“CREACION DEL SERVICIO DE AGUA POTABLE Y ALCANTARILLADO EN EL SECTOR LA FLORIDA LOTE 1, DISTRITO DE PARCONA –
PROYECTO:
ICA- ICA”
FECHA: oct-19
Dimensiones
Ítem Descripción de la Partida Unid. N° ElementosN° Veces Parcial Metrado
Largo Ancho Alto
RED ALCANTARILLADO
CALLE 2 2.00 41.40 82.80
CALLE 3 2.00 41.05 82.10
CALLE 4 2.00 42.21 84.42
CALLE 5 2.00 33.36 66.72
CALLE 6 2.00 28.25 56.50
CALLE 7 2.00 27.03 54.06
(PROLG. EL CARMEN) 2.00 122.23 244.46
01.02.06 PUENTE DE MADERA P/PASE PEATONAL(PROVIS. DURANTE OBRA) und 5.00
5.00 5.00
02.02.04 PROTECCION PARA TUB/AGUA DN 90-110mm CON MATERIAL ZARANDEADO DE h=0.30m m 487.22
02.03.02 SUMINISTRO E INSTALACION DE TUBERIA PVC-U UF NTP ISO 1452, DN=90mm (INC. ANILLO) 204.88
CALLE 2 1.00 70.53 70.53
CALLE 3 1.00 71.68 71.68
CALLE 5 1.00 62.67 62.67
02.03.03 DOBLE PRUEBA HIDRAULICA TUBERIA + DESINFECCION DE TUBERIAS PVC DN=110MM m 487.22
CALLE 2 1.00 70.53 70.53
CALLE 3 1.00 71.68 71.68
CALLE 4 1.00 68.93 68.93
CALLE 5 1.00 62.67 62.67
CALLE 6 1.00 62.06 62.06
CALLE 7 1.00 33.24 33.24
(PROLG. EL CARMEN) 1.00 118.11 118.11
2.04 VALVULAS Y ACCESORIOS
02.04.01 CODO DE 90º PVC-U UF NTP ISO 4422 DN 110mm UND 2.00 2.00 2.00
02.04.02 CODO DE 11.25 PVC-U UF NTP ISO 4422 DN 110mm UND 5.00 5.00 5.00
02.04.03 TEE PVC-U UF ISO 4422 CON REDUCCION DE 110mm a 90mm UND 8.00 8.00 8.00
02.04.04 REDUCCION PVC-U UF C-7.5 NTP ISO 1452 110mm A 90mm UND 6.00 6.00 6.00
02.04.05 VALVULA DE COMPUERTA DE HIERRO DUCTIL DE 110MM UND 3.00 3.00 3.00
02.04.06 VALVULA DE COMPUERTA DE HIERRO DUCTIL DE 90MM UND 3.00 3.00 3.00
2.05 EMPALMES
02.05.01 EMPALME A TUBERIA EXISTENTE DE DN 110 MM und 7.00
CALLE 7 4.00 4.00
(PROLG. EL CARMEN) 3.00 3.00
2.06 ANCLAJES
02.06.01 ANCLAJES DE TEES INC. ENCOFRADO und 8.00 8.00 8.00
02.06.02 ANCLAJES DE CODOS INC. ENCOFRADO und 7.00 7.00 7.00
2.07 CONEXIÓN DOMICILIARIA DE AGUA (PEAD)(35 UND)
02.07.01 OBRAS CIVILES PARA INSTALACION DE CONEXIÓN DOMICILIARIA DE AGUA DE POLIETILENO DE ALTA DENSIDAD (PEAD)
02.07.01.01 OBRAS PRELIMINARES
02.07.01.01.01 TRAZO Y REPLANTEO INICIALES M 175.50
CALLE 7 1.00 11.00 8.50 93.50
(PROLG. EL CARMEN) 1.00 3.00 2.20 6.60
(PROLG. EL CARMEN) 1.00 1.00 9.00 9.00
CALLE 2 1.00 3.00 2.20 6.60
CALLE 2 1.00 3.00 5.00 15.00
CALLE 3 1.00 2.00 2.20 4.40
