Item Descripción Und. Metrado Precio S/. Parcial S/. Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6 Mes 7 Mes 8 Mes 9 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15 Mes 16 Mes 17
01 COMPONENTE 01: SEMAFORIZACION VIAL Y PEATONAL 529,399.13
01.01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD 72,036.80
01.01.01 OBRAS PROVISIONALES 24,894.36
01.01.01.01 CARTEL DE OBRA 3.60 M x 2.40 M und 2.00 797.60 1,595.20 1,595.20
01.01.01.02 CONSTRUCCION DE AMBIENTES PARA ALMACEN Y GUARDIANIA DE OBRA m2 120.00 108.21 12,985.20 12,985.20
01.01.01.04 ALQUILER DE AMBIENTES PARA RESIDENCIA DE OBRA mes 18.00 500.00 9,000.00 500.00 500.00 500.00 500.00 500.00 500.00 500.00 500.00 500.00 500.00 500.00 500.00 500.00 500.00 500.00 500.00 500.00
01.01.03.02 EQUIPO DE PROTECCION INDIVIDUAL und 80.00 300.10 24,008.00 6,002.00 6,002.00 6,002.00 6,002.00
01.01.03.03 SEÑALIZACION TEMPORAL DE SEGURIDAD Y SALUD EN EL TRABAJO pqt 6.00 600.00 3,600.00 1,200.00 1,200.00 1,200.00
01.01.03.04 CAPACITACION AL PERSONAL EN SEGURIDAD Y SALUD EN OBRA ser 3.00 964.00 2,892.00 964.00 964.00 964.00
01.01.03.05 RECURSOS ANTE RESPUESTA ANTE EMERGENCIAS EN SEGURIDAD Y SALUD EN OBRA kit 3.00 600.00 1,800.00 600.00 600.00 600.00
01.02.01.02 PERFILADO Y COMPACTADO DE SUB RASANTE DE HUECOS PARA POSTES m2 26.00 4.31 112.06 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00
01.02.01.03 ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO) m3 23.00 27.77 638.71 37.57 37.57 37.57 37.57 37.57 37.57 37.57 37.57 37.57 37.57 37.57 37.57 37.57 37.57 37.57 37.57
01.02.02.03 FIJADORES C/ACERO CORRUGADO DE 1" Y ACCESORIOS (Semaforo peatonal) und 72.00 68.39 4,924.08 307.76 307.76 307.76 307.76 307.76 307.76 307.76 307.76 307.76 307.76 307.76 307.76 307.76 307.76 307.76 307.76
01.02.05.02 DEMOLICION DE SARDINEL DE CONCRETO m 30.00 5.57 167.10 10.44 10.44 10.44 10.44 10.44 10.44 10.44 10.44 10.44 10.44 10.44 10.44 10.44 10.44 10.44 10.44
01.02.05.03 CORTE DE LOSA DE CONCRETO CON DISCO e=0.20 m. m 30.00 1.34 40.20 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51
01.02.06.02 RELLENO Y COMPACTACION CON MATERIAL PROPIO IIEE m 360.00 13.88 4,996.80 29.92 29.92 29.92 29.92 29.92 29.92 29.92 29.92 29.92 29.92 29.92 29.92 29.92 29.92 29.92 29.92
01.02.06.03 ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO) m3 18.00 27.77 499.86 31.24 31.24 31.24 31.24 31.24 31.24 31.24 31.24 31.24 31.24 31.24 31.24 31.24 31.24 31.24 31.24
01.02.07.02 TAPAS PARA CAJA DE PASO DE IIEE und 36.00 9.87 355.32 22.21 22.21 22.21 22.21 22.21 22.21 22.21 22.21 22.21 22.21 22.21 22.21 22.21 22.21 22.21 22.21
01.02.08.02 EMPEDRADO PARA VEREDA DE 4" m2 36.00 16.73 602.28 37.64 37.64 37.64 37.64 37.64 37.64 37.64 37.64 37.64 37.64 37.64 37.64 37.64 37.64 37.64 37.64
01.02.09.02 SARDINEL DE CONCRETO DE f´c=175kg/cm2 h=0.30m, e=0.15m m 30.00 29.61 888.30 55.52 55.52 55.52 55.52 55.52 55.52 55.52 55.52 55.52 55.52 55.52 55.52 55.52 55.52 55.52 55.52
