Está en la página 1de 10

PONTIFICIA UNIVERSIDAD JAVERIANA -

MAESTRIA INGENIERIA CIVIL - PROGRAMMING


AND CONTROL OF CONSTRUCTION PROJECTS

Master of Civil Engineering

PROGRAMMING AND CONTROL OF


CONSTRUCTION PROJECTS

Scheduling and Control


Project Charter – Scope - Work
Breakdown Structures

Manuel Baquero, MSc


baquero_m@javeriana.edu.co
Semester II - 2017
Manuel Baquero. MSc.

Origin of species
Master of Civil Engineering theory
Charles Darwin

Manuel Baquero. MSc.

Master of Civil Engineering


Project
A project is a temporary endeavor
undertaken to create a unique product,
service, or result. The temporary
nature of projects indicates that a
project has a definite beginning and
end. The end is reached when the
project’s objectives have been achieved
or when the project is terminated
because its objectives will not or
cannot be met, or when the need for
the project no longer exists.
Manuel Baquero. MSc.

Manuel Baquero. MSc. 1


PONTIFICIA UNIVERSIDAD JAVERIANA -
MAESTRIA INGENIERIA CIVIL - PROGRAMMING
AND CONTROL OF CONSTRUCTION PROJECTS

Master of Civil Engineering


Restrictions
BUDGET
SCOPE RISKS

QUALITY RESOURCES

sCHEDULE CUSTOMER
Manuel Baquero. MSc.

Master of Civil Engineering


2 Worlds

Formulatión Management

Evaluate

Manuel Baquero. MSc.

Guide and Standards


Master of Civil Engineering

SOURCE: ©2013 Project Management Institute. A Guide to the Project Management Body of Knowledge (PMBOK® Guide) – Fifth Edition

1-6

Manuel Baquero. MSc. 2


PONTIFICIA UNIVERSIDAD JAVERIANA -
MAESTRIA INGENIERIA CIVIL - PROGRAMMING
AND CONTROL OF CONSTRUCTION PROJECTS

Grupos de Procesos PMI


Master of Civil Engineering
Adquisiciones Integración

Comunicaciones Alcance

Riesgos Gerencia de Tiempo


Proyectos

Recursos Humanos Costos


Seguridad
Calidad
Medio Ambiente
Extensión Proyectos
Finanzas de Construcción
Interesados

Reclamos

Project Cycle
Master of Civil Engineering

Grupos de
Procesos del
Proyecto

Ciclo de Vida

Fase Fase Fase Fase

Project Cycle
Master of Civil Engineering
Fase 01

Fase 02

Fase 03

Fase 04

Fase 05

Fase 06

Fase 07

Fase 08

Fase 09

Fase 10

Fase 11

Fase 12

Definición del Pre-Factibilidad Factibilidad Proyecto Contratación Construcción Explotación


Proyecto Definitivo
Estudios de factibilidad

Evaluación

Financiamiento

Diseño
Existencia de una necesidad

Licitación

Construcción

Puesta en marcha

Abandono
Operación y mantenimiento
Análisis de Necesidades

Identificación de soluciones

Manuel Baquero. MSc. 3


PONTIFICIA UNIVERSIDAD JAVERIANA -
MAESTRIA INGENIERIA CIVIL - PROGRAMMING
AND CONTROL OF CONSTRUCTION PROJECTS

Business Case
Master of Civil Engineering

A documented economic
feasibility study used to establish
validity of the benefits of a
selected component lacking
sufficient definition and that is
used as a basis for the
authorization of further project
management activities.
SOURCE: ©2013 Project Management Institute. A Guide to the Project
Management
Manuel Body of Knowledge (PMBOK® Guide) – Fifth Edition
Baquero. MSc.

