200,656.80

Análisis de Precios Unitarios

Item: 46 INSTALACION ASCENSOR Pts: 0


Proyecto: EDIFICIO MULTIFAMILIAR "VATICANO II" Fecha: 02/04/2018
Concepto: OBRA FINA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MANO DE OBRA 250,560.00
Ascensor Pza 1.00 250,560.00 250,560.00
TOTAL PRECIO UNITARIO 250,560.00

Análisis de Precios Unitarios

Item: 47 PISO DE CEMENTO EMPEDRADO c/ REFUERZO DE FIERRO m2: 434.51


Proyecto: EDIFICIO MULTIFAMILIAR "VATICANO II" Fecha: 02/04/2018
Concepto: OBRA FINA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 65.54
Cemento Portland Kg 22.00 1.10 24.20
Arena m3 0.07 130.00 9.10
Acero de alta Resistencia Kg 2.83 8.50 24.06
Grava m3 0.05 130.00 6.50
H2O lt 28.00 0.06 1.68
MANO DE OBRA 46.20
Albañil Maestro Hr 2.20 15.00 33.00
Ayudante Hr 2.20 6.00 13.20
EQUIPO, MAQUINARIA Y HERRAMIENTAS 2.31
Herramientas Menores 5% (TOTAL M.O.) 1.00 2.31 2.31
TOTAL PRECIO UNITARIO 114.05

Análisis de Precios Unitarios

Item: 48 LIMPIEZA GENERAL Global: 1.00


Proyecto: EDIFICIO MULTIFAMILIAR "VATICANO II" Fecha: 02/04/2018
Concepto: OBRA FINA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


20,000.00
Limpieza general Global 1.00 20,000.00 20,000.00
TOTAL PRECIO UNITARIO 20,000.00

Análisis de Precios Unitarios


Item: 49 CERRAJERÍA Global: 1.00
Proyecto: EDIFICIO MULTIFAMILIAR "VATICANO II" Fecha: 02/04/2018
Concepto: OBRA FINA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


117,483.50
Cerrajería Global 1.00 117,483.50 117,483.50
TOTAL PRECIO UNITARIO 117,483.50
Análisis de Precios Unitarios
Item: 1 INSTALACIÓN DE FAENAS Global: 1.00
Proyecto: EDIFICIO MULTIFAMILIAR VATICANO II Fecha: 02/04/2018
Concepto: OBRA GRUESA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 14,335.00
Madera de Construccion pie2 220.00 7.00 1,540.00
Calamina Ondulada No. 28 m2 180.00 65.00 11,700.00
Clavo Kg 30.00 13.00 390.00
Alambre de Amarre Kg 20.00 13.00 260.00
Bolillos de 4" m 89.00 5.00 445.00
MANO DE OBRA 5,590.00
Albañil Maestro Hr 104.00 20.00 2,080.00
Albañil Contra Maestro Hr 104.00 18.75 1,950.00
Ayudante 1 Hr 104.00 15.00 1,560.00
EQUIPO, MAQUINARIA Y HERRAMIENTAS 1,449.50
Volqueta Hr 4.00 180.00 720.00
Camion Hr 3.00 150.00 450.00
Herramientas Menores 5% (TOTAL M.O.) 1.00 279.50 279.50
TOTAL PRECIO UNITARIO 21,374.50

Análisis de Precios Unitarios

Item: 2 TANQUE BAJO H°A° EXCAVACIÓN SEMI DURO m3: 18.45


Proyecto: EDIFICIO MULTIFAMILIAR VATICANO II Fecha: 02/04/2018
Concepto: OBRA GRUESA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 0.00

MANO DE OBRA 38.75


Albañil Maestro Hr 1.00 20.00 20.00
Ayudante Hr 1.00 18.75 18.75
EQUIPO, MAQUINARIA Y HERRAMIENTAS 51.94
Excavadora CAT Hr 0.20 250.00 50.00
Herramientas Menores 5% (TOTAL M.O.) 1.00 1.94 1.94
TOTAL PRECIO UNITARIO 90.69