01.02.10.03 SUMINISTRO DE POSTE PEATONAL und 14.00 1,800.00 25,200.00 1,575.00 1,575.00 1,575.00 1,575.00 1,575.00 1,575.00 1,575.00 1,575.00 1,575.00 1,575.00 1,575.00 1,575.00 1,575.00 1,575.00 1,575.00 1,575.00
01.02.10.04 IZADO Y FIJADO DE POSTE PEATONAL und 14.00 101.89 1,426.46 89.15 89.15 89.15 89.15 89.15 89.15 89.15 89.15 89.15 89.15 89.15 89.15 89.15 89.15 89.15 89.15
01.02.10.05 SUMINISTRO DE SERCHA (para bandera) und 18.00 2,100.00 37,800.00 2,362.50 2,362.50 2,362.50 2,362.50 2,362.50 2,362.50 2,362.50 2,362.50 2,362.50 2,362.50 2,362.50 2,362.50 2,362.50 2,362.50 2,362.50 2,362.50
01.02.10.06 INSTALACION DE SERCHA (para bandera) und 18.00 256.22 4,611.96 288.25 288.25 288.25 288.25 288.25 288.25 288.25 288.25 288.25 288.25 288.25 288.25 288.25 288.25 288.25 288.25
01.02.10.07 INSTALACION DE SERCHA (para portico) und 2.00 332.52 665.04 41.57 41.57 41.57 41.57 41.57 41.57 41.57 41.57 41.57 41.57 41.57 41.57 41.57 41.57 41.57 41.57
01.02.11.02 COLOCACION E INSTALACION DE SEMAFOROS VEHICULARES und 27.00 19.45 525.15 32.82 32.82 32.82 32.82 32.82 32.82 32.82 32.82 32.82 32.82 32.82 32.82 32.82 32.82 32.82 32.82
01.02.11.03 COLOCACION E INSTALACION DE SEMAFOROS FLECHA und 8.00 12.96 103.68 6.48 6.48 6.48 6.48 6.48 6.48 6.48 6.48 6.48 6.48 6.48 6.48 6.48 6.48 6.48 6.48
01.02.11.04 SUMINISTRO DE SEMAFORO PEATONAL DE POLICARBONATO und 23.00 1,200.00 27,600.00 1,725.00 1,725.00 1,725.00 1,725.00 1,725.00 1,725.00 1,725.00 1,725.00 1,725.00 1,725.00 1,725.00 1,725.00 1,725.00 1,725.00 1,725.00 1,725.00
01.02.11.05 COLOCACION E INSTALACION DE SEMAFORO PEATONAL und 23.00 14.58 335.34 20.96 20.96 20.96 20.96 20.96 20.96 20.96 20.96 20.96 20.96 20.96 20.96 20.96 20.96 20.96 20.96
01.02.11.06 SUMINISTRO DE SEMAFORO DE CUENTA REGRESIVA und 27.00 1,200.00 32,400.00 2,025.00 2,025.00 2,025.00 2,025.00 2,025.00 2,025.00 2,025.00 2,025.00 2,025.00 2,025.00 2,025.00 2,025.00 2,025.00 2,025.00 2,025.00 2,025.00
01.02.11.07 COLOCACION E INSTALACION DE SEMAFORO DE CUENTA REGRESIVA und 27.00 19.45 525.15 32.82 32.82 32.82 32.82 32.82 32.82 32.82 32.82 32.82 32.82 32.82 32.82 32.82 32.82 32.82 32.82
PROYECTO "MEJORAMIENTO DEL SISTEMA DE SEMAFORIZACION, SEÑALIZACION Y NOMENCLATURA VIAL EN EL DISTRITO DE URUBAMBA-URUBAMBA-CUSCO"
Item Descripción Und. Metrado Precio S/. Parcial S/. Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6 Mes 7 Mes 8 Mes 9 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15 Mes 16 Mes 17
01.02.12 CONTROLADOR SEMAFORICOS 72,764.82
01.02.12.01 SUMINISTRO DE CONTROLADOR SEMAFORICO und 9.00 8,000.00 72,000.00 4,500.00 4,500.00 4,500.00 4,500.00 4,500.00 4,500.00 4,500.00 4,500.00 4,500.00 4,500.00 4,500.00 4,500.00 4,500.00 4,500.00 4,500.00 4,500.00
01.02.12.02 COLOCACION E INSTALACION DE CONTROLADOR und 9.00 84.98 764.82 47.80 47.80 47.80 47.80 47.80 47.80 47.80 47.80 47.80 47.80 47.80 47.80 47.80 47.80 47.80 47.80
01.02.13.02 COLOCACION E INSTALACION DE PANELES INFORMATIVOS und 2.00 216.92 433.84 27.12 27.12 27.12 27.12 27.12 27.12 27.12 27.12 27.12 27.12 27.12 27.12 27.12 27.12 27.12 27.12
