PRESUPUESTO
PROYECTO EXAMEN FINAL
FECHA 22 Junio 2016.
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
______________
SUB-TOTAL S/. 7,427,008.46
IGV (18%) S/. 1,336,861.52
______________
TOTAL GENERAL S/. 8,763,869.98
$0.00
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
OBRAS PRELIMINARES
PROYECTO: EXAMEN FINAL 1
PRECIO UNITARIO: OFICINAS
RENDIMIENTO EN 8 HRS: 12 M2/DIA
APORTE: 0.6667 HRS/M2 TOTAL P.U. 144.84
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 25.08 0.67 0.00
CAPATAZ H-H 0.10 22.89 0.67 1.53
OPERARIO H-H 1.00 19.18 0.67 12.79
OFICIAL H-H 0.00 15.90 0.67 0.00
PEON H-H 1.00 14.30 0.67 9.53
TOTAL MO 23.85
MATERIALES UNIDAD CANTIDAD COSTO SUBTOTAL
SEG. Y HERR.MAN. %MO 10 0.10 23.85 2.38
CEMENTO TIPO I BLS 3.10 14.83 2.97
HORMIGON M3 0.08 30.00 63.00
AGUA M3 0.08 5.70 3.99
CALAMINA PZA 0.20 14.83 45.97
MADERA TORNILLO P2 2.10 6.50 0.52
TRIPLAY LUPUNA 4´x 8´x 4 mm PZA 0.70 27.00 2.16
CAL KG. 0.00 0.50 0.00
CORDEL ML 0.00 2.80 0.00
AFIRMADO M3 0.00 17.00 0.00
Sikaflex 300 ml M3 0.00 16.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL MAT 120.99
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
PETROLEO GLN 0.00 5.00 0.67 0.00
ACEITE Y FILTROS GLN 0.00 80.00 0.67 0.00
GRASA KG 0.00 9.39 0.67 0.00
GASOLINA GLN 0.00 11.00 0.67 0.00
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
MOVIMIENTO DE TIERRAS
PROYECTO: EXAMEN FINAL 4
PRECIO UNITARIO: EXCAVACION DE ZANJAS
RENDIMIENTO EN 8 HRS: 3.5 M3/DIA
APORTE: 2.2857 HRS/M3 TOTAL P.U. 77.66
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 25.08 2.29 0.00
CAPATAZ H-H 0.10 22.89 2.29 5.23
OPERARIO H-H 0.00 19.18 2.29 0.00
OFICIAL H-H 0.00 15.90 2.29 0.00
PEON H-H 2.00 14.30 2.29 65.37
TOTAL MO 70.60
MATERIALES UNIDAD CANTIDAD COSTO SUBTOTAL
SEG. Y HERR.MAN. %MO 10 0.10 70.60 7.06
CEMENTO TIPO I BLS 0.00 14.83 0.00
HORMIGON M3 0.00 30.00 0.00
AGUA M3 0.00 5.70 0.00
CALAMINA PZA 0.00 14.83 0.00
MADERA TORNILLO P2 0.00 6.50 0.00
TRIPLAY LUPUNA 4´x 8´x 4 mm PZA 0.00 27.00 0.00
CAL KG. 0.00 0.50 0.00
CORDEL ML 0.00 2.80 0.00
AFIRMADO M3 0.00 17.00 0.00
Sikaflex 300 ml M3 0.00 16.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL MAT 7.06
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
PETROLEO GLN 0.00 5.00 2.29 0.00
ACEITE Y FILTROS GLN 0.00 80.00 2.29 0.00
GRASA KG 0.00 9.39 2.29 0.00
GASOLINA GLN 0.00 11.00 2.29 0.00
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
VARIOS
PROYECTO: EXAMEN FINAL 11
PRECIO UNITARIO: LIMPIEZA GENERAL DE OBRA
RENDIMIENTO EN 8 HRS: 100 M2/DIA
APORTE: 0.0800 HRS/M2 TOTAL P.U. 2.72
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 25.08 0.08 0.00
CAPATAZ H-H 0.10 22.89 0.08 0.18
OPERARIO H-H 0.00 19.18 0.08 0.00
OFICIAL H-H 0.00 15.90 0.08 0.00
PEON H-H 2.00 14.30 0.08 2.29