Análisis de Precios Unitarios

Item:3 TANQUE BAJO H°A° HORMIGON POBRE m3: 1.00


Proyecto: EDIFICIO VATICANO Fecha: 02/04/2018
Concepto: OBRA GRUESA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 272.00
Cemento Portland Kg 100.00 1.16 116.00
Arena m3 0.50 130.00 65.00
Grava m3 0.70 130.00 91.00
MANO DE OBRA 280.00
Albañil Maestro Hr 8.00 20.00 160.00
Ayudante Hr 8.00 15.00 120.00
EQUIPO, MAQUINARIA Y HERRAMIENTAS 32.75
Mezcladora de Hormigon Hr 0.50 18.75 9.38
Vibradora Hr 0.50 18.75 9.38
Herramientas Menores 5% (TOTAL M.O.) 1.00 14.00 14.00
TOTAL PRECIO UNITARIO 584.75
Análisis de Precios Unitarios

Item:4 TANQUE BAJO H°A°MURO CONTENCIÓN H°A° m3: 9.10


Proyecto: EDIFICIO VATICANO Fecha: 02/04/2018
Concepto: OBRA GRUESA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 1,316.10
Cemento Portland Kg 350.00 1.16 406.00
Acero de alta Resistencia Kg 80.00 8.50 680.00 6188
Arena m3 0.45 130.00 58.50 532.35
Grava m3 0.92 130.00 119.60 1088.36
Clavo Kg 2.00 13.00 26.00
Alambre de Amarre Kg 2.00 13.00 26.00
MANO DE OBRA 491.25
Albañil Maestro Hr 5.00 20.00 100.00
Albañil Contra Maestro Hr 5.00 16.25 81.25
Enferrador Hr 4.00 16.25 65.00
Encofrador Hr 4.00 16.25 65.00
Ayudante 1 Hr 6.00 15.00 90.00
Ayudante 2 Hr 6.00 15.00 90.00
EQUIPO, MAQUINARIA Y HERRAMIENTAS 62.06 564.76875
Mezcladora de Hormigon Hr 1.00 18.75 18.75
Vibradora Hr 1.00 18.75 18.75
Herramientas Menores 5% (TOTAL M.O.) 1.00 24.56 24.56
TOTAL PRECIO UNITARIO 1,869.41

Análisis de Precios Unitarios

Item:5 TANQUE BAJO H°A° REVOQ.PAREDES E IMPERMEABILIZ m2: 48.72


Proyecto: EDIFICIO VATICANO Fecha: 02/04/2018
Concepto: OBRA GRUESA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 26.60
Cemento Portland Kg 15.00 1.16 17.40
Arena Fina m3 0.06 70.00 4.20 204.624
Sika Impermeabilizante lt 0.50 10.00 5.00
MANO DE OBRA 52.50
Albañil Maestro Hr 1.50 20.00 30.00
Ayudante Hr 1.50 15.00 22.50
EQUIPO, MAQUINARIA Y HERRAMIENTAS 2.63 127.89
Herramientas Menores 5% (TOTAL M.O.) 1.00 2.63 2.63
TOTAL PRECIO UNITARIO 81.73

Análisis de Precios Unitarios

Item:6 REPLANTEO Y TRAZADO Global: 1.00


Proyecto: EDIFICIO VATICANO Fecha: 02/04/2018
Concepto: OBRA GRUESA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 392.25
Madera de Construccion pie2 50.00 7.00 350.00 350.00
Yeso Kg 50.00 0.42 21.00
Clavo Kg 0.25 13.00 3.25
Hilo Plastico Rollo 1.00 18.00 18.00
MANO DE OBRA 420.00
Albañil Maestro Hr 12.00 20.00 240.00
Ayudante Hr 12.00 15.00 180.00
EQUIPO, MAQUINARIA Y HERRAMIENTAS 21.00 21
Herramientas Menores 5% (TOTAL M.O.) 1.00 21.00 21.00
TOTAL PRECIO UNITARIO 833.25
8363.334 713.65875

Análisis de Precios Unitarios

Item:7 EXCAVACIÓN FUNDACIONES m3: 220.00


Proyecto: EDIFICIO VATICANO Fecha: 02/04/2018
Concepto: OBRA GRUESA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 0.00

MANO DE OBRA 3.88 852.5


Albañil Maestro Hr 0.10 20.00 2.00
Ayudante Hr 0.10 18.75 1.88
EQUIPO, MAQUINARIA Y HERRAMIENTAS 26.12
Excavadora CAT Hr 0.10 250.00 25.00
Herramientas Menores 5% (TOTAL M.O.) 1.00 1.12 1.12
TOTAL PRECIO UNITARIO 30.00

