Copia de ACTA N°07 WILSON HERNANDEZ v2 - MEMORIAS
Copia de ACTA N°07 WILSON HERNANDEZ v2 - MEMORIAS
ll. DEDUCCIONES
SUMINISTROS EFECTUADOS POR INGENIERIA DE VIAS S. A. AL CONTRATISTA
ITEM DESCRIPCION UNIDAD CANTIDAD UNITARIO SUB TOTAL
1 ARENA m3 204.98 47,000 9,634,201
2 TRITURADO m3 164.00 47,000 7,708,000
3 CEMENTO saco 2,000.00 19,550 39,100,000
4 ACERO DE REFUERZO kg 17,650.00 3,000 52,950,000
5 ACPM GL 200.00 8,615 1,723,000
0
TOTAL DESCUENTOS POR SUMINISTROS 111,115,201
llI. DESCUENTOS
1
2
Total Descuentos 0
IV RETENCIONES
ITEM DESCRIPCION VALOR
1 Retencion en la Fuente 2% 1,728,057
2 Reteiva 15% (sobre el IVA)
3 Retencion ICA 7*1000
4 Retencion en Garantia 2%
Total Retenciones 1,728,057
Nota:
UNIDAD CANTIDAD UNITARIO SUB TOTAL
1 ARENA m3 47,000 0
2 TRITURADO m3 47,000 0
3 CEMENTO saco 130.00 18,500 2,405,000
4 ACERO DE REFUERZO kg 17,022.10 3,000 51,066,288
5 ACPM GL 0 9,275 0
______________________________________________ Subcontratista
UNIDAD: TOTAL
ITEM: EXCAVACIONES VARIAS EN TERIAL COMÚN EN SECO
M³ 153.7
ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA VOL. OBSERVACIONES
DE A
UNIDAD: TOTAL
ITEM: DEMOLICIÓN DE CUNETA EN CONCRETO
M³ 0.0
ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA VOL. OBSERVACIONES
DE A
UNIDAD: TOTAL
ITEM: DEMOLICIÓN CONCRETO CICLOPEO INCLUYE RETIRO
M³ 7.6
ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA VOL. OBSERVACIONES
DE A
ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA VOL. OBSERVACIONES
DE A
0.00
0.00
0.00
0.00
0.00
UNIDAD: TOTAL
CAISSON DE DIAMETRO 1.5M EN CONCRETO FUNDIDO INSITU (Anillo de
3000psi E=0.15 y núcleo 4000psi)NO INCLUYE ACERO DE REFUERZO M³ 0.00
ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA VOLUMEN OBSERVACIONES
DE A
UNIDAD: TOTAL
ITEM: CONCRETO CLASE G (CICLOPEO)
M³ 16.35
ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA VOLUMEN OBSERVACIONES
DE A
UNIDAD: TOTAL
ITEM: CONCRETO CLASE F
M³ 2.31
ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA VOLUMEN OBSERVACIONES
DE A
SOLADO ALCANTARILLA
K22+660.00 DESCOLE 2.10 1.35 0.05 0.14
K22+660.00 SOLADO ALCANTARILLA ENCOLE 2.15 1.45 0.05 0.16
UNIDAD: TOTAL
ITEM: CONCRETO CLASE D (3000PSI) MUROS
M³ 7.87
ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA VOLUMEN OBSERVACIONES
DE A
UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6
ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt)
MURO
K23+190.00 REALCE BOX MARGEN IZ 0.50 19.00 4.00 0.99 9.44
1.90 2.00 4.00 0.99 3.78
1.90 2.00 4.00 0.99 3.78
K23+020 REALCE BOX 0.65 33.00 4.00 0.99 21.32
3.50 2.00 4.00 0.99 6.96
2.00 2.00 4.00 0.99 3.98
1.20 3.00 4.00 0.99 3.58
K23+020 REALCE BOX 0.65 41.00 4.00 0.99 26.49
4.80 2.00 4.00 0.99 9.54
4.00 2.00 4.00 0.99 7.95
K22+520 REALCE BOX 0.80 57.00 4.00 0.99 45.33
12.00 2.00 4.00 0.99 23.86
0.80 2.00 4.00 0.99 1.59
0.50 13.00 4.00 0.99 6.46
K22+520 REALCE BOX 0.70 13.00 4.00 0.99 9.05
2.80 2.00 4.00 0.99 5.57
2.50 1.00 4.00 0.99 2.49
1.75 1.00 4.00 0.99 1.74
K22+000 REALCE MURO 0.70 26.00 4.00 0.99 18.09
6.00 2.00 4.00 0.99 11.93
K21+853 REALCE MURO 0.65 108.00 4.00 0.99 69.78
6.00 8.00 4.00 0.99 47.71
ALCANTARILLAS
UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6
ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt)
1.40 4.00 4.00 0.99 5.57
6.00 5.00 4.00 0.99 29.82
1.20 17.00 4.00 0.99 20.28
K22+805.00 REALCE ALCANTARILLA DESCOLE 0.45 17.00 4.00 0.99 7.60
1.50 1.00 4.00 0.99 1.49
1.25 2.00 4.00 0.99 2.49
K22+805.00 REALCE ALCANTARILLA ENCOLE 1.10 10.00 4.00 0.99 10.93
1.60 4.00 4.00 0.99 6.36
1.20 3.00 4.00 0.99 3.58
K22+660.00 ALCANTARILLA DESCOLE 3.00 15.00 4.00 0.99 44.73
6.00 1.00 4.00 0.99 5.96
1.50 1.00 4.00 0.99 1.49
2.20 6.00 4.00 0.99 13.12
K22+660.00 ALCANTARILLA ENCOLE 6.00 11.00 4.00 0.99 65.60
5.00 4.00 4.00 0.99 19.88
6.00 4.00 4.00 0.99 23.86
1.20 4.00 4.00 0.99 4.77
K22+160.00 ALCANTARIILLA DESCOLE 3.60 4.00 4.00 0.99 14.31
3.00 9.00 4.00 0.99 26.84
6.00 6.00 4.00 0.99 35.78
4.00 1.00 4.00 0.99 3.98
2.00 2.00 4.00 0.99 3.98
1.85 11.00 4.00 0.99 20.23
2.00 3.00 4.00 0.99 5.96
3.15 9.00 4.00 0.99 28.18
2.00 5.00 4.00 0.99 9.94
1.30 2.00 4.00 0.99 2.58
0.70 2.00 4.00 0.99 1.39
K22+000.00 ALCANTARILLA ENCOLE 5.75 5.00 4.00 0.99 28.58
2.40 4.00 4.00 0.99 9.54
2.30 4.00 4.00 0.99 9.14
1.90 3.00 4.00 0.99 5.67
1.60 5.00 4.00 0.99 7.95
1.20 2.00 4.00 0.99 2.39
1.65 10.00 4.00 0.99 16.40
0.60 2.00 4.00 0.99 1.19
3.10 9.00 4.00 0.99 27.73
2.00 6.00 4.00 0.99 11.93
2.80 4.00 4.00 0.99 11.13
K21+550.00 ALETAS ENCOLE 6.00 2.00 4.00 0.99 11.93
4.00 4.00 4.00 0.99 15.90
1.75 2.00 4.00 0.99 3.48
3.00 8.00 4.00 0.99 23.86
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19
UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6
ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt)
K21+550.00 REALCE ALCANTARILLA 0.50 10.00 4.00 0.99 4.97
0.80 8.00 4.00 0.99 6.36
1.60 2.00 4.00 0.99 3.18
1.40 2.00 4.00 0.99 2.78
K21+640.00 ALETAS DESCOLE 1.55 9.00 4.00 0.99 13.87
1.30 2.00 4.00 0.99 2.58
1.00 2.00 4.00 0.99 1.99
0.70 2.00 4.00 0.99 1.39
0.50 2.00 4.00 0.99 0.99
3.00 8.00 4.00 0.99 23.86
2.00 2.00 4.00 0.99 3.98
2.20 4.00 4.00 0.99 8.75
1.60 18.00 4.00 0.99 28.63
2.50 10.00 4.00 0.99 24.85
5.70 2.00 4.00 0.99 11.33
1.86 2.00 4.00 0.99 3.70
0.90 6.00 4.00 0.99 5.37
1.75 2.00 4.00 0.99 3.48
K21+740.00 ALCANTARILLA ENCOLE 4.40 2.00 4.00 0.99 8.75
5.10 2.00 4.00 0.99 10.14
4.30 4.00 4.00 0.99 17.10
2.77 6.00 4.00 0.99 16.52
4.70 5.00 4.00 0.99 23.36
6.35 1.00 4.00 0.99 6.31
2.00 4.00 4.00 0.99 7.95
0.60 6.00 4.00 0.99 3.58
K22+110.00 REALCE DESCOLE 0.60 10.00 4.00 0.99 5.96
1.95 2.00 4.00 0.99 3.88
CUNETAS
UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6
ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt)
UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6
ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt)
D 3.15 14 3 0.56 24.70 SECC.
