RESUMEN LONGITUDES

TUBERIA DE ACERO

DIAMETRO LONGITUD
[mm] [m]
10
12 365.50
14
16
18
20
22
24
TOTAL: 365.50

537087200.ods RESUMEN_ESPESORES pág. 1 de 18


DIAMETROS INTERIORES SEGÚN PRESION DE TRABAJO PARA TUBERÍA PVC PRESION

DIAMETRO DIAMETRO REAL (mm)


pulg mm\Mpa 0.63 0.80 1.00 1.25 1.60 2.00 2.50
Fila -> o. Col -> 1 2 3 4 5 6 7
1 0.8 20 17.0 17.0 17.0 17.0 17.0 17.0 16.4
2 1.0 25 22.0 22.0 22.0 22.0 22.0 21.2 20.4
3 1.3 32 29.0 29.0 29.0 29.0 28.2 27.2
4 1.6 40 37.0 37.0 37.0 36.2 35.2
5 2.0 50 47.0 47.0 46.2 45.2 44.0 42.6
6 2.5 63 60.0 59.0 58.2 57.0
7 3.0 75 71.4 70.4 69.2 67.8
8 3.5 90 85.6 84.4 83.0 81.4 79.2 76.6
9 4.3 110 104.6 103.2 101.6 99.6 96.8 93.8
10 6.3 160 152.2 150.0 147.6 144.8 140.8 136.2
11 7.9 200 190.2 187.6 184.6 181.0 176.0 170.4 163.2
12 8.9 225 214.0 211.0 207.6 203.6
13 9.8 250 237.8 234.4 230.8 226.2 220.0 213.0 204.6
14 12.4 315 299.6 295.4 290.8 285.0 277.2 268.4 257.8
15 14.0 355 337.6 333.0 327.6 321.2
16 15.7 400 380.4 375.2 369.2 362.0 351.8 340.8

Diseño de la Tubería de Presión - Proyecto Hidroeléctrico Victoria Proyecto:


Cálculos hidráulicos Tubería de Presión (Ecuación de Hazen - Williams) Cálculo:

ACERO ASTM A516 GRADO 70


ESFUERZO DE FLUENCI 4220 Kg/cm2
ESFUERZO DE TRACCIO 6400 Kg/cm2
1/3* 6400 = 2133.33 Kg/cm2
2/3* 4220 = 2813.33 Kg/cm2
1/2* 4220 = 2110.00 Kg/cm2

Tramo Caudal Abscisa Cota Cota Abscisa Longitud Longitud Díametro Tipo de Diámetro Coef
Obser terreno proyecto Parcial real acumulada comercial tubería interno real rugosidad
No. l/s m msnm msnm m m m mm material mm CH
dato dato dato dato dato dato fórmula fórmula fórmula dato dato fórmula dato

factor 1

2700.00 1,356.00 1,353.00


1 2700.00 0+020.00 1,350.04 1,347.04 20.00 20.87 20.87 1300 ACERO 1350.0 140
2 2700.00 0+040.00 1,344.07 1,341.07 20.00 20.87 41.74 1300 ACERO 1350.0 140
3 2700.00 0+060.00 1,338.11 1,335.11 20.00 20.87 62.61 1300 ACERO 1350.0 140
4 2700.00 0+080.00 1,332.14 1,329.14 20.00 20.87 83.48 1300 ACERO 1350.0 140
5 2700.00 0+100.00 1,326.18 1,323.18 20.00 20.87 104.35 1300 ACERO 1350.0 140
6 2700.00 0+120.00 1,320.21 1,317.21 20.00 20.87 125.22 1300 ACERO 1350.0 140
7 2700.00 0+140.00 1,314.25 1,311.25 20.00 20.87 146.09 1300 ACERO 1350.0 140
8 2700.00 0+160.00 1,308.28 1,305.28 20.00 20.87 166.96 1300 ACERO 1350.0 140
9 2700.00 0+180.00 1,302.32 1,299.32 20.00 20.87 187.83 1300 ACERO 1350.0 140
10 2700.00 0+200.00 1,296.36 1,293.36 20.00 20.87 208.70 1300 ACERO 1350.0 140
11 2700.00 0+220.00 1,290.39 1,287.39 20.00 20.87 229.57 1300 ACERO 1350.0 140
12 2700.00 0+240.00 1,284.43 1,281.43 20.00 20.87 250.44 1300 ACERO 1350.0 140
13 2700.00 0+260.00 1,278.46 1,275.46 20.00 20.87 271.32 1300 ACERO 1350.0 140
14 2700.00 0+280.00 1,272.50 1,269.50 20.00 20.87 292.19 1300 ACERO 1350.0 140
15 2700.00 0+300.00 1,266.53 1,263.53 20.00 20.87 313.06 1300 ACERO 1350.0 140
16 2700.00 0+320.00 1,260.57 1,257.57 20.00 20.87 333.93 1300 ACERO 1350.0 140
17 2700.00 0+340.00 1,254.61 1,251.61 20.00 20.87 354.80 1300 ACERO 1350.0 140
18 2700.00 0+365.50 1,247.00 1,244.00 25.50 26.61 381.41 1300 ACERO 1350.0 140

Se asume una pediente constante (0,29822 %)

537087200.ods COND_NORMALES pag 2 de 18


REDISEÑO DE OBRAS CIVILES DEL PROYECTO HIDROELECTRICO VICTORIA
Ing. María Feria Fecha: Feb-13

Velocidad Pendiente Pérdida de Cota Carga Carga Espesor mín. Espesor por Espesor Carga sobre Coef. De
conducto hidráulica (S) carga (hf) Piezométrica dinámica estática por manipuleo presión int. CN tubo H carga Cd
m/s m/m m msnm m m mm mm mm m
fórmula fórmula fórmula fórmula fórmula fórmula fórmula fórmula

