Está en la página 1de 3

CRONOGRAMA VALORIZADO

PLAN DE REHABILITACION POR EMERGENCIA DE LOS RIOS CAPLINA Y UCHUSUMA DE LA PROVINCIA DE TACNA-TACNA

ITEM DESCRIPCION UND CANTIDAD PRECIO PARCIAL SEMANA 01 SEMANA 02 SEMANA 03 SEMANA 04 SEMANA 05 TOTAL

01 OBRAS PROVISIONALES
01.01 CARTEL DE IDENTIFICACION DE LA ACTIVIDAD DE 2.4x3.6M. CON GIGANTOGRAFIA und 2.00 607.04 1,214.08 S/. 1,214.08 S/. 1,214.08
01.02 CASETA DE SEGURIDAD, ALMACEN, COMEDOR, VESTUARIO, OFICINA TECNICA m2 92.00 88.90 8,178.80 S/. 8,178.80 S/. 8,178.80
02 SEGURIDAD Y SALUD EN EL TRABAJO

02.01 ELABORACION, IMPLEMENTACION Y ADMINISTRACION DE PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO glb 1.00 1,525.42 1,525.42 S/. 1,525.42 S/. 1,525.42

02.02 CAPACITACION EN SEGURIDAD Y SALUD glb 1.00 2,118.64 2,118.64 S/. 476.69 S/. 476.69 S/. 476.69 S/. 476.69 S/. 211.86 S/. 2,118.64
03 MITIGACIÓN DE IMPACTO AMBIENTAL
03.01 RIEGO PREVENTIVO PARA CONTROL DE POLVO vje 30.00 101.69 3,050.70 S/. 610.14 S/. 610.14 S/. 610.14 S/. 610.14 S/. 610.14 S/. 3,050.70
04 TRAMO UCHUSUMA
04.01 INSTALACIONES PROVISIONALES
04.01.01 ENERGIA ELECTRICA PROVISIONAL glb 1.00 847.46 847.46 S/. 847.46 S/. 847.46
04.01.02 BAÑO PORTATIL mes 1.00 508.48 508.48 508.48 S/. 508.48
04.02 MOVILIZACION Y DESMOVILIZACION
04.02.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS glb 1.00 1,830.51 1,830.51 S/. 915.26 915.26 S/. 1,830.51
04.02.02 TRASLADO DE PERSONAL OBRERO día 20.00 345.75 6,915.00 S/. 2,305.00 S/. 2,305.00 S/. 2,305.00 S/. 6,915.00
04.03 TRAZO, NIVELES Y REPLANTEO
04.03.01 TRAZO, NIVELES Y REPLANTEO km 0.99 1,305.63 1,292.57 S/. 430.86 S/. 430.86 S/. 430.86 S/. 1,292.57
04.04 SEGURIDAD Y SALUD EN LA ACTIVIDAD
04.04.01 EQUIPOS DE DE PROTECCION INDIVIDUAL und 16.00 335.15 5,362.40 5,362.40 S/. 5,362.40

