Está en la página 1de 2

PROGRAMACIÓN DE EJECUCIÓN DE OBRA (CPM)

Id ModoNombre de tarea Dias Duración Comienzo Fin Margen de demora Predecesoras


de Calendarios total 11 jul '21 18 jul '21 25 jul '21 01 ago '21 08 ago '21 15 ago '21 22 ago '21 29 ago '21 05 sep '21 12 sep '21 19 sep '21 26 sep '21 03 oct '21 10 oct '21 17 oct '21 24 oct '21 31 oct '21 07 nov '21 14 nov '21 21 nov '21 28 nov '21 05 dic '21 12 dic '21 19 dic '21 26 dic '21 02 ene '22 09 ene '22 16 ene '22 23 ene '22 30 ene '22
tarea M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J
1 ESTRUCTURAS 210 179 días jue 08/07/21 mié 02/02/22 0 días

2 BLOQUE 178 días jue 08/07/21 mar 01/02/22 0 días

3 OBRAS  62 días jue 08/07/21 vie 17/09/21 0 días


PRELIMINARES
4 LIMPIEZA DEL  15 13 días jue 08/07/21 jue 22/07/21 0 días 5CC
TERRENO MANUAL
5 CERCO DE  8 7 días jue 08/07/21 jue 15/07/21 0 días
PROTECCION
6 ELIMINACION DE  70 60 días sáb 10/07/21 vie 17/09/21 0 días 4CC+2 días
MALEZA Y 
ARBUSTOS DE 
7 SEGURIDAD Y SALUD 154 días jue 08/07/21 mar 04/01/22 0 días

8 EQUIPO DE  176 150 días jue 08/07/21 jue 30/12/21 0 días 5CC


PROTECCION 
PERSONAL
9 EQUIPO DE  177 151 días lun 12/07/21 mar 04/01/22 0 días 8CC+3 días
PROTECCION 
COLECTIVO
10 SEÑAL TEMPORAL  177 151 días lun 12/07/21 mar 04/01/22 0 días 9CC
DE SEGURIDAD
11 PLAN DE  176 150 días jue 08/07/21 jue 30/12/21 0 días 5CC
SEGURIDAD Y 
12 IMPLEMENTACION 176 150 días jue 08/07/21 jue 30/12/21 0 días 5CC
DEL PROTOCOLO 
DE VIGILANCIA, 
PREVENCION Y 
CONTROL DE 
COVID‐19
13 MOVIMIENTO DE  173 días mié 14/07/21 mar 01/02/22 0 días
TIERRAS
14 TRAZO, NIVELES Y  123 106 días mié 14/07/21 sáb 13/11/21 0 días 4CC+5 días
REPLANTEO
15 TRAZO, NIVELES Y  123 106 días mié 14/07/21 sáb 13/11/21 0 días 14CC
REPLANTEO 
DURANTE EL 
PROCESO 
16 EXCAVACION  99 85 días mié 14/07/21 mié 20/10/21 0 días 15CC
MANUAL
17 ELIMINACION DE  99 85 días sáb 17/07/21 sáb 23/10/21 0 días 16CC+3 días
MATERIAL 
EXCEDENTE HASTA
18 ELIMINACION DE  70 60 días sáb 17/07/21 vie 24/09/21 0 días 16CC+3 días
MATERIAL 
EXCEDENTE DM=5 
19 PERFILADO Y  99 85 días sáb 17/07/21 sáb 23/10/21 0 días 16CC+3 días
COMPACTADO DE 
FONDO DE ZANJA
20 RELLENO Y  100 85 días lun 25/10/21 mar 01/02/22 0 días 21
COMPACTACION 
CDE ZANJA
21 CORTE EN TIERRA  99 85 días sáb 17/07/21 sáb 23/10/21 0 días 14CC+3 días
SUELTA (CON 
MAQUINARIA)
22 OBRAS DE  140 días lun 26/07/21 mié 05/01/22 0 días
CONCRETO SIMPLE
23 SOLADO 130 días lun 26/07/21 jue 23/12/21 0 días

24 SOLADO EN  151 130 días lun 26/07/21 jue 23/12/21 0 días 19CC+7 días


ZAPATAS
25 CIMIENTOS  130 días mar 27/07/21 vie 24/12/21 0 días
CORRIDOS
26 CONCRETO 1:8 + 151 130 días mar 27/07/21 vie 24/12/21 0 días 24CC+1 día
25%P.M. PARA 
CIMIENTOS 
CORRIDOS
27 CURADO CON  98 84 días sáb 18/09/21 vie 24/12/21 0 días 26FF
AGUA
28 SOBRECIMIENTOS  129 días sáb 31/07/21 mié 29/12/21 0 días
CORRIDOS
29 ENCOFRADO Y  152 129 días sáb 31/07/21 mié 29/12/21 0 días 24CC+5 días
DESENCOFRADO
30 CONCRETO  152 129 días sáb 31/07/21 mié 29/12/21 0 días 29CC
1:8+25% P.M. 
PARA 
31 CURADO CON  152 129 días sáb 31/07/21 mié 29/12/21 0 días 30CC
AGUA
32 LOSA DE FALSO  135 días sáb 31/07/21 mié 05/01/22 0 días
PISO
33 NIVELADO DE  152 129 días sáb 31/07/21 mié 29/12/21 0 días 30CC
TERRENO PARA 
FALSO PISO
34 EMPEDRADO  152 129 días sáb 31/07/21 mié 29/12/21 0 días 33CC
PARA FALSO 
35 CONCRETO  153 130 días jue 05/08/21 mar 04/01/22 0 días 34CC+4 días
f'c=175 kg/cm2 
PARA FALSO 
36 CURADO CON  153 130 días vie 06/08/21 mié 05/01/22 0 días 35CC+1 día
AGUA
37 OBRAS DE  149 días vie 06/08/21 jue 27/01/22 0 días
CONCRETO ARMADO
38 ZAPATAS 130 días vie 06/08/21 mié 05/01/22 0 días