TOTAL MO 2.47
MATERIALES UNIDAD CANTIDAD COSTO SUBTOTAL
SEG. Y HERR.MAN. %MO 10 0.10 2.47 0.25
CEMENTO TIPO I BLS 0.00 14.83 0.00
HORMIGON M3 0.00 30.00 0.00
AGUA M3 0.00 5.70 0.00
CALAMINA PZA 0.00 14.83 0.00
MADERA P2 0.00 6.50 0.00
TRIPLAY LUPUNA 4´x 8´x 4 mm PZA 0.00 27.00 0.00
CAL KG. 0.00 0.50 0.00
CORDEL ML 0.00 2.80 0.00
AFIRMADO M3 0.00 17.00 0.00
Sikaflex 300 ml M3 0.00 16.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL MAT 0.25
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
PETROLEO GLN 0.00 5.00 0.08 0.00
ACEITE Y FILTROS GLN 0.00 80.00 0.08 0.00
GRASA KG 0.00 9.39 0.08 0.00
GASOLINA GLN 0.00 11.00 0.08 0.00
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
MANO SEGURIDAD
DE HERRAM CEMENTO TIPO I AGUA
UNIDAD OBRA MANUALES HORMIGON
OFICINAS 23.85 2.38 2.97 63.00 3.99
METRADO 96 2,289.22 228.92 284.74 6,048.00 383.04
TRAZO Y REPLANTEO
DURANTE EL PROCESO 0.90 0.09 0.00 0.00 0.00
METRADO 2400 2,149.21 214.92 0.00 0.00 0.00
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
0.0001620805329
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
MANO SEGURIDAD
DE HERRAM CLAVOS
UNIDAD OBRA MANUALES
TOTAL 239,187.74 23,918.77 0.00
PORCENTAJES 0.462 0.046 0.000
TRIPLAY
MADERA LUPUNA PLANC.CORRUG
TORNILLO (LARGA) . YESO (20 KG.)
672.38 279.46 430.08 0.00
0.001 0.001 0.001 0.000
COMBUST EQUIPOS
Y
MAT 10 Sikaflex 300 ml LUBRIC
0.00 5,788.80 36.79 15,565.82
0.000 0.011 0.000 0.030
TOTAL
COSTO
VARIOS 1 VARIOS 2 VARIOS 3 DIRECTO
102,154.24 4,672.00 0.00 405,666.09
0.197 0.009 0.000 0.783
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
MADERA TRIPLEY
CALAMINA TORNILLO LUPUNA CAL CORDEL AFIRMADO Sikaflex 300 ml MATERIAL 11
45.97 0.52 2.16 0.00 0.00 0.00 0.00 0.00
4,413.41 49.92 207.36 0.00 0.00 0.00 0.00 0.00
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
0.32 0.00
0.32 0.00
0.32 0.00
TOTAL VAR 0.00
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
TOTAL P.U. 156.12
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
ARQUITECTURA
PROYECTO: EXAMEN FINAL 15
PRECIO UNITARIO: MURO CON LADRILLO PANDERETA DE CABEZA
RENDIMIENTO EN 8 HRS: 6.25 M2/DIA
APORTE: 1.2800 HRS/M2 TOTAL P.U. 85.16
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 25.08 1.28 0.00
CAPATAZ H-H 0.10 22.89 1.28 2.93
OPERARIO H-H 1.00 19.18 1.28 24.55
OFICIAL H-H 0.00 15.90 1.28 0.00
PEON H-H 0.55 14.30 1.28 10.07
TOTAL MO 37.55
MATERIALES UNIDAD CANTIDAD COSTO SUBTOTAL
SEG. Y HERR.MAN. %MO 10 0.10 37.55 3.75
CEMENTO TIPO I BOL 0.47 14.83 6.97
ARENA GRUESA M3 0.07 35.00 2.45
PIEDRA CHANCADA M3 0.00 55.00 0.00
AGUA M3 0.01 5.70 0.06
ADITIVOS GLN 0.00 60.00 0.00
HORMIGON M3 0.00 30.00 0.00
ARENA FINA M3 0.00 37.50 0.00
LADRILLO PANDERETA UND 70.00 0.49 34.30
CLAVO KG 0.02 4.00 0.08
