ALCANTARA CHUQUILIN UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO VI.

DISEÑO DE VIGAS DE
ALEX FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA CIMENTACION EJE A-A
ESCUELA PROFESIONAL DE INGENIERIA CIVIL

DISEÑO DE VIGA DE CIMENTACION EJE A - A


P1 P2 P3 P4 P5 P6

0.50 m 1.00 m 1.50 m


1 2 3 4
Pm = 40.00 tn 18.10 tn 17.92 tn 20.62 tn 96.64 tn
Pv = 5.05 tn 2.25 tn 2.20 tn 3.86 tn 13.36 tn
Psx = 0.00 tn 0.00 tn 0.00 tn 0.00 tn 0.00 tn
Psy = -91.11 tn 2.27 tn 52.40 tn 36.45 tn 91.12 tn
0.87 m 22.62 tn 72.52 tn 60.93 tn
0.51 m 1.03 m 1.54 m 2.05 m
1 2 3 4 5
INGRESAR TODOS ESTOS DATOS OBENIDOS DEL ETABS 2016 Pm = 11.52 tn 19.90 tn 18.85 tn 18.55 tn 47.18 tn 116.00 tn
Pv = 2.10 tn 3.60 tn 3.40 tn 3.33 tn 8.48 tn 20.91 tn
σt = 17.50 tn/m2 f´c = 280.0 kg/cm2 rec = 0.075 m Psx = 0.00 tn 0.00 tn 0.00 tn 0.00 tn 0.00 tn 0.00 tn
Ko = 6000.0 tn/m3 fy = 4200.0 kg/cm2 ep = 0.10 m Psy = 0.00 tn 0.00 tn 0.00 tn 2.00 tn 109.40 tn 111.40 tn
DF = 1.50 m Es = 2.1E+06 kg/cm2 er = 0.15 m Yg= 1.651 23.50 tn 22.25 tn 23.88 tn 165.06 tn
NPT = 0.25 m γca = 2.40 tn/m3 0.51 m 1.03 m 1.54 m 2.05 m
S/C = 0.20 tn/m2 γcs = 2.00 tn/m3 1 2 3 4 5
Hz = 0.50 m asumido para hallar la capacidad neta γs = 1.70 tn/m3 Pm = 9.11 tn 16.00 tn 15.23 tn 14.90 tn 28.77 tn 84.01 tn
Pv = 1.31 tn 2.32 tn 2.20 tn 2.10 tn 4.02 tn 11.95 tn
OBS: las coordenadas de columnas son según plano y las de cargas y momentos ingresar según cuadro excel Psx = 0.00 tn 0.00 tn 0.00 tn 0.00 tn 0.00 tn 0.00 tn
Psy = 0.00 tn 0.00 tn 0.00 tn 31.96 tn 147.20 tn 179.16 tn
Yg= 1.71 m 18.32 tn 17.43 tn 48.96 tn 179.99 tn

COLUMNA 1 COLUMNA 2 COLUMNA 3 COLUMNA 4 COLUMNA 5 COLUMNA 6


dimensiones coord según plano dimensiones coord según plano dimensiones coord según plano dimensiones coord según plano dimensiones coord según plano dimensiones coord según plano
x y x y x y x y x y x y
0.35 m 0.40 m 0.30 m 0.45 m 0.30 m 0.40 m 0.35 m 0.40 m 0.30 m 0.45 m 0.35 m 0.40 m

cargas de gravedad cargas de gravedad cargas de gravedad cargas de gravedad cargas de gravedad cargas de gravedad
Pm = 44.00 tn Pm = 116.00 tn Pm = 42.44 tn Pm = 40.00 tn Pm = 96.64 tn Pm = 84.01 tn
Pv = 7.44 tn Pv = 20.91 tn Pv = 5.56 tn Pv = 5.10 tn Pv = 13.36 tn Pv = 11.95 tn
momentos longitudinales momentos longitudinales momentos longitudinales momentos longitudinales momentos longitudinales momentos longitudinales
Mm = 0.30 tn-m Horar Mm = -0.31 tn-m Antihor Mm = 0.33 tn-m Horar Mm = 0.34 tn-m Horar Mm = 1.00 tn-m Horar Mm = -0.21 tn-m Antihor
Mv = 0.10 tn-m Horar Mv = -0.01 tn-m Antihor Mv = 0.10 tn-m Horar Mv = 0.10 tn-m Horar Mv = 0.20 tn-m Horar Mv = 0.01 tn-m Horar
Msx = -2.00 tn-m Antihor Msx = -3.15 tn-m Antihor Msx = -2.50 tn-m Antihor Msx = -2.70 tn-m Antihor Msx = -2.00 tn-m Antihor Msx = -3.00 tn-m Antihor
Psx = 0.00 tn -24.30 tn Psx = 0.00 tn Psx = 0.00 tn -24.21 tn Psx = 0.00 tn -16.36 Psx = 0.00 tn Psx = 0.00 tn
momentos transversales momentos transversales momentos transversales momentos transversales momentos transversales momentos transversales
Mm = -0.24 tn-m Antihor Mm = 0.50 tn-m Horar Mm = 0.24 tn-m Horar Mm = -0.36 tn-m Antihor Mm = -0.20 tn-m Antihor Mm = 0.40 tn-m Horar
Mv = -0.01 tn-m Antihor Mv = 0.12 tn-m Horar Mv = 0.10 tn-m Horar Mv = -0.01 tn-m Antihor Mv = -0.01 tn-m Antihor Mv = 0.10 tn-m Horar
Msy = 4.30 tn-m Horar Msy = 5.04 tn-m Horar Msy = 7.00 tn-m Horar Msy = 4.87 tn-m Horar Msy = 7.00 tn-m Horar Msy = 4.12 tn-m Horar
Psy = 0.00 tn -38.00 tn Psy = 0.00 tn -188.00 tn Psy = 0.00 tn -26.00 tn Psy = 0.00 tn -91.1 Psy = 91.12 tn Psy = 111.40 tn

