Está en la página 1de 48

DESARROLLO (Jumbo)

80
REAL PROGRAMA
Día DIARIO ACUMULADO DIARIO

Mart 1 0.0 0.0 2.6

Mie 2 0.0 0.0 2.6

Jue 3 0.0 0.0 2.6

Vie 4 0.0 0.0 2.6

Sab 5 0.0 0.0 2.6

Dom 6 0.0 0.0 2.6

Lun 7 4.5 4.5 2.6

Mart 8 0.0 4.5 2.6

Mie 9 3.7 8.2 2.6

Jue 10 0.0 8.2 2.6

Vie 11 7.8 16.0 2.6

Sab 12 0.0 16.0 2.6

Dom 13 10.6 26.6 2.6

Lun 14 0.0 26.6 2.6

Mart 15 0.0 26.6 2.6

Mie 16 0.0 26.6 2.6

Jue 17 0.0 26.6 2.6

Vie 18 7.6 34.2 2.6

Sab 19 0.0 34.2 2.6


Dom 20 11.2 45.4 2.6

Lun 21 0.0 45.4 2.6

Mart 22 17.0 62.4 2.6

Mie 23 0.0 62.4 2.6

Jue 24 0.0 62.4 2.6

Vie 25 13.4 75.8 2.6

Sab 26 3.8 79.6 2.6

Dom 27 3.8 83.4 2.6

Lun 28 0.0 83.4 2.6

Mart 29 83.4 2.6

Mie 30 83.4 2.6

Jue 31 83.4 2.6


PERFORACION PRODUCC

PROGRAMA DIARIO
ACUMULADO S7D CUBEX DL311

2.6 3 62

5.2 26

7.7 165

10.3 36

12.9 124 13

15.5 267

18.1 236

20.6 260

23.2 77

25.8 89

28.4 184

31.0 273

33.5 265 130

36.1 320 41

38.7 215 104

41.3 65 0

43.9 80 132

46.5 195.1 72.0

49.0 296.1 87.1


51.6 220.6

54.2 158

56.8 264

59.4 26

61.9 15

64.5

67.1

69.7 28

72.3

74.8

77.4

80.0
PERFORACION PRODUCCION (Simba)
6,596
DIARIO ACUMULADO
1254 REAL PROGRAMA REAL PROGRAMA

65 213 65 213

26 213 91 426

165 213 256 638

36 213 291 851

137 213 428 1,064

267 213 696 1,277

236 213 931 1,489

260 213 1,191 1,702

77 213 1,268 1,915

89 213 1,357 2,128

184 213 1,541 2,341

273 213 1,814 2,553

395 213 2,209 2,766

361 213 2,570 2,979

319 213 2,889 3,192

65 213 2,954 3,404

212 213 3,166 3,617

267 213 3,433 3,830

383 213 3,816 4,043


221 213 4,037 4,255

158 213 4,194 4,468

264 213 4,458 4,681

26 213 4,484 4,894

15 213 4,499 5,107

65 65 213 4,564 5,319

122 122 213 4,686 5,532

59 87 213 4,773 5,745

0 213 4,773 5,958

0 213 4,773 6,170

0 213 4,773 6,383

0 213 4,773 6,596


ABASTECIMIENTO

REAL RENDIMIE
DIARIO CUT (%) 440 REAL ACUM MxCuT MxCuT Acum

0 0.00

0 0.00
390
1,358 0.80 1,358 1,087 1,087

2,303 0.80 3,662 1,843 2,929

2,297 0.76
340 5,959 1,743 4,673

0 0.00 5,959 0 4,673

0 0.00 290 5,959 0 4,673


267
Rend. (Mt/Día)

0 0.00 5,959 0 4,673


236
0 0.00 240 5,959 0 4,673

1,696 0.80 7,655 1,357 6,029

2,072 0.77 9,727 1,606 7,635


190
3,113 0.80 12,840 1652,504 RENDIMI
10,138

0 0.00 12,840 0 137


10,138

0 0.00
140
7,000
12,840 0 10,138

3,301 0.77 16,141 2,533 12,672


90
6,000
1,460 0.72
65 17,601 1,055 13,727

0 0.00 17,601 0 13,727


36
0 0.00 40
5,000 26
17,601 0 13,727

365 0.78 17,967 286 14,012


Mt/Día)

-101
4,000 2 3 4 5 6 7
36
5,000 26
40

Rend. (Mt/Día)
0 0.00 17,967 0 14,012
-101
4,000 2 3 4 5 6 7
0 0.00 17,967 0 14,012