01.02.14.02 SUMINISTRO DE CABLE ELECTRICO NLT 3X14 AWG m 1,000.00 7.05 7,050.00 440.63 440.63 440.63 440.63 440.63 440.63 440.63 440.63 440.63 440.63 440.63 440.63 440.63 440.63 440.63 440.63
01.02.14.03 SUMINISTRO DE CABLE ELECTRICO NLT 4X14 AWG m 1,000.00 13.35 13,350.00 834.38 834.38 834.38 834.38 834.38 834.38 834.38 834.38 834.38 834.38 834.38 834.38 834.38 834.38 834.38 834.38
01.02.14.04 SUMINISTRO E INSTALACION DE TUBERIA PVC-SAP DE 2" m 3,000.00 4.93 14,790.00 924.38 924.38 924.38 924.38 924.38 924.38 924.38 924.38 924.38 924.38 924.38 924.38 924.38 924.38 924.38 924.38
01.02.14.05 POZO A TIERRA und 9.00 335.75 3,021.75 188.86 188.86 188.86 188.86 188.86 188.86 188.86 188.86 188.86 188.86 188.86 188.86 188.86 188.86 188.86 188.86
01.02.14.06 CAJA DE REGISTRO PARA POZO A TIERRA und 9.00 123.89 1,115.01 69.69 69.69 69.69 69.69 69.69 69.69 69.69 69.69 69.69 69.69 69.69 69.69 69.69 69.69 69.69 69.69
01.02.02.01 CAMARA FIJA PARA VIDEO DETECCION (RECONOCIMIENTO ROSTRO) und 6.00 10,100.00 60,600.00 3,787.50 3,787.50 3,787.50 3,787.50 3,787.50 3,787.50 3,787.50 3,787.50 3,787.50 3,787.50 3,787.50 3,787.50 3,787.50 3,787.50 3,787.50 3,787.50
01.02.02.01 PENDALT KIT COLGANTE und 12.00 750.00 9,000.00 562.50 562.50 562.50 562.50 562.50 562.50 562.50 562.50 562.50 562.50 562.50 562.50 562.50 562.50 562.50 562.50
01.02.02.01 WALL MOUNT TYPE 4/12" ENCLOSURE und 12.00 1,863.00 22,356.00 1,397.25 1,397.25 1,397.25 1,397.25 1,397.25 1,397.25 1,397.25 1,397.25 1,397.25 1,397.25 1,397.25 1,397.25 1,397.25 1,397.25 1,397.25 1,397.25
01.02.02.01 PANEL (462X462) und 12.00 115.50 1,386.00 86.63 86.63 86.63 86.63 86.63 86.63 86.63 86.63 86.63 86.63 86.63 86.63 86.63 86.63 86.63 86.63
01.02.02.01 DIN RALL KIT DIN3 T35X 7.5 KIT DE CARRIL und 24.00 189.30 4,543.20 283.95 283.95 283.95 283.95 283.95 283.95 283.95 283.95 283.95 283.95 283.95 283.95 283.95 283.95 283.95 283.95
01.02.02.01 POLE MOUNTING KIT WHEN B=20.00(508) und 12.00 197.98 2,375.76 148.49 148.49 148.49 148.49 148.49 148.49 148.49 148.49 148.49 148.49 148.49 148.49 148.49 148.49 148.49 148.49
01.02.02.01 UPS RS 500 VA und 12.00 1,355.10 16,261.20 1,016.33 1,016.33 1,016.33 1,016.33 1,016.33 1,016.33 1,016.33 1,016.33 1,016.33 1,016.33 1,016.33 1,016.33 1,016.33 1,016.33 1,016.33 1,016.33
01.02.02.01 INTERRUPTOR THERMOMAGNETICO 220 VAC und 12.00 335.00 4,020.00 251.25 251.25 251.25 251.25 251.25 251.25 251.25 251.25 251.25 251.25 251.25 251.25 251.25 251.25 251.25 251.25
01.02.02.01 JOYSTICK und 1.00 1,300.00 1,300.00 81.25 81.25 81.25 81.25 81.25 81.25 81.25 81.25 81.25 81.25 81.25 81.25 81.25 81.25 81.25 81.25
01.02.02.01 ESTACIONES DE CENTRO VIGILANCIA und 1.00 6,400.00 6,400.00 400.00 400.00 400.00 400.00 400.00 400.00 400.00 400.00 400.00 400.00 400.00 400.00 400.00 400.00 400.00 400.00
01.02.02.01 MONITORES 40-55" und 1.00 7,200.00 7,200.00 450.00 450.00 450.00 450.00 450.00 450.00 450.00 450.00 450.00 450.00 450.00 450.00 450.00 450.00 450.00 450.00
