Está en la página 1de 51

CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO


CONSTRUCCIONES CIVILES SAS PERIODO: 20 JULIO AL 18 AGOSTO 2020 M = 1
ACTA No. 7 Of = 3
SUBCONTRATISTA OBRAS DE ARTE Ayd= 17
Pileros=
DESCRIPCION UNIDAD CANTIDAD P/ UNITARIO SUBTOTAL
1 EXCAVACIONES VARIAS EN TERIAL COMÚN EN SECO M3 153.67 12,500 1,920,875
2 DEMOLICIÓN DE CUNETA EN CONCRETO INCLUYE RETIRO M3 0.00 5,000 0
3 DEMOLICIÓN CONCRETO CICLOPEO INCLUYE RETIRO M3 7.57 30,000 227,100
RELLENO CON MATERIAL DE AFIRMADO COMPACTADOCON
4 PLANCHA VIBRADORA/BASE ALCANTARILLA Y TUBERIA M3 0.00 10,000 0
CAISSON DE DIAMETRO 1.5M EN CONCRETO FUNDIDO INSITU
(Anillo de 3000psi E=0.15 y núcleo 4000psi)NO INCLUYE ACERO DE
5 REFUERZO M3 0.00 950,000 0
6 CONCRETO CLASE G (CICLOPEO) M3 16.35 220,000 3,597,000
7 CONCRETO CLASE F M3 2.31 240,000 554,400
8 CONCRETO CLASE D (3000PSI) MUROS M3 7.87 390,000 3,069,300
9 ACERO DE REFUERZO KG 17,642.58 3,600 63,513,288
CUNETAS REVESTIDAS EN CONCRETO (3000PSI) INCLUYE SELLO
10 DE JUNTAS M3 273.01 380,000 103,742,783
11 CANAL EN CONCRETO REFORZADO ML 0.00 190,000 0
CONSTRUCCIÓN DE FILTROS, INCLUYE INSTALACIÓN GEOTEXTIL Y
12 TUBERIA PERFORADA M3 0.00 12,000 0
13 GAVIONES M3 0.00 145,000 0
14 CONSTRUCCIÓN TUBERIA 36" ML 0.00 250,000 0
15 INSTALACIÓN TUBERIA 36" ML 7.00 25,000 175,000
16 REALCE PONTON - ALCANTARILLAS ML 369.00 12,000 4,428,000
17 CONCRETO CLASE D (OBRAS DRENAJE) M3 41.77 390,000 16,290,300
0
TOTAL EJECUTADO 197,518,046

ll. DEDUCCIONES
SUMINISTROS EFECTUADOS POR INGENIERIA DE VIAS S. A. AL CONTRATISTA
ITEM DESCRIPCION UNIDAD CANTIDAD UNITARIO SUB TOTAL
1 ARENA m3 204.98 47,000 9,634,201
2 TRITURADO m3 164.00 47,000 7,708,000
3 CEMENTO saco 2,000.00 19,550 39,100,000
4 ACERO DE REFUERZO kg 17,650.00 3,000 52,950,000
5 ACPM GL 200.00 8,615 1,723,000
0
TOTAL DESCUENTOS POR SUMINISTROS 111,115,201

SUB TOTAL A FACTURAR BASE DE IMPUESTOS 86,402,845


MAS IVA S/AIU (19% -15% -5%) 713,763

TOTAL PARA FACTURA 87,116,608

llI. DESCUENTOS
1
2
Total Descuentos 0

IV RETENCIONES
ITEM DESCRIPCION VALOR
1 Retencion en la Fuente 2% 1,728,057
2 Reteiva 15% (sobre el IVA)
3 Retencion ICA 7*1000
4 Retencion en Garantia 2%
Total Retenciones 1,728,057

NETO A PAGAR PRESENTE ACTA 85,388,551

Nota:
UNIDAD CANTIDAD UNITARIO SUB TOTAL
1 ARENA m3 47,000 0
2 TRITURADO m3 47,000 0
3 CEMENTO saco 130.00 18,500 2,405,000
4 ACERO DE REFUERZO kg 17,022.10 3,000 51,066,288
5 ACPM GL 0 9,275 0

______________________________________________ Subcontratista

______________________________________________ Administrador de Obra

______________________________________________ Ingenieros Residente/ Director


Item Insumo UM Cantidad
4.004-CUNETA DE CONCRETO VACIADA1709-ARENA LAVADA DE 3/8" M3
4.004-CUNETA DE CONCRETO VACIADA1709-ARENA LAVADA DE 3/8" M3
4.004-CUNETA DE CONCRETO VACIADA1709-ARENA LAVADA DE 3/8" M3
4.004-CUNETA DE CONCRETO VACIADA1709-ARENA LAVADA DE 3/8" M3
4.004-CUNETA DE CONCRETO VACIADA1709-ARENA LAVADA DE 3/8" M3
4.004-CUNETA DE CONCRETO VACIADA1709-ARENA LAVADA DE 3/8" M3
4.004-CUNETA DE CONCRETO VACIADA1709-ARENA LAVADA DE 3/8" M3
4.004-CUNETA DE CONCRETO VACIADA1709-ARENA LAVADA DE 3/8" M3
4.004-CUNETA DE CONCRETO VACIADA1709-ARENA LAVADA DE 3/8" M3
4.004-CUNETA DE CONCRETO VACIADA1709-ARENA LAVADA DE 3/8" M3
4.004-CUNETA DE CONCRETO VACIADA1709-ARENA LAVADA DE 3/8" M3
4.004-CUNETA DE CONCRETO VACIADA1709-ARENA LAVADA DE 3/8" M3
4.004-CUNETA DE CONCRETO VACIADA1709-ARENA LAVADA DE 3/8" M3
4.004-CUNETA DE CONCRETO VACIADA1709-ARENA LAVADA DE 3/8" M3
4.004-CUNETA DE CONCRETO VACIADA1709-ARENA LAVADA DE 3/8" M3
4.004-CUNETA DE CONCRETO VACIADA1709-ARENA LAVADA DE 3/8" M3
4.004-CUNETA DE CONCRETO VACIADA1709-ARENA LAVADA DE 3/8" M3
4.004-CUNETA DE CONCRETO VACIADA1709-ARENA LAVADA DE 3/8" M3
4.004-CUNETA DE CONCRETO VACIADA1709-ARENA LAVADA DE 3/8" M3
4.004-CUNETA DE CONCRETO VACIADA1709-ARENA LAVADA DE 3/8" M3
4.004-CUNETA DE CONCRETO VACIADA1709-ARENA LAVADA DE 3/8" M3
Vr. Unitario Cantidad Cantidad Total Total
580 12 12 6,960.00 0
580 12 12 6,960.00 0
580 9.983 12 6,960.00 0
580 12 12 6,960.00 0
580 12 12 6,960.00 0
580 12 12 6,960.00 0
580 7 7 4,060.00 0
580 7 7 4,060.00 0
580 7 7 4,060.00 0
580 12 12 6,960.00 0
580 12 12 6,960.00 0
580 12 12 6,960.00 0
580 12 12 6,960.00 0
580 7 7 4,060.00 0
580 12 12 6,960.00 0
580 12 12 6,960.00 0
580 7 7 4,060.00 0
580 7 7 4,060.00 0
580 7 7 4,060.00 0
580 7 7 4,060.00 0
580 7 7 4,060.00 0
204.983
Item Insumo UM Cantidad
4.004-CUNETA DE CONCRETO VACIADA27305-TRITURADO DE 3/4" M3
4.004-CUNETA DE CONCRETO VACIADA27305-TRITURADO DE 3/4" M3
4.004-CUNETA DE CONCRETO VACIADA27305-TRITURADO DE 3/4" M3
4.004-CUNETA DE CONCRETO VACIADA27305-TRITURADO DE 3/4" M3
4.004-CUNETA DE CONCRETO VACIADA27305-TRITURADO DE 3/4" M3
4.004-CUNETA DE CONCRETO VACIADA27305-TRITURADO DE 3/4" M3
4.004-CUNETA DE CONCRETO VACIADA27305-TRITURADO DE 3/4" M3
4.004-CUNETA DE CONCRETO VACIADA27305-TRITURADO DE 3/4" M3
4.004-CUNETA DE CONCRETO VACIADA27305-TRITURADO DE 3/4" M3
4.004-CUNETA DE CONCRETO VACIADA27305-TRITURADO DE 3/4" M3
4.004-CUNETA DE CONCRETO VACIADA27305-TRITURADO DE 3/4" M3
4.004-CUNETA DE CONCRETO VACIADA27305-TRITURADO DE 3/4" M3
4.004-CUNETA DE CONCRETO VACIADA27305-TRITURADO DE 3/4" M3
4.004-CUNETA DE CONCRETO VACIADA27305-TRITURADO DE 3/4" M3
4.004-CUNETA DE CONCRETO VACIADA27305-TRITURADO DE 3/4" M3
4.004-CUNETA DE CONCRETO VACIADA27305-TRITURADO DE 3/4" M3
4.004-CUNETA DE CONCRETO VACIADA27305-TRITURADO DE 3/4" M3
Vr. Unitario Cantidad Cantidad Total Total
580 12 12 6,960.00 0
580 12 12 6,960.00 0
580 12 12 6,960.00 0
580 12 12 6,960.00 0
580 7 7 4,060.00 0
580 7 7 4,060.00 0
580 7 7 4,060.00 0
580 12 12 6,960.00 0
580 12 12 6,960.00 0
580 12 12 6,960.00 0
580 12 12 6,960.00 0
580 7 7 4,060.00 0
580 12 12 6,960.00 0
580 7 7 4,060.00 0
580 7 7 4,060.00 0
580 7 7 4,060.00 0
580 7 7 4,060.00 0
164
Item Insumo UM
6.001-ACERO DE REFUERZO FY 4200 M31982-VARILLA BAR COR NTC 2289 5/8 12M (11KG
6.001-ACERO DE REFUERZO FY 4200 M31986-VARILLA BAR COR NTC 2289 1/2 X 12M KG
6.001-ACERO DE REFUERZO FY 4200 M31985-VARILLA BAR COR NTC 2289 3/4 X 12M ( KG
6.001-ACERO DE REFUERZO FY 4200 M33821-VARILLA BAR COR NTC 2289 3/8 X 12 M KG
Cantidad Vr. Unitario Cantidad Cantidad Total Total
2,737.000 3389 13707 37,516,059.0 0
2,742.987 6227 15995 43,874,075.4 0
2,762.165 4009 7509 20,741,099.2 0
2,772.700 23051 33993 94,252,391.1 0
36676
-1288.22 descontar casa pcc
-2003.90
-715.68 descontar casa pcc
-17,650.00 descuento acta
17,022.10
Item Insumo UM Cantidad
4.004-CUNETA DE CONCRETO VACIADA5640-CEMENTO GRIS PORTLAND
BTO
4.004-CUNETA DE CONCRETO VACIADA5640-CEMENTO GRIS PORTLAND
BTO
4.004-CUNETA DE CONCRETO VACIADA5640-CEMENTO GRIS PORTLAND
BTO
4.004-CUNETA DE CONCRETO VACIADA5640-CEMENTO GRIS PORTLAND
BTO
4.004-CUNETA DE CONCRETO VACIADA5640-CEMENTO GRIS PORTLAND
BTO
Vr. Unitario Cantidad Cantidad Total Total
18,502.596 405 405 7,493,551.38 0
18,502.596 405 405 7,493,551.38 0
18,502.596 405 405 7,493,551.38 0
18,502.596 405 405 7,493,551.38 0
18,502.596 510 510 9,436,323.96 0
2130
Item Insumo UM Cantidad
10.005-COMBUSTIBLE ADMINISTRACIO29650-BIODIESEL B10 (ACPM) GAL
10.005-COMBUSTIBLE ADMINISTRACIO29650-BIODIESEL B10 (ACPM) GAL
10.005-COMBUSTIBLE ADMINISTRACIO29650-BIODIESEL B10 (ACPM) GAL
11.001-IMPREVISTOS 29650-BIODIESEL B10 (ACPM) GAL
Vr. Unitario Cantidad Cantidad Total Total
8,547.418 50 50 427,370.88 0
8,535.935 50 50 426,796.76 0
8,503.742 50 50 425,187.11 0
7,881.000 50 50 394,050.00 0
200
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO 20 JULIO AL 18 AGOSTO


ACTA No. 7 CONSTRUCCIONES CIVILES SAS
PERIODO:
2020
TRAMO: SAN ANTONIO

UNIDAD: TOTAL
ITEM: EXCAVACIONES VARIAS EN TERIAL COMÚN EN SECO
M³ 153.7

ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA VOL. OBSERVACIONES
DE A

K25+360 K25+100 TIPICA 240.00 0.194 46.56


K23+285 K23+220 TIPICA 65.00 0.194 12.61
K23+190 K23+020 TIPICA 170.00 0.194 32.98
K23+010 K22+950 TIPICA 60.00 0.194 11.64

