DESCRIP. DE
SECTOR ING. A CARGO
AREA
ESTRUCTURAS
ZAPATAS
VIGAS DE CIMENTACION
SOBRECIMIENTOS ARMADOS
COLUMNAS
COLUMNETAS
ACERO DE REFUERZO FY= 4200 KG/CM2 - COLUMNETAS kg
VIGAS
VIGAS DE CONFINAMIENTO
LOSAS ALIGERADAS
EXPEDIENTE
METRADO METRADO
METRADO REAL DIF. METRADOS % EJECUTADO
PRESUPUESTO ACUM.
REAL DIF
10108.19 1695.82 KG
DIFERENCIA
A FAVOR EN CONTRA
0.00 790.16
0.00 180.07
0.00 552.05
0.00 42.17
-63.84 0.00
0.00 229.85
-55.46 0.00
0.00 20.82
PORCENTAJE DE
DESCRIP. DE
SECTOR ING. A CARGO
AREA
ESTRUCTURAS
ZAPATAS
VIGAS DE CIMENTACION
SOBRECIMIENTOS ARMADOS
COLUMNAS
COLUMNETAS
VIGAS DE CONFINAMIENTO
LOSAS ALIGERADAS
EXPEDIENTE
Del: 30-Dec-99
Al: 30-Dec-99
REAL DIFERENCIA
17219.43 4253.44 KG
DIFERENCIA
EN CONTRA
1305.65
455.90
759.03
1159.65
0.00
778.60
0.00
0.00
PORCENTAJE DE P
ING. A DESCRIP.
SECTOR
CARGO DE AREA
ANA
02 IBAÑE
MOD
Z
03
PORCENTAJE DE PLAN COMPLET
DESCRIPCIÓN (Actividad)
ESTRUCTURAS
ZAPATAS
VIGAS DE CIMENTACION
SOBRECIMIENTOS ARMADOS
COLUMNAS
COLUMNETAS
VIGAS
VIGAS DE CONFINAMIENTO
ACERO DE REFUERZO FY= 4200 KG/CM2 - VIGAS CONFINAMIENTO
LOSAS ALIGERADAS
DIFERENCIA
% EJECUTADO
A FAVOR EN CONTRA
ING. A DESCRIP.
SECTOR
CARGO DE AREA
ANA
MOD
02 IBAÑE
03
Z
PORCENTAJE DE PLAN COMPLETAD
DESCRIPCIÓN (Actividad)
ESTRUCTURAS
ZAPATAS
VIGAS DE CIMENTACION
SOBRECIMIENTOS ARMADOS
COLUMNAS
COLUMNETAS
VIGAS
VIGAS DE CONFINAMIENTO
ACERO DE REFUERZO FY= 4200 KG/CM2 - VIGAS CONFINAMIENTO
LOSAS ALIGERADAS
30-Dec-99
30-Dec-99
0.00 642.60
0.00 19.81
0.00 837.72
-656.32 0.00
-161.56 0.00
0.00 617.49
-76.37 0.00
0.00 288.18
PORCENT
ING. A DESCRIP.
SECTOR
CARGO DE AREA
ANA
MOD
02 IBAÑE
05
Z
PORCENTAJE DE PLAN COMP
DESCRIPCIÓN (Actividad)
ESTRUCTURAS
ZAPATAS
VIGAS DE CIMENTACION
SOBRECIMIENTOS ARMADOS
COLUMNAS
COLUMNETAS
VIGAS
VIGAS DE CONFINAMIENTO
ACERO DE REFUERZO FY= 4200 KG/CM2 - VIGAS CONFINAMIENTO
LOSAS ALIGERADAS
METRADO METRADO
UND METRADO REAL DIF. METRADO
PRESUPUESTO ACUM.
kg 1258.78 2417.91
kg 128.15 119.71
kg 520.22 712.65
METRADO
EJECUT.
% EJECUTADO
PORCENTAJE
ING. A DESCRIP.