39 CONCRETO f’c =  147 125 días jue 12/08/21 mié 05/01/22 0 días 40CC+5 días


210 kg/cm2 
PARA ZAPATAS
40 ACERO DE  146 124 días vie 06/08/21 mié 29/12/21 0 días 24CC+10 días
REFUERZO 
f'y=4,200 
41 COLUMNAS 133 días jue 12/08/21 vie 14/01/22 0 días

42 CONCRETO f'c =  153 130 días sáb 14/08/21 jue 13/01/22 0 días 43CC+1 día


210 kg/cm2 EN 
COLUMNAS
43 ENCOFRADO Y  153 130 días vie 13/08/21 mié 12/01/22 0 días 44CC+1 día
DESENCOFRADO
PARA 
44 ACERO DE  153 130 días jue 12/08/21 mar 11/01/22 0 días 40CC+5 días
REFUERZO 
f'y=4,200 
kg/cm2 EN 
45 CURADO CON  152 130 días lun 16/08/21 vie 14/01/22 0 días 42CC+1 día
AGUA
46 VIGAS 133 días mié 18/08/21 jue 20/01/22 0 días

47 CONCRETO f'c =  153 130 días vie 20/08/21 mié 19/01/22 0 días 48CC+1 día


210 kg/cm2 
48 ENCOFRADO Y  153 130 días jue 19/08/21 mar 18/01/22 0 días 49CC+1 día
DESENCOFRADO
DE VIGAS
49 ACERO DE  153 130 días mié 18/08/21 lun 17/01/22 0 días 44CC+5 días
REFUERZO 
f'y=4,200 
50 CURADO CON  153 130 días sáb 21/08/21 jue 20/01/22 0 días 47CC+1 día
AGUA
51 LOSAS DE  133 días mié 25/08/21 jue 27/01/22 0 días
CONCRETO
52 CONCRETO f'c =  153 130 días vie 27/08/21 mié 26/01/22 0 días 53CC+2 días
210 kg/cm2 
PARA LOSAS DE 
53 ENCOFRADO Y  153 130 días mié 25/08/21 lun 24/01/22 0 días 48CC+5 días
DESENCOFRADO
DE LOSAS DE 
CONCRETOAS
54 ACERO DE  153 130 días sáb 28/08/21 jue 27/01/22 0 días 55CC+1 día
REFUERZO 
f'y=4,200 
kg/cm2 EN 
55 PLANCHA DE  153 130 días vie 27/08/21 mié 26/01/22 0 días 53CC+2 días
TECNOPORT DE 
2.4X0.30X0.15M
PARA TECHO
56 CURADO CON  153 130 días sáb 28/08/21 jue 27/01/22 0 días 52CC+1 día
AGUA
57 MURO DE  132 días vie 06/08/21 vie 07/01/22 0 días
CONCRETO 
58 CONCRETO f'c =  153 130 días sáb 07/08/21 jue 06/01/22 0 días 59CC
210 kg/cm2 
59 ENCOFRADO Y  153 130 días sáb 07/08/21 jue 06/01/22 0 días 60CC+1 día
DESENCOFRADO
PARA MUROS
60 ACERO  153 130 días vie 06/08/21 mié 05/01/22 0 días 24CC+10 días
CORRUGADO 
f'y= 4200 
kg/cm2 GRADO 
61 SUMINISTRO E  153 130 días sáb 07/08/21 jue 06/01/22 0 días 60CC+1 día
INSTALACION 
DE 
GEOCOMPUESTO
62 SUMINISTRO E  153 130 días sáb 07/08/21 jue 06/01/22 0 días 61CC
INSTALACION 
DE TUBERIA 
HDPE DE 4"
63 CONEXION DE  153 130 días sáb 07/08/21 jue 06/01/22 0 días 62CC
TUBERIA A 
CANAL DE 
EVACUACION DE
64 CURADO CON  152 130 días lun 09/08/21 vie 07/01/22 0 días 59CC+1 día
AGUA
65 SERVICIOS HIGIENICOS 134 días vie 23/07/21 lun 27/12/21 0 días

66 OBRAS  4 días lun 15/11/21 jue 18/11/21 0 días


PRELIMINARES
67 LIMPIEZA DEL  4 4 días lun 15/11/21 jue 18/11/21 0 días 14
TERRENO MANUAL
68 MOVIMIENTO DE  10 días vie 19/11/21 mar 30/11/21 0 días
TIERRAS
69 TRAZO Y  2 2 días vie 19/11/21 sáb 20/11/21 0 días 67
REPLANTEO INICAL
70 TRAZO, NIVELES Y  2 2 días lun 22/11/21 mar 23/11/21 0 días 69
REPLANTEO 
DURANTE EL 
PROCESO 
71 EXCAVACION  7 6 días mié 24/11/21 mar 30/11/21 0 días 70
MANUAL
72 OBRAS DE  15 días mié 01/12/21 vie 17/12/21 0 días
CONCRETO SIMPLE
73 SOLADO 6 días mié 01/12/21 mar 07/12/21 0 días

