CUANTIFICACION DE MATERIALES Y ELEMENTOS

ESTIMACION 4 PERIODO DE EJECUCION: PLANO:


FECHA: 17-Apr-20 17-Jul-21
CONCEPTO: ANGULOS VIGAS 1er NIVEL 2"
REALIZO: JMT HOJA: 1

N° CLAVE CONCEPTO LOCALIZACION DIMENSIONES N° TOTAL OBSERVACIONES


UNIDAD ANCHO/ESPESO
EJE TRAMO TIPO LARGO ALTO ELEMENTOS
R

A ANGULO 2"X 2" X 3/16


7 A ML 0.15 1.00 1.00 1.00 0.15
15.00
PESO ANGULO KG/ML 44.29
2” DIMENSION ANGULO ML 12.20 1.00 1.00 1.00 12.20
2 “”
KG/ML TOTAL PESO ANGULO 0.54
15.00

PESO DIMENSION
B ANGULO 4"X4" X 5/16 UNIDAD LARGO
ANGULO ANGULO
1 V-2 A (2-7) KG/ML 0.15 44.29 12.20 2.00 1.09
2 V-3 7 (A-B) KG/ML 0.15 44.29 12.20 2.00 1.09
3 V-3 7 (B-E) KG/ML 0.15 44.29 12.20 2.00 1.09
5 6
4 V-1 B (1-4) KG/ML 0.15 44.29 12.20 2.00 1.09 114
5 V-3 1 (B-E) KG/ML 0.15 44.29 12.20 2.00 1.09
1
6 V-1 1 (E-H) KG/ML 0.15 44.29 12.20 2.00 1.09 35

1 9

2
20

15
1
0 8 1 3
7 V-1 7 (E-H) KG/ML 0.15 44.29 12.20 2.00 1.09 2
2 3 7
8 V-1 B (4-7) KG/ML 0.15 44.29 12.20 2.00 1.09
9 V-3 4 (B-E) KG/ML 0.15 44.29 12.20 2.00 1.09
11 V-4 2 (A-B) KG/ML 0.15 44.29 12.20 1.00 0.54
13 V-2 E (4-7) KG/ML 0.15 44.29 12.20 2.00 1.09
14 V-2 E (1-4) KG/ML 0.15 44.29 12.20 2.00 1.09
19 V-2 H (4-7) KG/ML 0.15 44.29 12.20 2.00 1.09
20 V-3 4 (H-K) KG/ML 0.15 44.29 12.20 2.00 1.09
22 V-3 7 (H-K) KG/ML 0.15 44.29 12.20 2.00 1.09
23 V-2 K (4-7) KG/ML 0.15 44.29 12.20 2.00 1.09
24 V-2 H (1-4) KG/ML 0.15 44.29 12.20 2.00 1.09
25 V-3 1 (H-K) KG/ML 0.15 44.29 12.20 2.00 1.09
28 V-2 K (1-4) KG/ML 0.15 44.29 12.20 2.00 1.09
29 V-1 7 (K-M) KG/ML 0.15 44.29 12.20 2.00 1.09
30 V-1 1 (K-M) KG/ML 0.15 44.29 12.20 2.00 1.09
33 V-1 4 (K-M) KG/ML 0.15 44.29 12.20 1.00 0.54
35 V-2 M (1-3) KG/ML 0.15 44.29 12.20 2.00 1.09
36 V-2 M (3-7) KG/ML 0.15 44.29 12.20 2.00 1.09
37 V-3 1 (M-O) KG/ML 0.15 44.29 12.20 2.00 1.09
40 V-3 4 (M-O) KG/ML 0.15 44.29 12.20 1.00 0.54
42 V-3 7 (M-O) KG/ML 0.15 44.29 12.20 2.00 1.09
43 V-2 O (4-7) KG/ML 0.15 44.29 12.20 2.00 1.09
44 V.2 O (1-4) KG/ML 0.15 44.29 12.20 2.00 1.09

KG/ML TOTAL ANGULOS ESTA ESTIMACION 29.95


TOTAL KG/M2 TOTAL KG ESTIMACION 1 29.95
CUANTIFICACION DE MATERIALES Y ELEMENTOS

ESTIMACION 1 PERIODO DE EJECUCION: PLANO:


FECHA: 25-Feb-20 17-Jul-21
CONCEPTO: ANGULOS VIGUETA
REALIZO: JMT HOJA: 1

N° CLAVE CONCEPTO LOCALIZACION DIMENSIONES N° TOTAL OBSERVACIONES


UNIDAD ANCHO/ESPE
EJE TRAMO TIPO LARGO ALTO ELEMENTOS
SOR

1 ANGULO 2"X 2" X 3/16


7 A M2 0.15 1.00 1.00 1.00 0.15
15.00 PESO ANGULO KG/ML 44.29
2” DIMENSION ANGULO ML 12.20 1.00 1.00 1.00 12.20
2 “”
KG/ML TOTAL PESO ANGULO 0.54
15.00

