Z-1
ZAPATA
Z-1
S/ 3,218.89 S/ 220.02 14.63 S/ 74.26 S/ 1,086.42
Z-2 (ZAPATA CORRIDA)
ZAPATA
Z-1
S/ 857.02 S/ 2.70 317.415 S/ 1.34 S/ 425.34
Z-2 (ZAPATA CORRIDA)
COLUMNAS
COLUMNAS SOTANO
COLUMNAS PRIMER NIVEL S/ 6,541.19 S/ 220.02 29.73 S/ 266.31 S/ 7,917.40
MURO REFORZADO
COLUMNAS Y COLUMNETAS
COLUMNAS SOTANO
COLUMNAS PRIMER NIVEL
S/ 7,415.49 S/ 24.61 301.32 S/ 33.20 S/ 10,003.82
MURO REFORZADO
COLUMNETAS DE CONFINAMIENTO PRIMER NIVEL
VIGAS
SÓTANO
S/ 2,065.99 S/ 220.02 9.39 S/ 155.51 S/ 1,460.24
PRIMER NIVEL
SOTANO
CONCRETO EN LOSA
SÓTANO E= 5cm
ENCOFRADO Y DESENCOFRADO
SÓTANO
S/ 3,356.07 S/ 31.17 107.67 S/ 33.20 S/ 3,574.64
PRIMER NIVEL
ESCALERA
CISTERNA DE COMPENSACIÓN
ADULTOS
S/ 5,720.95 S/ 256.20 22.33 S/ 276.48 S/ 6,173.80
S/ 5,720.95 S/ 256.20 22.33 S/ 276.48 S/ 6,173.80
NIÑOS
ENCOFRADO Y DESENCOFRADO
ADULTOS
S/ 1,727.44 S/ 17.10 101.02 S/ 33.20 S/ 3,353.86
NIÑOS
ADULTOS
S/ 4,481.84 S/ 2.70 1659.94 S/ 1.34 S/ 2,224.32
NIÑOS
MURO SOGA
S/ 2,264.35 S/ 28.16 80.41 S/ 27.30 S/ 2,195.19
PARAPETO
MODULO
S/ 665.82 S/ 5.09 130.81 S/ 16.26 S/ 2,126.97
ESTERIORES
ESCALERA
SÓTANO
S/ 304.01 S/ 6.36 47.8 S/ 23.47 S/ 1,121.87
PRIMER NIVEL
SÓTANO
S/ 538.03 S/ 13.68 39.33 S/ 25.82 S/ 1,015.50
PRIMER NIVEL
VESTIDURA DE DERRAMES CEMENTO - ARENA 1:5 ANCHO = 0.25m
CIELORRASOS
CIELORRASO CON MEZCLA DE CEMENTO -ARENA 1:5
SS.HH + DEPOSITO DE SERVICIO
DEPOSITO S/ 1,545.68 S/ 13.90 111.2 S/ 18.44 S/ 2,050.53
CUARTO DE MAQUINAS
PISOS Y PAVIMENTOS
PISOS
CONTRAPISO DE 2.5 cm
SS.HH + DEPOSITO + SERVICIO S/ 974.82 S/ 11.08 87.98 S/ 14.88 S/ 1,309.14
PISOS DE CONCRETO CEMENTO PULIDO S/COLOREAR
DEPOSITO
S/ 775.80 S/ 9.00 86.2 S/ 21.62 S/ 1,863.64
CUARTO DE MAQUINAS
EXTERIOR
DEPOSITO S/ 12.02 S/ 0.75 16.02 S/ 12.91 S/ 206.82
CUARTO DE MAQUINAS
CARPINTERÍA DE MADERA
PUERTAS
P-6
S/ 6,781.32 S/ 546.00 12.42 S/ 58.35 S/ 724.71
P-7
TABLEROS DIVISORIOS EN BAÑOS
P-6
S/ 40.05 S/ 18.54 2.16 S/ 4.98 S/ -
P-7
VARIOS
JUNTA DE CONSTRUCCIÓN CON TEKNOPORT - COLUMNETA
SALIDAS DE DISTRIBUCIÓN
SALIDAS PARA CENTRO DE LUZ
SS.HH Y DEPOSITO
S/ 95.90 S/ 19.18 5 S/ 53.55 S/ 267.75
CUARTO DE MAQUINAS
SALIDA PARA INTERRUPTOR DE CONMUTACION DE ESCALERAS
SS.HH Y DEPOSITO
S/ 142.00 S/ 35.50 4 S/ 111.74 S/ 446.96
CUARTO DE MAQUINAS
LUCES DE EMERGENCIA
ARTEFACTOS ELECTRICOS
ARTEFACTOS ELECTRICOS
S/ 2,504.80 S/ 125.24 20 S/ 22.34 S/ 446.80
MODULO 3 SALA DE MAQUINAS
ARTEFACTO PLAST. CUADRADO C/1 LAMP. FLUORESC. CIRC. 32W -SIM JOSFEL
MODULO 3 S/ 144.94 S/ 72.47 2 S/ 27.94 S/ 55.88
INSTALACIONES SANITARIAS S/ 2,825.00 S/ 3,394.49
INODOROS
LAVATORIOS
S/ 51.06 S/ 8.51 6 S/ 91.82 S/ 550.92
URINARIOS
DUCHAS
VÁLVULAS
VALVULA DE COMPUERTA DE BRONCE DE 3/4"
EN MODULOS S/ 47.00 S/ 47.00 1 S/ 60.27 S/ 60.27
CAJA PARA VALVULAS
SISTEMA DE DESAGUE
SALIDA DE DESAGUE PVC DE 2"
LAVATORIOS
SUMIDEROS S/ 83.40 S/ 13.90 6 S/ 80.34 S/ 482.04
DUCHAS
SALIDA DE DESAGUE PVC DE 4"
INODOROS
SUMIDEROS REJILLA S/ 203.92 S/ 25.49 8 S/ 80.34 S/ 642.72
REGISTRO ROSCADO
SALIDAS DE PVC SAL PARA VENTILACION DE 2"
SUBIDAS DE VENTILACION