ITEM DESCRIPCION UND CANT. VR. UNIT VR.TOTAL INVIAS ACTUALIZADO A
A
AGOSTO 2021
1 PRELIMINARES AGOSTO 2021
1.1 DESMONTE Y LIMPIEZA UND 1.00 $ 2,629,358.00 $ 2,629,358.00 $ 2,437,678.04 $ 14,931,790.00 $ 14,931,790.00 0.0% 467.9%
1.2 LOCALIZACION Y REPLANTEO M2 19843.00 $ 3,375.00 $ 66,970,125.00 $ 11,812.50 $ 234,395,437.50 0.7% 250.0%
DEMOLICIÓN DE
2 0.0%
ESTRUCTURAS EXISTENTES
2.2 DESMONTE DE BARANDA METALICA M 14.00 $ 11,681.00 $ 163,534.00 $ 15,185.30 $ 212,594.20 0.0% 30.0%
DEMOLICION DE BARANDA EN
2.3 M2 6.60 $ 25,308.00 $ 167,033.00 $ 359,501.72 $ 32,900.40 $ 217,142.64 0.0% 30.0%
CONCRETO REFORZADO
DEMOLICION DE ESTRUCTURA EN
2.4 CONCRETO REFORZADO. INCLUYE M3 161.40 $ 167,281.00 $ 26,999,154.00 $ 200,737.20 $ 32,398,984.08 0.1% 20.0%
COMPRESOR Y OXICORTE
3.1.9 ACERO DE REFUERZO DE 60000 PSI KG 121635.33 $ 7,941.00 $ 965,906,156.00 $ 5,204.28 $ 9,800.00 $ 1,192,026,234.00 3.5% 23.4%
3.2.6 ACERO DE REFUERZO DE 60000 PSI KG 948619.53 $ 7,684.00 $ 7,289,192,469.00 $ 5,204.28 $ 9,800.00 $ 9,296,471,394.00 27.4% 27.5%
SUMINISTRO E INSTALACION DE
3.2.7 M 5534.00 $ 17,057.00 $ 94,393,438.00 $ 22,174.10 $ 122,711,469.40 0.4% 30.0%
CINTA PVC V-15
3.3 PAVIMENTO RIGIDO 0.0%
EXCAVACIÓN MATERIAL COMÚN A
3.3.1 M3 54.00 $ 8,246.00 $ 445,284.00 $ 33,975.07 $ 39,186.40 $ 2,116,065.60 0.0% 375.2%
MAQUINA
CARGUE Y RETIRO DE MATERIAL
3.3.2 M3 70.20 $ 33,877.00 $ 2,378,166.00 $ 45,200.00 $ 3,173,040.00 0.0% 33.4%
SOBRANTE
VR. UNIT
VR.TOTAL
ACTUALIZADO
ITEM DESCRIPCION UND CANT. VR. UNIT VR.TOTAL INVIAS ACTUALIZADO A
A
AGOSTO 2021
SUBBASE GRANULAR SEGÚN AGOSTO 2021
DISEÑO, CONTEMPLA
3.3.3 M3 32.40 $ 133,618.00 $ 4,329,224.00 $ 98,171.00 $ 193,727.80 $ 6,276,780.72 0.0% 45.0%
COMPACTACIÓN DEL MATERIAL
POR CAPAS
RELLENO CON MATERIAL
SELECCIONADO PARA ANDENES.
3.3.4 M3 86.40 $ 127,010.00 $ 10,973,664.00 $ 98,170.67 $ 193,727.80 $ 16,738,081.92 0.0% 52.5%
CONTEMPLA COMPACTACIÓN DEL
MATERIAL POR CAPAS
PAVIMENTO RIGIDO CONCRETO
3.3.5 MODULO ROTURA 40 KG/CM2 M3 21.60 $ 800,592.00 $ 17,292,788.00 $ 672,380.26 $ 1,041,196.00 $ 22,489,833.60 0.1% 30.1%
(OBRA)
BORDILLO DE 0.45x0.15M EN
3.3.6 M 36.00 $ 55,191.00 $ 1,986,876.00 $ 41,534.40 $ 76,356.00 $ 2,748,816.00 0.0% 38.3%
CONCRETO DE 3000 PSI.
ANDEN DE 0.10M DE ESPESOR Y
3.3.7 1.00M DE ANCHO EN CONCRETO DE M2 36.00 $ 103,482.00 $ 3,725,352.00 $ 106,462.00 $ 3,832,632.00 0.0% 2.9%
3000 PSI
CORTE DE PAVIMENTO Y ANDENES
3.3.8 M 54.00 $ 15,801.00 $ 853,254.00 $ 18,961.20 $ 1,023,904.80 0.0% 20.0%
PARA DILATACIONES
VALOR TOTAL COSTOS DIRECTOS $ 26,728,966,222.00 VALOR TOTAL COSTOS DIRECTOS $ 33,899,539,484.79
VALOR TOTAL OBRA CIVIL $ 35,282,235,413.00 VALOR TOTAL OBRA CIVIL $ 44,747,392,119.79
VALOR TOTAL DEL PROYECTO $ 38,054,198,178.00 VALOR TOTAL DEL PROYECTO $ 48,327,183,489.37