K25+360 K25+310 TIPICA 50.00 0.194 9.70


K23+580 K23+640 TIPICA 60.00 0.194 11.64
K23+190 K23+174 TIPICA 16.00 0.194 3.10
K23+094 K23+030 TIPICA 64.00 0.194 12.42
K23+015 K22+995 TIPICA 20.00 0.194 3.88

K23+380 SOLADO ALCANTRILLA 1.50 1.00 0.20 0.30


1.80 1.45 0.20 0.52
K23+220 SOLADO ALCANTARILLA 2.10 2.13 0.20 0.89
5.00 1.50 0.20 1.50
K23+115.00 SOLADO ALCANTARILLA 2.15 1.40 0.20 0.60
K22+660.00 SOLADO ALCANTARILLA DESCOLE 2.10 1.35 0.20 0.57
K22+660.00 SOLADO ALCANTARILLA ENCOLE 2.15 1.45 0.20 0.62
K22+160.00 SOLADO 1.00 1.50 0.20 0.30
3.10 1.85 0.20 1.15
K22+000 SOLADO DESCOLE 3.25 1.80 0.20 1.17
K21+550.00 SOLADO ALCANTARILLA ENCOLE 2.15 1.45 0.20 0.62
K21+740.00 SOLADO ALCANTARILLA ENCOLE 2.14 1.40 0.20 0.60
1.00 1.50 0.20 0.30

TOTAL PRESENTE ACTA 153.67 M3


CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO 20 JULIO AL 18 AGOSTO


ACTA No. 4 CONSTRUCCIONES CIVILES SAS
PERIODO:
2020
TRAMO: SAN ANTONIO

UNIDAD: TOTAL
ITEM: DEMOLICIÓN DE CUNETA EN CONCRETO
M³ 0.0

ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA VOL. OBSERVACIONES
DE A

TOTAL PRESENTE ACTA 0.00 M3


CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO 20 JULIO AL 18 AGOSTO


ACTA No. 7 CONSTRUCCIONES CIVILES SAS
PERIODO:
2020
TRAMO: SAN ANTONIO

UNIDAD: TOTAL
ITEM: DEMOLICIÓN CONCRETO CICLOPEO INCLUYE RETIRO
M³ 7.6

ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA VOL. OBSERVACIONES
DE A

K23+190 D 2.00 0.20 0.20 0.08


ALETA IZQ D 2.00 0.20 0.20 0.08
ALETA DER D 2.55 0.20 0.15 0.08

K23+190 REALCE BOX CABEZOTE L IZQ I 1.85 0.20 0.40 0.15


ALETA IZQ I 2.00 0.20 0.20 0.08
ALETA DER I 2.00 0.20 0.85 0.34

K23+020 REALCE BOX CABEZOTE L IZQ I 1.30 0.25 0.80 0.26


ALETA IZQ I 4.00 0.28 0.60 0.67
ALETA DER I 2.00 0.28 0.42 0.24

REALCE BOX CABEZOTE L DER D 4.85 0.25 0.55 0.67


ALETA IZQ D 4.18 0.25 0.45 0.47

K22+520 REALCE BOX CABEZOTE D 12.60 0.66 0.30 2.49


REALCE BOX CABEZOTE I 2.95 0.20 0.53 0.31
ALETA IZQ I 2.54 0.20 0.35 0.18
ALETA DER I 2.23 0.20 0.30 0.13

K22+000 REALCE MURO D 5.30 0.25 0.60 0.80


D 1.90 0.25 1.13 0.54

TOTAL PRESENTE ACTA 7.57 M3


CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO 20 JULIO AL 18 AGOSTO


ACTA No. 7 CONSTRUCCIONES CIVILES SAS
PERIODO:
2020
TRAMO: SAN ANTONIO

ITEM:RELLENO CON MATERIAL DE AFIRMADO COMPACTADOCON PLANCHA UNIDAD: TOTAL


VIBRADORA/BASE ALCANTARILLA Y TUBERIA M³ 0.0

ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA VOL. OBSERVACIONES
DE A

0.00
0.00
0.00
0.00

0.00

TOTAL PRESENTE ACTA 0.00 M3


CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & 20 JULIO AL 18 AGOSTO


ACTA No. 7 ANGULO CONSTRUCCIONES CIVILES SAS
PERIODO:
2020
TRAMO: SAN ANTONIO

UNIDAD: TOTAL
CAISSON DE DIAMETRO 1.5M EN CONCRETO FUNDIDO INSITU (Anillo de
3000psi E=0.15 y núcleo 4000psi)NO INCLUYE ACERO DE REFUERZO M³ 0.00

ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA VOLUMEN OBSERVACIONES
DE A

K21+767 K21+776 ANILLO 1 CAISSON 1 MOD 1 0.56 0.00 0.00


ANILLO 2 CAISSON 1 MOD 1 0.56 0.00 0.00
ANILLO 3 CAISSON 1 MOD 1 0.56 0.00 0.00
ANILLO 4 CAISSON 1 MOD 1 0.56 0.00 0.00
ANILLO 1 CAISSON 2 MOD 1 0.56 0.00 0.00
ANILLO 2 CAISSON 2 MOD 1 0.56 0.00 0.00
ANILLO 3 CAISSON 2 MOD 1 0.56 0.00 0.00
ANILLO 4 CAISSON 2 MOD 1 0.56 0.00 0.00

K21+767 K21+776 CAISSON 1 MOD 1 0.95 0.00 0.00


CAISSON 2 MOD 1 0.95 0.00 0.00

TOTAL PRESENTE ACTA 0.00


CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO PERIODO: 20 JULIO AL 18 AGOSTO


ACTA No. 7 CONSTRUCCIONES CIVILES SAS 2020
TRAMO: SAN ANTONIO

UNIDAD: TOTAL
ITEM: CONCRETO CLASE G (CICLOPEO)
M³ 16.35

ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA VOLUMEN OBSERVACIONES
DE A

K23+190.00 REALCE BOX LD D 1.26 1.26 1.20 1.91


K26+400 SOPORTE CUNETA 1.20 0.80 0.50 0.48
K23+020 CICLOPEO BOX D 2.00 1.70 1.00 3.40
K23+220 ALCANTARILLA I 1.00 0.40 1.20 0.48
K25+150 CICLOPEO ENTRADA BOX 2.50 2.20 0.80 4.40
2.90 2.80 0.70 5.68

TOTAL PRESENTE ACTA 16.35


CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & 20 JULIO AL 18 AGOSTO


ACTA No. 7 ANGULO CONSTRUCCIONES CIVILES SAS
PERIODO:
2020
TRAMO: SAN ANTONIO

UNIDAD: TOTAL
ITEM: CONCRETO CLASE F
M³ 2.31

ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA VOLUMEN OBSERVACIONES
DE A

K23+380 SOLADO ALCANTRILLA 1.50 1.00 0.05 0.08


1.80 1.45 0.05 0.13

K23+220 SOLADO ALCANTARILLA 2.10 2.13 0.05 0.22


5.00 1.50 0.05 0.38
K23+115.00 SOLADO ALCANTARILLA 2.15 1.40 0.05 0.15

SOLADO ALCANTARILLA
K22+660.00 DESCOLE 2.10 1.35 0.05 0.14
K22+660.00 SOLADO ALCANTARILLA ENCOLE 2.15 1.45 0.05 0.16

K22+160.00 SOLADO 1.00 1.50 0.05 0.08


3.10 1.85 0.05 0.29
K22+000 SOLADO DESCOLE 3.25 1.80 0.05 0.29

K21+550.00 SOLADO ALCANTARILLA ENCOLE 2.15 1.45 0.05 0.16

K21+740.00 SOLADO ALCANTARILLA ENCOLE 2.14 1.40 0.05 0.15


1.00 1.50 0.05 0.08

TOTAL PRESENTE ACTA 2.31


CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO PERIODO: 20 JULIO AL 18 AGOSTO


ACTA No. 7 CONSTRUCCIONES CIVILES SAS 2020
TRAMO: SAN ANTONIO

UNIDAD: TOTAL
ITEM: CONCRETO CLASE D (3000PSI) MUROS
M³ 7.87

ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA VOLUMEN OBSERVACIONES
DE A

K23+190 REALCE BOX CABEZOTE L DER D 2.00 0.20 0.35 0.14


ALETA IZQ D 2.00 0.20 0.30 0.12
ALETA DER D 2.55 0.20 0.35 0.18

K23+190 REALCE BOX CABEZOTE L IZQ I 1.85 0.20 0.52 0.19


ALETA IZQ I 2.00 0.20 0.35 0.14
ALETA DER I 2.00 0.20 0.85 0.34

K23+020 REALCE BOX CABEZOTE L IZQ I 1.30 0.25 0.80 0.26


ALETA IZQ I 4.00 0.28 0.60 0.67
ALETA DER I 2.00 0.28 0.42 0.24

REALCE BOX CABEZOTE L DER D 4.85 0.25 0.55 0.67


ALETA IZQ D 4.18 0.25 0.45 0.47

K22+520 REALCE BOX CABEZOTE D 12.60 0.66 0.30 2.49


REALCE BOX CABEZOTE I 2.95 0.20 0.53 0.31
ALETA IZQ I 2.54 0.20 0.35 0.18
ALETA DER I 2.23 0.20 0.30 0.13

K22+000 REALCE MURO D 5.30 0.25 0.60 0.80


D 1.90 0.25 1.13 0.54

TOTAL PRESENTE ACTA 7.87


CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO PERIODO: 20 JULIO AL 18 AGOSTO


ACTA No. 7 CONSTRUCCIONES CIVILES SAS 2020
TRAMO: SAN ANTONIO

UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6

ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt)
MURO
K23+190.00 REALCE BOX MARGEN IZ 0.50 19.00 4.00 0.99 9.44
1.90 2.00 4.00 0.99 3.78
1.90 2.00 4.00 0.99 3.78
K23+020 REALCE BOX 0.65 33.00 4.00 0.99 21.32
3.50 2.00 4.00 0.99 6.96
2.00 2.00 4.00 0.99 3.98
1.20 3.00 4.00 0.99 3.58
K23+020 REALCE BOX 0.65 41.00 4.00 0.99 26.49
4.80 2.00 4.00 0.99 9.54
4.00 2.00 4.00 0.99 7.95
K22+520 REALCE BOX 0.80 57.00 4.00 0.99 45.33
12.00 2.00 4.00 0.99 23.86
0.80 2.00 4.00 0.99 1.59
0.50 13.00 4.00 0.99 6.46
K22+520 REALCE BOX 0.70 13.00 4.00 0.99 9.05
2.80 2.00 4.00 0.99 5.57
2.50 1.00 4.00 0.99 2.49
1.75 1.00 4.00 0.99 1.74
K22+000 REALCE MURO 0.70 26.00 4.00 0.99 18.09
6.00 2.00 4.00 0.99 11.93
K21+853 REALCE MURO 0.65 108.00 4.00 0.99 69.78
6.00 8.00 4.00 0.99 47.71

ALCANTARILLAS

K23+380.00 ALCANTARILLA DESCOLE 6.00 1.00 4.00 0.99 5.96


4.00 2.00 4.00 0.99 7.95
0.80 1.00 4.00 0.99 0.80
3.00 1.00 4.00 0.99 2.98
1.30 6.00 4.00 0.99 7.75
0.90 1.00 4.00 0.99 0.89
0.60 1.00 4.00 0.99 0.60
4.00 6.00 4.00 0.99 23.86
K23+020.00 ALCANTARILLA ENCOLE 6.00 8.00 4.00 0.99 47.71
3.00 8.00 4.00 0.99 23.86
6.00 1.00 4.00 0.99 5.96
6.00 2.00 4.00 0.99 11.93
4.10 6.00 4.00 0.99 24.45
0.70 15.00 4.00 0.99 10.44
K23+115.00 ALCANTARILLA ENCOLE 6.00 11.00 4.00 0.99 65.60
4.30 4.00 4.00 0.99 17.10
4.80 5.00 4.00 0.99 23.86
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO PERIODO: 20 JULIO AL 18 AGOSTO