04.04.02 EQUIPOS DE DE PROTECCION COLECTIVA glb 1.00 1,436.63 1,436.63 S/. 1,436.63 S/. 1,436.63

04.04.03 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.00 218.92 218.92 S/. 218.92 S/. 218.92
04.04.04 RECURSO PARA RESPUESTAS ANTE EMERGENCIAS glb 1.00 1,000.02 1,000.02 S/. 1,000.02 S/. 1,000.02
04.05 MOVIMIENTO DE TIERRAS
04.05.01 ENCAUZAMIENTO Y DESCOLMATACION DE RIO m3 21,800.00 2.40 52,320.00 S/. 17,440.00 S/. 17,440.00 S/. 17,440.00 S/. 52,320.00
05 TRAMO CAPLINA
05.01 INSTALACIONES PROVISIONALES
05.01.01 ENERGIA ELECTRICA PROVISIONAL glb 1.00 847.46 847.46 847.46 S/. 847.46
05.01.02 BAÑO PORTATIL mes 1.00 508.48 508.48 508.48 S/. 508.48
05.02 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA Y EQUIPOS
05.02.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS glb 1.00 6,101.69 6,101.69 S/. 3,050.85 S/. 3,050.85 S/. 6,101.69
05.02.02 TRASLADO DE PERSONAL OBRERO día 30.00 345.75 10,372.50 S/. 2,074.50 S/. 2,074.50 S/. 2,074.50 S/. 2,074.50 S/. 2,074.50 S/. 10,372.50
05.03 TRAZO, NIVELES Y REPLANTEO
05.03.01 TRAZO, NIVELES Y REPLANTEO km 7.15 1,305.63 9,335.25 S/. 1,867.05 S/. 1,867.05 S/. 1,867.05 S/. 1,867.05 S/. 1,867.05 S/. 9,335.25
05.04 SEGURIDAD Y SALUD EN LA ACTIVIDAD
05.04.01 EQUIPOS DE DE PROTECCION INDIVIDUAL und 24.00 335.15 8,043.60 S/. 8,043.60 S/. 8,043.60
05.04.02 EQUIPOS DE DE PROTECCION COLECTIVA glb 1.00 1,436.63 1,436.63 S/. 1,436.63 S/. 1,436.63
05.04.03 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.00 218.92 218.92 S/. 218.92 S/. 218.92
05.04.04 RECURSO PARA RESPUESTAS ANTE EMERGENCIAS glb 1.00 1,000.02 1,000.02 S/. 1,000.02 S/. 1,000.02
05.05 MOVIMIENTO DE TIERRAS
05.05.01 ENCAUZAMIENTO Y DESCOLMATACION DE RIO m3 140,000.00 2.40 336,000.00 S/. 16,800.00 S/. 84,000.00 S/. 84,000.00 S/. 84,000.00 S/. 67,200.00 S/. 336,000.00

COSTO DIRECTO 461,684.19 78,317.66 109,204.24 109,204.24 89,028.38 75,929.65


GASTOS GENERALES (12%) 55,402.10 9,398.12 13,104.51 13,104.51 10,683.41 9,111.56
UTILIDAD (7%) 32,317.89 5,482.24 7,644.30 7,644.30 6,231.99 5,315.08
SUB TOTAL 549,404.18 93,198.02 129,953.05 129,953.05 105,943.78 90,356.29
IGV (18%) 98,892.75 16,775.64 23,391.55 23,391.55 19,069.88 16,264.13
PRESUPUESTO TOTAL 648,296.93 109,973.65 153,344.59 153,344.59 125,013.65 106,620.41
PORCENTAJE (%) 100.00 16.96% 23.65% 23.65% 19.28% 16.45%
RESUMEN CRONOGRAMA VALORIZADO
: PLAN DE REHABILITACION POR EMERGENCIA DE LOS RIOS CAPLINA Y UCHUSUMA DE LA PROVINC
PROYECTO
TACNA-TACNA

DESCRIPCION PRESUPUESTO SEMANA 01 SEMANA 02 SEMANA 03


COSTO DIRECTO 461,684.18 Err:509 Err:509 Err:509
GASTOS GENERALES (12%) 55,402.10 Err:509 Err:509 Err:509
UTILIDAD (7%) 32,317.89 Err:509 Err:509 Err:509
SUB TOTAL 549,404.17 Err:509 Err:509 Err:509
IGV (18%) 98,892.75 Err:509 Err:509 Err:509
PRESUPUESTO TOTAL 648,296.92 Err:509 Err:509 Err:509
PROGRAMADO Err:509 Err:509 Err:509
ACUMULADO Err:509 Err:509 Err:509
PORCENTAJE PARCIAL Err:509 Err:509 Err:509
PORCENTAJE ACUMULADO Err:509 Err:509 Err:509
DO
Y UCHUSUMA DE LA PROVINCIA DE

SEMANA 04 SEMANA 05
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509

También podría gustarte