Está en la página 1de 15

ADJUDICACIÓN : SIMPLIFICADA Nº 05-2016-SBPC

PROYECTO : "CONSTRUCCION DE MACIZO 192 NICHOS ADULTOS 2016-IV, CEMENTERIO GENERAL DE CAJAMARCA"
ENTIDAD : SOCIEDAD DE BENEFICIENCIA PUBLICA DE CAJAMARCA
UBICACIÓN : CAJAMARCA-CAJAMARCA-CAJAMARCA
CONTRATISTA :
INSPECTOR :
RESIDENTE :

CONTROL DE METRADOS EJECUTADOS


junio

METRADO METRADOS EJECUTADOS % SALDO


PARTIDA DESCRIPCIÓN UND
BASE ANTERIOR ACTUAL ACUMULADO AVANCE METRADO

1 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00

1.01 NIVELACION DE TERRENO m2 180.00 120.00 120.00 66.67% 60.00

1.02 EXCAVACION DE ZANJAS HASTA 0.80 m TERRENO NORMAL m3 31.88 31.88 31.88 100.00% 0.00

1.03 RELLENO Y COMP. MAT.PROPIO EN ZANJAS m3 14.20 8.98 8.98 63.24% 5.22

1.04 EXCAVACION PARA CANALETAS m 48.00 0.00 0.00% 48.00

1.05 ELIMINACION MATERIAL EXCEDENTE. m3 62.20 49.39 49.39 12.81

2 OBRAS DE CONCRETO SIMPLE 0.00 0.00

2.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 31.64 31.64 31.64 100.00% 0.00

2.02 VEREDA DE CONCRETO DE 4" m2 56.20 0.00 0.00% 56.20

2.03 CONCRETO PARA CANALETAS DE f'c=140 kg/cm2 m3 45.66 0.00 0.00% 45.66

3 OBRAS DE CONCRETO ARMADO 0.00 0.00

3.01 CONCRETO SOBRECIMIENTOS DE 1:8 CEM-HOR 25% P.M. ANCHO=0.25m m3 3.05 3.05 3.05 0.00

3.02 ENCOFRADO Y DESENCOF.SOBRECIMIENTO DE 0.30 A 0.60m m2 31.41 31.41 31.41 100.00% 0.00

3.03 ACERO DE ø 1/4" PARA SOBRECIMIENTO kg 63.80 63.80 63.80 100.00% 0.00

3.04 ACERO DE ø 3/8" PARA SOBRECIMIENTO kg 124.88 124.88 124.88 100.00% 0.00

3.05 CONCRETO EN COLUMNAS f'c=175 kg/cm2 m3 3.03 2.52 2.52 83.17% 0.51

3.06 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 23.74 19.78 19.78 83.32% 3.96

3.07 ACERO DE ø 1/2" EN COLUMNAS kg 354.42 354.42 354.42 100.00% 0.00

3.08 ACERO DE ø 1/4" EN COLUMNAS kg 74.40 74.40 74.40 100.00% 0.00

3.09 CONCRETO EN LOSAS MACISAS f'c=175 kg/cm2 m3 40.51 28.94 28.94 71.44% 11.57

3.1 ENCOFRADO Y DESENCOFRADO NIORMAL EN LOSAS MACISAS m2 135.00 90.00 90.00 66.67% 45.00

3.11 ACERO DE ø 1/4" PARA LOSAS MACISAS kg 1,137.50 812.50 812.50 71.43% 325.00

3.12 CONCRETO EN VIGAS f'c=175 kg/cm2 m3 3.05 0.00 0.00% 3.05

3.13 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 52.14 0.00 0.00% 52.14

3.14 ACERO DE ø 1/4" EN VIGAS kg 66.50 0.00 0.00% 66.50

3.15 ACERO DE ø 3/8" EN VIGAS kg 132.16 0.00 0.00% 132.16

4 ESTRUCTURAS DE MADERA Y COBERTURAS 0.00 0.00

4.01 VIGAS DE MADERA DE 4"X4" m 57.32 0.00 57.32

4.02 LISTONES DE MADERA DE 3"X2" m 176.00 0.00 0.00% 176.00

4.03 CORREAS DE MADERA DE 2"X1" m 195.96 0.00 0.00% 195.96

4.04 COBERTURA DE TEJA ANDINA m2 129.20 0.00 0.00% 129.20

4.05 CUMBRERA SUPERIOR E INFERIOR TEJA ANDINA und 120.00 0.00 0.00%

5 MUROS Y TABIQUES 0.00 0.00

5.01 MUROS DE LADRILLO KK DE ARCILLA DE SOGA C:A 1:5 m2 218.40 182.00 182.00 36.40

5.02 MURO DE LADRILLO KK DE ARCILLA DE CABEZA C:A 1:5 m2 157.57 131.31 131.31 83.33% 26.26

6 REVOQUES ENLUCIDOS Y MOLDADURAS 0.00 0.00

6.01 TARRAJEO INTERIOR C/MORTERO 1:5x1.5cm m2 569.09 474.24 474.24 83.33% 94.85

6.02 TARRAJEO EXTERIOR C/MORTERO 1:5x1.5cm m2 113.97 0.00 0.00% 113.97

7 PINTURA. 0.00 0.00

7.01 PINTURA LATEX EN MUROS EXTERIORES m2 114.50 0.00 0.00% 114.50

8 OTROS 0.00 0.00

8.01 TAPAS DE CONCRETO PARA NICHOS und 212.00 0.00 212.00

8.02 NOMBRE DEL MACIZO und 2.00 0.00 2.00

8.03 CANALETA DE CALAMINA GALVANIZADA m 30.80 0.00 0.00% 30.80

8.04 BAJANTE DE AGUA DE LLUVIA m 26.40 0.00 0.00% 26.40

8.05 PLANCHA DE TECNOPORT und 28.00 24.00 24.00 4.00


ADJUDICACIÓN : SIMPLIFICADA Nº 05-2016-SBPC
PROYECTO : "CONSTRUCCION DE MACIZO 192 NICHOS ADULTOS 2016-IV, CEMENTERIO GENERAL DE CAJAMARCA"
ENTIDAD : SOCIEDAD DE BENEFICIENCIA PUBLICA DE CAJAMARCA
UBICACIÓN : CAJAMARCA-CAJAMARCA-CAJAMARCA
CONTRATISTA
INSPECTOR
RESIDENTE