PR26+345.26 PR26+342.11
2.55 17 3 0.56 24.28 TRAPEZOIDAL
D 1.50 8 3 0.56 6.72 SECC.
PR26+342.11 PR26+340.61
1.22 9 3 0.56 6.15 RECTANGULAR
D 78.00 9 3 0.56 393.12
PR26+340.61 PR26+262.61 SECC.TIPICA
1.50 391 3 0.56 328.44
D 9.15 7 3 0.56 35.87 SECC.
PR26+262.61 PR26+253.46
1.11 47 3 0.56 29.22 RECTANGULAR
D 2.00 12 3 0.56 13.44 SECC.
PR26+253.46 PR26+251.46
2.12 11 3 0.56 13.06 TRAPEZOIDAL
D 19.00 9 3 0.56 95.76
PR26+251.46 PR26+232.46 SECC.TIPICA
1.50 96 3 0.56 80.64
D 3.00 14 3 0.56 23.52 SECC.
PR26+232.46 PR26+229.46
2.53 16 3 0.56 22.67 TRAPEZOIDAL
D 1.88 7 3 0.56 7.37 SECC.
PR26+229.46 PR26+227.58
1.05 11 3 0.56 6.47 RECTANGULAR
D 77.30 9 3 0.56 389.59
PR26+227.58 PR26+150.28 SECC.TIPICA
1.50 388 3 0.56 325.92
D 2.18 12 3 0.56 14.65 SECC.
PR26+150.28 PR26+148.10
2.12 12 3 0.56 14.25 TRAPEZOIDAL
D 30.12 7 3 0.56 118.07 SECC.
PR26+148.10 PR26+117.98
1.11 152 3 0.56 94.48 RECTANGULAR
D 31.73 9 3 0.56 159.92
PR26+117.98 PR26+086.25 SECC.TIPICA
1.50 160 3 0.56 134.40
D 2.82 13 3 0.56 20.53 SECC.
PR26+086.25 PR26+083.43
2.30 16 3 0.56 20.61 TRAPEZOIDAL
D 2.00 9 3 0.56 10.08 SECC.
PR26+083.43 PR26+081.43
1.53 11 3 0.56 9.42 RECTANGULAR
D 2.83 14 3 0.56 22.19 SECC.
PR26+081.43 PR26+078.60
2.60 16 3 0.56 23.30 TRAPEZOIDAL
D 43.37 9 3 0.56 218.58
PR26+078.60 PR26+035.23 SECC.TIPICA
1.50 218 3 0.56 183.12
D 2.45 7 3 0.56 9.60 SECC.
PR26+035.23 PR26+032.78
1.12 14 3 0.56 8.78 RECTANGULAR
D 3.05 15 3 0.56 25.62 SECC.
PR26+032.78 PR26+029.73
2.70 17 3 0.56 25.70 TRAPEZOIDAL
D 14.10 9 3 0.56 71.06
PR26+029.73 PR26+015.63 SECC.TIPICA
1.50 72 3 0.56 60.48
D 8.10 7 3 0.56 31.75 SECC.
PR26+015.63 PR26+007.53
1.04 42 3 0.56 24.46 RECTANGULAR
D 14.60 9 3 0.56 73.58
PR26+007.53 PR25+992.93 SECC.TIPICA
1.50 75 3 0.56 63.00
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19
UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6
ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt)
D 45.73 6 3 0.56 153.65 SECC.
PR25+992.93 PR25+947.20
0.92 230 3 0.56 118.50 RECTANGULAR
D 10.55 9 3 0.56 53.17
PR25+947.20 PR25+936.65 SECC.TIPICA
1.50 54 3 0.56 45.36
D 21.55 9 3 0.56 108.61
PR25+904.75 PR25+883.20 SECC.TIPICA
1.50 109 3 0.56 91.56
D 4.20 14 3 0.56 32.93 SECC.
PR25+883.20 PR25+879.00
2.50 23 3 0.56 32.20 TRAPEZOIDAL
D 15.65 6 3 0.56 52.58 SECC.
PR25+879.00 PR25+863.35
0.86 80 3 0.56 38.53 RECTANGULAR
D 78.73 9 3 0.56 396.80
PR25+863.35 PR25+784.62 SECC.TIPICA
1.50 395 3 0.56 331.80
D 2.22 13 3 0.56 16.16 SECC.
PR25+784.62 PR25+782.40
2.35 13 3 0.56 17.11 TRAPEZOIDAL
D 1.80 6 3 0.56 6.05 SECC.
PR25+782.40 PR25+780.60
0.84 10 3 0.56 4.70 RECTANGULAR
D 71.20 9 3 0.56 358.85
PR25+780.60 PR25+709.40 SECC.TIPICA
1.50 357 3 0.56 299.88
D 10.10 6 3 0.56 33.94 SECC.
PR25+709.40 PR25+699.30
0.91 52 3 0.56 26.50 RECTANGULAR
D 104.65 9 3 0.56 527.44
PR25+699.30 PR25+594.65 SECC.TIPICA
1.50 525 3 0.56 441.00
D 12.83 5 3 0.56 35.92 SECC.
PR25+594.65 PR25+581.82
0.80 66 3 0.56 29.57 RECTANGULAR
D 16.80 9 3 0.56 84.67
PR25+581.82 PR25+565.02 SECC.TIPICA
1.50 86 3 0.56 72.24
D 5.60 12 3 0.56 37.63 SECC.
