Está en la página 1de 2

CONST. SIST.

CUATRO CENTRALES, LITORAL, 6 DE AGOSTO, IND, D2, D5 (VILLA TUNARI)


Cod. Actividad Unidad Cantidad P. Unitario Bs. Monto Literal
Actividad
15,262,522.19
RED DE DISTRIBUCION (SIST.-1) 7,616,428.46
1 REMOSION Y REPOSIOCION DE EMPEDRADO M2 1,600.00 46.56 74,496.00
311 2 EXCAVACION COMUN C/RETROEXCAVADORA M3 33,300.20 25.86 861,143.17
277C2 3 PROV. Y TENDIDO TUBERIA PVC 2 PULG - CLASE 9 (ESPIG) ML 10,968.57 17.57 192,717.77
4 PROV. Y TENDIDO TUBERIA PVC 2 1/2 PULG - CLASE 9 (ESPIG) ML 3,132.05 23.82 74,605.43
277D 5 PROV. Y TENDIDO TUBERIA PVC 3 PULG - CLASE 9 ML 7,288.04 39.76 289,772.47
6 PROV. Y TENDIDO TUBERIA PVC 4 PULG - CLASE 9 (ESPIG) ML 2,287.67 60.28 137,900.75
7 PROV. Y TENDIDO TUBERIA PVC 6 PULG - CLASE 9 (ESPIG) ML 18,996.89 106.04 2,014,430.22
8 PROV. Y TENDIDO TUBERIA PVC 8 PULG - CLASE 9 (ESPIG) ML 13,661.83 175.36 2,395,738.51
282 9 PRUEBA HIDRAULICA ML 56,335.05 3.70 208,439.69
319A 10 CAMA DE TIERRA CERNIDA M3 3,211.65 36.15 116,101.15
11 PROV Y COLOC MACROMEDIDOR 2" GLB 14.00 3,986.86 55,816.04
12 PROV Y COLOC MACROMEDIDOR 8" GLB 2.00 15,770.86 31,541.72
320A 13 RELLENO Y COMPACTADO CON TIERRA CERNIDA M3 13,048.46 34.63 451,868.17
14 PROV Y COLOC ACCESORIOS RED AGUA POTABLE GLB 1.00 100,000.00 100,000.00
15 REMOSION Y REPOSIOCION DE ASFALTADO M2 29.25 189.61 5,546.09
16 PROV Y COLOC MACROMEDIDOR 3" PZA 3.00 5,117.58 15,352.74
320 17 RELLENO Y COMPACTADO CON MATERIAL COMUN M3 16,230.21 34.44 558,968.43
18 CAMARA MACROMEDIDOR HºCº CON TAPA METALICA PZA 19.00 1,683.69 31,990.11
ACTIVIDADES PRELIMINARES Y COMPLEMENTARIAS 565,557.26
19 PROV Y COLOCACION DE LETRERO DE OBRAS FPS (SEGÚN) PZA 1.00 2,457.37 2,457.37
20 PROV Y COLOC PLACA DE ENTREGAS (SEG DISEÑO) PZA 1.00 667.57 667.57
21 LIMPIEZA Y RETIRO DE ESCOMBROS GLB 1.00 13,170.11 13,170.11
22 INSTALACION DE FAENAS GLB 1.00 492,985.75 492,985.75
23 REPLANTEO GENERAL GLB 1.00 56,276.46 56,276.46
CASETA DE CLORACION 92,633.76
24 PROV E INSTALACION HIPOCLORADOR PZA 2.00 11,316.88 22,633.76
25 CASETA DE HIPOCLORADOR SEG/DISEÑO GLB 2.00 35,000.00 70,000.00
26 RED DE ADUCCION 1,719,995.71
70 27 EXCAVACION DE 0-2 M SUELO SEMIDURO M3 120.96 28.54 3,452.20
311 28 EXCAVACION COMUN C/RETROEXCAVADORA M3 1,566.68 25.86 40,514.34
277F6 29 PROV. Y TENDIDO TUBERIA PVC 8 PULG - CLASE 9 (ESPIG) ML 2,678.09 175.36 469,629.86
282 30 PRUEBA HIDRAULICA ML 6,341.55 3.70 23,463.74
31 PROVISION Y COLOCACION ACCESORIOS ADUCCION A.P. GLB 1.00 30,000.00 30,000.00
267B 32 ANCLAJE DE SUJECION TUBERIA S/DISEÑO PZA 1,221.00 44.25 54,035.26
320A 33 RELLENO Y COMPACTADO CON TIERRA CERNIDA M3 786.24 34.63 27,227.49
375A 34 PROV. Y TENDIDO SUPERTUBO HDPE D=8" SDR26 ML 3,663.46 222.27 814,277.25