CONTROL DE METRADOS EJECUTADOS


julio

METRADO
PARTIDA DESCRIPCIÓN UND
BASE

1 MOVIMIENTO DE TIERRAS
1.01 NIVELACION DE TERRENO m2 180.00
1.02 EXCAVACION DE ZANJAS HASTA 0.80 m TERRENO NORMAL m3 31.88
1.03 RELLENO Y COMP. MAT.PROPIO EN ZANJAS m3 14.20
1.04 EXCAVACION PARA CANALETAS m 48.00
1.05 ELIMINACION MATERIAL EXCEDENTE. m3 62.20
2 OBRAS DE CONCRETO SIMPLE
2.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 31.64
2.02 VEREDA DE CONCRETO DE 4" m2 56.20
2.03 CONCRETO PARA CANALETAS DE f'c=140 kg/cm2 m3 45.66
3 OBRAS DE CONCRETO ARMADO
3.01 CONCRETO SOBRECIMIENTOS DE 1:8 CEM-HOR 25% P.M. ANCHO=0.25m m3 3.05
3.02 ENCOFRADO Y DESENCOF.SOBRECIMIENTO DE 0.30 A 0.60m m2 31.41
3.03 ACERO DE ø 1/4" PARA SOBRECIMIENTO kg 63.80
3.04 ACERO DE ø 3/8" PARA SOBRECIMIENTO kg 124.88
3.05 CONCRETO EN COLUMNAS f'c=175 kg/cm2 m3 3.03
3.06 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 23.74
3.07 ACERO DE ø 1/2" EN COLUMNAS kg 354.42
3.08 ACERO DE ø 1/4" EN COLUMNAS kg 74.40
3.09 CONCRETO EN LOSAS MACISAS f'c=175 kg/cm2 m3 40.51
3.1 ENCOFRADO Y DESENCOFRADO NIORMAL EN LOSAS MACISAS m2 135.00
3.11 ACERO DE ø 1/4" PARA LOSAS MACISAS kg 1,137.50
3.12 CONCRETO EN VIGAS f'c=175 kg/cm2 m3 3.05
3.13 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 52.14
3.14 ACERO DE ø 1/4" EN VIGAS kg 66.50
3.15 ACERO DE ø 3/8" EN VIGAS kg 132.16
4 ESTRUCTURAS DE MADERA Y COBERTURAS
4.01 VIGAS DE MADERA DE 4"X4" m 57.32
4.02 LISTONES DE MADERA DE 3"X2" m 176.00
4.03 CORREAS DE MADERA DE 2"X1" m 195.96
4.04 COBERTURA DE TEJA ANDINA m2 129.20
4.05 CUMBRERA SUPERIOR E INFERIOR TEJA ANDINA und 120.00
5 MUROS Y TABIQUES
5.01 MUROS DE LADRILLO KK DE ARCILLA DE SOGA C:A 1:5 m2 218.40
5.02 MURO DE LADRILLO KK DE ARCILLA DE CABEZA C:A 1:5 m2 157.57
6 REVOQUES ENLUCIDOS Y MOLDADURAS
6.01 TARRAJEO INTERIOR C/MORTERO 1:5x1.5cm m2 569.09
6.02 TARRAJEO EXTERIOR C/MORTERO 1:5x1.5cm m2 113.97
7 PINTURA.
7.01 PINTURA LATEX EN MUROS EXTERIORES m2 114.50
8 OTROS
8.01 TAPAS DE CONCRETO PARA NICHOS und 212.00
8.02 NOMBRE DEL MACIZO und 2.00
8.03 CANALETA DE CALAMINA GALVANIZADA m 30.80
8.04 BAJANTE DE AGUA DE LLUVIA m 26.40
8.05 PLANCHA DE TECNOPORT und 28.00
E CAJAMARCA"

EJECUTADOS

METRADOS EJECUTADOS % SALDO


ANTERIOR ACTUAL ACUMULADO AVANCE METRADO

120.00 60.00 180.00 100.00% 0.00


31.88 31.88 100.00% 0.00
8.98 5.22 14.20 100.00% 0.00
48.00 48.00 100.00% 0.00
12.81 12.81 100.00% 49.39
0.00 0.00
31.64 31.64 100.00% 0.00
56.20 56.20 100.00% 0.00
45.66 45.66 100.00% 0.00
0.00 0.00
3.05 3.05 100.00% 0.00
31.41 31.41 100.00% 0.00
63.80 63.80 100.00% 0.00
124.88 124.88 100.00% 0.00
2.52 0.51 3.03 100.00% 0.00
19.78 3.96 23.74 100.00% 0.00
354.42 354.42 100.00% 0.00
74.40 74.40 100.00% 0.00
28.94 11.57 40.51 100.00% 0.00
90.00 45.00 135.00 100.00% 0.00
812.50 325.00 1137.50 100.00% 0.00
3.05 3.05 100.00% 0.00
52.14 52.14 100.00% 0.00
66.50 66.50 100.00% 0.00
132.16 132.16 100.00% 0.00
0.00 0.00
57.32 57.32 100.00% 0.00
176.00 176.00 100.00% 0.00
195.96 195.96 100.00% 0.00
129.20 129.20 100.00% 0.00
120.00 120.00 100.00%
0.00 0.00
182.00 36.40 218.40 100.00% 0.00
131.31 26.26 157.57 100.00% 0.00
0.00 0.00
474.24 94.85 569.09 100.00% 0.00
113.97 113.97 100.00% 0.00
0.00 0.00
114.50 114.50 100.00% 0.00
0.00 0.00
212.00 212.00 100.00% 0.00
2.00 2.00 100.00% 0.00
30.80 30.80 100.00% 0.00
26.40 26.40 100.00% 0.00
24.00 4.00 28.00 100.00% 0.00
PROYECTO PLAZO DE EJECUCIÓN : 52 DÍAS CALENDARIOS
: "CONSTRUCCION DE MACIZO 192 NICHOS ADULTOS 2016-IV, CEMENTERIO GENERAL DE CAJAMARCA"
ENTIDAD : SOCIEDAD DE BENEFICIENCIA PUBLICA DE CAJAMARCA VALOR REFERENCIAL : S/. Inc/IGV.
UBICACIÓN : CAJAMARCA-CAJAMARCA-CAJAMARCA MONTO OFERTADO : S/. 0.00 Inc/IGV.
FECHA BASE : ENERO 2020
FACTOR DE RELACIÓN 1.00000