01.02.02.01 INCREMENTO ALMACENAMIENTO NVR EN 5 TB und 1.00 13,800.00 13,800.00 862.50 862.50 862.50 862.50 862.50 862.50 862.50 862.50 862.50 862.50 862.50 862.50 862.50 862.50 862.50 862.50
01.02.02.01 MANO DE OBRA (CONFIGURACION DE LAS FUNCIONALIDADES Y PROGRAMACION PUESTO A PUNTO OBRAS CIVILES) glb 1.00 24,500.00 24,500.00 1,531.25 1,531.25 1,531.25 1,531.25 1,531.25 1,531.25 1,531.25 1,531.25 1,531.25 1,531.25 1,531.25 1,531.25 1,531.25 1,531.25 1,531.25 1,531.25
02 COMPONENTE 02: ELABORACIÓN E INSTALACIÓN DE NUMERACIÓN DE PREDIOS, NOMENCLATURA DE CALLES, AVENIDAS 1,339,848.15
Y APVS
02.01 ELABORACIÓN E INSTALACION DE CARTELES NOMENCLADORES DEL CENTRO HISTORICO 55,364.40
02.01.01 MODELADO DE ARCILLA DE MOLDES PARA EL CENTRO HISTORICO und 3.00 127.60 382.80 382.80
02.01.02 VACIADO DE MOLDES EN RESINA PARA EL CENTRO HISTORICO und 20.00 50.16 1,003.20 59.01 59.01 59.01 59.01 59.01 59.01 59.01 59.01 59.01 59.01 59.01 59.01 59.01 59.01 59.01 59.01
02.01.03 VACIADO DE FIGURAS CON RESINA PARA EL CENTRO HISTORICO und 280.00 47.68 13,350.40 785.32 785.32 785.32 785.32 785.32 785.32 785.32 785.32 785.32 785.32 785.32 785.32 785.32 785.32 785.32 785.32
02.01.05 PINTADO DE FIGURAS DE RESINA PARA EL CENTRO HISTORICO und 280.00 40.28 0.00
11,278.40 663.44 663.44 663.44 663.44 663.44 663.44 663.44 663.44 663.44 663.44 663.44 663.44 663.44 663.44 663.44 663.44
02.01.08 PEGADO DE FIGURAS DE RESINA DE CONTRO HISTORICO EN SUSTRATO und 280.00 8.92 0.00
2,497.60 146.92 146.92 146.92 146.92 146.92 146.92 146.92 146.92 146.92 146.92 146.92 146.92 146.92 146.92 146.92 146.92
02.01.09 PLOTEADO DE NOMENCLADORES DE CALLES Y AVENIDAS EN EL CENTRO HISTORICO und 280.00 21.29 0.00
5,961.20 350.66 350.66 350.66 350.66 350.66 350.66 350.66 350.66 350.66 350.66 350.66 350.66 350.66 350.66 350.66 350.66
02.01.11 COLOCADO DE NOMENCLATURA DE CALLES Y AVENIDAS EN PARED und 280.00 8.71 0.00
2,438.80 143.46 143.46 143.46 143.46 143.46 143.46 143.46 143.46 143.46 143.46 143.46 143.46 143.46 143.46 143.46 143.46
02.02.01.15 PINTURA ANTICORROSIVA + ESMALTE SINTÉTICO EN ESTRUCTURAS METÁLICAS m2 988.42 10.22 0.00
10,101.65 594.21 594.21 594.21 594.21 594.21 594.21 594.21 594.21 594.21 594.21 594.21 594.21 594.21 594.21 594.21 594.21
Item Descripción Und. Metrado Precio S/. Parcial S/. Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6 Mes 7 Mes 8 Mes 9 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15 Mes 16 Mes 17
02.02.02.02 EXCAVACION SIMPLE PARA CIMENTACIONES m3 32.50 26.78 870.35 51.20 51.20 51.20 51.20 51.20 51.20 51.20 51.20 51.20 51.20 51.20 51.20 51.20 51.20 51.20 51.20
02.02.02.04 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA dist.=5km. m3 42.38 23.48 0.00
995.08 58.53 58.53 58.53 58.53 58.53 58.53 58.53 58.53 58.53 58.53 58.53 58.53 58.53 58.53 58.53 58.53
02.03.01.02 PINTADO DE ROMPEMUELLES m2 480.00 16.13 7,742.40 455.44 455.44 455.44 455.44 455.44 455.44 455.44 455.44 455.44 455.44 455.44 455.44 455.44 455.44 455.44 455.44
