PRE DIMENSIONAMIENTO DE
ELEMENTOS ESTRUCTURALES
2020
L1 =6 m
L2=7 m
L3=6m
L4=7m
PREDIMENSIONAMIENTO DE VIGAS
Vigas Principales
(Peralte H)
H = L/12 = 6.70/12 = 0.558 m = 0.60 m
B= h/2 = 0.558/2 = 0.279 = 0.30 m
Vigas Secundarias
(Peralte H)
H = 4.70/12 = 0.57 = 0.391m = 0.40 m
B = H/2 = 0.391/2 = 0.195 = 0.25 m
PREDIMENSIONAMIENTO DE COLUMNA
𝑃 𝑆𝐸𝑅𝑉𝐼𝐶𝐼𝑂
A col = 0.35 𝑋 𝐹¨𝐶
Dónde: P servicio = P x Atrib x N° pisos
Columna excéntrica
87500 𝑘𝑔
A col = P servicio = 1000kg/m2x7x2.5m2x5
0.35 𝑥 210 𝑘𝑔/𝑐𝑚2
A=L2
L = √1190.47𝑐𝑚2
L = 34.50 cm = 35 cm
Columna esquinada
37500 𝑘𝑔
A col = P servicio = 1000kg/m2x3x2.5m2x5
0.35 𝑥 210 𝑘𝑔/𝑐𝑚2
A=L2
L = √510.25 𝑐𝑚2
L = 22.58 cm = 30cm
Columna centrada
175000 𝑘𝑔
A col = P servicio = 1500kg/m2 x 7x5m2 x 5
0.45𝑥 210 𝑘𝑔/𝑐𝑚2
Asumir:
L
L
A=L2
L = √1851.85 𝑐𝑚2
L = 43.03 cm = 45 cm
-3 -3 no cumple
2 0.35x0.35 1.251x10 5.4x10
Asumir:
L
A=L2
L = √87500 𝑐𝑚2
L = 295.80 cm = 300 cm
Zapata Excéntrica
87500 kg
A ZAP = = 43750 cm2
0.8𝑥2.5 𝑘𝑔/𝑐𝑚2
Asumir:
L
A=L2
L = √43750𝑐𝑚2
L = 209.19cm =290 cm
Zapata Esquinada
37500 kg
A ZAP = = 18750cm2
0.8𝑥2.5 𝑘𝑔/𝑐𝑚2
Asumir:
L
2
A=L
L = √18750 𝑐𝑚2
L =136.93 cm =140 cm