74 SOLADO EN  7 6 días mié 01/12/21 mar 07/12/21 0 días 71


ZAPATAS
75 CIMIENTOS  8 días jue 02/12/21 vie 10/12/21 0 días
CORRIDOS
76 CONCRETO 1:8 + 9 8 días jue 02/12/21 vie 10/12/21 0 días 74CC+1 día
25%P.M. PARA 
CIMIENTOS 
CORRIDOS
77 SOBRECIMIENTOS  9 días sáb 04/12/21 mar 14/12/21 0 días
CORRIDOS
78 ENCOFRADO Y  7 6 días sáb 04/12/21 vie 10/12/21 0 días 76CC+2 días
DESENCOFRADO
79 CONCRET0  4 3 días sáb 11/12/21 mar 14/12/21 0 días 78
1:8+25% P.M. 
PARA 
80 LOSA DE FALSO  15 días mié 01/12/21 vie 17/12/21 0 días
PISO
81 NIVELADO DE  7 6 días mié 01/12/21 mar 07/12/21 0 días 74CC
TERRENO PARA 
FALSO PISO
82 EMPEDRADO  17 15 días mié 01/12/21 vie 17/12/21 0 días 81CC
PARA FALSO 
83 CONCRETO  17 15 días mié 01/12/21 vie 17/12/21 0 días 82CC
f'c=175 kg/cm2 
PARA FALSO 
84 OBRAS DE  22 días mié 01/12/21 lun 27/12/21 0 días
CONCRETO ARMADO
85 COLUMNAS 22 días mié 01/12/21 lun 27/12/21 0 días

86 CONCRETO f'c =  24 19 días sáb 04/12/21 lun 27/12/21 0 días 87CC+1 día


210 kg/cm2 EN 
COLUMNAS
87 ENCOFRADO Y  25 20 días vie 03/12/21 lun 27/12/21 0 días 88CC+2 días
DESENCOFRADO
PARA 
88 ACERO DE  23 20 días mié 01/12/21 jue 23/12/21 0 días 83CC
REFUERZO 
f'y=4,200 
kg/cm2 EN 
89 VIGAS 22 días mié 01/12/21 lun 27/12/21 0 días

90 CONCRETO f'c =  25 20 días vie 03/12/21 lun 27/12/21 0 días 91CC+1 día


210 kg/cm2 
91 ENCOFRADO Y  23 20 días jue 02/12/21 vie 24/12/21 0 días 92CC+1 día
DESENCOFRADO
DE VIGAS
92 ACERO DE  23 20 días mié 01/12/21 jue 23/12/21 0 días 88CC
REFUERZO 
f'y=4,200 
93 LOSAS DE  21 días mié 01/12/21 vie 24/12/21 0 días
CONCRETO
94 CONCRETO f'c=  23 20 días jue 02/12/21 vie 24/12/21 0 días 95CC+1 día
210 kg/cm2 
PARA LOSAS DE 
95 ENCOFRADO Y  23 20 días mié 01/12/21 jue 23/12/21 0 días 92CC
DESENCOFRADO
DE LOSAS DE 
CONCRETOAS
96 ACERO DE  23 20 días mié 01/12/21 jue 23/12/21 0 días 92CC
REFUERZO 
f'y=4,200 
kg/cm2 EN 
97 PLANCHA DE  23 20 días jue 02/12/21 vie 24/12/21 0 días 95CC+1 día
TECNOPORT DE 
2.4X0.30X0.15M
PARA TECHO
98 PRUEBAS DE  133 días vie 23/07/21 vie 24/12/21 0 días
CONTROL DE 
99 PRUEBA DE  12 11 días lun 13/12/21 vie 24/12/21 0 días 86CC+7 días
ROTURA A LA 
COMPRESION DEL 
100 ENSAYO DE  2 2 días vie 19/11/21 sáb 20/11/21 0 días 67
CAPACIDAD 
PORTANTE DEL 
101 DISEÑO DE  4 3 días vie 23/07/21 lun 26/07/21 0 días 4
MEZCLAS DE 
102 ARQUITECTURA 136 días vie 27/08/21 mié 02/02/22 0 días

103 NICHOS 136 días vie 27/08/21 mié 02/02/22 0 días

104 MUROS Y  130 días mié 01/09/21 lun 31/01/22 0 días


TABIQUES DE 
105 Ñ
MURO DE  153 130 días mié 01/09/21 lun 31/01/22 0 días 42CC+15 días
LADRILLO KING 
KONG DE 
ARCILLA DE 
09X13X24cm 
106 MURO DE  153 130 días mié 01/09/21 lun 31/01/22 0 días 105CC
LADRILLO KING 
KONG DE 
ARCILLA DE 
09X13X24cm 
107 REVOQUES Y  120 días lun 13/09/21 lun 31/01/22 0 días
REVESTIMIENTOS
108 TARRAJEO  141 120 días lun 13/09/21 lun 31/01/22 2 días 105CC+10 días
MUROS 
109 TARRAJEO  141 120 días lun 13/09/21 lun 31/01/22 2 días 106CC+10 días
MUROS 
110 BRUÑAS DE 1 X  141 120 días lun 13/09/21 lun 31/01/22 0 días 108CC;109CC
1 cm
111 CIELO RASOS 120 días mar 14/09/21 mar 01/02/22 0 días

112 CIELORASO CON 141 120 días mar 14/09/21 mar 01/02/22 0 días 52CC+15 días


TARRAJEO DE 
CEMENTO 
SOBRE LOSA 
MEZCLA C:A 1:4 
113 PISOS Y  111 días vie 24/09/21 mar 01/02/22 0 días
PAVIMENTOS
114 CONTRAPISO DE 131 111 días vie 24/09/21 mar 01/02/22 0 días 105CC+20 días
2"
115 PISO DE  131 111 días vie 24/09/21 mar 01/02/22 0 días 114CC
CEMENTO 
PULIDO Y 
116 COBERTURAS 120 días vie 27/08/21 vie 14/01/22 0 días