MATERIAL 10 M3 0.00 0.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL MAT 47.61
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
PETROLEO GLN 0.00 5.00 1.28 0.00
ACEITE Y FILTROS GLN 0.00 80.00 1.28 0.00
GRASA KG 0.00 9.39 1.28 0.00
GASOLINA GLN 0.00 11.00 1.28 0.00
0.00
TOTAL COMB 0.00
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
TROMPO 9 P3 H-M 0 3.96 1.28 0.00
VIBRADOR 4 HP x 1.50" H-M 0.00 5.30 1.28 0.00
1.28 0.00
1.28 0.00
TOTAL EQUIP 0.00
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
1.28 0.00
1.28 0.00
1.28 0.00
TOTAL VAR 0.00
TOTAL P.U. 85.16
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
MANO SEGURIDAD
DE HERRAM
CEMENTO ARENA PIEDRA
UNIDAD OBRA MANUALES TIPO I GRUESA CHANCADA
SOLADO DE 2" 14.46 1.45 2.25 0.00 0.00
METRADO 2,880.00 41,655.74 4,165.57 6,470.63 0.00 0.00
CONCRETO PARA
CIMIENTOS 44.50 4.45 32.63 0.00 27.50
METRADO 1,344.00 59,810.80 5,981.08 43,849.34 0.00 36,960.00
CONCRETO PARA
SOBRECIMIENTOS 73.65 7.36 59.32 0.00 27.50
METRADO 1,440.00 106,050.24 10,605.02 85,420.80 0.00 39,600.00
CONCRETO EN
FALSOPISO 10.52 1.05 7.16 0.00 0.00
METRADO 3,840.00 40,393.45 4,039.34 27,505.50 0.00 0.00
Cº EN MUROS TABIQUES
Y PLACAS 139.87 13.99 111.23 18.90 0.00
METRADO 480 67,137.79 6,713.78 53,388.00 9,072.00 0.00
Cº DE F'c=175 KG/m2
E=10CM 32.57 3.26 125.02 17.50 0.00
METRADO 1,728.00 56,273.01 5,627.30 216,029.20 30,240.00 0.00
CONCRETO LOSAS
ALIGERADAS 81.12 8.11 125.02 17.50 0.00
METRADO 480 38,938.68 3,893.87 60,008.11 8,400.00 0.00
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
METRADO 288 13,540.79 1,354.08 36,004.87 0.00 0.00
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
MURO DE LADRILLO
KING KONG 28.62 2.86 1.66 10.50 0.00
METRADO 5,280.00 151,108.32 15,110.83 8,769.87 55,440.00 0.00
MURO DE LADRILLO DE
SOGA KING KONG 28.62 2.86 2.22 7.00 0.00
METRADO 1,920.00 54,941.18 5,494.12 4,271.04 13,440.00 0.00
MURO DE LADRILLO
PANDERETA DE SOGA 28.90 2.89 2.82 1.05 0.00
METRADO 960 27,748.07 2,774.81 2,704.99 1,008.00 0.00
TARRAJEO PRIMARIO O
RAYADO 19.08 1.91 1.74 0.00 0.00
METRADO 960 18,313.73 1,831.37 1,665.71 0.00 0.00
TARRAJEO EN
INTERIORES 14.31 1.43 1.76 0.00 0.00
METRADO 1,440.00 20,602.94 2,060.29 2,541.27 0.00 0.00
MESAS DE CONCRETO
PARA COCINA 10.30 1.03 62.51 9.45 0.00
METRADO 96 988.71 98.87 6,000.81 907.20 0.00
PISO DE CERAMICO 20 x
20 28.62 2.86 2.22 1.05 0.00
METRADO 1,248.00 35,716.51 3,571.65 2,776.18 1,310.40 0.00
PISO DE CEMENTO
PULIDO Y BRUÑADO
2011170517
PISO DE CEMENTO Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
PULIDO Y BRUÑADO 7.75 0.77 7.15 15.75 24.75
METRADO 1,920.00 14,877.39 1,487.74 13,724.28 30,240.00 47,520.00
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
CONTRAZOC. CEM.