Project Integration
Master of Civil Engineering Management
Project Integration Management
includes the processes and
activities to identify, define,
combine, unify, and coordinate
the various processes and project
management activities within the
Project Management Process
Groups.
SOURCE: ©2013 Project Management Institute. A Guide to the Project
Management
Manuel Body of Knowledge (PMBOK® Guide) – Fifth Edition
Baquero. MSc.

4.1 Develop Project


Master of Civil Engineering
Charter
Is the process of developing a document that
formally authorizes the existence of a project and
provides the project manager with the authority to
apply organizational resources to project activities.

Manuel Baquero. MSc.


SOURCE: ©2013 Project Management Institute. A Guide to the Project Management Body of Knowledge (PMBOK® Guide) – Fifth Edition

Manuel Baquero. MSc. 4


PONTIFICIA UNIVERSIDAD JAVERIANA -
MAESTRIA INGENIERIA CIVIL - PROGRAMMING
AND CONTROL OF CONSTRUCTION PROJECTS

4.2 Develop Project


Master of Civil Engineering
Management Plan
Is the process of defining, preparing, and
coordinating all subsidiary plans and
integrating them into a comprehensive project
management plan.

Manuel Baquero. MSc.


SOURCE: ©2013 Project Management Institute. A Guide to the Project Management Body of Knowledge (PMBOK® Guide) – Fifth Edition

4.3 Direct and Manage


Master of Civil Engineering
Project Work
Is the process of leading and performing the
work defined in the project management plan
and implementing approved changes to
achieve the project’s objectives.

Manuel Baquero. MSc.


SOURCE: ©2013 Project Management Institute. A Guide to the Project Management Body of Knowledge (PMBOK® Guide) – Fifth Edition

4.4 Monitor and


Master of Civil Engineering
Control Project Work
Is the process of tracking, reviewing, and
reporting the progress to meet the
performance objectives defined in the project
management plan

Manuel Baquero. MSc.


SOURCE: ©2013 Project Management Institute. A Guide to the Project Management Body of Knowledge (PMBOK® Guide) – Fifth Edition

Manuel Baquero. MSc. 5


PONTIFICIA UNIVERSIDAD JAVERIANA -
MAESTRIA INGENIERIA CIVIL - PROGRAMMING
AND CONTROL OF CONSTRUCTION PROJECTS

4.5 Perform Integrated


Master of Civil Engineering
Change Control
Is the process of reviewing all change requests; approving
changes and managing changes to deliverables,
organizational process assets, project documents, and the
project management plan; and communicating their
disposition. It reviews all requests for changes or
modifications to project documents, deliverables, baselines,
or the project management plan and approves or rejects
the changes.

Manuel Baquero. MSc.


SOURCE: ©2013 Project Management Institute. A Guide to the Project Management Body of Knowledge (PMBOK® Guide) – Fifth Edition

4.6 Close Project or


Master of Civil Engineering
Phase
Is the process of finalizing all activities across
all of the Project Management Process Groups
to formally complete the project or phase

Manuel Baquero. MSc.


SOURCE: ©2013 Project Management Institute. A Guide to the Project Management Body of Knowledge (PMBOK® Guide) – Fifth Edition

Project Scope
Master of Civil Engineering Management
Project Scope Management includes
the processes required to ensure
that the project includes all the
work required, and only the work
required, to complete the project
successfully. Managing the project
scope is primarily concerned with
defining and controlling what is and
is not included in the project

SOURCE: ©2013 Project Management Institute. A Guide to the Project


Management
Manuel Body of Knowledge (PMBOK® Guide) – Fifth Edition
Baquero. MSc.

Manuel Baquero. MSc. 6


PONTIFICIA UNIVERSIDAD JAVERIANA -
MAESTRIA INGENIERIA CIVIL - PROGRAMMING
AND CONTROL OF CONSTRUCTION PROJECTS

Project Scope
Master of Civil Engineering Management
Product scope: The features and
functions that characterize a product,
service, or result; and/or

Project scope. The work


performed to deliver a product,
service, or result with the specified
features and functions. The term
project scope is sometimes viewed
as including product scope.
SOURCE: ©2013 Project Management Institute. A Guide to the Project
Management
Manuel Body of Knowledge (PMBOK® Guide) – Fifth Edition
Baquero. MSc.

