Está en la página 1de 2

COSTO COSTO

ITEM UNIDADES
UNITARIO PARCIAL
Ladrillo S/0.70 200 S/140.00
Tierra S/3.00 3 S/9.00
Arena S/7.00 1 S/7.00
ROHPALEIAERATM ST UEUPESPR

Alambre de
S/6.00 1 S/6.00
amarre
Sal S/1.20 1 S/1.20
Cabello S/2.00 1 S/2.00
DE
O

Plancha metalica
S/25.00 1 S/25.00
80x80
Plancha metalica
S/15.00 1 S/15.00
45x45
RA S
EL

Arcilla S/5.00 0.5 S/2.50


Latas de conserva S/0.35 6 S/2.10
O
N

Periodicos/Carto
S/1.00 1 S/1.00
nes
Termometro para
S/60.00 1 S/60.00
horno
COSTO
S/270.80
TOTAL

COSTO N° DE COSTO
ITEM
POR DIA DIAS PARCIAL
PRESUPUESTO DE ALQUILER DE HERRAMIENTAS

Pala S/2.00 4 S/8.00


Carretilla S/5.00 2 S/10.00
Nivel S/1.00 4 S/4.00
Plomada S/1.00 3 S/3.00
Badilejo S/1.00 5 S/5.00
Flexometro S/1.00 5 S/5.00
Pico S/5.00 1 S/5.00
Batea grande S/6.00 2 S/12.00
Alicate S/1.00 2 S/2.00
Madera/Tablones S/2.00 2 S/4.00
Martillo S/1.00 4 S/4.00
Termometro de
S/15.00 1 S/15.00
comida
Corta fierro S/5.00 S/1.00 S/5.00
COSTO
S/82.00
TOTAL
TOTALES
COSTOS   PARCIALE
COSTO TOTAL

S
COSTO DE HORNO S/270.80
COSTO DE HERRAMIENTA S/82.00
TOTAL
S/352.80
FINAL

COSTOPOR PERSONA S/58.80  