VALORIZACIÓN CONTRACTUAL Nº 01
Del 01 al 30 de Junio del 2020

PRESUPUESTO BASE AVANCE


SALDOS
PARTIDA DESCRIPCION UNID METRADO P.U. PARCIAL ANTERIOR ACTUAL ACUMULADO
(S/.) (S/.) METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL % METRADO PARCIAL %

1 MOVIMIENTO DE TIERRAS 4,442.46 0.00 0.00 0.00


1.01 NIVELACION DE TERRENO m2 180.00 9.13 1,643.40 120.00 1,095.60 120.00 1,095.60 66.67% 60.00 0.00 33.33%
1.02 EXCAVACION DE ZANJAS HASTA 0.80 m TERRENO NORMAL m3 31.88 30.96 987.00 31.88 987.00 31.88 987.00 100.00% 0.00 0.00 0.00%
1.03 RELLENO Y COMP. MAT.PROPIO EN ZANJAS m3 14.20 15.81 224.50 8.98 141.97 8.98 141.97 63.24% 5.22 0.00 36.76%
1.04 EXCAVACION PARA CANALETAS m 48.00 1.65 79.20 0.00 0.00 0.00 0.00% 48.00 100.00%
1.05 ELIMINACION MATERIAL EXCEDENTE. m3 62.2 24.25 1,508.35 49.39 1,197.71 49.39 1,197.71 12.81 0.00 20.59%
2 OBRAS DE CONCRETO SIMPLE 13,494.30 0.00 0.00 0.00 0.00 0.00
2.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 31.64 168.52 5,331.97 31.64 5,331.97 31.64 5,331.97 100.00% 0.00 0.00%
2.02 VEREDA DE CONCRETO DE 4" m2 56.20 92.07 5,174.33 0.00 0.00 0.00 0.00% 56.20 100.00%
2.03 CONCRETO PARA CANALETAS DE f'c=140 kg/cm2 m3 45.66 65.44 2,987.99 0.00 0.00 0.00 45.66 100.00%
3 OBRAS DE CONCRETO ARMADO 37,925.24 0.00 0.00 0.00 0.00% 0.00
3.01 CONCRETO SOBRECIMIENTOS DE 1:8 CEM-HOR 25% P.M. ANCHO=0.25m m3 3.05 198.82 606.40 3.05 606.40 3.05 606.40 100.00% 0.00 0.00 0.00%
3.02 ENCOFRADO Y DESENCOF.SOBRECIMIENTO DE 0.30 A 0.60m m2 31.41 30.10 945.45 31.41 945.45 31.41 945.45 100.00% 0.00
3.03 ACERO DE ø 1/4" PARA SOBRECIMIENTO kg 63.80 4.72 301.14 63.80 301.14 63.80 301.14 100.00% 0.00
3.04 ACERO DE ø 3/8" PARA SOBRECIMIENTO kg 124.88 4.54 566.96 124.88 566.96 124.88 566.96 100.00% 0.00 0.00%
3.05 CONCRETO EN COLUMNAS f'c=175 kg/cm2 m3 3.03 324.59 983.51 2.52 817.97 2.52 817.97 83.17% 0.51 16.83%
3.06 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 23.74 35.76 848.94 19.78 707.33 19.78 707.33 83.32% 3.96 16.68%
3.07 ACERO DE ø 1/2" EN COLUMNAS kg 354.42 4.39 1,555.90 354.42 1,555.90 354.42 1,555.90 100.00% 0.00 0.00%
3.08 ACERO DE ø 1/4" EN COLUMNAS kg 74.40 4.53 337.03 74.40 337.03 74.40 337.03 100.00% 0.00 0.00%
3.09 CONCRETO EN LOSAS MACISAS f'c=175 kg/cm2 m3 40.51 358.62 14,527.70 28.94 10,378.46 28.94 10,378.46 71.44% 11.57 28.56%
3.1 ENCOFRADO Y DESENCOFRADO NIORMAL EN LOSAS MACISAS m2 135.00 55.66 7,514.10 90.00 5,009.40 90.00 5,009.40 66.67% 45.00 33.33%
3.11 ACERO DE ø 1/4" PARA LOSAS MACISAS kg 1,137.50 5.28 6,006.00 812.50 4,290.00 812.50 4,290.00 71.43% 325.00 28.57%
3.12 CONCRETO EN VIGAS f'c=175 kg/cm2 m3 3.05 314.85 960.29 0.00 0.00 0.00 0.00
3.13 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 52.14 36.18 1,886.43 0.00 0.00 0.00 0.00% 52.14 100.00%
3.14 ACERO DE ø 1/4" EN VIGAS kg 66.50 4.53 301.25 0.00 0.00 0.00 0.00% 66.50 100.00%
3.15 ACERO DE ø 3/8" EN VIGAS kg 132.16 4.42 584.15 0.00 0.00 0.00 0.00% 132.16 100.00%
4 ESTRUCTURAS DE MADERA Y COBERTURAS 11,448.18 0.00 0.00 0.00 0.00
4.01 VIGAS DE MADERA DE 4"X4" m 57.32 12.38 709.62 0.00 0.00 0.00 57.32 100.00%
4.02 LISTONES DE MADERA DE 3"X2" m 176.00 14.55 2,560.80 0.00 0.00 0.00 0.00% 176.00 100.00%
4.03 CORREAS DE MADERA DE 2"X1" m 195.96 3.95 774.04 0.00 0.00 0.00 0.00% 195.96 100.00%
4.04 COBERTURA DE TEJA ANDINA m2 129.20 45.23 5,843.72 0.00 0.00 0.00 129.20 100.00%
4.05 CUMBRERA SUPERIOR E INFERIOR TEJA ANDINA und 120.00 13.00 1,560.00 0.00 0.00 0.00 120.00 100.00%
5 MUROS Y TABIQUES 17,468.42 0.00 0.00 0.00 0.00% 0.00
5.01 MUROS DE LADRILLO KK DE ARCILLA DE SOGA C:A 1:5 m2 218.4 40.05 8,746.92 182.00 7,289.10 182.00 7,289.10 83.33% 36.40 16.67%
5.02 MURO DE LADRILLO KK DE ARCILLA DE CABEZA C:A 1:5 m2 157.57 55.35 8,721.50 131.31 7,268.01 131.31 7,268.01 83.33% 26.26 16.67%
6 REVOQUES ENLUCIDOS Y MOLDADURAS 12,491.86 0.00 0.00 0.00 0.00% 0.00
6.01 TARRAJEO INTERIOR C/MORTERO 1:5x1.5cm m2 569.09 17.01 9,680.22 474.24 8,066.82 474.24 8,066.82 83.33% 94.85 16.67%
6.02 TARRAJEO EXTERIOR C/MORTERO 1:5x1.5cm m2 113.97 24.67 2,811.64 0.00 0.00 0.00 113.97 100.00%
7 PINTURA. 922.87 0.00 0.00 0.00 0.00
7.01 PINTURA LATEX EN MUROS EXTERIORES m2 114.50 8.06 922.87 0.00 0.00 0.00 114.50 100.00%
8 OTROS 4,682.36 0.00 0.00 0.00 0.00% 0.00
8.01 TAPAS DE CONCRETO PARA NICHOS und 212 13.37 2,834.44 0.00 0.00 0.00 212.00 100.00%
8.02 NOMBRE DEL MACIZO und 2 140 280.00 0.00 0.00 0.00 2.00 100.00%
8.03 CANALETA DE CALAMINA GALVANIZADA m 30.8 24.18 744.74 0.00 0.00 30.80 100.00%
8.04 BAJANTE DE AGUA DE LLUVIA m 26.4 13.84 365.38 0.00 0.00 26.40 100.00%
8.05 PLANCHA DE TECNOPORT und 28.00 16.35 457.80 24.00 392.40 24.00 392.40 85.71% 4.00 14.29%
COSTO DIRECTO 102,875.68 0.00 57,286.63 57,286.63 0.00
GASTOS GENERALES (10.00 %) 0.10 10,287.57 0.00 5,728.66 5,728.66 0.00
UTILIDAD (8.00%) 0.08 8,230.05 0.00 4,582.93 4,582.93 0.00
SUB TOTAL 121,393.30 0.00 67,598.22 67,598.22 0.00
factor de relacion 1.0000 121,393.30 0.00 67,598.22 67,598.22 0.00
IMPUESTOS (18%) 18.00 21,850.79 0.00 12,167.68 12,167.68 0.00
VALOR TOTAL 143,244.11 0.00 79,765.90 79,765.92 0.00
PORCENTAJE % 100.00% 0.00% 55.7% 55.7% 0.00%