02.03.01.03 PINTADO DE LÍNEAS CENTRALES m2 2,000.00 9.97 19,940.00 1,172.94 1,172.94 1,172.94 1,172.94 1,172.94 1,172.94 1,172.94 1,172.94 1,172.94 1,172.94 1,172.94 1,172.94 1,172.94 1,172.94 1,172.94 1,172.94
02.03.01.04 COLOCADO DE TACHAS und 3,850.00 12.66 48,741.00 2,867.12 2,867.12 2,867.12 2,867.12 2,867.12 2,867.12 2,867.12 2,867.12 2,867.12 2,867.12 2,867.12 2,867.12 2,867.12 2,867.12 2,867.12 2,867.12
02.03.01.05 PINTADO DE ZONAS RÍGIDAS m2 8,050.00 12.66 101,913.00 5,994.88 5,994.88 5,994.88 5,994.88 5,994.88 5,994.88 5,994.88 5,994.88 5,994.88 5,994.88 5,994.88 5,994.88 5,994.88 5,994.88 5,994.88 5,994.88
02.03.01.06 PINTADO DE CRUCES PEATONALES m2 4,320.00 15.08 65,145.60 3,832.09 3,832.09 3,832.09 3,832.09 3,832.09 3,832.09 3,832.09 3,832.09 3,832.09 3,832.09 3,832.09 3,832.09 3,832.09 3,832.09 3,832.09 3,832.09
02.03.01.07 PINTADO DE FLECHAS SEÑALIZADORAS m2 500.00 23.24 11,620.00 683.53 683.53 683.53 683.53 683.53 683.53 683.53 683.53 683.53 683.53 683.53 683.53 683.53 683.53 683.53 683.53
02.03.02.01.02 ACARREO DE MATERIAL EXCEDENTE m3 13.05 3.57 46.59 2.91 2.91 2.91 2.91 2.91 2.91 2.91 2.91 2.91 2.91 2.91 2.91 2.91 2.91 2.91
02.03.02.01.03 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA dist.=5km. m3 13.05 23.48 0.00
306.41 19.15 19.15 19.15 19.15 19.15 19.15 19.15 19.15 19.15 19.15 19.15 19.15 19.15 19.15 19.15
02.03.02.02.01.02 CORTE DE SUSTRATO DE ALUMINIO PARA SEÑAL VERTICAL I - 5 und 20.00 72.38 0.00
1,447.60 144.76 144.76 144.76 144.76 144.76 144.76 144.76 144.76 144.76 144.76
02.03.02.02.01.04 CALADO Y PEGADO AL SUSTRATO SEÑAL VERTICAL und 20.00 6.65 0.00
133.00 13.30 13.30 13.30 13.30 13.30 13.30 13.30 13.30 13.30 13.30
02.03.02.02.02.02 CORTE DE SUSTRATO DE ALUMINIO PARA SEÑAL VERTICAL I - 6 und 82.00 58.64 0.00
4,808.48 351.84 351.84 293.20 293.20 293.20 293.20 293.20 293.20 293.20 293.20 293.20 293.20 293.20 293.20 293.20
02.03.02.02.02.04 CALADO Y PEGADO AL SUSTRATO SEÑAL VERTICAL und 82.00 6.65 0.00
545.30 39.90 39.90 33.25 33.25 33.25 33.25 33.25 33.25 33.25 33.25 33.25 33.25 33.25 33.25 33.25
02.03.02.02.03.02 CORTE DE SUSTRATO DE ALUMINIO PARA SEÑAL VERTICAL I - 10 und 10.00 73.86 0.00
738.60 73.86 73.86 73.86 73.86 73.86 73.86 73.86 73.86 73.86 73.86
02.03.02.02.03.04 CALADO Y PEGADO AL SUSTRATO SEÑAL VERTICAL und 10.00 6.65 0.00
66.50 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65
02.03.02.02.04.02 CORTE DE SUSTRATO DE ALUMINIO PARA SEÑAL VERTICAL I - 14 und 10.00 73.86 0.00
738.60 73.86 73.86 73.86 73.86 73.86 73.86 73.86 73.86 73.86 73.86
02.03.02.02.04.04 CALADO Y PEGADO AL SUSTRATO SEÑAL VERTICAL und 10.00 6.65 0.00
66.50 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65
02.03.02.02.05.02 CORTE DE SUSTRATO DE ALUMINIO PARA SEÑAL VERTICAL P - 33 A und 10.00 73.86 0.00
738.60 73.86 73.86 73.86 73.86 73.86 73.86 73.86 73.86 73.86 73.86
02.03.02.02.05.04 CALADO Y PEGADO AL SUSTRATO SEÑAL VERTICAL und 10.00 6.65 0.00
66.50 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65
