PROGRAMACION EXCAVACION FRENTE 21-MAY AL 20-JUN

NIVEL LABORES Contrato Item Cobro Desde (Pk) Hasta (Pk)


Rampa Acceso NTI OP O.P.1.2 0.00 2.60
NTI
Total (ml)
Rampa Acceso FW a NP OP O.P.1.10 0.00 6.20
NP
Total (ml)
Conexión Fronton Lavada OP O.P.1.4 0.00 8.10
IIFF
Total (ml)
XC-SLOT-FW CD1 2.2 0.00 9.80
NH XC-SLOT-HW CD1 2.2 0.00 5.40
Total (ml)
Total (m)
Y AL 20-JUN
Total (m) Total (meq) Pend.% Sección
2.60 2.60 -2.000 6.2 x 6.1
2.60
6.20 6.23 -10.000 5.2 x 5.1
6.20
8.10 8.10 -1.605 5.2 x 5.1
8.10
9.80 9.81 3.529 5.2 x 5.1
5.40 5.40 -0.500 5.2 x 5.1
15.20
32.10 32.14
PROGRAMACION EXCAVACION FRENTE 21-JUN AL 20-JUL
NIVEL LABORES Contrato Item Cobro Desde (Pk) Hasta (Pk)
Rampa Acceso NTI OP O.P.1.2 2.60 19.15
NTI
Total (ml)
Rampa Acceso FW a NP OP O.P.1.10 6.20 29.70
NP
Total (ml)
Conexión Fronton Lavada OP O.P.1.4 8.10 21.20
IIFF
Total (ml)
XC-SLOT-FW CD1 2.2 9.80 23.90
NH XC-SLOT-HW CD1 2.2 5.40 18.80
Total (ml)
Total (m)
AL 20-JUL
Total (m) Total (meq) Pend.% Sección
16.55 16.55 -2.000 6.2 x 6.1
16.55
23.50 23.62 -10.000 5.2 x 5.1
23.50
13.10 13.10 -1.605 5.2 x 5.1
13.10
14.10 14.11 3.529 5.2 x 5.1
13.40 13.40 -0.500 5.2 x 5.1
27.50
80.65 80.78
PROGRAMACION EXCAVACION FRENTE 21-JUL AL 20-AGO
NIVEL LABORES Contrato Item Cobro Plano Ref.
Rampa Acceso a NTI OP O.P.1.2 IM8-65518-0
NTI SWG SEU OP O.P.1.3 IM8-65504-1
Total (ml)
Rampa Acceso NP * NTI OP O.P.1.2 IM8-63697-3
Rampa Acceso FW a NP OP O.P.1.10 IM8-63693-6
NP
Fronton Refugio NP CD1 5.13 ME
Total (ml)
Fronton Taller Mantencion OP O.P.1.4 IM8-65533-3
Fronton Taller Sur CD1 S/I No Existe
IIFF
Fr. Conexión HW CD1 S/I No Existe
Total (ml)
XC-SLOT-FW CD1 2.2 IM8-65509-1
FS-19 ex FS-20 CD1 2.6 IM8-65509-1
Calle 19 ex CALLE 20 CD1 2.3 IM8-65509-1
NH
XC-SLOT-HW CD1 2.2 IM8-65509-1
Fronton Vaciado Marina CD1 2.2 IM8-76451-0
Total (ml)
Fronton Inversion OP-17 CD2 55.2.3 IM8-65524-0
OP-17
Total (ml)
Total (m)
ON FRENTE 21-JUL AL 20-AGO
Desde (Pk) Hasta (Pk) Total (m) Total (meq) Pend.% Sección
19.15 33.60 14.45 14.52 -10.000 6.2 x 6.1
0.00 8.40 8.40 8.40 1.000 5,2 x 5,1
22.85
0.00 5.90 5.90 5.90 1.000 6.2 x 6.1
29.70 56.60 26.90 27.03 -10.000 5.2 x 5.1
0.00 9.60 9.60 9.60 1.000 4,2 x 4,1
42.40
0.00 10.40 10.40 10.40 0.500 4,5 x 4,5
0.00 5.10 5.10 5.10 1.000 4,5 x 4,5