PR25+565.02 PR25+559.42
2.08 30 3 0.56 34.94 TRAPEZOIDAL
D 37.70 9 3 0.56 190.01
PR25+559.42 PR25+521.72 SECC.TIPICA
1.50 190 3 0.56 159.60
D 4.00 14 3 0.56 31.36 SECC.
PR25+521.72 PR25+517.72
2.55 21 3 0.56 29.99 TRAPEZOIDAL
D 4.56 6 3 0.56 15.32 SECC.
PR25+517.72 PR25+513.16
0.96 24 3 0.56 12.90 RECTANGULAR
D 5.20 13 3 0.56 37.86 SECC.
PR25+513.16 PR25+507.96
2.30 27 3 0.56 34.78 TRAPEZOIDAL
D 26.60 9 3 0.56 134.06
PR25+507.96 PR25+481.36 SECC.TIPICA
1.50 134 3 0.56 112.56
D 1.50 6 3 0.56 5.04 SECC.
PR25+481.36 PR25+479.86
1.00 9 3 0.56 5.04 RECTANGULAR
D 3.03 14 3 0.56 23.76 SECC.
PR25+479.86 PR25+476.83
2.45 17 3 0.56 23.32 TRAPEZOIDAL
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19
UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6
ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt)
D 20.00 9 3 0.56 100.80
PR25+476.83 PR25+456.83 SECC.TIPICA
1.50 101 3 0.56 84.84
D 26.73 9 3 0.56 134.72
PR25+456.83 PR25+430.10 SECC.TIPICA
1.50 135 3 0.56 113.40
D 13.60 9 3 0.56 68.54
PR25+430.10 PR25+416.50 SECC.TIPICA
1.50 70 3 0.56 58.80
D 2.27 6 3 0.56 7.63 SECC.
PR25+416.50 PR25+414.23
0.95 13 3 0.56 6.92 RECTANGULAR
D 3.10 13 3 0.56 22.57
PR25+415.00 CANAL DESCOLE
2.30 17 3 0.56 21.90
D 4.50 9 3 0.56 22.68
PR25+414.23 PR25+409.73 SECC.TIPICA
1.50 24 3 0.56 20.16
D 2.12 12 3 0.56 14.25 SECC.
PR25+409.73 PR25+407.61
2.20 12 3 0.56 14.78 TRAPEZOIDAL
D 36.40 8 3 0.56 163.07 SECC.
PR25+407.61 PR25+371.21
1.34 183 3 0.56 137.32 RECTANGULAR
D 10.50 9 3 0.56 52.92
PR25+371.21 PR25+360.71 SECC.TIPICA
1.50 54 3 0.56 45.36
UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6
ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt)
I 2.04 13 3 0.56 14.85 SECC.
PR26+389.67 PR26+387.63
2.24 12 3 0.56 15.05 TRAPEZOIDAL
I 42.10 9 3 0.56 212.18
PR26+387.63 PR26+345.53 SECC.TIPICA
1.50 212 3 0.56 178.08
I 4.35 14 3 0.56 34.10 SECC.
PR26+345.53 PR26+341.18
2.50 23 3 0.56 32.20 TRAPEZOIDAL
I 1.57 7 3 0.56 6.15 SECC.
PR26+341.18 PR26+339.61
1.14 9 3 0.56 5.75 RECTANGULAR
I 64.88 9 3 0.56 327.00
PR26+339.61 PR26+274.73 SECC.TIPICA
1.50 326 3 0.56 273.84
I 7.31 18 3 0.56 73.68 SECC.
PR26+274.73 PR26+267.42
3.37 38 3 0.56 71.71 TRAPEZOIDAL
I 5.40 15 3 0.56 45.36 SECC.
PR26+267.42 PR26+262.02
2.80 29 3 0.56 45.47 RECTANGULAR
I 2.87 15 3 0.56 24.11 SECC.
PR26+262.02 PR26+259.15
2.74 16 3 0.56 24.55 TRAPEZOIDAL
I 27.00 9 3 0.56 136.08
PR26+259.15 PR26+232.15 SECC.TIPICA
1.50 136 3 0.56 114.24
I 4.10 14 3 0.56 32.14 SECC.
PR26+232.15 PR26+228.05
2.59 22 3 0.56 31.91 TRAPEZOIDAL
I 1.64 6 3 0.56 5.51 SECC.
PR26+228.05 PR26+226.41
0.96 10 3 0.56 5.38 RECTANGULAR
I 21.02 9 3 0.56 105.94
PR26+226.41 PR26+205.39 SECC.TIPICA
1.50 107 3 0.56 89.88
I 42.42 6 3 0.56 142.53 SECC. CUNETA EN
PR26+205.39 PR26+162.97
0.90 214 3 0.56 107.86 "V"
I 8.00 9 3 0.56 40.32
PR26+162.97 PR26+154.97 SECC.TIPICA
1.50 41 3 0.56 34.44
I 7.70 14 3 0.56 60.37 SECC.
PR26+154.97 PR26+147.27
2.49 40 3 0.56 55.78 TRAPEZOIDAL
I 2.98 16 3 0.56 26.70 SECC.
PR26+147.27 PR26+144.29
3.00 16 3 0.56 26.88 TRAPEZOIDAL
I 60.00 9 3 0.56 302.40
PR26+144.29 PR26+084.29 SECC.TIPICA
1.50 301 3 0.56 252.84
I 2.70 13 3 0.56 19.66 SECC.
PR26+084.29 PR26+081.59
2.30 15 3 0.56 19.32 TRAPEZOIDAL
I 1.70 4 3 0.56 3.81 SECC.
PR26+081.59 PR26+079.89
0.48 10 3 0.56 2.69 RECTANGULAR
I 2.54 13 3 0.56 18.49 SECC.
PR26+079.89 PR26+077.35
2.35 14 3 0.56 18.42 TRAPEZOIDAL
I 47.72 9 3 0.56 240.51
PR26+077.35 PR26+029.63 SECC.TIPICA
1.50 240 3 0.56 201.60
I 1.40 5 3 0.56 3.92 SECC.
PR26+029.63 PR26+028.23
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19
UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6
ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt) SECC.
PR26+029.63 PR26+028.23
0.65 8 3 0.56 2.91 RECTANGULAR
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19
UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6
ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt)
I 2.80 13 3 0.56 20.38 SECC.
PR26+028.23 PR26+025.43
2.40 15 3 0.56 20.16 TRAPEZOIDAL
I 30.33 9 3 0.56 152.86
PR26+025.43 PR25+995.10 SECC.TIPICA
1.50 153 3 0.56 128.52
I 2.15 6 3 0.56 7.22 SECC.
PR25+995.10 PR25+992.95
0.92 12 3 0.56 6.18 RECTANGULAR
I 2.75 14 3 0.56 21.56 SECC.
PR25+992.95 PR25+990.20
2.54 15 3 0.56 21.34 TRAPEZOIDAL
I 21.71 9 3 0.56 109.42
PR25+990.20 PR25+968.49 SECC.TIPICA
1.50 110 3 0.56 92.40
I 2.12 7 3 0.56 8.31 SECC.
PR25+968.49 PR25+966.37
1.10 12 3 0.56 7.39 RECTANGULAR
I 3.00 14 3 0.56 23.52 SECC.