117 COBERTURA  141 120 días vie 27/08/21 vie 14/01/22 0 días 52CC


CON LADRILLO 
PASTELLERO DE 
24cm X 24cm X 
118 PINTURAS 17 días vie 14/01/22 mié 02/02/22 0 días

119 PINTURA LATEX  20 17 días vie 14/01/22 mié 02/02/22 0 días 108FF;109FF


EN MUROS 
120 VIDRIOS,  120 días mié 01/09/21 mié 19/01/22 0 días
CRISTALES Y 
121 BLOCK DE  141 120 días mié 01/09/21 mié 19/01/22 0 días 105CC
VIDRIO
122 SERVICIOS  11 días jue 20/01/22 mar 01/02/22 0 días
HIGIENICOS
123 MUROS Y  10 días jue 20/01/22 lun 31/01/22 0 días
TABIQUES
124 MURO DE  12 10 días jue 20/01/22 lun 31/01/22 0 días 42FC+5 días
LADRILLO KING 
KONG DE 
ARCILLA DE 
09X13X24cm 
125 REVOQUES Y  9 días sáb 22/01/22 mar 01/02/22 0 días
REVESTIMIENTOS
126 TARRAJEO  11 9 días sáb 22/01/22 mar 01/02/22 0 días 124CC+2 días
MUROS 
127 TARRAJEO  11 9 días sáb 22/01/22 mar 01/02/22 0 días 126CC
MUROS 
128 CIELO RASOS 9 días sáb 22/01/22 mar 01/02/22 0 días

129 CIELORASO CON 11 9 días sáb 22/01/22 mar 01/02/22 0 días 127CC


TARRAJEO DE 
CEMENTO 
SOBRE LOSA 
MEZCLA C:A 1:4 
130 PISOS Y  9 días sáb 22/01/22 mar 01/02/22 0 días
PAVIMENTOS
131 CONTRAPISO DE 7 6 días sáb 22/01/22 vie 28/01/22 0 días 129CC
2"
132 PISO CERAMICO  4 3 días sáb 29/01/22 mar 01/02/22 0 días 131
ANTIDESLIZANTE
0.60 X 0.60 m.
133 ZOCALOS Y  9 días sáb 22/01/22 mar 01/02/22 0 días
CONTRAZOCALOS
134 CONTRAZOCALO 11 9 días sáb 22/01/22 mar 01/02/22 0 días 131CC
DE CERAMICO 
H= 0.10 m
135 CARPINTERIA DE  9 días sáb 22/01/22 mar 01/02/22 0 días
MADERA
136 PUERTA  11 9 días sáb 22/01/22 mar 01/02/22 0 días 134CC
CONTRAPLACADA
CON MARCO DE 
ALUMINIO Y 
PLANCHA DE 
MELAMINA DE 
5mm INCL. 
SOBRE LUZ, 
VIDRIO 
137 PINTURAS 9 días sáb 22/01/22 mar 01/02/22 0 días

138 PINTURA LATEX  11 9 días sáb 22/01/22 mar 01/02/22 0 días 136CC


EN MUROS 
139 OTROS 32 días vie 24/12/21 lun 31/01/22 0 días

140 BARANDA  39 32 días vie 24/12/21 lun 31/01/22 0 días 94


METALICA SEGUN 
141 Ñ
ESCALERA  25 20 días vie 24/12/21 lun 17/01/22 0 días 140CC
METALICA
142 ESPEJO 4 3 días vie 14/01/22 lun 17/01/22 0 días 119CC

143 Bancas 4 3 días vie 14/01/22 lun 17/01/22 0 días 142CC

144 INSTALACIONES  68 días lun 15/11/21 mié 02/02/22 0 días


SANITARIAS
145 APARATOS  2 días mar 01/02/22 mié 02/02/22 0 días
SANITARIOS Y 
146 SUMINISTRO DE  2 días mar 01/02/22 mié 02/02/22 0 días
APARATOS 
SANITARIOS
147 INODORO DE  2 2 días mar 01/02/22 mié 02/02/22 0 días 160CC
LOSA TANQUE 
148 LAVATORIO DE  2 2 días mar 01/02/22 mié 02/02/22 0 días 147CC
LOSA
149 URINARIO DE  2 2 días mar 01/02/22 mié 02/02/22 0 días 148CC
LOSA

Proyecto: CONSTRUCCION_DE_ Tarea División Hito Resumen Resumen del proyecto Tarea inactiva Hito inactivo Resumen inactivo Tarea manual solo duración Informe de resumen manual Resumen manual solo el comienzo solo fin Tareas externas Hito externo Fecha límite Tareas críticas División crítica Progreso Progreso manual
Fecha: lun 19/07/21

Página 1
PROGRAMACIÓN DE EJECUCIÓN DE OBRA (CPM)
Id ModoNombre de tarea Dias Duración Comienzo Fin Margen de demora Predecesoras
de Calendarios total 11 jul '21 18 jul '21 25 jul '21 01 ago '21 08 ago '21 15 ago '21 22 ago '21 29 ago '21 05 sep '21 12 sep '21 19 sep '21 26 sep '21 03 oct '21 10 oct '21 17 oct '21 24 oct '21 31 oct '21 07 nov '21 14 nov '21 21 nov '21 28 nov '21 05 dic '21 12 dic '21 19 dic '21 26 dic '21 02 ene '22 09 ene '22 16 ene '22 23 ene '22 30 ene '22
tarea M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J
150 LAVATORIO  2 2 días mar 01/02/22 mié 02/02/22 0 días 149CC
CORRIDO DE 
CONCRETO
151 SUMINISTRO DE  2 días mar 01/02/22 mié 02/02/22 0 días
ACCESORIOS
152 GRIFOS 1 1 día mar 01/02/22 mar 01/02/22 0 días 150CC

