1.01 GASTOS FIJOS 10,413.20 5,642.78 4,770.42 10,413.20 -
1.01.01 TRANSPORTE DE MATERIALES HASTA SU PLANTA DE LIMA METROPOLITANA PARA EL TRASLADO A 1.00 GLB 1,562.50 1,562.50 0.00 1.00 1,562.50 100% - - 0%
OBRA POR PARTE DEL CLIENTE. 1.00 1,562.50 0.00
1.01.02 TRAZO Y REPLANTEO 1.00 GLB 6,150.70 6,150.70 0.40 2,460.28 0.60 3,690.42 1.00 6,150.70 100% - - 0%
1.01.03 HERRAMIENTAS ESPECIALES 1.00 GLB 2,700.00 2,700.00 0.60 1,620.00 0.40 1,080.00 1.00 2,700.00 100% - - 0%
1.02 RED DE DESAGÜE-TUBERÍA EXTERIOR(EN PVC-U) 33,768.40 0.00 12,168.32 0.00 21,600.08 - 33,768.40 - -
1.02.01 EXCAVACION DE TERRENO COMPACTADO 6" 62.89 ML 51.29 3,225.71 37.73 1,935.43 25.15 1,290.28 62.89 3,225.71 100% - - 0%
1.02.02 EXCAVACION DE TERRENO COMPACTADO 4" 215.97 ML 44.04 9,511.49 129.58 5,706.90 86.39 3,804.60 215.97 9,511.49 100% - - 0%
1.02.03 ACOPIO DE MATERIAL EXCEDENTE DM< 100M 130.51 M3 26.25 3,425.81 0.00 0.00 130.51 3,425.81 130.51 3,425.81 100% - - 0%
1.02.04 REFINE Y NIVELACION DE ZANJA 278.86 ML 4.54 1,265.60 139.43 632.80 139.43 632.80 278.86 1,265.60 100% - - 0%
6,162.83 278.86 6,162.83 100% - - 0%
1.02.05 RELLENO Y COMPACTACION DE ZANJA CON CAMA DE ARENA Y MATERIAL PROPIO ZARANDEADO ML
278.86 22.10 6,162.83 0.00 0.00 278.86
721.63 62.89 1,202.71 100% - - 0%
1.02.06 SUMINISTRO E INSTALACION DE DESAGUE CON TUBERÍA PVC 6" EN PVC UF CON ACCESORIOS ML
62.89 19.13 1,202.71 25.15 481.09 37.73
1,982.64 215.97 3,304.40 100% - - 0%
1.02.07 SUMINISTRO E INSTALACION DE DESAGUE CON TUBERÍA PVC 4" EN PVC UF CON ACCESORIOS ML
215.97 15.30 3,304.40 86.39 1,321.76 129.58
1.02.08 PROTECCIÒN DE CONCRETO PARA ACCESORIOS DE TUBERÌA 1.00 GLB 350.00 350.00 0.40 140.00 0.60 210.00 1.00 350.00 100% - - 0%
1.02.09 CAJA DE REGISTRO 30 X 60 16.00 UND 156.25 2,500.00 6.40 1,000.00 9.60 1,500.00 16.00 2,500.00 100% - - 0%
1.02.10 CAJA DE REGISTRO 60 X 60 1.00 UND 187.50 187.50 0.40 75.00 0.60 112.50 1.00 187.50 100% - - 0%
1.02.11 EMPALMES MODULARES 28.00 UND 78.16 2,188.38 11.20 875.35 16.80 1,313.03 28.00 2,188.38 100% - - 0%
1.02.12 EMPALMES RED EXISTENTE 5.00 UND 68.78 343.91 0.00 0.00 5.00 343.91 5.00 343.91 100% - - 0%
1.02.13 ANULACIÓN DE CAJA DE REGISTRO 2.00 UND 50.03 100.06 0.00 0.00 2.00 100.06 2.00 100.06 100% - - 0%
1.03 RED DE AGUA POTABLE-TUBERÍA EXTERIOR - PPR -POLIFUSION 81,231.53 0.00 13,546.43 0.00 67,685.10 - 81,231.53 - - 0%
1.03.01 EXCAVACION DE TERRENO COMPACTADO 620.58 ML 44.04 27,330.17 0.00 0.00 620.58 27,330.17 620.58 27,330.17 100% - - 0%
1.03.02 ACOPIO DE MATERIAL EXCEDENTE DM< 100M 290.43 M3 26.25 7,623.78 0.00 0.00 290.43 7,623.78 290.43 7,623.78 100% - - 0%
1.03.03 REFINE Y NIVELACION DE ZANJA 620.58 ML 1.54 954.73 0.00 0.00 620.58 954.73 620.58 954.73 100% - - 0%
1.03.04 RELLENO Y COMPACTACION DE ZANJA CON MATERIAL PROPIO 620.58 ML 18.46 11,456.79 0.00 0.00 620.58 11,456.79 620.58 11,456.79 100% - - 0%
1.03.05 SUMINISTRO E INSTALACION DE TUBERÍA PPR HASTA 2" CON ACCESORIOS 620.58 ML 19.54 12,124.50 248.23 4,849.80 372.35 7,274.70 620.58 12,124.50 100% - - 0%
1.03.06 SUMINISTRO E INSTALACION DE VALVULAS DE PPR HASTA 2" 35.00 UND 167.75 5,871.25 14.00 2,348.50 21.00 3,522.75 35.00 5,871.25 100% - -
1.03.07 CONEXIÓN MODULAR 35.00 UND 125.00 4,375.00 14.00 1,750.00 21.00 2,625.00 35.00 4,375.00 100% - - 0%
1.03.09 SUMINISTRO E INSTALACION DE CISTERNA PVC 25 M3 PARA AGUA NO POTABLE 1.00 GLB 6,300.00 6,300.00 0.40 2,520.00 0.60 3,780.00 1.00 6,300.00 100% - - 0%
1.03.10 CAJA DE REGISTRO 35.00 UND 148.44 5,195.31 14.00 2,078.13 21.00 3,117.19 35.00 5,195.31 100% - - 0%
1.04 OTROS 6,625.00 0.00 825.00 0.00 5,800.00 - 6,625.00 - - 0%
1.04.01 PLANOS AS BUILT 1.00 GLB 2,500.00 2,500.00 0.00 0.00 1.00 2,500.00 1.00 2,500.00 100% - - 0%
1.04.02 PROTOCOLOS DE CALIDAD 1.00 GLB 4,125.00 4,125.00 0.20 825.00 0.80 3,300.00 1.00 4,125.00 100% - - 0%
TOTAL DIRECTO US$ 132,038.13 32,182.53 99,855.61 132,038.13 100% - 0%