312 35 CAMA DE ARENA M3 174.08 89.01 15,494.86
320 36 RELLENO COMPACTADO CON MATERIAL COMUN M3 522.23 34.44 17,985.60
267A 37 HORMIGON CICLOPEO PARA ANCLAJES M3 240.80 929.88 223,915.10
PRESA DE HORMIGON 494,337.77
1 38 ACERO ESTRUCTURAL FY=4.200 KG/CM2 (GRADO 60) KG 94.40 12.98 1,225.31
72A 39 EXCAVACION EN ROCA CON EQUIPO M3 91.48 161.26 14,752.06
282B 40 PROV. E INTALACION LIMNIMETRO PZA 1.00 252.52 252.52
80 41 HORMIGON CICLOPEO (50% PIEDRA) M3 578.76 743.79 430,475.90
42 PUENTE PEATONAL SOBRE VERTEDERO DE EXCEDENCIAS GLB 1.00 5,000.00 5,000.00
359A 43 BARRAS DE ANCLAJE 1" (25.4 MMM) ML 124.20 38.29 4,755.62
94A 44 JUNTAS WATER STOP ML 24.00 152.58 3,661.92
102 45 HORMIGON SIMPLE (RESIST = 210 KG/CM2) M3 1.18 1,780.62 2,101.13
46 TUBERIAS VALVULAS Y ACCESORIOS GLB 1.00 25,000.00 25,000.00
47 PERFORACION PARA ANCLAJES ML 46.50 63.22 2,939.73
498A 48 BARANDA METALICA DE PROTECCION GLB 1.00 4,173.57 4,173.57
CRUCE DE RIO 181,429.24
70 49 EXCAVACION DE 0-2 M SUELO SEMIDURO M3 16.74 28.54 477.76
375A 50 PROV. Y TENDIDO TUB FG8" ML 160.00 222.27 35,563.20
80 51 HORMIGON CICLOPEO (50% PIEDRA) M3 16.74 743.79 12,451.04
385D 52 PROV. E INST. TORRES+ACCESORIOS P/QUEBRADA L=75M PZA 4.00 33,234.31 132,937.24
PASO DE ALCANTARILLA Y PUENTES 41,021.22
53 PASO DE ALCANTARILLA FG 8", L=3M GLB 2.00 2,557.00 5,114.00
54 PASO DE ALCANTARILLA FG 6", L=3M GLB 1.00 2,391.32 2,391.32
55 PASO DE ALCANTARILLA FG 2", L=3M GLB 2.00 1,059.35 2,118.70
56 PASO DE ALCANTARILLA FG 1 1/2", L=3M GLB 1.00 689.59 689.59
57 PASO DE PUENTE FG 8", L=8M GLB 1.00 5,224.71 5,224.71
58 PASO DE PUENTE FG 6", L=15M GLB 2.00 8,225.85 16,451.70
59 PASO DE PUENTE FG 4", L=15M GLB 2.00 2,161.12 4,322.24
60 PASO DE PUENTE FG 3", L=15M GLB 1.00 1,692.31 1,692.31
61 PASO DE PUENTE FG 2", L=15M GLB 1.00 2,327.06 2,327.06
62 PASO DE PUENTE FG 1 1/2", L=15M GLB 1.00 689.59 689.59
CAMARA DE VALVULAS 293,175.92
70 63 EXCAVACION DE 0-2 M SUELO SEMIDURO M3 111.25 28.54 3,175.08
64 PROV/COLOC. ACCES. CAM. PURGA LODO (D=2 1/2") GLB 1.00 1,593.91 1,593.91
80 65 HORMIGON CICLOPEO (50% PIEDRA) M3 68.31 743.79 50,808.29
66 PROV/COLOC. ACCES. CAM. PURGA AIRE (D=3") GLB 1.00 695.82 695.82
67 PROV/COLOC. ACCES. CAM. PURGA AIRE (D=2") GLB 2.00 381.07 762.14
68 PROV/COLOC. ACCES. CAM. PURGA LODO (D=8") GLB 5.00 13,431.57 67,157.85
69 PROV/COLOC. ACCES. CAM. PURGA LODO (D=6") GLB 1.00 5,320.32 5,320.32
70 PROV/COLOC. ACCES. CAM. PURGA LODO (D=2") GLB 1.00 670.10 670.10
71 PROV/COLOC. ACCES. CAM. REDUC. PRESION (D=8") GLB 1.00 37,939.91 37,939.91
72 PROV/COLOC. LLAVE PASO CORTINA+ACC. (D=8") GLB 2.00 6,585.45 13,170.90
73 PROV/COLOC. LLAVE PASO CORTINA+ACC. (D=6") GLB 1.00 4,256.05 4,256.05
