Obra :“MEJORAMIENTO DEL SERVICIO VIAL INTEGRAL EN LA AV. CAMINO REAL, DISTRITO DE CHIMBOTE, SANTA, ANCASH” I ETAPA
PRESUPUESTO BASE ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO POR VALORIZAR
CODIGO
DESCRIPCION METRADO PARCIAL AVANCE AVANCE AVANCE AVANCE
METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL
PARTIDA UND CANT. P.U COSTO % % % %
29,785.48 100.00% 0.00 0.00% 29,785.48 100.00% 0.00 0.00%
01.00.00 OBRAS PROVISIONALES S/.29,785.48
GLB 1.00 S/.5,750.00 S/.5,750.00 1.00 5,750.00 100.00% 0.00 0.00 0.00% 1.00 5,750.00 100.00% 0.00 0.00 0.00%
01.01.00 MOVILIZACION Y DESMOVILIZACION DE EQUIPO
GLB 1.00 S/.6,404.00 S/.6,404.00 1.00 6,404.00 100.00% 0.00 0.00 0.00% 1.00 6,404.00 100.00% 0.00 0.00 0.00%
01.02.00 TRANSPORTE DE EQUIPO, MATERIALES Y HERRAMIENTAS
GLB 1.00 S/.2,800.00 S/.2,800.00 1.00 2,800.00 100.00% 0.00 0.00 0.00% 1.00 2,800.00 100.00% 0.00 0.00 0.00%
01.03.00 ALQUIER PARA OFICINA, ALMACEN Y CASETA DE GUARDIANIA
UND 2.00 S/.1,574.94 S/.3,149.88 2.00 3,149.88 100.00% 0.00 0.00 0.00% 2.00 3,149.88 100.00% 0.00 0.00 0.00%
01.04.00 CARTEL DE OBRA DE 3.60x7.20m - (Gigantografía)
GLB 1.00 S/.7,767.76 S/.7,767.76 1.00 7,767.76 100.00% 0.00 0.00 0.00% 1.00 7,767.76 100.00% 0.00 0.00 0.00%
01.05.00 SEÑALIZACION Y SEGURIDAD EN OBRA
GLB 1.00 S/.3,913.84 S/.3,913.84 1.00 3,913.84 100.00% 0.00 0.00 0.00% 1.00 3,913.84 100.00% 0.00 0.00 0.00%
01.06.00 MANTENIMIENTO Y DESVIO DE TRANSITO TEMPORAL
S/.88,799.37 88,799.37 100.00% 0.00 0.00% 88,799.37 100.00% 0.00 0.00%
02.00.00 OBRAS PRELIMINARES
M2 18,100.75 S/.1.38 S/.24,979.04 18,100.75 24,979.04 100.00% 0.00 0.00 0.00% 18,100.75 24,979.04 100.00% 0.00 0.00 0.00%
02.01.00 TRAZO NIVELACION Y REPLANTEO INICIAL DE OBRA
M2 18,100.75 S/.1.38 S/.24,979.04 18,100.75 24,979.04 100.00% 0.00 0.00 0.00% 18,100.75 24,979.04 100.00% 0.00 0.00 0.00%
02.02.00 TRAZO NIVELACION Y REPLANTEO DURANTE LA OBRA
M2 13,301.81 S/.2.92 S/.38,841.29 13,301.81 38,841.29 100.00% 0.00 0.00 0.00% 13,301.81 38,841.29 100.00% 0.00 0.00 0.00%
02.03.00 DEMOLICION DE CARPETA ASFALTICA EXISTENTE DE 2"
S/.1,467,676.48 1,458,199.12 99.35% 6,519.10 0.44% 1,464,718.22 99.80% 2,958.26 0.20%
03.00.00 MOVIMIENTO DE TIERRAS
M3 17,760.44 S/.7.70 S/.136,755.39 17,376.25 133,797.13 97.84% 0.00 0.00 0.00% 17,376.25 133,797.13 97.84% 384.19 2,958.26 2.16%
03.01.00 CORTE HASTA NIVEL DE SUBRASANTE
M2 18,100.75 S/.2.26 S/.40,907.70 18,100.75 40,907.70 100.00% 0.00 0.00 0.00% 18,100.75 40,907.70 100.00% 0.00 0.00 0.00%
03.02.00 CONFORMACION DE SUB-RASANTE
M2 14,971.92 S/.12.72 S/.190,442.82 14,971.92 190,442.82 100.00% 0.00 0.00 0.00% 14,971.92 190,442.82 100.00% 0.00 0.00 0.00%
03.03.00 BASE DE AFIRMADO E= 0.25m
M2 3,128.83 S/.15.23 S/.47,652.08 3,128.83 47,652.08 100.00% 0.00 0.00 0.00% 3,128.83 47,652.08 100.00% 0.00 0.00 0.00%
03.04.00 BASE DE AFIRMADO E= 0.30m
M2 14,971.92 S/.12.72 S/.190,442.82 14,971.92 190,442.82 100.00% 0.00 0.00 0.00% 14,971.92 190,442.82 100.00% 0.00 0.00 0.00%
03.05.00 SUB - BASE DE AFIRMADO E= 0.25m
M2 3,128.83 S/.15.23 S/.47,652.08 3,128.83 47,652.08 100.00% 0.00 0.00 0.00% 3,128.83 47,652.08 100.00% 0.00 0.00 0.00%
03.06.00 SUB - BASE DE AFIRMADO E= 0.30m
MEJORAMIENTO DE TERRENO DE FUNDACION CON OVER TAM. MAX.
M3 5,074.43 S/.58.72 S/.297,970.53 5,074.43 297,970.53 100.00% 0.00 0.00 0.00% 5,074.43 297,970.53 100.00% 0.00 0.00 0.00%
03.07.00 2"-4 ", H=Variable
M2 18,100.75 S/.11.85 S/.214,493.89 18,100.75 214,493.89 100.00% 0.00 0.00 0.00% 18,100.75 214,493.89 100.00% 0.00 0.00 0.00%
03.08.00 SUMINISTRO Y COLOCACION DE GEOMALLA MULTIAXIAL
M3 21,312.53 S/.14.14 S/.301,359.17 20,851.49 294,840.07 97.84% 461.04 6,519.10 2.16% 21,312.53 301,359.17 100.00% 0.00 0.00 0.00%
03.09.00 ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. D=10Km F.E.=20%
VALORIZACION MENSUAL DE OBRA N° 05
(DESDE EL 01 DE JUNIO HASTA EL 17 DE JUNIO DEL 2017)
Obra :“MEJORAMIENTO DEL SERVICIO VIAL INTEGRAL EN LA AV. CAMINO REAL, DISTRITO DE CHIMBOTE, SANTA, ANCASH” I ETAPA
PRESUPUESTO BASE ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO POR VALORIZAR
CODIGO
DESCRIPCION METRADO PARCIAL AVANCE AVANCE AVANCE AVANCE
METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL
PARTIDA UND CANT. P.U COSTO % % % %
S/.1,166,050.32 0.00 1,014,303.86 86.99% 151,746.46 13.01% 1,166,050.32 100.00% 0.00 0.00%
04.00.00 PAVIMENTACION
M2 18,100.75 S/.0.64 S/.11,584.48 15,745.17 10,076.91 86.99% 2,355.58 1,507.57 13.01% 18,100.75 11,584.48 100.00% 0.00 0.00 0.00%
04.01.00 BARRIDO DE BASE PARA IMPRIMACION
M2 18,100.75 S/.4.50 S/.81,453.38 15,745.17 70,853.27 86.99% 2,355.58 10,600.11 13.01% 18,100.75 81,453.38 100.00% 0.00 0.00 0.00%
04.02.00 IMPRIMACION CON EMULSION ASFALTICA
M2 18,100.75 S/.59.28 S/.1,073,012.46 15,745.17 933,373.68 86.99% 2,355.58 139,638.78 13.01% 18,100.75 1,073,012.46 100.00% 0.00 0.00 0.00%
04.03.00 CARPETA ASFALTICA EN CALIENTE DE 3"
S/.68,278.09 0.00 0.00 0.00% 68,278.09 100.00% 68,278.09 100.00% 0.00 0.00%
05.00.00 SEÑALIZACION
M2 929.90 S/.26.32 S/.24,474.97 0.00 0.00 0.00% 929.90 24,474.97 100.00% 929.90 24,474.97 100.00% 0.00 0.00 0.00%
05.01.00 PINTADO DE PAVIMENTOS (SIMBOLOS - Y LETRAS)
M 381.00 S/.6.48 S/.2,468.88 0.00 0.00 0.00% 381.00 2,468.88 100.00% 381.00 2,468.88 100.00% 0.00 0.00 0.00%
05.02.00 PINTADO DE PAVIMENTOS ( LINEA DISCONTINUA)
M 4,416.29 S/.6.48 S/.28,617.56 0.00 0.00 0.00% 4,416.29 28,617.56 100.00% 4,416.29 28,617.56 100.00% 0.00 0.00 0.00%
05.03.00 PINTADO DE PAVIMENTOS ( LINEA CONTINUA)
UND 5.00 S/.560.18 S/.2,800.90 0.00 0.00 0.00% 5.00 2,800.90 100.00% 5.00 2,800.90 100.00% 0.00 0.00 0.00%
05.04.00 SEÑAL INFORMATIVA INC/SUM/COLOCACION
UND 6.00 S/.520.18 S/.3,121.08 0.00 0.00 0.00% 6.00 3,121.08 100.00% 6.00 3,121.08 100.00% 0.00 0.00 0.00%
05.05.00 SEÑAL REGLAMENTARIA INC/SUM/COLOCACION
UND 10.00 S/.440.11 S/.4,401.10 0.00 0.00 0.00% 10.00 4,401.10 100.00% 10.00 4,401.10 100.00% 0.00 0.00 0.00%
05.06.00 SEÑAL PREVENTIVA INC/SUM/COLOCACION
SUMINISTRO E INSTALACION DE TACHAS REFLECTIVAS
UND 136.00 S/.17.60 S/.2,393.60 0.00 0.00 0.00% 136.00 2,393.60 100.00% 136.00 2,393.60 100.00% 0.00 0.00 0.00%
05.07.00 BIDIRECCIONALES
S/.13,783.52 0.00 5,274.00 38.26% 8,509.52 61.74% 13,783.52 100.00% 0.00 0.00%
06.00.00 VARIOS
UND 30.00 S/.175.80 S/.5,274.00 30.00 5,274.00 100.00% 0.00 0.00 0.00% 30.00 5,274.00 100.00% 0.00 0.00 0.00%
06.01.00 NIVELACION DE TECHOS DE BUZONES, H=Variable
SUM. Y COLOCACION DE TUBO PROTECTOR PARA CHOQUES, D=4" +
UND 34.00 S/.250.28 S/.8,509.52 0.00 0.00 0.00% 34.00 8,509.52 100.00% 34.00 8,509.52 100.00% 0.00 0.00 0.00%
06.02.00 ACABDO E INCL DADOS DE ANCLAJE
GASTOS GENERALES VARIABLES 8.00% S/. 226,749.86 0.00 207,708.95 18,804.25 226,513.20 236.66