A) DIMENSIONAMIENTO Y ANÁLISIS:

1) DETERMINACION DE LA CAPACIDAD NETA DEL TERRENO

Considerando solo CARGAS DE GRAVEDAD: σnt = 15.65 tn/m2  nt   t  e p ( CS )  er ( S )  S / C  H Z ( CA )


Considerando efectos de SISMO: σnts = 20.90 tn/m2  nts  1.3 *  t  eP ( CS )  er ( S )  S / C  H Z ( CA )

CONCRETO ARMADO II: DISEÑO ESTRUCTURAL DE UNA VIVIENDA


ING. CARLOS RAMOS CHIMPEN MULTIFAMILIAR DE 8 PISOS RNE: NORMA E-060
ALCANTARA CHUQUILIN UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO VI. DISEÑO DE VIGAS DE
ALEX FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA CIMENTACION EJE A-A
ESCUELA PROFESIONAL DE INGENIERIA CIVIL

DIAGRAMA DE CARGAS

ML1 = 0.30 + 0.10 tn-m ML2= -0.31 + -0.01 tn-m ML3= 0.33 + 0.10 tn-m ML4= 0.34 + 0.10 tn-m ML5= 1.00 + 0.20 tn-m ML6= 0.34 + 0.10 tn-m
P1 = 44.00 + 7.44 tn P2= 116.00 + 20.91 tn P3= 42.44 + 5.56 tn P4 = 40.00 + 5.10 tn P5 = 96.64 + 13.36 tn P6= 40.00 + 5.10 tn

4.794 m 4.331 m 2.650 m 3.171 m 5.168 m


20.11 m
2) POSICION DE LA RESULTANTE RESPECTO A P1 CONSIDERANDO ALTERNANCIA DE CARGAS SIN SISMO
ALTERNANCIA DE SOBRECARGA
Xg1 = 4.79 x 136.91 + 9.12 m x 48.00 + 11.77 m x 45.10 + 14.95 m x 110.00 + 20.11 m x 95.96 + 20.11 m + ( 0.40 + -0.32 + 0.43 + 0.44 + 1.20 + 0.44 + 0.440 ) = 5202.57 = 10.67 m 100
487.41 487.41

Xg2 = 4.79 x 126.46 + 9.12 m x 45.22 + 11.77 m x 42.55 + 14.95 m x 103.32 + 20.11 m x 89.99 + 20.11 m + ( 0.35 + -0.32 + 0.38 + 0.39 + 1.10 + 0.39 + 0.390 ) = 4876.69 = 10.71 m 50
455.25 455.25

Xg3= 4.79 x 126.46 + 9.12 m x 48.00 + 11.77 m x 42.55 + 14.95 m x 110.00 + 20.11 m x 89.99 + 20.11 m + ( 0.40 + -0.32 + 0.43 + 0.39 + 1.20 + 0.39 + 0.440 ) = 5002.15 = 10.68 m 100
468.43 468.43

Xg4 = 4.79 x 126.46 + 9.12 m x 45.22 + 11.77 m x 42.55 + 14.95 m x 103.32 + 20.11 m x 95.96 + 20.11 m + ( 0.35 + -0.32 + 0.38 + 0.39 + 1.10 + 0.39 + 0.440 ) = 4996.92 = 10.83 m 50
461.23 461.23

Xg5 = 4.79 x 126.46 + 9.12 m x 45.22 + 11.77 m x 42.55 + 14.95 m x 110.00 + 20.11 m x 89.99 + 20.11 m + ( 0.35 + -0.32 + 0.38 + 0.39 + 1.10 + 0.44 + 0.390 ) = 4976.58 = 10.77 m 50
461.93 461.93

Xg6 = 4.79 x 126.46 + 9.12 m x 45.22 + 11.77 m x 45.10 + 14.95 m x 103.32 + 20.11 m x 89.99 + 20.11 m + ( 0.35 + -0.32 + 0.38 + 0.39 + 1.20 + 0.39 + 0.390 ) = 4906.82 = 10.72 m 50
457.80 457.80

Xg7= 4.79 x 126.46 + 9.12 m x 48.00 + 11.77 m x 42.55 + 14.95 m x 103.32 + 20.11 m x 89.99 + 20.11 m + ( 0.35 + -0.32 + 0.38 + 0.44 + 1.10 + 0.39 + 0.390 ) = 4902.11 = 10.70 m 50
458.03 458.03

Xg8= 4.79 x 136.91 + 9.12 m x 45.22 + 11.77 m x 42.55 + 14.95 m x 103.32 + 20.11 m x 89.99 + 20.11 m + ( 0.35 + -0.32 + 0.43 + 0.39 + 1.10 + 0.39 + 0.390 ) = 4926.86 = 10.58 m 100
465.71 465.71

Xg9= 4.79 x 126.46 + 9.12 m x 45.22 + 11.77 m x 42.55 + 14.95 m x 110.00 + 20.11 m x 95.96 + 20.11 m + ( 0.35 + -0.32 + 0.38 + 0.39 + 1.10 + 0.39 + 0.390 ) = 5096.71 = 10.89 m 50
467.91 467.91

Xg1 0= 4.79 x 126.46 + 9.12 m x 45.22 + 11.77 m x 45.10 + 14.95 m x 110.00 + 20.11 m x 89.99 + 20.11 m + ( 0.40 + -0.32 + 0.38 + 0.39 + 1.10 + 0.39 + 0.390 ) = 5006.61 = 10.69 m 50
468.20 468.20