6 de 15
PROYECTO : "CONSTRUCCION DE MACIZO 192 NICHOS ADULTOS 2016-IV, CEMENTERIO GENERAL DE CAJAMARCA" PLAZO DE EJECUCIÓN 52 DIAS

ENTIDAD : SOCIEDAD DE BENEFICIENCIA PUBLICA DE CAJAMARCA VALOR REFERENCIAL : S/. Inc/IGV.


UBICACIÓN : CAJAMARCA-CAJAMARCA-CAJAMARCA MONTO OFERTADO : S/. 0.00 Inc/IGV.
FECHA BASE : ENERO 2020
FACTOR DE RELACIÓN 1.00000

VALORIZACIÓN CONTRACTUAL Nº 02
Del 01 al 31 Julio de 2020

PRESUPUESTO BASE AVANCE


SALDOS
PARTIDA DESCRIPCION UNID METRADO P.U. PARCIAL ANTERIOR ACTUAL ACUMULADO
(S/.) (S/.) METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL % METRADO PARCIAL %

1 MOVIMIENTO DE TIERRAS 4,442.46 0.00 0.00 0.00 0.00


1.01 NIVELACION DE TERRENO m2 180.00 9.13 1,643.40 120.00 1,095.60 60.00 547.80 180.00 1,643.40 100.00% 0.00 0.00%
1.02 EXCAVACION DE ZANJAS HASTA 0.80 m TERRENO NORMAL m3 31.88 30.96 987.00 31.88 987.00 0.00 31.88 987.00 100.00% 0.00 0.00%
1.03 RELLENO Y COMP. MAT.PROPIO EN ZANJAS m3 14.20 15.81 224.50 8.98 141.97 5.22 82.53 14.20 224.50 100.00% 0.00 0.00%
1.04 EXCAVACION PARA CANALETAS m 48.00 1.65 79.20 0.00 48.00 79.20 48.00 79.20 100.00% 0.00 0.00%
1.05 ELIMINACION MATERIAL EXCEDENTE. m3 62.2 24.25 1,508.35 49.39 1,197.71 12.81 310.64 62.20 1,508.35 100.00% 0.00 0.00
2 OBRAS DE CONCRETO SIMPLE 13,494.30 0.00 0.00 0.00 0.00 0.00% 0.00
2.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 31.64 168.52 5,331.97 31.64 5,331.97 0.00 31.64 5,331.97 100.00% 0.00 0.00%
2.02 VEREDA DE CONCRETO DE 4" m2 56.20 92.07 5,174.33 0.00 56.20 5,174.33 56.20 5,174.33 100.00% 0.00 0.00%
2.03 CONCRETO PARA CANALETAS DE f'c=140 kg/cm2 m3 45.66 65.44 2,987.99 0.00 45.66 2,987.99 45.66 2,987.99 100.00% 0.00
3 OBRAS DE CONCRETO ARMADO 37,925.23 0.00 0.00 0.00 0.00 0.00% 0.00
3.01 CONCRETO SOBRECIMIENTOS DE 1:8 CEM-HOR 25% P.M. ANCHO=0.25m m3 3.05 198.82 606.40 3.05 606.40 0.00 3.05 606.40 100.00% 0.00 0.00
3.02 ENCOFRADO Y DESENCOF.SOBRECIMIENTO DE 0.30 A 0.60m m2 31.41 30.10 945.44 31.41 945.44 0.00 31.41 945.44 100.00% 0.00
3.03 ACERO DE ø 1/4" PARA SOBRECIMIENTO kg 63.80 4.72 301.14 63.80 301.14 0.00 63.80 301.14 100.00% 0.00
3.04 ACERO DE ø 3/8" PARA SOBRECIMIENTO kg 124.88 4.54 566.96 124.88 566.96 0.00 124.88 566.96 100.00% 0.00 0.00%
3.05 CONCRETO EN COLUMNAS f'c=175 kg/cm2 m3 3.03 324.59 983.51 2.52 817.97 0.51 165.54 3.03 983.51 100.00% 0.00 0.00%
3.06 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 23.74 35.76 848.94 19.78 707.33 3.96 141.61 23.74 848.94 100.00% 0.00 0.00%
3.07 ACERO DE ø 1/2" EN COLUMNAS kg 354.42 4.39 1,555.90 354.42 1,555.90 0.00 354.42 1,555.90 100.00% 0.00
3.08 ACERO DE ø 1/4" EN COLUMNAS kg 74.40 4.53 337.03 74.40 337.03 0.00 74.40 337.03 100.00% 0.00 0.00%
3.09 CONCRETO EN LOSAS MACISAS f'c=175 kg/cm2 m3 40.51 358.62 14,527.70 28.94 10,378.46 11.57 4,149.23 40.51 14,527.70 100.00% 0.00
3.1 ENCOFRADO Y DESENCOFRADO NIORMAL EN LOSAS MACISAS m2 135.00 55.66 7,514.10 90.00 5,009.40 45.00 2,504.70 135.00 7,514.10 100.00% 0.00 0.00%