FACTOR DE RELACION (1.00000) S/. 3,259,529.25 0.00 2,985,816.11 270,311.14 3,256,127.25 3,402.00
IMP. GEN A LAS VENTAS 18.00% S/. 586,715.27 0.00 537,446.91 48,656.01 586,102.92 612.35
Obra :“MEJORAMIENTO DEL SERVICIO VIAL INTEGRAL EN LA AV. CAMINO REAL, DISTRITO DE CHIMBOTE, SANTA, ANCASH” I ETAPA
Obra :“MEJORAMIENTO DEL SERVICIO VIAL INTEGRAL EN LA AV. CAMINO REAL, DISTRITO DE CHIMBOTE, SANTA, ANCASH” I ETAPA
04.00.00 PAVIMENTACION
M2 18,100.75 S/.0.64 S/.11,584.48 18,100.75 11,584.48 100.00% 105.91 67.78 0.59%
04.01.00 BARRIDO DE BASE PARA IMPRIMACION
M2 18,100.75 S/.4.50 S/.81,453.38 18,100.75 81,453.38 100.00% 105.91 476.59 0.59%
04.02.00 IMPRIMACION CON EMULSION ASFALTICA
M2 18,100.75 S/.59.28 S/.1,073,012.46 18,100.75 1,073,012.46 100.00% 105.91 6,278.34 0.59%
04.03.00 CARPETA ASFALTICA EN CALIENTE DE 3"
06.00.00 VARIOS
UND 30.00 S/.175.80 S/.5,274.00 30.00 5,274.00 100.00% 9.00 1,582.20 30.00%
06.01.00 NIVELACION DE TECHOS DE BUZONES, H=Variable
SUM. Y COLOCACION DE TUBO PROTECTOR PARA CHOQUES, D=4" +
UND 34.00 S/.250.28 S/.8,509.52 34.00 8,509.52 100.00% 6.00 1,501.68 17.65%
06.02.00 ACABDO E INCL DADOS DE ANCLAJE
Obra :“MEJORAMIENTO DEL SERVICIO VIAL INTEGRAL EN LA AV. CAMINO REAL, DISTRITO DE CHIMBOTE, SANTA, ANCASH” I ETAPA
Propietario : MUNICIPALIDAD DISTRITAL DE MORO LOCALIDAD : P.J. MAGDALENA NUEVA, A.H. MIRAFLORES BAJO, A.H. MIRAMAR ALTO, P.J. LA VICTORIA
PRESUPUESTO BASE ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO POR VALORIZAR
CODIGO
DESCRIPCION METRADO PARCIAL AVANCE AVANCE AVANCE AVANCE
METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL
PARTIDA UND CANT. P.U COSTO % % % %
07.00.00 OBRAS PRELIMINARES S/.59,419.13 59,298.29 98.77% 120.84 0.20% 59,419.13 100.00% 0.00 0.00%
07.01.00 TRAZO NIVELACION Y REPLANTEO DURANTE LA OBRA M2 5,668.63 S/.1.87 S/.10,600.34 5,604.01 10,479.50 98.86% 64.62 120.84 1.14% 5,668.63 10,600.34 100.00% 0.00 0.00 0.00%
07.02.00 DEMOLICION DE VEREDAS E=0.10M CON MAQUINA (80%) M2 4,310.79 S/.6.32 S/.27,244.19 4,310.79 27,244.19 100.00% 0.00 0.00 0.00% 4,310.79 27,244.19 100.00% 0.00 0.00 0.00%
07.03.00 DEMOLICION MANUAL DE VEREDAS E=0.10M (20%) M2 1,077.70 S/.15.22 S/.16,402.59 1,077.70 16,402.59 100.00% 0.00 0.00 0.00% 1,077.70 16,402.59 100.00% 0.00 0.00 0.00%
07.04.00 DEMOLICION DE SARDINEL DE H.PROM=0.40 M. CON MAQUINA M 915.40 S/.5.65 S/.5,172.01 915.40 5,172.01 100.00% 0.00 0.00 0.00% 915.40 5,172.01 100.00% 0.00 0.00 0.00%
08.00.00 MOVIMIENTO DE TIERRAS S/.173,006.55 171,090.98 98.89% 1,915.55 1.11% 173,006.53 100.00% 0.02 0.00%
08.01.00 CORTE SUPERFICIAL MANUAL HASTA 0.20M M3 1,133.73 S/.34.57 S/.39,193.05 1,120.81 38,746.40 98.86% 12.92 446.64 1.14% 1,133.73 39,193.04 100.00% 0.00 0.01 0.00%
08.02.00 EXCAVACION PARA UÑAS DE VEREDAS M3 39.43 S/.39.51 S/.1,557.88 38.73 1,530.22 98.22% 0.70 27.66 1.78% 39.43 1,557.88 100.00% 0.00 0.00 0.00%
08.03.00 PREPARACIÓN DE SUBRASANTE C/PLANCHA PARA VEREDAS Y PISOS M2 5,668.63 S/.6.62 S/.37,526.33 5,604.01 37,098.55 98.86% 64.62 427.78 1.14% 5,668.63 37,526.33 100.00% 0.00 0.00 0.00%
08.04.00 AFIRMADO DE 4" PARA VEREDAS Y PISOS M2 5,668.63 S/.11.20 S/.63,488.66 5,604.01 62,764.91 98.86% 64.62 723.74 1.14% 5,668.63 63,488.65 100.00% 0.00 0.01 0.00%
08.05.00 ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. D=10Km M3 2,209.38 S/.14.14 S/.31,240.63 2,188.89 30,950.90 99.07% 20.49 289.73 0.93% 2,209.38 31,240.63 100.00% 0.00 0.00 0.00%
09.00.00 PISOS Y PAVIMENTOS S/.398,378.06 385,417.49 96.75% 7,268.48 1.82% 392,685.97 98.57% 5,692.09 1.43%
09.01.00 VEREDAS S/.173,421.17 161,773.06 93.28% 11,648.12 6.72% 173,421.18 100.00% -0.01 0.00%
CONCRETO VEREDA F´C=175KG/CM2 E=4" I/ENC ACABADO 1:2/ M2 2,604.82 S/.54.87 S/.142,926.47 2,604.82 142,926.47 100.00% 0.00 0.00 0.00% 2,604.82 142,926.47 100.00% 0.00 0.00 0.00%
09.01.0 BRUÑADO/CURADO (CEM. TIPO MS)
09.01.0 UÑA DE VEREDAS F´c=175KG/CM2 (CEMENTO TIPO MS) M 985.70 S/.19.12 S/.18,846.58 985.70 18,846.59 100.00% 0.00 0.00 0.00% 985.70 18,846.59 100.00% 0.00 -0.01 0.00%
09.01.0 JUNTA DE DILATACION CON ASFALTO 1" M 443.57 S/.3.21 S/.1,423.86 0.00 0.00 0.00% 443.57 1,423.86 100.00% 443.57 1,423.86 100.00% 0.00 0.00 0.00%
09.01.0 PINTADO DE BORDE VEREDAS P=0.30m M 2,184.67 S/.4.68 S/.10,224.26 0.00 0.00 0.00% 2184.67 10,224.26 100.00% 2,184.67 10,224.26 100.00% 0.00 0.00 0.00%
09.02.00 PISOS DE ADOQUIN S/.224,956.89 0.00 223,644.43 99.42% -4,379.64 -1.95% 219,264.79 97.47% 5,692.10 2.53%
09.02.0 FALSO PISO PARA ADOQUINADO, E=2" C:H 1:8 M2 2,946.39 S/.20.76 S/.61,167.06 2,929.20 60,810.19 99.42% -57.37 -1,191.00 -1.95% 2,871.83 59,619.19 97.47% 1,547.87 2.53%
09.02.0 PISO DE ADOQUIN CONCRETO - NEGRO 4X20X10cm (CEMENTO TIPO V) M2 982.13 S/.55.59 S/.54,596.61 976.40 54,278.08 99.42% -19.12 -1,062.88 -1.95% 957.28 53,215.20 97.47% 24.85 1,381.41 2.53%
09.02.0 PISO DE ADOQUIN CONCRETO - AMARILLO 4x20x10cm (CEMENTO TIPO V) M2 982.13 S/.55.59 S/.54,596.61 976.40 54,278.08 99.42% -19.12 -1,062.88 -1.95% 957.28 53,215.20 97.47% 24.85 1,381.41 2.53%
09.02.0 PISO DE ADOQUIN CONCRETO - ROJO 4x20x10cm (CEMENTO TIPO V) M2 982.13 S/.55.59 S/.54,596.61 976.40 54,278.08 99.42% -19.12 -1,062.88 -1.95% 957.28 53,215.20 97.47% 24.85 1,381.41 2.53%
10.00.00 SARDINELES S/.124,903.76 0.00 124,072.45 99.33% 0.00 831.31 0.67% 124,903.76 100.00% 0.00 0.00%
10.01.00 SARDINELES PERALTADOS TIPO II S/.124,903.76 0.00 124,072.45 99.33% 0.00 831.31 0.67% 124,903.76 100.00% 0.00 0.00%
10.01.0 EXCAVACION DE ZANJA PARA SARDINELES M3 91.30 S/.34.57 S/.3,156.24 91.30 3,156.24 100.00% 0.00 0.00 0.00% 91.30 3,156.24 100.00% 0.00 0.00 0.00%
10.01.0 ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. D = 10KM M3 104.99 S/.14.14 S/.1,484.56 104.99 1,484.56 100.00% 0.00 0.00 0.00% 104.99 1,484.56 100.00% 0.00 0.00 0.00%
M3 82.17 S/.384.75 S/.31,614.91 82.17 31,614.91 100.00% 0.00 0.00 0.00% 82.17 31,614.91 100.00% 0.00 0.00 0.00%
10.01.0 SARDINEL PERALTADO DE CONCRETO DE F'C=175 KG/CM2 (CEM. TIPO MS)
10.01.0 SARDINEL PERALTADO ENCOFRADO CARAVISTA Y DESENCOFRADO M2 1,095.56 S/.66.72 S/.73,095.76 1,095.56 73,095.76 100.00% 0.00 0.00 0.00% 1,095.56 73,095.76 100.00% 0.00 0.00 0.00%
10.01.0 SARDINEL PERALTADO ACERO DE REFUERZO KG 3,135.72 S/.4.77 S/.14,957.38 3,086.16 14,720.98 98.42% 49.56 236.40 1.58% 3,135.72 14,957.38 100.00% 0.00 0.00 0.00%
10.01.0 JUNTA DE DILATACION CON TEKNOPOR 1" y MASTIQUE ASFALTICO M2 21.30 S/.27.93 S/.594.91 0.00 0.00 0.00% 21.30 594.91 100.00% 21.30 594.91 100.00% 0.00 0.00 0.00%
11.00.00 VARIOS S/.47,226.40 28,457.20 60.26% 0.00 529.65 1.12% 28,986.85 61.38% 18,239.55 38.62%