Xg1 1= 4.79 x 126.46 + 9.12 m x 48.00 + 11.77 m x 45.10 + 14.95 m x 103.32 + 20.11 m x 89.99 + 20.11 m + ( 0.35 + -0.32 + 0.38 + 0.39 + 1.10 + 0.44 + 0.440 ) = 4932.18 = 10.71 m 50
460.58 460.58

Xg12 = 4.79 x 136.91 + 9.12 m x 48.00 + 11.77 m x 42.55 + 14.95 m x 103.32 + 20.11 m x 89.99 + 20.11 m + ( 0.35 + -0.32 + 0.38 + 0.39 + 1.20 + 0.44 + 0.390 ) = 4952.33 = 10.57 m 100
468.49 468.49

Xg13 = 4.79 x 126.46 + 9.12 m x 45.22 + 11.77 m x 45.10 + 14.95 m x 110.00 + 20.11 m x 95.96 + 20.11 m + ( 0.35 + -0.32 + 0.38 + 0.44 + 1.20 + 0.39 + 0.390 ) = 5126.89 = 10.90 m 50
470.46 470.46

Xg14 = 4.79 x 126.46 + 9.12 m x 48.00 + 11.77 m x 45.10 + 14.95 m x 110.00 + 20.11 m x 89.99 + 20.11 m + ( 0.35 + -0.32 + 0.43 + 0.44 + 1.10 + 0.39 + 0.390 ) = 5032.02 = 10.77 m 50
467.26 467.26

Xg15= 4.79 x 136.91 + 9.12 m x 48.00 + 11.77 m x 45.10 + 14.95 m x 103.32 + 20.11 m x 89.99 + 20.11 m + ( 0.35 + -0.32 + 0.43 + 0.39 + 1.10 + 0.39 + 0.390 ) = 4982.25 = 10.58 m 100
471.04 471.04

Xg16 = 4.79 x 126.46 + 9.12 m x 48.00 + 11.77 m x 45.10 + 14.95 m x 110.00 + 20.11 m x 95.96 + 20.11 m + ( 0.40 + -0.32 + 0.38 + 0.39 + 1.10 + 0.39 + 0.390 ) = 5152.15 = 10.80 m 50
476.96 476.96

Xg17 = 4.79 x 136.91 + 9.12 m x 48.00 + 11.77 m x 45.10 + 14.95 m x 110.00 + 20.11 m x 89.99 + 20.11 m + ( 0.35 + -0.32 + 0.38 + 0.39 + 1.20 + 0.44 + 0.440 ) = 5082.24 = 10.64 m 100
477.72 477.72

CONCRETO ARMADO II: DISEÑO ESTRUCTURAL DE UNA VIVIENDA


ING. CARLOS RAMOS CHIMPEN MULTIFAMILIAR DE 8 PISOS RNE: NORMA E-060
ALCANTARA CHUQUILIN UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO VI. DISEÑO DE VIGAS DE
ALEX FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA CIMENTACION EJE A-A
ESCUELA PROFESIONAL DE INGENIERIA CIVIL

RESUMEN ALTERNANCIA (Ingresar manualmente) EXENTRICIDAD


MAYOR Xg = 10.90 m 50% 50% 50% 100% 100% 100% e1 = 20.91 - 10.57 m -= 0.11 m e2 = 20.91 - 10.90 m -= 0.44 m
MENOR Xg = 10.57 m 100% 100% 100% 50% 50% 50% 2 2
Carga mas desfavorable para Xg menor: P´s = 468.49 e1 < L/6 = 3.49 m OK e2 < L/6 = 3.49 m OK
Carga mas desfavorable para Xg mayor: P´s = 460.58

2.1) DETERMINACION DEL ANCHO "B" P : CARGAS DE SERVICIO AL 100%

Az = P = 436.55 tn = 27.9 m2 aumentamos el area en un 10% por accion de los momentos


σnt 16 tn/m2

Az = 30.69 m2 B= 30.69 m2 = 1.47 m Adoptamos B = 1.70 m


20.91 m L = 20.91 m

2.1.1) VERIFICACION DE PRESIONES


P´s 6 * Mlong P´s : carga mas desfavorable para Xg mayor y menor
a) considerando solo momentos longitudinales  
L*B B * L2

σ1 = 468.49 + 6.00 x 468.49 x -0.44 = 11.5 tn/m2 < σnt = 15.6 tn/m2 OK
1.70 x 20.91 1.70 x 20.91^2

σ1 = 468.49 - 6.00 x 468.49 x -0.44 = 14.8 tn/m2 < σnt = 15.6 tn/m2 OK
1.70 x 20.91 1.70 x 20.91^2

σ2 = 460.58 + 6.00 x 460.58 x -0.11 = 12.5 tn/m2 < σnt = 15.6 tn/m2 OK
1.70 x 20.91 1.70 x 20.91^2

σ2 = 460.58 - 6.00 x 460.58 x -0.11 = 13.4 tn/m2 < σnt = 15.6 tn/m2 OK
1.70 x 20.91 1.70 x 20.91^2

b) considerando solo momentos transversales P ´s 6 * Mtransv


  
L*B L*B2
P´s : carga mas desfavorable para Xg mayor y menor

σ1 = 468.49 + 6.00 x ( -0.25 + 0.62 + 0.34 + -0.37 + -0.21 + 0.50 + 0.00 ) = 13.2 tn/m2 < σnt = 15.6 tn/m2 OK
1.70 x 20.91 1.70 x 20.91^2

σ1 = 468.49 - 6.00 x ( -0.25 + 0.62 + 0.34 + -0.37 + -0.21 + 0.50 + 0.00 ) = 13.2 tn/m2 < σnt = 15.6 tn/m2 OK
1.70 x 20.91 1.70 x 20.91^2

σ2 = 460.58 + 6.00 x ( -0.25 + 0.62 + 0.34 + -0.37 + -0.21 + 0.50 + 0.00 ) = 13.0 tn/m2 < σnt = 15.6 tn/m2 OK
1.70 x 20.91 20.91 x 1.70^2