ACTA No. 7 CONSTRUCCIONES CIVILES SAS 2020
TRAMO: SAN ANTONIO

UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6

ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt)
1.40 4.00 4.00 0.99 5.57
6.00 5.00 4.00 0.99 29.82
1.20 17.00 4.00 0.99 20.28
K22+805.00 REALCE ALCANTARILLA DESCOLE 0.45 17.00 4.00 0.99 7.60
1.50 1.00 4.00 0.99 1.49
1.25 2.00 4.00 0.99 2.49
K22+805.00 REALCE ALCANTARILLA ENCOLE 1.10 10.00 4.00 0.99 10.93
1.60 4.00 4.00 0.99 6.36
1.20 3.00 4.00 0.99 3.58
K22+660.00 ALCANTARILLA DESCOLE 3.00 15.00 4.00 0.99 44.73
6.00 1.00 4.00 0.99 5.96
1.50 1.00 4.00 0.99 1.49
2.20 6.00 4.00 0.99 13.12
K22+660.00 ALCANTARILLA ENCOLE 6.00 11.00 4.00 0.99 65.60
5.00 4.00 4.00 0.99 19.88
6.00 4.00 4.00 0.99 23.86
1.20 4.00 4.00 0.99 4.77
K22+160.00 ALCANTARIILLA DESCOLE 3.60 4.00 4.00 0.99 14.31
3.00 9.00 4.00 0.99 26.84
6.00 6.00 4.00 0.99 35.78
4.00 1.00 4.00 0.99 3.98
2.00 2.00 4.00 0.99 3.98
1.85 11.00 4.00 0.99 20.23
2.00 3.00 4.00 0.99 5.96
3.15 9.00 4.00 0.99 28.18
2.00 5.00 4.00 0.99 9.94
1.30 2.00 4.00 0.99 2.58
0.70 2.00 4.00 0.99 1.39
K22+000.00 ALCANTARILLA ENCOLE 5.75 5.00 4.00 0.99 28.58
2.40 4.00 4.00 0.99 9.54
2.30 4.00 4.00 0.99 9.14
1.90 3.00 4.00 0.99 5.67
1.60 5.00 4.00 0.99 7.95
1.20 2.00 4.00 0.99 2.39
1.65 10.00 4.00 0.99 16.40
0.60 2.00 4.00 0.99 1.19
3.10 9.00 4.00 0.99 27.73
2.00 6.00 4.00 0.99 11.93
2.80 4.00 4.00 0.99 11.13
K21+550.00 ALETAS ENCOLE 6.00 2.00 4.00 0.99 11.93
4.00 4.00 4.00 0.99 15.90
1.75 2.00 4.00 0.99 3.48
3.00 8.00 4.00 0.99 23.86
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO PERIODO: 20 JULIO AL 18 AGOSTO


ACTA No. 7 CONSTRUCCIONES CIVILES SAS 2020
TRAMO: SAN ANTONIO

UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6

ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt)
K21+550.00 REALCE ALCANTARILLA 0.50 10.00 4.00 0.99 4.97
0.80 8.00 4.00 0.99 6.36
1.60 2.00 4.00 0.99 3.18
1.40 2.00 4.00 0.99 2.78
K21+640.00 ALETAS DESCOLE 1.55 9.00 4.00 0.99 13.87
1.30 2.00 4.00 0.99 2.58
1.00 2.00 4.00 0.99 1.99
0.70 2.00 4.00 0.99 1.39
0.50 2.00 4.00 0.99 0.99
3.00 8.00 4.00 0.99 23.86
2.00 2.00 4.00 0.99 3.98
2.20 4.00 4.00 0.99 8.75
1.60 18.00 4.00 0.99 28.63
2.50 10.00 4.00 0.99 24.85
5.70 2.00 4.00 0.99 11.33
1.86 2.00 4.00 0.99 3.70
0.90 6.00 4.00 0.99 5.37
1.75 2.00 4.00 0.99 3.48
K21+740.00 ALCANTARILLA ENCOLE 4.40 2.00 4.00 0.99 8.75
5.10 2.00 4.00 0.99 10.14
4.30 4.00 4.00 0.99 17.10
2.77 6.00 4.00 0.99 16.52
4.70 5.00 4.00 0.99 23.36
6.35 1.00 4.00 0.99 6.31
2.00 4.00 4.00 0.99 7.95
0.60 6.00 4.00 0.99 3.58
K22+110.00 REALCE DESCOLE 0.60 10.00 4.00 0.99 5.96
1.95 2.00 4.00 0.99 3.88

CUNETAS

K26+600 K25+360 CUNETAS 1240.00 -8.50 -10,540.00 pago actas anteriores


K26+600 K25+524 CUNETAS 1076.00 -8.50 -9,146.00 pago actas anteriores
K25+360 K25+100 TIPICA 240.00 -8.0 -1920.00 pago actas anteriores
K23+285 K23+220 TIPICA 65.00 -8.0 -520.00 pago actas anteriores
K23+190 K23+020 TIPICA 170.00 -8.0 -1360.00 pago actas anteriores
K23+010 K22+950 TIPICA 60.00 -8.0 -480.00 pago actas anteriores
K25+360 K25+310 TIPICA 50.00 -8.0 -400.00 pago actas anteriores
K23+580 K23+640 TIPICA 60.00 -8.0 -480.00 pago actas anteriores
K23+190 K23+174 TIPICA 16.00 -8.0 -128.00 pago actas anteriores
K23+094 K23+030 TIPICA 64.00 -8.0 -512.00 pago actas anteriores
K23+015 K22+995 TIPICA 20.00 -8.0 -160.00 pago actas anteriores
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO PERIODO: 20 JULIO AL 18 AGOSTO


ACTA No. 7 CONSTRUCCIONES CIVILES SAS 2020
TRAMO: SAN ANTONIO

UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6

ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt)

D 81.00 9 3 0.56 408.24


PR26+600.00 PR26+519.00 SECC.TIPICA
1.50 406 3 0.56 341.04
D 2.30 13 3 0.56 16.74 SECC.
PR26+519.00 PR26+516.70
2.27 13 3 0.56 16.53 TRAPEZOIDAL
D 1.65 6 3 0.56 5.54 SECC.
PR26+516.70 PR26+515.05
0.95 10 3 0.56 5.32 RECTANGULAR
D 46.12 9 3 0.56 232.44
PR26+515.05 PR26+468.93 SECC.TIPICA
1.50 232 3 0.56 194.88
D 5.17 14 3 0.56 40.53 SECC.
PR26+468.93 PR26+463.76
2.47 27 3 0.56 37.35 TRAPEZOIDAL
D 5.20 12 3 0.56 34.94 SECC.
PR26+463.76 PR26+458.56
2.16 27 3 0.56 32.66 TRAPEZOIDAL
D 58.18 9 3 0.56 293.23
PR26+458.56 PR26+400.38 SECC.TIPICA
1.50 292 3 0.56 245.28
D 6.02 6 3 0.56 20.23 SECC.
PR26+400.38 PR26+394.36
1.00 32 3 0.56 17.92 RECTANGULAR
D 49.10 9 3 0.56 247.46
PR26+394.36 PR26+345.26 SECC.TIPICA
1.50 247 3 0.56 207.48
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO PERIODO: 20 JULIO AL 18 AGOSTO


ACTA No. 7 CONSTRUCCIONES CIVILES SAS 2020
TRAMO: SAN ANTONIO

UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6

ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt)
D 3.15 14 3 0.56 24.70 SECC.
PR26+345.26 PR26+342.11
2.55 17 3 0.56 24.28 TRAPEZOIDAL
D 1.50 8 3 0.56 6.72 SECC.
PR26+342.11 PR26+340.61
1.22 9 3 0.56 6.15 RECTANGULAR
D 78.00 9 3 0.56 393.12
PR26+340.61 PR26+262.61 SECC.TIPICA
1.50 391 3 0.56 328.44
D 9.15 7 3 0.56 35.87 SECC.
PR26+262.61 PR26+253.46
1.11 47 3 0.56 29.22 RECTANGULAR
D 2.00 12 3 0.56 13.44 SECC.
PR26+253.46 PR26+251.46
2.12 11 3 0.56 13.06 TRAPEZOIDAL
D 19.00 9 3 0.56 95.76
PR26+251.46 PR26+232.46 SECC.TIPICA
1.50 96 3 0.56 80.64
D 3.00 14 3 0.56 23.52 SECC.
PR26+232.46 PR26+229.46
2.53 16 3 0.56 22.67 TRAPEZOIDAL
D 1.88 7 3 0.56 7.37 SECC.
PR26+229.46 PR26+227.58
1.05 11 3 0.56 6.47 RECTANGULAR
D 77.30 9 3 0.56 389.59
PR26+227.58 PR26+150.28 SECC.TIPICA
1.50 388 3 0.56 325.92
D 2.18 12 3 0.56 14.65 SECC.
PR26+150.28 PR26+148.10
2.12 12 3 0.56 14.25 TRAPEZOIDAL
D 30.12 7 3 0.56 118.07 SECC.
PR26+148.10 PR26+117.98
1.11 152 3 0.56 94.48 RECTANGULAR
D 31.73 9 3 0.56 159.92
PR26+117.98 PR26+086.25 SECC.TIPICA
1.50 160 3 0.56 134.40
D 2.82 13 3 0.56 20.53 SECC.
PR26+086.25 PR26+083.43
2.30 16 3 0.56 20.61 TRAPEZOIDAL
D 2.00 9 3 0.56 10.08 SECC.
PR26+083.43 PR26+081.43
1.53 11 3 0.56 9.42 RECTANGULAR
D 2.83 14 3 0.56 22.19 SECC.
PR26+081.43 PR26+078.60
2.60 16 3 0.56 23.30 TRAPEZOIDAL
D 43.37 9 3 0.56 218.58
PR26+078.60 PR26+035.23 SECC.TIPICA
1.50 218 3 0.56 183.12
D 2.45 7 3 0.56 9.60 SECC.
PR26+035.23 PR26+032.78
1.12 14 3 0.56 8.78 RECTANGULAR
D 3.05 15 3 0.56 25.62 SECC.
PR26+032.78 PR26+029.73
2.70 17 3 0.56 25.70 TRAPEZOIDAL
D 14.10 9 3 0.56 71.06
PR26+029.73 PR26+015.63 SECC.TIPICA
1.50 72 3 0.56 60.48
D 8.10 7 3 0.56 31.75 SECC.
PR26+015.63 PR26+007.53
1.04 42 3 0.56 24.46 RECTANGULAR
D 14.60 9 3 0.56 73.58
PR26+007.53 PR25+992.93 SECC.TIPICA
1.50 75 3 0.56 63.00
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO PERIODO: 20 JULIO AL 18 AGOSTO


ACTA No. 7 CONSTRUCCIONES CIVILES SAS 2020
TRAMO: SAN ANTONIO

UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6

ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt)
D 45.73 6 3 0.56 153.65 SECC.
PR25+992.93 PR25+947.20
0.92 230 3 0.56 118.50 RECTANGULAR
D 10.55 9 3 0.56 53.17
PR25+947.20 PR25+936.65 SECC.TIPICA
1.50 54 3 0.56 45.36
D 21.55 9 3 0.56 108.61
PR25+904.75 PR25+883.20 SECC.TIPICA
1.50 109 3 0.56 91.56
D 4.20 14 3 0.56 32.93 SECC.
PR25+883.20 PR25+879.00
2.50 23 3 0.56 32.20 TRAPEZOIDAL
D 15.65 6 3 0.56 52.58 SECC.
PR25+879.00 PR25+863.35
0.86 80 3 0.56 38.53 RECTANGULAR
D 78.73 9 3 0.56 396.80
PR25+863.35 PR25+784.62 SECC.TIPICA
1.50 395 3 0.56 331.80
D 2.22 13 3 0.56 16.16 SECC.
PR25+784.62 PR25+782.40
2.35 13 3 0.56 17.11 TRAPEZOIDAL
D 1.80 6 3 0.56 6.05 SECC.
PR25+782.40 PR25+780.60
0.84 10 3 0.56 4.70 RECTANGULAR
D 71.20 9 3 0.56 358.85
PR25+780.60 PR25+709.40 SECC.TIPICA
1.50 357 3 0.56 299.88
D 10.10 6 3 0.56 33.94 SECC.
PR25+709.40 PR25+699.30
0.91 52 3 0.56 26.50 RECTANGULAR
D 104.65 9 3 0.56 527.44
PR25+699.30 PR25+594.65 SECC.TIPICA
1.50 525 3 0.56 441.00
D 12.83 5 3 0.56 35.92 SECC.
PR25+594.65 PR25+581.82
0.80 66 3 0.56 29.57 RECTANGULAR
D 16.80 9 3 0.56 84.67
PR25+581.82 PR25+565.02 SECC.TIPICA
1.50 86 3 0.56 72.24
D 5.60 12 3 0.56 37.63 SECC.
PR25+565.02 PR25+559.42
2.08 30 3 0.56 34.94 TRAPEZOIDAL
D 37.70 9 3 0.56 190.01
PR25+559.42 PR25+521.72 SECC.TIPICA
1.50 190 3 0.56 159.60
D 4.00 14 3 0.56 31.36 SECC.
PR25+521.72 PR25+517.72
2.55 21 3 0.56 29.99 TRAPEZOIDAL
D 4.56 6 3 0.56 15.32 SECC.
PR25+517.72 PR25+513.16
0.96 24 3 0.56 12.90 RECTANGULAR
D 5.20 13 3 0.56 37.86 SECC.
PR25+513.16 PR25+507.96
2.30 27 3 0.56 34.78 TRAPEZOIDAL
D 26.60 9 3 0.56 134.06
PR25+507.96 PR25+481.36 SECC.TIPICA
1.50 134 3 0.56 112.56
D 1.50 6 3 0.56 5.04 SECC.
PR25+481.36 PR25+479.86
1.00 9 3 0.56 5.04 RECTANGULAR
D 3.03 14 3 0.56 23.76 SECC.
PR25+479.86 PR25+476.83
2.45 17 3 0.56 23.32 TRAPEZOIDAL
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO PERIODO: 20 JULIO AL 18 AGOSTO