S/COLOREAR 14.31 1.43 0.59 0.00 0.00
METRADO 2,400.00 34,338.24 3,433.82 1,423.68 0.00 0.00
ZOCALO DE CERAMICO
20X20 35.77 3.58 2.77 0.00 0.00
METRADO 480 17,169.12 1,716.91 1,330.43 0.00 0.00
ZOCALO DE MEZCLA
CEMENTO-ARENA 14.31 1.43 3.71 0.00 0.00
METRADO 480 6,867.65 686.76 1,779.60 0.00 0.00
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
303.70 0.00 0.00 0.00 0.00
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
0.26 0.00 0.00 2.25 0.00
492.48 0.00 0.00 4,320.00 0.00
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
COMBUST EQUIPOS
Y
CERAMICA MAT 10 MAT 11 LUBRIC VARIOS 1 VARIOS 2 VARIOS 3
0.00 0.00 0.00 1.10 0.40 0.00 0.00 0.00
0.00 0.00 0.00 3,168.00 1,140.48 0.00 0.00 0.00
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
0.00 0.00 0.00 1,013.76 853.40 0.00 0.00 0.00
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
156.12
179,854.49
141.66
190,395.73
204.19
294,029.90
24.41
93,746.42
301.22
144,583.89
236.30
22,684.43
264.56
304,768.54
183.45
316,993.55
239.29
114,858.75
184.27
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
53,070.60
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
181.74
87,234.18
76.76
405,270.94
79.36
152,362.02
85.16
81,753.00
65.28
62,668.19
23.81
22,853.85
18.48
26,604.91
99.27
9,530.20
28.94
41,671.32
18.90
27,212.02
55.24
68,933.53
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
58.68
112,661.88
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
17.51
42,032.54
61.88
29,703.18
20.76
9,967.13
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
ENCOFRADOS
PROYECTO: EXAMEN FINAL 1
PRECIO UNITARIO: ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTOS
RENDIMIENTO EN 8 HRS: 14 M2/DIA
APORTE: 0.5714 HRS/M2 TOTAL P.U. 45.53
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 25.08 0.57 0.00
CAPATAZ H-H 0.10 22.89 0.57 1.31
OPERARIO H-H 1.00 19.18 0.57 10.96
OFICIAL H-H 0.00 15.90 0.57 0.00
PEON H-H 2.00 14.30 0.57 16.34
TOTAL MO 28.61
MATERIALES UNIDAD CANTIDAD COSTO SUBTOTAL
SEG. Y HERR.MAN. %MO 10 0.10 28.61 2.86
ALAMBRE NEGRO RECOCIDO N° 8 KG 0.18 2.24 0.40
CLAVOS PARA MADERA C/C 3" KG 0.10 2.88 0.29
MADERA TORNILLO 12' DE LARGO P2 2.70 4.95 13.37
MATERIAL 4 M3 0.00 0.00 0.00
MATERIAL 5 M3 0.00 0.00 0.00
MATERIAL 6 M3 0.00 0.00 0.00
MATERIAL 7 M3 0.00 0.00 0.00
MATERIAL 8 M3 0.00 0.00 0.00
MATERIAL 9 M3 0.00 0.00 0.00
MATERIAL 10 M3 0.00 0.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL MAT 16.92
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
PETROLEO GLN 0.00 5.00 0.57 0.00
ACEITE Y FILTROS GLN 0.00 80.00 0.57 0.00
GRASA KG 0.00 9.39 0.57 0.00
GASOLINA GLN 0.00 11.00 0.57 0.00
0.00
TOTAL COMB 0.00
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
H-M 0.57 0.00
H-M 0.57 0.00
H-M 0.57 0.00
H-M 0.57 0.00
TOTAL EQUIP 0.00
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.57 0.00
