Está en la página 1de 2

VR.

UNIT
VR.TOTAL
ACTUALIZADO
ITEM DESCRIPCION UND CANT. VR. UNIT VR.TOTAL INVIAS ACTUALIZADO A
A
AGOSTO 2021
1 PRELIMINARES AGOSTO 2021
1.1 DESMONTE Y LIMPIEZA UND 1.00 $ 2,629,358.00 $ 2,629,358.00 $ 2,437,678.04 $ 14,931,790.00 $ 14,931,790.00 0.0% 467.9%
1.2 LOCALIZACION Y REPLANTEO M2 19843.00 $ 3,375.00 $ 66,970,125.00 $ 11,812.50 $ 234,395,437.50 0.7% 250.0%

DEMOLICIÓN DE
2 0.0%
ESTRUCTURAS EXISTENTES

SEÑALIZACION CON CINTA DE


PELIGRO REFLECTIVA. INCLUYE
2.1 M 980.00 $ 22,564.00 $ 22,112,720.00 $ 31,589.60 $ 30,957,808.00 0.1% 40.0%
SEÑALIZADOR TUBULAR 130 CMS
ALTURA

2.2 DESMONTE DE BARANDA METALICA M 14.00 $ 11,681.00 $ 163,534.00 $ 15,185.30 $ 212,594.20 0.0% 30.0%

DEMOLICION DE BARANDA EN
2.3 M2 6.60 $ 25,308.00 $ 167,033.00 $ 359,501.72 $ 32,900.40 $ 217,142.64 0.0% 30.0%
CONCRETO REFORZADO

DEMOLICION DE ESTRUCTURA EN
2.4 CONCRETO REFORZADO. INCLUYE M3 161.40 $ 167,281.00 $ 26,999,154.00 $ 200,737.20 $ 32,398,984.08 0.1% 20.0%
COMPRESOR Y OXICORTE

CARGUE Y RETIRO DE MATERIAL


2.5 M3 22462.45 $ 29,205.00 $ 656,015,853.00 $ 45,200.00 $ 1,015,302,740.00 3.0% 54.8%
SOBRANTE
CONSTRUCCION DE NUEVAS
3 0.0%
ESTRUCTURAS
3.1 BOX CULVERT 0.0%
EXCAVACION MATERIAL COMUN
3.1.1 BAJO CUALQUIER GRADO DE M3 3825.79 $ 65,142.00 $ 249,219,613.00 $ 33,975.07 $ 65,384.00 $ 250,145,453.36 0.7% 0.4%
HUMEDAD. INCLUYE RETIRO
RELLENO MATERIAL GRANULAR
3.1.2 SELECCIONADO COMPACTADO M3 2392.41 $ 131,551.00 $ 314,723,928.00 $ 98,170.67 $ 193,727.80 $ 463,476,326.00 1.4% 47.3%
RANA AL 95% PM
SOLADO CONCRETO POBRE 2000
3.1.3 M3 60.51 $ 554,232.00 $ 33,536,579.00 $ 401,261.82 $ 574,412.00 $ 34,757,670.12 0.1% 3.6%
PSI DE 0.07M DE ESPESOR
CONCRETO CICLOPEO RELACION
3.1.4 M3 380.96 $ 653,963.00 $ 249,133,745.00 $ 299,878.62 $ 814,106.40 $ 310,141,974.14 0.9% 24.5%
60-40

CONCRETO DE 4000 PSI PARA BOX


CULVERT . INCLUYE CONCRETO DE M3
3.1.5 1562.80 $ 1,095,044.00 $ 1,711,334,764.00 $ 639,040.69 $ 1,147,857.00 $ 1,793,870,919.60 5.3% 4.8%
LOSA DE FONDO, LOSA SUPERIOR ,
PAREDES Y MENSULA