σ2 = 460.58 - 6.00 x ( -0.25 + 0.50 + 0.34 + -0.37 + -0.21 + 0.50 + 0.00 ) = 12.9 tn/m2 < σnt = 15.6 tn/m2 OK
1.70 x 20.91 20.91 x 1.70^2

CONCRETO ARMADO II: DISEÑO ESTRUCTURAL DE UNA VIVIENDA


ING. CARLOS RAMOS CHIMPEN MULTIFAMILIAR DE 8 PISOS RNE: NORMA E-060
ALCANTARA CHUQUILIN UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO VI. DISEÑO DE VIGAS DE
ALEX FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA CIMENTACION EJE A-A
ESCUELA PROFESIONAL DE INGENIERIA CIVIL

3) CONSIDERANDO EFECTOS DE SISMO EN DIRECCION LONGITUDINAL X-X

3.1) caso de momentos sismicos horarios

P1 = 44.00 tn 7.44 tn 0.00 tn P2 = 116.00 tn 20.91 tn 0.00 tn P3 = 42.44 tn 5.56 tn 0.00 tn P4 = 40.00 tn 5.10 tn 0.00 tn
ML1 = 0.30 tn-m 0.10 tn-m -2.00 tn-m ML2 = -0.31 tn-m -0.01 tn-m -3.15 tn-m ML3 = 0.33 tn-m 0.10 tn-m -2.50 tn-m ML4 = 0.34 tn-m 0.10 tn-m -2.70 tn-m
MT1 = -0.24 tn-m -0.01 tn-m 0.00 tn-m MT2 = 0.50 tn-m 0.12 tn-m 0.00 tn-m MT3 = 0.24 tn-m 0.10 tn-m 0.00 tn-m MT4 = -0.36 tn-m -0.01 tn-m 0.00 tn-m

P5 = 96.64 tn 13.36 tn 0.00 tn P6 = 84.01 tn 11.95 tn 0.00 tn P7 = 0.00 tn 0.00 tn 0.00 tn


ML5 = 1.00 tn-m 0.20 tn-m -2.00 tn-m ML6 = -0.21 tn-m 0.01 tn-m -3.00 tn-m ML7 = 0.00 tn-m 0.00 tn-m 0.00 tn-m
MT5 = -0.20 tn-m -0.01 tn-m 0.00 tn-m MT6 = 0.40 tn-m 0.10 tn-m 0.00 tn-m MT7 = 0.00 tn-m 0.00 tn-m 0.00 tn-m

P1 = 51.44 tn P2 = 136.91 tn P3 = 48.00 tn P4 = 45.10 tn P5 = 110.00 tn P6 = 95.96 tn


ML1 = -1.60 tn-m ML2 = -3.47 tn-m ML3 = -2.07 tn-m ML4 = -2.26 tn-m ML5 = -0.80 tn-m ML6 = -3.20 tn
MT1 = -0.25 tn-m MT2 = 0.62 tn-m MT3 = 0.34 tn-m MT4 = -0.37 tn-m MT5 = -0.21 tn-m MT6 = 0.50 tn

4.79 m 4.33 m 2.65 m 3.17 m 5.17 m


3.1.1) posicion de la resultante considerando alternancia de cargas
ALTERNANCIA
50% 50% 50% 100% 100% 100%

Xg= 4.79 x 126.46 + 9.12 m x 45.22 + 11.77 m x 45.10 + 14.95 m x 110.00 + 20.11 m x 95.96 + 20.11 m x 0.00 + ( -1.65 + -3.47 + -2.12 + -2.26 + -0.80 + -3.20 + 0.000 ) = 5110.56 = 10.86 m 50%
470.46 470.46
ALTERNANCIA
100% 100% 100% 50% 50% 50%

Xg= 4.79 x 136.91 + 9.12 m x 48.00 + 11.77 m x 42.55 + 14.95 m x 103.32 + 20.11 m x 89.99 + 20.11 m x 0.00 + ( -1.60 + -3.47 + -2.07 + -2.31 + -0.90 + -3.21 + 0.000 ) = 4935.94 = 10.54 m 100%
468.49 468.49
EXENTRICIDAD

e1 = 20.91 - 10.86 m -= 0.41 m e2 = 20.91 - 10.54 m -= 0.08 m OK


2 2 CHEKEAR
<
e1 < L/6 = 3.49 m OK e2 < L/6 = 3.49 m OK >
P 6 Mlong 6 Mtrans
3.1.2) VERIFICACION DE PRESIONES    
L*B B * L2 L * B2
σ1 = 470.46 + 6.00 x 470.46 x -0.41 + 6.00 ( -0.25 + 0.62 + 0.34 + -0.37 + -0.21 + 0.50 + 0.00 ) = 11.8 tn/m2 < σnts = 20.9 tn/m2 OK
1.70 x 20.91 1.70 x 20.91^2 20.91 x 1.70^2

σ1 = 470.46 + 6.00 x 470.46 x -0.41 - 6.00 ( -0.25 + 0.62 + 0.34 + -0.37 + -0.21 + 0.50 + 0.00 ) = 11.6 tn/m2 < σnts = 20.9 tn/m2 OK
1.70 x 20.91 1.70 x 20.91^2 20.91 x 1.70^2

σ1 = 470.46 - 6.00 x 470.46 x -0.41 + 6.00 ( -0.25 + 0.62 + 0.34 + -0.37 + -0.21 + 0.50 + 0.00 ) = 14.8 tn/m2 < σnts = 20.9 tn/m2 OK
1.70 x 20.91 1.70 x 20.91^2 20.91 x 1.70^2