0.57 0.00
0.57 0.00
TOTAL VAR 0.00
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
TOTAL P.U. 45.53
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
TOTAL VAR 0.00
TOTAL P.U. 62.18
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
TOTAL P.U. 66.92
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
TOTAL P.U. 43.90
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
TOTAL P.U. 42.03
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
MANO SEGURIDAD
DE HERRAM
ALAMBRE
UNIDAD OBRA MANUALES NEGRO
ENC./DESEN. SOBREC. 28.61 2.86 0.40
METRADO 3840 109,865.69 10,986.57 1,545.25
ENC./DESEN. LOSAS
ALIGERADAS 24.91 2.49 0.22
METRADO 1728 43,049.09 4,304.91 386.31
ENC./DESEN EN LOSAS
MACIZAS 19.93 1.99 0.27
METRADO 288 5,739.88 573.99 77.26
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
MANO SEGURIDAD
DE HERRAM
ALAMBRE
UNIDAD OBRA MANUALES NEGRO
TOTAL 202,737.39 20,273.74 4,747.56
PORCENTAJES 0.436 0.044 0.010
CLAVOS PARA
MADERA MADERA TORNILLO- MAT 4 MAT 5
2,876.72 133,353.70 0.00 0.00
0.006 0.287 0.000 0.000
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
CLAVOS PARA
MADERA MADERA TORNILLO MAT 4 MAT 5 MAT 6 MAT 7 MAT 8
0.29 13.37 0.00 0.00 0.00 0.00 0.00
1,107.30 51,321.60 0.00 0.00 0.00 0.00 0.00
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
COMBUST EQUIPOS
Y
MAT9 MAT 10 MAT 11 LUBRIC VARIOS 1 VARIOS 2 VARIOS 3
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
62.18
71,627.45
66.92
51,395.24
43.90
75,859.26
42.03
12,105.30
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
TOTAL P.U. 6.40
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
MANO SEGURIDAD
DE HERRAM
ACERO
UNIDAD OBRA MANUALES ALAMBRE CORRUGADO
AC. EN SOBREC. 1.14 0.11 0.11 5.03
METRADO 11520 13,185.88 1,318.59 1,287.71 57,909.43
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
GRALES
PRESUPUESTO
460,378.75
1.000
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
MANO SEGURIDAD
DE HERRAM
PERFILES DE CRISTAL
UNIDAD OBRA MANUALES VENTANA ALUMINIO TEMPLADO
TOTAL 135,530.19 13,553.02 56,544.00 18,787.20 9,393.55
PORCENTAJES 0.261 0.026 0.109 0.036 0.018
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
COMBUST
Y
ESCALERA DE CARPINTERIA
ACCESORIOS Y CERRAJERIA
SILICONA CARACOL METALICA PREMARCO PUERTA MAT 10 MAT 11 LUBRIC
6.00 0.00 0.00 0.00 0.00 160.00 0.00 0.00 0.00
576.00 0.00 0.00 0.00 0.00 15,360.00 0.00 0.00 0.00
COMBUST
Y
ESCALERA DE CARPINTERIA
ACCESORIOS Y CERRAJERIA
SILICONA CARACOL METALICA PREMARCO PUERTA MAT 10 MAT 11 LUBRIC
12,672.00 921.60 24,000.00 0.00 0.00 168,960.00 0.00 0.00 0.00
0.024 0.002 0.046 0.000 0.000 0.325 0.000 0.000 0.000
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
159,119.41
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
INSTALACIONES SANITARIAS
PROYECTO: EXAMEN FINAL 1
PRECIO UNITARIO: INODORO COLOR BLANCO ECONOMICO