PR25+966.37 PR25+963.37
2.60 16 3 0.56 23.30 TRAPEZOIDAL
I 67.25 9 3 0.56 338.94
PR25+963.37 PR25+896.12 SECC.TIPICA
1.50 338 3 0.56 283.92
I 8.40 7 3 0.56 32.93 SECC. CUNETA EN
PR25+896.12 PR25+887.72
1.10 43 3 0.56 26.49 "V"
I 15.65 8 3 0.56 70.11 SECC. CUNETA EN
PR25+887.72 PR25+872.07
1.30 80 3 0.56 58.24 "V"
I 61.85 9 3 0.56 311.72
PR25+872.07 PR25+810.22 SECC.TIPICA
1.50 311 3 0.56 261.24
I 4.50 14 3 0.56 35.28 SECC.
PR25+810.22 PR25+805.72
2.41 24 3 0.56 32.39 TRAPEZOIDAL
I 1.60 7 3 0.56 6.27 SECC.
PR25+805.72 PR25+804.12
1.20 10 3 0.56 6.72 RECTANGULAR
I 4.15 12 3 0.56 27.89 SECC.
PR25+804.12 PR25+799.97
2.18 22 3 0.56 26.86 TRAPEZOIDAL
I 15.35 9 3 0.56 77.36
PR25+799.97 PR25+784.62 SECC.TIPICA
1.50 78 3 0.56 65.52
I 3.65 16 3 0.56 32.70 SECC.
PR25+784.62 PR25+780.97
2.92 20 3 0.56 32.70 TRAPEZOIDAL
I 1.65 10 3 0.56 9.24 SECC.
PR25+780.97 PR25+779.32
1.72 10 3 0.56 9.63 RECTANGULAR
I 4.32 13 3 0.56 31.45 SECC.
PR25+779.32 PR25+775.00
2.40 23 3 0.56 30.91 TRAPEZOIDAL
I 62.10 9 3 0.56 312.98
PR25+775.00 PR25+712.90 SECC.TIPICA
1.50 312 3 0.56 262.08
I 5.40 13 3 0.56 39.31 SECC.
PR25+712.90 PR25+707.50
2.37 28 3 0.56 37.16 TRAPEZOIDAL
I 1.76 5 3 0.56 4.93 SECC.
PR25+707.50 PR25+705.74
0.67 10 3 0.56 3.75 RECTANGULAR
I 123.90 9 3 0.56 624.46
PR25+705.74 PR25+581.84 SECC.TIPICA
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19
UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6
ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt)
PR25+705.74 PR25+581.84 SECC.TIPICA
1.50 621 3 0.56 521.64
I 3.00 14 3 0.56 23.52 SECC.
PR25+581.84 PR25+578.84
2.48 16 3 0.56 22.22 TRAPEZOIDAL
I 2.12 6 3 0.56 7.12 SECC.
PR25+578.84 PR25+576.72
0.95 12 3 0.56 6.38 RECTANGULAR
I 2.52 14 3 0.56 19.76 SECC.
PR25+576.72 PR25+574.20
2.49 14 3 0.56 19.52 TRAPEZOIDAL
I 47.82 9 3 0.56 241.01
PR25+574.20 PR25+526.38 SECC.TIPICA
1.50 241 3 0.56 202.44
I 2.25 14 3 0.56 17.64 SECC.
PR25+526.38 PR25+524.13
2.56 13 3 0.56 18.64 TRAPEZOIDAL
I 2.60 6 3 0.56 8.74 SECC.
PR25+524.13 PR25+521.53
0.92 15 3 0.56 7.73 RECTANGULAR
I 2.15 14 3 0.56 16.86 SECC.
PR25+521.53 PR25+519.38
2.50 12 3 0.56 16.80 TRAPEZOIDAL
I 36.00 9 3 0.56 181.44
PR25+519.38 PR25+483.38 SECC.TIPICA
1.50 181 3 0.56 152.04
I 2.50 14 3 0.56 19.60 SECC.
PR25+483.38 PR25+480.88
2.50 14 3 0.56 19.60 TRAPEZOIDAL
I 2.10 6 3 0.56 7.06 SECC.
PR25+480.88 PR25+478.78
1.00 12 3 0.56 6.72 RECTANGULAR
I 4.30 14 3 0.56 33.71 SECC.
PR25+478.78 PR25+474.48
2.60 23 3 0.56 33.49 TRAPEZOIDAL
I 54.80 9 3 0.56 276.19
PR25+474.48 PR25+419.68 SECC.TIPICA
1.50 275 3 0.56 231.00
I 2.30 15 3 0.56 19.32 SECC.
PR25+419.68 PR25+417.38
2.70 13 3 0.56 19.66 TRAPEZOIDAL
I 2.20 8 3 0.56 9.86 SECC.
PR25+417.38 PR25+415.18
1.30 12 3 0.56 8.74 RECTANGULAR
I 2.17 15 3 0.56 18.23 SECC.
PR25+415.18 PR25+413.01
2.70 12 3 0.56 18.14 TRAPEZOIDAL
I 48.70 9 3 0.56 245.45
PR25+413.01 PR25+364.31 SECC.TIPICA
1.50 245 3 0.56 205.80
I 2.70 12 3 0.56 18.14 SECC.
PR25+364.31 PR25+361.61
2.15 15 3 0.56 18.06 TRAPEZOIDAL
I 2.10 8 3 0.56 9.41 SECC.
PR25+361.61 PR25+359.51
1.28 12 3 0.56 8.60 RECTANGULAR
UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6
ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt)
PR25+355.21 PR25+321.29 SECC.TIPICA
1.50 171 3.00 0.56 143.64
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19
UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6
ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt)
D 2.55 13 3.00 0.56 18.56 SECC.
PR25+321.29 PR25+318.74
2.40 14 3.00 0.56 18.82 TRAPEZOIDAL
D 1.80 11 3.00 0.56 11.09 SECC.
PR25+318.74 PR25+316.94
1.82 11 3.00 0.56 11.21 RECTANGULAR
D 2.30 15 3.00 0.56 19.32 SECC.
PR25+316.94 PR25+314.64
2.70 13 3.00 0.56 19.66 TRAPEZOIDAL
D 6.60 9 3.00 0.56 33.26
PR25+314.64 PR25+308.04 SECC.TIPICA
1.50 34 3.00 0.56 28.56
D 5.00 9 3.00 0.56 25.20
PR25+160.00 PR25+155.00 SECC.TIPICA
1.50 26 3.00 0.56 21.84
D 3.82 6 3.00 0.56 12.84 SECC.
PR25+155.00 PR25+151.18
0.97 21 3.00 0.56 11.41 RECTANGULAR
D 3.60 12 3.00 0.56 24.19 SECC.
PR25+151.18 PR25+147.58
2.12 19 3.00 0.56 22.56 TRAPEZOIDAL
D 14.07 9 3.00 0.56 70.91
PR25+147.58 PR25+133.51 SECC.TIPICA
1.50 72 3.00 0.56 60.48
D 27.70 9 3.00 0.56 139.61
PR25+050.00 PR25+022.30 SECC.TIPICA
1.50 140 3.00 0.56 117.60
D 1.67 6 3.00 0.56 5.61 SECC.
