Está en la página 1de 2

LINE EXISTENTE DE DESAGUE CSN

CALLE LONGITUD PARCIAL LONGITUD ACUMULADA


SUCRE 100.31 100.31
97.88 198.19
TARAPACA 66.7 264.89
111.18 376.07
67.48 443.55
64.17 507.72
91.85 599.57
97.56 697.13
MIRAFLORES 24.38 721.51
68.67 790.18
69.28 859.46
64.03 923.49
75.35 998.84
74.52 1073.36
82.54 1155.9
78.54 1234.44
65.65 1300.09
64.14 1364.23
JIRON TARAPACA 84.66 1448.89
BOLOGNESI 82.22 1531.11
68.57 1599.68
65.82 1665.5
43.75 1709.25
MIGUEL GRAU 83.05 1792.3
88.35 1880.65
73.43 1954.08
08 DE OCTUBRE 66.74 2020.82
67.03 2087.85
S/N 68.16 2156.01
67.98 2223.99
25 DE NOVIEMBRE 79.59 2303.58
125.67 2429.25
52.99 2482.24
24.3 2506.54
TOTAL TUBERIA CSN 2506.54
LINE EXISTENTE DE DESAGUE PVC
CALLE LONGITUD PARCIAL LONGITUD ACUMULADA
MIRAFLORES 9.13 9.13
40.15 49.28
48.65 97.93
52.29 150.22
LEONCIO PRADO 76.25 226.47
48.8 275.27
34.4 309.67
57.57 367.24
80 447.24
TOTAL TUBERIA PVC 447.24

También podría gustarte