11.01.00 SUM. NIVELACION Y COLOCACION DE CAJAS AGUA (TERMOPLASTICO) UND 152.00 S/.176.55 S/.26,835.60 89.00 15,712.95 58.55% 3.00 529.65 1.97% 92.00 16,242.60 60.53% 60.00 10,593.00 39.47%
11.02.00 SUM. NIVELACION Y COLOCACION DE CAJAS DESAGUE (CONCRETO) UND 152.00 S/.134.15 S/.20,390.80 95.00 12,744.25 62.50% 0.00 0.00 0.00% 95.00 12,744.25 62.50% 57.00 7,646.55 37.50%
Obra :“MEJORAMIENTO DEL SERVICIO VIAL INTEGRAL EN LA AV. CAMINO REAL, DISTRITO DE CHIMBOTE, SANTA, ANCASH” I ETAPA
P.J. MAGDALENA NUEVA, A.H. MIRAFLORES
Propietario : MUNICIPALIDAD DISTRITAL DE MORO LOCALIDAD : BAJO, A.H. MIRAMAR ALTO, P.J. LA VICTORIA
Modalidad : POR CONTRATA INICIO DE OBRA : 03.02.2017
Residente : ING. WILSON PORTALES ARIAS TERMINO DE OBRA : 02.06.2017 DISTRITO : CHIMBOTE
supervisor : ING. JULIO CESAR MARTINEZ ESTRADA PLAZO DE EJECUCION : 120 DIAS CALENDARIOS PROVINCIA : SANTA
periodo : 01.03.2017 AL 31.03.2017 TOTAL PRESUPUESTO : S/. 5,495,336.06 REGION : ANCASH
SUB PRESUPUESTO: 002 VEREDAS COSTO DIRECTO TOTAL : S/. 4,049,619.45
08.02.00 EXCAVACION PARA UÑAS DE VEREDAS M3 39.43 S/.39.51 S/.1,557.88 39.43 1,557.88 100.00% 6.72 265.51 17.04%
08.03.00 PREPARACIÓN DE SUBRASANTE C/PLANCHA PARA VEREDAS Y PISOS M2 5,668.63 S/.6.62 S/.37,526.33 5,668.63 37,526.33 100.00% 203.04 1,344.12 3.58%
08.04.00 AFIRMADO DE 4" PARA VEREDAS Y PISOS M2 5,668.63 S/.11.20 S/.63,488.66 5,668.63 63,488.65 100.00% 203.04 2,274.05 3.58%
08.05.00 ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. D=10Km M3 2,209.38 S/.14.14 S/.31,240.63 2,209.38 31,240.63 100.00% 56.79 803.01 2.57%
09.01.0 JUNTA DE DILATACION CON ASFALTO 1" M 443.57 S/.3.21 S/.1,423.86 443.57 1,423.86 100.00% 174.55 560.31 39.35%
09.01.0 PINTADO DE BORDE VEREDAS P=0.30m M 2,184.67 S/.4.68 S/.10,224.26 2,184.67 10,224.26 100.00% 14.38 67.30 0.66%
09.02.0 PISO DE ADOQUIN CONCRETO - NEGRO 4X20X10cm (CEMENTO TIPO V) M2 982.13 S/.55.59 S/.54,596.61 957.28 53,215.20 97.47% -24.85 -1,381.41 -2.53%
09.02.0 PISO DE ADOQUIN CONCRETO - AMARILLO 4x20x10cm (CEMENTO TIPO V) M2 982.13 S/.55.59 S/.54,596.61 957.28 53,215.20 97.47% -24.85 -1,381.41 -2.53%
09.02.0 PISO DE ADOQUIN CONCRETO - ROJO 4x20x10cm (CEMENTO TIPO V) M2 982.13 S/.55.59 S/.54,596.61 957.28 53,215.20 97.47% -24.85 -1,381.41 -2.53%
10.00.00 SARDINELES
10.01.00 SARDINELES PERALTADOS TIPO II
10.01.0 EXCAVACION DE ZANJA PARA SARDINELES M3 91.30 S/.34.57 S/.3,156.24 91.30 3,156.24 100.00% 4.66 161.10 5.10%
10.01.0 ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. D = 10KM M3 104.99 S/.14.14 S/.1,484.56 104.99 1,484.56 100.00% 5.36 75.79 5.11%
10.01.0 SARDINEL PERALTADO ACERO DE REFUERZO KG 3,135.72 S/.4.77 S/.14,957.38 3,135.72 14,957.38 100.00% 160.01 763.25 5.10%
10.01.0 JUNTA DE DILATACION CON TEKNOPOR 1" y MASTIQUE ASFALTICO M2 21.30 S/.27.93 S/.594.91 21.30 594.91 100.00% 1.09 30.44 5.12%
11.00.00 VARIOS
11.01.00 SUM. NIVELACION Y COLOCACION DE CAJAS AGUA (TERMOPLASTICO) UND 152.00 S/.176.55 S/.26,835.60 92.00 16,242.60 60.53% -60.00 -10,593.00 -39.47%
11.02.00 SUM. NIVELACION Y COLOCACION DE CAJAS DESAGUE (CONCRETO) UND 152.00 S/.134.15 S/.20,390.80 95.00 12,744.25 62.50% -57.00 -7,646.55 -37.50%
Propietario : MUNICIPALIDAD DISTRITAL DE MORO LOCALIDAD : P.J. MAGDALENA NUEVA, A.H. MIRAFLORES BAJO, A.H. MIRAMAR ALTO, P.J. LA VICTORIA
PRESUPUESTO BASE ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO POR VALORIZAR
CODIGO
DESCRIPCION METRADO PARCIAL AVANCE AVANCE AVANCE AVANCE
METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL
PARTIDA UND CANT. P.U COSTO % % % %
12.00.00 OBRAS PRELIMINARES S/.4,632.85 4,632.85 100.00% 0.00 0.00% 4,632.85 100.00% 0.00 0.00%
12.01.00 TRAZO NIVELACION Y REPLANTEO DURANTE LA OBRA M2 2,477.46 S/.1.87 S/.4,632.85 2,477.46 4,632.85 100.00% 0.00 0.00 0.00% 2,477.46 4,632.85 100.00% 0.00 0.00 0.00%
13.00.00 MOVIMIENTO DE TIERRAS S/.6,734.29 6,734.29 100.00% 0.00 0.00% 6,734.29 100.00% 0.00 0.00%
13.01.00 CORTE SUPERFICIAL MANUAL HASTA 0.20M M3 46.81 S/.34.57 S/.1,618.22 46.81 1,618.22 100.00% 0.00 0.00 0.00% 46.81 1,618.22 100.00% 0.00 0.00 0.00%
13.02.00 EXCAVACION PARA UÑAS DE VEREDAS M3 2.67 S/.39.51 S/.105.49 2.67 105.49 100.00% 0.00 0.00 0.00% 2.67 105.49 100.00% 0.00 0.00 0.00%
13.03.00 PREPARACIÓN DE SUBRASANTE C/PLANCHA PARA VEREDAS Y PISOS M2 234.06 S/.6.62 S/.1,549.48 234.06 1,549.48 100.00% 0.00 0.00 0.00% 234.06 1,549.48 100.00% 0.00 0.00 0.00%
13.04.00 AFIRMADO DE 4" PARA VEREDAS Y PISOS M2 234.06 S/.11.20 S/.2,621.47 234.06 2,621.47 100.00% 0.00 0.00 0.00% 234.06 2,621.47 100.00% 0.00 0.00 0.00%
13.05.00 ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. D=10Km M3 59.38 S/.14.14 S/.839.63 59.38 839.63 100.00% 0.00 0.00 0.00% 59.38 839.63 100.00% 0.00 0.00 0.00%
14.00.00 PISOS Y PAVIMENTOS S/.18,323.56 18,080.86 98.68% 242.70 1.32% 18,323.56 100.00% 0.00 0.00%
14.01.00 VEREDAS S/.4,249.20 4,006.50 94.29% 242.70 5.71% 4,249.20 100.00% 0.00 0.00%
CONCRETO VEREDA F´C=175KG/CM2 E=4" I/ENC ACABADO 1:2/ M2 49.72 S/.54.87 S/.2,728.14 49.72 2,728.14 100.00% 0.00 0.00% 49.72 2,728.14 100.00% 0.00 0.00 0.00%
14.01.01 BRUÑADO/CURADO (CEM. TIPO MS) 0.00
14.01.02 UÑA DE VEREDAS F´c=175KG/CM2 (CEMENTO TIPO MS) M 66.86 S/.19.12 S/.1,278.36 66.86 1,278.36 100.00% 0.00 0.00 0.00% 66.86 1,278.36 100.00% 0.00 0.00 0.00%
14.01.03 PINTADO DE BORDE VEREDAS P=0.30m M 51.86 S/.4.68 S/.242.70 0.00 0.00 0.00% 51.86 242.70 100.00% 51.86 242.70 100.00% 0.00 0.00 0.00%
14.02.00 PISOS DE ADOQUIN S/.14,074.36 14,074.36 100.00% 0.00 0.00% 14,074.36 100.00% 0.00 0.00%
14.02.01 FALSO PISO PARA ADOQUINADO, E=2" C:H 1:8 M2 184.34 S/.20.76 S/.3,826.90 184.34 3,826.90 100.00% 0.00 0.00 0.00% 184.34 3,826.90 100.00% 0.00 0.00 0.00%
14.02.02 PISO DE ADOQUIN CONCRETO - ROJO 4x20x10cm (CEMENTO TIPO V) M2 184.34 S/.55.59 S/.10,247.46 184.34 10,247.46 100.00% 0.00 0.00 0.00% 184.34 10,247.46 100.00% 0.00 0.00 0.00%
15.00.00 SARDINELES S/.268,658.90 254,030.95 94.56% 4,017.44 1.50% 258,048.39 96.05% 10,610.51 3.95%
15.01.00 SARDINELES PERALTADOS TIPO I S/.249,972.94 235,452.96 94.19% 11,155.36 4.46% 246,608.32 98.65% 3,364.62 1.35%
15.01.01 EXCAVACION DE ZANJA PARA SARDINELES M3 144.53 S/.39.51 S/.5,710.38 144.53 5,710.38 100.00% -1.44 -56.89 -1.00% 143.09 5,653.49 99.00% 1.44 56.89 1.00%
15.01.02 ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. D = 10KM M3 173.43 S/.14.14 S/.2,452.30 173.43 2,452.30 100.00% -1.72 -24.32 -0.99% 171.71 2,427.98 99.01% 1.72 24.32 0.99%
15.01.03 SARDINEL PERALTADO DE CONCRETO DE F'C=175 KG/CM2 (CEM. TIPO MS) M3 206.47 S/.384.75 S/.79,439.33 206.47 79,439.34 100.00% -2.05 -788.74 -0.99% 204.42 78,650.60 99.01% 2.05 788.73 0.99%
15.01.04 SARDINEL PERALTADO ENCOFRADO CARAVISTA Y DESENCOFRADO M2 1,651.72 S/.66.72 S/.110,202.76 1,651.72 110,202.76 100.00% -16.37 -1,092.21 -0.99% 1,635.35 109,110.55 99.01% 16.37 1,092.21 0.99%