CALLE 3 1.00 2.00 5.00 10.00
CALLE 4 1.00 2.00 2.20 4.40
CALLE 4 1.00 2.00 5.00 10.00
CALLE 5 1.00 2.00 2.20 4.40
CALLE 5 1.00 1.00 5.00 5.00
CALLE 6 1.00 3.00 2.20 6.60
02.07.01.02.04 ELIMIN. DESMONTE(PULS+V) T-NORMAL D=20KM P/TUB. DN 15 - 40 mm PARA TODA PROF. M 221.00
Excavacion
CALLE 7 1.00 11.00 8.50 93.50
(PROLG. EL CARMEN) 1.00 3.00 2.20 6.60
(PROLG. EL CARMEN) 1.00 1.00 9.00 9.00
CALLE 2 1.00 3.00 2.20 6.60
CALLE 2 1.00 3.00 5.00 15.00
CALLE 3 1.00 2.00 2.20 4.40
CALLE 3 1.00 2.00 5.00 10.00
CALLE 4 1.00 2.00 2.20 4.40
CALLE 4 1.00 2.00 5.00 10.00
CALLE 5 1.00 2.00 2.20 4.40
CALLE 5 1.00 1.00 5.00 5.00
CALLE 6 1.00 3.00 2.20 6.60
02.07.02.07.02 CONCRETO f'c=175 kg/cm2 EN LOSA E=10CM FROTACHADO Y BRUÑADO M2 35 1.00 1.00 35.00 35.00
2.08 HIDRANTE (2 UND)
02.08.01 OBRAS CIVILES PARA INSTALACION DE HIDRANTE
02.08.01.01 OBRAS PRELIMINARES
02.08.01.01.01 TRAZO Y REPLANTEO INICALES m2 2.66
Cámara 2.00 1.00 2.22 0.60 2.66
02.08.01.04.02 CONCRETO F'C= 210KG/CM2 P/ANILLO DE CONCRETO DE CAMPANA (CEMENTO P-I) m3 0.05
2.00 1.00 0.16 0.15 0.05
03 SISTEMA DE REDES DE ALCANTARILLADO
03.01 OBRAS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL m 360.55
CALLE 2 1.00 44.65 44.65
CALLE 3 1.00 47.12 47.12
CALLE 4 1.00 40.38 40.38
CALLE 5 1.00 32.64 32.64
CALLE 6 1.00 26.23 26.23
CALLE 7 1.00 27.03 27.03
(PROLG. EL CARMEN) 1.00 142.50 142.50
03.01.02 TRAZO Y REPLANTEO INICIAL m 360.55
CALLE 2 1.00 44.65 44.65
CALLE 3 1.00 47.12 47.12
CALLE 4 1.00 40.38 40.38
CALLE 5 1.00 32.64 32.64
CALLE 6 1.00 26.23 26.23
CALLE 7 1.00 27.03 27.03
(PROLG. EL CARMEN) 1.00 142.50 142.50
03.01.03 TRAZO Y REPLANTEO FINAL m 360.55
CALLE 2 1.00 44.65 44.65
CALLE 3 1.00 47.12 47.12
CALLE 4 1.00 40.38 40.38
CALLE 5 1.00 32.64 32.64
CALLE 6 1.00 26.23 26.23
CALLE 7 1.00 27.03 27.03
(PROLG. EL CARMEN) 1.00 142.50 142.50
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION C/MAQUINA EN TERRENO NORMAL P/TUBERIA H=1.00-1.50 PROF. PARA TUBERIA DN=8" m 360.55
CALLE 5
1.00 32.64 32.64
(PROLG. EL CARMEN)
1.00 19.97 19.97
1.00 28.04 28.04
1.00 47.10 47.10
1.00 47.39 47.39
CALLE 4
1.00 40.38 40.38
CALLE 3
1.00 47.12 47.12
CALLE 2
1.00 44.65 44.65
CALLE 7
1.00 27.03 27.03
CALLE 6
1.00 26.23 26.23
03.02.02 REFINE Y NIVELACION DE FONDO DE ZANJA P/TUB DESGUE DN 200MM m 360.55
