PROYECTO:

"CREACION DEL SERVICIO DE AGUA POTABLE Y ALCANTARILLADO DEL AA.HH LA GRAMA,


DISTRITO DE NEPEÑA-SANTA-ANCASH"

Subpresupuesto RED Y CONEXIONES DOMICILIARIAS DE AGUA POTABLE


Cliente GOBIERNO REGIONAL DE ANCASH
Lugar LA GRAMA-NEPEÑA-SANTA FECHA JUNIO - 2019
METRADO AGUA POTABLE - REDES

SUB TOTAL
ÍTEM DESCRIPCION C L A H TOTAL UND
04 RED Y CONEXIONES DOMICILIARIAS DE AGUA POTABLE
04.01 RED DE AGUA POTABLE
04.01.01 TRABAJOS PRELIMINARES
04.01.01.01 LIMPIEZA DE TERRENO MANUAL 603.46 m
Tendido de Tuberia Ø 48 mm
1.00 43.500 0.50 21.75
Tendido de Tuberia Ø 88.5 mm
1.00 1163.410 0.50 581.71
04.01.01.02 TRAZO Y REPLANTEO DE RED DE AGUA 603.46 m
Tendido de Tuberia Ø 48 mm
1.00 43.500 0.50 21.75
Tendido de Tuberia Ø 88.5 mm
1.00 1163.410 0.50 581.71
04.01.01.03 CINTA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA 2,413.82 m
En Zanjas 2.00 1,206.91 1.00 2,413.82
04.01.01.04 ALINEAMIENTO Y AJUSTES DE TUBERIA PVC P/RED DE AGUA 1,206.91 m
En Zanjas 1.00 1,206.91 1.00 1,206.91
04.01.02 MOVIMIENTO DE TIERRAS
04.01.02.01 EXCAVACION MANUAL EN TERRENO NORMAL 1,206.91 m
zanjas 1.00 1,206.91 1.00 1,206.91
04.01.02.02 REFINE Y NIVELACION DE ZANJA EN TERRENO NORMAL 1,206.91 m
zanjas 1.00 1,206.91 1.00 1,206.91
04.01.02.03 CAMA DE APOYO E=0.10M. 1,206.91 m
Tendido de Tuberia Ø 48 mm 1.00 43.50 1.00 1.00 43.50
Tendido de Tuberia Ø 88.5 mm 1.00 1,163.41 1.00 1.00 1,163.41
04.01.02.04 RELLENO CON MATERIAL PROPIO 765.05 m3
Para redes de distribución 1.00 1,206.91 0.60 1.20 868.98
Volumen ocupado por tuberia y cama de arena Ø 48
1.00 21.75 0.60 0.25 3.24
mm
Volumen ocupado por tuberia y cama de arena Ø 88.5
mm 1.00 581.71 0.60 0.29 100.69

04.01.02.05 ELIMINACION DE MATERIAL EXCEDENTE 220.43 m3


Volumen cama de arena e=10cm(debajo tuberia) 1.00 1,206.91 0.60 0.100 72.41
Volumen cama de arena e=10cm (encima tuberia) 1.00 1,206.91 0.60 0.100 72.41
Vol.Tuberia DN=48 mm 1.00 21.75 0.60 0.048 0.63
Vol.Tuberia DN=88.5 mm 1.00 581.71 0.60 0.089 30.89
C: 1.25 220.43
04.01.03 SUMINISTRO E INSTALACION DE TUBERIAS
SUMINISTRO E INSTALACION DE TUBERIA PVC
04.01.03.01 1.00 43.50 43.50 m
ISO 4422 UF C-5, DN=48mm

SUMINISTRO E INSTALACION DE TUBERIA PVC


04.01.03.02 1.00 1,163.41 1,163.41 m
ISO 4422 UF C-5, DN= 88.5mm
04.01.04 SUMINISTRO E INST. DE ACCESORIOS
SUMINISTRO E INSTALACION DE TAPON DE
04.01.04.01 1.00 1.00 1.00 und
CAMPANA DE PVC D=48mm