σ1 = 470.46 - 6.00 x 470.46 x -0.41 - 6.00 ( -0.25 + 0.62 + 0.34 + -0.37 + -0.21 + 0.50 + 0.00 ) = 14.7 tn/m2 < σnts = 20.9 tn/m2 OK
1.70 x 20.91 1.70 x 20.91^2 20.91 x 1.70^2

σ2 = 468.49 + 6.00 x 470.46 x -0.08 + 6.00 ( -0.25 + 0.62 + 0.34 + -0.37 + -0.21 + 0.50 + 0.00 ) = 12.9 tn/m2 < σnts = 20.9 tn/m2 OK
1.70 x 20.91 1.70 x 20.91^2 20.91 x 1.70^2

σ2 = 468.49 + 6.00 x 470.46 x -0.08 - 6.00 ( -0.25 + 0.62 + 0.34 + -0.37 + -0.21 + 0.50 + 0.00 ) = 12.8 tn/m2 < σnts = 20.9 tn/m2 OK
1.70 x 20.91 1.70 x 20.91^2 20.91 x 1.70^2

σ2 = 468.49 - 6.00 x 470.46 x -0.08 + 6.00 ( -0.25 + 0.62 + 0.34 + -0.37 + -0.21 + 0.50 + 0.00 ) = 13.5 tn/m2 < σnts = 20.9 tn/m2 OK
1.70 x 20.91 1.70 x 20.91^2 20.91 x 1.70^2

σ2 = 468.49 - 6.00 x 470.46 x -0.08 - 6.00 ( -0.25 + 0.62 + 0.34 + -0.37 + -0.21 + 0.50 + 0.00 ) = 13.4 tn/m2 < σnts = 20.9 tn/m2 OK
1.70 x 20.91 1.70 x 20.91^2 20.91 x 1.70^2

CONCRETO ARMADO II: DISEÑO ESTRUCTURAL DE UNA VIVIENDA


ING. CARLOS RAMOS CHIMPEN MULTIFAMILIAR DE 8 PISOS RNE: NORMA E-060
ALCANTARA CHUQUILIN UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO VI. DISEÑO DE VIGAS DE
ALEX FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA CIMENTACION EJE A-A
ESCUELA PROFESIONAL DE INGENIERIA CIVIL

3.2) Caso de momentos sismicos antihorarios

P1 = 44.00 tn 7.44 tn 0.00 tn P2 = 116.00 tn 20.91 tn 0.00 tn P3 = 42.44 tn 5.56 tn 0.00 tn P4 = 40.00 tn 5.10 tn 0.00 tn
ML1 = 0.30 tn-m 0.10 tn-m 2.00 tn-m ML2 = -0.31 tn-m -0.01 tn-m 3.15 tn-m ML3 = 0.33 tn-m 0.10 tn-m 2.50 tn-m ML4 = 0.34 tn-m 0.10 tn-m 2.70 tn-m
MT1 = -0.24 tn-m -0.01 tn-m 0.00 tn-m MT2 = 0.50 tn-m 0.12 tn-m 0.00 tn-m MT3 = 0.24 tn-m 0.10 tn-m 0.00 tn-m MT4 = -0.36 tn-m -0.01 tn-m 0.00 tn-m

P5 = 96.64 tn 13.36 tn 0.00 tn P6 = 84.01 tn 11.95 tn 0.00 tn P7 = 0.00 tn 0.00 tn 0.00 tn


ML5 = 1.00 tn-m 0.20 tn-m 2.00 tn-m ML6 = -0.21 tn-m 0.01 tn-m 3.00 tn-m ML7 = 0.00 tn-m 0.00 tn-m 0.00 tn-m
MT5 = -0.20 tn-m -0.01 tn-m 0.00 tn-m MT6 = 0.40 tn-m 0.10 tn-m 0.00 tn-m MT7 = 0.00 tn-m 0.00 tn-m 0.00 tn-m

P1 = 51.44 tn P2 = 136.91 tn P3 = 48.00 tn P4 = 45.10 tn P5 = 110.00 tn P6 = 95.96 tn


ML1 = 2.40 tn-m ML2 = 2.83 tn-m ML3 = 2.93 tn-m ML4 = 3.14 tn-m ML5 = 3.20 tn-m ML6 = 2.80 tn
MT1 = -0.25 tn-m MT2 = 0.62 tn-m MT3 = 0.34 tn-m MT4 = -0.37 tn-m MT5 = -0.21 tn-m MT6 = 0.50 tn

4.79 m 4.33 m 2.65 m 3.17 m 5.17 m

3.2.1) posicion de la resultante considerando alternancia de cargas


ALTERNANCIA
50% 50% 50% 100% 100% 100%

Xg= 4.79 x 126.46 + 9.12 m x 45.22 + 11.77 m x 45.10 + 14.95 m x 110.00 + 20.11 m x 95.96 + 20.11 m x 0.00 + ( 2.40 + 2.83 + 2.93 + 3.14 + 3.20 + 2.80 + 0.000 ) = 5141.35 = 10.93 m 50%
470.46 470.46
ALTERNANCIA
100% 100% 100% 50% 50% 50%
100%
Xg= 4.79 x 136.91 + 9.12 m x 48.00 + 11.77 m x 42.55 + 14.95 m x 103.32 + 20.11 m x 89.99 + 20.11 m x 0.00 + ( 2.40 + 2.83 + 2.93 + 3.14 + 3.20 + 2.80 + 0.000 ) = 4966.79 = 10.60 m
468.49 468.49
EXENTRICIDAD

e1 = 20.91 - 10.93 m -= 0.47 m e2 = 20.91 - 10.60 m -= 0.15 m OK


2 2 CHEKEAR
<
e1 < L/6 = 3.49 m OK e2 < L/6 = 3.49 m OK >

P 6 Mlong 6 Mtrans
3.1.2) VERIFICACION DE PRESIONES    
L*B B * L2 L * B2
σ1 = 470.46 + 6.00 x 470.46 x -0.47 + 6.00 ( -0.25 + 0.62 + 0.34 + -0.37 + -0.21 + 0.50 + 0.00 ) = 11.5 tn/m2 < σnts = 20.9 tn/m2 OK
1.70 x 20.91 1.70 x 20.91^2 20.91 x 1.70^2