2110.00 0.33
1 0.5
15.00% 1.6

1,356.00
1.89 0.0017 0.03 1,355.97 5.93 5.96 4.65 0.22 4.65 2.00 1.02
1.89 0.0017 0.03 1,355.93 11.86 11.93 4.65 0.44 4.65 2.00 1.02
1.89 0.0017 0.03 1,355.90 17.79 17.89 4.65 0.66 4.65 2.00 1.02
1.89 0.0017 0.03 1,355.86 23.72 23.86 4.65 0.88 4.65 2.00 1.02
1.89 0.0017 0.03 1,355.83 29.65 29.82 4.65 1.10 4.65 2.00 1.02
1.89 0.0017 0.03 1,355.79 35.58 35.79 4.65 1.32 4.65 2.00 1.02
1.89 0.0017 0.03 1,355.76 41.51 41.75 4.65 1.54 4.65 2.00 1.02
1.89 0.0017 0.03 1,355.72 47.44 47.72 4.65 1.76 4.65 2.00 1.02
1.89 0.0017 0.03 1,355.69 53.37 53.68 4.65 1.98 4.65 2.00 1.02
1.89 0.0017 0.03 1,355.65 59.30 59.64 4.65 2.19 4.65 2.00 1.02
1.89 0.0017 0.03 1,355.62 65.23 65.61 4.65 2.41 4.65 2.00 1.02
1.89 0.0017 0.03 1,355.58 71.16 71.57 4.65 2.63 4.65 2.00 1.02
1.89 0.0017 0.03 1,355.55 77.09 77.54 4.65 2.85 4.65 2.00 1.02
1.89 0.0017 0.03 1,355.52 83.02 83.50 4.65 3.07 4.65 2.00 1.02
1.89 0.0017 0.03 1,355.48 88.95 89.47 4.65 3.29 4.65 2.00 1.02
1.89 0.0017 0.03 1,355.45 94.88 95.43 4.65 3.51 4.65 2.00 1.02
1.89 0.0017 0.03 1,355.41 100.81 101.39 4.65 3.73 4.65 2.00 1.02
1.89 0.0017 0.04 1,355.37 108.37 109.00 4.65 4.01 4.65 2.00 1.02

537087200.ods COND_NORMALES pag 3 de 18


Carga de Carga viva Carga viva Carga total Carga total Deflexión Deflexión Chequeo Espesor
relleno Wr Wcv Wcv W W Horizontal Horizontal deflexión
kg/m2 (lb/pie2) kg/m2 (kg/m2) (lb/plg2) (plg) (mm) < 5% mm
fórmula

13243.50 488.00 1 1 50.00


1 1
30,000.00 30,000.00
1,400.00 1,400.00
0.28

29,300.03 175.75 857.90 30,157.92 42.80 0.501 12.73 O.K. 6.00


29,300.03 175.75 857.90 30,157.92 42.80 0.501 12.73 O.K. 6.00
29,300.03 175.75 857.90 30,157.92 42.80 0.501 12.73 O.K. 6.00
29,300.03 175.75 857.90 30,157.92 42.80 0.501 12.73 O.K. 6.00
29,300.03 175.75 857.90 30,157.92 42.80 0.501 12.73 O.K. 6.00
29,300.03 175.75 857.90 30,157.92 42.80 0.501 12.73 O.K. 6.00
29,300.03 175.75 857.90 30,157.92 42.80 0.501 12.73 O.K. 6.00
29,300.03 175.75 857.90 30,157.92 42.80 0.501 12.73 O.K. 6.00
29,300.03 175.75 857.90 30,157.92 42.80 0.501 12.73 O.K. 6.00
29,300.03 175.75 857.90 30,157.92 42.80 0.501 12.73 O.K. 6.00
29,300.03 175.75 857.90 30,157.92 42.80 0.501 12.73 O.K. 6.00
29,300.03 175.75 857.90 30,157.92 42.80 0.501 12.73 O.K. 6.00
29,300.03 175.75 857.90 30,157.92 42.80 0.501 12.73 O.K. 6.00
29,300.03 175.75 857.90 30,157.92 42.80 0.501 12.73 O.K. 6.00
29,300.03 175.75 857.90 30,157.92 42.80 0.501 12.73 O.K. 6.00
29,300.03 175.75 857.90 30,157.92 42.80 0.501 12.73 O.K. 6.00
29,300.03 175.75 857.90 30,157.92 42.80 0.501 12.73 O.K. 6.00
29,300.03 175.75 857.90 30,157.92 42.80 0.501 12.73 O.K. 6.00

537087200.ods COND_NORMALES pag 4 de 18


DIAMETROS INTERIORES SEGÚN PRESION DE TRABAJO PARA TUBERÍA PVC PRESION

DIAMETRO DIAMETRO REAL (mm)


pulg mm\Mpa 0.63 0.80 1.00 1.25 1.60 2.00 2.50
Fila -> No. Col -> 1 2 3 4 5 6 7
1 0.8 20 17.0 17.0 17.0 17.0 17.0 17.0 16.4
2 1.0 25 22.0 22.0 22.0 22.0 22.0 21.2 20.4
3 1.3 32 29.0 29.0 29.0 29.0 28.2 27.2
4 1.6 40 37.0 37.0 37.0 36.2 35.2
5 2.0 50 47.0 47.0 46.2 45.2 44.0 42.6
6 2.5 63 60.0 59.0 58.2 57.0
7 3.0 75 71.4 70.4 69.2 67.8
8 3.5 90 85.6 84.4 83.0 81.4 79.2 76.6
9 4.3 110 104.6 103.2 101.6 99.6 96.8 93.8
10 6.3 160 152.2 150.0 147.6 144.8 140.8 136.2
11 7.9 200 190.2 187.6 184.6 181.0 176.0 170.4 163.2
12 8.9 225 214.0 211.0 207.6 203.6
13 9.8 250 237.8 234.4 230.8 226.2 220.0 213.0 204.6
14 12.4 315 299.6 295.4 290.8 285.0 277.2 268.4 257.8
15 14.0 355 337.6 333.0 327.6 321.2
16 15.7 400 380.4 375.2 369.2 362.0 351.8 340.8

Diseño de la Tubería de Presión - Proyecto Hidroeléctrico Victoria Proyecto: REDISEÑO DE OBRAS CIVILES DEL PROYECTO HIDROELECTRICO VICTORIA
Cálculos hidráulicos Tubería de Presión (Ecuación de Hazen - Williams) Cálculo: Ing. María Feria Fecha:

ACERO ASTM A516 GRADO 70


ESFUERZO DE FLUENCIA = 4220 Kg/cm2
ESFUERZO DE TRACCION = 6400 Kg/cm2
2/3* 6400 = 4266.67 Kg/cm2

Tramo Caudal Abscisa Cota Cota Abscisa Longitud Longitud Díametro Tipo de Diámetro Coef Velocidad Pendiente Pérdida de Cota Carga Carga Espesor mín. Espesor por Espesor Carga sobre Coef. De Carga de Carga viva Carga viva
Obser terreno proyecto Parcial real acumulada comercial tubería interno real rugosidad conducto hidráulica (S) carga (hf) Piezométrica dinámica estática por manipuleo presión int. CN tubo H carga Cd relleno Wr Wcv Wcv
No. l/s m msnm msnm m m m mm material mm CH m/s m/m m msnm m m mm mm mm m kg/m2 (lb/pie2) kg/m2
dato dato dato dato dato dato fórmula fórmula fórmula dato dato fórmula dato fórmula fórmula fórmula fórmula fórmula fórmula fórmula fórmula