02.03.02.02.06.02 CORTE DE SUSTRATO DE ALUMINIO PARA SEÑAL VERTICAL P - 48. und 70.00 72.38 0.00
5,066.60 361.90 361.90 361.90 361.90 361.90 361.90 289.52 289.52 289.52 289.52 289.52 289.52 289.52 289.52 289.52
02.03.02.02.06.04 CALADO Y PEGADO AL SUSTRATO SEÑAL VERTICAL und 70.00 6.65 0.00
465.50 33.25 33.25 33.25 33.25 33.25 33.25 26.60 26.60 26.60 26.60 26.60 26.60 26.60 26.60 26.60
02.03.02.02.07.02 CORTE DE SUSTRATO DE ALUMINIO PARA SEÑAL VERTICAL P - 49 und 30.00 72.38 0.00
2,171.40 144.76 144.76 144.76 144.76 144.76 144.76 144.76 144.76 144.76 144.76 144.76 144.76 144.76 144.76 72.38
02.03.02.02.07.04 CALADO Y PEGADO AL SUSTRATO SEÑAL VERTICAL und 30.00 6.65 0.00
199.50 13.30 13.30 13.30 13.30 13.30 13.30 13.30 13.30 13.30 13.30 13.30 13.30 13.30 13.30 6.65
02.03.02.02.08.02 CORTE DE SUSTRATO DE ALUMINIO PARA SEÑAL VERTICAL P - 50 und 20.00 72.38 0.00
1,447.60 144.76 144.76 144.76 144.76 72.38 72.38 72.38 72.38 72.38 72.38 72.38 72.38 72.38 72.38 72.38
02.03.02.02.08.04 CALADO Y PEGADO AL SUSTRATO SEÑAL VERTICAL und 20.00 6.65 0.00
133.00 13.30 13.30 13.30 13.30 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65
Item Descripción Und. Metrado Precio S/. Parcial S/. Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6 Mes 7 Mes 8 Mes 9 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15 Mes 16 Mes 17
02.03.02.02.09.01 CORTE Y ARMADO DE POSTE PARA SEÑAL VERTICAL und 50.00 60.39 3,019.50 301.95 301.95 301.95 301.95 301.95 301.95 120.78 120.78 120.78 120.78 120.78 120.78 120.78 120.78 120.78
02.03.02.02.09.02 CORTE DE SUSTRATO DE ALUMINIO PARA SEÑAL VERTICAL R - 27 und 50.00 72.38 0.00
3,619.00 361.90 361.90 361.90 361.90 361.90 361.90 144.76 144.76 144.76 144.76 144.76 144.76 144.76 144.76 144.76
02.03.02.02.09.04 CALADO Y PEGADO AL SUSTRATO SEÑAL VERTICAL und 50.00 6.65 0.00
332.50 33.25 33.25 33.25 33.25 33.25 33.25 13.30 13.30 13.30 13.30 13.30 13.30 13.30 13.30 13.30
02.03.02.02.10.02 CORTE DE SUSTRATO DE ALUMINIO PARA SEÑAL VERTICAL R - 30 und 50.00 72.38 0.00
3,619.00 361.90 361.90 361.90 361.90 361.90 361.90 144.76 144.76 144.76 144.76 144.76 144.76 144.76 144.76 144.76
02.03.02.02.10.04 CALADO Y PEGADO AL SUSTRATO SEÑAL VERTICAL und 50.00 6.65 0.00
332.50 33.25 33.25 33.25 33.25 33.25 33.25 13.30 13.30 13.30 13.30 13.30 13.30 13.30 13.30 13.30
02.03.02.02.11.02 CORTE DE SUSTRATO DE ALUMINIO PARA SEÑAL VERTICAL T - 09 und 10.00 72.38 0.00
723.80 72.38 72.38 72.38 72.38 72.38 72.38 72.38 72.38 72.38 72.38
02.03.02.02.11.04 CALADO Y PEGADO AL SUSTRATO SEÑAL VERTICAL und 10.00 6.65 0.00
66.50 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65
02.03.02.02.12 SEÑAL TURISTICA T - 15 2,823.10
02.03.02.02.12.01 CORTE Y ARMADO DE POSTE PARA SEÑAL VERTICAL und 10.00 60.39 603.90 60.39 60.39 60.39 60.39 60.39 60.39 60.39 60.39 60.39 60.39
02.03.02.02.12.02 CORTE DE SUSTRATO DE ALUMINIO PARA SEÑAL VERTICAL T - 15 und 10.00 72.38 0.00
723.80 72.38 72.38 72.38 72.38 72.38 72.38 72.38 72.38 72.38 72.38
02.03.02.02.12.04 CALADO Y PEGADO AL SUSTRATO SEÑAL VERTICAL und 10.00 6.65 0.00
