Está en la página 1de 5

SICUANI

DISEÑO ESTACION DE BOMBEO

PROYECTO: PLANTA TRATAMIENTO DE SICUANI

ESTRUCTURA TIPO CAISSON

PESO DEL CAISSON 139.99 Ton


CONCRETO DE SELLO 24.59 Ton
AGUA 60.47 Ton (considerando hasta la altura de rebose)
SOBRE CARGA 8.55 Ton (1000 Kg/m2)

TOTAL 233.60 Ton


CARGA TRASMITIDA 1.77 Kg/cm2

CARGA TRASM. CENTR 1.09 Kg/cm2


CARGA TRASM. ANILLO 2.41 Kg/cm2

PRESION AGUA 118.82 Ton

PRESIONES LATERALES CONSIDERANDO ESTRATOS DE MATERIALES DIFERENTES

S/C 1.00 Ton/m2

1o ESTRATO
ANGULO= 21.00 GRADOS
PESO ESP. 2.00 Ton/m3
Ka1= 0.472

2o ESTRATO
ANGULO= 33.00 GRADOS
PESO ESP. 2.00 Ton/m3
Ka2= 0.295
EXISTE NAPA FREATICA
m= 0.7 (coef. que depende del indice vacios)
PESO ESP. 1.3 Ton/m3 (peso especifico del terreno con agua)

PRESIONES
PROFUND. S/C SUELO AGUA TOTAL
Mt. Ton/m2 Ton/m2 Ton/m2 Ton/m2

Página 1
SICUANI

0 0.47 - 0.47
1 0.47 0.945 1.42
2 0.47 1.889 2.36
3 0.47 2.834 - 3.31
4 0.47 2.456 1.00 3.93
5 0.29 2.742 2.00 5.04
6 0.29 3.125 3.00 6.42
7 0.29 3.508 4.00 7.80
8 0.29 3.891 5.00 9.19
9 0.29 4.275 6.00 10.57
10 0.29 4.658 7.00 11.95
11 0.29 5.041 8.00 13.34
12 0.29 5.424 9.00 14.72

Página 2
DISEÑO ESTACION DE BOMBEO DE LETICIA

ESTRUCTURA TIPO CAISSON

PESO DEL CAISSON 42.22 Ton


CONCRETO DE SELLO 8.60 Ton
AGUA 8.31 Ton (considerando hasta la altura de camara rejas)
SOBRE CARGA LOSA F. 4.15 Ton (1000 Kg/m2)

TOTAL 63.28 Ton

CARGA TRASMITIDA TOT 0.96 Kg/cm2 < 2.00 Kg/cm2

EMPUJE DEL AGUA 33.03 Ton < 63.28 Ton

PRESIONES LATERALES

S/C 1.00 Ton/m2 (sobre carga en el terreno)


1o ESTRATO
ANGULO= 32.00 GRADOS
PESO ESP. 1.90 Ton/m3
Ka1= 0.307 (coeficiente de empuje activo)

EXISTE NAPA FREATICA


m= 0.6 (coef. que depende del indice vacios: ARENA )
PESO ESP. 1.3 Ton/m3 (peso especifico del terreno con agua)

PRESIONES
PROFUND. S/C SUELO AGUA TOTAL Z
Mt. Ton/m2 Ton/m2 Ton/m2 Ton/m2
0.00 0.31 0.00 0.31
0.50 0.31 0.29 0.60 1.5
1.00 0.31 0.58 0.89
1.50 0.31 0.60 0.00 0.91
2.00 0.31 0.80 0.50 1.61
2.50 0.31 1.00 1.00 2.31 5.0
3.00 0.31 1.20 1.50 3.01
3.50 0.31 1.40 2.00 3.71
4.00 0.31 1.60 2.50 4.41
4.50 0.31 1.80 3.00 5.10 X
5.00 0.31 2.00 3.50 5.80
5.50 0.31 2.20 4.00 6.50 2.6
6.00 0.31 2.40 4.50 7.20
6.50 0.31 2.60 5.00 7.90

