OBRA:AMPLIACIÓN DE ALMACÉN
CONTRATISTA: MARCO CASAS CONTRATISTAS GRLS.
PROPIETARIO: SENCICO
ANTERIOR
ITEM DESCRIPCIÓN UND. CANT. P.UNIT PARCIAL CANT. IMP.
1.00 CONCRETO ARMADO
1.01 COLUMNA
1.01.01 CONCRETO F'C=175 KG/CM2. M3. 12.00 333.94 4,007.28
1.01.02 ENCOF.-DESENCOF. M2. 60.00 42.00 2,520.00
1.01.03 ACERO KG. 800.00 4.94 3,952.00
1.02 VIGA
1.02.01 CONCRETO F'C=175 KG/CM2. M3. 8.00 305.15 2,441.20
1.02.02 ENCOF.-DESENCOF. M2. 40.00 46.53 1,861.20
1.02.03 ACERO KG. 500.00 4.94 2,470.00
1.03 LOSA ALIGERADA
1.03.01 CONCRETO F'C=175 KG/CM2. M3. 9.00 279.22 2,512.98
1.03.02 ENCOF.-DESENCOF. M2. 120.00 33.07 3,968.40
1.03.03 ACERO KG. 700.00 4.94 3,458.00
1.03.04 LADRILLOS 0.15X0.30X0.30 UND. 1020.00 2.67 2,723.40
2.00 MURO
2.01 LAD. KK. 18 HCO. SOGA M2. 30.00 48.84 1,465.20
2.02 LAD. KK. 18 HCO. CABEZA M2. 48.00 76.09 3,652.32
COSTO DIRECTO 35,031.98
GG (15%) 5,254.80
U ( 10%) 3,503.20
SUBTOTAL 43,789.98
% AVANCE 100.00
OBRA: AMPLIACION
CONTRATISTA: P.B= 43,789.98
ESPECIALIDAD: ESTRUCTURAS FECHA= Mar-18
AREA GEOGRAFICA: 02
ENERO
MONo. DESCRIPCION SIMBOLO I.U C.I % Io Ir
1 CEMENTO P.T 1 21 72.93
PIEDRA CHANCADA CPM 5 0.133 17.29
MAQUINARIA NACIONAL 48 9.78
OBRA:
SUPERVISOR:
CONTRATISTA:
PRESUPUESTO BASE:
PRESUPUESTO CONTRATADO:
D = DEDUCCION Ka=
VRC = V x K - A x V / C (K / Ka - 1)
AVANCE DE OBRA
Nº FECHA APA ARA ESTADO
1 MAYO
2 JUN.
R= V( K-1)
REINTEGROS
Nº FECHA Vpro Vre K-1 Rprog Rreal Rrecon.
N° 1 2 3
FECHA
APA
ARA
MIN. VAL. 80% APA
CUADRO RESUMEN DE VALORIZACION N° 02
DEL 01 AL 30 DE JULIO DEL….
TOTAL CONTRACTUAL
Avances en porcentaje
DEDUCCIONES (D)
POR ADELANTO EN EFECTIVO
POR ADELANTO PARA MATERIALES
TOTAL DEDUCCIONES
AMORTIZACIONES (A)
AMORTIZACION DEL ADELANTO EN EFECTIVO
AMORTIZACION DEL ADELANTO PARA MATERIALES
RETENCIONES ( C )
FONDOS DE GARANTIA (5% X VB)
GASTOS DE LICITACION
MULTA POR ATRASO DE OBRA
TOTAL
- 0.00
0.00
0.00
0.00
0.00
0.00
S/. 0.00