Mano de Obra 0101010003 OPERARIO hh 0.4706 12.20 5.74 0101010005 PEON hh 0.2353 9.88 2.32 8.06 Materiales 0207070001 AGUA PUESTA EN OBRA m3 0.0134 9.00 0.12 0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.0500 16.00 0.80 02190100010004CONCRETO PREMEZCLADO F'C=120 kg/cm2 m3 0.0350 259.30 9.08 0222030002 SIKA 1 (balde de 20 kg) bal 0.3545 109.50 38.82 48.82
Partida 01.01.03 (010304030401-0102004-01) TRATAMIENTOS DE FISURAS