Análisis de Precios Unitarios

Item:8 RELLENO Y COMPACTACION MANUAL SIN MATERIAL m3: 140.00


Proyecto: EDIFICIO VATICANO Fecha: 02/04/2018
Concepto: OBRA GRUESA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 0.00

MANO DE OBRA 24.75 3465 346.5


Albañil Maestro Hr 0.30 20.00 6.00
Ayudante Hr 1.00 18.75 18.75 4317.5 669.2125
EQUIPO, MAQUINARIA Y HERRAMIENTAS 6.24
Compactadora Manual Hr 0.25 20.00 5.00
Herramientas Menores 5% (TOTAL M.O.) 1.00 1.24 1.24
TOTAL PRECIO UNITARIO 30.99

Análisis de Precios Unitarios

Item:9 MURO DE CONTENCIÓN H°A° m3: 6.15


Proyecto: EDIFICIO VATICANO Fecha: 02/04/2018
Concepto: OBRA GRUESA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 1,302.40
Cemento Portland Kg 350.00 1.16 406.00
Acero de alta Resistencia Kg 80.00 8.50 680.00
Arena m3 0.45 120.00 54.00
Grava m3 0.92 120.00 110.40
Clavo Kg 2.00 13.00 26.00
Alambre de Amarre Kg 2.00 13.00 26.00
MANO DE OBRA 491.25 3021.1875
Albañil Maestro Hr 5.00 20.00 100.00
Albañil Contra Maestro Hr 5.00 16.25 81.25
Enferrador Hr 4.00 16.25 65.00
Encofrador Hr 4.00 16.25 65.00
Ayudante 1 Hr 6.00 15.00 90.00
Ayudante 2 Hr 6.00 15.00 90.00
EQUIPO, MAQUINARIA Y HERRAMIENTAS 49.56
Excavadora CAT Hr 0.10 250.00 25.00
Herramientas Menores 5% (TOTAL M.O.) 1.00 24.56 24.56
TOTAL PRECIO UNITARIO 1,843.21

Análisis de Precios Unitarios

Item:10 HORMIGÓN POBRE DE NIVELACIÓN m2: 118.31


Proyecto: EDIFICIO VATICANO Fecha: 02/04/2018
Concepto: OBRA GRUESA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 27.24
Cemento Portland Kg 9.00 1.16 10.44
Arena m3 0.08 120.00 9.60
Grava m3 0.06 120.00 7.20
MANO DE OBRA 19.50 2307.045
Albañil Maestro Hr 0.60 20.00 12.00
Ayudante Hr 0.50 15.00 7.50
EQUIPO, MAQUINARIA Y HERRAMIENTAS 9.98
Mezcladora de Hormigon Hr 0.48 18.75 9.00
Herramientas Menores 5% (TOTAL M.O.) 1.00 0.98 0.98
TOTAL PRECIO UNITARIO 56.72

Análisis de Precios Unitarios

Item:11 ZAPATAS m3: 81.67


Proyecto: EDIFICIO VATICANO Fecha: 02/04/2018
Concepto: OBRA GRUESA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 1,503.80
Acero de alta Resistencia Kg 68.00 8.50 578.00
Madera de Construccion pie2 30.00 7.00 210.00
Clavo Kg 0.80 13.00 10.40
Alambre de Amarre Kg 0.80 13.00 10.40
Hormigon Premezclado m3 1.00 695.00 695.00
MANO DE OBRA 755.00 61660.85
Albañil Maestro Hr 8.00 20.00 160.00
Albañil Contra Maestro Hr 8.00 16.25 130.00
Enferrador Hr 6.00 16.25 97.50
Encofrador Hr 6.00 16.25 97.50
Ayudante 1 Hr 9.00 15.00 135.00
Ayudante 2 Hr 9.00 15.00 135.00
EQUIPO, MAQUINARIA Y HERRAMIENTAS 52.75
Vibradora Hr 0.80 18.75 15.00
Herramientas Menores 5% (TOTAL M.O.) 1.00 37.75 37.75
TOTAL PRECIO UNITARIO 2,311.55
Análisis de Precios Unitarios