PR25+022.30 PR25+020.63
0.95 10 3.00 0.56 5.32 RECTANGULAR
D 5.06 13 3.00 0.56 36.84 SECC.
PR25+020.63 PR25+015.57
2.37 27 3.00 0.56 35.83 TRAPEZOIDAL
D 55.50 9 3.00 0.56 279.72
PR25+015.57 PR24+960.07 SECC.TIPICA
1.50 279 3.00 0.56 234.36
D 1.53 12 3.00 0.56 10.28 SECC.
PR24+960.07 PR24+958.54
2.13 9 3.00 0.56 10.74 TRAPEZOIDAL
D 1.76 8 3.00 0.56 7.88 SECC.
PR24+958.54 PR24+956.78
1.36 10 3.00 0.56 7.62 RECTANGULAR
D 7.34 18 3.00 0.56 73.99
PR24+796.00 PR24+788.66 ACCESO EN "V"
3.26 38 3.00 0.56 69.37
D 23.50 7 3.00 0.56 92.12
PR24+788.66 PR24+765.16 CUNETA EN "V"
1.18 119 3.00 0.56 78.64
D 2.70 21 3.00 0.56 31.75
PR24+765.16 PR24+762.46 ACCESO EN "V"
3.90 15 3.00 0.56 32.76
D 2.04 5 3.00 0.56 5.71 SECC.
PR24+617.00 PR24+614.96
0.80 12 3.00 0.56 5.38 RECTANGULAR
D 102.90 9 3.00 0.56 518.62
PR24+614.96 PR24+512.06 SECC.TIPICA
1.50 516 3.00 0.56 433.44
D 7.20 12 3.00 0.56 48.38 SECC.
PR24+498.50 PR24+491.30
2.13 37 3.00 0.56 44.13 TRAPEZOIDAL
D 13.60 9 3.00 0.56 68.54
PR24+491.30 PR24+477.70 SECC.TIPICA
1.50 70 3.00 0.56 58.80
D 7.02 14 3.00 0.56 55.04 SECC.
PR24+412.00 PR24+404.98
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19
UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6
ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt) SECC.
PR24+412.00 PR24+404.98
2.50 37 3.00 0.56 51.80 TRAPEZOIDAL
D 45.90 9 3.00 0.56 231.34
PR24+404.98 PR24+359.08 SECC.TIPICA
1.50 231 3.00 0.56 194.04
D 4.62 13 3.00 0.56 33.63 SECC.
PR24+254.00 PR24+249.38
2.40 25 3.00 0.56 33.60 TRAPEZOIDAL
D 5.68 9 3.00 0.56 28.63
PR24+249.38 PR24+243.70 SECC.TIPICA
1.50 30 3.00 0.56 25.20
D 7.80 7 3.00 0.56 30.58 SECC.
PR23+631.68 PR23+639.48
1.05 41 3.00 0.56 24.11 RECTANGULAR
D 14.98 9 3.00 0.56 75.50
PR23+616.70 PR23+631.68 SECC.TIPICA
1.50 76 3.00 0.56 63.84
D 32.50 7 3.00 0.56 127.40 SECC.
PR23+584.20 PR23+616.70
1.15 164 3.00 0.56 105.62 RECTANGULAR
D 6.16 9 3.00 0.56 31.05 SECC. CUNETA EN
PR23+578.04 PR23+584.20
1.60 32 3.00 0.56 28.67 "V"
D 2.00 6 3.00 0.56 6.72 SECC.
PR23+185.00 PR23+183.00
1.00 11 3.00 0.56 6.16 RECTANGULAR
D 7.20 14 3.00 0.56 56.45 SECC.
PR23+183.00 PR23+175.80
2.53 37 3.00 0.56 52.42 TRAPEZOIDAL
D 15.20 9 3.00 0.56 76.61
PR23+175.80 PR23+160.60 SECC.TIPICA
1.50 78 3.00 0.56 65.52
D 57.85 9 3.00 0.56 291.56
PR23+091.40 PR23+033.55 SECC.TIPICA
1.50 291 3.00 0.56 244.44
D 8.63 9 3.00 0.56 43.50 SECC.
PR23+033.55 PR23+024.92
1.52 45 3.00 0.56 38.30 TRAPEZOIDAL
D 5.00 6 3.00 0.56 16.80 SECC.
PR23+024.92 PR23+019.92
0.99 26 3.00 0.56 14.41 RECTANGULAR
D 6.85 15 3.00 0.56 57.54 SECC.
PR23+019.92 PR23+013.07
2.76 36 3.00 0.56 55.64 TRAPEZOIDAL
D 15.75 9 3.00 0.56 79.38
PR23+013.07 PR22+997.32 SECC.TIPICA
1.50 80 3.00 0.56 67.20
UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6
ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt)
PR25+309.44 PR25+224.94 SECC.TIPICA
1.50 424 3 0.56 356.16
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19
UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6
ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt)
I 4.56 13 3 0.56 33.20 SECC.
PR25+224.94 PR25+220.38
2.25 24 3 0.56 30.24 TRAPEZOIDAL
I 2.10 5 3 0.56 5.88 SECC.
PR25+220.38 PR25+218.28
0.65 12 3 0.56 4.37 RECTANGULAR
I 4.20 13 3 0.56 30.58 SECC.
PR25+218.28 PR25+214.08
2.22 22 3 0.56 27.35 TRAPEZOIDAL
I 51.10 9 3 0.56 257.54
PR25+214.08 PR25+162.98 SECC.TIPICA
1.50 257 3 0.56 215.88
I 6.16 14 3 0.56 48.29 SECC.
PR25+162.98 PR25+156.82
2.43 32 3 0.56 43.55 TRAPEZOIDAL
I 1.88 9 3 0.56 9.48 SECC.
PR25+156.82 PR25+154.94
1.49 11 3 0.56 9.18 RECTANGULAR
I 4.90 14 3 0.56 38.42 SECC.
PR25+154.94 PR25+150.04
2.55 26 3 0.56 37.13 TRAPEZOIDAL
I 39.00 9 3 0.56 196.56
PR25+150.04 PR25+111.04 SECC.TIPICA
1.50 196 3 0.56 164.64
I 3.20 12 3 0.56 21.50 SECC.
PR25+111.04 PR25+107.84
2.08 17 3 0.56 19.80 TRAPEZOIDAL
I 2.10 7 3 0.56 8.23 SECC.
PR25+107.84 PR25+105.74
1.20 12 3 0.56 8.06 RECTANGULAR
I 4.00 13 3 0.56 29.12 SECC.
PR25+105.74 PR25+101.74
2.38 21 3 0.56 27.99 TRAPEZOIDAL
I 22.73 9 3 0.56 114.56
PR25+101.74 PR25+079.01 SECC.TIPICA
1.50 115 3 0.56 96.60
I 4.16 13 3 0.56 30.28 SECC.
PR25+079.01 PR25+074.85
2.38 22 3 0.56 29.32 TRAPEZOIDAL
I 2.10 7 3 0.56 8.23 SECC.
PR25+074.85 PR25+072.75
1.10 12 3 0.56 7.39 RECTANGULAR
I 4.30 14 3 0.56 33.71 SECC.