3.70 19.70 16.00 16.00 1.000 4,5 x 4,5
31.50
23.90 37.90 14.00 14.00 0.500 5.2 x 5.1
0.00 8.40 8.40 8.40 1.000 4,2 x 4,1
0.00 11.60 11.60 11.60 -1.000 4,2 x 4,1
18.80 35.80 17.00 17.00 -0.500 5.2 x 5.1
0.00 2.40 2.40 2.40 1.000 5.2 x 5.1
53.40
0.00 8.20 8.20 8.20 1.000 4.2 x 4.1
8.20
158.35 158.56
PROGRAMACION EXCAVACION FRENTE 21-AGO AL 20-SEPT
NIVEL LABORES Contrato Item Cobro Plano Ref.
Rampa Acceso a NTI OP O.P.1.2 IM8-65518-0
Rampa Acceso a NTI CD2 2.1 IM8-65518-0
NTI
SWG SEU OP O.P.1.3 IM8-65504-1
Total (ml)
Rampa Acceso NP * NTI OP O.P.1.2 IM8-63697-4
Rampa Acceso FW a NP OP O.P.1.10 IM8-63693-6
NP
Fronton Refugio NP CD1 5.13 ME
Total (ml)
Fronton Taller Mantencion CD1 O.P.1.4 IM8-65533-3
Fr. Conexión HW OP S/I No Existe
IIFF
Fronton Taller Sur CD1 S/I No Existe
Total (ml)
XC-SLOT-FW CD1 2.2 IM8-65509-2
FS-19 ex FS-20 CD1 2.6 IM8-65509-1
XC-SLOT-HW CD1 2.2 IM8-65509-2
NH RAMPA A UCL CD1 2.2 IM8-65516-1
Fronton Vaciado Marina CD1 2.2 IM8-76451-1
Fr. Chimenea Extracción HW CD1 2.2 IM8-76451-1
Total (ml)
Total (m)
ON FRENTE 21-AGO AL 20-SEPT
Desde (Pk) Hasta (Pk) Total (m) Total (meq) Pend.% Sección
33.60 35.40 1.80 1.81 -10.000 6.2 x 6.1
35.40 46.70 11.30 11.31 -5.000 6.2 x 6.1
8.40 16.00 7.60 7.60 1.000 5,2 x 5,1
20.70
5.90 17.70 11.80 11.80 1.000 6.2 x 6.1
56.60 78.10 21.50 21.61 -10.000 5.2 x 5.1
9.60 9.90 0.30 0.30 1.000 4,2 x 4,1
33.60
10.40 20.50 10.10 10.10 0.500 4,5 x 4,5
19.70 24.10 4.40 4.40 1.000 4,5 x 4,5
5.10 21.60 16.50 16.50 1.000 4,5 x 4,5
31.00
37.90 54.80 16.90 16.90 0.500 5.2 x 5.1
8.40 13.50 5.10 5.10 1.000 4,2 x 4,1
35.80 50.55 14.75 14.75 -0.500 5.2 x 5.1
0.00 4.50 4.50 4.50 -1.000 5.2 x 5.1
2.40 10.80 8.40 8.40 1.000 5.2 x 5.1
0.00 3.00 3.00 3.00 1.000 5.2 x 5.1
52.65
137.95 138.08
PROGRAMACION EXCAVACION FRENTE 21-SEPT AL 20-OCT
NIVEL LABORES Contrato Item Cobro Plano Ref. Desde (Pk) Hasta (Pk) Total (m) Total (meq) Pend.% Sección
Rampa Acceso a NTI CD2 2.1 IM8-65518-1 46.70 52.25 5.55 5.56 -5.000 6.2 x 6.1
NTI Acceso Norte OP 32/33 CD2 7.3 IM8-65518-1 0.00 12.45 12.45 12.46 -3.720 6.2 x 6.1
Total (ml) 18.00
Rampa Acceso NP * NTI OP O.P.1.12 IM8-63697-5 17.70 25.00 7.30 7.30 1.000 6.2 x 6.1
Rampa Acceso NP * NTI CD1 5.2 IM8-63697-5 25.00 34.70 9.70 9.70 1.000 6.2 x 6.1