RENDIMIENTO EN 8 HRS: 3 PZA./DIA
APORTE: 2.6667 HRS/PZA TOTAL P.U. 199.98
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 25.08 2.67 0.00
CAPATAZ H-H 0.10 22.89 2.67 6.10
OPERARIO H-H 1.00 19.18 2.67 51.15
OFICIAL H-H 0.00 15.90 2.67 0.00
PEON H-H 0.00 14.30 2.67 0.00
TOTAL MO 57.25
MATERIALES UNIDAD CANTIDAD COSTO SUBTOTAL
SEG. Y HERR.MAN. %MO 10 0.10 57.25 5.73
INODORO LOSA COLOR BLANCO UND 1.00 130.50 130.50
PEGAMENTO P/TUBO PVC 1/4GL UND 0.00 21.30 0.00
DUCHA SIMPLE C/GRIFERIA Y BRAZO M/VAINSA UND 0.00 106.60 0.00
LAVATORIO UND 0.00 133.5 0.00
TUBERIA PVC 1/2" C-10 Pza 1.00 6.50 6.50
CODO PVC1/2" Pza 0.00 3.40 0.00
TEE PVC 1/2" Pza 0.00 4.30 0.00
UNION UNIVERSAL ACERO GALV. 1/2" UND 0.00 6.64 0.00
TUBO DE PVC P/DESAGUE SAL. 2"X 3m UND 0.00 7.00 0.00
NIPLE ACERO GALV. 1/2" x 1 1/4" UND 0.00 1.00 0.00
REGISTRO ROSCADO DE BRONCE DE 2" UND 0.00 8.55 0.00
TOTAL MAT 142.73
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
PETROLEO GLN 0.00 5.00 2.67 0.00
ACEITE Y FILTROS GLN 0.00 80.00 2.67 0.00
GRASA KG 0.00 9.39 2.67 0.00
GASOLINA GLN 0.00 11.00 2.67 0.00
0.00
TOTAL COMB 0.00
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
H-M 2.67 0.00
H-M 2.67 0.00
H-M 2.67 0.00
H-M 2.67 0.00
TOTAL EQUIP 0.00
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
2.67 0.00
2.67 0.00
2.67 0.00
TOTAL VAR 0.00
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
TOTAL P.U. 199.98
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2.00 0.00
TOTAL VAR 0.00
TOTAL P.U. 180.73
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
TOTAL P.U. 180.73
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
TOTAL VAR 0.00
TOTAL P.U. 185.29
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
TOTAL P.U. 20.56
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
TOTAL P.U. 106.78
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
TOTAL P.U. 80.23
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
TOTAL P.U. 56.31
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
TOTAL P.U. 48.55
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
TOTAL P.U. 48.76
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
TOTAL P.U. 82.54
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
TOTAL P.U. 64.79
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
TOTAL P.U. 31.49
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
TOTAL P.U. 34.97
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
TOTAL P.U. 17.87
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
LAVADERO DE ACERO
INOXIDABLE 42.94 4.29 0.00 0.00 0.00
METRADO 192 8,244.10 824.41 0.00 0.00 0.00
VALVULAS DE COMPUERTA DE
BRONCE DE 1/2" 57.23 5.72 0.00 0.00 0.00
METRADO 192 10,988.24 1,098.82 0.00 0.00 0.00
TUB. DESA. PVC SAL 2" VENT. 11.45 1.15 0.00 21.30 0.00
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