66.50 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65
02.04.02 PRUEBA DE RESISTENCIA A LA COMPRESION DE CONCRETO und 15.00 30.00 450.00 90.00 90.00 90.00 90.00 90.00
02.05.02 MITIGACION POR IMPACTO NEGATIVO EN EL AIRE ( RUIDO POLVOS Y OLORES) glb 3.00 500.00 0.00
1,500.00 500.00 500.00
03.02.02 ELABORACION Y DIFUSION DE SPOT TELEVISIVO und 18.00 1,200.00 21,600.00 1,200.00 1,200.00 1,200.00 1,200.00 1,200.00 1,200.00 1,200.00 1,200.00 1,200.00 1,200.00 1,200.00 1,200.00 1,200.00 1,200.00 1,200.00 1,200.00 1,200.00
Costo Directo MENSUAL 2,207,069.28 34,646.84 136,526.57 129,690.68 135,252.68 129,122.13 135,455.23 128,901.33 134,813.33 127,097.50 127,007.50 127,097.50 138,728.50 125,303.95 125,303.95 125,303.95 125,303.95 125,080.20
GASTOS GENERALES (15.26 %) 286,919.01 15,939.95 15,939.95 15,939.95 15,939.95 15,939.95 15,939.95 15,939.95 15,939.95 15,939.95 15,939.95 15,939.95 15,939.95 15,939.95 15,939.95 15,939.95 15,939.95 15,939.95
GASTOS DE SUPERVISION (3.93%) 22,070.69 1,226.15 1,226.15 1,226.15 1,226.15 1,226.15 1,226.15 1,226.15 1,226.15 1,226.15 1,226.15 1,226.15 1,226.15 1,226.15 1,226.15 1,226.15 1,226.15 1,226.15
GASTOS DE LIQUIDACION (0.70%) 24,277.76
COSTO DE EXPEDIENTE TECNICO (1.02 %) 39,727.25 39,727.25
PRESUPUESTO TOTAL 2,580,063.99 91,540.18 153,692.67 146,856.78 152,418.78 146,288.23 152,621.33 146,067.43 151,979.43 144,263.60 144,173.60 144,263.60 155,894.60 142,470.05 142,470.05 142,470.05 142,470.05 142,246.30
Mes 18
500.00
37.57
Mes 18
59.01
785.32
19.44
663.44
843.13
195.67
146.92
350.66
27.18
143.46
6,930.85
287.36
1,994.51
12,466.27
2,893.13
1,095.88
8,219.12
2,038.34
1,872.74
2,382.94
3,652.94
3,310.17
594.21
376.25
388.16
Mes 18
51.20
8.90
58.53
743.06
2,617.94
2,081.18
455.44
1,172.94
2,867.12
5,994.88
3,832.09
683.53
16.80
2.91
19.15
181.27
385.25
143.69
301.95
293.20
464.35
33.25
241.56
289.52
301.00
26.60
60.39
72.38
84.33
6.65
60.39
72.38
81.38
6.65
Mes 18
120.78
144.76
250.88
13.30
120.78
144.76
250.88
13.30
500.00
500.00
2,768.40
989.20
1,400.00
1,200.00
84,403.57
15,939.95
1,226.15
24,277.76
125,847.42
PROYECTO "MEJORAMIENTO DEL SIS
02.03.01 MODELADO DE ARCILLA DE MOLDES PARA EL CENTRO HISTORICO und 3.00 180.83
02.03.02 VACIADO DE MOLDES EN RESINA PARA EL CENTRO HISTORICO und 280.00 55.49
02.03.03 VACIADO DE FIGURAS CON RESINA PARA EL CENTRO HISTORICO und 280.00 82.96
02.03.04 LAVADO Y LIJADO DE FIGURAS DE RESINA und 280.00 1.62
02.03.05 PINTADO DE FIGURAS DE RESINA PARA EL CENTRO HISTORICO und 280.00 92.57
02.03.06 CORTADO DE SUSTRATO 0.3 X 0.9 M und 280.00 53.62
02.03.07 LIJADO DE SUSTRATO und 280.00 12.62
02.03.08 PEGADO DE FIGURAS DE RESINA DE CONTRO HISTORICO EN SUSTRATO und 280.00 10.34
02.03.09 PLOTEADO DE NOMENCLADORES DE CALLES Y AVENIDAS EN EL CENTRO HISTORICO und 280.00 21.29
02.03.10 CALADO Y PEGADO AL SUSTRATO und 280.00 2.19
02.03.11 COLOCADO DE NOMENCLATURA DE CALLES Y AVENIDAS EN PARED und 280.00 10.91
02.04 ELABORACIÓN E INSTALACION DE CARTELES NOMENCLADORES DE CALLES Y AVENIDAS