factor 1 4220.00 0.33 13243.50 488.00


1 0.5
15.00% 1.6

2700.00 1,356.00 1,353.00 1,356.00 2.00 1.02 175.75 857.90


1 2700.00 0+020.00 1,350.04 1,347.04 20.00 20.87 20.87 1300 ACERO 1350.0 140 1.89 0.0017 0.03 1,355.97 5.93 5.96 4.65 0.11 4.65 2.00 1.02 29,300.03 175.75 857.90
2 2700.00 0+040.00 1,344.07 1,341.07 20.00 20.87 41.74 1300 ACERO 1350.0 140 1.89 0.0017 0.03 1,355.93 11.86 11.93 4.65 0.22 4.65 2.00 1.02 29,300.03 175.75 857.90
3 2700.00 0+060.00 1,338.11 1,335.11 20.00 20.87 62.61 1300 ACERO 1350.0 140 1.89 0.0017 0.03 1,355.90 17.79 17.89 4.65 0.33 4.65 2.00 1.02 29,300.03 175.75 857.90
4 2700.00 0+080.00 1,332.14 1,329.14 20.00 20.87 83.48 1300 ACERO 1350.0 140 1.89 0.0017 0.03 1,355.86 23.72 23.86 4.65 0.44 4.65 2.00 1.02 29,300.03 175.75 857.90
5 2700.00 0+100.00 1,326.18 1,323.18 20.00 20.87 104.35 1300 ACERO 1350.0 140 1.89 0.0017 0.03 1,355.83 29.65 29.82 4.65 0.55 4.65 2.00 1.02 29,300.03 175.75 857.90
6 2700.00 0+120.00 1,320.21 1,317.21 20.00 20.87 125.22 1300 ACERO 1350.0 140 1.89 0.0017 0.03 1,355.79 35.58 35.79 4.65 0.66 4.65 2.00 1.02 29,300.03 175.75 857.90
7 2700.00 0+140.00 1,314.25 1,311.25 20.00 20.87 146.09 1300 ACERO 1350.0 140 1.89 0.0017 0.03 1,355.76 41.51 41.75 4.65 0.77 4.65 2.00 1.02 29,300.03 175.75 857.90
8 2700.00 0+160.00 1,308.28 1,305.28 20.00 20.87 166.96 1300 ACERO 1350.0 140 1.89 0.0017 0.03 1,355.72 47.44 47.72 4.65 0.88 4.65 2.00 1.02 29,300.03 175.75 857.90
9 2700.00 0+180.00 1,302.32 1,299.32 20.00 20.87 187.83 1300 ACERO 1350.0 140 1.89 0.0017 0.03 1,355.69 53.37 53.68 4.65 0.99 4.65 2.00 1.02 29,300.03 175.75 857.90
10 2700.00 0+200.00 1,296.36 1,293.36 20.00 20.87 208.70 1300 ACERO 1350.0 140 1.89 0.0017 0.03 1,355.65 59.30 59.64 4.65 1.10 4.65 2.00 1.02 29,300.03 175.75 857.90
11 2700.00 0+220.00 1,290.39 1,287.39 20.00 20.87 229.57 1300 ACERO 1350.0 140 1.89 0.0017 0.03 1,355.62 65.23 65.61 4.65 1.21 4.65 2.00 1.02 29,300.03 175.75 857.90
12 2700.00 0+240.00 1,284.43 1,281.43 20.00 20.87 250.44 1300 ACERO 1350.0 140 1.89 0.0017 0.03 1,355.58 71.16 71.57 4.65 1.32 4.65 2.00 1.02 29,300.03 175.75 857.90
13 2700.00 0+260.00 1,278.46 1,275.46 20.00 20.87 271.32 1300 ACERO 1350.0 140 1.89 0.0017 0.03 1,355.55 77.09 77.54 4.65 1.43 4.65 2.00 1.02 29,300.03 175.75 857.90
14 2700.00 0+280.00 1,272.50 1,269.50 20.00 20.87 292.19 1300 ACERO 1350.0 140 1.89 0.0017 0.03 1,355.52 83.02 83.50 4.65 1.54 4.65 2.00 1.02 29,300.03 175.75 857.90
15 2700.00 0+300.00 1,266.53 1,263.53 20.00 20.87 313.06 1300 ACERO 1350.0 140 1.89 0.0017 0.03 1,355.48 88.95 89.47 4.65 1.65 4.65 2.00 1.02 29,300.03 175.75 857.90
16 2700.00 0+320.00 1,260.57 1,257.57 20.00 20.87 333.93 1300 ACERO 1350.0 140 1.89 0.0017 0.03 1,355.45 94.88 95.43 4.65 1.76 4.65 2.00 1.02 29,300.03 175.75 857.90
17 2700.00 0+340.00 1,254.61 1,251.61 20.00 20.87 354.80 1300 ACERO 1350.0 140 1.89 0.0017 0.03 1,355.41 100.81 101.39 4.65 1.87 4.65 2.00 1.02 29,300.03 175.75 857.90
18 2700.00 0+365.50 1,247.00 1,244.00 25.50 26.61 381.41 1300 ACERO 1350.0 140 1.89 0.0017 0.04 1,355.37 108.37 109.00 4.65 2.01 4.65 2.00 1.02 29,300.03 175.75 857.90

537087200.ods COND_EMERGENTE pag 5 de 18


Carga total Carga total Deflexión Deflexión Chequeo Espesor A
W W Horizontal Horizontal deflexión adoptado
(kg/m2) (lb/plg2) (plg) (mm) < 5% mm
fórmula

1 1 50.00 10.00
1 1
30,000.00 30,000.00
1,400.00 1,400.00
0.28
857.90 1.22
30,157.92 42.80 0.501 12.73 O.K. 6.00
30,157.92 42.80 0.501 12.73 O.K. 6.00
30,157.92 42.80 0.501 12.73 O.K. 6.00
30,157.92 42.80 0.501 12.73 O.K. 6.00
30,157.92 42.80 0.501 12.73 O.K. 6.00
30,157.92 42.80 0.501 12.73 O.K. 6.00
30,157.92 42.80 0.501 12.73 O.K. 6.00
30,157.92 42.80 0.501 12.73 O.K. 6.00
30,157.92 42.80 0.501 12.73 O.K. 6.00
30,157.92 42.80 0.501 12.73 O.K. 6.00
30,157.92 42.80 0.501 12.73 O.K. 6.00
30,157.92 42.80 0.501 12.73 O.K. 6.00
30,157.92 42.80 0.501 12.73 O.K. 6.00
30,157.92 42.80 0.501 12.73 O.K. 6.00
30,157.92 42.80 0.501 12.73 O.K. 6.00
30,157.92 42.80 0.501 12.73 O.K. 6.00
30,157.92 42.80 0.501 12.73 O.K. 6.00
30,157.92 42.80 0.501 12.73 O.K. 6.00