SUMINISTRO E INSTALACION DE TAPON DE


04.01.04.02 3.00 3.00 3.00 und
CAMPANA DE PVC D=88.5mm

SUMINISTRO E INSTALACION DE TEE DE


04.01.04.03 1.00 1.00 1.00 und
REDUCCION DE PVC D=88.5mm a 48 mm

SUMINISTRO E INSTALACION DE TEE DE PVC


04.01.04.04 3.00 3.00 3.00 und
D=88.5mm

SUMINISTRO E INSTALACION DE CODO DE 11° 15'


04.01.04.05 19.00 19.00 19.00 und
DE PVC D=88.5mm

SUMINISTRO E INSTALACION DE CODO DE 11° 15'


04.01.04.06 1.00 1.00 1.00 und
DE PVC D=48 m

SUMINISTRO E INSTALACION DE CODO DE 22° 30'


04.01.04.07 1.00 1.00 1.00 und
DE PVC D=88.5mm

SUMINISTRO E INSTALACION DE CODO DE 90° DE


04.01.04.08 1.00 1.00 1.00 und
PVC D=88.5mm
04.01.05 SUMINISTRO E INSTALACION DE VALVULAS
SUMINISTRO E INSTALACION DE VALVULA DE
04.01.05.01 6.00 6.00 6.00 und
BRONCE D=88.5mm

SUMINISTRO E INSTALACION DE VALVULA DE


04.01.05.02 1.00 1.00 1.00 und
BRONCE D=48mm

04.01.06 CAJAS DE VALVULAS


04.01.06.01 TRABAJOS PRELIMINARES
04.01.06.01.01 LIMPIEZA DE TERRENO MANUAL 5.67 m2
7.00 0.90 0.90 5.67
04.01.06.01.02 TRAZO Y REPLANTEO 5.67 m2
7.00 0.90 0.90 5.67

04.01.06.02 MOVIMIENTO DE TIERRAS


04.01.06.02.01 EXCAVACION MANUAL EN TERRENO NORMAL 5.10 m3
solo dos caras, ya se escavaron 0.60 m de ancho 7.00 0.90 0.90 0.90 5.10
04.01.06.02.02 ELIMINACION DE MATERIAL EXCEDENTE 6.63 m3
factor
de las dos caras 5.10 1.30 6.63
04.01.06.02.03 MATERIAL DE FILTRO 0.25 m3
dentro de la caja 7.00 0.60 0.60 0.10 0.25
04.01.06.03 ESTRUCTURAS
04.01.06.03.01 CONCRETO ARMADO
04.01.06.03.01.01 CONCRETO f'c=175 kg/cm2 7.00 2.84 m3
4.00 0.60 0.15 0.90 2.27
4.00 0.15 0.15 0.90 0.57

04.01.06.03.01.02 ENCOFRADO Y DESENCOFRADO EN CAJAS 7.00 32.76 m2


exterior 4.00 0.90 0.90 22.68
interior 4.00 0.60 0.60 10.08

04.01.06.03.01.03 ACERO ESTRUCTURAL TRABAJADO PARA CAJA 150.53 kg


7.00 # caras kg/m
Acero Horizontal Φ = 3/8" 6.00 0.75 4.00 0.56 70.56
Acero Vertical Φ = 3/8" 6.00 0.85 4.00 0.56 79.97
04.01.06.04 ARQUITECTURA
04.01.06.04.01 REVOQUES Y ENLUCIDOS
04.01.06.04.01.01 TARRAJEO EN INTERIORES 7.00 18.27 m2
exterior 4.00 0.60 0.90 15.12
interior 2.00 0.15 0.90 1.89
2.00 0.15 0.60 1.26
04.01.06.04.02 CARPINTERIA METALICA
04.01.06.04.02.01 TAPA METALICA DE 70X70 cm 7.00 und
7.00 7.00