3.11 ACERO DE ø 1/4" PARA LOSAS MACISAS kg 1,137.50 5.28 6,006.00 812.50 4,290.00 325.00 1,716.00 1,137.50 6,006.00 100.00% 0.00 0.00%
3.12 CONCRETO EN VIGAS f'c=175 kg/cm2 m3 3.05 314.85 960.29 0.00 3.05 960.29 3.05 960.29 100.00% 0.00
3.13 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 52.14 36.18 1,886.43 0.00 52.14 1,886.43 52.14 1,886.43 100.00% 0.00 0.00%
3.14 ACERO DE ø 1/4" EN VIGAS kg 66.50 4.53 301.25 0.00 66.50 301.25 66.50 301.25 100.00% 0.00 0.00%
3.15 ACERO DE ø 3/8" EN VIGAS kg 132.16 4.42 584.15 0.00 132.16 584.15 132.16 584.15 100.00% 0.00 0.00%
4 ESTRUCTURAS DE MADERA Y COBERTURAS 11,448.18 0.00 0.00 0.00 0.00 0.00% 0.00
4.01 VIGAS DE MADERA DE 4"X4" m 57.32 12.38 709.62 0.00 57.32 709.62 57.32 709.62 100.00% 0.00 0.00%
4.02 LISTONES DE MADERA DE 3"X2" m 176.00 14.55 2,560.80 0.00 176.00 2,560.80 176.00 2,560.80 100.00% 0.00 0.00%
4.03 CORREAS DE MADERA DE 2"X1" m 195.96 3.95 774.04 0.00 195.96 774.04 195.96 774.04 100.00% 0.00 0.00%
4.04 COBERTURA DE TEJA ANDINA m2 129.20 45.23 5,843.72 0.00 129.20 5,843.72 129.20 5,843.72 100.00% 0.00
4.05 CUMBRERA SUPERIOR E INFERIOR TEJA ANDINA und 120.00 13.00 1,560.00 0.00 120.00 1,560.00 120.00 1,560.00 100.00% 0.00
5 MUROS Y TABIQUES 17,468.42 0.00 0.00 0.00 0.00 0.00% 0.00
5.01 MUROS DE LADRILLO KK DE ARCILLA DE SOGA C:A 1:5 m2 218.4 40.05 8,746.92 182.00 7,289.10 36.40 1,457.82 218.40 8,746.92 100.00% 0.00 0.00%
5.02 MURO DE LADRILLO KK DE ARCILLA DE CABEZA C:A 1:5 m2 157.57 55.35 8,721.50 131.31 7,268.01 26.26 1,453.49 157.57 8,721.50 100.00% 0.00 0.00%
6 REVOQUES ENLUCIDOS Y MOLDADURAS 12,491.86 0.00 0.00 0.00 0.00 0.00% 0.00
6.01 TARRAJEO INTERIOR C/MORTERO 1:5x1.5cm m2 569.09 17.01 9,680.22 474.24 8,066.82 94.85 1,613.40 569.09 9,680.22 100.00% 0.00 0.00%
6.02 TARRAJEO EXTERIOR C/MORTERO 1:5x1.5cm m2 113.97 24.67 2,811.64 0.00 113.97 2,811.64 113.97 2,811.64 100.00% 0.00
7 PINTURA. 922.87 0.00 0.00 0.00 0.00 0.00% 0.00
7.01 PINTURA LATEX EN MUROS EXTERIORES m2 114.50 8.06 922.87 0.00 114.50 922.87 114.50 922.87 100.00% 0.00
8 OTROS 4,682.36 0.00 0.00 0.00 0.00 0.00% 0.00
8.01 TAPAS DE CONCRETO PARA NICHOS und 212 13.37 2,834.44 0.00 212.00 2,834.44 212.00 2,834.44 100.00% 0.00 0.00%
8.02 NOMBRE DEL MACIZO und 2 140 280.00 0.00 2.00 280.00 2.00 280.00 100.00% 0.00
8.03 CANALETA DE CALAMINA GALVANIZADA m 30.8 24.18 744.74 0.00 30.80 744.74 30.80 744.74 100.00%
8.04 BAJANTE DE AGUA DE LLUVIA m 26.4 13.84 365.38 0.00 26.40 365.38 26.40 365.38 100.00%
8.05 PLANCHA DE TECNOPORT und 28.00 16.35 457.80 24.00 392.40 4.00 65.40 28.00 457.80 100.00% 0.00 0.00%
COSTO DIRECTO 102,875.67 57,286.62 45,589.05 102,875.67 0.00
GASTOS GENERALES (10.00 %) 0.10 10,287.57 5,728.66 4,558.90 10,287.57 0.00
UTILIDAD (8.00%) 0.08 8,230.05 4,582.93 3,647.12 8,230.05 0.00
SUB TOTAL 121,393.29 67,598.21 53,795.07 121,393.29 0.00
factor de relacion 1.0000 121,393.29 67,598.21 53,795.07 121,393.29 0.00
IMPUESTOS (18%) 18.00 21,850.79 12,167.68 9,683.11 21,850.79 0.00
VALOR TOTAL 143,244.10 79,765.89 63,478.18 143,244.10 0.00
PORCENTAJE % 100.00% 55.7% 44.3% 100.00% 0.00%