15.01.05 SARDINEL PERALTADO ACERO DE REFUERZO KG 7,892.70 S/.4.77 S/.37,648.18 7,892.70 37,648.18 100.00% -189.32 -903.06 -2.40% 7,703.38 36,745.12 97.60% 189.32 903.06 2.40%
15.01.06 JUNTA DE DILATACION CON TEKNOPOR 1" y MASTIQUE ASFALTICO M2 64.50 S/.28.19 S/.1,818.26 0.00 0.00 0.00% 51.25 1,444.74 79.46% 51.25 1,444.74 79.46% 13.25 373.52 20.54%
15.01.07 PINTADO DE SARDINELES Y BORDES H=variable M 1,651.72 S/.7.69 S/.12,701.73 0.00 0.00 0.00% 1,635.35 12,575.84 99.01% 1,635.35 12,575.84 99.01% 16.37 125.89 0.99%
15.02.00 SARDINELES SUMERGIDOS S/.18,685.96 18,577.99 99.42% -7,137.92 -38.20% 11,440.07 61.22% 7,245.89 38.78%
15.02.01 EXCAVACION DE ZANJA PARA SARDINELES M3 14.57 S/.39.51 S/.575.66 14.57 575.66 100.00% -4.25 -167.92 -29.17% 10.32 407.74 70.83% 4.25 167.92 29.17%
15.02.02 ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. D = 10KM M3 17.49 S/.14.14 S/.247.31 17.49 247.31 100.00% -5.11 -72.26 -29.22% 12.38 175.05 70.78% 5.11 72.26 29.22%
15.02.03 SARDINEL SUMERGIDO CONCRETO F'C=175KG/CM2 (CEM. TIPO MS) M3 14.57 S/.363.50 S/.5,296.20 14.57 5,296.20 100.00% -4.25 -1,544.88 -29.17% 10.32 3,751.32 70.83% 4.25 1,544.88 29.17%
15.02.04 SARDINEL SUMERGIDO ENCOFRADO Y DESENCOFRADO M2 194.32 S/.52.50 S/.10,201.80 194.32 10,201.80 100.00% -84.71 -4,447.28 -43.59% 109.61 5,754.52 56.41% 84.71 4,447.28 43.59%
15.02.05 SARDINEL SUMERGIDO ACERO DE REFUERZO KG 473.17 S/.4.77 S/.2,257.02 473.17 2,257.02 100.00% -206.16 -983.38 -43.57% 267.01 1,273.64 56.43% 206.16 983.38 43.57%
15.02.06 JUNTA DE DILATACION CON TEKNOPOR 1" y MASTIQUE ASFALTICO M2 3.83 S/.28.19 S/.107.97 0.00 0.00 0.00% 2.76 77.80 72.06% 2.76 77.80 72.06% 1.07 30.17 27.94%
VALORIZACION MENSUAL DE OBRA N° 05
(DESDE EL 01 DE JUNIO HASTA EL 17 DE JUNIO DEL 2017)
Obra :“MEJORAMIENTO DEL SERVICIO VIAL INTEGRAL EN LA AV. CAMINO REAL, DISTRITO DE CHIMBOTE, SANTA, ANCASH” I ETAPA
Propietario : MUNICIPALIDAD DISTRITAL DE MORO LOCALIDAD : P.J. MAGDALENA NUEVA, A.H. MIRAFLORES BAJO, A.H. MIRAMAR ALTO, P.J. LA VICTORIA
PRESUPUESTO BASE ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO POR VALORIZAR
CODIGO
DESCRIPCION METRADO PARCIAL AVANCE AVANCE AVANCE AVANCE
METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL
PARTIDA UND CANT. P.U COSTO % % % %
16.00.00 AREAS VERDES S/.95,271.15 26,997.12 28.34% 43,866.73 46.04% 70,863.85 74.38% 24,407.30 25.62%
16.01.00 CORTE SUPERFICIAL CON MAQUINARIA H=0.20m M3 406.84 S/.6.63 S/.2,697.35 406.84 2,697.35 100.00% -21.48 -142.41 -5.28% 385.36 2,554.94 94.72% 21.48 142.41 5.28%
16.02.00 ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. D=10Km M3 488.21 S/.14.14 S/.6,903.29 488.21 6,903.29 100.00% -25.78 -364.53 -5.28% 462.43 6,538.76 94.72% 25.78 364.53 5.28%
16.03.00 RELLENO CON TIERRA DE CULTIVO M3 406.84 S/.42.76 S/.17,396.48 406.84 17,396.48 100.00% -21.48 -918.48 -5.28% 385.36 16,478.00 94.72% 21.48 918.48 5.28%
16.04.00 PREPARACION DE TERRENO PARA SEMBRADO M2 2,034.21 S/.5.12 S/.10,415.16 0.00 0.00 0.00% 1,926.78 9,865.11 94.72% 1,926.78 9,865.11 94.72% 107.43 550.05 5.28%
16.05.00 SEMBRADO DE GRAS EN CHAMPAS M2 2,034.21 S/.11.62 S/.23,637.52 0.00 0.00 0.00% 1,926.78 22,389.18 94.72% 1,926.78 22,389.18 94.72% 107.43 1,248.34 5.28%
16.06.00 SEMBRADOS DE PLANTAS ORNAMENTALES: PALMERA ROYSTONEA REGIA UND 47.00 S/.90.19 S/.4,238.93 0.00 0.00 0.00% 47.00 4,238.93 100.00% 47.00 4,238.93 100.00% 0.00 0.00 0.00%
16.07.00 SEMBRADOS DE PLANTAS ORNAMENTALES: PONCIANAS H=2.50M UND 47.00 S/.90.19 S/.4,238.93 0.00 0.00 0.00% 47.00 4,238.93 100.00% 47.00 4,238.93 100.00% 0.00 0.00 0.00%
16.08.00 CONSERVACION Y RIEGO DE JARDINES HASTA ENTREGA OBRA GLB 1.00 S/.4,560.00 S/.4,560.00 0.00 0.00 0.00% 1.00 4,560.00 100.00% 1.00 4,560.00 100.00% 0.00 0.00 0.00%
16.09.00 DUCTOS DE CONCRETO P/ PASE DE TUBERIA PVC S/.21,183.49 0.00 0.00% 0.00 0.00% 0.00 0.00% 21,183.49 100.00%
16.09.01 TRAZO NIVELACION Y REPLANTEO M 162.54 S/.1.65 S/.268.19 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 162.54 268.19 100.00%
16.09.02 EXCAVACION DE ZANJA PARA DUCTOS DE CONCRETO M3 117.03 S/.34.57 S/.4,045.73 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 117.03 4,045.73 100.00%
16.09.03 RELLENO DE ZANJA COMPACTADO CON MATERIAL PROPIO M3 68.27 S/.25.83 S/.1,763.41 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 68.27 1,763.41 100.00%
16.09.04 SUM. E INST. DE DUCTO DE CONCRETO DE 04 VIAS. M 162.54 S/.64.42 S/.10,470.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 162.54 10,470.83 100.00%
16.09.05 MANHOLES DE C.A 0.40x0.40M C/ MARCO Y TAPA UND 32.00 S/.119.00 S/.3,808.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 32.00 3,808.00 100.00%
16.09.06 ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. D = 10KM M3 58.51 S/.14.14 S/.827.33 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 58.51 827.33 100.00%
17.00.00 SUM. E INST DE DUCTOS DE CONCRETO-SEMAFORIZACION S/.18,693.36 14,863.56 79.51% 3,829.80 20.49% 18,693.36 100.00% 0.00 0.00%
17.01.00 TRAZO NIVELACION Y REPLANTEO M 141.15 S/.1.65 S/.232.90 141.15 232.90 100.00% 0.00 0.00 0.00% 141.15 232.90 100.00% 0.00 0.00 0.00%
17.02.00 EXCAVACION DE ZANJAS DE 0.60 X 1.20 M M3 101.63 S/.34.57 S/.3,513.35 101.63 3,513.35 100.00% 0.00 0.00 0.00% 101.63 3,513.35 100.00% 0.00 0.00 0.00%
17.03.00 RELLENO DE ZANJA COMPACTADO CON MATERIAL PROPIO M3 76.22 S/.25.83 S/.1,968.76 76.22 1,968.76 100.00% 0.00 0.00 0.00% 76.22 1,968.76 100.00% 0.00 0.00 0.00%
17.04.00 DUCTOS DE CONCRETO DE DOS VIAS M 141.15 S/.61.76 S/.8,717.42 141.15 8,717.42 100.00% 0.00 0.00 0.00% 141.15 8,717.42 100.00% 0.00 0.00 0.00%
17.05.00 MANHOLES DE C.A. TIPO CE-2 CON MARCO Y TAPA UND 15.00 S/.255.32 S/.3,829.80 0.00 0.00 0.00% 15.00 3,829.80 100.00% 15.00 3,829.80 100.00% 0.00 0.00 0.00%
17.06.00 ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. D = 10KM M3 30.49 S/.14.14 S/.431.13 30.49 431.13 100.00% 0.00 0.00 0.00% 30.49 431.13 100.00% 0.00 0.00 0.00%
COSTO DIRECTO S/. 412,314.11 325,339.63 51,956.67 377,296.30 35,017.81
GASTOS GENERALES VARIABLES 8.00% S/. 32,985.13 26,027.17 4,156.53 30,183.70 2,801.43
UTILIDADES 07.00% S/. 28,861.99 22,773.77 3,636.97 26,410.74 2,451.25
Propietario : MUNICIPALIDAD DISTRITAL DE MORO LOCALIDAD : P.J. MAGDALENA NUEVA, A.H. MIRAFLORES
BAJO, A.H. MIRAMAR ALTO, P.J. LA VICTORIA
Modalidad : POR CONTRATA INICIO DE OBRA : 03.02.2017
Residente : ING. WILSON PORTALES ARIAS TERMINO DE OBRA : 02.06.2017 DISTRITO : CHIMBOTE
supervisor : ING. JULIO CESAR MARTINEZ ESTRADA PLAZO DE EJECUCION : 120 DIAS CALENDARIOS PROVINCIA : SANTA
