Documentos de Académico
Documentos de Profesional
Documentos de Cultura
La columna parcial es el producto del precio por la cantidad requerida; y en la última columna se muestra el Monto Real que se está utilizando
Página :
TOTAL
1,577.08
7,880.48
116,728.89
57.31
1,653.74
343.99
67.03
467.00
111,101.68
3,220.34
33,850.00
24,518.64
40,805.41
26,178.60
74,079.07
43,775.55
2,063.74
3,790.49
30,030.59
16,038.31
1,125.56
19.64
853.56
208.16
5,965.52
39.95
405,182.73
4,093.00
84.80
372.88
21,963.67
518.51
1,211.75
5,397.78
5,491.41
46,087.94
111.60
16,299.58
247.78
1,136.94
1,860.82
659.00
1,073.57
272.00
26.37
713.52
10.60
54.38
64.26
12,287.69
12,899.80
498.98
1,640.62
2,547.50
1,213.27
300.00
300.00
180.00
150.00
300.00
3,559.20
3,050.82
63.60
2.50
50.85
75.00
50.85
75.00
22.50
550.00
285.00
1.69
373.95
256.50
5,076.00
675.00
720.00
12.00
360.00
574.65
2,520.00
60.00
442.80
1,016.88
231.42
260.00
60.00
36.00
180.00
42.38
42.38
63.55
90.00
495.00
339.00
457.60
50.76
29.58
327.90
90.00
1,040.00
945.00
1,603.80
1,540.24
1,016.94
1,335.25
889.00
17.80
264.30
25.00
43.36
339.00
450.00
177.96
169.50
169.49
302.40
19,953.59
436.35
253.40
1,356.00
271.20
152.60
423.80
457.80
915.24
1,000.00
1,000.00
84.75
4,800.00
148.80
963.06
64.80
14,651.82
245.69
189.00
22.40
191.00
50.84
25.42
25,412.01
1,705.42
13,219.20
1,238,396.24
682.16
227.38
568.47
1,364.33
17,531.73
5,482.03
1,641.60
710.51
80,450.00
324,217.63
57,942.48
3,094.11
7,707.91
77,015.52
310,311.68
5,000.00
7,826.77
14,948.11
4,271.60
461.76
2,482.98
133.82
5,558.53
929,631.11
2,752,545.42
"REHABILITACION DEL SISTEMA DE RIEGO, BOCATOMA LA BOCANA DEL SECTOR PARQUE INDUSTRIAL, DISTRITO DE MOCHE,
PROVINCIA DE TRUJILLO, REGIÓN LA LIBERTAD"
FLETE TERRESTRE
A. POR PESO
MATERIALES UNIDAD CANTIDAD PESO UNITARIO PESO TOTAL
ALAMBRE NEGRO RECOCIDO N° 8 kg 463.84 1.00 463.84
ALAMBRE NEGRO RECOCIDO N° 16 kg 2,298.56 1.00 2,298.56
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 34,332.03 1.00 34,332.03
ACERO LISO Ø 1" m 5.71 1.00 5.71
CLAVOS PARA MADERA C/C 3" kg 486.35 1.00 486.35
CLAVOS CABEZA PROMEDIO kg 114.54 1.00 114.54
PLATINA DE ACERO DE 4"X4"X1/4" und 0.78 23.00 17.94
PLANCHA METALICA e=1/4" pln 1.44 12.00 17.28
AGUA m3 473.32 1.50 709.98
TECNOPOR DE 1"X4X8' pln 120.72 1.50 181.08
WATER STOP PVC DE 6" m 8.40 4.00 33.60
WATER STOP PVC DE 9" m 219.40 4.00 877.60
CEMENTO PORTLAND TIPO I (42.5 kg) bol 2.05 42.50 87.13
CEMENTO PORTLAND TIPO MS (42.5 kg) bol 18,749.83 42.50 796,867.78
CAL bol 378.60 8.00 3,028.80
PERNOS 5/8"x10" CON TUERCA und 8.00 1.00 8.00
ADITIVO ACELERANTE FRAGUA gal 583.97 4.00 2,335.88
IMPRIMANTE PARA SELLADO gal 4.14 4.00 16.56
MADERA NACIONAL P/ENCOFRADO-CARP p2 1,079.55 1.50 1,619.33
MADERA TORNILLO p2 915.24 1.50 1,372.86
MADERA TORNILLO INC. CORTE P/ENCOFRADO p2 7,681.32 1.50 11,521.98
TRIPLAY DE 4'x8'x6 mm pln 3.00 9.00 27.00
TRIPLAY DE 4' x 8' x18 mm pln 196.29 9.00 1,766.61
PESO TOTAL 856,423.8
B. POR VOLUMEN
UNIDAD (2.20 M. x 3.00 M.) DE CARROCERIA, CON H=1.50 M.
MATERIALES UNIDAD CANTIDAD Nº Tubos Nº Viajes N° tub / Viaje
TUBERIA DE FIERRO GALVANIZADO D=1 1/2" und 387.15 64.525 0.03 2,320.00
TUBERIA PVC-SAP Ø 2" m 210 42 0.03 1,320.00
Accesorios Varios gbl 0.96
TOTAL EN VIAJES 1.02
C. DATOS DE TRANSPORTE
CAPACIDAD DE CAMION 20 TONELADAS =
FLETE POR KG. S/. 0.05
FLETE POR VOLUMEN(POR VIAJE) S/. 1,100.00
RESULTADOS
A .-POR PESO CANTIDAD (KG) COSTO x KG SUB TOTAL
MATERIALES E INSUMOS 856,423.82 0.050 42,821.19
SUB TOTAL S/. 42,821.19