153 PAPELERA LOSA  1 1 día mié 02/02/22 mié 02/02/22 0 días 152


BLANCO
154 INSTALACION DE  2 días mar 01/02/22 mié 02/02/22 0 días
APARATOS 
SANITARIOS
155 COLOCACION DE 2 2 días mar 01/02/22 mié 02/02/22 0 días 147CC
APARATOS 
SANITARIOS
156 INSTALACION DE  2 días mar 01/02/22 mié 02/02/22 0 días
ACCESORIOS
157 COLOCACION DE 2 2 días mar 01/02/22 mié 02/02/22 0 días 155CC
ACCESORIOS 
SANITARIOS
158 SISTEMA DE AGUA  68 días lun 15/11/21 mié 02/02/22 0 días
FRIA
159 SALIDA DE AGUA  2 días mar 01/02/22 mié 02/02/22 0 días
FRIA
160 SALIDA DE  2 2 días mar 01/02/22 mié 02/02/22 0 días 106
AGUA FRIA 
TUBERIA PVC 
161 REDES DE  67 días lun 15/11/21 mar 01/02/22 0 días
DISTRIBUCION
162 TRAZO Y  6 6 días lun 15/11/21 sáb 20/11/21 0 días 14
REPLANTEO
163 EXCAVACION  20 18 días lun 22/11/21 sáb 11/12/21 0 días 162
MANUAL DE 
164 REFINE,  22 18 días lun 13/12/21 lun 03/01/22 0 días 163
NIVELACION Y 
COMPACTACION
165 CAMA DE  21 18 días mar 04/01/22 lun 24/01/22 0 días 164
APOYO PARA 
TUBERIA CON 
MISMO MAT. 
166 RELLENO Y  15 13 días mar 18/01/22 mar 01/02/22 0 días 168
COMPACTACION
CDE ZANJA
167 TUBERIA PVC  7 6 días mar 04/01/22 lun 10/01/22 0 días 165CC
SAP DE 1/2" 
168 TUBERIA PVC  7 6 días mar 11/01/22 lun 17/01/22 0 días 167
SAP DE 3/4" 
169 ACCESORIOS DE  24 días mar 04/01/22 lun 31/01/22 0 días
REDES DE AGUA
170 CODO DE 90°  7 6 días mar 04/01/22 lun 10/01/22 0 días 167CC
PVC SAP 3/4"
171 CODO DE 90°  7 6 días mar 11/01/22 lun 17/01/22 0 días 170
PVC SAP 1/2"
172 TEE PVC SAP  4 4 días mar 18/01/22 vie 21/01/22 0 días 171
3/4"
173 REDUCCION PVC 5 4 días sáb 22/01/22 mié 26/01/22 0 días 172
SAP DE 3/4" 
174 TAPONES PVC  5 4 días jue 27/01/22 lun 31/01/22 0 días 173
1/2"
175 VALVULAS 18 días mar 04/01/22 lun 24/01/22 0 días

176 VALVULA  7 6 días mar 04/01/22 lun 10/01/22 0 días 170CC


COMPUERTA DE
1/2"
177 VALVULA  7 6 días mar 11/01/22 lun 17/01/22 0 días 176
COMPUERTA DE
3/4"
178 CAJA DE  7 6 días mar 18/01/22 lun 24/01/22 0 días 177
VALVULA DE 
179 PRUEBA  6 días vie 17/12/21 jue 23/12/21 0 días
HIDRAULICA DE 
180 PRUEBA  7 6 días vie 17/12/21 jue 23/12/21 0 días
HIDRAULICA + 
DESINFECCION, 
SISTEMA DE 
181 DESAGÜE Y  7 días mar 25/01/22 mar 01/02/22 0 días
VENTILACION
182 SALIDA DE  7 días mar 25/01/22 mar 01/02/22 0 días
DESAGÜE
183 SALIDA DE  3 3 días mar 25/01/22 jue 27/01/22 0 días 165
DESAGÜE CON 
TUBERIA PVC 
184 SALIDA DE  5 4 días vie 28/01/22 mar 01/02/22 0 días 183
DESAGÜE CON 
TUBERIA PVC 
185 REDES COLECTORAS 64 días lun 15/11/21 vie 28/01/22 0 días

186 TRAZO Y  3 3 días lun 15/11/21 mié 17/11/21 0 días 162CC


REPLANTEO
187 EXCAVACION  29 25 días lun 15/11/21 lun 13/12/21 0 días 186CC
MANUAL DE 
188 REFINE,  29 25 días lun 15/11/21 lun 13/12/21 0 días 187CC
NIVELACION Y 
189 CAMA DE APOYO  29 25 días mar 16/11/21 mar 14/12/21 6 días 188CC+1 día
PARA TUBERIA 
CON MISMO MAT. 
190 RELLENO Y  7 6 días mar 11/01/22 lun 17/01/22 0 días 192
COMPACTACION 
CDE ZANJA
191 RED COLECTORA  9 7 días mié 22/12/21 jue 30/12/21 0 días 189
PARA DESAGÜE 
TUBERIA PVC SAL 
192 RED COLECTORA  11 9 días vie 31/12/21 lun 10/01/22 0 días 191
PARA DESAGÜE 
TUBERIA PVC SAL 
193 ACCESORIOS DE  25 días vie 31/12/21 vie 28/01/22 0 días
REDES 
194 SUMIDERO DE  8 7 días vie 31/12/21 vie 07/01/22 0 días 191
BRONCE 
ROSCADO 2"
195 REGISTRO DE  7 6 días sáb 08/01/22 vie 14/01/22 0 días 194
BRONCE 4"
196 CODO DE 45°  7 6 días sáb 15/01/22 vie 21/01/22 0 días 195
PVC SAL 2"X2
197 YEE PVC SAL DE  7 6 días sáb 22/01/22 vie 28/01/22 0 días 196
4”X4“
198 CAMARAS DE  7 días mié 22/12/21 jue 30/12/21 0 días
INSPECCION
199 CAJA DE  9 7 días mié 22/12/21 jue 30/12/21 0 días 191CC
REGISTRO DE 
DESAGÜE 
200 VENTILACION 13 días vie 31/12/21 vie 14/01/22 0 días