periodo : 01.03.2017 AL 31.03.2017 TOTAL PRESUPUESTO : S/. 5,495,336.06 REGION : ANCASH
SUB PRESUPUESTO: 003 BERMAS CENTRALES Y AREAS VERDES COSTO DIRECTO TOTAL : S/. 4,049,619.45
13.02.00 EXCAVACION PARA UÑAS DE VEREDAS M3 2.67 S/.39.51 S/.105.49 2.67 105.49 100.00% 1.90 75.07 71.16%
13.03.00 PREPARACIÓN DE SUBRASANTE C/PLANCHA PARA VEREDAS Y PISOS M2 234.06 S/.6.62 S/.1,549.48 234.06 1,549.48 100.00% 50.65 335.30 21.64%
13.04.00 AFIRMADO DE 4" PARA VEREDAS Y PISOS M2 234.06 S/.11.20 S/.2,621.47 234.06 2,621.47 100.00% 50.65 567.28 21.64%
13.05.00 ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. D=10Km M3 59.38 S/.14.14 S/.839.63 59.38 839.63 100.00% 14.43 204.04 24.30%
14.00.00 PISOS Y PAVIMENTOS
14.01.00 VEREDAS
CONCRETO VEREDA F´C=175KG/CM2 E=4" I/ENC ACABADO 1:2/ M2 49.72 S/.54.87 S/.2,728.14 49.72 2,728.14 100.00% 34.11 1,871.62 68.60%
14.01.01 BRUÑADO/CURADO (CEM. TIPO MS)
14.01.02 UÑA DE VEREDAS F´c=175KG/CM2 (CEMENTO TIPO MS) M 66.86 S/.19.12 S/.1,278.36 66.86 1,278.36 100.00% 47.36 905.52 70.83%
14.01.03 PINTADO DE BORDE VEREDAS P=0.30m M 51.86 S/.4.68 S/.242.70 51.86 242.70 100.00% 32.85 153.74 63.35%
14.02.00 PISOS DE ADOQUIN
14.02.01 FALSO PISO PARA ADOQUINADO, E=2" C:H 1:8 M2 184.34 S/.20.76 S/.3,826.90 184.34 3,826.90 100.00% 13.17 273.41 7.14%
14.02.02 PISO DE ADOQUIN CONCRETO - ROJO 4x20x10cm (CEMENTO TIPO V) M2 184.34 S/.55.59 S/.10,247.46 184.34 10,247.46 100.00% 13.17 732.12 7.14%
15.00.00 SARDINELES
15.01.00 SARDINELES PERALTADOS TIPO I
15.01.01 EXCAVACION DE ZANJA PARA SARDINELES M3 144.53 S/.39.51 S/.5,710.38 143.09 5,653.49 99.00% -1.44 -56.89 -1.00%
15.01.02 ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. D = 10KM M3 173.43 S/.14.14 S/.2,452.30 171.71 2,427.98 99.01% -1.72 -24.32 -0.99%
15.01.03 SARDINEL PERALTADO DE CONCRETO DE F'C=175 KG/CM2 (CEM. TIPO MS) M3 206.47 S/.384.75 S/.79,439.33 204.42 78,650.60 99.01% -2.05 -788.74 -0.99%
15.01.04 SARDINEL PERALTADO ENCOFRADO CARAVISTA Y DESENCOFRADO M2 1,651.72 S/.66.72 S/.110,202.76 1,635.35 109,110.55 99.01% -16.37 -1,092.21 -0.99%
15.01.05 SARDINEL PERALTADO ACERO DE REFUERZO KG 7,892.70 S/.4.77 S/.37,648.18 7,703.38 36,745.12 97.60% -189.32 -903.06 -2.40%
15.01.06 JUNTA DE DILATACION CON TEKNOPOR 1" y MASTIQUE ASFALTICO M2 64.50 S/.28.19 S/.1,818.26 51.25 1,444.74 79.46% -13.25 -373.52 -20.54%
15.01.07 PINTADO DE SARDINELES Y BORDES H=variable M 1,651.72 S/.7.69 S/.12,701.73 1,635.35 12,575.84 99.01% -16.37 -125.89 -0.99%
15.02.00 SARDINELES SUMERGIDOS
15.02.01 EXCAVACION DE ZANJA PARA SARDINELES M3 14.57 S/.39.51 S/.575.66 10.32 407.74 70.83% -4.25 -167.92 -29.17%
15.02.02 ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. D = 10KM M3 17.49 S/.14.14 S/.247.31 12.38 175.05 70.78% -5.11 -72.26 -29.22%
15.02.03 SARDINEL SUMERGIDO CONCRETO F'C=175KG/CM2 (CEM. TIPO MS) M3 14.57 S/.363.50 S/.5,296.20 10.32 3,751.32 70.83% -4.25 -1,544.88 -29.17%
15.02.04 SARDINEL SUMERGIDO ENCOFRADO Y DESENCOFRADO M2 194.32 S/.52.50 S/.10,201.80 109.61 5,754.52 56.41% -84.71 -4,447.28 -43.59%
15.02.05 SARDINEL SUMERGIDO ACERO DE REFUERZO KG 473.17 S/.4.77 S/.2,257.02 267.01 1,273.64 56.43% -206.16 -983.38 -43.57%
15.02.06 JUNTA DE DILATACION CON TEKNOPOR 1" y MASTIQUE ASFALTICO M2 3.83 S/.28.19 S/.107.97 2.76 77.80 72.06% -1.07 -30.16 -27.93%
VALORIZACION MENSUAL DE OBRA N° 05
(DESDE EL 01 DE JUNIO HASTA EL 17 DE JUNIO DEL 2017)
Obra :“MEJORAMIENTO DEL SERVICIO VIAL INTEGRAL EN LA AV. CAMINO REAL, DISTRITO DE CHIMBOTE, SANTA, ANCASH” I ETAPA
Propietario : MUNICIPALIDAD DISTRITAL DE MORO LOCALIDAD : P.J. MAGDALENA NUEVA, A.H. MIRAFLORES
BAJO, A.H. MIRAMAR ALTO, P.J. LA VICTORIA
Modalidad : POR CONTRATA INICIO DE OBRA : 03.02.2017
Residente : ING. WILSON PORTALES ARIAS TERMINO DE OBRA : 02.06.2017 DISTRITO : CHIMBOTE
supervisor : ING. JULIO CESAR MARTINEZ ESTRADA PLAZO DE EJECUCION : 120 DIAS CALENDARIOS PROVINCIA : SANTA
periodo : 01.03.2017 AL 31.03.2017 TOTAL PRESUPUESTO : S/. 5,495,336.06 REGION : ANCASH
SUB PRESUPUESTO: 003 BERMAS CENTRALES Y AREAS VERDES COSTO DIRECTO TOTAL : S/. 4,049,619.45
16.02.00 ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. D=10Km M3 488.21 S/.14.14 S/.6,903.29 462.43 6,538.76 94.72% -25.78 -364.53 -5.28%
16.03.00 RELLENO CON TIERRA DE CULTIVO M3 406.84 S/.42.76 S/.17,396.48 385.36 16,478.00 94.72% -21.48 -918.48 -5.28%
16.04.00 PREPARACION DE TERRENO PARA SEMBRADO M2 2,034.21 S/.5.12 S/.10,415.16 1,926.78 9,865.11 94.72% -107.43 -550.04 -5.28%
16.05.00 SEMBRADO DE GRAS EN CHAMPAS M2 2,034.21 S/.11.62 S/.23,637.52 1,926.78 22,389.18 94.72% -107.43 -1,248.34 -5.28%
17.00.00 SUM. E INST DE DUCTOS DE CONCRETO-SEMAFORIZACION
17.01.00 TRAZO NIVELACION Y REPLANTEO M 141.15 S/.1.65 S/.232.90 141.15 232.90 100.00% 142.61 235.31 101.03%
17.02.00 EXCAVACION DE ZANJAS DE 0.60 X 1.20 M M3 101.63 S/.34.57 S/.3,513.35 101.63 3,513.35 100.00% 102.68 3,549.65 101.03%
17.03.00 RELLENO DE ZANJA COMPACTADO CON MATERIAL PROPIO M3 76.22 S/.25.83 S/.1,968.76 76.22 1,968.76 100.00% 77.01 1,989.17 101.04%
17.04.00 DUCTOS DE CONCRETO DE DOS VIAS M 141.15 S/.61.76 S/.8,717.42 141.15 8,717.42 100.00% 142.61 8,807.59 101.03%
17.05.00 MANHOLES DE C.A. TIPO CE-2 CON MARCO Y TAPA UND 15.00 S/.255.32 S/.3,829.80 15.00 3,829.80 100.00% 2.00 510.64 13.33%
17.06.00 ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. D = 10KM M3 30.49 S/.14.14 S/.431.13 30.49 431.13 100.00% 44.58 630.36 146.21%
COSTO DIRECTO S/. 21,335.09 -13,834.31
GASTOS GENERALES VARIABLES 8.00% S/. 1,706.81 -1,106.74
UTILIDADES 07.00% S/. 1,493.46 -968.40
OBRA :“MEJORAMIENTO DEL SERVICIO VIAL INTEGRAL EN LA AV. CAMINO REAL, DISTRITO DE CHIMBOTE, SANTA, ANCASH” I ETAPA
MONTO
VALORIZACION
CONTRATO % DE AVANCE SALDO POR
DESCRIPCION
ACUMULADO VALORIZAR
(s/IGV) ANTERIOR ACTUAL ACUMULADO
A: VALORIZACION CONTRACTUAL
PAVIMENTACION 3,259,529.25 2,985,816.11 270,311.14 3,256,127.25 99.90% 3,402.00
CONSTRUCCION DE VEREDAS 923,373.98 883,586.89 12,265.71 895,852.60 97.02% 27,521.38
BERMA CENTRAL Y AREAS VERDES 474,161.23 374,140.57 59,750.17 433,890.74 91.51% 40,270.49
B: REAJUSTES
SUB TOTALES 0.00 0.00 0.00
TOTAL (B) 0.00 0.00 0.00
C: AMORTIZACIONES
AMORTIZACION DEL ADELANTO DIRECTO 0.00 0.00 0.00 0.00 0.00
AMORTIZACION DEL ADELANTO DE MATERIALES 0.00 0.00 0.00 0.00 0.00
TOTAL (C) 0.00 0.00 0.00 0.00 0.00
D: RETENCIONES *
FONDO DE GARANTIA (10% * VN) 0.00 0.00 0.00
GASTOS DE LICITACION 0.00 0.00 0.00
MULTA POR ATRASO DE OBRA 0.00 0.00 0.00
TOTAL (D) 0.00 0.00 0.00
VALORIZACION AL
DESCRIPCION
17/06/17
B: DESCUENTOS : (D) S/ -
AMORTIZACION DE ADELANTOS
ADELANTO DIRECTO 20.00% S/ -
ADELANTO POR MATERIALES 40.00% S/ -
Son: CUATROCIENTOS TRES MIL NOVECIENTOS CUARENTA Y CINCO CON 88/100 SOLES.