537087200.ods COND_EMERGENTE pag 6 de 18


DIAMETROS INTERIORES SEGÚN PRESION DE TRABAJO PARA TUBERÍA PVC PRESION

DIAMETRO DIAMETRO REAL (mm)


pulg mm\Mpa 0.63 0.80 1.00 1.25 1.60 2.00 2.50
Fila -> No. Col -> 1 2 3 4 5 6 7
1 0.8 20 17.0 17.0 17.0 17.0 17.0 17.0 16.4
2 1.0 25 22.0 22.0 22.0 22.0 22.0 21.2 20.4
3 1.3 32 29.0 29.0 29.0 29.0 28.2 27.2
4 1.6 40 37.0 37.0 37.0 36.2 35.2
5 2.0 50 47.0 47.0 46.2 45.2 44.0 42.6
6 2.5 63 60.0 59.0 58.2 57.0
7 3.0 75 71.4 70.4 69.2 67.8
8 3.5 90 85.6 84.4 83.0 81.4 79.2 76.6
9 4.3 110 104.6 103.2 101.6 99.6 96.8 93.8
10 6.3 160 152.2 150.0 147.6 144.8 140.8 136.2
11 7.9 200 190.2 187.6 184.6 181.0 176.0 170.4 163.2
12 8.9 225 214.0 211.0 207.6 203.6
13 9.8 250 237.8 234.4 230.8 226.2 220.0 213.0 204.6
14 12.4 315 299.6 295.4 290.8 285.0 277.2 268.4 257.8
15 14.0 355 337.6 333.0 327.6 321.2
16 15.7 400 380.4 375.2 369.2 362.0 351.8 340.8

Diseño de la Tubería de Presión - Proyecto Hidroeléctrico Victoria Proyecto: REDISEÑO DE OBRAS CIVILES DEL PROYECTO HIDROELECTRICO VICTORIA
Cálculos hidráulicos Tubería de Presión (Ecuación de Hazen - Williams) Cálculo: Ing. María Feria Fecha:

ACERO GRADO 60
ESFUERZO DE FLUENCIA = 4220 Kg/cm2
ESFUERZO DE TRACCION = 6400 Kg/cm2

Tramo Caudal Abscisa Cota Cota Abscisa Longitud Longitud Díametro Tipo de Diámetro Coef Velocidad Pendiente Pérdida de Cota Carga Carga Espesor mín. Espesor por Espesor Carga sobre Coef. De Carga de Carga viva
Obser terreno proyecto Parcial real acumulada comercial tubería interno real rugosidad conducto hidráulica (S) carga (hf) Piezométrica dinámica estática por manipuleo presión int. CN tubo H carga Cd relleno Wr Wcv
No. l/s m msnm msnm m m m mm material mm CH m/s m/m m msnm m m mm mm mm m kg/m2 (lb/pie2)
dato dato dato dato dato dato fórmula fórmula fórmula dato dato fórmula dato fórmula fórmula fórmula fórmula fórmula fórmula fórmula fórmula

factor 1 6400.00 0.33 13243.50 488.00


1 0.5
15.00% 1.6

2700.00 1,356.00 1,353.00 1,356.00 2.00 1.02 175.75


1 2700.00 0+020.00 1,350.04 1,347.04 20.00 20.87 20.87 1300 ACERO 1350.0 140 1.89 0.0017 0.03 1,355.97 5.93 5.96 4.65 0.07 4.65 2.00 1.02 29,300.03 175.75
2 2700.00 0+040.00 1,344.07 1,341.07 20.00 20.87 41.74 1300 ACERO 1350.0 140 1.89 0.0017 0.03 1,355.93 11.86 11.93 4.65 0.14 4.65 2.00 1.02 29,300.03 175.75
3 2700.00 0+060.00 1,338.11 1,335.11 20.00 20.87 62.61 1300 ACERO 1350.0 140 1.89 0.0017 0.03 1,355.90 17.79 17.89 4.65 0.22 4.65 2.00 1.02 29,300.03 175.75
4 2700.00 0+080.00 1,332.14 1,329.14 20.00 20.87 83.48 1300 ACERO 1350.0 140 1.89 0.0017 0.03 1,355.86 23.72 23.86 4.65 0.29 4.65 2.00 1.02 29,300.03 175.75
5 2700.00 0+100.00 1,326.18 1,323.18 20.00 20.87 104.35 1300 ACERO 1350.0 140 1.89 0.0017 0.03 1,355.83 29.65 29.82 4.65 0.36 4.65 2.00 1.02 29,300.03 175.75
6 2700.00 0+120.00 1,320.21 1,317.21 20.00 20.87 125.22 1300 ACERO 1350.0 140 1.89 0.0017 0.03 1,355.79 35.58 35.79 4.65 0.43 4.65 2.00 1.02 29,300.03 175.75
7 2700.00 0+140.00 1,314.25 1,311.25 20.00 20.87 146.09 1300 ACERO 1350.0 140 1.89 0.0017 0.03 1,355.76 41.51 41.75 4.65 0.51 4.65 2.00 1.02 29,300.03 175.75
8 2700.00 0+160.00 1,308.28 1,305.28 20.00 20.87 166.96 1300 ACERO 1350.0 140 1.89 0.0017 0.03 1,355.72 47.44 47.72 4.65 0.58 4.65 2.00 1.02 29,300.03 175.75
9 2700.00 0+180.00 1,302.32 1,299.32 20.00 20.87 187.83 1300 ACERO 1350.0 140 1.89 0.0017 0.03 1,355.69 53.37 53.68 4.65 0.65 4.65 2.00 1.02 29,300.03 175.75
10 2700.00 0+200.00 1,296.36 1,293.36 20.00 20.87 208.70 1300 ACERO 1350.0 140 1.89 0.0017 0.03 1,355.65 59.30 59.64 4.65 0.72 4.65 2.00 1.02 29,300.03 175.75
11 2700.00 0+220.00 1,290.39 1,287.39 20.00 20.87 229.57 1300 ACERO 1350.0 140 1.89 0.0017 0.03 1,355.62 65.23 65.61 4.65 0.80 4.65 2.00 1.02 29,300.03 175.75
12 2700.00 0+240.00 1,284.43 1,281.43 20.00 20.87 250.44 1300 ACERO 1350.0 140 1.89 0.0017 0.03 1,355.58 71.16 71.57 4.65 0.87 4.65 2.00 1.02 29,300.03 175.75
13 2700.00 0+260.00 1,278.46 1,275.46 20.00 20.87 271.32 1300 ACERO 1350.0 140 1.89 0.0017 0.03 1,355.55 77.09 77.54 4.65 0.94 4.65 2.00 1.02 29,300.03 175.75
14 2700.00 0+280.00 1,272.50 1,269.50 20.00 20.87 292.19 1300 ACERO 1350.0 140 1.89 0.0017 0.03 1,355.52 83.02 83.50 4.65 1.01 4.65 2.00 1.02 29,300.03 175.75
15 2700.00 0+300.00 1,266.53 1,263.53 20.00 20.87 313.06 1300 ACERO 1350.0 140 1.89 0.0017 0.03 1,355.48 88.95 89.47 4.65 1.09 4.65 2.00 1.02 29,300.03 175.75
16 2700.00 0+320.00 1,260.57 1,257.57 20.00 20.87 333.93 1300 ACERO 1350.0 140 1.89 0.0017 0.03 1,355.45 94.88 95.43 4.65 1.16 4.65 2.00 1.02 29,300.03 175.75
17 2700.00 0+340.00 1,254.61 1,251.61 20.00 20.87 354.80 1300 ACERO 1350.0 140 1.89 0.0017 0.03 1,355.41 100.81 101.39 4.65 1.23 4.65 2.00 1.02 29,300.03 175.75
18 2700.00 0+365.50 1,247.00 1,244.00 25.50 26.61 381.41 1300 ACERO 1350.0 140 1.89 0.0017 0.04 1,355.37 108.37 109.00 4.65 1.32 4.65 2.00 1.02 29,300.03 175.75

