HOJA DE METRADO - DE SALA DE EQUIPOS

PROYECTO : HUASO
METRADO DE SALA DE EQUIPOS
ARMADO DE COLUMNAS A L H METRADO UNID
C-1 85.92 85.40 KG
C-3 14.80 8.29 KG
C-5 21.48 21.35 KG
C-6 40.00 39.76 KG
TOTAL 154.8036 KG
ESTRIBUS 1/4" A L H METRADO UNID
C-1 120 30.00 KG
C-3 25.80 6.45 KG
C-5 31.8 7.95 KG
C-6 28.80 7.20 KG
TOTAL 51.6 KG
SS.HH
ARMADO DE COLUMNAS 3/8" A L H METRADO UNID
C-2 106.8 59.81 KG
KG
TOTAL 59.81 KG
ESTRIBUS 1/4" A L H METRADO UNID
C-2 99.84 24.96 KG
TOTAL 24.960 KG
PATIO
ARMADO DE COLUMNAS A L H METRADO UNID
C-1 35.2 34.99 KG
C-4 30.8 17.25 KG
C-5 17.8 17.69 KG
C-7 17.8 27.77 KG
TOTAL 69.93 KG
ESTRIBUS 1/4" A L H METRADO UNID
C-1 54 13.50 KG
C-4 46.44 11.61 KG
C-5 28.62 7.16 KG
C-7 32.4 8.10 KG
TOTAL 32.265 KG
SALA DE FUERZAS
ARMADO DE COLUMNAS A L H METRADO UNID
C-4 30.8 17.25 KG
C-5 53.4 53.08 KG
TOTAL 70.33 KG
ESTRIBUS 1/4" A L H METRADO UNID
C-4 46.44 11.61 KG
C-5 85.86 21.47 KG
TOTAL 33.075 KG
TOTAL DE ACERO EN KG 5/8" 27.77 KG
TOTAL DE ACERO EN KG 1/2" 269.53 KG
TOTAL DE ACERO EN KG 3/8" 85.34 KG
TOTAL DE ACERO EN KG 1/4" 141.900 KG
TOTAL DE ACERO EN VARILLAS 5/8" 3.09 UND
TOTAL DE ACERO EN VARILLAS 1/2" 29.95 UND
TOTAL DE ACERO EN VARILLAS 3/8" 9.48 UND
TOTAL DE ACERO EN VARILLAS 1/4" 15.77 UND
HOJA DE METRADO - DE SALA DE EQUIPOS
PROYECTO : HUASO
METRADO DE SALA DE EQUIPOS
ARMADO DE MALLA DE REFUERZO DE A L H METRADO UNID
SOBRECIMIENTO ACERO VERTICAL
SC-1 15.29 8.5624 KG
SC-2 15.29 8.5624 KG
SC-3 9.10 5.096 KG
SC-4 6.60 3.696 KG
SC-5 2.60 1.456 KG
SC-6 7.20 4.032 KG
SC-7 22.24 12.45 KG
SC-8 6.88 3.85 KG
TOTAL 47.712 KG
ARMADO DE MALLA DE REFUERZO DE A L H METRADO UNID
SOBRECIMIENTO ACERO HORIZONTAL
SC-1
19.04 10.66 KG
SC-2
SC-3
SC-4
SC-5 19.04 10.66 KG
SC-6
SC-7
SC-8 9.33 2.33 KG
TOTAL 23.66 KG
SS.HH
ARMADO DE MALLA DE REFUERZO DE A L H METRADO UNID
SOBRECIMIENTO ACERO VERTICAL
SC-1 5.56 3.11 KG
SC-2 5.56 3.11 KG
SC-3 13.9 7.78 KG
SC-4 8.34 4.67 KG
SC-5 3.54 1.98 KG
TOTAL 18.68 KG
ARMADO DE MALLA DE REFUERZO DE A L H
SOBRECIMIENTO ACERO HORIZONTAL
SC-1 5.96 3.34 KG
SC-2 5.96 3.34 KG
SC-3 8.92 5.00 KG
SC-4
8.92 5.00 KG
SC-5
TOTAL 16.67 KG
PATIO
ARMADO DE MALLA DE REFUERZO DE A L H METRADO UNID
SOBRECIMIENTO ACERO VERTICAL
SC-1 18.20 10.19 KG
SC-2 13.00 7.28 KG
SC-3 13.00 7.28 KG
TOTAL 24.75 KG
ARMADO DE MALLA DE REFUERZO DE A L H METRADO UNID
SOBRECIMIENTO ACERO HORIZONTAL
SC-1 12.96 7.26 KG
SC-2 KG
18.24 10.21
SC-3 KG
TOTAL 17.47 KG
SALA DE FUERZAS
ARMADO DE MALLA DE REFUERZO DE A L H
SOBRECIMIENTO ACERO VERTICAL
SC-1 14.00 7.84 KG
SC-2 13.00 7.28 KG
SC-3 62.28 34.88 KG
SC-4 7.76 4.35 KG
TOTAL 54.34 KG

ARMADO DE MALLA DE REFUERZO DE A L H


SOBRECIMIENTO ACERO HORIZONTAL
SC-1 KG
18.64 10.44
SC-2 KG
SC-3 15.84 8.87 KG
SC-4 3.60 2.02 KG
TOTAL 21.32 KG

TOTAL DE ACERO EN KG 3/8" 224.61 KG


TOTAL DE ACERO EN KG 1/4" KG
TOTAL DE ACERO EN VARILLAS 3/8" 24.96 UND
TOTAL DE ACERO EN VARILLAS 1/4" UND
HOJA DE METRADO - DE SALA DE EQUIPOS
PROYECTO : HUASO
ESCALERA
COLUMNA 5/8" A L H METRADO UNID
C-1 10.32 16.02 KG
TOTAL 16.02 KG
ESCRIBUS 1/4" A L H METRADO UNID
C-1 19.2 4.80 KG
TOTAL 4.80 KG
PARRILLA 5/8" A L H METRADO UNID
P-1 5.76 8.94 KG
TOTAL 8.94 KG
PASOS, CONTRAPASOS Y DESCSNSO (VERTICALES) A L H
ES-1 30.07 16.84 KG
ES-2 28.46 15.94 KG
TOTAL 32.78 KG

A L H
PASOS, CONTRAPASOS Y DESCSNSO (HORIZONTAL)
ES-1 23.37 13.09 KG
ES-2 23.37 13.09 KG
TOTAL 26.17 KG

TOTAL DE ACERO EN KG 5/8" 24.96 KG


TOTAL DE ACERO EN KG 3/8" 58.95 KG
TOTAL DE ACERO EN KG 1/4" 4.800 KG
TOTAL DE ACERO EN VARILLAS 5/8" 2.77 UND
TOTAL DE ACERO EN VARILLAS 3/8" 6.55 UND
TOTAL DE ACERO EN VARILLAS 1/4" 0.53 UND