ACTA No. 7 CONSTRUCCIONES CIVILES SAS 2020
TRAMO: SAN ANTONIO

UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6

ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt)
D 20.00 9 3 0.56 100.80
PR25+476.83 PR25+456.83 SECC.TIPICA
1.50 101 3 0.56 84.84
D 26.73 9 3 0.56 134.72
PR25+456.83 PR25+430.10 SECC.TIPICA
1.50 135 3 0.56 113.40
D 13.60 9 3 0.56 68.54
PR25+430.10 PR25+416.50 SECC.TIPICA
1.50 70 3 0.56 58.80
D 2.27 6 3 0.56 7.63 SECC.
PR25+416.50 PR25+414.23
0.95 13 3 0.56 6.92 RECTANGULAR
D 3.10 13 3 0.56 22.57
PR25+415.00 CANAL DESCOLE
2.30 17 3 0.56 21.90
D 4.50 9 3 0.56 22.68
PR25+414.23 PR25+409.73 SECC.TIPICA
1.50 24 3 0.56 20.16
D 2.12 12 3 0.56 14.25 SECC.
PR25+409.73 PR25+407.61
2.20 12 3 0.56 14.78 TRAPEZOIDAL
D 36.40 8 3 0.56 163.07 SECC.
PR25+407.61 PR25+371.21
1.34 183 3 0.56 137.32 RECTANGULAR
D 10.50 9 3 0.56 52.92
PR25+371.21 PR25+360.71 SECC.TIPICA
1.50 54 3 0.56 45.36

I 14.74 9 3 0.56 74.29


PR26+600.00 PR26+585.26 SECC.TIPICA
1.50 75 3 0.56 63.00
I 4.51 12 3 0.56 30.31 SECC.
PR26+585.26 PR26+580.75
2.08 24 3 0.56 27.96 TRAPEZOIDAL
I 6.12 6 3 0.56 20.56 SECC.
PR26+580.75 PR26+574.63
0.87 32 3 0.56 15.59 RECTANGULAR
I 51.45 9 3 0.56 259.31
PR26+574.63 PR26+523.18 SECC.TIPICA
1.50 259 3 0.56 217.56
I 3.17 13 3 0.56 23.08 SECC.
PR26+523.18 PR26+520.01
2.33 17 3 0.56 22.18 TRAPEZOIDAL
I 1.56 6 3 0.56 5.24 SECC.
PR26+520.01 PR26+518.45
0.95 9 3 0.56 4.79 RECTANGULAR
I 48.83 9 3 0.56 246.10
PR26+518.45 PR26+469.62 SECC.TIPICA
1.50 246 3 0.56 206.64
I 3.03 15 3 0.56 25.45 SECC.
PR26+469.62 PR26+466.59
2.73 17 3 0.56 25.99 TRAPEZOIDAL
I 5.75 6 3 0.56 19.32 SECC.
PR26+466.59 PR26+460.84
1.00 30 3 0.56 16.80 RECTANGULAR
I 60.81 9 3 0.56 306.48
PR26+460.84 PR26+400.03 SECC.TIPICA
1.50 306 3 0.56 257.04
I 4.60 15 3 0.56 38.64 SECC.
PR26+400.03 PR26+395.43
2.67 24 3 0.56 35.88 TRAPEZOIDAL
I 5.76 8 3 0.56 25.80 SECC.
PR26+395.43 PR26+389.67
1.40 30 3 0.56 23.52 RECTANGULAR
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO PERIODO: 20 JULIO AL 18 AGOSTO


ACTA No. 7 CONSTRUCCIONES CIVILES SAS 2020
TRAMO: SAN ANTONIO

UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6

ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt)
I 2.04 13 3 0.56 14.85 SECC.
PR26+389.67 PR26+387.63
2.24 12 3 0.56 15.05 TRAPEZOIDAL
I 42.10 9 3 0.56 212.18
PR26+387.63 PR26+345.53 SECC.TIPICA
1.50 212 3 0.56 178.08
I 4.35 14 3 0.56 34.10 SECC.
PR26+345.53 PR26+341.18
2.50 23 3 0.56 32.20 TRAPEZOIDAL
I 1.57 7 3 0.56 6.15 SECC.
PR26+341.18 PR26+339.61
1.14 9 3 0.56 5.75 RECTANGULAR
I 64.88 9 3 0.56 327.00
PR26+339.61 PR26+274.73 SECC.TIPICA
1.50 326 3 0.56 273.84
I 7.31 18 3 0.56 73.68 SECC.
PR26+274.73 PR26+267.42
3.37 38 3 0.56 71.71 TRAPEZOIDAL
I 5.40 15 3 0.56 45.36 SECC.
PR26+267.42 PR26+262.02
2.80 29 3 0.56 45.47 RECTANGULAR
I 2.87 15 3 0.56 24.11 SECC.
PR26+262.02 PR26+259.15
2.74 16 3 0.56 24.55 TRAPEZOIDAL
I 27.00 9 3 0.56 136.08
PR26+259.15 PR26+232.15 SECC.TIPICA
1.50 136 3 0.56 114.24
I 4.10 14 3 0.56 32.14 SECC.
PR26+232.15 PR26+228.05
2.59 22 3 0.56 31.91 TRAPEZOIDAL
I 1.64 6 3 0.56 5.51 SECC.
PR26+228.05 PR26+226.41
0.96 10 3 0.56 5.38 RECTANGULAR
I 21.02 9 3 0.56 105.94
PR26+226.41 PR26+205.39 SECC.TIPICA
1.50 107 3 0.56 89.88
I 42.42 6 3 0.56 142.53 SECC. CUNETA EN
PR26+205.39 PR26+162.97
0.90 214 3 0.56 107.86 "V"
I 8.00 9 3 0.56 40.32
PR26+162.97 PR26+154.97 SECC.TIPICA
1.50 41 3 0.56 34.44
I 7.70 14 3 0.56 60.37 SECC.
PR26+154.97 PR26+147.27
2.49 40 3 0.56 55.78 TRAPEZOIDAL
I 2.98 16 3 0.56 26.70 SECC.
PR26+147.27 PR26+144.29
3.00 16 3 0.56 26.88 TRAPEZOIDAL
I 60.00 9 3 0.56 302.40
PR26+144.29 PR26+084.29 SECC.TIPICA
1.50 301 3 0.56 252.84
I 2.70 13 3 0.56 19.66 SECC.
PR26+084.29 PR26+081.59
2.30 15 3 0.56 19.32 TRAPEZOIDAL
I 1.70 4 3 0.56 3.81 SECC.
PR26+081.59 PR26+079.89
0.48 10 3 0.56 2.69 RECTANGULAR
I 2.54 13 3 0.56 18.49 SECC.
PR26+079.89 PR26+077.35
2.35 14 3 0.56 18.42 TRAPEZOIDAL
I 47.72 9 3 0.56 240.51
PR26+077.35 PR26+029.63 SECC.TIPICA
1.50 240 3 0.56 201.60
I 1.40 5 3 0.56 3.92 SECC.
PR26+029.63 PR26+028.23
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO PERIODO: 20 JULIO AL 18 AGOSTO


ACTA No. 7 CONSTRUCCIONES CIVILES SAS 2020
TRAMO: SAN ANTONIO

UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6

ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt) SECC.
PR26+029.63 PR26+028.23
0.65 8 3 0.56 2.91 RECTANGULAR
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO PERIODO: 20 JULIO AL 18 AGOSTO


ACTA No. 7 CONSTRUCCIONES CIVILES SAS 2020
TRAMO: SAN ANTONIO

UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6

ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt)
I 2.80 13 3 0.56 20.38 SECC.
PR26+028.23 PR26+025.43
2.40 15 3 0.56 20.16 TRAPEZOIDAL
I 30.33 9 3 0.56 152.86
PR26+025.43 PR25+995.10 SECC.TIPICA
1.50 153 3 0.56 128.52
I 2.15 6 3 0.56 7.22 SECC.
PR25+995.10 PR25+992.95
0.92 12 3 0.56 6.18 RECTANGULAR
I 2.75 14 3 0.56 21.56 SECC.
PR25+992.95 PR25+990.20
2.54 15 3 0.56 21.34 TRAPEZOIDAL
I 21.71 9 3 0.56 109.42
PR25+990.20 PR25+968.49 SECC.TIPICA
1.50 110 3 0.56 92.40
I 2.12 7 3 0.56 8.31 SECC.
PR25+968.49 PR25+966.37
1.10 12 3 0.56 7.39 RECTANGULAR
I 3.00 14 3 0.56 23.52 SECC.
PR25+966.37 PR25+963.37
2.60 16 3 0.56 23.30 TRAPEZOIDAL
I 67.25 9 3 0.56 338.94
PR25+963.37 PR25+896.12 SECC.TIPICA
1.50 338 3 0.56 283.92
I 8.40 7 3 0.56 32.93 SECC. CUNETA EN
PR25+896.12 PR25+887.72
1.10 43 3 0.56 26.49 "V"
I 15.65 8 3 0.56 70.11 SECC. CUNETA EN
PR25+887.72 PR25+872.07
1.30 80 3 0.56 58.24 "V"
I 61.85 9 3 0.56 311.72
PR25+872.07 PR25+810.22 SECC.TIPICA
1.50 311 3 0.56 261.24
I 4.50 14 3 0.56 35.28 SECC.
PR25+810.22 PR25+805.72
2.41 24 3 0.56 32.39 TRAPEZOIDAL
I 1.60 7 3 0.56 6.27 SECC.
PR25+805.72 PR25+804.12
1.20 10 3 0.56 6.72 RECTANGULAR
I 4.15 12 3 0.56 27.89 SECC.
PR25+804.12 PR25+799.97
2.18 22 3 0.56 26.86 TRAPEZOIDAL
I 15.35 9 3 0.56 77.36
PR25+799.97 PR25+784.62 SECC.TIPICA
1.50 78 3 0.56 65.52
I 3.65 16 3 0.56 32.70 SECC.
PR25+784.62 PR25+780.97
2.92 20 3 0.56 32.70 TRAPEZOIDAL
I 1.65 10 3 0.56 9.24 SECC.
PR25+780.97 PR25+779.32
1.72 10 3 0.56 9.63 RECTANGULAR
I 4.32 13 3 0.56 31.45 SECC.
PR25+779.32 PR25+775.00
2.40 23 3 0.56 30.91 TRAPEZOIDAL
I 62.10 9 3 0.56 312.98
PR25+775.00 PR25+712.90 SECC.TIPICA
1.50 312 3 0.56 262.08
I 5.40 13 3 0.56 39.31 SECC.
PR25+712.90 PR25+707.50
2.37 28 3 0.56 37.16 TRAPEZOIDAL
I 1.76 5 3 0.56 4.93 SECC.
PR25+707.50 PR25+705.74
0.67 10 3 0.56 3.75 RECTANGULAR
I 123.90 9 3 0.56 624.46
PR25+705.74 PR25+581.84 SECC.TIPICA
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO PERIODO: 20 JULIO AL 18 AGOSTO