RESUMEN DE VALORIZACION MENSUAL N° 02
OBRA :“MEJORAMIENTO DEL SERVICIO VIAL INTEGRAL EN LA AV. CAMINO REAL, DISTRITO DE CHIMBOTE, SANTA, ANCASH” I ETAPA
RESIDENTE : ING. JUAN FREDY ROBLES MIÑANO TERMINO DE OBRA 02.06.2017 DISTRITO CHIMBOTE
SUPERVISOR : ING. JULIO CESAR MARTINEZ ESTRADA PLAZO DE EJEC. 120 DIAS CALENDARIOS PROVINCIA SANTA
PERIODO : 01.06.2017 AL 17.06.2017 TOTAL PRESUP. S/. 5,495,336.06 REGION ANCASH
COSTO DIRECTO TOTAL S/. 4,049,621.27
CODIGO
PRESUPUESTO BASE VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO POR VALORIZAR
DESCRIPCION
PARTIDA PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
COSTO DIRECTO 4,049,621.27 83.09% 3,364,698.25 7.35% 297,675.68 90.44% 3,662,373.93 9.56% 387,247.34
UTILIDAD 7% 283,473.49 83.09% 235,528.88 7.35% 20,837.30 90.44% 256,366.18 9.56% 27,107.31
100.00% 90.00%
90.00%
80.00%
80.00%
70.00%
70.00%
60.00% 60.00%
50.00% 50.00%
47.31%
40.00%
40.00%
30.00% 28.36%
20.97%
21.01% 30.00%
20.00% 26.34%
21.01%
20.97%
10.00% 20.00%
0.00%
10.00%
1º VAL 2º VAL 3º VAL 4º VAL 5º VAL 7.35%
0.00%
0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 5.5
% Avance programado
% Avance acumulado programado % Avance Acumulado Ejecutado % Avance Ejecutado
80.00%
0.988974905053282 1.00000000518567
70.00% 1
% Avance acumulado programado
60.00%
% Avance Acumulado Ejecutado
47.31% 0.8
50.00%
0.731566898106499
40.00%
PROGRAMAD
28.36% 0.6 O
30.00%
20.97% 21.01% Column K
20.00% 0.473104454037007
1
0.4
10.00% 0.31927425650251
0.00% 0.210066542863649
0.209679872113078
1º VAL 2º VAL 0.2
-10.00%
0
03/02/17 28/02/17 31/03/17 30/04/17 31/05/17 02/06/17
CUADRO COMPARATIVO DE AVANCE PROGRAMADO VS. EJECUTADO
OBRA :“MEJORAMIENTO DEL SERVICIO VIAL INTEGRAL EN LA AV. CAMINO REAL, DISTRITO DE CHIMBOTE, SANTA, ANCASH” I ETAPA
ACUMULADO
VALORIZACION PROGRAMADO EJECUTADO ACUMULADO EJECUTADO SALDO
PROGRAMADO
MENSUAL S/. % S/. % S/. % S/. % S/. %
VALORIZACION Nº 01 976,492.65 20.97% 978,293.44 21.01% 976,492.65 20.97% 978,293.44 21.01% 3,678,771.02 78.99%
VALORIZACION Nº 02 1,226,785.26 26.34% 342,327.02 7.35% 2,203,277.91 47.31% 1,320,620.46 28.36% 3,336,444.00 71.64%
VALORIZACION Nº 03 1,203,676.26 25.85% 0.00 0.00% 3,406,954.17 73.16% 0.00 28.36% 4,657,064.46 71.64%
VALORIZACION Nº 04 1,198,765.69 25.74% 0.00 0.00% 4,605,719.87 98.90% 0.00 28.36% 4,657,064.46 71.64%
VALORIZACION Nº 05 51,344.60 1.10% 0.00 0.00% 4,657,064.47 100.00% 0.00 28.36% 4,657,064.46 71.64%
TOTAL 4,657,064.46 100.00% 1,320,620.46 28.36% ATRASADA EN 15.38%
RESUMEN DE VALORIZACIONES DE OBRA
OBRA :“MEJORAMIENTO DEL SERVICIO VIAL INTEGRAL EN LA AV. CAMINO REAL, DISTRITO DE CHIMBOTE, SANTA, ANCASH” I ETAPA
UBICACIÓN : Distrito CHIMBOTE / Provincia SANTA / Departamento ANCASH
PROP. :MUNICIPALIDAD PROVINCIAL DEL SANTA
EJECUTA : "CONSORCIO CAMINO REAL"
RESIDENTE : ING. WILSON PORTALES ARIAS
SUPERVISOR : ING. JULIO CESAR MARTINEZ ESTRADA
FECHA : FEBRERO DEL 2017
PRES. BASE : 5,495,336.06
PRES. CONTRACTUAL : 5,495,336.06
PRES. CON IGV 18% : 5,495,336.06
FACTOR DE RELACION : 1.0000
TIEMPO DE EJECUCIÓN : 120 dias Calendario
IMP. GEN A LAS VENTAS 18.00% 838,271.60 176,092.82 61,618.87 - - - 237,711.68 600,559.92
AVANCE PROGRAMADO ACUMULADO 20.97% 47.31% 0.00% 0.00% 0.00% 68.28% 79.03%
AVANCE REAL ACUMULADO 21.01% 28.36% 0.00% 0.00% 0.00% 49.36% 50.64%
DETALLE DE PAGO AL CONTRATISTA VALORIZACION N° 02 - MARZO DEL 2017
Del 01 al 17 de Junio del 2017
OBRA :“MEJORAMIENTO DEL SERVICIO VIAL INTEGRAL EN LA AV. CAMINO REAL, DISTRITO DE CHIMBOTE, SANTA, ANCASH” I ETAPA
REAJUSTES (S)
B
0.00 0.00 0.00
AMORTIZACIONES (A)
F MONTO TOTAL DE VALORIZACIÓN CON IGV 5,495,336.06 5,007,381.41 403,945.88 5,411,327.29 98.47% 84,008.77
ITEM
01.00.00
01.01.00
01.02.00
01.03.00
01.04.00
01.05.00
01.06.00
02.00.00
02.01.00
02.02.00
02.03.00
03.00.00
03.01.00
03.02.00
03.03.00
03.04.00
03.05.00
03.06.00
03.07.00
03.08.00
03.09.00
04.00.00
04.01.00
04.02.00
04.03.00
05.00.00
05.01.00
05.02.00
05.03.00
05.04.00
05.05.00
05.06.00
05.07.00
06.00.00
06.01.00
06.02.00
07.00.00
07.01.00
07.02.00
07.03.00
07.04.00
08.00.00
08.01.00
08.02.00
08.03.00
08.04.00
08.05.00
09.00.00
09.01.00
09.01.
09.01.
09.01.
09.01.
09.02.00
09.02.
09.02.
09.02.
09.02.
10.00.00
10.01.00
10.01.
10.01.
10.01.
10.01.
10.01.
10.01.
11.00.00
11.01.00
11.02.00
12.00.00
12.01.00
13.00.00
13.01.00
13.02.00
13.03.00
13.04.00
13.05.00
14.00.00
14.01.00
14.01.
14.01.
14.01.
14.02.00
14.02.
14.02.
15.00.00
15.01.00
15.01.
15.01.
15.01.
15.01.
15.01.
15.01.
15.01.
15.02.00
15.02.
15.02.
15.02.
15.02.
15.02.
15.02.
16.00.00
16.01.00
16.02.00
16.03.00
16.04.00
16.05.00
16.06.00
16.07.00
16.08.00
16.09.00
16.09.
16.09.
16.09.
16.09.
16.09.
16.09.