σ1 = 470.46 + 6.00 x 470.46 x -0.47 - 6.00 ( -0.25 + 0.62 + 0.34 + -0.37 + -0.21 + 0.50 + 0.00 ) = 11.4 tn/m2 < σnts = 20.9 tn/m2 OK
1.70 x 20.91 1.70 x 20.91^2 20.91 x 1.70^2

σ1 = 470.46 - 6.00 x 470.46 x -0.47 + 6.00 ( -0.25 + 0.62 + 0.34 + -0.37 + -0.21 + 0.50 + 0.00 ) = 15.1 tn/m2 < σnts = 20.9 tn/m2 OK
1.70 x 20.91 1.70 x 20.91^2 20.91 x 1.70^2

σ1 = 470.46 - 6.00 x 470.46 x -0.47 - 6.00 ( -0.25 + 0.62 + 0.34 + -0.37 + -0.21 + 0.50 + 0.00 ) = 15.0 tn/m2 < σnts = 20.9 tn/m2 OK
1.70 x 20.91 1.70 x 20.91^2 20.91 x 1.70^2

σ2 = 468.49 + 6.00 x 468.49 x -0.15 + 6.00 ( -0.25 + 0.62 + 0.34 + -0.37 + -0.21 + 0.50 + 0.00 ) = 12.7 tn/m2 < σnts = 20.9 tn/m2 OK
1.70 x 20.91 1.70 x 20.91^2 20.91 x 1.70^2

σ2 = 468.49 + 6.00 x 468.49 x -0.15 - 6.00 ( -0.25 + 0.62 + 0.34 + -0.37 + -0.21 + 0.50 + 0.00 ) = 12.6 tn/m2 < σnts = 20.9 tn/m2 OK
1.70 x 20.91 1.70 x 20.91^2 20.91 x 1.70^2

σ2 = 468.49 - 6.00 x 468.49 x -0.15 + 6.00 ( -0.25 + 0.62 + 0.34 + -0.37 + -0.21 + 0.50 + 0.00 ) = 13.8 tn/m2 < σnts = 20.9 tn/m2 OK
1.70 x 20.91 1.70 x 20.91^2 20.91 x 1.70^2

σ2 = 468.49 - 6.00 x 468.49 x -0.15 - 6.00 ( -0.25 + 0.62 + 0.34 + -0.37 + -0.21 + 0.50 + 0.00 ) = 13.7 tn/m2 < σnts = 20.9 tn/m2 OK
1.70 x 20.91 1.70 x 20.91^2 20.91 x 1.70^2

CONCRETO ARMADO II: DISEÑO ESTRUCTURAL DE UNA VIVIENDA


ING. CARLOS RAMOS CHIMPEN MULTIFAMILIAR DE 8 PISOS RNE: NORMA E-060
ALCANTARA CHUQUILIN UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO VI. DISEÑO DE VIGAS DE
ALEX FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA CIMENTACION EJE A-A
ESCUELA PROFESIONAL DE INGENIERIA CIVIL

4) CONSIDERANDO EFECTOS DE SISMO EN DIRECCION TRANSVERSAL Y - Y

4.1) Caso de momentos sismicos horarios

P1 = 44.00 tn 7.44 tn 0.00 tn P2 = 116.00 tn 20.91 tn 0.00 tn P3 = 42.44 tn 5.56 tn 0.00 tn P4 = 40.00 tn 5.10 tn 0.00 tn
ML1 = 0.30 tn-m 0.10 tn-m 0.00 tn-m ML2 = -0.31 tn-m -0.01 tn-m 0.00 tn-m ML3 = 0.33 tn-m 0.10 tn-m 0.00 tn-m ML4 = 0.34 tn-m 0.10 tn-m 0.00 tn-m
MT1 = -0.24 tn-m -0.01 tn-m 4.30 tn-m MT2 = 0.50 tn-m 0.12 tn-m 5.04 tn-m MT3 = 0.24 tn-m 0.10 tn-m 7.00 tn-m MT4 = -0.36 tn-m -0.01 tn-m 4.87 tn-m

P5 = 96.64 tn 13.36 tn 91.12 tn P6 = 96.64 tn 13.36 tn 111.40 tn P7 = 96.64 tn 13.36 tn 0.00 tn


ML5 = 1.00 tn-m 0.20 tn-m 0.00 tn-m ML6 = 1.00 tn-m 0.20 tn-m 0.00 tn-m ML7 = 1.00 tn-m 0.20 tn-m 0.00 tn-m
MT5 = -0.20 tn-m -0.01 tn-m 7.00 tn-m MT6 = -0.20 tn-m -0.01 tn-m 4.12 tn-m MT7 = -0.20 tn-m -0.01 tn-m 0.00 tn-m

P1 = 51.44 tn P2 = 136.91 tn P3 = 48.00 tn P4 = 45.10 tn P5 = 201.12 tn P6 = 221.40 tn


ML1 = 0.40 tn-m ML2 = -0.32 tn-m ML3 = 0.43 tn-m ML4 = 0.44 tn-m ML5 = 1.20 tn-m ML6 = 1.20 tn-m
MT1 = 4.05 tn-m MT2 = 5.66 tn-m MT3 = 7.34 tn-m MT4 = 4.50 tn-m MT5 = 6.79 tn-m MT4 = 3.91 tn-m