04.01.07 DADO DE CONCRETO PARA ACCESORIOS


04.01.07.01 CONCRETO SIMPLE
04.01.07.01.01 ENCOFRADO Y DESENCOFRADO EN DADOS 10.70 m2
Tapon 4.00 1.00 0.10 0.40
Codos 20.00 1.00 0.08 1.50
TEE 3.00 1.00 0.10 0.30
TEE de Reduccion 1.00 1.00 0.10 0.10
Valvulas 7.00 1.00 1.20 8.40
04.01.07.01.02 CONCRETO 140 Kg/cm2 0.34 m3
Tapon 4.00 0.30 0.30 0.10 0.04
Codos 20.00 0.30 0.30 0.10 0.18
TEE 3.00 0.30 0.30 0.10 0.03
Reducciones 1.00 0.20 0.20 0.20 0.01
Valvulas 7.00 0.20 0.20 0.30 0.08

04.01.08 PRUEBA
PRUEBA HIDRAULICA
HIDRAULICA EN RED DE AGUA DE RED
Y DESINFECCION
04.01.08.01 DE AGUA 1,206.91 m
1.00 1,206.91 1,206.91
PROYECTO:
"CREACION DEL SERVICIO DE AGUA POTABLE Y ALCANTARILLADO DEL AA.HH LA GRAMA ,
DISTRITO DE NEPEÑA-SANTA- ANCASH"

Cliente GOBIERNO REGIONAL DE ANCASH


Lugar ANCASH - SANTA - NEPEÑA FECHA: JUNIO - 2019

METRADO AGUA POTABLE -CONEXIONES DOMICILIARIAS

SUB TOTAL
ÍTEM DESCRIPCION C L A H TOTAL UND
04.02 CONEXIONES DOMICILIARIAS DE AGUA
04.02.01 TRABAJOS PRELIMINARES
04.02.01.01 LIMPIEZA DE TERRENO MANUAL 443.86 m2
Tendido de Tuberia Ø 20 mm
Conexiones domiciliarias 1.00 739.770 0.60 443.86

04.02.01.02 TRAZO Y REPLANTEO DE CONEXIONES DOMICILIARIAS 443.86 m2


Tendido de Tuberia Ø 20 mm
Conexiones domiciliarias 1.00 739.770 0.60 443.86

04.02.01.03 CINTA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA 1,479.54 m


En Zanjas 2.00 739.77 1,479.54
04.02.01.04 ALINEAMIENTO Y AJUSTES DE TUBERIA PVC P/CONEXIONES DOMICILIARIAS 739.77 m
En Zanjas 1.00 739.77 1.00 739.77
04.02.02 MOVIMIENTO DE TIERRAS
04.02.02.01 EXCAVACION MANUAL EN TERRENO NORMAL 739.77 m
En Zanjas 1.00 739.77 739.77
04.02.02.02 REFINE Y NIVELACION DE ZANJA EN TERRENO NORMAL 739.77 m
En Zanjas 1.00 739.77 739.77
04.02.02.03 CAMA DE APOYO E=0.10M. 739.77 m3
Tendido de Tuberia Ø 20 mm 1.00 739.77 1.00 739.77
04.02.02.04 RELLENO CON MATERIAL PROPIO 438.53 m3
Para redes de distribución 1.00 739.77 0.60 1.00 443.86
Volumen ocupado por tuberia y cama de arena 1.00 443.86 0.60 0.02 5.33

04.02.02.05 ELIMINACION DE MATERIAL EXCEDENTE 122.06 m3

Volumen cama de arena e=10cm(debajo tuberia) 1.00 739.77 0.60 0.100 44.39
Volumen cama de arena e=10cm (encima tuberia) 1.00 739.77 0.60 0.100 44.39
Vol.Tuberia DN=20 mm 1.00 739.77 0.60 0.020 8.88
C: 1.25 122.06
04.02.03 INSTALACIONES HIDRAULICAS
04.02.03.01 CAJA DE REGISTRO DE AGUA 1.00 123.00 123.00 123.00 und
04.02.03.02 SUMINISTRO E INSTALACION DE MICROMEDIDORES 1.00 123.00 123.00 123.00 und