17.00.00
17.01.00
17.02.00
17.03.00
17.04.00
17.05.00
17.06.00
(A)
(B)
(C)
TOTAL VALORIZADO SIN I.G.V. ( A + B +C )
I.G.V (18%)
MONTO TOTAL VALORIZADO
PORCENTAJE DE AVANCE VALORIZADO
“MEJORAMIENTO DEL SERVICIO VIAL INTEGRAL EN LA AV. CAMINO REAL, DISTRITO DE CHIMBOTE, PROVINCIA DE SANTA - ANCASH.” I ETAPA
CONSORCIO CAMINO REAL
ING. JULIO CÉSAR MARTINEZ ESTRADA
VALORIZACI
CORRESPONDIENTE AL
OBRAS PROVISIONALES
MOVILIZACION Y DESMOVILIZACION DE EQUIPO GLB 1.00
TRANSPORTE DE EQUIPO, MATERIALES Y HERRAMIENTAS GLB 1.00
ALQUIER PARA OFICINA, ALMACEN Y CASETA DE GUARDIANIA GLB 1.00
CARTEL DE OBRA DE 3.60x7.20m - (Gigantografía) UND 2.00
SEÑALIZACION Y SEGURIDAD EN OBRA GLB 1.00
MANTENIMIENTO Y DESVIO DE TRANSITO TEMPORAL GLB 1.00
OBRAS PRELIMINARES 0.00
TRAZO NIVELACION Y REPLANTEO INICIAL DE OBRA M2 18,100.75
TRAZO NIVELACION Y REPLANTEO DURANTE LA OBRA M2 18,100.75
DEMOLICION DE CARPETA ASFALTICA EXISTENTE DE 2" M2 13,301.81
MOVIMIENTO DE TIERRAS 0.00
CORTE HASTA NIVEL DE SUBRASANTE M3 17,760.44
CONFORMACION DE SUB-RASANTE M2 18,100.75
BASE DE AFIRMADO E= 0.25m M2 14,971.92
BASE DE AFIRMADO E= 0.30m M2 3,128.83
SUB - BASE DE AFIRMADO E= 0.25m M2 14,971.92
SUB - BASE DE AFIRMADO E= 0.30m M2 3,128.83
MEJORAMIENTO DE TERRENO DE FUNDACION CON OVER TAM. MAX. 2"-4 ", H M3 5,074.43
SUMINISTRO Y COLOCACION DE GEOMALLA MULTIAXIAL M2 18,100.75
ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. D=10Km F.E.=20% M3 21,312.53
PAVIMENTACION 0.00
BARRIDO DE BASE PARA IMPRIMACION M2 18,100.75
IMPRIMACION CON EMULSION ASFALTICA M2 18,100.75
CARPETA ASFALTICA EN CALIENTE DE 3" M2 18,100.75
SEÑALIZACION 0.00
PINTADO DE PAVIMENTOS (SIMBOLOS - Y LETRAS) M2 929.90
PINTADO DE PAVIMENTOS ( LINEA DISCONTINUA) M 381.00
PINTADO DE PAVIMENTOS ( LINEA CONTINUA) M 4,416.29
SEÑAL INFORMATIVA INC/SUM/COLOCACION UND 5.00
SEÑAL REGLAMENTARIA INC/SUM/COLOCACION UND 6.00
SEÑAL PREVENTIVA INC/SUM/COLOCACION UND 10.00
SUMINISTRO E INSTALACION DE TACHAS REFLECTIVAS BIDIRECCIONALES UND 136.00
VARIOS 0.00
NIVELACION DE TECHOS DE BUZONES, H=Variable UND 30.00
SUM. Y COLOCACION DE TUBO PROTECTOR PARA CHOQUES, D=4" + ACAB UND 34.00
OBRAS PRELIMINARES
TRAZO NIVELACION Y REPLANTEO DURANTE LA OBRA M2 5,668.63
DEMOLICION DE VEREDAS E=0.10M CON MAQUINA (80%) M2 4,310.79
DEMOLICION MANUAL DE VEREDAS E=0.10M (20%) M2 1,077.70
DEMOLICION DE SARDINEL DE H.PROM=0.40 M. CON MAQUINA M 915.40
MOVIMIENTO DE TIERRAS
CORTE SUPERFICIAL MANUAL HASTA 0.20M M3 1,133.73
EXCAVACION PARA UÑAS DE VEREDAS M3 39.43
PREPARACIÓN DE SUBRASANTE C/PLANCHA PARA VEREDAS Y PISOS M2 5,668.63
AFIRMADO DE 4" PARA VEREDAS Y PISOS M2 5,668.63
ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. D=10Km M3 2,209.38
PISOS Y PAVIMENTOS
VEREDAS
CONCRETO VEREDA F´C=175KG/CM2 E=4" I/ENC ACABADO 1:2/ BRUÑADO M2 2,604.82
UÑA DE VEREDAS F´c=175KG/CM2 (CEMENTO TIPO MS) M 985.70
JUNTA DE DILATACION CON ASFALTO 1" M 443.57
PINTADO DE BORDE VEREDAS P=0.30m M 2,184.67
PISOS DE ADOQUIN
FALSO PISO PARA ADOQUINADO, E=2" C:H 1:8 M2 2,946.39
PISO DE ADOQUIN CONCRETO - NEGRO 4X20X10cm (CEMENTO TIPO V) M2 982.13
PISO DE ADOQUIN CONCRETO - AMARILLO 4x20x10cm (CEMENTO TIPO V) M2 982.13
PISO DE ADOQUIN CONCRETO - ROJO 4x20x10cm (CEMENTO TIPO V) M2 982.13
SARDINELES
SARDINELES PERALTADOS TIPO II
EXCAVACION DE ZANJA PARA SARDINELES M3 91.30
ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. D = 10KM M3 104.99
SARDINEL PERALTADO DE CONCRETO DE F'C=175 KG/CM2 (CEM. TIPO MS M3 82.17
SARDINEL PERALTADO ENCOFRADO CARAVISTA Y DESENCOFRADO M2 1,095.56
SARDINEL PERALTADO ACERO DE REFUERZO KG 3,135.72
JUNTA DE DILATACION CON TEKNOPOR 1" y MASTIQUE ASFALTICO M2 21.30
VARIOS
SUM. NIVELACION Y COLOCACION DE CAJAS AGUA (TERMOPLASTICO) UND 152.00
SUM. NIVELACION Y COLOCACION DE CAJAS DESAGUE (CONCRETO) UND 152.00
OBRAS PRELIMINARES
TRAZO NIVELACION Y REPLANTEO DURANTE LA OBRA M2 2,477.46
MOVIMIENTO DE TIERRAS
CORTE SUPERFICIAL MANUAL HASTA 0.20M M3 46.81
EXCAVACION PARA UÑAS DE VEREDAS M3 2.67
PREPARACIÓN DE SUBRASANTE C/PLANCHA PARA VEREDAS Y PISOS M2 234.06
AFIRMADO DE 4" PARA VEREDAS Y PISOS M2 234.06
ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. D=10Km M3 59.38
PISOS Y PAVIMENTOS
VEREDAS
CONCRETO VEREDA F´C=175KG/CM2 E=4" I/ENC ACABADO 1:2/ BRUÑADO M2 49.72
UÑA DE VEREDAS F´c=175KG/CM2 (CEMENTO TIPO MS) M 66.86
PINTADO DE BORDE VEREDAS P=0.30m M 51.86
PISOS DE ADOQUIN
FALSO PISO PARA ADOQUINADO, E=2" C:H 1:8 M2 184.34
PISO DE ADOQUIN CONCRETO - ROJO 4x20x10cm (CEMENTO TIPO V) M2 184.34
SARDINELES
SARDINELES PERALTADOS TIPO I
EXCAVACION DE ZANJA PARA SARDINELES M3 144.53
ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. D = 10KM M3 173.43
SARDINEL PERALTADO DE CONCRETO DE F'C=175 KG/CM2 (CEM. TIPO MS M3 206.47
SARDINEL PERALTADO ENCOFRADO CARAVISTA Y DESENCOFRADO M2 1,651.72
SARDINEL PERALTADO ACERO DE REFUERZO KG 7,892.70
JUNTA DE DILATACION CON TEKNOPOR 1" y MASTIQUE ASFALTICO M2 64.50
PINTADO DE SARDINELES Y BORDES H=variable M 1,651.72
SARDINELES SUMERGIDOS
EXCAVACION DE ZANJA PARA SARDINELES M3 14.57
ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. D = 10KM M3 17.49
SARDINEL SUMERGIDO CONCRETO F'C=175KG/CM2 (CEM. TIPO MS) M3 14.57
SARDINEL SUMERGIDO ENCOFRADO Y DESENCOFRADO M2 194.32
SARDINEL SUMERGIDO ACERO DE REFUERZO KG 473.17
JUNTA DE DILATACION CON TEKNOPOR 1" y MASTIQUE ASFALTICO M2 3.83
AREAS VERDES
CORTE SUPERFICIAL CON MAQUINARIA H=0.20m M3 406.84
ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. D=10Km M3 488.21
RELLENO CON TIERRA DE CULTIVO M3 406.84
PREPARACION DE TERRENO PARA SEMBRADO M2 2,034.21
SEMBRADO DE GRAS EN CHAMPAS M2 2,034.21
SEMBRADOS DE PLANTAS ORNAMENTALES: PALMERA ROYSTONEA REGIA UND 47.00
SEMBRADOS DE PLANTAS ORNAMENTALES: PONCIANAS H=2.50M UND 47.00
CONSERVACION Y RIEGO DE JARDINES HASTA ENTREGA OBRA GLB 1.00
DUCTOS DE CONCRETO P/ PASE DE TUBERIA PVC
TRAZO NIVELACION Y REPLANTEO M 162.54
EXCAVACION DE ZANJA PARA DUCTOS DE CONCRETO M3 117.03
RELLENO DE ZANJA COMPACTADO CON MATERIAL PROPIO M3 68.27
SUM. E INST. DE DUCTO DE CONCRETO DE 04 VIAS. M 162.54
MANHOLES DE C.A 0.40x0.40M C/ MARCO Y TAPA UND 32.00
ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. D = 10KM M3 58.51
SUM. E INST DE DUCTOS DE CONCRETO-SEMAFORIZACION
TRAZO NIVELACION Y REPLANTEO M 141.15
EXCAVACION DE ZANJAS DE 0.60 X 1.20 M M3 101.63
RELLENO DE ZANJA COMPACTADO CON MATERIAL PROPIO M3 76.22
DUCTOS DE CONCRETO DE DOS VIAS M 141.15
MANHOLES DE C.A. TIPO CE-2 CON MARCO Y TAPA UND 15.00
ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. D = 10KM M3 30.49
COSTO DIRECTO
GASTOS GENERALES 8% DE ( A )
UTILIDADES 7% DE ( B )
TOTAL VALORIZADO SIN I.G.V. ( A + B +C )
I.G.V (18%)
MONTO TOTAL VALORIZADO
PORCENTAJE DE AVANCE VALORIZADO
FORMATO N° 02
ANTA - ANCASH.” I ETAPA
131619.47
5,565,336.06 10529.56
9213.36
151362.39
151362.39
27245.23
178607.62
ACUMULADO ACTUAL SALDO POR VALORIZAR
719070.48 850689.95
57525.64 68055.2
50334.93 59548.29
826931.05 978293.44
826931.05 978293.44
148847.6 176092.83
975778.65 1154386.27
719070.45
131619.47
850689.92
RESUMEN DE LA VALORIZACION DE LA OBRA PRINCIPAL
OBRA: “MEJORAMIENTO DEL SERVICIO VIAL INTEGRAL EN LA AV. CAMINO REAL, DISTRITO DE CHIMBOTE,
SANTA, ANCASH.” I ETAPA
EJECUTA: CAMINO REAL
SUPERVISA: ING. JULIO CÉSAR MARTINEZ ESTRADA
MONTO VAL. N° 01
CONCEPTO ACUMULADO
HASTA VAL. N°
(N-1) (S/.) mes 1
(S/.)
1.- MONTO VALORIZADO SIN REAJUSTE: 0.00 342,327.02
- Monto Bruto Valorizado sin reajuste 0.00 0.00
SON: SEISCIENTOS MIL TRESCIENTOS TREINTA Y TRES CON 10/100 NUEVOS SOLES
CRONOGRAMA VALORIZADO DE AVANCE MENSUAL A LA FECHA
OBRA :“MEJORAMIENTO DEL SERVICIO VIAL INTEGRAL EN LA AV. CAMINO REAL, DISTRITO DE CHIMBOTE
ETAPA
UBICACIÓN :CHIMBOTE - SANTA - ANCASH
CLIENTE : MUNICIPALIDAD PROVINCIAL DEL SANTA
CONTRATISTA : CONSORCIO CAMINO REAL
SUPERVISION : ING. JULIO CESAR MARTINEZ ESTRADA
MODALIDAD : POR CONTRATO
1.- PAVIMENTACION
M2 18,100.75
04.02.00 IMPRIMACION CON EMULSION ASFALTICA
04.03.00 CARPETA ASFALTICA EN CALIENTE DE 3" M2 18,100.75
05.00.00 SEÑALIZACION
05.01.00 PINTADO DE PAVIMENTOS (SIMBOLOS - Y LETRAS) M2 929.90
05.02.00 PINTADO DE PAVIMENTOS ( LINEA DISCONTINUA) M 381.00
05.03.00 PINTADO DE PAVIMENTOS ( LINEA CONTINUA) M 4,416.29
05.04.00 SEÑAL INFORMATIVA INC/SUM/COLOCACION UND 5.00
05.05.00 SEÑAL REGLAMENTARIA INC/SUM/COLOCACION UND 6.00
05.06.00 SEÑAL PREVENTIVA INC/SUM/COLOCACION UND 10.00
SUMINISTRO E INSTALACION DE TACHAS REFLECTIVAS
UND 136.00
05.07.00 BIDIRECCIONALES
06.00.00 VARIOS
06.01.00 NIVELACION DE TECHOS DE BUZONES, H=Variable UND 30.00
SUM. Y COLOCACION DE TUBO PROTECTOR PARA CHOQUES, D=4" +
UND 34.00
06.02.00 ACABDO E INCL DADOS DE ANCLAJE
COSTO DIRECTO COSTO DIRECTO
GASTOS GENERALES (8.00%) 8%
UTILIDAD (7.00%) 7%
SUBTOTAL SUBTOTAL
IGV (18%) IGV (18%)
TOTAL GENERAL DE PRESUPUESTO TOTAL
Avance Promedio Porcentual Mensual % Avance Fisico Programado
Avance Promedio Acumulado
DO DE AVANCE MENSUAL A LA FECHA DE INICIO DE OBRA
RAL EN LA AV. CAMINO REAL, DISTRITO DE CHIMBOTE, PROVINCIA DE SANTA - ANCASH.” I
Nº
07.00.00
07.01.00
07.02.00
07.03.00
07.04.00
08.00.00
08.01.00
08.02.00
08.03.00
08.04.00
08.05.00
09.00.00
09.01.00
09.01.