4.79 m 4.33 m 2.65 m 3.17 m 5.17 m

4.1.1) Posicion de la resultante considerando alternancia de cargas


ALTERNANCIA
50% 50% 50% 100% 100% 100%
ALTERNANCIA
Xg3= 4.79 x 126.46 + 9.12 m x 45.22 + 11.77 m x 45.10 + 14.95 m x 201.12 + 20.11 m x 207.36 + 20.11 m x 0.00 + ( 0.40 + -0.32 + 0.43 + 0.44 + 1.20 + 1.20 + 0.000 ) = 8729.95 = 12.97 m 50%
672.98 672.98
ALTERNANCIA
100% 100% 100% 50% 50% 50%
100%
Xg4= 4.79 x 136.91 + 9.12 m x 48.00 + 11.77 m x 42.55 + 14.95 m x 194.44 + 20.11 m x 201.39 + 20.11 m x 0.00 + ( 0.40 + -0.32 + 0.43 + 0.39 + 1.10 + 1.20 + 0.000 ) = 8555.24 = 12.75 m
671.01 671.01
EXENTRICIDAD

e1 = 20.91 - 12.97 m -= 2.52 m e2 = 20.91 - 12.75 m -= 2.29 m OK


2 2 CHEKEAR
<
e1 < L/6 = 3.49 m OK e2 < L/6 = 3.49 m OK >

P 6 Mlong 6 Mtrans
4.1.2) VERIFICACION DE PRESIONES    
L*B B * L2 L * B2
σ1 = 672.98 + 6.00 x 672.98 x -2.52 + 6.00 ( ( 4.05 + 5.66 + 7.34 + 4.50 + 6.79 + 3.91 + 0.00 ) = 8.47 tn/m2 < σnts = 20.9 tn/m2 OK
1.70 x 20.91 1.70 x 20.91^2 20.91 x 1.70^2

σ1 = 672.98 + 6.00 x 672.98 x -2.52 - 6.00 ( ( 4.05 + 5.66 + 7.34 + 4.50 + 6.79 + 3.91 + 0.00 ) = 2.06 tn/m2 < σnts = 20.9 tn/m2 OK
1.70 x 20.91 1.70 x 20.91^2 20.91 x 1.70^2

σ1 = 672.98 - 6.00 x 672.98 x -2.52 + 6.00 ( ( 4.05 + 5.66 + 7.34 + 4.50 + 6.79 + 3.91 + 0.00 ) = 35.8 tn/m2 > σnts = 20.9 tn/m2 CHEKEAR
1.70 x 20.91 1.70 x 20.91^2 20.91 x 1.70^2

σ1 = 672.98 - 6.00 x 672.98 x -2.52 - 6.00 ( ( 4.05 + 5.66 + 7.34 + 4.50 + 6.79 + 3.91 + 0.00 ) = 29.4 tn/m2 > σnts = 20.9 tn/m2 CHEKEAR
1.70 x 20.91 1.70 x 20.91^2 20.91 x 1.70^2

σ2 = 671.01 + 6.00 x 671.01 -2.29 + 6.00 ( ( 4.05 + 5.66 + 7.34 + 4.50 + 6.79 + 3.91 + 0.00 ) = 9.66 tn/m2 < σnts = 20.9 tn/m2 OK
1.70 x 20.91 1.70 x 20.91^2 20.91 x 1.70^2

σ2 = 671.01 + 6.00 x 671.01 x -2.29 - 6.00 ( ( 4.05 + 5.66 + 7.34 + 4.50 + 6.79 + 3.91 + 0.00 ) = 3.25 tn/m2 < σnts = 20.9 tn/m2 OK
1.70 x 20.91 1.70 x 20.91^2 20.91 x 1.70^2

σ2 = 671.01 - 6.00 x 671.01 x -2.29 + 6.00 ( ( 4.05 + 5.66 + 7.34 + 4.50 + 6.79 + 3.91 + 0.00 ) = 34.5 tn/m2 > σnts = 20.9 tn/m2 CHEKEAR
1.70 x 20.91 1.70 x 20.91^2 20.91 x 1.70^2

σ2 = 671.01 - 6.00 x 671.01 -2.29 - 6.00 ( ( 4.05 + 5.66 + 7.34 + 4.50 + 6.79 + 3.91 + 0.00 ) = 28.1 tn/m2 > σnts = 20.9 tn/m2 CHEKEAR
1.70 x 20.91 1.70 x 20.91^2 20.91 x 1.70^2

CONCRETO ARMADO II: DISEÑO ESTRUCTURAL DE UNA VIVIENDA


ING. CARLOS RAMOS CHIMPEN MULTIFAMILIAR DE 8 PISOS RNE: NORMA E-060
ALCANTARA CHUQUILIN UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO VI. DISEÑO DE VIGAS DE
ALEX FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA CIMENTACION EJE A-A
ESCUELA PROFESIONAL DE INGENIERIA CIVIL

4.2) caso de momentos sismicos antihorarios

P1 = 44.00 tn 7.44 tn 0.00 tn P2 = 116.00 tn 20.91 tn 0.00 tn P3 = 42.44 tn 5.56 tn 0.00 tn P4 = 40.00 tn 5.10 tn 0.00 tn
ML1 = 0.30 tn-m 0.10 tn-m 0.00 tn-m ML2 = -0.31 tn-m -0.01 tn-m 0.00 tn-m ML3 = 0.33 tn-m 0.10 tn-m 0.00 tn-m ML4 = 0.34 tn-m 0.10 tn-m 0.00 tn-m
MT1 = -0.24 tn-m -0.01 tn-m -4.30 tn-m MT2 = 0.50 tn-m 0.12 tn-m -5.04 tn-m MT3 = 0.24 tn-m 0.10 tn-m -7.00 tn-m MT4 = -0.36 tn-m -0.01 tn-m -4.87 tn-m

P5 = 96.64 tn 13.36 tn -91.12 tn P6 = 96.64 tn 13.36 tn -111.40 tn P7 = 96.64 tn 13.36 tn 0.00 tn