SUMINISTRO E INSTALACION DE TUBERIA PVC ISO 4422


04.02.03.03 1.00 739.77 739.77 739.77 m
UF C-5, DN= 20mm

04.02.04 SUMINISTRO E INST. DE ACCESORIOS

SUMINISTRO E INSTALACION DE ABRAZADERAS DE PVC 121.00 121.00 121.00 und


04.02.04.01
DE 88.5 mm a 20 mm

SUMINISTRO E INSTALACION DE ABRAZADERAS DE PVC 2.00 2.00 und


04.02.04.02 2.00
DE 48 mm a 20 mm
2.00 2.00 und
04.02.04.03 SUMINISTRO E INSTALACION DE TEE DE PVC D=48 mm 2.00

121.00 121.00 und


04.02.04.04 SUMINISTRO E INSTALACION DE TEE DE PVC D=88.5mm 121.00

SUMINISTRO E INSTALACION DE REDUCCION D=48 mm a 2.00 2.00 und


04.02.04.05 2.00
20 mm
SUMINISTRO E INSTALACION DE REDUCCION D=88.5 mm a 121.00 121.00 und
04.02.04.06 121.00
20 mm
123.00 123.00 und
04.02.04.07 SUMINISTRO E INSTALACION DE CODO DE 20 mm X 90° 123.00

04.02.05 PRUEBA HIDRAULICA EN CONEXIONES DOMICILIARIAS

PRUEBA HIDRAULICA Y DESINFECCION DE CONEXIONES


04.02.05.01 1.00 739.77 739.77 739.77 m
DOMICILIARIAS
PROYECTO:
"CREACION DEL SERVICIO DE AGUA POTABLE Y ALCANTARILLADO DE AA.HH LA GRAMA EN
EL DISTRITO DE NEPEÑA, PROVINCIA DE SANTA REGION ANCASH"

Subpresupuesto SISTEMA DE AGUA POTABLE


Cliente MUNICIPALIDAD DISTRITAL DE NEPEÑA
Lugar C.P. LA GRAMA

METRADO ALCANTARILLADO - REDES

SUB TOTAL
ÍTEM DESCRIPCION C L A H TOTAL UND
REDES DE DISTRIBUCION
27 OBRAS PROVISIONALES
27.01 Limpieza de terreno manual 2.00 2,196.34 4,392.68 4,392.68 m2
27.02 Movilizacion y desmovilizacion de equio 2.00 1,500.00 3,000.00 3,000.00 viaj
28 TRABAJOS PRELIMINARES
28.01 Trazo y Replanteo preliminar 2,196.34 m
28.02 Trazo y Replanteo finales del Proyecto 2,196.34 m
Tendido de Tuberia Ø 200 mm
47-46 1.00 41.16 41.16
46-3 1.00 9.81 9.81
1-2 1.00 43.78 43.78
2-3 1.00 58.31 58.31
3-4 1.00 31.84 31.84
4-5 1.00 73.74 73.74
5-6 1.00 72.63 72.63
12-11 1.00 52.96 52.96
11-10 1.00 60.76 60.76
10-9 1.00 44.58 44.58
18-17 1.00 89.26 89.26
17-16 1.00 62.43 62.43
16-15 1.00 49.58 49.58
15-14 1.00 74.12 74.12
14-13 1.00 78.01 78.01
13-9 1.00 25.37 25.37
9-8 1.00 73.24 73.24
8-7 1.00 45.59 45.59
7-6 1.00 30.24 30.24
6-19 1.00 27.47 27.47
19-20 1.00 49.38 49.38
20-21 1.00 34.65 34.65
21-22 1.00 79.99 79.99
22-23 1.00 21.02 21.02
23-24 1.00 12.56 12.56
24-25 1.00 50.07 50.07
25-26 1.00 53.36 53.36
26-27 1.00 12.09 12.09
27-28 1.00 10.56 10.56
28-29 1.00 61.12 61.12
29-30 1.00 85.78 85.78
30-31 1.00 17.68 17.68
31-32 1.00 45.08 45.08
32-33 1.00 18.09 18.09
33-34 1.00 52.36 52.36
34-35 1.00 61.79 61.79
35-36 1.00 13.18 13.18
36-37 1.00 79.99 79.99
37-38 1.00 20.36 20.36
38-39 1.00 80.00 80.00
39-40 1.00 38.66 38.66
40-41 1.00 45.20 1.00 45.20
41-42 1.00 50.58 50.58
42-43 1.00 80.75 80.75
43-44 1.00 25.45 25.45
44-45 1.00 51.72 51.72