Project Scope
Master of Civil Engineering Management
The scope baseline for the project is
the approved version of the project
scope statement, work breakdown
structure (WBS), and its associated
WBS dictionary. A baseline can be
changed only through formal change
control procedures and is used as a
basis for comparison while performing
Validate Scope and Control Scope
processes as well as other controlling
processes
SOURCE: ©2013 Project Management Institute. A Guide to the Project
Management
Manuel Body of Knowledge (PMBOK® Guide) – Fifth Edition
Baquero. MSc.

5.1 Plan Scope


Master of Civil Engineering
Management
Is the process of creating a scope management
plan that documents how the project scope will
be defined, validated, and controlled

Manuel Baquero. MSc.


SOURCE: ©2013 Project Management Institute. A Guide to the Project Management Body of Knowledge (PMBOK® Guide) – Fifth Edition

Manuel Baquero. MSc. 7


PONTIFICIA UNIVERSIDAD JAVERIANA -
MAESTRIA INGENIERIA CIVIL - PROGRAMMING
AND CONTROL OF CONSTRUCTION PROJECTS

5.2 Collect
Master of Civil Engineering Requirements
Is the process of determining, documenting,
and managing stakeholder needs and
requirements to meet project objectives.

Manuel Baquero. MSc.


SOURCE: ©2013 Project Management Institute. A Guide to the Project Management Body of Knowledge (PMBOK® Guide) – Fifth Edition

5.3 Define Scope


Master of Civil Engineering

Is the process of developing a detailed


description of the project and product.

Manuel Baquero. MSc.


SOURCE: ©2013 Project Management Institute. A Guide to the Project Management Body of Knowledge (PMBOK® Guide) – Fifth Edition

5.4 Create WBS


Master of Civil Engineering

Is the process of subdividing project


deliverables and project work into smaller,
more manageable components.

Manuel Baquero. MSc.


SOURCE: ©2013 Project Management Institute. A Guide to the Project Management Body of Knowledge (PMBOK® Guide) – Fifth Edition

Manuel Baquero. MSc. 8


PONTIFICIA UNIVERSIDAD JAVERIANA -
MAESTRIA INGENIERIA CIVIL - PROGRAMMING
AND CONTROL OF CONSTRUCTION PROJECTS

5.4 Create WBS


Master of Civil Engineering

Manuel Baquero. MSc.


SOURCE: ©2013 Project Management Institute. A Guide to the Project Management Body of Knowledge (PMBOK® Guide) – Fifth Edition

WBS House of
Master of Civil Engineering Social Interest

5.5 Validate Scope


Master of Civil Engineering

Is the process of formalizing acceptance of the


completed project deliverables

Manuel Baquero. MSc.


SOURCE: ©2013 Project Management Institute. A Guide to the Project Management Body of Knowledge (PMBOK® Guide) – Fifth Edition

Manuel Baquero. MSc. 9


PONTIFICIA UNIVERSIDAD JAVERIANA -
MAESTRIA INGENIERIA CIVIL - PROGRAMMING
AND CONTROL OF CONSTRUCTION PROJECTS

5.6 Control Scope


Master of Civil Engineering

Is the process of monitoring the status of the


project and product scope and managing
changes to the scope baseline.

Manuel Baquero. MSc.


SOURCE: ©2013 Project Management Institute. A Guide to the Project Management Body of Knowledge (PMBOK® Guide) – Fifth Edition

Bibliografía
Fuente: ©2013 Project Management Institute. A Guide
to the Project Management Body of Knowledge
(PMBOK® Guide) – Fifth Edition.

Manuel Baquero. MSc.

Manuel Baquero. MSc. 10

También podría gustarte