7 de 15
PROYECTO : "CONSTRUCCION DE MACIZO 192 NICHOS ADULTOS 2016-IV, CEMENTERIO GENERAL DE CAJAMARCA"

ENTIDAD : SOCIEDAD DE BENEFICIENCIA PUBLICA DE CAJAMARCA


UBICACIÓN : CAJAMARCA-CAJAMARCA-CAJAMARCA

MONTO DEL CONTRATO : Inc/IGV


MONTO DEL CONTRATO : S/. - Sin/IGV

CONTROL DE VALORIZACIONES EJECUTADAS VS. PROGRAMADAS

PROGRAMADO (Sin. IGV) EJECUTADO (Sin. IGV)


%
MES VALORIZACIÓN Nº AVANCE AVANCE PORCENTAJE AVANCE AVANCE PORCENTAJE EJEC./ PROG.
MENSUAL ACUMULADO ACUMULADO MENSUAL ACUMULADO ACUMULADO

Aug-20 01 38,976.71 38,976.71 27.21% 79,765.90 79,765.90 55.69% 204.65%


Sep-20 02 59,947.65 98,924.36 69.06% 63,478.18 143,244.08 100.00% 144.80%
Sep-20 03 44319.72 143,244.08 100.00%

TOTAL 143,244.08 143,244.08


PROYECTO
#REF!

(% )
ENTIDAD : SOCIEDAD DE BENEFICIENCIA PUBLICA DE CAJAMARCA
UBICACIÓN : CAJAMARCA-CAJAMARCA-CAJAMARCA

AV ANCE M E NS UAL ACUM ULADO


GRÁFICO DEL AVANCE FÍSICO PROGRAMADO VS. AVANCE FÍSICO EJECUTADO 100.00%
100%

90%

80%

70%
69.06%
60% 55.69%
50%

40%

30%
27.21%
20%
Column F
Column L

10%

0.00%
0%
1-Jun-20 8-Jun-20 15-Jun-20 22-J un-20 29-Jun-20 6-J ul-20 13-Jul-20 20-Jul-20 27-Jul-20 3-Aug-20 10-Aug-20 17-Aug-20 24-Aug-20 31-Aug-20

MONTOS VALORIZADOS PROGRAMADOS MONTOS VALORIZADOS EJECUTADOS


MONTOS (Sin/ IGV) PORCENTAJES MONTOS (Sin/ IGV) PORCENTAJES
MES PARCIAL ACUMUL. PARCIAL ACUMUL. MES PARCIAL ACUMUL. PARCIAL ACUMUL.
S/. S/. % % S/. S/. % %
1-Jun-20 0.00 0.00% 1-Jun-20 0.00 0.00%
30-Jun-20 38,976.71 38,976.71 27.21% 27.21% 30-Jun-20 79,765.90 79,765.90 55.69% 55.69%
31-Jul-20 59,947.65 98,924.36 41.85% 69.06% 31-Jul-20 63,478.18 143,244.08 44.31% 100.00%
31-Aug-20 44,319.72 143,244.08 30.94% 100.00%
TOTAL 143,244.08 100.00%
TOTAL 143,244.08 100.00%
PROYECTO
#REF!

ENTIDAD : SOCIEDAD DE BENEFICIENCIA PUBLICA DE CAJAMARCA

(S /.)
UBICACIÓN : CAJAMARCA-CAJAMARCA-CAJAMARCA
AV ANCE M E NS UAL ACUM UL ADO

GRÁFICO DEL AVANCE FINANCIERO PROGRAMADO VS. AVANCE FINANCIERO EJECUTADO

150,000 143,244.08 143,244.08

125,000

100,000
98,924.36
79,765.90

75,000

50,000
38,976.71
25,000

0.00
Colum n D

Colum n J
0.00
0
1-Jun-20 8-Jun-20 15-Jun-20 22-Jun-20 29-Jun-20 6-Jul-20 13-Jul-20 20-Jul-20 27-Jul-20 3-Aug-20 10-Aug-20 17-Aug-20 24-Aug-20 31-Aug-20

MONTOS VALORIZADOS PROGRAMADOS MONTOS VALORIZADOS EJECUTADOS


MONTOS (Incl/ IGV) PORCENTAJES MONTOS (Incl./ IGV) PORCENTAJES
MES PARCIAL ACUMUL. PARCIAL ACUMUL. MES PARCIAL ACUMUL. PARCIAL ACUMUL.
S/. S/. % % S/. S/. % %
1-Jun-20 0.00 0.00% 1-Jun-20 0.00 0.00%
30-Jun-20 38,976.71 38,976.71 27.21% 27.21% 1-Jun-20 79,765.90 79,765.90 55.69% 55.69%
31-Jul-20 59,947.65 98,924.36 41.85% 69.06% 31-Jul-20 63,478.18 143,244.08 44.31% 100.00%
31-Aug-20 44,319.72 143,244.08 30.94% 100.00%
TOTAL 143,244.08 100.00%
TOTAL 143,244.08 100.00%
CÁLCULO DEL FACTOR DE REAJUSTE " K "
FÓRMULA POLINÓMICA Nº 001

K= 0.269*(Mr / Mo) + 0.122*(ATr / ATo) + 0.096*(AHr / AHo) + 0.230*(CMr / CMo) + 0.077*(Mr / Mo) + 0.206*(Ir / Io)