28.03 Suministro de Cinta Señalizadora 1.00 2,196.34 1.00 2,196.34 2,196.34 m

28.04 Alineamiento y ajuste de tuberia PVC red de Alcantarilla 1.00 2,196.34 1.00 2,196.34 2,196.34 m

29 MOVIMIENTO DE TIERRAS

Excavación de zanjas c/Retroecavadora 2,196.34 m


29.01

De la partida 01.02.01
1.00 2,196.34 2,196.34

2,196.34 m
29.02 1.00 2,196.34 2,196.34
Refine y Nivelación de Zanjas p/Tubería

29.03 Colocación de cama de Arena Fina e=10cm. 1.00 2,196.34 2,196.34 2,196.34 m

Relleno con material propio compactado


29.04 1,405.66 m3

Para redes de distribución 1.00 2,196.34 0.80 1.20 2,108.49

Volumen ocupado por tuberia y cama de arena


1.00 2,196.34 0.80 0.40 702.83

Eliminación de Material Excedente a 2.5 Km de la Obra 636.94 m3


29.05

Volumen cama de arena e=10cm(debajo tuberia)


1.00 2,196.34 0.80 0.100 175.71

Volumen cama de arena e=10cm (encima tuberia)


1.00 2,196.34 0.80 0.100 175.71

Vol.Tuberia DN=90 mm 1.00 2,196.34 0.80 0.090 158.14

C: 1.25 636.94

30 CONCRETO ARMADO - BUZONES

30.01.01
Buzon d= 1.20 Hasta 1.50mts PF 1.00 28.00 28.00 28.00 unid

30.01.02
Buzon d= 1.20 Hasta 2.50mts PF 1.00 18.00 18.00 18.00 unid

30.01.03
Sumnistro e Inst. de techo de Buzon 1.00 46.00 46.00 46.00 unid
30.01.04
Sumnistro y colocacion de tapa de buzon 1.00 46.00 46.00 46.00 unid

31 Sumnistro e Inst. de Tuberia PVC

Suministro e instalación de tuberia ISO 4435 UF S-20


31.01 1.00 2,196.34 2,196.34 2,196.34 m
200mm.

31.02 1.00 2,196.34 2,196.34 2,196.34 m


Prueba Hidráulica y Desinfección en tub.PVC

32 Otros
32.01 Dados de Concreto 92.00 unid
De buzones
Buzon d= 1.20 Hasta 1.50mts PF 28.00 2.00 1.00 56.00
Buzon d= 1.20 Hasta 2.50mts PF 18.00 2.00 1.00 36.00

32.02 Emplame a tuberia existente 1.00 1.00 1.00 1.00 m3


PROYECTO:
"CREACION DEL SERVICIO DE AGUA POTABLE Y ALCANTARILLADO DE AA.HH LA GRAMA
EN EL DISTRITO DE NEPEÑA, PROVINCIA DE SANTA REGION ANCASH"

Subpresupuesto SISTEMA DE AGUA POTABLE


Cliente MUNICIPALIDAD DISTRITAL DE NEPEÑA
Lugar C.P. LA GRAMA

METRADO ALCANTARILLADO -CONEXIONES DOMIC.