ACTA No. 7 CONSTRUCCIONES CIVILES SAS 2020
TRAMO: SAN ANTONIO

UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6

ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt)
PR25+705.74 PR25+581.84 SECC.TIPICA
1.50 621 3 0.56 521.64
I 3.00 14 3 0.56 23.52 SECC.
PR25+581.84 PR25+578.84
2.48 16 3 0.56 22.22 TRAPEZOIDAL
I 2.12 6 3 0.56 7.12 SECC.
PR25+578.84 PR25+576.72
0.95 12 3 0.56 6.38 RECTANGULAR
I 2.52 14 3 0.56 19.76 SECC.
PR25+576.72 PR25+574.20
2.49 14 3 0.56 19.52 TRAPEZOIDAL
I 47.82 9 3 0.56 241.01
PR25+574.20 PR25+526.38 SECC.TIPICA
1.50 241 3 0.56 202.44
I 2.25 14 3 0.56 17.64 SECC.
PR25+526.38 PR25+524.13
2.56 13 3 0.56 18.64 TRAPEZOIDAL
I 2.60 6 3 0.56 8.74 SECC.
PR25+524.13 PR25+521.53
0.92 15 3 0.56 7.73 RECTANGULAR
I 2.15 14 3 0.56 16.86 SECC.
PR25+521.53 PR25+519.38
2.50 12 3 0.56 16.80 TRAPEZOIDAL
I 36.00 9 3 0.56 181.44
PR25+519.38 PR25+483.38 SECC.TIPICA
1.50 181 3 0.56 152.04
I 2.50 14 3 0.56 19.60 SECC.
PR25+483.38 PR25+480.88
2.50 14 3 0.56 19.60 TRAPEZOIDAL
I 2.10 6 3 0.56 7.06 SECC.
PR25+480.88 PR25+478.78
1.00 12 3 0.56 6.72 RECTANGULAR
I 4.30 14 3 0.56 33.71 SECC.
PR25+478.78 PR25+474.48
2.60 23 3 0.56 33.49 TRAPEZOIDAL
I 54.80 9 3 0.56 276.19
PR25+474.48 PR25+419.68 SECC.TIPICA
1.50 275 3 0.56 231.00
I 2.30 15 3 0.56 19.32 SECC.
PR25+419.68 PR25+417.38
2.70 13 3 0.56 19.66 TRAPEZOIDAL
I 2.20 8 3 0.56 9.86 SECC.
PR25+417.38 PR25+415.18
1.30 12 3 0.56 8.74 RECTANGULAR
I 2.17 15 3 0.56 18.23 SECC.
PR25+415.18 PR25+413.01
2.70 12 3 0.56 18.14 TRAPEZOIDAL
I 48.70 9 3 0.56 245.45
PR25+413.01 PR25+364.31 SECC.TIPICA
1.50 245 3 0.56 205.80
I 2.70 12 3 0.56 18.14 SECC.
PR25+364.31 PR25+361.61
2.15 15 3 0.56 18.06 TRAPEZOIDAL
I 2.10 8 3 0.56 9.41 SECC.
PR25+361.61 PR25+359.51
1.28 12 3 0.56 8.60 RECTANGULAR

D 1.60 6 3.00 0.56 5.38 SECC.


PR25+360.00 PR25+358.40
0.84 10 3.00 0.56 4.70 RECTANGULAR
D 3.19 13 3.00 0.56 23.22 SECC.
PR25+358.40 PR25+355.21
2.28 17 3.00 0.56 21.71 TRAPEZOIDAL
D 33.92 9 3.00 0.56 170.96
PR25+355.21 PR25+321.29 SECC.TIPICA
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO PERIODO: 20 JULIO AL 18 AGOSTO


ACTA No. 7 CONSTRUCCIONES CIVILES SAS 2020
TRAMO: SAN ANTONIO

UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6

ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt)
PR25+355.21 PR25+321.29 SECC.TIPICA
1.50 171 3.00 0.56 143.64
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO PERIODO: 20 JULIO AL 18 AGOSTO


ACTA No. 7 CONSTRUCCIONES CIVILES SAS 2020
TRAMO: SAN ANTONIO

UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6

ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt)
D 2.55 13 3.00 0.56 18.56 SECC.
PR25+321.29 PR25+318.74
2.40 14 3.00 0.56 18.82 TRAPEZOIDAL
D 1.80 11 3.00 0.56 11.09 SECC.
PR25+318.74 PR25+316.94
1.82 11 3.00 0.56 11.21 RECTANGULAR
D 2.30 15 3.00 0.56 19.32 SECC.
PR25+316.94 PR25+314.64
2.70 13 3.00 0.56 19.66 TRAPEZOIDAL
D 6.60 9 3.00 0.56 33.26
PR25+314.64 PR25+308.04 SECC.TIPICA
1.50 34 3.00 0.56 28.56
D 5.00 9 3.00 0.56 25.20
PR25+160.00 PR25+155.00 SECC.TIPICA
1.50 26 3.00 0.56 21.84
D 3.82 6 3.00 0.56 12.84 SECC.
PR25+155.00 PR25+151.18
0.97 21 3.00 0.56 11.41 RECTANGULAR
D 3.60 12 3.00 0.56 24.19 SECC.
PR25+151.18 PR25+147.58
2.12 19 3.00 0.56 22.56 TRAPEZOIDAL
D 14.07 9 3.00 0.56 70.91
PR25+147.58 PR25+133.51 SECC.TIPICA
1.50 72 3.00 0.56 60.48
D 27.70 9 3.00 0.56 139.61
PR25+050.00 PR25+022.30 SECC.TIPICA
1.50 140 3.00 0.56 117.60
D 1.67 6 3.00 0.56 5.61 SECC.
PR25+022.30 PR25+020.63
0.95 10 3.00 0.56 5.32 RECTANGULAR
D 5.06 13 3.00 0.56 36.84 SECC.
PR25+020.63 PR25+015.57
2.37 27 3.00 0.56 35.83 TRAPEZOIDAL
D 55.50 9 3.00 0.56 279.72
PR25+015.57 PR24+960.07 SECC.TIPICA
1.50 279 3.00 0.56 234.36
D 1.53 12 3.00 0.56 10.28 SECC.
PR24+960.07 PR24+958.54
2.13 9 3.00 0.56 10.74 TRAPEZOIDAL
D 1.76 8 3.00 0.56 7.88 SECC.
PR24+958.54 PR24+956.78
1.36 10 3.00 0.56 7.62 RECTANGULAR
D 7.34 18 3.00 0.56 73.99
PR24+796.00 PR24+788.66 ACCESO EN "V"
3.26 38 3.00 0.56 69.37
D 23.50 7 3.00 0.56 92.12
PR24+788.66 PR24+765.16 CUNETA EN "V"
1.18 119 3.00 0.56 78.64
D 2.70 21 3.00 0.56 31.75
PR24+765.16 PR24+762.46 ACCESO EN "V"
3.90 15 3.00 0.56 32.76
D 2.04 5 3.00 0.56 5.71 SECC.
PR24+617.00 PR24+614.96
0.80 12 3.00 0.56 5.38 RECTANGULAR
D 102.90 9 3.00 0.56 518.62
PR24+614.96 PR24+512.06 SECC.TIPICA
1.50 516 3.00 0.56 433.44
D 7.20 12 3.00 0.56 48.38 SECC.
PR24+498.50 PR24+491.30
2.13 37 3.00 0.56 44.13 TRAPEZOIDAL
D 13.60 9 3.00 0.56 68.54
PR24+491.30 PR24+477.70 SECC.TIPICA
1.50 70 3.00 0.56 58.80
D 7.02 14 3.00 0.56 55.04 SECC.
PR24+412.00 PR24+404.98
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO PERIODO: 20 JULIO AL 18 AGOSTO


ACTA No. 7 CONSTRUCCIONES CIVILES SAS 2020
TRAMO: SAN ANTONIO

UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6

ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt) SECC.
PR24+412.00 PR24+404.98
2.50 37 3.00 0.56 51.80 TRAPEZOIDAL
D 45.90 9 3.00 0.56 231.34
PR24+404.98 PR24+359.08 SECC.TIPICA
1.50 231 3.00 0.56 194.04
D 4.62 13 3.00 0.56 33.63 SECC.
PR24+254.00 PR24+249.38
2.40 25 3.00 0.56 33.60 TRAPEZOIDAL
D 5.68 9 3.00 0.56 28.63
PR24+249.38 PR24+243.70 SECC.TIPICA
1.50 30 3.00 0.56 25.20
D 7.80 7 3.00 0.56 30.58 SECC.
PR23+631.68 PR23+639.48
1.05 41 3.00 0.56 24.11 RECTANGULAR
D 14.98 9 3.00 0.56 75.50
PR23+616.70 PR23+631.68 SECC.TIPICA
1.50 76 3.00 0.56 63.84
D 32.50 7 3.00 0.56 127.40 SECC.
PR23+584.20 PR23+616.70
1.15 164 3.00 0.56 105.62 RECTANGULAR
D 6.16 9 3.00 0.56 31.05 SECC. CUNETA EN
PR23+578.04 PR23+584.20
1.60 32 3.00 0.56 28.67 "V"
D 2.00 6 3.00 0.56 6.72 SECC.
PR23+185.00 PR23+183.00
1.00 11 3.00 0.56 6.16 RECTANGULAR
D 7.20 14 3.00 0.56 56.45 SECC.
PR23+183.00 PR23+175.80
2.53 37 3.00 0.56 52.42 TRAPEZOIDAL
D 15.20 9 3.00 0.56 76.61
PR23+175.80 PR23+160.60 SECC.TIPICA
1.50 78 3.00 0.56 65.52
D 57.85 9 3.00 0.56 291.56
PR23+091.40 PR23+033.55 SECC.TIPICA
1.50 291 3.00 0.56 244.44
D 8.63 9 3.00 0.56 43.50 SECC.
PR23+033.55 PR23+024.92
1.52 45 3.00 0.56 38.30 TRAPEZOIDAL
D 5.00 6 3.00 0.56 16.80 SECC.
PR23+024.92 PR23+019.92
0.99 26 3.00 0.56 14.41 RECTANGULAR
D 6.85 15 3.00 0.56 57.54 SECC.
PR23+019.92 PR23+013.07
2.76 36 3.00 0.56 55.64 TRAPEZOIDAL
D 15.75 9 3.00 0.56 79.38
PR23+013.07 PR22+997.32 SECC.TIPICA
1.50 80 3.00 0.56 67.20

I 4.44 14 3 0.56 34.81 SECC.


PR25+360.00 PR25+355.56
2.54 24 3 0.56 34.14 TRAPEZOIDAL
I 34.73 9 3 0.56 175.04
PR25+355.56 PR25+320.83 SECC.TIPICA
1.50 175 3 0.56 147.00
I 4.76 13 3 0.56 34.65 SECC.
PR25+320.83 PR25+316.07
2.37 25 3 0.56 33.18 TRAPEZOIDAL
I 2.12 6 3 0.56 7.12 SECC.
PR25+316.07 PR25+313.95
0.86 12 3 0.56 5.78 RECTANGULAR
I 4.51 14 3 0.56 35.36 SECC.
PR25+313.95 PR25+309.44
2.45 24 3 0.56 32.93 TRAPEZOIDAL
I 84.50 9 3 0.56 425.88
PR25+309.44 PR25+224.94 SECC.TIPICA
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO PERIODO: 20 JULIO AL 18 AGOSTO


ACTA No. 7 CONSTRUCCIONES CIVILES SAS 2020
TRAMO: SAN ANTONIO

UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6

ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt)
PR25+309.44 PR25+224.94 SECC.TIPICA
1.50 424 3 0.56 356.16
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO PERIODO: 20 JULIO AL 18 AGOSTO


ACTA No. 7 CONSTRUCCIONES CIVILES SAS 2020
TRAMO: SAN ANTONIO

UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6

ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt)
I 4.56 13 3 0.56 33.20 SECC.
PR25+224.94 PR25+220.38
2.25 24 3 0.56 30.24 TRAPEZOIDAL
I 2.10 5 3 0.56 5.88 SECC.
PR25+220.38 PR25+218.28
0.65 12 3 0.56 4.37 RECTANGULAR
I 4.20 13 3 0.56 30.58 SECC.
PR25+218.28 PR25+214.08
2.22 22 3 0.56 27.35 TRAPEZOIDAL
I 51.10 9 3 0.56 257.54
PR25+214.08 PR25+162.98 SECC.TIPICA
1.50 257 3 0.56 215.88
I 6.16 14 3 0.56 48.29 SECC.
PR25+162.98 PR25+156.82
2.43 32 3 0.56 43.55 TRAPEZOIDAL
I 1.88 9 3 0.56 9.48 SECC.
PR25+156.82 PR25+154.94
1.49 11 3 0.56 9.18 RECTANGULAR
I 4.90 14 3 0.56 38.42 SECC.
PR25+154.94 PR25+150.04
2.55 26 3 0.56 37.13 TRAPEZOIDAL
I 39.00 9 3 0.56 196.56
PR25+150.04 PR25+111.04 SECC.TIPICA
1.50 196 3 0.56 164.64
I 3.20 12 3 0.56 21.50 SECC.
PR25+111.04 PR25+107.84
2.08 17 3 0.56 19.80 TRAPEZOIDAL
I 2.10 7 3 0.56 8.23 SECC.
PR25+107.84 PR25+105.74
1.20 12 3 0.56 8.06 RECTANGULAR
I 4.00 13 3 0.56 29.12 SECC.
PR25+105.74 PR25+101.74
2.38 21 3 0.56 27.99 TRAPEZOIDAL
I 22.73 9 3 0.56 114.56
PR25+101.74 PR25+079.01 SECC.TIPICA
1.50 115 3 0.56 96.60
I 4.16 13 3 0.56 30.28 SECC.
PR25+079.01 PR25+074.85
2.38 22 3 0.56 29.32 TRAPEZOIDAL
I 2.10 7 3 0.56 8.23 SECC.
PR25+074.85 PR25+072.75
1.10 12 3 0.56 7.39 RECTANGULAR
I 4.30 14 3 0.56 33.71 SECC.
PR25+072.75 PR25+068.45
2.46 23 3 0.56 31.68 TRAPEZOIDAL
I 40.40 9 3 0.56 203.62
PR25+068.45 PR25+028.05 SECC.TIPICA
1.50 203 3 0.56 170.52
I 2.12 14 3 0.56 16.62 SECC.
PR25+028.05 PR25+025.93
2.55 12 3 0.56 17.14 TRAPEZOIDAL
I 2.14 6 3 0.56 7.19 SECC.
PR25+025.93 PR25+023.79
0.97 12 3 0.56 6.52 RECTANGULAR
I 2.22 14 3 0.56 17.40 SECC.
PR25+023.79 PR25+021.57
2.49 13 3 0.56 18.13 TRAPEZOIDAL
I 53.73 9 3 0.56 270.80
PR25+021.57 PR24+967.84 SECC.TIPICA
1.50 270 3 0.56 226.80
I 4.82 14 3 0.56 37.79 SECC.
PR24+967.84 PR24+963.02
2.41 26 3 0.56 35.09 TRAPEZOIDAL
I 2.17 7 3 0.56 8.51 SECC.
PR24+963.02 PR24+960.85
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO PERIODO: 20 JULIO AL 18 AGOSTO