(*) Fórmula de Expediente Inicial

JUNIO 2020 JULIO 2020 AGOSTO 2020


COEF. IU FEBRERO
I.U. DESCRIPCION FACTOR IU Kr IU Kr IU Kr
INCIDENCIA 2020
47 MANO DE OBRA INC. LEYES SOCIALES 0.269 100.00% 619.99 619.99 0.269 619.99 0.269 619.99 0.269
5 AGREGADO GRUESO 0.122 90.98% 450.61 452.66 0.112 455.04 0.112 453.73 0.112
66 TUBERIA ASBESTO-CEMENTO 0.122 9.02% 727.87 739.85 0.011 746.51 0.011 753.18 0.011
37 HERRAMIENTA MANUAL 0.096 25.00% 311.84 310.98 0.024 310.70 0.024 311.30 0.024
3 ACERO DE CONSTRUCCION CORRUGADO 0.966 75.00% 542.74 554.21 0.74 561.72 0.75 571.93 0.763
43 MADERA NACIONAL PARA ENCOF. Y CARPINT. 0.230 41.74% 752.10 747.02 0.095 762.56 0.097 766.64 0.098
21 CEMENTO PORTLAND TIPO I 0.230 58.26% 471.42 471.42 0.134 471.42 0.134 458.63 0.13
48 MAQUINARIA Y EQUIPO NACIONAL 0.077 100.00% 374.73 378.13 0.078 380.15 0.078 382.27 0.079
39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.206 100.00% 461.49 464.67 0.207 466.82 0.208 466.30 0.208
Kr = 1.670 Kr = 1.683 Kr = 1.694
PROYECTO #REF!
ENTIDAD : SOCIEDAD DE BENEFICIENCIA PUBLICA DE CAJAMARCA
UBICACIÓN : CAJAMARCA-CAJAMARCA-CAJAMARCA

MONTO CONTRATADO : S/. Inc/IGV


MONTO CONTRATADO : S/. 0.01 Sin/IGV

CÁLCULO DEL REAJUSTE FORMULA POLINOMICA 01

VAL. PROGRAMADO EJECUTADO REAJUSTES


MES Nº % % K-1 PROGRAMADO EJECUTADO RECONOCIDO
MES ACUMUL, MES ACUMUL.
ACUMUL. ACUMUL. MES ACUMUL. MES ACUMUL. MES ACUMUL.

Jun-20 01 38,976.71 38,976.71 27.21% 79,765.90 79,765.90 55.69% 0.670 26,114.40 26,114.40 53,443.15 53,443.15 53,443.15 53,443.15
Jul-20 02 59,947.65 98,924.36 69.06% 63,478.18 143,244.08 100.00% 0.683 40,944.24 67,058.64 43,355.60 96,798.75 43,355.60 43,355.60
Aug-20 03 44,319.72 143,244.08 100.00% 0.694 30,757.89 97,816.53
143,244.08 143,244.08 97,816.53 96,798.75

RESUMEN :
Reajuste Total Reconocido 96,798.75
Reajuste Reconocido en la Valorización Nº 01 53,443.15
Reajuste Reconocido en la Valorización Nº 02 43,355.60
ENTIDAD: PROYECTO ESPECIAL OLMOS TINAJONES
SUPERVISION: VCHI S.A. INGENIEROS CONSULTORES

AMORTIZACION DEL ADELANTO DE MATERIALES


(POR FORMULA E INDICE UNIFICADO)

Fórmula : Amortización = Material utilizado * P.U. * Ima/Imo


Amortización = Material utilizado * P.U.

Adelanto Otorgado: S/. 150,847.46 Sin IGV Material: Cemento Portland Tipo I

ADELANTO DESCRIPCION DELMATERIAL F.P. N°02 PROVEEDOR


Cemento Tipo I Portland
ADELANTO OTORGADO MATERIAL PRECIO MONTO SALDO POR
Ima Imo AMORTIZACION ADELANTO AMORTIZ.
FECHA MONTO MONTO VAL. N° MES UTILIZADO UNIT. CONTRATADO AMORTIZAR
OTORG. DEFLATADO (*) AMORTIZABLE
DE P.B. (1) (2) (3)=(1)*(2) (4) (5) (6)=(3)*(4)/(5) (7) (8) (9)=(7)-(8)
11/28/2000 150,847.46 150,847.46 02 Dic. 3,096.16 14.83 45,916.02 350.55 350.55 45,916.02 150,847.46 45,916.02 104,931.44
Acumul. 45,916.02 104,931.44
03 Ene. 6,320.94 14.83 93,739.53 350.55 350.55 93,739.53 104,931.44 104,931.44
Acumul. 0.00

NOTA: A solicitud del Contratista se está amortizando el 100% del adelanto de materiales para el cemento.

CALCULO DE MATERIAL UTILIZADO

VALORIZACION Nº01 y Nº02 VALORIZACION Nº03


CEMENTO CEMENTO CEMENTO CEMENTO
PARTIDA DESCRIPCION UNID MET. METRADO
bls. total bls. total
4.1.01 C.C. F'c = 140 Kg/cm2 + 30% P.M. m3 76.60 4.20 321.72 28.26 4.20 118.69
4.1.02 C.S. F'c = 100 Kg/cm2 m 3
51.08 5.50 280.94 0.00 5.50 0.00
4.1.08 C.S. F'c = 175 Kg/cm2, e = 7.5cm. m2 92.72 0.60 55.63 6541.40 0.60 3924.84
4.1.09 C.S. F'c = 175 Kg/cm2, e = 10cm. m2 0.00 0.00 0.00 128.00 0.80 102.40
4.1.12 C.C. F'c = 175 Kg/cm2 + 30% P.M. m3 126.60 5.46 691.24 385.04 5.46 2102.32
4.1.13 C.Ref. F'c = 210 Kg/cm2 m3 194.07 9.00 1746.63 2.53 9.00 22.77
4.4.03 Mampostería de Piedra labrada m3 0.00 0.00 0.00 21.61 2.31 49.92
TOTAL 3096.16 6320.94
ENTIDAD: PROYECTO ESPECIAL OLMOS TINAJONES
SUPERVISION: VCHI S.A. INGENIEROS CONSULTORES

AMORTIZACION DEL ADELANTO DE MATERIALES


(POR FORMULA E INDICE UNIFICADO)

Fórmula : Amortización = Material utilizado * P.U. * Ima/Imo


Amortización = Material utilizado * P.U.