09.01.
09.01.
09.01.
09.02.00
09.02.
09.02.
09.02.
09.02.
10.00.00
10.01.00
10.01.
10.01.
10.01.
10.01.
10.01.
10.01.
11.00.00
11.01.00
11.02.00
CRONOGRAMA VALORIZADO DE AVANCE MENSUAL A LA FECHA DE IN
:“MEJORAMIENTO DEL SERVICIO VIAL INTEGRAL EN LA AV. CAMINO REAL, DISTRITO DE CHIMBOTE, PROVINCIA D
:CHIMBOTE - SANTA - ANCASH
: MUNICIPALIDAD PROVINCIAL DEL SANTA
: CONSORCIO CAMINO REAL
: ING. JULIO CESAR MARTINEZ ESTRADA
: POR CONTRATO
.- CONSTRUCCION DE VEREDAS
OBRAS PRELIMINARES
TRAZO NIVELACION Y REPLANTEO DURANTE LA OBRA M2 5,668.63
DEMOLICION DE VEREDAS E=0.10M CON MAQUINA (80%) M2 4,310.79
DEMOLICION MANUAL DE VEREDAS E=0.10M (20%) M2 1,077.70
DEMOLICION DE SARDINEL DE H.PROM=0.40 M. CON MAQUINA M 915.40
MOVIMIENTO DE TIERRAS
CORTE SUPERFICIAL MANUAL HASTA 0.20M M3 1,133.73
EXCAVACION PARA UÑAS DE VEREDAS M3 39.43
PREPARACIÓN DE SUBRASANTE C/PLANCHA PARA VEREDAS Y PISOS M2 5,668.63
AFIRMADO DE 4" PARA VEREDAS Y PISOS M2 5,668.63
ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. D=10Km M3 2,209.38
PISOS Y PAVIMENTOS
VEREDAS
CONCRETO VEREDA F´C=175KG/CM2 E=4" I/ENC ACABADO 1:2/ M2 2,604.82
BRUÑADO/CURADO (CEM. TIPO MS)
UÑA DE VEREDAS F´c=175KG/CM2 (CEMENTO TIPO MS) M 985.70
JUNTA DE DILATACION CON ASFALTO 1" M 443.57
PINTADO DE BORDE VEREDAS P=0.30m M 2,184.67
PISOS DE ADOQUIN
FALSO PISO PARA ADOQUINADO, E=2" C:H 1:8 M2 2,946.39
PISO DE ADOQUIN CONCRETO - NEGRO 4X20X10cm (CEMENTO TIPO V) M2 982.13
PISO DE ADOQUIN CONCRETO - AMARILLO 4x20x10cm (CEMENTO TIPO V) M2 982.13
PISO DE ADOQUIN CONCRETO - ROJO 4x20x10cm (CEMENTO TIPO V) M2 982.13
SARDINELES
SARDINELES PERALTADOS TIPO II
EXCAVACION DE ZANJA PARA SARDINELES M3 91.30
ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. D = 10KM M3 104.99
SARDINEL PERALTADO DE CONCRETO DE F'C=175 KG/CM2 (CEM. TIPO M3 82.17
MS)
SARDINEL PERALTADO ENCOFRADO CARAVISTA Y DESENCOFRADO M2 1,095.56
SARDINEL PERALTADO ACERO DE REFUERZO KG 3,135.72
JUNTA DE DILATACION CON TEKNOPOR 1" y MASTIQUE ASFALTICO M2 21.30
VARIOS
SUM. NIVELACION Y COLOCACION DE CAJAS AGUA (TERMOPLASTICO) UND 152.00
SUM. NIVELACION Y COLOCACION DE CAJAS DESAGUE (CONCRETO) UND 152.00
SUBTOTAL SUBTOTAL
OBRA
UBICACIÓN
CLIENTE
CONTRATISTA
SUPERVISION
MODALIDAD
Nº
12.00.00
12.01.00
13.00.00
13.01.00
13.02.00
13.03.00
13.04.00
13.05.00
14.00.00
14.01.00
14.01.01
14.01.02
14.01.03
14.02.00
14.02.01
14.02.02
15.00.00
15.01.00
15.01.01
15.01.02
15.01.03
15.01.04
15.01.05
15.01.06
15.01.07
15.02.00
15.02.01
15.02.02
15.02.03
15.02.04
15.02.05
15.02.06
16.00.00
16.01.00
16.02.00
16.03.00
16.04.00
16.05.00
16.06.00
16.07.00
16.08.00
16.09.00
16.09.01
16.09.02
16.09.03
16.09.04
16.09.05
16.09.06
17.00.00
17.01.00
17.02.00
17.03.00
17.04.00
17.05.00
17.06.00
CRONOGRAMA VALORIZADO DE AVANCE MENSUAL A LA FECHA DE INI
:“MEJORAMIENTO DEL SERVICIO VIAL INTEGRAL EN LA AV. CAMINO REAL, DISTRITO DE CHIMBOTE, PROVINCIA D
:CHIMBOTE - SANTA - ANCASH
: MUNICIPALIDAD PROVINCIAL DEL SANTA
: CONSORCIO CAMINO REAL
: ING. JULIO CESAR MARTINEZ ESTRADA
: POR CONTRATO
OBRAS PRELIMINARES
TRAZO NIVELACION Y REPLANTEO DURANTE LA OBRA M2 2,477.46
MOVIMIENTO DE TIERRAS
CORTE SUPERFICIAL MANUAL HASTA 0.20M M3 46.81
EXCAVACION PARA UÑAS DE VEREDAS M3 2.67
PREPARACIÓN DE SUBRASANTE C/PLANCHA PARA VEREDAS Y PISOS M2 234.06
AFIRMADO DE 4" PARA VEREDAS Y PISOS M2 234.06
ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. D=10Km M3 59.38
PISOS Y PAVIMENTOS
VEREDAS
CONCRETO VEREDA F´C=175KG/CM2 E=4" I/ENC ACABADO 1:2/ M2 49.72
BRUÑADO/CURADO (CEM. TIPO MS)
UÑA DE VEREDAS F´c=175KG/CM2 (CEMENTO TIPO MS) M 66.86
PINTADO DE BORDE VEREDAS P=0.30m M 51.86
PISOS DE ADOQUIN
FALSO PISO PARA ADOQUINADO, E=2" C:H 1:8 M2 184.34
PISO DE ADOQUIN CONCRETO - ROJO 4x20x10cm (CEMENTO TIPO V) M2 184.34
SARDINELES
SARDINELES PERALTADOS TIPO I
EXCAVACION DE ZANJA PARA SARDINELES M3 144.53
ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. D = 10KM M3 173.43
SARDINEL PERALTADO DE CONCRETO DE F'C=175 KG/CM2 (CEM. TIP M3 206.47
SARDINEL PERALTADO ENCOFRADO CARAVISTA Y DESENCOFRADO M2 1,651.72
SARDINEL PERALTADO ACERO DE REFUERZO KG 7,892.70
JUNTA DE DILATACION CON TEKNOPOR 1" y MASTIQUE ASFALTICO M2 64.50
PINTADO DE SARDINELES Y BORDES H=variable M 1,651.72
SARDINELES SUMERGIDOS
EXCAVACION DE ZANJA PARA SARDINELES M3 14.57
ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. D = 10KM M3 17.49
SARDINEL SUMERGIDO CONCRETO F'C=175KG/CM2 (CEM. TIPO MS) M3 14.57
SARDINEL SUMERGIDO ENCOFRADO Y DESENCOFRADO M2 194.32
SARDINEL SUMERGIDO ACERO DE REFUERZO KG 473.17
JUNTA DE DILATACION CON TEKNOPOR 1" y MASTIQUE ASFALTICO M2 3.83
AREAS VERDES
CORTE SUPERFICIAL CON MAQUINARIA H=0.20m M3 406.84
ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. D=10Km M3 488.21
RELLENO CON TIERRA DE CULTIVO M3 406.84
PREPARACION DE TERRENO PARA SEMBRADO M2 2,034.21
SEMBRADO DE GRAS EN CHAMPAS M2 2,034.21
SEMBRADOS DE PLANTAS ORNAMENTALES: PALMERA ROYSTONEA R UND 47.00
SEMBRADOS DE PLANTAS ORNAMENTALES: PONCIANAS H=2.50M UND 47.00
CONSERVACION Y RIEGO DE JARDINES HASTA ENTREGA OBRA GLB 1.00
DUCTOS DE CONCRETO P/ PASE DE TUBERIA PVC
TRAZO NIVELACION Y REPLANTEO M 162.54
EXCAVACION DE ZANJA PARA DUCTOS DE CONCRETO M3 117.03
RELLENO DE ZANJA COMPACTADO CON MATERIAL PROPIO M3 68.27
SUM. E INST. DE DUCTO DE CONCRETO DE 04 VIAS. M 162.54
MANHOLES DE C.A 0.40x0.40M C/ MARCO Y TAPA UND 32.00
ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. D = 10KM M3 58.51
SUM. E INST DE DUCTOS DE CONCRETO-SEMAFORIZACION
TRAZO NIVELACION Y REPLANTEO M 141.15
EXCAVACION DE ZANJAS DE 0.60 X 1.20 M M3 101.63
RELLENO DE ZANJA COMPACTADO CON MATERIAL PROPIO M3 76.22
DUCTOS DE CONCRETO DE DOS VIAS M 141.15
MANHOLES DE C.A. TIPO CE-2 CON MARCO Y TAPA UND 15.00
ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. D = 10KM M3 30.49
SUBTOTAL SUBTOTAL
559,510.25 - 18,851.66