NP Rampa Acceso FW a NP OP O.P.1.10 IM8-63693-7 78.10 82.00 3.90 3.92 -10.000 5.2 x 5.1
Rampa Acceso FW a NP CD1 5.2 IM8-63693-7 82.00 117.50 35.50 35.68 -10.000 5.2 x 5.1
Total (ml) 56.40
Fronton Taller Sur OP S/I IM8-65533-4 21.60 26.40 4.80 4.80 1.000 4,5 x 4,5
IIFF
Total (ml) 4.80
XC-SLOT-FW CD1 2.2 IM8-65509-2 54.80 79.70 24.90 24.90 0.500 5.2 x 5.1
FS-18 ex FS-19 CD1 2.6 IM8-65509-2 0.00 2.40 2.40 2.40 1.000 5.2 x 5.1
Cabecera HW CD1 2.2 IM8-65509-2 0.00 15.90 15.90 15.90 0.500 5.2 x 5.1
NH RAMPA A UCL CD1 2.2 IM8-65516-1 4.50 27.20 22.70 22.70 -1.000 5.2 x 5.1
Fronton Vaciado Marina CD1 2.2 IM8-76451-1 10.80 12.40 1.60 1.60 1.000 5.2 x 5.1
Fr. Chimenea Extracción HW CD1 2.2 IM8-76451-1 3.00 12.80 9.80 9.80 1.000 5.2 x 5.1
Total (ml) 77.30
Total (m) 156.50 156.72
PROGRAMACION EXCAVACION FRENTE 21-OCT. AL 20-NOV.
NIVEL LABORES Contrato Item Cobro Plano Ref. Desde (Pk) Hasta (Pk) Total (m) Total (meq) Pend.% Sección
Acceso Norte OP 32/33 CD2 7.3 IM8-76447-0 12.55 30.80 18.25 18.26 -3.762 6.2 x 6.1
NTI Rampa Acceso a NTI FW CD2 2.1 IM8-65518-1 0.00 11.90 11.90 11.91 -5.000 6.2 x 6.1
Total (ml) 30.15
Rampa Acceso NP * NTI CD1 5.2 IM8-63697-5 34.70 65.70 31.00 31.13 9.091 6.2 x 6.1
NP Rampa Acceso FW a NP CD1 5.2 IM8-63693-8 117.50 128.50 11.00 11.01 -4.020 5.2 x 5.1
Total (ml) 42.00
XC-SLOT-FW CD1 2.2 IM8-65509-3 79.70 111.30 31.60 31.60 0.500 5.2 x 5.1
Cabecera HW CD1 2.2 IM8-65509-3 15.90 36.10 20.20 20.20 -1.000 5.2 x 5.1
NH
RAMPA A UCL CD1 2.2 IM8-65516-1 27.20 49.60 22.40 22.51 -10.000 5.2 x 5.1
Total (ml) 74.20
Total (ml) 146.35 146.63
PROGRAMACION EXCAVACION FRENTE 21-NOV. AL 20-DIC.
NIVEL Labores en Metro Lineal Contrato Item Cobro Plano Ref. Desde (Pk) Hasta (Pk) Total (m) Total (meq) Pend.% Sección
Acceso Norte OP 32/33 CD2 7.3 IM8-76447-0 30.80 48.70 17.90 17.91 -3.762 6.2 x 6.1
NTI Rampa Acceso a NTI FW CD2 2.1 IM8-65518-1 11.90 28.60 16.70 16.79 -10.276 6.2 x 6.1
Total (ml) 34.60
Rampa Acceso NP * NTI CD1 5.2 IM8-63697-7 65.70 92.60 26.90 27.01 9.091 6.2 x 6.1
Fronton Chimenea Extraccion CD1 5.2 IM8-63697-7 0.00 10.40 10.40 10.40 1.000 6.2 x 6.1
NP Sala Integrada Tica CD1 5.2 IM8-63697-7 0.00 8.40 8.40 8.40 2.284 5.2 x 5.1
Rampa Acceso FW a NP CD1 5.2 IM8-63693-9 128.50 162.10 33.60 33.63 -4.020 5.2 x 5.1