537087200.ods COND_EXTRAORDINARIA pag 7 de 18


Carga viva Carga total Carga total Deflexión Deflexión Chequeo Espesor A
Wcv W W Horizontal Horizontal deflexión adoptado
kg/m2 (kg/m2) (lb/plg2) (plg) (mm) < 5% mm
fórmula

1 1 50.00 10.00
1 1
30,000.00 30,000.00
1,400.00 1,400.00
0.28
857.90 857.90 1.22
857.90 30,157.92 42.80 0.501 12.73 O.K. 6.00
857.90 30,157.92 42.80 0.501 12.73 O.K. 6.00
857.90 30,157.92 42.80 0.501 12.73 O.K. 6.00
857.90 30,157.92 42.80 0.501 12.73 O.K. 6.00
857.90 30,157.92 42.80 0.501 12.73 O.K. 6.00
857.90 30,157.92 42.80 0.501 12.73 O.K. 6.00
857.90 30,157.92 42.80 0.501 12.73 O.K. 6.00
857.90 30,157.92 42.80 0.501 12.73 O.K. 6.00
857.90 30,157.92 42.80 0.501 12.73 O.K. 6.00
857.90 30,157.92 42.80 0.501 12.73 O.K. 6.00
857.90 30,157.92 42.80 0.501 12.73 O.K. 6.00
857.90 30,157.92 42.80 0.501 12.73 O.K. 6.00
857.90 30,157.92 42.80 0.501 12.73 O.K. 6.00
857.90 30,157.92 42.80 0.501 12.73 O.K. 6.00
857.90 30,157.92 42.80 0.501 12.73 O.K. 6.00
857.90 30,157.92 42.80 0.501 12.73 O.K. 6.00
857.90 30,157.92 42.80 0.501 12.73 O.K. 6.00
857.90 30,157.92 42.80 0.501 12.73 O.K. 6.00

537087200.ods COND_EXTRAORDINARIA pag 8 de 18


DIAMETROS INTERIORES SEGÚN PRESION DE TRABAJO PARA TUBERÍA PVC PRESION

DIAMETRO DIAMETRO REAL (mm)


pulg mm\Mpa 0.63 0.80 1.00 1.25 1.60 2.00
Fila -> No. Col -> 1 2 3 4 5 6
1 0.8 20 17.0 17.0 17.0 17.0 17.0 17.0
2 1.0 25 22.0 22.0 22.0 22.0 22.0 21.2
3 1.3 32 29.0 29.0 29.0 29.0 28.2 27.2
4 1.6 40 37.0 37.0 37.0 36.2 35.2
5 2.0 50 47.0 47.0 46.2 45.2 44.0 42.6
6 2.5 63 60.0 59.0 58.2 57.0
7 3.0 75 71.4 70.4 69.2 67.8
8 3.5 90 85.6 84.4 83.0 81.4 79.2 76.6
9 4.3 110 104.6 103.2 101.6 99.6 96.8 93.8
10 6.3 160 152.2 150.0 147.6 144.8 140.8 136.2
11 7.9 200 190.2 187.6 184.6 181.0 176.0 170.4
12 8.9 225 214.0 211.0 207.6 203.6
13 9.8 250 237.8 234.4 230.8 226.2 220.0 213.0
14 12.4 315 299.6 295.4 290.8 285.0 277.2 268.4
15 14.0 355 337.6 333.0 327.6 321.2
16 15.7 400 380.4 375.2 369.2 362.0 351.8 340.8

Diseño de la Tubería de Presión - Proyecto Hidroeléctrico Victoria


Cálculos hidráulicos Tubería de Presión (Ecuación de Hazen - Williams)

ACERO ASTM A516 GRADO 70


ESFUERZO DE FLUENCIA = 4220 Kg/cm2
ESFUERZO DE TRACCION = 6400 Kg/cm2

Tramo Caudal Abscisa Cota Cota Abscisa Longitud Longitud Díametro Espesor Factor de Coef. Soporte Presión max.
Obser terreno proyecto Parcial real acumulada comercial tuberia flotación Elástico pandeo
No. l/s m msnm msnm m m m mm mm Rw B' psi
dato dato dato dato dato dato fórmula fórmula fórmula dato

factor 1 2.00 2.00


1400.00
30000000.00

2700.00 1,356.00 1,353.00 1300 8 0.61 0.21 28.64


1 2700.00 0+020.00 1,350.04 1,347.04 20.00 20.87 20.87 1300 8 0.61 0.21 28.64
2 2700.00 0+040.00 1,344.07 1,341.07 20.00 20.87 41.74 1300 8 0.61 0.21 28.64
3 2700.00 0+060.00 1,338.11 1,335.11 20.00 20.87 62.61 1300 8 0.61 0.21 28.64
4 2700.00 0+080.00 1,332.14 1,329.14 20.00 20.87 83.48 1300 8 0.61 0.21 28.64
5 2700.00 0+100.00 1,326.18 1,323.18 20.00 20.87 104.35 1300 8 0.61 0.21 28.64
6 2700.00 0+120.00 1,320.21 1,317.21 20.00 20.87 125.22 1300 8 0.61 0.21 28.64
7 2700.00 0+140.00 1,314.25 1,311.25 20.00 20.87 146.09 1300 8 0.61 0.21 28.64
8 2700.00 0+160.00 1,308.28 1,305.28 20.00 20.87 166.96 1300 8 0.61 0.21 28.64
9 2700.00 0+180.00 1,302.32 1,299.32 20.00 20.87 187.83 1300 8 0.61 0.21 28.64
10 2700.00 0+200.00 1,296.36 1,293.36 20.00 20.87 208.70 1300 8 0.61 0.21 28.64
11 2700.00 0+220.00 1,290.39 1,287.39 20.00 20.87 229.57 1300 8 0.61 0.21 28.64
12 2700.00 0+240.00 1,284.43 1,281.43 20.00 20.87 250.44 1300 8 0.61 0.21 28.64
13 2700.00 0+260.00 1,278.46 1,275.46 20.00 20.87 271.32 1300 8 0.61 0.21 28.64
14 2700.00 0+280.00 1,272.50 1,269.50 20.00 20.87 292.19 1300 8 0.61 0.21 28.64
15 2700.00 0+300.00 1,266.53 1,263.53 20.00 20.87 313.06 1300 8 0.61 0.21 28.64
16 2700.00 0+320.00 1,260.57 1,257.57 20.00 20.87 333.93 1300 8 0.61 0.21 28.64
17 2700.00 0+340.00 1,254.61 1,251.61 20.00 20.87 354.80 1300 8 0.61 0.21 28.64
18 2700.00 0+365.50 1,247.00 1,244.00 25.50 26.61 381.41 1300 8 0.61 0.21 28.64