CALLE 5
1.00 32.64 32.64
CALLE 4
1.00 40.38 40.38
CALLE 3
1.00 47.12 47.12
CALLE 2
1.00 44.65 44.65
CALLE 7
1.00 27.03 27.03
CALLE 6
1.00 26.23 26.23
(PROLG. EL CARMEN)
1.00 142.50 142.50
03.02.03 CAMA DE ARENA MANUAL E=0.10M ZANJA P/TUB.DESGUE DN 200MM m 360.55
CALLE 5
1.00 32.64 32.64
CALLE 4
1.00 40.38 40.38
CALLE 3
1.00 47.12 47.12
CALLE 2
1.00 44.65 44.65
CALLE 7
1.00 27.03 27.03
CALLE 6
1.00 26.23 26.23
(PROLG. EL CARMEN)
1.00 142.50 142.50
03.02.04 PROTECCION PARA TUB/DESAGUE DN 200mm HASTA H=1.50m CON MATERIAL ZARANDEADO DE h=0.30m m 360.55
CALLE 5
1.00 32.64 32.64
CALLE 4
1.00 40.38 40.38
CALLE 3
1.00 47.12 47.12
CALLE 2
1.00 44.65 44.65
CALLE 7
1.00 27.03 27.03
CALLE 6
1.00 26.23 26.23
(PROLG. EL CARMEN)
1.00 142.50 142.50
03.02.05 RELLENO COMPACT. DE ZANJA PARA TUB/DESAGUE DN 200mm HASTA H=1.50m CON MATERIAL PROPIO m
360.55
CALLE 5
1.00 32.64 32.64
CALLE 4
1.00 40.38 40.38
CALLE 3
1.00 47.12 47.12
CALLE 2
1.00 44.65 44.65
CALLE 7
1.00 27.03 27.03
CALLE 6
1.00 26.23 26.23
(PROLG. EL CARMEN)
1.00 142.50 142.50
03.02.06 ELIMINACION DE MATERIAL EXCEDENTE m 360.55
03.03 SUMINISTRO Y COLOCACION DE TUBERIA UF -PVC
03.03.01 INSTLAC. TUB. DESAGUE PVC ISO 4435 - S25 - 200MM m 360.55
CALLE 2 1.00 44.65 44.65
CALLE 3 1.00 47.12 47.12
CALLE 4 1.00 40.38 40.38
CALLE 5 1.00 32.64 32.64
CALLE 6 1.00 26.23 26.23
CALLE 7 1.00 27.03 27.03
(PROLG. EL CARMEN) 1.00 142.50 142.50
03.03.02 PRUEBA HIDR.+ESCORRENT. TUBERIA 8"(200MM) ZANJA ABIERTA/TAPADA m 360.55
CALLE 2 1.00 44.65 44.65
CALLE 3 1.00 47.12 47.12
CALLE 4 1.00 40.38 40.38
CALLE 5 1.00 32.64 32.64
CALLE 6 1.00 26.23 26.23
CALLE 7 1.00 27.03 27.03
(PROLG. EL CARMEN) 1.00 142.50 142.50
03.04 BUZONES (7 UND)
03.04.01 BUZON TIPO I hmax = 3.00m Ø bz=1.2m
03.04.01.01 OBRAS PRELIMINARES
03.04.01.01.01 Trazo y Nivelacion Inicial m2 31.36
EXCAVACION DE BUZONES ø=1.20 - H=1.2 m m2 5.00 2.80 1.60 22.40
EXCAVACION DE BUZONES ø=1.20 - H=1.5 m m2 2.00 2.80 1.60 8.96
03.04.01.04.01 TARRAJEO C/IMPERMEABILIZANTE LOSA FONDO-PISO (INCL. MEDIA CAÑA) E=20MM C:A 1:3 M3 7.00 2.01 0.02 0.28 0.28
03.04.01.04.02 TARRAJEO C/IMPERMEABILIZANTE MUROS E=40MM C:A 1:3 M3 7.00 2.01 6.00 0.04 3.38 3.38
03.04.01.04.03 TARRAJEO C/IMPERMEABILIZANTE LOSAS MACISAS E=20MM C:A 1:3 M3 7.00 1.73 12.10 12.10