201 SALIDA DE  8 7 días vie 31/12/21 vie 07/01/22 0 días 191


VENTILACION 
CON TUBERIA 
PVC SAL DE 2"
202 TUBERIA PVC  7 6 días sáb 08/01/22 vie 14/01/22 0 días 201
SAL DE 
203 PRUEBA  8 días sáb 08/01/22 lun 17/01/22 0 días
HIDRAULICA DE 
204 Ü
PRUEBA  10 8 días sáb 08/01/22 lun 17/01/22 0 días 201
HIDRAULICA DE 
DESAGÜE
205 CONEXIÓN A LA  8 días mar 11/01/22 mié 19/01/22 0 días
RED A EXTERIOR
206 CONEXIÓN DEL  9 8 días mar 11/01/22 mié 19/01/22 0 días 192
SISTEMA DE 
DESAGÜE A RED 
EXTERIOR
207 SISTEMA DE  55 días lun 29/11/21 mar 01/02/22 0 días
DRENAJE PLUVIAL
208 TRAZO Y  5 5 días lun 29/11/21 vie 03/12/21 0 días 287CC
REPLANTEO
209 EXCAVACION  59 50 días mié 01/12/21 vie 28/01/22 0 días 208CC+2 días
MANUAL DE 
210 REFINE,  59 50 días mié 01/12/21 vie 28/01/22 0 días 209CC
NIVELACION Y 
211 CAMA DE APOYO  60 50 días vie 03/12/21 lun 31/01/22 0 días 210CC+2 días
PARA TUBERIA 
CON MISMO MAT. 
212 RELLENO Y  57 48 días mar 07/12/21 mar 01/02/22 0 días 213CC
COMPACTACION 
CDE ZANJA
213 RED COLECTORA  57 48 días mar 07/12/21 mar 01/02/22 0 días 211CC+3 días
PARA DESAGÜE 
TUBERIA PVC SAL 
214 MONTANTE DE  57 48 días mar 07/12/21 mar 01/02/22 0 días 213CC
TUBERIA PVC SAL 
215 CAJA DE REGISTRO  36 30 días lun 13/12/21 lun 17/01/22 0 días 214CC+5 días
DE AGUAS 
PLUVIALES 
216 CANAL DE AGUAS  21 días vie 10/12/21 mar 04/01/22 0 días
PLUVIALES
217 TRAZO Y REPLANTEO  2 2 días vie 10/12/21 sáb 11/12/21 0 días 286FC+10 días
DURANTE EL 
PROCESO DE 
218 EXCAVACION  7 6 días vie 10/12/21 jue 16/12/21 0 días 217CC
MANUAL DE ZANJAS
219 NIVELACION  7 6 días sáb 11/12/21 vie 17/12/21 0 días 218CC+1 día
INTERIOR Y 
220 ENCOFRADO Y  9 8 días lun 13/12/21 mar 21/12/21 0 días 219CC+1 día
DESENCOFRADO DE 
MURETES
221 CONCRETO f'c=175  7 6 días mié 15/12/21 mar 21/12/21 0 días 220CC+2 días
kg/cm2
222 TARRAJEO  6 5 días jue 16/12/21 mar 21/12/21 0 días 221CC+1 día
IMPERMEABILIZADO
223 CURADO CON AGUA 7 6 días jue 16/12/21 mié 22/12/21 0 días 221CC+1 día;222CC