ACTA No. 7 CONSTRUCCIONES CIVILES SAS 2020
TRAMO: SAN ANTONIO

UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6

ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt) SECC.
PR24+963.02 PR24+960.85
1.19 12 3 0.56 8.00 RECTANGULAR
I 6.30 14 3 0.56 49.39 SECC.
PR24+960.85 PR24+954.55
2.50 33 3 0.56 46.20 TRAPEZOIDAL
I 33.90 9 3 0.56 170.86
PR24+954.55 PR24+920.65 SECC.TIPICA
1.50 171 3 0.56 143.64
I 2.84 12 3 0.56 19.08 SECC.
PR24+920.65 PR24+917.81
2.11 16 3 0.56 18.91 TRAPEZOIDAL
I 1.56 7 3 0.56 6.12 SECC.
PR24+917.81 PR24+916.25
1.20 9 3 0.56 6.05 RECTANGULAR
I 7.53 14 3 0.56 59.04 SECC.
PR24+916.25 PR24+908.72
2.59 39 3 0.56 56.57 TRAPEZOIDAL
I 70.42 9 3 0.56 354.92
PR24+908.72 PR24+838.30 SECC.TIPICA
1.50 354 3 0.56 297.36
I 4.60 16 3 0.56 41.22 SECC.
PR24+838.30 PR24+833.70
2.87 24 3 0.56 38.57 TRAPEZOIDAL
I 2.10 11 3 0.56 12.94 SECC.
PR24+833.70 PR24+831.60
1.82 12 3 0.56 12.23 RECTANGULAR
I 2.10 14 3 0.56 16.46 SECC.
PR24+831.60 PR24+829.50
2.42 12 3 0.56 16.26 TRAPEZOIDAL
I 4.65 15 3 0.56 39.06
PR24+831.00 CANAL ENCOLE
2.80 25 3 0.56 39.20
I 18.24 9 3 0.56 91.93
PR24+829.50 PR24+811.26 SECC.TIPICA
1.50 93 3 0.56 78.12
I 4.06 13 3 0.56 29.56 SECC.
PR24+811.26 PR24+807.20
2.23 22 3 0.56 27.47 TRAPEZOIDAL
I 1.70 5 3 0.56 4.76 SECC.
PR24+807.20 PR24+805.50
0.76 10 3 0.56 4.26 RECTANGULAR
I 2.16 13 3 0.56 15.72 SECC.
PR24+805.50 PR24+803.34
2.26 12 3 0.56 15.19 TRAPEZOIDAL
I 32.50 9 3 0.56 163.80
PR24+803.34 PR24+770.84 SECC.TIPICA
1.50 164 3 0.56 137.76
I 2.42 13 3 0.56 17.62 SECC.
PR24+770.84 PR24+768.42
2.25 14 3 0.56 17.64 TRAPEZOIDAL
I 1.84 18 3 0.56 18.55 SECC.
PR24+768.42 PR24+766.58
3.35 11 3 0.56 20.64 TRAPEZOIDAL
I 2.35 19 3 0.56 25.00 SECC.
PR24+766.58 PR24+764.23
3.50 13 3 0.56 25.48 RECTANGULAR
I 1.54 19 3 0.56 16.39 SECC.
PR24+764.23 PR24+762.69
3.50 9 3 0.56 17.64 TRAPEZOIDAL
I 2.17 7 3 0.56 8.51 SECC.
PR24+762.69 PR24+760.52
1.13 12 3 0.56 7.59 RECTANGULAR
I 50.67 9 3 0.56 255.38
PR24+617.00 PR24+566.33 SECC.TIPICA
1.50 255 3 0.56 214.20
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO PERIODO: 20 JULIO AL 18 AGOSTO


ACTA No. 7 CONSTRUCCIONES CIVILES SAS 2020
TRAMO: SAN ANTONIO

UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6

ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt)
I 4.80 13 3 0.56 34.94 SECC.
PR24+566.33 PR24+561.53
2.27 26 3 0.56 33.05 TRAPEZOIDAL
I 1.75 7 3 0.56 6.86 SECC.
PR24+561.53 PR24+559.78
1.12 10 3 0.56 6.27 RECTANGULAR
I 6.40 12 3 0.56 43.01 SECC.
PR24+559.78 PR24+553.38
2.04 33 3 0.56 37.70 TRAPEZOIDAL
I 47.50 9 3 0.56 239.40
PR24+553.38 PR24+505.88 SECC.TIPICA
1.50 239 3 0.56 200.76
I 5.10 14 3 0.56 39.98 SECC.
PR24+505.88 PR24+500.78
2.52 27 3 0.56 38.10 TRAPEZOIDAL
I 2.16 6 3 0.56 7.26 SECC.
PR24+500.78 PR24+498.62
1.00 12 3 0.56 6.72 RECTANGULAR
I 5.00 16 3 0.56 44.80 SECC.
PR24+492.70 PR24+487.70
2.85 26 3 0.56 41.50 TRAPEZOIDAL
I 1.40 15 3 0.56 11.76 SECC.
PR24+487.70 PR24+486.30
2.75 8 3 0.56 12.32 TRAPEZOIDAL
I 2.33 14 3 0.56 18.27 SECC.
PR24+486.30 PR24+483.97
2.58 13 3 0.56 18.78 RECTANGULAR
I 0.89 15 3 0.56 7.48 SECC.
PR24+483.97 PR24+483.08
2.80 6 3 0.56 9.41 TRAPEZOIDAL
I 31.52 9 3 0.56 158.86
PR24+483.08 PR24+451.56 SECC.TIPICA
1.50 159 3 0.56 133.56
I 4.12 5 3 0.56 11.54 SECC.
PR24+416.00 PR24+411.88
0.70 22 3 0.56 8.62 RECTANGULAR
I 4.45 16 3 0.56 39.87 SECC.
PR24+411.88 PR24+407.43
3.00 24 3 0.56 40.32 TRAPEZOIDAL
I 24.45 9 3 0.56 123.23
PR24+407.43 PR24+382.98 SECC.TIPICA
1.50 124 3 0.56 104.16
I 7.26 18 3 0.56 73.18
PR24+382.98 PR24+375.72 ACCESO
3.30 38 3 0.56 70.22
I 22.00 9 3 0.56 110.88
PR24+375.72 PR24+353.72 SECC.TIPICA
1.50 111 3 0.56 93.24
I 2.10 6 3 0.56 7.06 SECC.
PR24+353.72 PR24+351.62
0.94 12 3 0.56 6.32 RECTANGULAR
I 4.45 14 3 0.56 34.89 SECC.
PR24+351.62 PR24+347.17
2.46 24 3 0.56 33.06 TRAPEZOIDAL
I 52.62 9 3 0.56 265.20
PR24+347.17 PR24+294.55 SECC.TIPICA
1.50 265 3 0.56 222.60
I 6.24 16 3 0.56 55.91 SECC.
PR24+294.55 PR24+288.31
2.82 33 3 0.56 52.11 TRAPEZOIDAL
I 1.54 7 3 0.56 6.04 SECC.
PR24+288.31 PR24+286.77
1.18 9 3 0.56 5.95 RECTANGULAR
I 5.84 14 3 0.56 45.79 SECC.
PR23+370.33 PR23+376.17
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO PERIODO: 20 JULIO AL 18 AGOSTO


ACTA No. 7 CONSTRUCCIONES CIVILES SAS 2020
TRAMO: SAN ANTONIO

UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6

ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt) SECC.
PR23+370.33 PR23+376.17
2.44 31 3 0.56 42.36 TRAPEZOIDAL
I 110.35 9 3 0.56 556.16
PR23+259.98 PR23+370.33 SECC.TIPICA
1.50 553 3 0.56 464.52
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO PERIODO: 20 JULIO AL 18 AGOSTO


ACTA No. 7 CONSTRUCCIONES CIVILES SAS 2020
TRAMO: SAN ANTONIO

UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6

ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt)
I 2.13 7 3 0.56 8.35 SECC.
PR23+257.85 PR23+259.98
1.06 12 3 0.56 7.12 RECTANGULAR
I 4.10 14 3 0.56 32.14 SECC.
PR23+253.75 PR23+257.85
2.44 22 3 0.56 30.06 TRAPEZOIDAL
I 44.70 9 3 0.56 225.29
PR23+209.05 PR23+253.75 SECC.TIPICA
1.50 225 3 0.56 189.00
I 1.38 6 3 0.56 4.64 SECC.
PR23+207.67 PR23+209.05
0.82 8 3 0.56 3.67 RECTANGULAR
I 3.99 15 3 0.56 33.52 SECC.
PR23+203.68 PR23+207.67
2.70 21 3 0.56 31.75 TRAPEZOIDAL
I 19.00 9 3 0.56 95.76
PR23+184.68 PR23+203.68 SECC.TIPICA
1.50 96 3 0.56 80.64
I 1.83 9 3 0.56 9.22 SECC.
PR23+182.85 PR23+184.68
1.51 11 3 0.56 9.30 TRAPEZOIDAL
I 6.75 12 3 0.56 45.36 SECC.
PR23+176.10 PR23+182.85
2.14 35 3 0.56 41.94 TRAPEZOIDAL
I 20.35 9 3 0.56 102.56
PR23+155.75 PR23+176.10 SECC.TIPICA
1.50 103 3 0.56 86.52
I 8.05 11 3 0.56 49.59
PR23+147.70 PR23+155.75 ACCESO
1.92 42 3 0.56 45.16
I 44.20 9 3 0.56 222.77
PR23+103.50 PR23+147.70 SECC.TIPICA
1.50 222 3 0.56 186.48
I 5.10 13 3 0.56 37.13 SECC.
PR23+098.40 PR23+103.50
2.21 27 3 0.56 33.42 TRAPEZOIDAL
I 2.12 8 3 0.56 9.50 SECC.
PR23+096.28 PR23+098.40
1.38 12 3 0.56 9.27 RECTANGULAR
I 2.16 15 3 0.56 18.14 SECC.
PR23+094.12 PR23+096.28
2.72 12 3 0.56 18.28 TRAPEZOIDAL
I 69.96 9 3 0.56 352.60
PR23+024.16 PR23+094.12 SECC.TIPICA
1.50 351 3 0.56 294.84
I 3.61 13 3 0.56 26.28 SECC.
PR23+020.55 PR23+024.16
2.28 20 3 0.56 25.54 TRAPEZOIDAL
I 1.45 6 3 0.56 4.87 SECC.
PR23+019.10 PR23+020.55
1.00 9 3 0.56 5.04 RECTANGULAR
I 5.00 14 3 0.56 39.20 SECC.
PR23+014.10 PR23+019.10
2.47 26 3 0.56 35.96 TRAPEZOIDAL
I 61.10 9 3 0.56 307.94
PR22+953.00 PR23+014.10 SECC.TIPICA
1.50 307 3 0.56 257.88

TOTAL PRESENTE ACTA= 17,642.58


CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO 20 JULIO AL 18 AGOSTO


ACTA No. 7 CONSTRUCCIONES CIVILES SAS
PERIODO:
2020
TRAMO: SAN ANTONIO

ITEM: CUNETAS REVESTIDAS EN CONCRETO (3000PSI) INCLUYE SELLO DE UNIDAD: TOTAL


JUNTAS M³ 273.0

ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA AREA VOL. OBSERVACIONES
DE A