SECTOR
CARGO DE AREA
ALEXI
S MOD
03 CORN 06
EJO
PORCENTAJE DE PLAN COMPLET
DESCRIPCIÓN (Actividad)
ESTRUCTURAS
ZAPATAS
VIGAS DE CIMENTACION
SOBRECIMIENTOS ARMADOS
COLUMNAS
COLUMNETAS
VIGAS
VIGAS DE CONFINAMIENTO
ACERO DE REFUERZO FY= 4200 KG/CM2 - VIGAS CONFINAMIENTO
LOSAS ALIGERADAS
METRADO METRADO
UND METRADO REAL DIF . METRADO
PRESUPUESTO ACUM.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
kg 153.00 379.38 379.38 -226.38
0.00
% EJECUTADO
#DIV/0!
100%
#DIV/0!
100%
#DIV/0!
100%
#DIV/0!
100%
#DIV/0!
100%
#DIV/0!
100%
#DIV/0!
100%
#DIV/0!
100%
PORCENTAJE DE PLAN
ING. A DESCRIP.
SECTOR
CARGO DE AREA
ALEXI
S MOD
03 CORN 07
EJO
PORCENTAJE DE PLAN COMPLETADO
METRADO
DESCRIPCIÓN (Actividad) UND PRESUPUE
STO
ESTRUCTURAS
ZAPATAS
VIGAS DE CIMENTACION
SOBRECIMIENTOS ARMADOS
COLUMNAS
COLUMNETAS
VIGAS
LOSAS ALIGERADAS
EXPEDIENTE REAL
%
METRADO METRADO DIF.
EJECUTAD
REAL ACUM. METRADO
O
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
DIFERENCIA
-100.17 KG
ING. A DESCRIP.
SECTOR
CARGO DE AREA
ALEX MOD
03 DIAZ 07
DESCRIPCIÓN (Actividad) UND
ESTRUCTURAS
ZAPATAS
VIGAS DE CIMENTACION
SOBRECIMIENTOS ARMADOS
COLUMNAS
VIGAS
VIGAS DE CONFINAMIENTO
LOSAS ALIGERADAS
ESCALERAS
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
7846.32 -2243.66 KG
PORCENTAJE DE P
ING. A DESCRIP. DE
SECTOR
CARGO AREA
ALEX OBRAS
01 DIAZ EXT
PORCENTAJE DE PLAN COMPLETAD
DESCRIPCIÓN (Actividad)
ESTRUCTURAS
ZAPATAS
VIGAS DE CIMENTACION
SOBRECIMIENTOS ARMADOS
COLUMNAS
COLUMNETAS
VIGAS
LOSA MACIZA
ACERO DE REFUERZO FY= 4200 KG/CM2 - LOSA MACIZA
ESCALERAS
MESAS DE CONCRETO
CISTERNA
TANQUE ELEVADO
30-Dec-99
30-Dec-99
kg 0.00
kg 347.90
kg 5970.85 5582.03
kg 450.25
0.00 589.36
-686.58 0.00
-2391.63 0.00
-1417.52 0.00
-4947.46 0.00
-1789.40 0.00
PORCENTAJE DE
ING. A DESCRIP.
SECTOR
CARGO DE AREA
ALEXI
S MOD
03 CORN 07
EJO
PORCENTAJE DE PLAN COMPLETAD
ESTRUCTURAS
ZAPATAS
VIGAS DE CIMENTACION
SOBRECIMIENTOS ARMADOS
COLUMNAS
COLUMNETAS
VIGAS
LOSAS ALIGERADAS
CISTERNA
EXPEDIENTE
METRADO METRADO
METRADO REAL DIF. METRADO % EJECUTADO
PRESUPUESTO ACUM.
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
REAL DIFERENCIA
2540.60 -90.78 KG
DESCRIPCION MONTO A VALORIZAR
MOD 01 10108.19
MOD 02 17219.43
MOD 03 26204.34
MOD 04 15488.07
MOD 05 11768.93
MOD 06 25881.99
MOD 07 18283.81
ESC 01 7846.32
ESC 02 7846.32
ESC 03 7846.32
KIOSKO 2540.60
MAESTRANZA 2540.60
OBRAS EXT 33322.92
TANQUE ELEVADO 5000.00
GRUPO ELECTROGENO 2000.00
TOTAL 193897.84 KG
REQ. ANTERIOR 161000.00 KG
NOTA:
SOLO SE CONSIDERO PARTIDAS DEL PRIMER PISO REFERENTES A ESTRUCTURAS.