ML5 = 1.00 tn-m 0.20 tn-m 0.00 tn-m ML6 = 1.00 tn-m 0.20 tn-m 0.00 tn-m ML7 = 1.00 tn-m 0.20 tn-m 0.00 tn-m
MT5 = -0.20 tn-m -0.01 tn-m -7.00 tn-m MT6 = -0.20 tn-m -0.01 tn-m -4.12 tn-m MT7 = -0.20 tn-m -0.01 tn-m 0.00 tn-m

P1 = 51.44 tn P2 = 136.91 tn P3 = 48.00 tn P4 = 45.10 tn P5 = 18.88 tn P6 = -1.40 tn


ML1 = 0.40 tn-m ML2 = -0.32 tn-m ML3 = 0.43 tn-m ML4 = 0.44 tn-m ML5 = 1.20 tn-m ML6 = 1.20 tn-m
MT1 = -4.55 tn-m MT2 = -4.42 tn-m MT3 = -6.66 tn-m MT4 = -5.24 tn-m MT5 = -7.21 tn-m MT6 = -4.33 tn-m

4.79 m 4.33 m 2.65 m 3.17 m 5.17 m

4.2.1) posicion de la resultante considerando alternancia de cargas


ALTERNANCIA
50% 50% 50% 100% 100% 100%

Xg3= 4.79 x 126.46 + 9.12 m x 45.22 + 11.77 m x 45.10 + 14.95 m x 18.88 + 20.11 m -x 15.44 + 20.11 m x 0.00 + ( 0.40 + -0.32 + 0.43 + 0.44 + 1.20 + 1.20 + 0.000 ) = 1524.85 = 5.69 m 50%
267.94 267.94
ALTERNANCIA
100% 100% 100% 50% 50% 50%

Xg4= 4.79 x 136.91 + 9.12 m x 48.00 + 11.77 m x 42.55 + 14.95 m x 12.20 + 20.11 m -x 21.42 + 20.11 m x 0.00 + ( 0.35 + -0.32 + 0.38 + 0.44 + 1.20 + 1.20 + 0.000 ) = 1350.20 = 5.08 m 100%
265.97 265.97
EXENTRICIDAD

e1 = 20.31 - 5.69 m = 4.47 m e2 = 20.31 - 5.08 m = 5.08 m OK


2 2 CHEKEAR
<
e1 < L/6 = 3.39 m CHEKEAR e2 < L/6 = 3.39 m CHEKEAR >

P 6 Mlong 6 Mtrans
4.1.2) VERIFICACION DE PRESIONES    
L*B B * L2 L * B2

σ1 = 267.94 + 6.00 x 267.94 x 4.47 + 6.00 ( -4.55 + -4.42 + -6.66 + -5.24 + -7.21 ) -4.33 + 0.00 ) = 14.0 tn/m2 < σnts = = 20.9 tn/m2 OK
1.70 x 20.91 1.70 x 20.91^2 20.91 x 1.70^2

σ1 = 267.94 + 6.00 x 267.94 x 4.47 - 6.00 ( -4.55 + -4.42 + -6.66 + -5.24 + -7.21 ) -4.33 + 0.00 ) = 20.4 tn/m2 < σnts = = 20.9 tn/m2 OK
1.70 x 20.91 1.70 x 20.91^2 20.91 x 1.70^2

σ1 = 267.94 - 6.00 x 267.94 x 4.47 + 6.00 ( -4.55 + -4.42 + -6.66 + -5.24 + -7.21 ) -4.33 + 0.00 ) -= 5.3 tn/m2 < σnts = = 20.9 tn/m2 OK
1.70 x 20.91 1.70 x 20.91^2 20.91 x 1.70^2

σ1 = 267.94 - 6.00 x 267.94 x 4.47 - 6.00 ( -4.55 + -4.42 + -6.66 + -5.24 + -7.21 ) -4.33 + 0.00 ) = 1.1 tn/m2 < σnts = = 20.9 tn/m2 OK
1.70 x 20.91 1.70 x 20.91^2 20.91 x 1.70^2

σ2 = 265.97 + 6.00 x 265.97 5.08 + 6.00 ( -4.55 + -4.42 + -6.66 + -5.24 + -7.21 ) -4.33 + 0.00 ) = 15.2 tn/m2 < σnts = = 20.9 tn/m2 OK
1.70 x 20.91 1.70 x 20.91^2 20.91 x 1.70^2

σ2 = 265.97 + 6.00 x 265.97 5.08 - 6.00 ( -4.55 + -4.42 + -6.66 + -5.24 + -7.21 ) -4.33 + 0.00 ) = 21.6 tn/m2 > σnts = = 20.9 tn/m2 CHEKEAR
1.70 x 20.91 1.70 x 20.91^2 20.91 x 1.70^2

σ2 = 265.97 - 6.00 x 265.97 5.08 + 6.00 ( -4.55 + -4.42 + -6.66 + -5.24 + -7.21 ) -4.33 + 0.00 ) -= 6.6 tn/m2 < σnts = = 20.9 tn/m2 OK
1.70 x 20.91 1.70 x 20.91^2 20.91 x 1.70^2

σ2 = 265.97 - 6.00 x 265.97 5.08 - 6.00 ( -4.55 + -4.42 + -6.66 + -5.24 + -7.21 ) -4.33 + 0.00 ) -= 0.2 tn/m2 < σnts = = 20.9 tn/m2 OK
1.70 x 20.91 1.70 x 20.91^2 20.91 x 1.70^2

CONCRETO ARMADO II: DISEÑO ESTRUCTURAL DE UNA VIVIENDA


ING. CARLOS RAMOS CHIMPEN MULTIFAMILIAR DE 8 PISOS RNE: NORMA E-060

También podría gustarte