PROYECTO: “MEJORAMIENTO Y AMPLIACION DEL CANAL DE RIEGO DE PUCARA, SECTOR VINCOCOTA Y VIVER

LA LOCALIDAD DE RAHUAPAMPA, DISTRITO DE RAHUAPAMPA, PROVINCIA DE HUARI, DEPARTAMENTO D

CALCULO HIDRAULICO DE LA LINEA PRINCIPAL Y RIEGO PRESURIZADO


REPORTE WATE GEMS V.8i DE TRAMOS DE TUBERIA

Hazen-
Dia Mannin Length Start Stop
Element Mat William Flow Velocity
m g's n (Scaled) Node Node
sC

RED PRINCIPAL DE TUBERIA HDPE 110 mm


RED PRINC 4" HDPE 110 0.01 150 55.75 55 39 2.9 0.31
RED PRINC 4" HDPE 110 0.01 150 162.09 47 57 2.3 0.24
RED PRINC 4" HDPE 110 0.01 150 209.31 57 51 1.9 0.20
RED PRINC 4" HDPE 110 0.01 150 275.08 39 47 2.7 0.28
RED PRINC 4" HDPE 110 0.01 150 84.97 51 CRP - N:1 1.5 0.16
RED PRINC 4" HDPE 110 0.01 150 47.02 CRP - N:1 RESERV 1.5 0.16
834.22
TOTAL DE TUBERIA DE 110 mm PARA EL PROYECTO (leng 3D)

RED DE DITRIBUCION DE RIEGO PRESURIZADO DE 1 1/2 "


RED RIEGO 1 1/2" HDPE 57 0.01 150 20.88 47 48 0.4 0.16
RED RIEGO 1 1/2" HDPE 57 0.01 150 27.05 51 52 0.4 0.16
RED RIEGO 1 1/2" HDPE 57 0.01 150 53.12 52 29 0.2 0.08
RED RIEGO 1 1/2" HDPE 57 0.01 150 65.47 57 58 0.4 0.16
RED RIEGO 1 1/2" HDPE 57 0.01 150 91.8 48 53 0.2 0.08
RED RIEGO 1 1/2" HDPE 57 0.01 150 105.08 58 49 0.2 0.08
RED RIEGO 1 1/2" HDPE 57 0.01 150 60.21 58 49 0.2 0.08
423.61
TOTAL DE TUBERIA DE 1 1/2" PARA EL PROYECTO (leng 3D)
SECTOR VINCOCOTA Y VIVERO FORESTAL EN
DE HUARI, DEPARTAMENTO DE ANCASH”

GO PRESURIZADO
TUBERIA

Pressure Pressure
Length (3D)
(Start) (Stop)

29.81 31.53 55.78


36.72 38.48 162.10
38.48 40.23 209.32
31.53 36.72 275.14
40.23 58.67 86.96
0.00 11.69 48.46
837.76
837.76

36.72 47.28 23.41


40.23 55.34 31.01
55.34 52.87 53.18
38.48 57.08 68.08
47.28 53.75 92.03
57.08 56.82 105.08
57.08 56.82 60.21
433.00
433.00
NODOS
Element Elevation X Y Hydraulic Demand Pressure
Grade
38 2,630.36 273,045.64 8,965,014.51 2,636.79 0.05 6.42
39 2,601.32 271,951.84 8,964,718.66 2,632.92 0.00 31.53
40 2,593.65 271,946.84 8,964,733.17 2,632.91 0.20 39.18
41 2,631.18 273,235.19 8,965,033.28 2,637.37 0.00 6.17
42 2,630.63 273,231.30 8,965,049.57 2,637.37 0.05 6.73
43 2,633.45 273,304.19 8,965,096.76 2,637.66 0.00 4.20
44 2,630.46 273,289.71 8,965,106.39 2,637.66 0.05 7.19
45 2,631.00 273,158.28 8,965,026.12 2,637.10 0.00 6.08
46 2,631.87 273,155.60 8,965,044.41 2,637.10 0.05 5.22
47 2,595.90 271,789.35 8,964,563.15 2,632.69 0.00 36.72
48 2,585.30 271,771.47 8,964,573.93 2,632.68 0.20 47.28
49 2,575.60 271,552.72 8,964,461.11 2,632.54 0.20 56.82
51 2,592.19 271,499.01 8,964,411.16 2,632.50 0.00 40.23
52 2,577.04 271,493.08 8,964,437.56 2,632.49 0.20 55.34
53 2,578.81 271,700.96 8,964,515.15 2,632.66 0.20 53.75
55 2,603.10 271,991.85 8,964,754.77 2,632.97 0.00 29.81
56 2,582.60 271,972.38 8,964,792.74 2,632.95 1.50 50.26
57 2,594.04 271,689.42 8,964,441.40 2,632.59 0.00 38.48
58 2,575.36 271,652.12 8,964,495.20 2,632.56 0.20 57.08
60 2,561.96 271,407.32 8,964,462.03 2,573.68 1.50 11.69
Element Scenario Timestep ID Label Notes GIS-IDs GIS-IDs <Cou
CAPT. N: 1 Base 1/1/2000 0:00 2564 CAPT. N: 1 <Collection: 0
GIS-IDs (Deli Elevation Zone Hydraulic GraElevation (InlX Y Geometry mod
2,637.96 <None> Fixed 0 273,354.69 ### 27
Is Active? Trace (Initial)Is Constituen Pattern (ConsConstituent ConcentrationMass Rate (B Concentration
1 0 0 Fixed Concentratio 0 0 0
Age (Initial) Hydraulic Gr Flow (Out netFlow (In net) Age (CalculatTrace (Calcul ConcentrationHas Calculat
0 2637.95857 5.44999818 -5.44999818 (N/A) (N/A) (N/A) 0
Alert Level (EAlert Level ( Head (Maximu
Head (MinimuPressure (MaPressure (Mi Air Volume ( Vapor Volume (Maximum, Transi
None None (N/A) (N/A) (N/A) (N/A) (N/A) (N/A)
apor Volume (Maximum, Transient)
CAMARA ROMPRE PRESION
Element Elevation Diameter X Y Pressure Pressure Flow
(Valve) (From) (To) (Absolute)
CRP - N:1 2,573.69 0 271,415.12 8,964,417.09 58.6743384 0 1.50