Está en la página 1de 14

EJERCICIO 01

DIMENSIONAR UNA ZAPATA CUYA PCM = 250TN , PCV=100TN


σ admi suelo = 30tn/m2 , Y LA COLUMNA l= 0.70m b=0.30m,
Fc=210Kg/cm2, Fy=4200 Kg/cm2 Y UNA CAPACIDAD PORTANTE=1.07

EJERCICIO 02
DIMENSIONAR UNA ZAPATA CUYA PCM = 200TN , PCV=50TN
σ admi suelo = 30tn/m2 , Y LA COLUMNA l= 0.70m b=0.30m,
Fc=210Kg/cm2, Fy=4200 Kg/cm2 Y UNA CAPACIDAD PORTANTE=1.07
PCV=100TN
b=0.30m,
AD PORTANTE=1.07

PCV=50TN
b=0.30m,
AD PORTANTE=1.07
DISEÑO DE ZAPATA AISLADA

hh f f

DD f f
t t 11
SS

t2
t2

TT

DATOS
CARGA MUERTA PCM = 250.00 Tn/m.
CARGA VIVA PCV = 100.00 Tn/m.
SECCIÒN DE COLUMNA b= 0.30 m.
l= 0.70 m.
ESFUERZO DE SUELO σs = 25.00 m/m2
RESISTENCIA DEL CONCRETO DE LA ZAPATA f'c = 210.00 Kg/cm2
RESISTECIA DEL ACERO Fy = 4200.00 Kg/cm2
CAPACIDAD PORTANTE σt = 1.08

DIMENSIONAMIENTO DE LA ZAPATA

Area Zapata 16.72 m2.

B = 4.09 m. Bx L = 16.3625 ≥ 16.72 m2.


L= 4.49 m.
m= 1.895 m.

Elegimos :
B= 3.85
L= 4.25
VERIFICACIÒN POR GRAVEDAD

σ1 = 24.46 ≤ 25.00 m/m2 Cumple √

VERIFICACIÒN POR SISMO EN "X"

σ2 = 27.39 ≤ 32.50 m/m2 Cumple √

VERIFICACIÒN POR SISMO EN "Y"

σ3 = 27.23 ≤ 32.50 m/m2 Cumple √

ESFUERZO DE DISEÑO

σ1 = 24.46 * 1.55 = 37.91 m/m2

σ2 = 27.39 * 1.25 = 34.24 m/m3 USA EL MAYOR


σ3 = 27.23 * 1.26 = 34.04 m/m4

VERIFICACION POR PUNZONAMIENTO

Suponemos d = 0.90 m. βc = 2.33


Perimeto Critico ba = 5.60 m. Ɣc = 40.00
Àrea Crìtca Ao = 1.92 m2
Cort. Ult. de Diseño Vu = 547.52 Tn.

718.8882 X 0.85 = 611.05 Tn.

Vc 1662.1029 X 0.85 = 1412.79 Tn.

774.1873 X 0.85 = 658.06 Tn.

Vu < øVc
547.5152 < 611.05

DISEÑO POR CORTE

Vu = 127.7093 ≤ 266.1269 m =

DISEÑO POR FLEXIÒN

Mu = 229.92 mm.
a = 4.23 Cm.
As = 69.21 Cm2
Distribuciòn del acero

S = 15.85 Cm ø3/4@ 0.1585

DISEÑO POR APLASTAMIENTO

Pu = 520.00 Tn Pu ≤ øPm

øPm = 562.28 Tn

520.00 ≤ 562.28 Cumple √


LADA

EJERCICIO 01

Pcsx = 25 m.
Pcsy = 35 m.
Mcmx = 5 m.m.
Mcvx = 2 m.m.
Mcsx = 15 m.m.
Mcmy = 6 m.m.
Mcvy = 3 m.m.
Mcsy = 5 m.m.

Cumple √
USA EL MAYOR

USA EL MENOR

1.78 m.
DISEÑO DE ZAPATA AISLADA

hh f f

DD f f
t t 11
SS

t2
t2

TT

DATOS
CARGA MUERTA PCM = 200.00 Tn/m.
CARGA VIVA PCV = 50.00 Tn/m.
SECCIÒN DE COLUMNA b= 0.40 m.
l= 0.60 m.
ESFUERZO DE SUELO σs = 25.00 m/m2
RESISTENCIA DEL CONCRETO DE LA ZAPATA f'c = 210.00 Kg/cm2
RESISTECIA DEL ACERO Fy = 4200.00 Kg/cm2
CAPACIDAD PORTANTE σt = 1.08

DIMENSIONAMIENTO DE LA ZAPATA

Area Zapata 11.94 m2.

B = 3.46 m. Bx L = 16.3625 ≥ 11.94 m2.


L= 3.66 m.
m= 1.53 m.

Elegimos :
B= 3.85
L= 4.25

VERIFICACIÒN POR GRAVEDAD

σ1 = 17.89 ≤ 25.00 m/m2 Cumple √

VERIFICACIÒN POR SISMO EN "X"

σ2 = 20.82 ≤ 32.50 m/m2 Cumple √

VERIFICACIÒN POR SISMO EN "Y"

σ3 = 20.66 ≤ 32.50 m/m2 Cumple √

ESFUERZO DE DISEÑO

σ1 = 17.89 * 1.55 = 27.72 m/m2

σ2 = 20.82 * 1.25 = 26.03 m/m3 USA EL MAYOR


σ3 = 20.66 * 1.26 = 25.83 m/m4

VERIFICACION POR PUNZONAMIENTO

Suponemos d = 0.90 m. βc = 1.50


Perimeto Critico ba = 5.60 m. Ɣc = 40.00
Àrea Crìtca Ao = 1.95 m2
Cort. Ult. de Diseño Vu = 399.51 Tn.

903.2185 X 0.85 = 767.74 Tn.

Vc 1662.1029 X 0.85 = 1412.79 Tn.

774.1873 X 0.85 = 658.06 Tn.

Vu < øVc
399.5145 < 767.74

DISEÑO POR CORTE

Vu = 88.0457 ≤ 266.1269 m =
DISEÑO POR FLEXIÒN

Mu = 158.78 mm.
a = 2.90 Cm.
As = 47.44 Cm2

Distribuciòn del acero

S = 23.13 Cm ø3/4@ 0.2313

DISEÑO POR APLASTAMIENTO

Pu = 365.00 Tn Pu ≤ øPm

øPm = 599.76 Tn

365.00 ≤ 599.76 Cumple √


LADA

EJERCICIO 02

Pcsx = 25 m.
Pcsy = 35 m.
Mcmx = 5 m.m.
Mcvx = 2 m.m.
Mcsx = 15 m.m.
Mcmy = 6 m.m.
Mcvy = 3 m.m.
Mcsy = 5 m.m.

Cumple √
USA EL MAYOR

USA EL MENOR

1.73 m.

También podría gustarte