SUB TOTAL
ÍTEM DESCRIPCION C L A H TOTAL UND
REDES DE DISTRIBUCION
33 TRABAJOS PRELIMINARES
33.01 Trazo y Replanteo red de alcantarillado 708.00 m
Tendido de Tuberia Ø 160 mm
Conexiones domiciliarias 1.00 118.000 6.00 708.00

33.02 Suministro de Cinta Señalizadora 1,416.00 m


En Zanjas 2.00 708.00 1,416.00
33.03 Alineamiento y ajuste de tuberia PVC rconex. Alcant 1.00 708.00 1.00 708.00 708.00 m
34 MOVIMIENTO DE TIERRAS
34.01 Excavación de zanjas c/Retroecavadora 708.00 m
De la partida 01.02.01 1.00 708.00 1.00 708.00
34.02 Cama de apoyo E= 10cm 56.64 m3
Tendido de Tuberia Ø 160 mm 1.00 708.00 0.80 0.10 56.64
34.03 Relleno con material propio compactado DN 110 475.78 m3
Para redes de distribución 1.00 708.00 0.80 1.00 566.40
Volumen ocupado por tuberia y cama de arena
1.00 708.00 0.80 0.16 90.62

Nivelacion interior apisonado manual para inst. de caja


de Registro 1.00 708.00 1.00 708.00 708.00 m

Eliminación de Material Excedente a 2.5 Km de la Obra 191.16 m3


34.04

Volumen cama de arena e=10cm(debajo tuberia) 1.00 708.00 0.60 0.100 42.48
Volumen cama de arena e=10cm (encima tuberia) 1.00 708.00 0.60 0.100 42.48
Vol.Tuberia DN=90 mm 1.00 708.00 0.60 0.160 67.97
C: 1.25 191.16

35 INSTALACION DE CONEXIONES DE ALCANTARILLADO

35.01 Caja de concreto p/desague inc. Marco y Tapa 1.00 118.00 1.00 118.00

Suministro e instalación de tuberia ISO 4435 UF S-20


35.02 1.00 118.00 6.00 708.00 708.00 m
DN 160mm.

36 Prueba Hidraulica de tuberia PVC

36.01 Prueba Hidráulica tub. Conex. Domicil. 1.00 708.00 1.00 708.00 708.00 m

37 Otros

37.01 Vereda de Concreto f'c=175 kg/cm2 de 1.00x1.00 mts 1.00 1.00 118.00 118.00 118.00 m2
PROYECTO:
"CREACION DEL SERVICIO DE AGUA POTABLE Y ALCANTARILLADO DE AA.HH LA GRAMA EN EL DISTRITO DE
NEPEÑA, PROVINCIA DE SANTA REGION ANCASH"

Subpresupuesto SISTEMA DE AGUA POTABLE


Cliente MUNICIPALIDAD DISTRITAL DE NEPEÑA
Lugar C.P. LA GRAMA

METRADO AGUA POTABLE - LINEA DE IMPULSION

SUB TOTAL
ÍTEM DESCRIPCION C L A H TOTAL UND
LINEA DE IMPULSION
9 OBRAS PRELIMINARES
09.01 Trazo y Replanteo red de agua 90.50 m
Tuberia Ø 90 mm
En Línea de Impulsión 1.00 90.50 90.50
09.02 Suministro de Cinta Señalizadora 181.00 m
En Zanja excavada 2.00 90.50 181.00
10 MOVIMIENTO DE TIERRAS
10.01 Excavación de zanjas c/Equipo p/Agua.T.Normal, DN= 150mm 50.00 m
De la partida 02.01.01 1.00 50.00 50.00
10.02 Refine y Nivelación de Zanjas p/Tubería de Red 1.00 50.00 50.00 50.00 m
10.03 Colocación de cama de Arena Fina e=10cm. 50.00 m
En Línea de Impulsión 1.00 50.00 50.00
10.04 Relleno Zanja c/ material propio compactado DN 160mm. 50.00 m

De la partida 02.02.01 1.00 50.00 50.00


10.05 Eliminación de Material Excedente a 2.5 Km de la Obra 28.86 m3
Volumen de excv, Total 1.00 50.00 0.80 1.00 40.00
Volumen cama de arena e=10cm 1.00 5.00 0.80 0.10 0.40
Volumen cama de arena e=20cm 1.00 50.00 0.80 0.200 8.00
Vol.Tuberia de Desague DN=150mm 1.00 50.00 0.08 3.14 0.88
C: 1.20 28.86
11 SUMINISTRO E INSTALACION DE TUBERIA DE IMPULSION