537087200.ods CARGAS_EXT_C_VACIO pag 9 de 18


ESION DE TRABAJO PARA TUBERÍA PVC PRESION

resión - Proyecto Hidroeléctrico Victoria


de Presión (Ecuación de Hazen - Williams)

Presión de Presión de Carga de Carga Chequeo


agua suelo vacio total cargas
psi psi psi psi

1.35

2.42 3.26 14.68 20.36 O.K


2.42 3.26 14.68 20.36 O.K
2.42 3.26 14.68 20.36 O.K
2.42 3.26 14.68 20.36 O.K
2.42 3.26 14.68 20.36 O.K
2.42 3.26 14.68 20.36 O.K
2.42 3.26 14.68 20.36 O.K
2.42 3.26 14.68 20.36 O.K
2.42 3.26 14.68 20.36 O.K
2.42 3.26 14.68 20.36 O.K
2.42 3.26 14.68 20.36 O.K
2.42 3.26 14.68 20.36 O.K
2.42 3.26 14.68 20.36 O.K
2.42 3.26 14.68 20.36 O.K
2.42 3.26 14.68 20.36 O.K
2.42 3.26 14.68 20.36 O.K
2.42 3.26 14.68 20.36 O.K
2.42 3.26 14.68 20.36 O.K
2.42 3.26 14.68 20.36 O.K

537087200.ods CARGAS_EXT_C_VACIO pag 10 de 18


DIAMETROS INTERIORES SEGÚN PRESION DE TRABAJO PARA TUBERÍA PVC PRESION

DIAMETRO DIAMETRO REAL (mm)


pulg mm\Mpa 0.63 0.80 1.00 1.25 1.60 2.00
Fila -> No. Col -> 1 2 3 4 5 6
1 0.8 20 17.0 17.0 17.0 17.0 17.0 17.0
2 1.0 25 22.0 22.0 22.0 22.0 22.0 21.2
3 1.3 32 29.0 29.0 29.0 29.0 28.2 27.2
4 1.6 40 37.0 37.0 37.0 36.2 35.2
5 2.0 50 47.0 47.0 46.2 45.2 44.0 42.6
6 2.5 63 60.0 59.0 58.2 57.0
7 3.0 75 71.4 70.4 69.2 67.8
8 3.5 90 85.6 84.4 83.0 81.4 79.2 76.6
9 4.3 110 104.6 103.2 101.6 99.6 96.8 93.8
10 6.3 160 152.2 150.0 147.6 144.8 140.8 136.2
11 7.9 200 190.2 187.6 184.6 181.0 176.0 170.4
12 8.9 225 214.0 211.0 207.6 203.6
13 9.8 250 237.8 234.4 230.8 226.2 220.0 213.0
14 12.4 315 299.6 295.4 290.8 285.0 277.2 268.4
15 14.0 355 337.6 333.0 327.6 321.2
16 15.7 400 380.4 375.2 369.2 362.0 351.8 340.8

Diseño de la Tubería de Presión - Proyecto Hidroeléctrico Victoria


Cálculos hidráulicos Tubería de Presión (Ecuación de Hazen - Williams)

ACERO ASTM A516 GRADO 70


ESFUERZO DE FLUENCIA = 4220 Kg/cm2
ESFUERZO DE TRACCION = 6400 Kg/cm2

Tramo Caudal Abscisa Cota Cota Abscisa Longitud Longitud Díametro Espesor Factor de Coef. Soporte Presión max.
Obser terreno proyecto Parcial real acumulada comercial tuberia flotación Elástico pandeo
No. l/s m msnm msnm m m m mm mm Rw B' psi
dato dato dato dato dato dato fórmula fórmula fórmula dato

factor 1 2.00 2.00


1400.00
30000000.00

2700.00 1,356.00 1,353.00 1300 8 0.61 0.21 28.64


1 2700.00 0+020.00 1,350.04 1,347.04 20.00 20.87 20.87 1300 8 0.61 0.21 28.64
2 2700.00 0+040.00 1,344.07 1,341.07 20.00 20.87 41.74 1300 8 0.61 0.21 28.64
3 2700.00 0+060.00 1,338.11 1,335.11 20.00 20.87 62.61 1300 8 0.61 0.21 28.64
4 2700.00 0+080.00 1,332.14 1,329.14 20.00 20.87 83.48 1300 8 0.61 0.21 28.64
5 2700.00 0+100.00 1,326.18 1,323.18 20.00 20.87 104.35 1300 8 0.61 0.21 28.64
6 2700.00 0+120.00 1,320.21 1,317.21 20.00 20.87 125.22 1300 8 0.61 0.21 28.64
7 2700.00 0+140.00 1,314.25 1,311.25 20.00 20.87 146.09 1300 8 0.61 0.21 28.64
8 2700.00 0+160.00 1,308.28 1,305.28 20.00 20.87 166.96 1300 8 0.61 0.21 28.64
9 2700.00 0+180.00 1,302.32 1,299.32 20.00 20.87 187.83 1300 8 0.61 0.21 28.64
10 2700.00 0+200.00 1,296.36 1,293.36 20.00 20.87 208.70 1300 8 0.61 0.21 28.64
11 2700.00 0+220.00 1,290.39 1,287.39 20.00 20.87 229.57 1300 8 0.61 0.21 28.64
12 2700.00 0+240.00 1,284.43 1,281.43 20.00 20.87 250.44 1300 8 0.61 0.21 28.64
13 2700.00 0+260.00 1,278.46 1,275.46 20.00 20.87 271.32 1300 8 0.61 0.21 28.64
14 2700.00 0+280.00 1,272.50 1,269.50 20.00 20.87 292.19 1300 8 0.61 0.21 28.64
15 2700.00 0+300.00 1,266.53 1,263.53 20.00 20.87 313.06 1300 8 0.61 0.21 28.64
16 2700.00 0+320.00 1,260.57 1,257.57 20.00 20.87 333.93 1300 8 0.61 0.21 28.64
17 2700.00 0+340.00 1,254.61 1,251.61 20.00 20.87 354.80 1300 8 0.61 0.21 28.64
18 2700.00 0+365.50 1,247.00 1,244.00 25.50 26.61 381.41 1300 8 0.61 0.21 28.64