Total (ml) 79.30
XC-SLOT-FW CD1 2.2 IM8-65509-3 111.30 143.90 32.60 32.60 0.500 5.2 x 5.1
Calle 16 CD1 2.3 IM8-65509-3 0.00 10.20 10.20 10.20 -1.000 4.2 x 4.1
FS-16 CD1 2.3 IM8-65509-3 0.00 3.60 3.60 3.60 1.000 4,2 x 4,1
UCL Cabecera HW CD1 2.2 IM8-65509-3 36.10 46.20 10.10 10.10 -1.000 5.2 x 5.1
Fronton Chimenea Inyeccion CD1 2.3 IM8-65509-3 0.00 10.20 10.20 10.20 1.000 4.2 x 4.1
RAMPA A UCL CD1 2.2 IM8-65516-1 49.60 81.20 31.60 31.76 -10.000 5.2 x 5.1
Total (ml) 98.30
Total Mes (ml) 212.20 212.60
PROGRAMACION EXCAVACION FRENTE 21-DIC. AL 31-DIC.
NIVEL Labores en Metro Lineal Contrato Item Cobro Plano Ref. Desde (Pk) Hasta (Pk) Total (m) Total (meq) Pend.% Sección
Acceso Norte OP 32/33 CD2 7.3 IM8-76447-1 48.70 48.70 0.00 0.00 -3.762 6.2 x 6.1
Galeria Acceso OP-32 CD2 S/I IM8-76447-1 0.00 2.00 2.00 2.00 -1.000 7.0 x 6.1
NTI
Rampa Acceso a NTI FW CD2 2.1 IM8-65518-1 28.60 41.40 12.80 12.87 -10.276 6.2 x 6.1
Total (ml) 14.80
Rampa Acceso NP * NTI CD1 5.2 IM8-63697-8 92.60 105.80 13.20 13.25 9.091 6.2 x 6.1
Fronton Chimenea Extraccion CD1 5.2 IM8-63697-8 10.40 10.40 0.00 0.00 1.000 6.2 x 6.1
Sala Integrada Tica CD1 5.2 IM8-63697-7 8.40 8.40 0.00 0.00 2.284 5.2 x 5.1
NP
Rampa Acceso FW a NP CD1 5.2 IM8-63693-10 162.10 168.20 6.10 6.13 -10.620 5.2 x 5.1
Rampa FW Produccion - SNI OP O.P.1.1.1 IM8-71167-0 0.00 8.00 8.00 8.00 1.000 6.2 x 6.1
Total (ml) 27.30
XC-SLOT-FW CD1 2.2 IM8-65509-3 143.90 150.30 6.40 6.40 0.500 5.2 x 5.1
Calle 16 CD1 2.3 IM8-65509-3 10.20 13.70 3.50 3.50 -1.000 4.5 x 4.5
FS-16 CD1 2.3 IM8-65509-3 3.60 8.20 4.60 4.60 1.000 4.5 x 4.5
UCL Cabecera HW CD1 2.2 IM8-65509-3 46.20 46.20 0.00 0.00 -1.000 5.2 x 5.1
Fronton Chimenea Inyeccion CD1 2.3 IM8-65509-3 10.20 10.20 0.00 0.00 1.000 4.2 x 4.1
RAMPA A UCL CD1 2.2 IM8-65516-1 81.20 88.60 7.40 7.44 -10.000 5.2 x 5.1
Total (ml) 21.90
Total Mes (ml) 64.00 64.19
PROGRAMACION EXCAVACION FRENTE 01-ENE. AL 21-ENE.
NIVEL Labores en Metro Lineal Contrato Item Cobro Plano Ref. Desde (Pk) Hasta (Pk) Total (m) Total (meq) Pend.% Sección
Acceso Norte OP 32/33 CD2 7.3 IM8-76447-1 48.70 48.70 0.00 0.00 -3.762 6.2 x 6.1
Galeria Acceso OP-32 CD2 S/I IM8-76447-1 2.00 2.00 0.00 0.00 -1.000 7.0 x 6.1
NTI
Rampa Acceso a NTI FW CD2 2.1 IM8-65518-1 41.40 44.20 2.80 2.81 -10.276 6.2 x 6.1