METRADO 4800 54,960.64 5,496.06 0.00 102,240.00 0.00
CAJA DE REGISTRO DE
ALBAÑILERIA DE 10" X 20" 28.63 2.86 0.00 0.00 0.00
METRADO 192 5,496.06 549.61 0.00 0.00 0.00
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
PERNO DE LAVATORIO
ANCLAJE PARA ARUBA TRAMPA "P" TUBO DE LAVADERO INOX. REGISTRO
INODORO MASILLA BLANCO CROMADA ABASTO Y ACCES. CAJA DE REGISTRO ROSCADO
0.00 6.50 0.00 0.00 0.00 0.00 0.00 0.00
0.00 1,248.00 0.00 0.00 0.00 0.00 0.00 0.00
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
INSTALACIONES ELECTRICAS
PROYECTO: EXAMEN FINAL 1
PRECIO UNITARIO: CENTRO DE LUZ
RENDIMIENTO EN 8 HRS: 5 PTO/DIA
APORTE: 1.6000 HRS/PTO TOTAL P.U. 83.41
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 23.91 1.60 0.00
CAPATAZ H-H 0.10 20.79 1.60 3.33
OPERARIO H-H 1.00 18.08 1.60 28.93
OFICIAL H-H 0.00 14.81 1.60 0.00
PEON H-H 1.00 13.62 1.60 21.79
TOTAL MO 54.05
MATERIALES UNIDAD CANTIDAD COSTO SUBTOTAL
SEG. Y HERR.MAN. %MO 10 0.10 54.05 5.40
CABLE TW N 14 AWG 2.5 MM2 M 8.50 0.988 8.40
CAJA RECTANGULAR GALV. 4" x 2 1/8" UND 1.00 2.50 2.50
CAJA ORTOGONAL GALV 4" x 2 1/8" UND 1.00 2.50 2.50
INTERRUPTOR 250V -15 A PZA 1.00 7.50 7.50
TUBO PVC 5/8" PZA 1.50 0.40 0.60
CURVA LIVIANA PVC 5/8" UND 3.00 0.70 2.10
CONEXIÓN A CAJA PVC 5/8" UND 2.00 0.18 0.36
TUBO PVC 3/4" UND 0.00 1.35 0.00
CURVA PESADA 3/4" UND 0.00 1.37 0.00
CURVA LIVIANA 3/4" UND 0.00 0.46 0.00
UNION UNIVERSAL 3/4" UND 0.00 4.24 0.00
TOTAL MAT 29.36
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
PETROLEO GLN 0.00 5.00 1.60 0.00
ACEITE Y FILTROS GLN 0.00 80.00 1.60 0.00
GRASA KG 0.00 9.39 1.60 0.00
GASOLINA GLN 0.00 11.00 1.60 0.00
0.00
TOTAL COMB 0.00
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
H-M 1.60 0.00
H-M 1.60 0.00
H-M 1.60 0.00
H-M 1.60 0.00
TOTAL EQUIP 0.00
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
INTERRUPTO DOBLE UND 0.00 8.00 1.60 0.00
INTERRUPTOR CONMUTABLE SIMPLE UND 0.00 9.00 1.60 0.00
TOMACORRIENTE DOBLE BIPOLAR UND 0.00 8.00 1.60 0.00
TOTAL VAR 0.00
TOTAL P.U. 83.41
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
MANO SEGURIDAD
DE HERRAM
CAJA CAJA
UNIDAD OBRA MANUALES CABLE TW RECTANGULAR ORTOGONAL
CENTRO DE LUZ 54.05 5.40 8.40 2.50 2.50
METRADO 960 51,884.85 5,188.49 8,062.08 2,400.00 2,400.00
SALIDA DE INTERRUPTOR
SIMPLE 10.75 1.08 9.88 2.50 2.50
METRADO 960 10,321.51 1,032.15 9,484.80 2,400.00 2,400.00
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
COMBUST
Y
INTERRUCTOR
DE 250V TUBO PVC 5/8"
CURVA LIVIANA PVC
CONEXIÓN
5/8" A CAJA PVC
TUBO PVC 3/4"CURVA PESADA 3/4"
CURVA LIVIANAUNION
3/4" UNIVERSAL 3/4" LUBRIC
7.50 0.60 2.10 0.36 0.00 0.00 0.00 0.00 0.00
7,200.00 576.00 2,016.00 345.60 0.00 0.00 0.00 0.00 0.00
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517
Marco Miguel Montalvo Pizan COSTOS Y PRESUPUESTOS
2011170517