537087200.ods CARGAS_EXT_C_VIVA pag 11 de 18


ESION DE TRABAJO PARA TUBERÍA PVC PRESION

resión - Proyecto Hidroeléctrico Victoria


de Presión (Ecuación de Hazen - Williams)

Presión de Presión de Carga Carga Chequeo


agua suelo VIVA total cargas
psi psi psi psi

1.35

2.42 3.26 1.22 6.90 O.K


2.42 3.26 1.22 6.90 O.K
2.42 3.26 1.22 6.90 O.K
2.42 3.26 1.22 6.90 O.K
2.42 3.26 1.22 6.90 O.K
2.42 3.26 1.22 6.90 O.K
2.42 3.26 1.22 6.90 O.K
2.42 3.26 1.22 6.90 O.K
2.42 3.26 1.22 6.90 O.K
2.42 3.26 1.22 6.90 O.K
2.42 3.26 1.22 6.90 O.K
2.42 3.26 1.22 6.90 O.K
2.42 3.26 1.22 6.90 O.K
2.42 3.26 1.22 6.90 O.K
2.42 3.26 1.22 6.90 O.K
2.42 3.26 1.22 6.90 O.K
2.42 3.26 1.22 6.90 O.K
2.42 3.26 1.22 6.90 O.K
2.42 3.26 1.22 6.90 O.K

537087200.ods CARGAS_EXT_C_VIVA pag 12 de 18


DIAMETROS INTERIORES SEGÚN PRESION DE TRABAJO PARA TUBERÍA PVC PRESION

DIAMETRO DIAMETRO REAL (mm)


pulg mm\Mpa 0.63 0.80 1.00 1.25 1.60 2.00
Fila -> No. Col -> 1 2 3 4 5 6
1 0.8 20 17.0 17.0 17.0 17.0 17.0 17.0
2 1.0 25 22.0 22.0 22.0 22.0 22.0 21.2
3 1.3 32 29.0 29.0 29.0 29.0 28.2 27.2
4 1.6 40 37.0 37.0 37.0 36.2 35.2
5 2.0 50 47.0 47.0 46.2 45.2 44.0 42.6
6 2.5 63 60.0 59.0 58.2 57.0
7 3.0 75 71.4 70.4 69.2 67.8
8 3.5 90 85.6 84.4 83.0 81.4 79.2 76.6
9 4.3 110 104.6 103.2 101.6 99.6 96.8 93.8
10 6.3 160 152.2 150.0 147.6 144.8 140.8 136.2
11 7.9 200 190.2 187.6 184.6 181.0 176.0 170.4
12 8.9 225 214.0 211.0 207.6 203.6
13 9.8 250 237.8 234.4 230.8 226.2 220.0 213.0
14 12.4 315 299.6 295.4 290.8 285.0 277.2 268.4
15 14.0 355 337.6 333.0 327.6 321.2
16 15.7 400 380.4 375.2 369.2 362.0 351.8 340.8

Diseño de la Tubería de Presión - Proyecto Hidroeléctrico Victoria


Cálculos hidráulicos Tubería de Presión (Ecuación de Hazen - Williams)

ACERO ASTM A516 GRADO 70


ESFUERZO DE FLUENCIA = 4220 Kg/cm2
ESFUERZO DE TRACCION = 6400 Kg/cm2

Tramo Caudal Abscisa Cota Cota Abscisa Longitud Longitud Díametro Espesor Factor de Coef. Soporte Presión max. Presión de
Obser terreno proyecto Parcial real acumulada comercial tuberia flotación Elástico pandeo agua
No. l/s m msnm msnm m m m mm mm Rw B' psi psi
dato dato dato dato dato dato fórmula fórmula fórmula dato

factor 1 2.00 2.00


1400.00
30000000.00

2740.00 1,356.00 1,353.00 1000 8 0.67 0.21 44.53 2.84


1 2740.00 0+020.00 1,350.04 1,347.04 20.00 20.87 20.87 1000 8 0.67 0.21 44.53 2.84
2 2740.00 0+040.00 1,344.07 1,341.07 20.00 20.87 41.74 1000 8 0.67 0.21 44.53 2.84
3 2740.00 0+060.00 1,338.11 1,335.11 20.00 20.87 62.61 1000 8 0.67 0.21 44.53 2.84
4 2740.00 0+080.00 1,332.14 1,329.14 20.00 20.87 83.48 1000 8 0.67 0.21 44.53 2.84
5 2740.00 0+100.00 1,326.18 1,323.18 20.00 20.87 104.35 1000 8 0.67 0.21 44.53 2.84
6 2740.00 0+120.00 1,320.21 1,317.21 20.00 20.87 125.22 1000 8 0.67 0.21 44.53 2.84
7 2740.00 0+140.00 1,314.25 1,311.25 20.00 20.87 146.09 1000 8 0.67 0.21 44.53 2.84
8 2740.00 0+160.00 1,308.28 1,305.28 20.00 20.87 166.96 1000 8 0.67 0.21 44.53 2.84
9 2740.00 0+180.00 1,302.32 1,299.32 20.00 20.87 187.83 1000 8 0.67 0.21 44.53 2.84
10 2740.00 0+200.00 1,296.36 1,293.36 20.00 20.87 208.70 1000 8 0.67 0.21 44.53 2.84
11 2740.00 0+220.00 1,290.39 1,287.39 20.00 20.87 229.57 1000 8 0.67 0.21 44.53 2.84
12 2740.00 0+240.00 1,284.43 1,281.43 20.00 20.87 250.44 1000 8 0.67 0.21 44.53 2.84
13 2740.00 0+260.00 1,278.46 1,275.46 20.00 20.87 271.32 1000 8 0.67 0.21 44.53 2.84
14 2740.00 0+280.00 1,272.50 1,269.50 20.00 20.87 292.19 1000 8 0.67 0.21 44.53 2.84
15 2740.00 0+300.00 1,266.53 1,263.53 20.00 20.87 313.06 1000 8 0.67 0.21 44.53 2.84
16 2740.00 0+320.00 1,260.57 1,257.57 20.00 20.87 333.93 1000 8 0.67 0.21 44.53 2.84
17 2740.00 0+340.00 1,254.61 1,251.61 20.00 20.87 354.80 1000 8 0.67 0.21 44.53 2.84
18 2740.00 0+365.50 1,247.00 1,244.00 25.50 26.61 381.41 1000 8 0.67 0.21 44.53 2.84

537087200.ods CARGAS_EXT_C_TOTAL pag 13 de 18


RESION DE TRABAJO PARA TUBERÍA PVC PRESION

Presión - Proyecto Hidroeléctrico Victoria


a de Presión (Ecuación de Hazen - Williams)