Total (ml) 2.80
Rampa Acceso NP * NTI CD1 5.2 IM8-63697-8 105.80 113.00 7.20 7.23 9.091 6.2 x 6.1
Fronton Chimenea Extraccion CD1 5.2 IM8-63697-8 10.40 10.40 0.00 0.00 1.000 6.2 x 6.1
Sala Integrada Tica CD1 5.2 IM8-63697-7 8.40 8.40 0.00 0.00 2.284 5.2 x 5.1
NP
Rampa Acceso FW a NP CD1 5.2 IM8-63693-10 168.20 168.20 0.00 0.00 -10.620 5.2 x 5.1
Rampa FW Produccion - SNI OP O.P.1.1.1 IM8-71167-0 8.00 8.00 0.00 0.00 1.000 6.2 x 6.1
Total (ml) 7.20
XC-SLOT-FW CD1 2.2 IM8-65509-3 150.30 150.30 0.00 0.00 0.500 5.2 x 5.1
Calle 16 CD1 2.3 IM8-65509-3 13.70 15.80 2.10 2.10 -1.000 4.5 x 4.5
FS-16 CD1 2.3 IM8-65509-3 8.20 12.00 3.80 3.80 1.000 4.5 x 4.5
UCL Cabecera HW CD1 2.2 IM8-65509-3 46.20 46.20 0.00 0.00 -1.000 5.2 x 5.1
Fronton Chimenea Inyeccion CD1 2.3 IM8-65509-3 10.20 10.20 0.00 0.00 1.000 4.2 x 4.1
RAMPA A UCL CD1 2.2 IM8-65516-1 88.60 92.00 3.40 3.42 -10.000 5.2 x 5.1
Total (ml) 9.30
Total Mes (ml) 19.30 19.36
May.19 Jun.19 Jul.19 Agos.19
Labores en Metro Lineal Final Final Final Final
NIVEL TRANSPORTE INTERMEDIO
Rampa Acceso a NTI 0.00 8.20 19.60 7.60
SWG SEU 0.00 0.00 0.00 14.40
Acceso Norte OP 32/33 0.00 0.00 0.00 0.00
Galeria Acceso OP-32 0.00 0.00 0.00 0.00
Rampa Acceso a NTI FW 0.00 0.00 0.00 0.00
NIVEL PRODUCCION
Rampa Acceso NP * NTI 0.00 0.00 0.00 9.30
Fronton Refugio NP 0.00 0.00 0.00 9.90
Fronton Chimenea Extraccion 0.00 0.00 0.00 0.00
Sala Integrada Tica 0.00 0.00 0.00 0.00
Rampa Acceso FW a NP 0.00 13.60 26.90 21.90
Rampa FW Produccion - SNI 0.00 0.00 0.00 0.00
IIFF
Fronton Conexión 3.00 9.80 4.70 0.00
Fr. Conexión HW 0.00 0.00 9.60 14.50
Fronton Taller Mantencion 0.00 0.00 6.70 9.80
Fronton Taller Sur 0.00 0.00 0.00 11.00
NIVEL HUNDIMIENTO
XC-SLOT-FW 3.00 13.50 14.20 12.90
FS-19 EX FS-20 0.00 0.00 1.70 9.50
Calle 19 ex Calle 20 0.00 0.00 0.00 11.60
FS-18 ex FS-19 0.00 0.00 0.00 0.00
Calle 16 0.00 0.00 0.00 0.00
FS-16 0.00 0.00 0.00 0.00
XC-SLOT-HW 2.40 5.70 18.20 18.50
Cabecera HW 0.00 0.00 0.00 0.00
Fronton Chimenea Inyeccion 0.00 0.00 0.00 0.00
RAMPA A UCL 0.00 0.00 0.00 0.00
Fronton Vaciado Marina 0.00 0.00 0.00 5.30
Fr. Chimenea Extracción HW 0.00 0.00 0.00 0.00
OP-17
Fronton Inversion OP-17 0.00 0.00 0.00 8.20
TOTAL ML. 8.40 50.80 101.60 164.40