03.04.01.05 CARPINTERIA METALICA Y HERRERIA
03.04.01.04.01 Marco de hierro dúctil con tapa de concreto und 7.00
7.00 1.00 7.00
03.05.03.06 ENCOFRADO (INCL. HABILITACIÓN DE MADERA) PARA MUROS TIPO CARAVISTA m2 4.71
circular 3.00 1.00 perimetro 2.83 0.15 1.27
rectangular 3.00 2.00 0.6 0.6 0.15 0.32
Muro (A=15) 3.00 1.00 area 0.35 0.36 0.38
03.05.03.07 Concreto f'c 210 kg/cm2 p/losas macizas (cemento P-I) m3 0.35
loza maciza 3.00 1.00 area 0.49 0.24 0.35
03.05.03.08 Acero estruc. trabajado p/muros (costo prom. incl. desperdicios) kg kg/ml : 56.52
vertical 3.00 14.00 0.68 3/8" 0.56 15.99
Horizontal 3.00 4.00 2.45 3/8" 0.56 16.47
Acero de ingreso-salida de tuberia 3.00 2.00 7.16 3/8" 0.56 24.06
03.05.03.09 Curado de concreto con aditivo m2 7.00
Muro exterior 3.00 1.00 perimetro 2.83 0.60 5.09
losa .-circular 3.00 1.00 area 0.64 1.91
losa Rectangular 2.00 0.6 0.6 0.72
03.05.03.10 Aditivo desmoldador para encofrado tipo caravista m2 4.41
Muro Interior 3.00 1.00 perimetro 1.88 0.78 4.41
01.01.04 REVOQUES, ENLUCIDOS Y MOLDURAS
01.01.04.01 Tarrajeo c/impermeabilizante losa fondo-piso (incl. media caña) e=20mm c:a 1:3 m2 1.48
media caña 3.00 2.00 0.6 0.41 1.48
01.01.04.02 Tarrajeo c/impermeabilizante muros e=40mm c:a 1:3 m2 3.05
muro interior 3.00 1.00 perimetro 1.88 0.54 3.05
01.01.04.03 Tarrajeo c/impermeabilizante losas macizas e=20mm c:a 1:3 m2 1.36
3.00 1.00 perimetro 1.88 0.24 1.36
01.01.05 CARPINTERIA METALICA Y HERRERIA
01.01.04.01 Marco de hierro dúctil con tapa de concreto und 3.00
3.00 1.00 3.00
03.06.01.02.03 RELLENO COMP.ZANJA(PULSO) P/TUB T-NORMAL DN 100 - 150 DE 0,60 M A 1,00 M PROF M 160.20
CALLE 2 6.00 3.60 21.60
CALLE 3 4.00 3.60 14.40
CALLE 4 4.00 3.60 14.40
CALLE 5 3.00 3.60 10.80
CALLE 6 2.00 6.00 12.00
CALLE 7 12.00 6.00 72.00
PROLONG. EL CARMEN 3.00 3.00 9.00
PROLONG. EL CARMEN 1.00 6.00 6.00
03.06.01.02.04 ELIMIN. DESMONTE(PULS+V) T-NORMAL D=10KM P/TUB. DN 100 - 150 PARA TODA PROF. M 160.20
Excavacion
CALLE 2 6.00 3.60 21.60
CALLE 3 4.00 3.60 14.40
CALLE 4 4.00 3.60 14.40
CALLE 5 3.00 3.60 10.80
CALLE 6 2.00 6.00 12.00
CALLE 7 12.00 6.00 72.00
PROLONG. EL CARMEN 3.00 3.00 9.00
PROLONG. EL CARMEN 1.00 6.00 6.00
03.06.02.03.02 CONCRETO f'c=175 kg/cm2 EN LOSA E=10CM FROTACHADO Y BRUÑADO M2 35 1.00 1.00 35.00 35.00