CANTIDADES DE OB
ITEM
1
1.1
1.2
2.1
3
3.1
3.2
3.3
3.4
3.5
4
4.1
4.2
5
5.1
5.2
5.3
5.4
5.5
5.6
5.7
6
6.1
7
7.1
7.2
7.3
8
8.1
8.2
9
9.1
9.2
10
10.1
10.2
10.3
10.4
10.5
10.6
10.7
10.8
10.9
10.10
11
11.1
11.2
11.3
11.4
TOTAL A
12
12.1
12.2
12.3
12.4
12.5
12.6
12.7
12.8
12.9
12.10
12.11
TOTA
13
13.1
13.2
14
14.1
15
15.1
15.2
15.3
TOTAL
16
16.1
16.2
16.3
PRESENTA: MARIANA, HAWIRSON, YEIMY NRC: 10080
CANTIDADES DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. Unitario
Obras Preliminares
Localizacion Y Replanteo (m^2) m^2 80 $ 2,606
VR. Total
$ 208,480
$ 259,200
$ 467,680
$ 70,513
$ 70,513
$ 761,418
$ 3,203,192
$ 807,940
$ 363,883
$ 1,612,958
$ 6,749,390
$ 3,637,858
$ 20,490,996
$ 24,128,854
$ 38,711
$ 38,711
$ 161,296
$ 2,482,662
$ 7,693,156
$ 2,064,584
$ 998,743
$ 13,477,862
$ 10,340,910
$ 10,340,910
$ 1,557,726
$ 375,312
$ 205,868
$ 2,138,906
$ 7,764,973
$ 5,571,420
$ 13,336,393
$ 838,248
$ 296,156
$ 1,134,404
$ 756,612
$ 949,439
$ 681,066
$ 101,115
$ 397,380
$ 175,536
$ 347,850
$ 120,225
$ 336,525
$ 765,440
$ 4,631,187
$ 917,439.0
$ 1,134,933.0
$ 200,566.0
$ 373,647.0
$ 2,626,585.0
$ 15,740
$ 13,071
$ 11,462
$ 92,229
$ 51,126
$ 46,405
$ 11,025
$ 105,854
$ 93,756
$ 20,186
$ 894,491
$ 1,355,344
$ 3,221,589.0
$ 1,202,532.0
$ 4,424,121.0
$ 7,873,968
$ 7,873,968
$ 1,475,331
$ 1,006,720
$ 2,973,635
$ 5,455,686
$ 1,467,116
$ 115,641
$ 5,607,810
$ 7,190,567
$ 105,402,370.8
$ 24,242,545.3
$ 2,108,047.4
$ 5,270,118.5
$ 137,023,082.0
EJES Area
L1 L2 longitud total
A,B,C 3 0.2 0.2 10 1.2 m3
ENTRE A Y B 0.2 0.2 5.95 0.238 m3
ENTRE 1 Y 3 0.2 0.2 3.65 0.146 m3
1,3,5 3 0.2 0.2 7.7 0.924 m3
2.508 m3
CANTIDADES VIGA
𝑁^⁰ Ejes longitud (m) Cantidad longitud Total(m) Masa Unit(kg/m)
3 A,B,C 5.7 24 136.8 0.56
3 ENTRE A Y B 5.95 4 23.8 0.56
3 1,3,5 3.95 24 94.8 0.56
3 ENTRE 1 Y 3 3.75 4 15 0.56
2 A,B,C 0.8 123 98.4 0.25
2 ENTRE A Y B 0.8 25 20 0.250
2 1,3,5 0.8 95 76 0.250
2 ENTRE 1 Y 2 0.8 15 12 0.250
Total Kg
350 50
7 bultos
desperdicio del 5%
Cemento 0.8778
Arena 0.070224
Triturado 0.105336
Concreto
Varilla
20 0.18 1 3
Masa Total (Kg) 111 112 336
76.608 9.25 0.18 1 3
13.328 51 52 157
53.088
8.400
24.6 Varilla 3/8 $ 4,258 Kilo 151.4 $ 644,763
5 Varilla 1/4 $ 3,146 Kilo 51.6 $ 162,334
19
3 Total $ 807,097 Varilla
203.0