LABORES EN DESQUINCHES
OP-17
C.A.V. OP-17 0.00 39.02 0.00 0.00
CAJA ACCESO OP-17 0.00 0.00 83.70 0.00
EST. DESCARGA OP-17 0.00 0.00 0.00 20.00
Rpa.Dacita Chimenea OP-17 0.00 0.00 0.00 0.00
CAV Rampa Dacita OP-17 0.00 0.00 0.00 0.00
NIVEL TRANSPORTE INTERMEDIO
SALA TABLEROS ELEC. E INSTRUMENTACION POR NT 0.00 0.00 0.00 0.00
PISO RAMPA ACCESO NTI 0.00 30.00 0.00 0.00
NIVEL HUNDIMIENTO
REFUGIO PEATONAL Pk-19, N°1 0.00 0.00 0.00 0.00
NIVEL PRODUCCION
PISO RAMPA ACCESO FW A NP 0.00 103.38 0.00 0.00
REFUGIO PEATONAL Pk-11, N°1 0.00 0.00 0.00 0.00
REFUGIO PEATONAL Pk-41, N°2 0.00 0.00 0.00 0.00
REFUGIO PEATONAL Pk-71, N°3 0.00 0.00 0.00 0.00
ESTOCADA N°2 RPA. NP 0.00 0.00 0.00 0.00
FR. CHIMENEA INY. XC-2AN POR RPA. NP 0.00 0.00 0.00 0.00
ESTOCADA N°1 POR RPA.NP * NTI 0.00 0.00 0.00 0.00
TOTAL M3 0.00 172.40 83.70 20.00