PESO DIMENSION
2 ANGULO 2"X 2" X 3/16 UNIDAD LARGO
ANGULO ANGULO
1 A (2-7) KG/ML 0.15 44.29 12.20 2.00 1.09
2 7 (A-B) KG/ML 0.15 44.29 12.20 2.00 1.09
3 7 (B-E) KG/ML 0.15 44.29 12.20 2.00 1.09
4 B (1-4) KG/ML 0.15 44.29 12.20 2.00 1.09
5 6
5 1 (B-E) KG/ML 0.15 44.29 12.20 2.00 1.09
11 4
6 1 (E-H) KG/ML 0.15 44.29 12.20 2.00 1.09
7 1 7 (E-H) KG/ML 0.15 44.29 12.20 2.00 1.09
9
8 10 B (4-7) KG/ML 0.15 44.29 12.20 2.00 1.09
35
2

13
20

15

8 12
9 4 (B-E) KG/ML 0.15 44.29 12.20 2.00 1.09
2 3 7
10 4 (A-B) KG/ML 0.15 44.29 12.20 2.00 1.09
11 2 (A-B) KG/ML 0.15 44.29 12.20 2.00 1.09
12 5' (B-E) KG/ML 0.15 44.29 12.20 2.00 1.09
13 E (4-7) KG/ML 0.15 44.29 12.20 2.00 1.09

KG/ML TOTAL ANGULOS ESTA ESTIMACION 14.16


TOTAL KG/M2 TOTAL KG ESTIMACION 1 14.16
CUANTIFICACION DE MATERIALES Y ELEMENTOS

ESTIMACION 4 PERIODO DE EJECUCION: PLANO:


FECHA: 17-Apr-20 17-Jul-21
CONCEPTO: ANGULOS VIGAS PLANTA BAJA 2"
REALIZO: JMT HOJA: 1

N° CLAVE CONCEPTO LOCALIZACION DIMENSIONES N° TOTAL OBSERVACIONES


UNIDAD ANCHO/ESPESO
EJE TRAMO TIPO LARGO ALTO ELEMENTOS
R

A ANGULO 2"X 2" X 3/16


7 A ML 0.15 1.00 1.00 1.00 0.15
15.00
PESO ANGULO KG/ML 44.29
2” DIMENSION ANGULO ML 12.20 1.00 1.00 1.00 12.20
2 “”
KG/ML TOTAL PESO ANGULO 0.54
15.00

PESO DIMENSION
B ANGULO 4"X4" X 5/16 UNIDAD LARGO
ANGULO ANGULO
1 V-2 A (2-7) KG/ML 0.15 44.29 12.20 2.00 1.09
2 V-3 7 (A-B) KG/ML 0.15 44.29 12.20 2.00 1.09
3 V-3 7 (B-E) KG/ML 0.15 44.29 12.20 2.00 1.09
5 6
4 V-1 B (1-4) KG/ML 0.15 44.29 12.20 2.00 1.09 114
5 V-3 1 (B-E) KG/ML 0.15 44.29 12.20 2.00 1.09
1
6 V-1 1 (E-H) KG/ML 0.15 44.29 12.20 2.00 1.09 35

1 9

2
0
2

15
1
0 8 1 3
7 V-1 7 (E-H) KG/ML 0.15 44.29 12.20 2.00 1.09 2
2 3 7
8 V-1 B (4-7) KG/ML 0.15 44.29 12.20 2.00 1.09
9 V-3 4 (B-E) KG/ML 0.15 44.29 12.20 2.00 1.09
11 V-4 2 (A-B) KG/ML 0.15 44.29 12.20 1.00 0.54
13 V-2 E (4-7) KG/ML 0.15 44.29 12.20 2.00 1.09
14 V-2 E (1-4) KG/ML 0.15 44.29 12.20 2.00 1.09
19 V-2 H (4-7) KG/ML 0.15 44.29 12.20 2.00 1.09
20 V-3 4 (H-K) KG/ML 0.15 44.29 12.20 2.00 1.09
22 V-3 7 (H-K) KG/ML 0.15 44.29 12.20 2.00 1.09
23 V-2 K (4-7) KG/ML 0.15 44.29 12.20 2.00 1.09
24 V-2 H (1-4) KG/ML 0.15 44.29 12.20 2.00 1.09
25 V-3 1 (H-K) KG/ML 0.15 44.29 12.20 2.00 1.09
28 V-2 K (1-4) KG/ML 0.15 44.29 12.20 2.00 1.09
29 V-1 7 (K-M) KG/ML 0.15 44.29 12.20 2.00 1.09
30 V-1 1 (K-M) KG/ML 0.15 44.29 12.20 2.00 1.09
33 V-1 4 (K-M) KG/ML 0.15 44.29 12.20 1.00 0.54
35 V-2 M (1-3) KG/ML 0.15 44.29 12.20 2.00 1.09
36 V-2 M (3-7) KG/ML 0.15 44.29 12.20 2.00 1.09
37 V-3 1 (M-O) KG/ML 0.15 44.29 12.20 2.00 1.09
40 V-3 4 (M-O) KG/ML 0.15 44.29 12.20 1.00 0.54
42 V-3 7 (M-O) KG/ML 0.15 44.29 12.20 2.00 1.09
43 V-2 O (4-7) KG/ML 0.15 44.29 12.20 2.00 1.09
44 V.2 O (1-4) KG/ML 0.15 44.29 12.20 2.00 1.09

KG/ML TOTAL ANGULOS ESTA ESTIMACION 29.95


TOTAL KG/M2 TOTAL KG ESTIMACION 1 29.95