224 REJILLA METALICA  13 10 días jue 23/12/21 mar 04/01/22 0 días 223


PARA CANALETAS 
225 INSTALACIONES  50 días lun 15/11/21 mié 12/01/22 0 días
ELECTRICAS
226 OBRAS  25 días lun 15/11/21 lun 13/12/21 0 días
PRELIMINARES Y 
MOVIMIENTO DE 
227 TRAZO Y  3 3 días lun 15/11/21 mié 17/11/21 0 días 14
REPLANTEO
228 EXCAVACION  26 22 días jue 18/11/21 lun 13/12/21 0 días 227
MANUAL DE 
229 RELLENO Y  13 11 días jue 25/11/21 mar 07/12/21 0 días 236CC+2 días
COMPACTACION 
CDE ZANJA
230 SALIDA DE  6 días sáb 18/12/21 vie 24/12/21 0 días
ALUMBRADO E 
231 SALIDA DE CENTRO 4 3 días sáb 18/12/21 mar 21/12/21 0 días 236
DE LUZ EN TECHO
232 SALIDA PARA  3 3 días mié 22/12/21 vie 24/12/21 0 días 231
INTERRUPTOR 
233 CANALIZACIONES,  26 días jue 18/11/21 vie 17/12/21 0 días
CONDUCTOS O 
TUBERIAS
234 TUBERIA PVC‐SAP  26 22 días jue 18/11/21 lun 13/12/21 0 días 228CC
ELECTRICA DE 35 
235 TUBERIA PVC‐SAP  26 22 días sáb 20/11/21 mié 15/12/21 0 días 234CC+2 días
ELECTRICA DE 30 
236 TUBERIA PVC‐SAP  25 22 días mar 23/11/21 vie 17/12/21 0 días 235CC+2 días
ELECTRICA DE 20 
237 DISPOSITIVOS TOM  2 días vie 24/12/21 lun 27/12/21 0 días
ACORRI ENTES, 
INTERRUPTORES, 
VARIOS
238 INTERRUPTOR  4 2 días vie 24/12/21 lun 27/12/21 0 días 232
UNIPOLAR SIMPLE
239 CAJAS DE PASO,  22 días vie 26/11/21 mar 21/12/21 0 días
BUZONES
240 BUZON ELECTRICO  26 22 días vie 26/11/21 mar 21/12/21 0 días 229CC+1 día
SEGUN DETALLE
241 MONTAJE DE  3 días lun 13/12/21 mié 15/12/21 0 días
TABLEROS
242 TABLERO DE  3 3 días lun 13/12/21 mié 15/12/21 0 días 247
DISTRIBUCION 
GENERAL
243 CONDUCTORES  14 días vie 26/11/21 sáb 11/12/21 0 días
ALIMENTADORES
244 CABLES 2‐1X10  13 11 días vie 26/11/21 mié 08/12/21 0 días 236CC+3 días
2XNH +1x10 mm2 
245 CABLES 2‐1X6  13 11 días sáb 27/11/21 jue 09/12/21 0 días 244CC+1 día
2XNH + 1x6 mm2 
246 CABLES 1‐1X6  12 11 días lun 29/11/21 vie 10/12/21 0 días 245CC+1 día
2XNH + 1x2.5 mm2
247 CONDUCTOR DE  12 11 días mar 30/11/21 sáb 11/12/21 0 días 246CC+1 día
Cu RECOCIDO, 
TIPO N2XY, 
BIPOLAR, 2x10 
mm2, CUBIERTA 
248 MONTAJE DE  16 días lun 13/12/21 vie 31/12/21 0 días
LUMINARIAS
249 LUMINARIA SPOT  2 2 días lun 13/12/21 mar 14/12/21 27 días 247
2X26 W ADOSABLE
CON EQ. 
250 LAMPARA TIPO  17 14 días mié 15/12/21 vie 31/12/21 27 días 249
SIMON VIENA HID
251 LAMPARA LED  16 13 días mié 15/12/21 jue 30/12/21 0 días 250CC
CIRCULAR TIPO 
252 SISTEMA DE PUESTA  26 días lun 13/12/21 mié 12/01/22 0 días
A TIERRA, 
INSTALACIONES 
253 EXCAVACION DE  4 4 días lun 13/12/21 jue 16/12/21 0 días 247
HOYO PARA 
PUESTA A TIERRA
254 POZO A TIERRA 2 2 días vie 17/12/21 sáb 18/12/21 0 días 253

255 POSTE DE FIERRO  24 20 días lun 20/12/21 mié 12/01/22 0 días 254


GALVANIZADO 3 
CUERPOS 8 m
256 PRUEBAS  4 días lun 20/12/21 jue 23/12/21 0 días
ELECTRICAS
257 PRUEBAS  4 4 días lun 20/12/21 jue 23/12/21 0 días 254
ELECTRICAS
258 OBRAS EXTERIORES 62 días sáb 20/11/21 mar 01/02/22 0 días

259 SARDINELES DE  60 días mar 23/11/21 mar 01/02/22 0 días


CONCRETO H = 
260 TRAZO Y  10 9 días mar 23/11/21 jue 02/12/21 0 días 286CC+2 días
REPLANTEO INICAL
261 CORTE  13 11 días vie 03/12/21 mié 15/12/21 0 días 260
SUPERFICIAL 
262 COMPACTADO Y  13 10 días jue 16/12/21 mar 28/12/21 0 días 261
AFIRMADO
263 CONCRETO f'c=175 13 11 días mié 12/01/22 lun 24/01/22 0 días 265
kg/cm2 PARA 
SARDINELES
264 SELLADO DE  8 7 días mar 25/01/22 mar 01/02/22 0 días 263
JUNTA E=1/2" EN 
265 ENCOFRADO Y  14 12 días mié 29/12/21 mar 11/01/22 0 días 262
DESENCOFRADO
266 GRADERIAS  47 días lun 06/12/21 sáb 29/01/22 0 días
EXTERIORES DE 
267 TRAZO Y  3 3 días lun 06/12/21 mié 08/12/21 0 días 260FC+2 días
REPLANTEO INICAL
268 CORTE  23 19 días vie 10/12/21 sáb 01/01/22 0 días 267FC+1 día
SUPERFICIAL 
269 COMPACTADO Y  20 16 días sáb 11/12/21 jue 30/12/21 2 días 268CC+1 día
AFIRMADO
270 EMPEDRADO  19 16 días vie 31/12/21 mar 18/01/22 2 días 269
E=0.15CM
271 CONCRETO f'c=175 11 10 días mié 19/01/22 sáb 29/01/22 2 días 270;272
kg/cm2 PARA 
272 ENCOFRADO Y  19 16 días vie 31/12/21 mar 18/01/22 2 días 270CC
DESENCOFRADO
273 RAMPAS 26 días sáb 01/01/22 lun 31/01/22 0 días