3,599 0.77 21,565 2,773 16,786

2,358 0.73 3,000


23,923 1,723 18,509

23,923 0 18,509

2,000
23,923 0 18,509

23,923 0 18,509

1,000
23,923 0 18,509
DESA
23,923 0 18,509

9023,923
0
0 18,509

1
23,923 2 30 4 5 6 7
8023,923 0

70

60
AVANCE (Metros)

50

40

30

20
ABASTECIMIENTO

NDIMIENTO DIARIO PERFORACION


CuT (%) Aum DIARIO CuT (%)
PROGRAMA
ACUMULADO

0
395
0.80 1,842 0.80 1,842 361
0.80 1,842 0.80 3,684

0.78 1,842 0.80 5,526 319


0.78 5,526

267 0.78 2735,526


0.78
260 5,526
236
0.78 5,526

0.79 1,842 0.80 7,368


21
0.78 1,842 0.80184 9,210

RENDIMIENTO
0.79 1,842 ACUMULADO
0.80 11,052 PERFORACION

7 0.79 11,052

0.79 11,052

0.79 1,842 890.80 12,894


77
0.78 1,842 0.80 14,736
65
0.78 1,842 0.80 16,578

0.78 1,842 0.80 18,420

0.78 1,842 0.80 20,262

6 7 8 9 10 11 12 13 14 15 16 17
0.78 20,262
6 7 8 9 10 11 12 13 14 15 16 17
0.78 1,842 0.80 22,104

0.78 1,842 0.80


REAL DIARIO23,946 PROGRAMA DIA
0.77 1,842 0.80 25,788

0.77 1,842 0.80 27,630

0.77 27,630

0.77 27,630

DESARROLLO
0.77
ACUMULADO
27,630
- REAL V/S P
0.77 1,842 0.80 29,472

0.77 1,842 0.80 31,314

5 6 7 8 9
1,842 100.8011 12 33,156
13 14 15 16 17
1,844 0.80
REAL PROGRAMA
REAL DIARIO PROGRAMA DIARIO

ERFORACION PRODUCCIÓN
CUMPLIMIENTO

0% 4,
395 0% 383
361 74%
3,
99%

319
108%

108% 3,
108%
267 264
108%
2,

Masa (Tonelaje)
108%
221
104%
212
106%
2,
O PERFORACION
116% PRODUCCIÓN
158
116% 1,
116%
30
125%
1,
119%
65
106%
25
96% 26
15
89% 20
onelaje)

13 14 15 16 17 18 19 20 21 22 23 24
15
26
15
20

Masa (Tonelaje)
89%
13 14 15 16 17 18 19 20 21 22 23 24
81%
15
90%
PROGRAMA DIARIO
93%

87% 10
87%

87%
5
ADO - REAL
87%
V/S PROGRAMA
81%

76%

3 14 1572% 16 17 18 19 20 21 22 23 24 25 2
0%
PROGRAMA

PROGRAMA
REAL
13 14 15 16 17 18 19 20 21 22 23 24 2

DESARROLLO PROGRAMA
DESARROLLO REAL
DESARROLLO PROGRAMA
OGRAMA DIARIO

ABASTECIMIE
4,000

3,500

3,000 3,11

2,500
Masa (Tonelaje)

2,303 2,297 2,072


2,000

1,500
ABASTEC
122
30,000 1,358
1,000 87
5,958
65 1,696
25,000
26 500 4,773
15
20,000 0.80
onelaje)

0.80 0.80 0.8


0.76 0.77
23 24 250 26 27
1 2 3 4 5 6
15,000
26 500 4,773
15
Masa (Tonelaje) 20,000 0.80 0.80 0.80 0.8
0.76 0.77
23 24 250 26 27
1 2 3 4 5 6
15,000
ABASTACIMIENTO R
10,000

5,000 1 1 1 1 1 1 1 1

0
1
83.4 2 3 4 5 6 7 8
24 25 26 27 28
ABASTECIMIENTO
69.7 LEY REAL
23 24 25 26 27
BASTECIMIENTO - RENDIMIENTO DIARIO

3,301
3,113

2,072

ABASTECIMIENTO - ACUMULADO
1,460

96

0 0.80 365
0.77 0.77 0 0 0.78
0.72
5 6 7 8 9 10 11
0 0.80 365
0.77 0.77 0 0 0.78
0.72
5 6 7 8 9 10 11

TACIMIENTO REAL LEY PROGRAMA LEY

1 1 1 1 1 1 1 1 1 1

6 7 8 9 10 11 12 13 14 15

STECIMIENTO REAL ABASTECIMIENTO PROGR


REAL LEY PROGRAMA
TO DIARIO

1.90
3,599

1.70

1.50
2,358

CuT (%)
1.30
ULADO
1.50
1.10
27,630
1.40
23,923
0.90
1.30
365
0 0.78 0.77 1.20
0.73 0.70
(%)

