USO DE TECNOLOGÍA BIM PARA LA ESTACIÓN DE BOMBEO DEL POZO PP-1 PARA EL
ABASTECIMIENTO DE LA URBANIZACIÓN ALTO BUJAMA - PROVINCIA DE CAÑETE -
DISTRITO DE MALA
INTEGRANTES:
Yerson Luis Lazo Huamán
Alexander Julio López Castromonte
Mateo Renzo Morales Jave
Diego Homero Parra Arteaga
Walter Enrique Yerba Pacompia
Lima, Perú
2019
“USO DE TECNOLOGÍA BIM PARA LA ESTACIÓN DE BOMBEO DEL POZO PP-1 PARA EL
ABASTECIMIENTO DE LA URBANIZACIÓN ALTO BUJAMA - PROVINCIA DE CAÑETE - DISTRITO DE
MALA”
Yerson Luis Lazo Huamán, Alexander Julio López Castromonte, Mateo Renzo Morales Jave,
Diego Homero Parra Arteaga, Walter Enrique Yerba Pacompia
Asignatura: Aprovechamiento Aguas Subterráneas II
Docente: Ing. Marco Cerrón Palomino
Facultad de Ingeniería Ambiental
Universidad Nacional de Ingeniería, Facultad de Ingeniería Ambiental
Escuela Profesional de Ingeniería Sanitaria
RESUMEN
El desarrollo del presente trabajo permite obtener mediante la metodología BIM (Building Information Modeling), el
cual es un sistema de gestión de las obras de construcción que está basado en el uso de un modelo tridimensional
virtual relacionado con bases de datos. El BIM permite producir y almacenar toda la información necesaria para
operar en las distintas fases del ciclo de vida de las construcciones en los campos de la edificación y la ingeniería
civil. Para nuestro caso, se desarrolló la metodología BIM aplicado al modelamiento tridimensional de una estación
de bombeo para el abastecimiento de agua de la urbanización del Alto Bujama – Cañete – Mala. Dicho modelamiento
nos permitió realizar los metrados de los componentes que pertenecen a la estación de bombeo, que finalmente se
plasman en un análisis de costos que puede variar en función al tipo de material usado. Se concluye que la
herramienta BIM aplicada en el programa Revit, nos permitió determinar la estructura de la caseta de bombeo de
Alto Bujama. Y con esto, se obtuvo el metrado de dicha estructura. Además, la herramienta nos posibilitó modificar
las texturas y tipos de materiales y en función a ello ver una estimación de costos. En cuanto al cerco perimétrico
de la caseta, se determinaron que los muros interiores y exteriores son no portantes de 0.15 m de ancho y se cuenta
también con muros interiores no portantes de 0.10 m de ancho. El metrado de dichos muros se expresa en unidades
de metros cuadrados.
ABSTRACT
The development of the present work allows to obtain by means of the BIM methodology (Building Information
Modeling), which is a management system of construction works that is based on the use of a virtual three-
dimensional model related to databases. The BIM allows to produce and store all the necessary information to
operate in the different phases of the life cycle of buildings in the fields of building and civil engineering. For our case,
the BIM methodology applied to the three-dimensional modeling of a pumping station for the water supply of the Alto
Bujama - Cañete - Mala urbanization was developed. Said modeling allowed us to perform the measurements of the
components that belong to the pumping station, which are finally reflected in a cost analysis that can vary depending
on the type of material used. It is concluded that the BIM tool applied in the Revit program allowed us to determine
the structure of the Alto Bujama pumping house. And with this, the metrado of said structure was obtained. In addition,
the tool allowed us to modify the textures and types of materials and based on it see an estimate of costs. As for the
perimeter fence of the house, it was determined that the interior and exterior walls are non-bearing 0.15 m wide and
also has non-bearing interior walls of 0.10 m wide. The meter of said walls is expressed in units of square meters.
Keywords: Pumping well station, Building Information Modeling, unit costs
1
OBJETIVO Diagnóstico de la situación actual
En la zona donde se construirá y equipará el pozo PP-
Elaboración de plano en 3D de la Estación de 1, actualmente es una zona despoblada, la mayor
Bombeo para la urbanización Alto Bujama parte de los alrededores son terrenos de cultivo. El
mediante el uso de un software BIM (Building terreno donde se encuentra construido el pozo
Information Modeling). exploratorio cuenta con cerco perimétrico de triplay,
Dar a conocer las facilidades y/o dificultades que que de acuerdo al expediente es adecuado para
se presentó al hacer uso de dicho software. salvaguardar las instalaciones proyectadas.
2
El sistema de purga o de desagüe se realiza Procedimiento de elaboración del 3D:
mediante la descarga de sus aguas hacia la Para pasar los planos de AutoCAD a Revit, es
acequia más cercana. tener en cuenta las coordenadas en que hemos
dibujado esos planos en el Cad, y para tal efecto
vamos a vamos a colocar en la coordenada (0,0)
en el Cad para iniciar la exportación.
Para insertar el plano de AutoCAD a Revit, nos
vamos a la pestaña de Insertar (en Revit) y vamos
a observar que vamos a tener dos opciones:
Vincular CAD e Importar CAD
3
RESULTADOS:
4
Figura:12: Material y longitud de columnas.
5
La herramienta finalmente nos permitió
encontrar algunos costos como son los del techo
compuesto tipo rejilla que se estimó un costo de
S/. 1500.00. En cuanto al muro básico exterior
de .15m de espesor y un área de 9 m 2, el costo
es de S/. 250.00. Por su parte, en cuanto a la
puerta enrollable de 2.8m de altura, 2.7 m de
ancho y 0.5m de espesor, el costo para un
material de acero inoxidable asciende a S/.
5000.00, esto se observa en la figura 16.
RECOMENDACIONES