Item:12 COLUMNAS H°A° m3: 52.35


Proyecto: EDIFICIO VATICANO Fecha: 02/04/2018
Concepto: OBRA GRUESA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 3,875.60
Cemento Portland Kg 350.00 1.16 406.00
Acero de alta Resistencia Kg 320.00 8.50 2,720.00
Arena m3 0.56 120.00 67.20
Grava m3 0.76 120.00 91.20
Madera de Construccion pie2 80.00 7.00 560.00
Clavo Kg 1.20 13.00 15.60
Alambre de Amarre Kg 1.20 13.00 15.60
MANO DE OBRA 623.75 32653.3125
Albañil Maestro Hr 7.00 20.00 140.00
Albañil Contra Maestro Hr 7.00 16.25 113.75
Enferrador Hr 4.00 16.25 65.00
Encofrador Hr 4.00 16.25 65.00
Ayudante 1 Hr 8.00 15.00 120.00
Ayudante 2 Hr 8.00 15.00 120.00
EQUIPO, MAQUINARIA Y HERRAMIENTAS 40.56
Mezcladora de Hormigon Hr 0.25 18.75 4.69
Vibradora Hr 0.25 18.75 4.69
Herramientas Menores 5% (TOTAL M.O.) 1.00 31.19 31.19
TOTAL PRECIO UNITARIO 4,539.91

Análisis de Precios Unitarios

Item:13 VIGA CADENA DE H°A° (premezclado) m3: 119.06


Proyecto: EDIFICIO VATICANO Fecha: 02/04/2018
Concepto: OBRA GRUESA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 1,154.00
Acero de alta Resistencia Kg 140.00 8.50 1,190.00
Madera de Construccion pie2 60.00 7.00 420.00
Clavo Kg 1.50 13.00 19.50
Alambre de Amarre Kg 1.50 13.00 19.50
Hormigon Premezclado m3 1.00 695.00 695.00
MANO DE OBRA 623.75 74263.675
Albañil Maestro Hr 7.00 20.00 140.00
Albañil Contra Maestro Hr 7.00 16.25 113.75
Enferrador Hr 4.00 16.25 65.00
Encofrador Hr 4.00 16.25 65.00
Ayudante 1 Hr 8.00 15.00 120.00
Ayudante 2 Hr 8.00 15.00 120.00
EQUIPO, MAQUINARIA Y HERRAMIENTAS 35.88
Vibradora Hr 0.25 18.75 4.69
Herramientas Menores 5% (TOTAL M.O.) 1.00 31.19 31.19
TOTAL PRECIO UNITARIO 1,813.63

Análisis de Precios Unitarios


Item:14 ESCALERA DE H°A° (premezclado) m3: 16.19
Proyecto: EDIFICIO VATICANO Fecha: 02/04/2018
Concepto: OBRA GRUESA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 1,330.30
Acero de alta Resistencia Kg 100.00 8.50 850.00
Madera de Construccion pie2 85.00 7.00 595.00
Clavo Kg 1.55 13.00 20.15
Alambre de Amarre Kg 1.55 13.00 20.15
Hormigon Premezclado m3 1.00 695.00 695.00
MANO DE OBRA 982.50 15906.675
Albañil Maestro Hr 10.00 20.00 200.00
Albañil Contra Maestro Hr 10.00 16.25 162.50
Enferrador Hr 8.00 16.25 130.00
Encofrador Hr 8.00 16.25 130.00
Ayudante 1 Hr 12.00 15.00 180.00
Ayudante 2 Hr 12.00 15.00 180.00
EQUIPO, MAQUINARIA Y HERRAMIENTAS 53.81
Vibradora Hr 0.25 18.75 4.69
Herramientas Menores 5% (TOTAL M.O.) 1.00 49.13 49.13
TOTAL PRECIO UNITARIO 2,366.61