PR25+072.75 PR25+068.45
2.46 23 3 0.56 31.68 TRAPEZOIDAL
I 40.40 9 3 0.56 203.62
PR25+068.45 PR25+028.05 SECC.TIPICA
1.50 203 3 0.56 170.52
I 2.12 14 3 0.56 16.62 SECC.
PR25+028.05 PR25+025.93
2.55 12 3 0.56 17.14 TRAPEZOIDAL
I 2.14 6 3 0.56 7.19 SECC.
PR25+025.93 PR25+023.79
0.97 12 3 0.56 6.52 RECTANGULAR
I 2.22 14 3 0.56 17.40 SECC.
PR25+023.79 PR25+021.57
2.49 13 3 0.56 18.13 TRAPEZOIDAL
I 53.73 9 3 0.56 270.80
PR25+021.57 PR24+967.84 SECC.TIPICA
1.50 270 3 0.56 226.80
I 4.82 14 3 0.56 37.79 SECC.
PR24+967.84 PR24+963.02
2.41 26 3 0.56 35.09 TRAPEZOIDAL
I 2.17 7 3 0.56 8.51 SECC.
PR24+963.02 PR24+960.85
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19
UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6
ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt) SECC.
PR24+963.02 PR24+960.85
1.19 12 3 0.56 8.00 RECTANGULAR
I 6.30 14 3 0.56 49.39 SECC.
PR24+960.85 PR24+954.55
2.50 33 3 0.56 46.20 TRAPEZOIDAL
I 33.90 9 3 0.56 170.86
PR24+954.55 PR24+920.65 SECC.TIPICA
1.50 171 3 0.56 143.64
I 2.84 12 3 0.56 19.08 SECC.
PR24+920.65 PR24+917.81
2.11 16 3 0.56 18.91 TRAPEZOIDAL
I 1.56 7 3 0.56 6.12 SECC.
PR24+917.81 PR24+916.25
1.20 9 3 0.56 6.05 RECTANGULAR
I 7.53 14 3 0.56 59.04 SECC.
PR24+916.25 PR24+908.72
2.59 39 3 0.56 56.57 TRAPEZOIDAL
I 70.42 9 3 0.56 354.92
PR24+908.72 PR24+838.30 SECC.TIPICA
1.50 354 3 0.56 297.36
I 4.60 16 3 0.56 41.22 SECC.
PR24+838.30 PR24+833.70
2.87 24 3 0.56 38.57 TRAPEZOIDAL
I 2.10 11 3 0.56 12.94 SECC.
PR24+833.70 PR24+831.60
1.82 12 3 0.56 12.23 RECTANGULAR
I 2.10 14 3 0.56 16.46 SECC.
PR24+831.60 PR24+829.50
2.42 12 3 0.56 16.26 TRAPEZOIDAL
I 4.65 15 3 0.56 39.06
PR24+831.00 CANAL ENCOLE
2.80 25 3 0.56 39.20
I 18.24 9 3 0.56 91.93
PR24+829.50 PR24+811.26 SECC.TIPICA
1.50 93 3 0.56 78.12
I 4.06 13 3 0.56 29.56 SECC.
PR24+811.26 PR24+807.20
2.23 22 3 0.56 27.47 TRAPEZOIDAL
I 1.70 5 3 0.56 4.76 SECC.
PR24+807.20 PR24+805.50
0.76 10 3 0.56 4.26 RECTANGULAR
I 2.16 13 3 0.56 15.72 SECC.
PR24+805.50 PR24+803.34
2.26 12 3 0.56 15.19 TRAPEZOIDAL
I 32.50 9 3 0.56 163.80
PR24+803.34 PR24+770.84 SECC.TIPICA
1.50 164 3 0.56 137.76
I 2.42 13 3 0.56 17.62 SECC.
PR24+770.84 PR24+768.42
2.25 14 3 0.56 17.64 TRAPEZOIDAL
I 1.84 18 3 0.56 18.55 SECC.
PR24+768.42 PR24+766.58
3.35 11 3 0.56 20.64 TRAPEZOIDAL
I 2.35 19 3 0.56 25.00 SECC.
PR24+766.58 PR24+764.23
3.50 13 3 0.56 25.48 RECTANGULAR
I 1.54 19 3 0.56 16.39 SECC.
PR24+764.23 PR24+762.69
3.50 9 3 0.56 17.64 TRAPEZOIDAL
I 2.17 7 3 0.56 8.51 SECC.
PR24+762.69 PR24+760.52
1.13 12 3 0.56 7.59 RECTANGULAR
I 50.67 9 3 0.56 255.38
PR24+617.00 PR24+566.33 SECC.TIPICA
1.50 255 3 0.56 214.20
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19
UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6
ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt)
I 4.80 13 3 0.56 34.94 SECC.
PR24+566.33 PR24+561.53
2.27 26 3 0.56 33.05 TRAPEZOIDAL
I 1.75 7 3 0.56 6.86 SECC.
PR24+561.53 PR24+559.78
1.12 10 3 0.56 6.27 RECTANGULAR
I 6.40 12 3 0.56 43.01 SECC.
PR24+559.78 PR24+553.38
2.04 33 3 0.56 37.70 TRAPEZOIDAL
I 47.50 9 3 0.56 239.40
PR24+553.38 PR24+505.88 SECC.TIPICA
1.50 239 3 0.56 200.76
I 5.10 14 3 0.56 39.98 SECC.
PR24+505.88 PR24+500.78
2.52 27 3 0.56 38.10 TRAPEZOIDAL
I 2.16 6 3 0.56 7.26 SECC.
PR24+500.78 PR24+498.62
1.00 12 3 0.56 6.72 RECTANGULAR
I 5.00 16 3 0.56 44.80 SECC.
PR24+492.70 PR24+487.70
2.85 26 3 0.56 41.50 TRAPEZOIDAL
I 1.40 15 3 0.56 11.76 SECC.
PR24+487.70 PR24+486.30
2.75 8 3 0.56 12.32 TRAPEZOIDAL
I 2.33 14 3 0.56 18.27 SECC.
PR24+486.30 PR24+483.97
2.58 13 3 0.56 18.78 RECTANGULAR
I 0.89 15 3 0.56 7.48 SECC.
PR24+483.97 PR24+483.08
2.80 6 3 0.56 9.41 TRAPEZOIDAL
I 31.52 9 3 0.56 158.86
PR24+483.08 PR24+451.56 SECC.TIPICA
1.50 159 3 0.56 133.56
I 4.12 5 3 0.56 11.54 SECC.
PR24+416.00 PR24+411.88
0.70 22 3 0.56 8.62 RECTANGULAR
I 4.45 16 3 0.56 39.87 SECC.
PR24+411.88 PR24+407.43
3.00 24 3 0.56 40.32 TRAPEZOIDAL
I 24.45 9 3 0.56 123.23
PR24+407.43 PR24+382.98 SECC.TIPICA
1.50 124 3 0.56 104.16
I 7.26 18 3 0.56 73.18
PR24+382.98 PR24+375.72 ACCESO
3.30 38 3 0.56 70.22
I 22.00 9 3 0.56 110.88
PR24+375.72 PR24+353.72 SECC.TIPICA
1.50 111 3 0.56 93.24
I 2.10 6 3 0.56 7.06 SECC.