02.07.02 MITIGACION POR IMPACTO NEGATIVO EN EL AIRE ( RUIDO POLVOS Y OLORES) glb 3.00 500.00
02.07.03 MANEJO DE RESIDUOS SOLIDOS glb 1.00 1,200.00
02.07.04 DESMONTAJE DE CONSTRUCCIONES PROVISIONALES m2 120.00 32.02
02.07.05 ACONDICIONAMIENTO DE MATERIALES EXCEDENTES. glb 2.00 500.08
03 COMPONENTE 03 : SOCIALIZACION Y CONCIENTIZACION
03.01 ADQUISICION DE EQUIPOS PARA SOCIALIZACION Y CONCIENTIZACION
03.01.01 AMPLIFICADOR PORTATIL und 1.00 800.00
03.01.02 MEGAFONO Y ACCESORIOS und 1.00 600.00
03.01.03 IMPRESORA MULTIFUNCIONAL und 1.00 700.00
03.01.04 MOBILIARIO DE OFICINA und 1.00 1,280.00
03.01.05 REVISTAS INFORMATIVAS und 3,000.00 2.80
03.01.06 TRIPTICOS INFORMATIVAS und 10,000.00 0.45
03.02 ELABORACION Y DIFUSION DE SPOT PUBLICITARIO
03.02.01 ELABORACION Y DIFUSION DE SPOT RADIAL und 18.00 1,400.00
03.02.02 ELABORACION Y DIFUSION DE SPOT TELEVISIVO und 18.00 1,200.00
03.03 TALLERES DE SOCIALIZACION Y CONCIENTIZACION A LA POBLACION
03.03.01 SOCIALIZACION Y SENSIBILIZACION PARA NOMENCLARURA Y NUMERACION DE PREDIOS. mes 18.00 5,353.50
1,452.06 1,452.06
1,788.00
1,050.00 350.00 350.00 350.00
738.00 738.00
38,165.00
5,865.00 1,955.00 1,955.00
117,582.20
13,545.00 846.56 846.56 846.56 846.56 846.56 846.56
1,926,069.18
171,400.00
51,200.00 3,011.76 3,011.76 3,011.76 3,011.76 3,011.76 3,011.76
125,133.67
408.02 24.00 24.00 24.00 24.00 24.00 24.00
96,753.29
542.49 542.49
1,071,773.46
1,017,136.05
1,034.20 517.10 517.10
54,637.41
18,010.80 1,059.46 1,059.46 1,059.46 1,059.46 1,059.46 1,059.46
450,616.20
356,213.00
43,236.00 2,543.29 2,543.29 2,543.29 2,543.29 2,543.29 2,543.29
8,550.00 502.94 502.94 502.94 502.94 502.94 502.94
94,403.20
3,987.96
392.91 24.56 24.56 24.56 24.56 24.56
87,644.64
2,019.80
1,857.40 185.74 185.74 185.74 185.74 185.74
18,607.44
5,234.88 383.04 383.04 319.20 319.20 319.20
2,421.40
638.40 63.84 63.84 63.84 63.84 63.84
2,421.40
638.40 63.84 63.84 63.84 63.84 63.84
2,151.80
638.40 63.84 63.84 63.84 63.84 63.84
15,533.00
4,468.80 319.20 319.20 319.20 319.20 319.20
6,929.40
1,915.20 127.68 127.68 127.68 127.68 127.68
4,560.60
1,276.80 127.68 127.68 127.68 127.68 63.84
13,604.50
3,192.00 319.20 319.20 319.20 319.20 319.20
13,604.50
3,192.00 319.20 319.20 319.20 319.20 319.20
2,895.40
638.40 63.84 63.84 63.84 63.84 63.84
1,350.00
900.00 900.00
9,042.56
1,500.00 500.00
1,500.00 500.00
1,200.00 1,200.00
3,842.40
1,000.16
216,950.00
16,280.00
800.00 800.00
0.00
600.00 600.00
0.00
700.00 700.00
0.00
1,280.00 1,280.00
0.00
8,400.00 0.00 8,400.00
46,800.00
25,200.00 1,400.00 1,400.00 1,400.00 1,400.00 1,400.00 1,400.00 1,400.00
153,870.00
96,363.00 5,353.50 5,353.50 5,353.50 5,353.50 5,353.50 5,353.50 5,353.50
1,955.00
6,002.00 6,002.00
1,200.00
964.00
600.00
90.00 90.00
500.00
500.00
846.56 846.56
2,262.50 2,262.50
745.91 745.91 745.91
1,156.28 1,156.28 1,156.28
2,088.24 2,088.24 2,088.24
500.00
500.00
3,842.40
1,000.16
4,792.25 4,792.25
131,392.09 131,161.11 129,102.36
6
3
8
6
4
5
9
13
17
4
17
11
3
3
9
17
11
5
4
15
12
182