74 PROV/COLOC. LLAVE PASO CORTINA+ACC. (D=4") GLB 1.00 2,133.63 2,133.63
75 PROV/COLOC. LLAVE PASO CORTINA+ACC. (D=3") GLB 6.00 499.87 2,999.22
76 PROV/COLOC. LLAVE PASO CORTINA+ACC. (D=2 1/2") GLB 1.00 348.00 348.00
77 PROV/COLOC. LLAVE PASO CORTINA+ACC. (D=2") GLB 17.00 229.21 3,896.57
83 78 HORMIGON ARMADO 210 KG/CM2 M3 8.50 3,180.14 27,031.19
79 PROV/COLOC. ACCES. CAM. PURGA LODO (D=8") GLB 9.00 5,140.29 46,262.61
80 PROV/COLOC. ACCES. CAM. PURGA LODO (D=6") GLB 3.00 2,977.46 8,932.38
81 PROV/COLOC. ACCES. CAM. PURGA LODO (D=4") GLB 1.00 2,213.23 2,213.23
267A 82 HORMIGON CICLOPEO PARA ANCLAJES M3 14.85 929.88 13,808.72
REDES SECUNDARIAS 1,347,549.74
311 83 EXCAVACION COMUN C/RETROEXCAVADORA M3 12,920.60 25.86 334,126.72
277C2 84 PROV. Y TENDIDO TUBERIA PVC 2 PULG - CLASE 9 (ESPIG) ML 9,571.87 17.57 168,177.76
277D 85 PROV. Y TENDIDO TUBERIA PVC 3 PULG - CLASE 9 (ESPIG) ML 552.79 39.76 21,978.93
277F1 86 PROV. Y TENDIDO DE TUBERIA PVC 1 1/2PULG-CLASE 9(JU ML 17,047.51 14.30 243,779.39
282 87 PRUEBA HIDRAULICA ML 27,172.17 3.70 100,537.03
319A 88 CAMA DE TIERRA CERNIDA M3 1,358.61 36.15 49,113.75
89 PROV Y COLOC ACCESORIOS RED DISTRIBUCION 1 GLB 1.00 35,000.00 35,000.00
320A 90 RELLENO Y COMPACTADO CON TIERRA CERNIDA M3 4,637.55 34.63 160,598.36
320 91 RELLENO COMPACTADO CON MATERIAL COMUN M3 6,801.33 34.44 234,237.81
MEDIDAS DE PREVENCION DE RIESGOS 250,390.00
518 92 PROVISION Y ARMADO DE GAVIONES (2x1x1) M3 500.00 425.78 212,890.00
93 CONFORMACION ZANJAS CORONAMIENTO SEG/DISEÑO ML 250.00 150.00 37,500.00
CONEXIONES DOMICILIARIAS 2,616,454.03
70 94 EXCAVACION DE 0-2 M SUELO SEMIDURO M3 4,781.69 28.54 136,469.43
268A 95 PROV. Y TENDIDO DE TUBERIA PVC 1/2 PULG-ESQ.40(ESP ML 17,604.00 18.09 318,456.36
83 96 HORMIGON ARMADO 210 KG/CM2 M3 26.41 3,180.14 83,987.50
80 97 HORMIGON CICLOPEO 50% PIEDRA DESPLAZADORA M3 67.78 743.79 50,414.09
320 98 RELLENO COMPACTADO CON MATERIAL COMUN M3 3,968.72 34.44 136,682.72
578A 99 PROVISION Y COLOCACION DE GRAVA M3 563.33 129.00 72,669.57
329A 100 PROV. COLOC. ACCESORIOS CONEXIONES DOMICILIARIAS PZA 1,467.00 934.53 1,370,955.51
254A 101 CAMARA DE H S PREFABRICADO P/MEDIDOR PZA 1,467.00 304.58 446,818.86
MEDIDAS DE MITIGACION AMBIENTAL 43,549.08
405D 102 SEÑALIZACION VERTICAL PZA 16.00 801.20 12,819.20
543 103 CINTA PLASTICA DE SEGURIDAD ML 1,000.00 9.23 9,230.00
544 104 CONTROL Y SELECCIÓN DE DESECHOS GLB 1.00 2,464.00 2,464.00
545 105 RECIPIENTE PARA BASURA PZA 16.00 172.48 2,759.68
298 106 LETRINA PZA 4.00 3,499.23 13,996.92
249 107 ANALISIS DE AGUA FISICO QUIMICO Y BACTEOROLOGICO GLB 2.00 1,139.64 2,279.28

16,987,310.07 1,724,787.88
10.15

También podría gustarte