Presión de Carga de Carga Carga Chequeo


suelo vacio VIVA total cargas
psi psi psi psi

1.35

3.84 14.68 1.22 22.58 O.K


3.84 14.68 1.22 22.58 O.K
3.84 14.68 1.22 22.58 O.K
3.84 14.68 1.22 22.58 O.K
3.84 14.68 1.22 22.58 O.K
3.84 14.68 1.22 22.58 O.K
3.84 14.68 1.22 22.58 O.K
3.84 14.68 1.22 22.58 O.K
3.84 14.68 1.22 22.58 O.K
3.84 14.68 1.22 22.58 O.K
3.84 14.68 1.22 22.58 O.K
3.84 14.68 1.22 22.58 O.K
3.84 14.68 1.22 22.58 O.K
3.84 14.68 1.22 22.58 O.K
3.84 14.68 1.22 22.58 O.K
3.84 14.68 1.22 22.58 O.K
3.84 14.68 1.22 22.58 O.K
3.84 14.68 1.22 22.58 O.K
3.84 14.68 1.22 22.58 O.K

537087200.ods CARGAS_EXT_C_TOTAL pag 14 de 18


DIAMETROS INTERIORES SEGÚN PRESION DE TRABAJO PARA TUBERÍA PVC PRESION

DIAMETRO DIAMETRO REAL (mm)


pulg mm\Mpa 0.63 0.80 1.00 1.25 1.60 2.00
Fila -> No. Col -> 1 2 3 4 5 6
1 0.8 20 17.0 17.0 17.0 17.0 17.0 17.0
2 1.0 25 22.0 22.0 22.0 22.0 22.0 21.2
3 1.3 32 29.0 29.0 29.0 29.0 28.2 27.2
4 1.6 40 37.0 37.0 37.0 36.2 35.2
5 2.0 50 47.0 47.0 46.2 45.2 44.0 42.6
6 2.5 63 60.0 59.0 58.2 57.0
7 3.0 75 71.4 70.4 69.2 67.8
8 3.5 90 85.6 84.4 83.0 81.4 79.2 76.6
9 4.3 110 104.6 103.2 101.6 99.6 96.8 93.8
10 6.3 160 152.2 150.0 147.6 144.8 140.8 136.2
11 7.9 200 190.2 187.6 184.6 181.0 176.0 170.4
12 8.9 225 214.0 211.0 207.6 203.6
13 9.8 250 237.8 234.4 230.8 226.2 220.0 213.0
14 12.4 315 299.6 295.4 290.8 285.0 277.2 268.4
15 14.0 355 337.6 333.0 327.6 321.2
16 15.7 400 380.4 375.2 369.2 362.0 351.8 340.8

Diseño de la Tubería de Presión - Proyecto Hidroeléctrico Victoria


Cálculos hidráulicos Tubería de Presión (Ecuación de Hazen - Williams)

ACERO ASTM A516 GRADO 70


ESFUERZO DE FLUENCIA = 2671 Kg/cm2
ESFUERZO DE TRACCION = 4921 Kg/cm2

Tramo Caudal Abscisa Cota Cota Abscisa Longitud Longitud Díametro Espesor
Obser terreno proyecto Parcial real acumulada comercial tuberia
No. l/s m msnm msnm m m m mm mm
dato dato dato dato dato dato fórmula fórmula fórmula dato

factor 1

2700.00 1,356.00 1,353.00 1300 8


1 2700.00 0+020.00 1,350.04 1,347.04 20.00 20.87 20.87 1300 8
2 2700.00 0+040.00 1,344.07 1,341.07 20.00 20.87 41.74 1300 8
3 2700.00 0+060.00 1,338.11 1,335.11 20.00 20.87 62.61 1300 8
4 2700.00 0+080.00 1,332.14 1,329.14 20.00 20.87 83.48 1300 8
5 2700.00 0+100.00 1,326.18 1,323.18 20.00 20.87 104.35 1300 8
6 2700.00 0+120.00 1,320.21 1,317.21 20.00 20.87 125.22 1300 8
7 2700.00 0+140.00 1,314.25 1,311.25 20.00 20.87 146.09 1300 8
8 2700.00 0+160.00 1,308.28 1,305.28 20.00 20.87 166.96 1300 8
9 2700.00 0+180.00 1,302.32 1,299.32 20.00 20.87 187.83 1300 8
10 2700.00 0+200.00 1,296.36 1,293.36 20.00 20.87 208.70 1300 8
11 2700.00 0+220.00 1,290.39 1,287.39 20.00 20.87 229.57 1300 8
12 2700.00 0+240.00 1,284.43 1,281.43 20.00 20.87 250.44 1300 8
13 2700.00 0+260.00 1,278.46 1,275.46 20.00 20.87 271.32 1300 8
14 2700.00 0+280.00 1,272.50 1,269.50 20.00 20.87 292.19 1300 8
15 2700.00 0+300.00 1,266.53 1,263.53 20.00 20.87 313.06 1300 8
16 2700.00 0+320.00 1,260.57 1,257.57 20.00 20.87 333.93 1300 8
17 2700.00 0+340.00 1,254.61 1,251.61 20.00 20.87 354.80 1300 8
18 2700.00 0+365.50 1,247.00 1,244.00 25.50 26.61 381.41 1300 8

537087200.ods ESPESORES pag 15 de 18


RESION DE TRABAJO PARA TUBERÍA PVC PRESION

Presión - Proyecto Hidroeléctrico Victoria


a de Presión (Ecuación de Hazen - Williams)

Espesor por Espesor Espesor


corrosión total seleccionado
mm mm mm

3.00 11.00 12.00


3.00 11.00 12.00
3.00 11.00 12.00
3.00 11.00 12.00
3.00 11.00 12.00
3.00 11.00 12.00
3.00 11.00 12.00
3.00 11.00 12.00
3.00 11.00 12.00
3.00 11.00 12.00
3.00 11.00 12.00
3.00 11.00 12.00
3.00 11.00 12.00
3.00 11.00 12.00
3.00 11.00 12.00
3.00 11.00 12.00
3.00 11.00 12.00
3.00 11.00 12.00
3.00 11.00 12.00

537087200.ods ESPESORES pag 16 de 18


3000.0

2950.0 TUBERIA DE PRESION - ( Q = 2.7 m3/s)


ELEVACION (msnm)

2900.0

2850.0
LINEA PIEZOMETRICA FLUJO NO PERMANE

2800.0
LINEA PIEZOMETRICA FL
2750.0 PERMANENTE

2700.0

2650.0

2600.0

2550.0

2500.0

2450.0

2400.0

2350.0

2300.0 ABSCISAS (KM)

2250.0

2200.0
0+000 0+100 0+200 0+300 0+400 0+500 0+600 0+700 0+800 0+900 1+000 1+100
.7 m3/s)

RICA FLUJO NO PERMANENTE

LINEA PIEZOMETRICA FLUJO


PERMANENTE

0+900 1+000 1+100 1+200 1+300 1+400 1+500