PR24+353.72 PR24+351.62
0.94 12 3 0.56 6.32 RECTANGULAR
I 4.45 14 3 0.56 34.89 SECC.
PR24+351.62 PR24+347.17
2.46 24 3 0.56 33.06 TRAPEZOIDAL
I 52.62 9 3 0.56 265.20
PR24+347.17 PR24+294.55 SECC.TIPICA
1.50 265 3 0.56 222.60
I 6.24 16 3 0.56 55.91 SECC.
PR24+294.55 PR24+288.31
2.82 33 3 0.56 52.11 TRAPEZOIDAL
I 1.54 7 3 0.56 6.04 SECC.
PR24+288.31 PR24+286.77
1.18 9 3 0.56 5.95 RECTANGULAR
I 5.84 14 3 0.56 45.79 SECC.
PR23+370.33 PR23+376.17
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19
UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6
ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt) SECC.
PR23+370.33 PR23+376.17
2.44 31 3 0.56 42.36 TRAPEZOIDAL
I 110.35 9 3 0.56 556.16
PR23+259.98 PR23+370.33 SECC.TIPICA
1.50 553 3 0.56 464.52
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19
UNIDAD: TOTAL
ITEM: ACERO DE REFUERZO
KG 17,642.6
ABSCISA Largo
TIPO DE OBRA CANT No. Kg/m PESO OBSERVACIONES
DE A (mt)
I 2.13 7 3 0.56 8.35 SECC.
PR23+257.85 PR23+259.98
1.06 12 3 0.56 7.12 RECTANGULAR
I 4.10 14 3 0.56 32.14 SECC.
PR23+253.75 PR23+257.85
2.44 22 3 0.56 30.06 TRAPEZOIDAL
I 44.70 9 3 0.56 225.29
PR23+209.05 PR23+253.75 SECC.TIPICA
1.50 225 3 0.56 189.00
I 1.38 6 3 0.56 4.64 SECC.
PR23+207.67 PR23+209.05
0.82 8 3 0.56 3.67 RECTANGULAR
I 3.99 15 3 0.56 33.52 SECC.
PR23+203.68 PR23+207.67
2.70 21 3 0.56 31.75 TRAPEZOIDAL
I 19.00 9 3 0.56 95.76
PR23+184.68 PR23+203.68 SECC.TIPICA
1.50 96 3 0.56 80.64
I 1.83 9 3 0.56 9.22 SECC.
PR23+182.85 PR23+184.68
1.51 11 3 0.56 9.30 TRAPEZOIDAL
I 6.75 12 3 0.56 45.36 SECC.
PR23+176.10 PR23+182.85
2.14 35 3 0.56 41.94 TRAPEZOIDAL
I 20.35 9 3 0.56 102.56
PR23+155.75 PR23+176.10 SECC.TIPICA
1.50 103 3 0.56 86.52
I 8.05 11 3 0.56 49.59
PR23+147.70 PR23+155.75 ACCESO
1.92 42 3 0.56 45.16
I 44.20 9 3 0.56 222.77
PR23+103.50 PR23+147.70 SECC.TIPICA
1.50 222 3 0.56 186.48
I 5.10 13 3 0.56 37.13 SECC.
PR23+098.40 PR23+103.50
2.21 27 3 0.56 33.42 TRAPEZOIDAL
I 2.12 8 3 0.56 9.50 SECC.
PR23+096.28 PR23+098.40
1.38 12 3 0.56 9.27 RECTANGULAR
I 2.16 15 3 0.56 18.14 SECC.
PR23+094.12 PR23+096.28
2.72 12 3 0.56 18.28 TRAPEZOIDAL
I 69.96 9 3 0.56 352.60
PR23+024.16 PR23+094.12 SECC.TIPICA
1.50 351 3 0.56 294.84
I 3.61 13 3 0.56 26.28 SECC.
PR23+020.55 PR23+024.16
2.28 20 3 0.56 25.54 TRAPEZOIDAL
I 1.45 6 3 0.56 4.87 SECC.
PR23+019.10 PR23+020.55
1.00 9 3 0.56 5.04 RECTANGULAR
I 5.00 14 3 0.56 39.20 SECC.
PR23+014.10 PR23+019.10
2.47 26 3 0.56 35.96 TRAPEZOIDAL
I 61.10 9 3 0.56 307.94
PR22+953.00 PR23+014.10 SECC.TIPICA
1.50 307 3 0.56 257.88
ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA AREA VOL. OBSERVACIONES
DE A
ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA AREA VOL. OBSERVACIONES
DE A
PR23+013.07 PR22+997.32 SECC.TIPICA D 15.75 0.12 0.19 3.06
PR23+578.04 PR23+584.20 SECC. CUNETA EN "V" D 6.16 1.60 0.12 9.86 1.18
PR23+584.20 PR23+616.70 SECC. RECTANGULAR D 32.50 1.15 0.12 37.38 4.49
PR23+616.70 PR23+631.68 SECC.TIPICA D 14.98 0.12 0.19 2.91
PR23+631.68 PR23+639.48 SECC. RECTANGULAR D 7.80 1.05 0.12 8.19 0.98
ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA AREA VOL. OBSERVACIONES
DE A
PR24+833.70 PR24+831.60 SECC. RECTANGULAR I 2.10 1.82 0.12 3.82 0.46
PR24+831.60 PR24+829.50 SECC. TRAPEZOIDAL I 2.10 2.02 0.12 4.24 0.51
PR24+831.00 CANAL ENCOLE I 4.65 2.80 0.12 13.02 1.56
PR24+829.50 PR24+811.26 SECC.TIPICA I 18.24 0.12 0.19 3.54
PR24+811.26 PR24+807.20 SECC. TRAPEZOIDAL I 4.06 1.83 0.12 7.43 0.89
PR24+807.20 PR24+805.50 SECC. RECTANGULAR I 1.70 0.76 0.12 1.29 0.16
PR24+805.50 PR24+803.34 SECC. TRAPEZOIDAL I 2.16 1.86 0.12 4.02 0.48
PR24+803.34 PR24+770.84 SECC.TIPICA I 32.50 0.12 0.19 6.31
PR24+770.84 PR24+768.42 SECC. TRAPEZOIDAL I 2.42 1.85 0.12 4.48 0.54
PR24+768.42 PR24+766.58 SECC. TRAPEZOIDAL I 1.84 2.95 0.12 5.43 0.65
PR24+766.58 PR24+764.23 SECC. RECTANGULAR I 2.35 3.50 0.12 8.23 0.99
PR24+764.23 PR24+762.69 SECC. TRAPEZOIDAL I 1.54 3.10 0.12 4.77 0.57
PR24+762.69 PR24+760.52 SECC. RECTANGULAR I 2.17 1.13 0.12 2.45 0.29
ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA AREA VOL. OBSERVACIONES
DE A
PR23+103.50 PR23+147.70 SECC.TIPICA I 44.20 0.12 0.19 8.57
PR23+147.70 PR23+155.75 ACCESO I 8.05 1.92 0.12 15.46 1.85
PR23+155.75 PR23+176.10 SECC.TIPICA I 20.35 0.12 0.19 3.95