RESULTADOS DEL PROGRAMA SAP

FUERZAS MEMBRANALES EN TON/M


ELEMENTO 144
JOINT S11 S22 CONVENCION DE SIGNOS
155 -4.62E+00 -9.51E+00
156 -4.57E+00 -9.12E+00 Z
1 -4.62E+00 -9.51E+00
2 -4.57E+00 -9.12E+00 S11
ELEMENTO 145 l
156 -4.23E+00 -9.07E+00
157 -4.11E+00 -8.25E+00 j
2 -4.23E+00 -9.07E+00 S22
3 -4.11E+00 -8.25E+00
ELEMENTO 146 k
157 -3.84E+00 -8.21E+00
158 -3.71E+00 -7.31E+00 i
3 -3.84E+00 -8.21E+00
4 -3.71E+00 -7.31E+00
ELEMENTO 147
158 -3.48E+00 -7.28E+00
159 -3.35E+00 -6.42E+00
4 -3.48E+00 -7.28E+00
5 -3.35E+00 -6.42E+00
ELEMENTO 148
159 -3.12E+00 -6.39E+00
160 -3.00E+00 -5.55E+00
5 -3.12E+00 -6.39E+00
6 -3.00E+00 -5.55E+00
ELEMENTO 149
160 -2.76E+00 -5.52E+00
161 -2.64E+00 -4.68E+00
6 -2.76E+00 -5.52E+00
7 -2.64E+00 -4.68E+00
ELEMENTO 150
161 -2.41E+00 -4.64E+00
162 -2.28E+00 -3.79E+00
7 -2.41E+00 -4.64E+00
8 -2.28E+00 -3.79E+00
ELEMENTO 151
162 -2.04E+00 -3.75E+00
163 -1.91E+00 -2.89E+00
8 -2.04E+00 -3.75E+00
9 -1.91E+00 -2.89E+00
ELEMENTO 152
163 -1.67E+00 -2.85E+00
164 -1.54E+00 -2.04E+00
9 -1.67E+00 -2.85E+00
10 -1.54E+00 -2.04E+00
ELEMENTO 153
164 -1.27E+00 -2.00E+00
165 -1.18E+00 -1.39E+00
10 -1.27E+00 -2.00E+00
11 -1.18E+00 -1.39E+00
ELEMENTO 154
165 -8.98E-01 -1.35E+00
166 -8.50E-01 -1.03E+00
11 -8.98E-01 -1.35E+00
12 -8.50E-01 -1.03E+00
ELEMENTO 155
166 -5.58E-01 -9.81E-01
167 -5.21E-01 -7.32E-01
12 -5.58E-01 -9.81E-01
13 -5.21E-01 -7.32E-01
ELEMENTO 156
167 -1.85E-01 -6.82E-01
168 -1.52E-01 -4.56E-01
13 -1.85E-01 -6.82E-01
14 -1.52E-01 -4.56E-01

RESUMEN DE FUERZAS NODALES EN FUNCION DE LA ALTURA

Z S11 S22
0.00 -4.62 -9.51
0.50 -4.40 -9.10
1.00 -3.97 -8.23
1.50 -3.60 -7.30
2.00 -3.24 -6.41
2.50 -2.88 -5.53
3.00 -2.52 -4.66
3.50 -2.16 -3.77
4.00 -1.79 -2.87
4.50 -1.41 -2.02
5.00 -1.04 -1.37
5.50 -0.70 -1.00
6.00 -0.35 -0.71
6.50 -0.15 -0.46

FUERZAS MEMBRANALES

0.0
-1.0 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0

-2.0
FUERZAS (Ton/m)

-3.0
-4.0
S11
-5.0
S22
-6.0
-7.0
-8.0
-9.0
-10.0
ALTURA (Mt)

DISEÑO

Pserv= 9.51 Ton


Pu= 14.46 Ton <0.10f'c*Ag= 63.00 Ton

Por lo tanto el Caisson se diseñará como un elemento en compresión

Pu=0.7(0.85xf'cxAg+Asxfy)

cuantia mínima vertical=0.0012 Asv= 3.60 cm2 acero 1/2" cada 36


cuantia mínima horizontal=0.0020 Ash= 6.00 cm2 acero 5/8" cada 33

Puv= 396.02 Ton < 14.46 Ton


Puh= 410.13 Ton < 14.46 Ton