11.01 Suminist. e inst. de tub. de DN 3" foGo(subida) 90.50 m

tramo vertical pozo -camara de bombas 1.00 18.95 18.95


tramo horizontal pozo camara de bombas 1.00 52.05 52.05
tramo vertical pozo 1.00 19.50 19.50
Suministro e instalación de tuberia de distribucion (bajada de
11.02
reservorio a linea de distribucion
Tuberia Ø 3" fogo (vertical) 1.00 18.95 18.95 18.95 m

11.03 Suministro e instalación de tuberia de rebose y limpieza


Tuberia PVC rebose 90mm C-10 inc. Accesorios 1.00 18.95 18.95 18.95 m

Tuberia PVC de limpieza de 3" fogo. Accesorios (Valvula y codos) 1.00 2.50 2.50 2.50 m

11.05 Prueba Hidráulica y Desinfección de Red de Agua Potable 90.50 m


Tuberia Ø 3" 1.00 90.50 90.50
12 SUMINISTRO E INST. DE ACCESORIOS
12.01 Suministro e Instalación de valvula de Fodo 90mm 2.00 2.00 2.00 und
12.02 Suministro e Instalación de Codo PVC 45°X90mm 2.00 2.00 2.00 und
12.03 Suministro e Instalación de Codo PVC 90°X90mm 6.00 6.00 6.00 und
12.04 Suministro e Instalación de DRESSER de 90mm 4.00 4.00 4.00 und
12.05 Suministro e Instalación de canastilla de PVC p/rebose 160mm 1.00 1.00 1.00 und
12.06 Suministro e Instalación de YEE PVC 90mm 1.00 1.00 1.00 und
12.07 Suministro e inst. de Manometro DN de 90x1"
12.08 Suministro e inst. de Valvula de Aire inc. DRESSER de 90mm 2.00 2.00 2.00 und
12.09 Suministro e inst. de Mariposa inc DRESSER DN 90mm 2.00 2.00 2.00 und
12.10 Suministro e inst. de Valvula Check ic DRESSER de 90mm 1.00 1.00 1.00 und
13 OTROS
PROYECTO:
"CREACION DEL SERVICIO DE AGUA POTABLE Y ALCANTARILLADO DE AA.HH LA GRAMA EN EL DISTRITO DE
NEPEÑA, PROVINCIA DE SANTA REGION ANCASH"

Subpresupuesto SISTEMA DE AGUA POTABLE


Cliente MUNICIPALIDAD DISTRITAL DE NEPEÑA
Lugar C.P. LA GRAMA

METRADO AGUA POTABLE - LINEA DE IMPULSION

SUB TOTAL
ÍTEM DESCRIPCION C L A H TOTAL UND
13.01 Empalme a Tuberia DN 90mm de Distribucion 1.00 1.00 1.00 und
Suministro e inst. de puerta metalica de 90x2.60 mts en Caseta de
13.02 1.00 1.00 1.00 unid
Valvulas
Caseta de Valvulas de 3.10x3.10 ladrillo caravista losa armada E=
13.03 1.00 1.00 1.00 glob
10 cm
13.04 Inst. electrica en caseta de valvulas, C.A. 380/220v 1.00 1.00 1.00 glob
Transporte de Equipos y materiales a la Obra 2.00 1.00 2.00 glob
RELACION DE ACCESORIOS

TAPON CODO REDUCCIONES TEE VALVULA TOTAL


DESCRIPCION
90° 45° 11°15¨ 22°30¨ 63mm 50mm 32mm 25mm 20mm ACCESORIOS
3" 90mm 1 1 6 3 4 3 4 18
2" 63mm 1 1 3 1 5
1 1/2" 50mm 2 3 5
1" 32mm 1 4 2 5
3/4" 25mm 3 1 1 5
1/2" 20mm 0

TOTALES 5 1 1 8 5 4 3 3 4 1 3 7 38