PR23+176.10 PR23+182.85 SECC. TRAPEZOIDAL I 6.75 2.04 0.12 13.77 1.65
PR23+182.85 PR23+184.68 SECC. TRAPEZOIDAL I 1.83 1.11 0.12 2.03 0.24
PR23+184.68 PR23+203.68 SECC.TIPICA I 19.00 0.12 0.19 3.69
PR23+203.68 PR23+207.67 SECC. TRAPEZOIDAL I 3.99 2.30 0.12 9.18 1.10
PR23+207.67 PR23+209.05 SECC. RECTANGULAR I 1.38 0.82 0.12 1.13 0.14
PR23+209.05 PR23+253.75 SECC.TIPICA I 44.70 0.12 0.19 8.67
PR23+253.75 PR23+257.85 SECC. TRAPEZOIDAL I 4.10 2.04 0.12 8.36 1.00
PR23+257.85 PR23+259.98 SECC. RECTANGULAR I 2.13 1.06 0.12 2.26 0.27
PR23+259.98 PR23+370.33 SECC.TIPICA I 110.35 0.12 0.19 21.41
PR23+370.33 PR23+376.17 SECC. TRAPEZOIDAL I 5.84 2.04 0.12 11.91 1.43
UNIDAD: TOTAL
ITEM: CANAL EN CONCRETO REFORZADO
ML 0.0
ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA VOL. OBSERVACIONES
DE A
ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA VOL. OBSERVACIONES
DE A
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
UNIDAD: TOTAL
ITEM: GAVIONES
M3 0.0
ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA VOL. OBSERVACIONES
DE A
UNIDAD: TOTAL
ITEM: CONSTRUCCIÓN TUBERIA 36"
ML 0.0
ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA ML OBSERVACIONES
DE A
UNIDAD: TOTAL
ITEM: INSTALACIÓN TUBERIA 36"
ML 7.0
ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA VOL. OBSERVACIONES
DE A
UNIDAD: TOTAL
ITEM: REALCE PONTON - ALCANTARILLAS
ML 0.0
ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA LONGITUD OBSERVACIONES
DE A
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
UNIDAD: TOTAL
ITEM: CONCRETO CLASE D (OBRAS DRENAJE)
M3 41.8
ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA VOL. OBSERVACIONES
DE A
ALCANTARILLA
K23+380 ATRAQUE DESCOLE 1.00 0.50 0.35 0.18
1.00 0.50 0.35 0.18
PLACA DE PISO 1.75 1.40 0.20 0.49
CABEZOTE 1.53 0.20 2.60 0.80
MURO IZQUIERDO 2.10 0.20 2.00 0.84
MURO DERECHO 2.10 0.20 2.00 0.84
K23+220 ATRAQUE ENCOLE IZQ 5.00 0.50 0.35 0.88
5.00 0.50 0.35 0.88
PLACA DE PISO 2.10 2.13 0.20 0.89
CABEZOTE 2.10 0.20 1.45 0.61
MURO POSTERIOR 2.10 0.20 1.45 0.61
MURO IZQUIERDO 2.10 0.20 1.45 0.61
MURO DERECHO 1.70 0.20 1.15 0.39
PLACA DE ENTRADA ALCANTARILLA 2.00 1.30 0.15 0.39
K23+115 PLACA DE PISO 2.15 1.40 0.20 0.60
CABEZOTE 1.38 0.20 2.63 0.73
MURO POSTERIOR 1.38 0.20 2.63 0.73
MURO IZQUIERDO 1.71 0.20 2.50 0.86
MURO DERECHO 1.71 0.20 2.50 0.86
MENOS ENTRADA TUBERIA 36 -1.20 0.20 1.20 -0.29
K23+805 CABEZOTE DESCOLE D 1.70 0.38 0.28 0.18
MURO POSTERIOR D 1.84 0.25 0.35 0.16
MURO IZQUIERDO D 1.25 0.25 0.30 0.09
K23+805 CABEZOTE ENCOLE I 1.67 0.25 0.80 0.33
MURO IZQUIERDO I 1.30 0.25 1.10 0.36
K22+660 PLACA DE PISO 2.05 0.20 1.30 0.53
CABEZOTE DESCOLE 1.00 0.20 2.40 0.48
MURO POSTERIOR 2.65 0.20 1.85 0.98
MURO IZQUIERDO 2.65 0.20 1.85 0.98
K22+660 CABEZOTE 2.15 0.20 2.25 0.97
MURO POSTERIOR 2.15 0.20 2.25 0.97
MURO IZQUIERDO 1.80 0.20 0.95 0.34
MURO DERECHO 1.80 0.20 0.95 0.34
PLACA DE PISO 2.13 1.40 0.20 0.60
K22+160 ATRAQUE DESCOLE 1.00 0.50 0.35 0.18
1.00 0.50 0.35 0.18
PLACA DE PISO 3.00 1.80 0.20 1.08
CABEZOTE 2.13 0.20 3.38 1.44
ALETA DER 1.89 0.20 2.83 1.07
ALETA IZQ 1.89 0.20 2.83 1.07
K21+855 CABEZOTE 2.13 0.20 2.70 1.15
MURO POSTERIOR 2.13 0.20 2.70 1.15
MURO IZQUIERDO 0.95 0.20 2.30 0.44
MURO DERECHO 0.95 0.20 2.30 0.44
CONSORCIO INFRAESTRUCTURA VIAL 2019 - CTO 0681-19
UNIDAD: TOTAL
ITEM: CONCRETO CLASE D (OBRAS DRENAJE)
M3 41.8
ABSCISA
TIPO DE OBRA LOCALIZACION LONGITUD ANCHO ALTURA VOL. OBSERVACIONES
DE A
K22+000 PLACA DE PISO 3.20 1.78 0.20 1.14
CABEZOTE ENCOLE 2.05 0.20 2.44 1.00
K21+550 PLACA DE PISO I 2.10 1.40 0.20 0.59
MURO POSTERIOR I 2.10 0.20 1.75 0.74
MURO LATERAL IZQ I 0.95 0.20 1.43 0.27
MURO LATERAL DER I 0.95 0.20 1.43 0.27
CABEZOTE I 2.10 0.20 2.27 0.95
K21+550 REALCE ALCANTARILLA CABEZOTE D 1.75 0.20 0.70 0.25
ALETA DER D 1.50 0.20 0.30 0.09
ALETA IZQ D 1.50 0.20 0.30 0.09
K21+640 PLACA DE PISO 3.30 1.70 0.20 1.12
CABEZOTE DESCOLE 1.72 0.20 2.00 0.69
MURO LATERAL IZQ 2.00 0.20 1.48 0.59
MURO LATERAL DER 2.00 0.20 1.48 0.59
K21+740 ATRAQUE ENCOLE 1.00 0.50 0.35 0.18
1.00 0.50 0.35 0.18
PLACA DE PISO 2.14 1.40 0.20 0.60
CABEZOTE 2.12 0.20 1.62 0.69
MURO POSTERIOR 2.12 0.20 1.62 0.69
MURO IZQUIERDO 0.96 0.20 1.20 0.23
MURO DERECHO 0.96 0.20 1.20 0.23
K22+620 PLACA PARA PROTOCOLO COVID 4.00 5.00 0.15 3.00