ANDEN DE 0.15M DE ESPESOR Y


3.1.6 1.00M DE ANCHO EN CONCRETO DE M2 29.70 $ 97,771.00 $ 2,903,799.00 $ 100,751.00 $ 2,992,304.70 0.0% 3.0%
3000 PSI
CUNETA DE 0.15M DE ESPESOR
3.1.7 1.00M DE ANCHO EN CONCRETO DE M 12.60 $ 71,966.00 $ 906,772.00 $ 99,470.00 $ 1,253,322.00 0.0% 38.2%
3000 PSI
LOSA DE APROXIMACION DE 0.30M
3.1.8 DE ESPESOR EN CONCRETO DE M3 37.80 $ 759,196.00 $ 28,697,609.00 $ 639,040.69 $ 1,147,857.00 $ 43,388,994.60 0.1% 51.2%
4000 PSI

3.1.9 ACERO DE REFUERZO DE 60000 PSI KG 121635.33 $ 7,941.00 $ 965,906,156.00 $ 5,204.28 $ 9,800.00 $ 1,192,026,234.00 3.5% 23.4%

BARANDA VEHICULAR EN ACERO


3.1.10 M 985.70 $ 669,676.00 $ 660,099,634.00 $ 736,646.00 $ 726,111,962.20 2.1% 10.0%
ESTRUCTURAL
SOLERA DE FONDO PARA EL CANAL
3.1.11 M2 864.22 $ 138,615.00 $ 119,793,856.00 $ 152,897.58 $ 132,137,146.59 0.4% 10.3%
( C CICLOPEO + VIGAS)
3.1.12 NEOPRENOS UND 25.00 $ 1,374,921.00 $ 34,373,025.00 $ 1,856,143.35 $ 46,403,583.75 0.1% 35.0%
3.2 CANAL 0.0%
EXCAVACION MATERIAL COMUN
3.2.1 BAJO CUALQUIER GRADO DE M3 18474.60 $ 53,721.00 $ 992,473,987.00 $ 84,999.20 $ 1,570,326,220.32 4.6% 58.2%
HUMEDAD. INCLUYE RETIRO
RELLENO MATERIAL GRANULAR
3.2.2 SELECCIONADO COMPACTADO M3 10216.90 $ 131,551.00 $ 1,344,043,412.00 $ 98,170.67 $ 193,727.80 $ 1,979,297,559.82 5.8% 47.3%
RANA AL 95% PM
SOLADO CONCRETO POBRE 2000
3.2.3 M3 979.60 $ 554,232.00 $ 542,925,668.00 $ 746,735.60 $ 731,502,193.76 2.2% 34.7%
PSI DE 0.05M DE ESPESOR
LOSA DE FONDO CANAL EN
3.2.4 M3 6546.14 $ 928,961.00 $ 6,081,108,761.00 $ 639,040.69 $ 1,147,857.00 $ 7,514,032,621.98 22.2% 23.6%
CONCRETO DE 4000 PSI
PAREDES DE CANAL EN CONCRETO M3
3.2.5 4958.22 $ 1,048,190.00 $ 5,197,156,622.00 $ 639,040.69 $ 1,270,955.40 $ 6,301,676,483.39 18.6% 21.3%
DE 4000 PSI

3.2.6 ACERO DE REFUERZO DE 60000 PSI KG 948619.53 $ 7,684.00 $ 7,289,192,469.00 $ 5,204.28 $ 9,800.00 $ 9,296,471,394.00 27.4% 27.5%