LABORES VERTICALES
PILOTO CH# RAISE BORE XC-2AN A NP Ø 12" 0.00 0.00 0.00 0.00
ESCAREADO CH# RAISE BORE XC-2AN A NP Ø 3,00 0.00 0.00 0.00 0.00
TOTAL ML. 0.00 0.00 0.00 0.00

N° Semana Semana N°
Semana
01 N°
Semana
05 N°Semana
10 N° 14
Avance de Lunes a Domingo Gpro 11.00 22.00 30.70 30.30
Disparos por Semana 4 8 11 11

N° Semana Semana N°
Semana
01 N°
Semana
05 N°Semana
10 N° 14
Avance de Jueves a Miercoles Gpro-ME-Santiago 11.50 15.90 41.50 29.60
N° Disparos Semana 4 6 14 11

N° Semana Semana N°
Semana
01 N°
Semana
05 N°Semana
10 N° 14
Avance de Miercoles a Martes Las-Planner 14.50 15.90 39.10 31.40
N° Disparos Semana 5 6 13 12
Sept.19 Oct.19 Nov.19 dom. lun. mar. mié. jue. vie. sáb. dom. lun. mar. mié.
Final Final Final 1 2 3 4 5 6 7 8 9 10 11

14.00 2.85 0.00


1.60 0.00 0.00
0.00 20.25 16.45 3.00 2.50 3.30 3.20
0.00 0.00 0.00
0.00 0.00 17.50 2.60 3.20 3.30

11.10 23.70 31.70 2.70 2.70 4.00


0.00 0.00 0.00
0.00 0.00 3.60 3.10 3.70
0.00 0.00 0.00 3.00
28.10 38.00 4.60 4.50 3.00 2.50 3.50
0.00 0.00 0.00

0.00 0.00 0.00


0.00 0.00 0.00
4.00 0.00 0.00
15.40 0.00 0.00

17.80 29.50 29.70 3.60 3.30 3.10 2.60 3.70


2.30 0.00 0.00
0.00 0.00 0.00
0.00 2.40 0.00
0.00 0.00 0.00
0.00 0.00 0.00
5.75 0.00 0.00
0.00 22.50 20.60 3.10
0.00 0.00 6.10 1.60 2.50
13.90 22.50 22.90 3.80 3.70 2.50
7.10 0.00 0.00
11.80 1.00 0.00

0.00 0.00 0.00


132.85 162.70 153.15 9.20 3.10 15.10 9.50 6.80 11.90 5.20 8.30 7.20 7.30 3.70

0.00 0.00 0.00


0.00 0.00 0.00
46.73 0.00 0.00
0.00 0.00 8.00
0.00 0.00 0.00

160.06 0.00 0.00


0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00


1.30 0.00 0.00
1.30 0.00 0.00
0.00 1.30 0.00
90.26 176.26 518.40
0.00 93.84 292.21
0.00 0.00 0.00
299.65 271.40 818.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00


0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Semana N°Semana
19 N° 23Semana N° 27 Semana N° 28 Semana N° 29
35.75 41.70 54.20 59.90 49.00
14 13 17 20 15

Semana N°Semana
18 N° 23 Semana N° 27 Semana N° 28
32.10 31.20 65.80 50.40
11 12 20 16

Semana N°Semana
18 N° 23 Semana N° 27 Semana N° 28 Se
35.10 35.00 61.00 56.20
12 12 19 18
DICIEMBRE
jue. vie. sáb. dom. lun. mar. mié. jue. vie. sáb. dom. lun. mar. mié. jue.
12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

2.00
2.00 2.50 2.20 2.10

3.80 3.60 3.10 3.10 3.40

2.70 2.70
3.30 2.80 3.30 2.80 3.30 2.40
3.00 2.30

3.40 3.60 3.20

3.90 3.10 3.20 3.50


3.60 2.10

3.30 2.50 2.70 3.40 2.20

10.40 9.30 8.00 3.10 6.00 6.80 6.20 9.90 3.30 12.30 6.80 8.20 0.00 2.10 7.70
1.30

1.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Semana N° 29 Semana N° 30 Semana N° 31


49.00 51.30 35.30
15 17 13

Semana N° 29 Semana N° 30
49.80 42.60
16 15

Semana N° 29 Semana N° 30 Semana N


47.30 46.70 36.70
15 16 13
vie. sáb. dom. lun. mar. Dic.19 mié. jue. vie. sáb. dom. lun. mar. mié.
27 28 29 30 31 Final 1 2 3 4 5 6 7 8

0.00
0.00
12.00
2.00
2.80 3.20 23.90 2.80

3.60 30.00 4.00 3.20


0.00
6.80
8.40
3.70 35.10
2.70 8.00

0.00
0.00
0.00
0.00

3.20 29.70
0.00
0.00
0.00
13.70 2.10
2.50 8.20 0.80 3.00
0.00
3.10
4.10
2.30 2.90 29.30 3.40
0.00
0.00