10 11 12 13 14
1.10
1.30
365
0 0.78 0.77 1.20
0.73 0.70

CuT (%)
10 11 12 13 14
1.10
AMA LEY REAL
1.00

0.90
1 1 1 1 1 1 1 0.80

0.70
13 14 15 16 17 18 19

MIENTO PROGRAMA
AMA
90

70

50
CuT (%)

30

50
10

40
90
30

20
70
(%)

10
30

20
70 CuT (%)
10

00

90

80

70
LEY REAL

ABASTACIMIENTO REAL

LEY PROGRAMA
LEY PROGRAMA

LEY REAL

ABASTECIMIENTO REAL

ABASTECIMIENTO PROGRAMA
STOCKS

INTERIOR MINA P4C4A Des P2 C8 P4C3 P4C6


N790 - E1 90
N790 - E2

N790 - E3 180
TOTAL 0 180 90 0

EXTERIOR MINA P4C4A Des P2 C8 P4C3 P4C6


1050 450 360
1005
TOTAL 0 0 450 360

INTERIOR + EXTERIOR P4C4A Des P2 C8 P4C3 P4C6


INTERIOR 0 180 90 0
EXTERIOR 0 0 450 360
TOTAL 0 180 540 360

EXTRACCION (I.M -> E.M) P4C4A Des P2 C8 P4C3 P4C6


TA 90 780
TB 120 150 390
TOTAL 0 120 240 1,170
TOTAL
90 CONTROL STOCKS
0 600 600
540
180 500 500
270
400 360 400
TOTAL
810 300 300

0 180
200 200
810
100 100
TOTAL 0
270 0 0
P4C4A Des P2 C8 P4C3 P4C6
810
1,080 INTERIOR EXTERIOR TOTAL

TOTAL
870
660
1,530
KS
600
40

500

360 400

300

200

100

0
C3 P4C6

TOTAL
SCOOP N°1
Fecha: 12/27/2020

TIEMPO NOMINAL
24
TIEMPO DISPONIBLE
23.5
TIEMPO OPERATIVO
21.5
TIEMPO EFECTIVO PERDIDAS OP. DEMORAS
16 PROG 5.5 NO PROG.

SCOOP N°1

DISPONIBILIDAD 98%

UTILIZACION 67%

UTILIZACION EFECTIVA 68%

FACTOR DE UTILIZACION 74%

RESERVA 9%

PERDIDA OPERACIONAL 0%

SIMBA S7D
Fecha: 12/27/2020

TIEMPO NOMINAL
12
TIEMPO DISPONIBLE
10
TIEMPO OPERATIVO
5.0
TIEMPO EFECTIVO PERDIDAS OP. DEMORAS
2 PROG 3 NO PROG.

SIMBA S7D

DISPONIBILIDAD 83%

UTILIZACION 17%

UTILIZACION EFECTIVA 20%


FACTOR DE UTILIZACION 40%

RESERVA 50%

PERDIDA OPERACIONAL 0%
SCOOP N°2
Fecha: 12/23/2020

MINAL

FUERA DE SERVICIO (M/R)


0.5
RESERVA PROG NO PROG. 0.5 TIEMP
2
TIEMPO EFECTIVO

SCOOP N°2

DISPONIBILIDAD

UTILIZACION

UTILIZACION EFECTIVA

FACTOR DE UTILIZACION

RESERVA

PERDIDA OPERACIONAL

Simba 1254
Fecha: 12/27/2020

MINAL

FUERA DE SERVICIO (M/R)


2
RESERVA PROG NO PROG. 2 TIEMP
5
TIEMPO EFECTIVO
3

Simba 1254

DISPONIBILIDAD

UTILIZACION

UTILIZACION EFECTIVA
FACTOR DE UTILIZACION

RESERVA

PERDIDA OPERACIONAL
TIEMPO NOMINAL
24
TIEMPO DISPONIBLE FUERA DE SERVICIO
24 0
TIEMPO OPERATIVO RESERVA PROG
0 24
PERDIDAS OP. DEMORAS
PROG NO PROG.

100%

0%

0%

0%

100%

0%

TIEMPO NOMINAL
12
TIEMPO DISPONIBLE FUERA DE SERVICIO
12 0
TIEMPO OPERATIVO RESERVA PROG
8 4
PERDIDAS OP. DEMORAS
0 PROG 5 NO PROG.

100%

25%

25%
38%

33%

0%
FUERA DE SERVICIO (M/R)
0
NO PROG.

FUERA DE SERVICIO (M/R)


0
NO PROG.

También podría gustarte