SUMINISTRO E INSTALACION DE
3.2.7 M 5534.00 $ 17,057.00 $ 94,393,438.00 $ 22,174.10 $ 122,711,469.40 0.4% 30.0%
CINTA PVC V-15
3.3 PAVIMENTO RIGIDO 0.0%
EXCAVACIÓN MATERIAL COMÚN A
3.3.1 M3 54.00 $ 8,246.00 $ 445,284.00 $ 33,975.07 $ 39,186.40 $ 2,116,065.60 0.0% 375.2%
MAQUINA
CARGUE Y RETIRO DE MATERIAL
3.3.2 M3 70.20 $ 33,877.00 $ 2,378,166.00 $ 45,200.00 $ 3,173,040.00 0.0% 33.4%
SOBRANTE
VR. UNIT
VR.TOTAL
ACTUALIZADO
ITEM DESCRIPCION UND CANT. VR. UNIT VR.TOTAL INVIAS ACTUALIZADO A
A
AGOSTO 2021
SUBBASE GRANULAR SEGÚN AGOSTO 2021
DISEÑO, CONTEMPLA
3.3.3 M3 32.40 $ 133,618.00 $ 4,329,224.00 $ 98,171.00 $ 193,727.80 $ 6,276,780.72 0.0% 45.0%
COMPACTACIÓN DEL MATERIAL
POR CAPAS
RELLENO CON MATERIAL
SELECCIONADO PARA ANDENES.
3.3.4 M3 86.40 $ 127,010.00 $ 10,973,664.00 $ 98,170.67 $ 193,727.80 $ 16,738,081.92 0.0% 52.5%
CONTEMPLA COMPACTACIÓN DEL
MATERIAL POR CAPAS
PAVIMENTO RIGIDO CONCRETO
3.3.5 MODULO ROTURA 40 KG/CM2 M3 21.60 $ 800,592.00 $ 17,292,788.00 $ 672,380.26 $ 1,041,196.00 $ 22,489,833.60 0.1% 30.1%
(OBRA)
BORDILLO DE 0.45x0.15M EN
3.3.6 M 36.00 $ 55,191.00 $ 1,986,876.00 $ 41,534.40 $ 76,356.00 $ 2,748,816.00 0.0% 38.3%
CONCRETO DE 3000 PSI.
ANDEN DE 0.10M DE ESPESOR Y
3.3.7 1.00M DE ANCHO EN CONCRETO DE M2 36.00 $ 103,482.00 $ 3,725,352.00 $ 106,462.00 $ 3,832,632.00 0.0% 2.9%
3000 PSI
CORTE DE PAVIMENTO Y ANDENES
3.3.8 M 54.00 $ 15,801.00 $ 853,254.00 $ 18,961.20 $ 1,023,904.80 0.0% 20.0%
PARA DILATACIONES

SUBTOTAL $ 26,728,966,222.00 SUBTOTAL $ 33,899,539,484.79

VALOR TOTAL COSTOS DIRECTOS $ 26,728,966,222.00 VALOR TOTAL COSTOS DIRECTOS $ 33,899,539,484.79

TOTAL COSTOS DIRECTOS $ 26,728,966,222.00 TOTAL COSTOS DIRECTOS $ 33,899,539,484.79


ADMINISTRACION 25.00% $ 6,682,241,556.00 25.00% $ 8,474,884,871.00
IMPREVISTOS 1.00% $ 267,289,662.00 1.00% $ 338,995,395.00
COSTOS INDIRECTOS
UTILIDAD 4.00% $ 1,069,158,649.00 4.00% $ 1,355,981,579.00
TOTAL AIU 30.00% $ 8,018,689,867.00 30.00% $ 10,169,861,845.00
VALOR TOTAL PRESUPUESTO $ 34,747,656,089.00 $ 44,069,401,329.79 27%
-
MITIGACIÓN AMBIENTAL 2.00% $ 534,579,324.00 2.00% $ 677,990,790.00

VALOR TOTAL OBRA CIVIL $ 35,282,235,413.00 VALOR TOTAL OBRA CIVIL $ 44,747,392,119.79

PRESUPUESTO INTERVENTORIA 8.0% $ 2,771,962,765.00 8.0% $ 3,579,791,369.58

VALOR TOTAL DEL PROYECTO $ 38,054,198,178.00 VALOR TOTAL DEL PROYECTO $ 48,327,183,489.37