0.00
5.50 8.90 2.90 9.60 0.00 214.30 0.00 4.20 4.00 7.90 3.20 0.00 0.00 0.00

0.00
0.00
0.00
0.00
26.46 20.00 46.46

0.00
0.00

1.30

0.00
0.00
0.00
0.00
0.00
0.00
93.40 93.40
26.46 0.00 20.00 93.40 0.00 141.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 3.02 18.11 19.69 22.71


0.00
0.00 0.00 0.00 0.00 0.00 0.00 3.02 18.11 0.00 19.69 22.71 0.00 0.00 0.00

Semana N° 31 Semana N° 32 Semana N° 33


35.30 28.90 0.00
13 10 0

Semana N° 31 Semana N° 32
34.60 19.30
12 7

Semana N° 31 Semana N° 32 Sem


36.70 19.30
13 7
January/2020
jue. vie. sáb. dom. lun. mar. mié. jue. vie. sáb. dom. lun. mar. mié. jue. vie.
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Semana N° 33 Semana N° 34 Semana N° 35


0.00 0.00 0.00
0 0 0

Semana N° 33 Semana N° 34 Semana N


0.00 0.00 0.00
0 0 0

Semana N° 33 Semana N° 34 Semana N° 35


0.00 0.00 0.00
0 0 0
TOTAL METROS
sáb. dom. lun. mar. mié. jue. vie. Ene.20 AL ALCANCE DIFERENCIA
25 26 27 28 29 30 31 Final 3-Jun CONTRATO FALTA
163.15 NTI
0.00 52.25 52.25 0.00
0.00 16.00 16.00 0.00
0.00 48.70 86.90 38.20
0.00 2.00 62.80 60.80
2.80 44.20 249.20 205.00
309.9 NP
7.20 113.00 94.60 -18.40
0.00 9.90 9.90 0.00
0.00 10.40 10.40 0.00
0.00 8.40 69.40 61.00
0.00 168.20 190.77 22.57
0.00 8.00 101.00 93.00
88.5 IIFF
0.00 17.50 17.50 0.00
0.00 24.10 24.10 0.00
0.00 20.50 20.50 0.00
0.00 26.40 26.40 0.00
429.75 NH
0.00 150.30 171.00 20.70
0.00 13.50 13.50 0.00
0.00 11.60 11.60 0.00
0.00 2.40 2.40 0.00
2.10 15.80 163.30 147.50
3.80 12.00 12.00 0.00
0.00 50.55 50.55 0.00
0.00 46.20 100.00 53.80
0.00 10.20 7.90 -2.30
3.40 92.00 210.00 118.00
0.00 12.40 12.40 0.00
0.00 12.80 12.80 0.00
8.2 OP-17
0.00 8.20 8.20 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 19.30 988.20 1807.37 819.17

OP-17
0.00 39.02 39.02 0.00
0.00 83.70 83.70 0.00
0.00 66.73 80.00 13.27
0.00 8.00 8.00 0.00
0.00 46.46 140.21 93.75
NTI
0.00 160.06 160.06 0.00
0.00 30.00 30.00 0.00
NP
0.00 1.30 1.30 0.00
NP
0.00 103.38 160.00 56.62
0.00 1.30 1.30 0.00
0.00 1.30 1.30 0.00
0.00 1.30 1.30 0.00
0.00 784.92 784.92 0.00
0.00 386.05 386.05 0.00
0.00 93.40 1358.78 1265.38
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1806.92 3235.94 1429.02

63.53 63.53 113.48 49.95


0.00 0.00 110.98 110.98
0.00 0.00 0.00 0.00 0.00 0.00 0.00 63.53 63.53 224.46 160.93

na N° 35
.00
0

Semana N° 35
0.00
0

Semana N° 35
0.00
0