Análisis de Precios Unitarios

Item:15 LOSA LLENA H°A° m3: 5.97


Proyecto: EDIFICIO VATICANO Fecha: 02/04/2018
Concepto: OBRA GRUESA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 1,596.80
Cemento Portland Kg 300.00 1.16 348.00
Acero de alta Resistencia Kg 100.00 8.50 850.00
Arena m3 0.60 120.00 72.00
Grava m3 0.80 120.00 96.00
Madera de Construccion pie2 30.00 7.00 210.00
Clavo Kg 0.80 13.00 10.40
Alambre de Amarre Kg 0.80 13.00 10.40
MANO DE OBRA 722.50 4313.325
Albañil Maestro Hr 8.00 20.00 160.00
Albañil Contra Maestro Hr 8.00 16.25 130.00
Enferrador Hr 5.00 16.25 81.25
Encofrador Hr 5.00 16.25 81.25
Ayudante 1 Hr 9.00 15.00 135.00
Ayudante 2 Hr 9.00 15.00 135.00
EQUIPO, MAQUINARIA Y HERRAMIENTAS 37.63
Vibradora Hr 0.08 18.75 1.50
Herramientas Menores 5% (TOTAL M.O.) 1.00 36.13 36.13
TOTAL PRECIO UNITARIO 2,356.93

Análisis de Precios Unitarios

Item:16 LOSA ALIVIANADA UN SENTIDO m2: 1,307.15


Proyecto: EDIFICIO VATICANO Fecha: 02/04/2018
Concepto: OBRA GRUESA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 215.75
Acero de alta Resistencia Kg 2.00 8.50 17.00
Madera de Construccion pie2 10.00 7.00 70.00
Clavo Kg 0.15 13.00 1.95
Alambre de Amarre Kg 0.10 13.00 1.30
Vigueta y Complemento m2 1.00 73.00 73.00
Hormigon Premezclado m3 0.10 695.00 69.50
MANO DE OBRA 88.06 115110.896875
Albañil Maestro Hr 0.40 20.00 8.00
Albañil Contra Maestro Hr 0.35 16.25 5.69
Enferrador Hr 0.35 16.25 5.69
Encofrador Hr 0.35 16.25 5.69
Ayudante 1 Hr 2.10 15.00 31.50
Ayudante 2 Hr 2.10 15.00 31.50
EQUIPO, MAQUINARIA Y HERRAMIENTAS 5.90
Vibradora Hr 0.08 18.75 1.50
Herramientas Menores 5% (TOTAL M.O.) 1.00 4.40 4.40
TOTAL PRECIO UNITARIO 309.72

Análisis de Precios Unitarios

Item:17 RAMPA DE H°A° m3: 8.11


Proyecto: EDIFICIO VATICANO Fecha: 02/04/2018
Concepto: OBRA GRUESA Moneda: Bolivianos

Insumo/Parámetro Unidad Cantidad Precio Unitario Parcial TOTAL


MATERIALES 1,766.10
Cemento Portland Kg 350.00 1.16 406.00
Acero de alta Resistencia Kg 100.00 8.50 850.00
Arena m3 0.45 130.00 58.50
Grava m3 0.92 130.00 119.60
Madera de Construccion pie2 40.00 7.00 280.00
Clavo Kg 2.00 13.00 26.00
Alambre de Amarre Kg 2.00 13.00 26.00
MANO DE OBRA 320.00 2595.2
Albañil Maestro Hr 5.00 20.00 100.00 Bs311,832.17
Enferrador Hr 4.00 16.25 65.00 Bs38,979.02
Encofrador Hr 4.00 16.25 65.00 Bs6,041.75
Ayudante Hr 6.00 15.00 90.00
EQUIPO, MAQUINARIA Y HERRAMIENTAS 53.50
Mezcladora de Hormigon Hr 1.00 18.75 18.75
Vibradora Hr 1.00 18.75 18.75
Herramientas Menores 5% (TOTAL M.O.) 1.00 16.00 16.00
TOTAL PRECIO UNITARIO 2,139.60
ESTADO DE RESULTADOS (proyectado)
Al 13 de mayo de 2019
(En Bs)

Ingreso por Ventas Bs5,781,282.24


Otros Ingresos Bs0.00
Costos y Gastos Bs4,805,448.87
Costo constructivo Bs4,085,667.85
Gastos Administrativos Bs201,344.20
Gastos de comercialización Bs10,800.00
Valor Terreno Bs507,636.82

UTILIDAD BRUTA Bs975,833.37


Gastos financieros Bs95,000.00
UTILIDAD ANTES DE IMPUESTOS Bs880,833.37

También podría gustarte