2.00 GASTOS GENERALES 10.16% 13,414.28 13,414.28 3,269.55 10,144.73 13,414.28 -


3.00 UTILIDAD 12.00% 15,844.58 15,844.58 3,861.90 11,982.67 15,844.58 -
4.00 PROTOCOLO DE INGRESO 11.93% 15,756.77 15,756.77 3,840.50 11,916.27 15,756.77 -
5.00 DESCUENTO DE INGENIERIA -1.81% (2,388.06) (2,388.06) (582.06) (1,806.00) (2,388.06) -
6.00 DESCUENTO ESPECIAL -1.97% (2,600.00) (2,600.00) (633.72) (1,966.28) (2,600.00) -
3.00 SUB TOTAL 172,065.69 41,938.71 130,126.98 172,065.69 -
4.00 AMORTIZACION DE ADELANTO 20% -34,413.14 -8,387.74 -26,025.40 -34,413.14 -
5.00 TOTAL CON AMORTIZACIÓN ADELANTO 137,652.55 33,550.97 104,101.59 137,652.55 -
6.00 IGV 18% 18% 24,777.46 6,039.17 18,738.29 24,777.46 -
7.00 TOTAL A FACTURAR TOTAL CON IGV US$ 162,430.01 39,590.14 122,839.87 162,430.01 100% - 0%
Cliente: PROMET
Proyecto Instalaciones Sanitarias Campamemento - PIONERO

ACUMULADO ANTERIOR VALORIZACION N° 03 ACUMULADO ACTUAL SALDO


PRECIO PRECIO
ITEM DESCRIPCION CANT UND UNITARIO US$ TOTAL US$ CANT PARCIAL CANT PARCIAL CANT PARCIAL % CANT PARCIAL %

También podría gustarte