274 TRAZO Y  3 2 días sáb 01/01/22 lun 03/01/22 0 días 268


REPLANTEO INICAL
275 CORTE  10 9 días mar 04/01/22 jue 13/01/22 0 días 274
SUPERFICIAL 
276 COMPACTADO Y  10 9 días mié 05/01/22 vie 14/01/22 0 días 275CC+1 día
AFIRMADO
277 EMPEDRADO  10 9 días jue 06/01/22 sáb 15/01/22 0 días 276CC+1 día
E=0.15CM
278 CONCRETO f'c=175 7 6 días sáb 22/01/22 vie 28/01/22 1 día 279;277
kg/cm2 (ACABADO
FROTACHADO)
279 ENCOFRADO Y  7 6 días sáb 15/01/22 vie 21/01/22 1 día 277
DESENCOFRADO
280 SELLO CON  3 2 días sáb 29/01/22 lun 31/01/22 1 día 278
MEZCLA 
281 AREAS VERDES 27 días sáb 01/01/22 mar 01/02/22 0 días

282 TRAZO Y  18 15 días sáb 01/01/22 mar 18/01/22 0 días 268


REPLANTEO INICAL
283 PREPARACION DE  11 10 días mié 19/01/22 sáb 29/01/22 0 días 282
TIERRA 
AGRICOLA‐TIERRA 
NEGRA
284 SEMBRADO DE  2 2 días lun 31/01/22 mar 01/02/22 0 días 283
GRASS
285 VEREDAS 61 días sáb 20/11/21 lun 31/01/22 0 días

286 TRAZO Y  8 7 días sáb 20/11/21 sáb 27/11/21 0 días 14FC+5 días


REPLANTEO INICAL
287 CORTE  48 41 días lun 29/11/21 sáb 15/01/22 0 días 286
SUPERFICIAL 
288 COMPACTADO Y  48 41 días lun 29/11/21 sáb 15/01/22 0 días 287CC
AFIRMADO
289 EMPEDRADO  49 41 días mar 30/11/21 lun 17/01/22 0 días 288CC+1 día
E=0.15CM
290 CONCRETO f'c=175 48 41 días lun 06/12/21 sáb 22/01/22 1 día 291CC+3 días
kg/cm2 PARA 
291 ENCOFRADO Y  49 41 días jue 02/12/21 mié 19/01/22 0 días 289CC+2 días
DESENCOFRADO
292 SELLO CON  8 7 días lun 24/01/22 lun 31/01/22 1 día 290
MEZCLA 
293 MUROS DE  24 días sáb 01/01/22 vie 28/01/22 0 días
CONTENCION
294 TRAZO, NIVELES Y  3 2 días sáb 01/01/22 lun 03/01/22 0 días 268
REPLANTEO
295 EXCAVACION  12 11 días mar 04/01/22 sáb 15/01/22 0 días 294
MANUAL
296 PERFILADO Y  14 12 días mié 05/01/22 mar 18/01/22 0 días 295CC+1 día
COMPACTADO 
SUPERFICIE DE ZANJA
297 SOLADO e=3" 14 12 días jue 06/01/22 mié 19/01/22 0 días 296CC+1 día

298 ENCOFRADO Y  14 12 días vie 07/01/22 jue 20/01/22 0 días 297CC+1 día


DESENCOFRADO
299 CONCRETO CICLOPEO 14 12 días sáb 08/01/22 vie 21/01/22 0 días 298CC+1 día
PARA 
CIMENTACIONES 
300 DRENES DE PVC Ø  14 12 días sáb 08/01/22 vie 21/01/22 0 días 299CC
=3" PARA MUROS
301 RELLENO  7 6 días sáb 22/01/22 vie 28/01/22 0 días 300
COMPACTADO CON 
302 IMPACTO AMBIENTAL 179 días jue 08/07/21 mié 02/02/22 0 días

303 PLAN DE MANEJO  178 días jue 08/07/21 mar 01/02/22 0 días


AMBIENTAL
304 MANEJO DE  209 178 días jue 08/07/21 mar 01/02/22 0 días 4CC
RESIDUOS 
305 LONAS PARA  209 178 días jue 08/07/21 mar 01/02/22 0 días 304CC
COBERTURA DE 
AGREGADOS
306 MONITOREO  168 143 días mié 18/08/21 mar 01/02/22 0 días 305CC+35 días
AMBIENTAL
307 MANEJO DE  209 178 días jue 08/07/21 mar 01/02/22 0 días 305CC
RESIDUOS 
308 RECICLAJEDE  209 178 días jue 08/07/21 mar 01/02/22 0 días 304CC
RESIDUOS 
SOLIDOS EN LA 
ETAPA DE 
309 SEÑALIZACION  209 178 días jue 08/07/21 mar 01/02/22 0 días 308CC
AMBIETAL PARA 
LA ETAPA DE LA 
OPERACION
310 PLAN DE CIERRE 1 día mié 02/02/22 mié 02/02/22 0 días

311 DESMONT/UE DE  1 1 día mié 02/02/22 mié 02/02/22 0 días 309


INSTALACIONES 
PROVICIONALES
312 LIMPIEZA FINAL DE 1 1 día mié 02/02/22 mié 02/02/22 0 días 311FF;119;184;212;250;264;271;278;280;284;292
OBRA
313 FIN DE OBRA 1 1 día mié 02/02/22 mié 02/02/22 0 días 312FF FIN DE OBRA
02/02

Proyecto: CONSTRUCCION_DE_ Tarea División Hito Resumen Resumen del proyecto Tarea inactiva Hito inactivo Resumen inactivo Tarea manual solo duración Informe de resumen manual Resumen manual solo el comienzo solo fin Tareas externas Hito externo Fecha límite Tareas críticas División crítica Progreso Progreso manual
Fecha: lun 19/07/21

Página 2

También podría gustarte