K25+360 K25+100 TIPICA -240.00 0.194 -46.56


K23+285 K23+220 TIPICA -65.00 0.194 -12.61
K23+190 K23+020 TIPICA -170.00 0.194 -32.98
K23+010 K22+950 TIPICA -60.00 0.194 -11.64
PR25+360.00 PR25+358.40 SECC. RECTANGULAR D 1.60 0.84 0.12 1.34 0.16
PR25+358.40 PR25+355.21 SECC. TRAPEZOIDAL D 3.19 1.88 0.12 6.00 0.72
PR25+355.21 PR25+321.29 SECC.TIPICA D 33.92 0.12 0.19 6.58
PR25+321.29 PR25+318.74 SECC. TRAPEZOIDAL D 2.55 2.00 0.12 5.09 0.61
PR25+318.74 PR25+316.94 SECC. RECTANGULAR D 1.80 1.82 0.12 3.28 0.39
PR25+316.94 PR25+314.64 SECC. TRAPEZOIDAL D 2.30 2.30 0.12 5.29 0.63
PR25+314.64 PR25+308.04 SECC.TIPICA D 6.60 0.12 0.19 1.28

PR25+160.00 PR25+155.00 SECC.TIPICA D 5.00 0.12 0.19 0.97


PR25+155.00 PR25+151.18 SECC. RECTANGULAR D 3.82 0.97 0.12 3.71 0.44
PR25+151.18 PR25+147.58 SECC. TRAPEZOIDAL D 3.60 1.72 0.12 6.19 0.74
PR25+147.58 PR25+133.51 SECC.TIPICA D 14.07 0.12 0.19 2.73

PR25+050.00 PR25+022.30 SECC.TIPICA D 27.70 0.12 0.19 5.37


PR25+022.30 PR25+020.63 SECC. RECTANGULAR D 1.67 0.95 0.12 1.59 0.19
PR25+020.63 PR25+015.57 SECC. TRAPEZOIDAL D 5.06 1.97 0.12 9.97 1.20
PR25+015.57 PR24+960.07 SECC.TIPICA D 55.50 0.12 0.19 10.77
PR24+960.07 PR24+958.54 SECC. TRAPEZOIDAL D 1.53 1.73 0.12 2.64 0.32
PR24+958.54 PR24+956.78 SECC. RECTANGULAR D 1.76 1.36 0.12 2.39 0.29

PR24+796.00 PR24+788.66 ACCESO EN "V" D 7.34 3.26 0.12 23.93 2.87


PR24+788.66 PR24+765.16 CUNETA EN "V" D 23.50 1.18 0.12 27.73 3.33
PR24+765.16 PR24+762.46 ACCESO EN "V" D 2.70 3.90 0.12 10.53 1.26

PR24+617.00 PR24+614.96 SECC. RECTANGULAR D 2.04 0.80 0.12 1.63 0.20


PR24+614.96 PR24+512.06 SECC.TIPICA D 102.90 0.12 0.19 19.96

PR24+498.50 PR24+491.30 SECC. TRAPEZOIDAL D 7.20 1.73 0.12 12.46 1.49


PR24+491.30 PR24+477.70 SECC.TIPICA D 13.60 0.12 0.19 2.64

PR24+412.00 PR24+404.98 SECC. TRAPEZOIDAL D 7.02 2.10 0.12 14.74 1.77


PR24+404.98 PR24+359.08 SECC.TIPICA D 45.90 0.12 0.19 8.90

PR24+254.00 PR24+249.38 SECC. TRAPEZOIDAL D 4.62 2.00 0.12 9.24 1.11


PR24+249.38 PR24+243.70 SECC.TIPICA D 5.68 0.12 0.19 1.10

PR23+094.00 PR23+091.40 D 2.60 2.05 0.12 5.33 0.64


PR23+091.40 PR23+033.55 SECC.TIPICA D 57.85 0.12 0.19 11.22
PR23+033.55 PR23+024.92 SECC. TRAPEZOIDAL D 8.63 1.12 0.12 9.67 1.16
PR23+024.92 PR23+019.92 SECC. RECTANGULAR D 5.00 0.99 0.12 4.95 0.59
PR23+019.92 RECALCE ALETA D 2.00 1.00 0.12 2.00 0.24
PR23+019.92 PR23+013.07 SECC. TRAPEZOIDAL D 6.85 2.36 0.12 16.17 1.94
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO 20 JULIO AL 18 AGOSTO


ACTA No. 7 CONSTRUCCIONES CIVILES SAS
PERIODO:
2020
TRAMO: SAN ANTONIO

ITEM: CUNETAS REVESTIDAS EN CONCRETO (3000PSI) INCLUYE SELLO DE UNIDAD: TOTAL


JUNTAS M³ 273.0

ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA AREA VOL. OBSERVACIONES
DE A
PR23+013.07 PR22+997.32 SECC.TIPICA D 15.75 0.12 0.19 3.06

PR23+185.00 PR23+183.00 SECC. RECTANGULAR D 2.00 1.00 0.12 2.00 0.24


PR23+183.00 PR23+175.80 SECC. TRAPEZOIDAL D 7.20 2.13 0.12 15.34 1.84
PR23+183.00 RECALCE ALETA D 1.12 1.15 0.20 1.29 0.26
PR23+175.80 PR23+160.60 SECC.TIPICA D 15.20 0.12 0.19 2.95

PR23+578.04 PR23+584.20 SECC. CUNETA EN "V" D 6.16 1.60 0.12 9.86 1.18
PR23+584.20 PR23+616.70 SECC. RECTANGULAR D 32.50 1.15 0.12 37.38 4.49
PR23+616.70 PR23+631.68 SECC.TIPICA D 14.98 0.12 0.19 2.91
PR23+631.68 PR23+639.48 SECC. RECTANGULAR D 7.80 1.05 0.12 8.19 0.98

PR25+360.00 PR25+355.56 SECC. TRAPEZOIDAL I 4.44 2.14 0.12 9.50 1.14


PR25+355.56 PR25+320.83 SECC.TIPICA I 34.73 0.12 0.19 6.74
PR25+320.83 PR25+316.07 SECC. TRAPEZOIDAL I 4.76 1.97 0.12 9.38 1.13
PR25+316.07 PR25+313.95 SECC. RECTANGULAR I 2.12 0.86 0.12 1.82 0.22
PR25+313.95 PR25+309.44 SECC. TRAPEZOIDAL I 4.51 2.05 0.12 9.25 1.11
PR25+309.44 PR25+224.94 SECC.TIPICA I 84.50 0.12 0.19 16.39
PR25+224.94 PR25+220.38 SECC. TRAPEZOIDAL I 4.56 1.85 0.12 8.44 1.01
PR25+220.38 PR25+218.28 SECC. RECTANGULAR I 2.10 0.65 0.12 1.37 0.16
PR25+218.28 PR25+214.08 SECC. TRAPEZOIDAL I 4.20 1.82 0.12 7.64 0.92
PR25+214.08 PR25+162.98 SECC.TIPICA I 51.10 0.12 0.19 9.91
PR25+162.98 PR25+156.82 SECC. TRAPEZOIDAL I 6.16 2.03 0.12 12.50 1.50
PR25+156.82 PR25+154.94 SECC. RECTANGULAR I 1.88 1.49 0.12 2.80 0.34
PR25+154.94 PR25+150.04 SECC. TRAPEZOIDAL I 4.90 2.15 0.12 10.54 1.26
PR25+150.04 PR25+111.04 SECC.TIPICA I 39.00 0.12 0.19 7.57
PR25+111.04 PR25+107.84 SECC. TRAPEZOIDAL I 3.20 1.68 0.12 5.38 0.65
PR25+107.84 PR25+105.74 SECC. RECTANGULAR I 2.10 1.20 0.12 2.52 0.30
PR25+105.74 PR25+101.74 SECC. TRAPEZOIDAL I 4.00 1.98 0.12 7.92 0.95
PR25+101.74 PR25+079.01 SECC.TIPICA I 22.73 0.12 0.19 4.41
PR25+079.01 PR25+074.85 SECC. TRAPEZOIDAL I 4.16 1.98 0.12 8.24 0.99
PR25+074.85 PR25+072.75 SECC. RECTANGULAR I 2.10 1.10 0.12 2.31 0.28
PR25+072.75 PR25+068.45 SECC. TRAPEZOIDAL I 4.30 2.06 0.12 8.86 1.06
PR25+068.45 PR25+028.05 SECC.TIPICA I 40.40 0.12 0.19 7.84
PR25+028.05 PR25+025.93 SECC. TRAPEZOIDAL I 2.12 2.15 0.12 4.56 0.55
PR25+025.93 PR25+023.79 SECC. RECTANGULAR I 2.14 0.97 0.12 2.08 0.25
PR25+023.79 PR25+021.57 SECC. TRAPEZOIDAL I 2.22 2.09 0.12 4.64 0.56
PR25+021.57 PR24+967.84 SECC.TIPICA I 53.73 0.12 0.19 10.42
PR24+967.84 PR24+963.02 SECC. TRAPEZOIDAL I 4.82 2.01 0.12 9.69 1.16
PR24+963.02 PR24+960.85 SECC. RECTANGULAR I 2.17 1.19 0.12 2.58 0.31
PR24+960.85 PR24+954.55 SECC. TRAPEZOIDAL I 6.30 2.10 0.12 13.23 1.59
PR24+954.55 PR24+920.65 SECC.TIPICA I 33.90 0.12 0.19 6.58
PR24+920.65 PR24+917.81 SECC. TRAPEZOIDAL I 2.84 1.71 0.12 4.86 0.58
PR24+917.81 PR24+916.25 SECC. RECTANGULAR I 1.56 1.20 0.12 1.87 0.22
PR24+916.25 PR24+908.72 SECC. TRAPEZOIDAL I 7.53 2.19 0.12 16.49 1.98
PR24+908.72 PR24+838.30 SECC.TIPICA I 70.42 0.12 0.19 13.66
PR24+838.30 PR24+833.70 SECC. TRAPEZOIDAL I 4.60 2.47 0.12 11.36 1.36
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO 20 JULIO AL 18 AGOSTO


ACTA No. 7 CONSTRUCCIONES CIVILES SAS
PERIODO:
2020
TRAMO: SAN ANTONIO

ITEM: CUNETAS REVESTIDAS EN CONCRETO (3000PSI) INCLUYE SELLO DE UNIDAD: TOTAL


JUNTAS M³ 273.0

ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA AREA VOL. OBSERVACIONES
DE A
PR24+833.70 PR24+831.60 SECC. RECTANGULAR I 2.10 1.82 0.12 3.82 0.46
PR24+831.60 PR24+829.50 SECC. TRAPEZOIDAL I 2.10 2.02 0.12 4.24 0.51
PR24+831.00 CANAL ENCOLE I 4.65 2.80 0.12 13.02 1.56
PR24+829.50 PR24+811.26 SECC.TIPICA I 18.24 0.12 0.19 3.54
PR24+811.26 PR24+807.20 SECC. TRAPEZOIDAL I 4.06 1.83 0.12 7.43 0.89
PR24+807.20 PR24+805.50 SECC. RECTANGULAR I 1.70 0.76 0.12 1.29 0.16
PR24+805.50 PR24+803.34 SECC. TRAPEZOIDAL I 2.16 1.86 0.12 4.02 0.48
PR24+803.34 PR24+770.84 SECC.TIPICA I 32.50 0.12 0.19 6.31
PR24+770.84 PR24+768.42 SECC. TRAPEZOIDAL I 2.42 1.85 0.12 4.48 0.54
PR24+768.42 PR24+766.58 SECC. TRAPEZOIDAL I 1.84 2.95 0.12 5.43 0.65
PR24+766.58 PR24+764.23 SECC. RECTANGULAR I 2.35 3.50 0.12 8.23 0.99
PR24+764.23 PR24+762.69 SECC. TRAPEZOIDAL I 1.54 3.10 0.12 4.77 0.57
PR24+762.69 PR24+760.52 SECC. RECTANGULAR I 2.17 1.13 0.12 2.45 0.29

PR24+617.00 PR24+566.33 SECC.TIPICA I 50.67 0.12 0.19 9.83


PR24+566.33 PR24+561.53 SECC. TRAPEZOIDAL I 4.80 1.87 0.12 8.98 1.08
PR24+561.53 PR24+559.78 SECC. RECTANGULAR I 1.75 1.12 0.12 1.96 0.24
PR24+559.78 PR24+553.38 SECC. TRAPEZOIDAL I 6.40 1.64 0.12 10.50 1.26
PR24+553.38 PR24+505.88 SECC.TIPICA I 47.50 0.12 0.19 9.22
PR24+505.88 PR24+500.78 SECC. TRAPEZOIDAL I 5.10 2.12 0.12 10.81 1.30
PR24+500.78 PR24+498.62 SECC. RECTANGULAR I 2.16 1.00 0.12 2.16 0.26