Adelanto Otorgado: S/. 30,008.63 Sin IGV Material: Acero Corrugado

ADELANTO DESCRIPCION DEL MATERIAL F.P. N°01 PROVEEDOR


Acero Corrugado f'y = 4200 Kg/cm2
ADELANTO OTORGADO MATERIAL PRECIO MONTO SALDO POR
AMORTIZACION ADELANTO AMORTIZACION
UNIT.
MONTO MONTO UTILIZADO CONTRATADO Ima Imo AMORTIZAR
VAL. N° MES
FECHA OTORG. DEFLATADO (*) AMORTIZABLE
DE P.B. (1) (2) (3)=(1)*(2) (4) (5) (6)=(3)*(4)/(5) (7) (8) (9)=(7)-(8)
11/8/2000 30,008.63 30,008.63 02 Dic. 9,670.50 1.30 12,571.65 229.97 229.97 12,571.65 30,008.63 12,571.65 17,436.98
Acumul. 17,436.98
03 Ene. 598.50 1.30 778.05 229.97 229.97 778.05 778.05 16,658.93
Acumul. 16,658.93
04 Feb . 17,335.50 1.30 22,536.15 229.97 229.97 16,658.93 16,658.93 0.00
Acumul. 0.00

CALCULO DE MATERIAL UTILIZADO

VALORIZACION Nº01 y Nº02 VALORIZACION Nº03 VALORIZACION Nº04


PARTIDA DESCRIPCION UND MET. FIERRO FIERRO MET. FIERRO FIERRO MET. FIERRO FIERRO
Kg. total Kg. total Kg. total
4.3.01 Acero de refuerzo f'y=4200 Kg/cm2 Tn. 9.21 1050.00 9670.50 0.57 1050.00 598.50 16.51 1050.00 17,335.50

TOTAL 9670.50 598.50 17,335.50


ENTIDAD: PROYECTO ESPECIAL OLMOS-TINAJONES
SUPERVISION: VCHI S.A. INGENIEROS CONSULTORES

DEDUCCION POR REAJUSTE QUE NO CORRESPONDE POR ADELANTO DE MATERIALES


VALORIZACION CONTRACTUAL Nº04
Del 21 de Enero al 15 de Febrero de 2001.

LICITACION PUBLICA : Nº 01-2000-INADE-8200


PROYECTO : REHABILITACION DE LA PRESA TINAJONES Y REHABILITACION Y CONSTRUCCION DEL CANAL MAGDALENA
ENTIDAD : MINISTERIO DE LA PRESIDENCIA - INADE - PROYECTO ESPECIAL OLMOS TINAJONES - DEPOLTI.
UBICACIÓN : CHICLAYO - LAMBAYEQUE
CONTRATISTA : CONSORCIO CEBASA-INGEDISA-PROYEC S.A.
SUPERVISION : VCHI S.A. INGENIEROS CONSULTORES
FECHA : 20-02-2001.

Fórmula : Deducción = A*(Imo/Ima)*((Imr-Ima)/Imo)

Adelanto Otorgado: S/. 150,847.46 Sin IGV Material: Cemento Portland Tipo I
ADELANTO Nº 01 DESCRIPCION DEL MATERIAL : CEMENTO TIPO I PORTLAND F.P. N°02
MES ADELANTO OTORGADO COEF. INCIDENC ADELANTO SALD.ADEL. DEDUCCION DEDUCC. ACUM.
VAL. PERIODO DE MES MONTO MONTO Vº UTILIZ.( A) Imr Ima Imo POR UTILIZ. MENSUAL MENSUAL
Nº REGULARIZ. OTORG. (1) DEFRACTADO (2) (3) (4) (5)=(2)*(3)*(4) (6) (7) (8) (10)=(1)-(5) (11)=(5)*(8)/(7)*(((6)-(7))/(8))
OCT'00 350.55 350.55 350.55 93,208.44 0.00 0.00
1 19-OCT AL 20-NOV 339,089.97 0.299 0.5685 57,639.02
NOV'00 350.55 350.55 350.55 0.00 0.00
NOV'00 350.55 350.55 350.55 #REF! #REF! #REF!
2 21-NOV AL 20-DIC OCT./00 150,847.46 150,847.46 #REF! 0.299 0.5685 #REF!
DIC'00 350.55 350.55 350.55 #REF! #REF!
DIC'00 350.55 350.55 350.55 #REF! #REF! #REF!
3 21-DIC AL 20-ENE #REF! 0.299 0.5685 #REF!
ENE'01 350.55 350.55 350.55 #REF! #REF!
ENE'01 350.55 350.55 350.55 #REF! #REF! #REF!
4 21-ENE AL 20-FEB #REF! 0.299 0.5685 #REF!
FEB'01 350.55 350.55 350.55 #REF! #REF!

Adelanto Otorgado: S/. 30,008.63 Sin IGV Material: Acero Corrugado


ADELANTO Nº 01 DESCRIPCION DEL MATERIAL : ACERO CORRUGADO F.P. N°02
MES ADELANTO OTORGADO COEF. INCIDENC ADELANTO SALD.ADEL. DEDUCCION DEDUCC. ACUM.
VAL. PERIODO DE MES MONTO MONTO Vº UTILIZ.( A) Imr Ima Imo POR UTILIZ. MENSUAL MENSUAL
Nº REGULARIZ. OTORG. (1) DEFRACTADO (2) (3) (4) (5)=(2)*(3)*(4) (6) (7) (8) (10)=(1)-(5) (11)=(5)*(8)/(7)*(((6)-(7))/(8))

1 19-OCT AL 20-NOV NOV'00 339,089.97 0.299 0.0870 8,820.75 232.87 232.87 223.87 20,028.10 0.00 0.00

NOV'00 232.87 232.87 223.87 #REF! #REF!


2 21-NOV AL 20-DIC OCT./00 30,008.63 28,848.85 #REF! 0.299 0.0870 #REF! #REF!
DIC'00 232.28 232.87 223.87 #REF! 0.00
DIC'00 232.28 232.87 223.87 #REF! 0.00
3 21-DIC AL 20-ENE #REF! 0.299 0.0870 #REF! #REF!
ENE'01 #REF! 232.87 223.87 #REF! #REF!
ENE'01 #REF! 232.87 223.87 #REF! 0.00
4 21-ENE AL 20-FEB #REF! 0.299 0.0870 #REF! #REF!
FEB'01 232.87 223.87 0.00

#REF!