PR24+492.70 PR24+487.70 SECC. TRAPEZOIDAL I 5.00 2.45 0.12 12.25 1.47


PR24+487.70 PR24+486.30 SECC. TRAPEZOIDAL I 1.40 2.35 0.12 3.29 0.39
PR24+486.30 PR24+483.97 SECC. RECTANGULAR I 2.33 2.58 0.12 6.01 0.72
PR24+483.97 PR24+483.08 SECC. TRAPEZOIDAL I 0.89 2.40 0.12 2.14 0.26
PR24+483.08 PR24+451.56 SECC.TIPICA I 31.52 0.12 0.19 6.11

PR24+416.00 PR24+411.88 SECC. RECTANGULAR I 4.12 0.70 0.12 2.88 0.35


PR24+411.88 PR24+407.43 SECC. TRAPEZOIDAL I 4.45 2.60 0.12 11.57 1.39
PR24+407.43 PR24+382.98 SECC.TIPICA I 24.45 0.12 0.19 4.74
PR24+382.98 PR24+375.72 ACCESO I 7.26 3.30 0.12 23.96 2.87
PR24+375.72 PR24+353.72 SECC.TIPICA I 22.00 0.12 0.19 4.27
PR24+353.72 PR24+351.62 SECC. RECTANGULAR I 2.10 0.94 0.12 1.97 0.24
PR24+351.62 PR24+347.17 SECC. TRAPEZOIDAL I 4.45 2.06 0.12 9.17 1.10
PR24+347.17 PR24+294.55 SECC.TIPICA I 52.62 0.12 0.19 10.21
PR24+294.55 PR24+288.31 SECC. TRAPEZOIDAL I 6.24 2.42 0.12 15.10 1.81
PR24+288.31 PR24+286.77 SECC. RECTANGULAR I 1.54 1.18 0.12 1.82 0.22

PR22+953.00 PR23+014.10 SECC.TIPICA I 61.10 0.12 0.19 11.85


PR23+014.10 PR23+019.10 SECC. TRAPEZOIDAL I 5.00 2.07 0.12 10.35 1.24
PR23+019.10 PR23+020.55 SECC. RECTANGULAR I 1.45 1.00 0.12 1.45 0.17
PR23+020.55 PR23+024.16 SECC. TRAPEZOIDAL I 3.61 1.88 0.12 6.79 0.81
PR23+024.16 PR23+094.12 SECC.TIPICA I 69.96 0.12 0.19 13.57
PR23+094.12 PR23+096.28 SECC. TRAPEZOIDAL I 2.16 2.32 0.12 5.01 0.60
PR23+096.28 PR23+098.40 SECC. RECTANGULAR I 2.12 1.38 0.12 2.93 0.35
PR23+098.40 PR23+103.50 SECC. TRAPEZOIDAL I 5.10 1.81 0.12 9.23 1.11
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO 20 JULIO AL 18 AGOSTO


ACTA No. 7 CONSTRUCCIONES CIVILES SAS
PERIODO:
2020
TRAMO: SAN ANTONIO

ITEM: CUNETAS REVESTIDAS EN CONCRETO (3000PSI) INCLUYE SELLO DE UNIDAD: TOTAL


JUNTAS M³ 273.0

ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA AREA VOL. OBSERVACIONES
DE A
PR23+103.50 PR23+147.70 SECC.TIPICA I 44.20 0.12 0.19 8.57
PR23+147.70 PR23+155.75 ACCESO I 8.05 1.92 0.12 15.46 1.85
PR23+155.75 PR23+176.10 SECC.TIPICA I 20.35 0.12 0.19 3.95
PR23+176.10 PR23+182.85 SECC. TRAPEZOIDAL I 6.75 2.04 0.12 13.77 1.65
PR23+182.85 PR23+184.68 SECC. TRAPEZOIDAL I 1.83 1.11 0.12 2.03 0.24
PR23+184.68 PR23+203.68 SECC.TIPICA I 19.00 0.12 0.19 3.69
PR23+203.68 PR23+207.67 SECC. TRAPEZOIDAL I 3.99 2.30 0.12 9.18 1.10
PR23+207.67 PR23+209.05 SECC. RECTANGULAR I 1.38 0.82 0.12 1.13 0.14
PR23+209.05 PR23+253.75 SECC.TIPICA I 44.70 0.12 0.19 8.67
PR23+253.75 PR23+257.85 SECC. TRAPEZOIDAL I 4.10 2.04 0.12 8.36 1.00
PR23+257.85 PR23+259.98 SECC. RECTANGULAR I 2.13 1.06 0.12 2.26 0.27
PR23+259.98 PR23+370.33 SECC.TIPICA I 110.35 0.12 0.19 21.41
PR23+370.33 PR23+376.17 SECC. TRAPEZOIDAL I 5.84 2.04 0.12 11.91 1.43

TOTAL PRESENTE ACTA 273.01 M3


CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO 20 JULIO AL 18 AGOSTO


ACTA No. 7 CONSTRUCCIONES CIVILES SAS
PERIODO:
2020
TRAMO: SAN ANTONIO

UNIDAD: TOTAL
ITEM: CANAL EN CONCRETO REFORZADO
ML 0.0

ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA VOL. OBSERVACIONES
DE A

TOTAL PRESENTE ACTA 0.00 ML


CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO 20 JULIO AL 18 AGOSTO


ACTA No. 7 CONSTRUCCIONES CIVILES SAS
PERIODO:
2020
TRAMO: SAN ANTONIO

ITEM: CONSTRUCCIÓN DE FILTROS, INCLUYE INSTALACIÓN GEOTEXTIL Y UNIDAD: TOTAL


TUBERIA PERFORADA M3 0.0

ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA VOL. OBSERVACIONES
DE A

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

TOTAL PRESENTE ACTA 0.00 M3


CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO 20 JULIO AL 18 AGOSTO


ACTA No. 7 CONSTRUCCIONES CIVILES SAS
PERIODO:
2020
TRAMO: SAN ANTONIO

UNIDAD: TOTAL
ITEM: GAVIONES
M3 0.0

ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA VOL. OBSERVACIONES
DE A

TOTAL PRESENTE ACTA 0.00 M3


CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO 20 JULIO AL 18 AGOSTO


ACTA No. 7 CONSTRUCCIONES CIVILES SAS
PERIODO:
2020
TRAMO: SAN ANTONIO

UNIDAD: TOTAL
ITEM: CONSTRUCCIÓN TUBERIA 36"
ML 0.0

ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA ML OBSERVACIONES
DE A

K23+350.00 CONSTRUCCION TUBERIA 36"

TOTAL PRESENTE ACTA 0.00 ML


CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO 20 JULIO AL 18 AGOSTO


ACTA No. 7 CONSTRUCCIONES CIVILES SAS
PERIODO:
2020
TRAMO: SAN ANTONIO

UNIDAD: TOTAL
ITEM: INSTALACIÓN TUBERIA 36"
ML 7.0

ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA VOL. OBSERVACIONES
DE A

K23+220 TUBERIA 36" 5.00 5.00

K23+160 TUBERIA 36" 1.00 1.00

K21+740 TUBERIA 36" 1.00 1.00

TOTAL PRESENTE ACTA 7.00 ML


CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO 20 JULIO AL 18 AGOSTO


ACTA No. 7 CONSTRUCCIONES CIVILES SAS
PERIODO:
2020
TRAMO: SAN ANTONIO

UNIDAD: TOTAL
ITEM: REALCE PONTON - ALCANTARILLAS
ML 0.0

ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA LONGITUD OBSERVACIONES
DE A

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

TOTAL PRESENTE ACTA 0.00 ML


CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO 20 JULIO AL 18 AGOSTO


ACTA No. 7 CONSTRUCCIONES CIVILES SAS
PERIODO:
2020
TRAMO: SAN ANTONIO

UNIDAD: TOTAL
ITEM: CONCRETO CLASE D (OBRAS DRENAJE)
M3 41.8

ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA VOL. OBSERVACIONES
DE A
ALCANTARILLA
K23+380 ATRAQUE DESCOLE 1.00 0.50 0.35 0.18
1.00 0.50 0.35 0.18
PLACA DE PISO 1.75 1.40 0.20 0.49
CABEZOTE 1.53 0.20 2.60 0.80
MURO IZQUIERDO 2.10 0.20 2.00 0.84
MURO DERECHO 2.10 0.20 2.00 0.84
K23+220 ATRAQUE ENCOLE IZQ 5.00 0.50 0.35 0.88
5.00 0.50 0.35 0.88
PLACA DE PISO 2.10 2.13 0.20 0.89
CABEZOTE 2.10 0.20 1.45 0.61
MURO POSTERIOR 2.10 0.20 1.45 0.61
MURO IZQUIERDO 2.10 0.20 1.45 0.61
MURO DERECHO 1.70 0.20 1.15 0.39
PLACA DE ENTRADA ALCANTARILLA 2.00 1.30 0.15 0.39
K23+115 PLACA DE PISO 2.15 1.40 0.20 0.60
CABEZOTE 1.38 0.20 2.63 0.73
MURO POSTERIOR 1.38 0.20 2.63 0.73
MURO IZQUIERDO 1.71 0.20 2.50 0.86
MURO DERECHO 1.71 0.20 2.50 0.86
MENOS ENTRADA TUBERIA 36 -1.20 0.20 1.20 -0.29
K23+805 CABEZOTE DESCOLE D 1.70 0.38 0.28 0.18
MURO POSTERIOR D 1.84 0.25 0.35 0.16
MURO IZQUIERDO D 1.25 0.25 0.30 0.09
K23+805 CABEZOTE ENCOLE I 1.67 0.25 0.80 0.33
MURO IZQUIERDO I 1.30 0.25 1.10 0.36
K22+660 PLACA DE PISO 2.05 0.20 1.30 0.53
CABEZOTE DESCOLE 1.00 0.20 2.40 0.48
MURO POSTERIOR 2.65 0.20 1.85 0.98
MURO IZQUIERDO 2.65 0.20 1.85 0.98
K22+660 CABEZOTE 2.15 0.20 2.25 0.97
MURO POSTERIOR 2.15 0.20 2.25 0.97
MURO IZQUIERDO 1.80 0.20 0.95 0.34
MURO DERECHO 1.80 0.20 0.95 0.34
PLACA DE PISO 2.13 1.40 0.20 0.60
K22+160 ATRAQUE DESCOLE 1.00 0.50 0.35 0.18
1.00 0.50 0.35 0.18
PLACA DE PISO 3.00 1.80 0.20 1.08
CABEZOTE 2.13 0.20 3.38 1.44
ALETA DER 1.89 0.20 2.83 1.07
ALETA IZQ 1.89 0.20 2.83 1.07
K21+855 CABEZOTE 2.13 0.20 2.70 1.15
MURO POSTERIOR 2.13 0.20 2.70 1.15
MURO IZQUIERDO 0.95 0.20 2.30 0.44
MURO DERECHO 0.95 0.20 2.30 0.44
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19

SUBCONTRATISTA: HERNANDEZ & ANGULO 20 JULIO AL 18 AGOSTO


ACTA No. 7 CONSTRUCCIONES CIVILES SAS
PERIODO:
2020
TRAMO: SAN ANTONIO

UNIDAD: TOTAL
ITEM: CONCRETO CLASE D (OBRAS DRENAJE)
M3 41.8

ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA VOL. OBSERVACIONES
DE A
K22+000 PLACA DE PISO 3.20 1.78 0.20 1.14
CABEZOTE ENCOLE 2.05 0.20 2.44 1.00
K21+550 PLACA DE PISO I 2.10 1.40 0.20 0.59
MURO POSTERIOR I 2.10 0.20 1.75 0.74
MURO LATERAL IZQ I 0.95 0.20 1.43 0.27
MURO LATERAL DER I 0.95 0.20 1.43 0.27
CABEZOTE I 2.10 0.20 2.27 0.95
K21+550 REALCE ALCANTARILLA CABEZOTE D 1.75 0.20 0.70 0.25
ALETA DER D 1.50 0.20 0.30 0.09
ALETA IZQ D 1.50 0.20 0.30 0.09
K21+640 PLACA DE PISO 3.30 1.70 0.20 1.12
CABEZOTE DESCOLE 1.72 0.20 2.00 0.69
MURO LATERAL IZQ 2.00 0.20 1.48 0.59
MURO LATERAL DER 2.00 0.20 1.48 0.59
K21+740 ATRAQUE ENCOLE 1.00 0.50 0.35 0.18
1.00 0.50 0.35 0.18
PLACA DE PISO 2.14 1.40 0.20 0.60
CABEZOTE 2.12 0.20 1.62 0.69
MURO POSTERIOR 2.12 0.20 1.62 0.69
MURO IZQUIERDO 0.96 0.20 1.20 0.23
MURO DERECHO 0.96 0.20 1.20 0.23
K22+620 PLACA PARA PROTOCOLO COVID 4.00 5.00 0.15 3.00

TOTAL PRESENTE ACTA 41.77 M3