01 OBRAS PRELIMINARES 01
01.01 CARTEL DE IDENTIFICACION DE LA OBRA 4.80M X 2.40M u 1.00
01.02 CAMPAMENTO Y ALMACEN DE OBRA glb 1.00
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPO_I glb 1.00
01.04 TRAZO Y REPLANTEO km 70.98
01.05 ROCE Y LIMPIEZA m2 241,343.61
02 MOVIMIENTO DE TIERRAS 02
02.01 CORTE PARA MEJORAMIENTO m3 144,088.58
02.02 MEJORAMIENTO DE SUELOS A NIVEL DE SUBRASANTE m3 184,920.15
02.03 ESCARIFICADO DE AFIRMADO m2 177,147.12
02.04 PERFILADO Y COMPACTADO m2 177,147.12
03 SUB BASESY BASES 03
03.02 SUB BASE GRANULAR m3 73,381.88
03.03 BASE GRANULAR m3 61,755.57
04 PAVIMENTOS 04
04.01 IMPRIMACION ASFALTICA m2 393,070.66
04.02 MEJORAMIENTO DE LA SUPERFICIE DE RODADURA C/ SOLUCION BASICA m2 393,070.66
05 TRANSPORTE 05
05.01 TRANSPORTE DE MATERIAL GRANULAR HASTA 1KM m3k 245,718.90
05.02 TRANSPORTE DE MATERIAL GRANULAR DESPUES DE 1KM m3k 6,420,538.70
05.03 TRANSPORTE DE MATERIAL EXCEDENTE HASTA 1KM m3k 118,622.01
05.04 TRANSPORTE DE MATERIAL EXCEDENTE DESPUES DE 1KM m3k 827,813.50
06 OBRAS DE ARTE Y DRENAJE 06
06.01 CUNETAS 06.01
06.01.01 CUNETA TRIANGULAR REVESTIDA TIPO I m 20,475.00
06.01.03 LIMPIEZA Y ENCAUZAMIENTO CUNETAS m 3,492.00
06.01.04 DEMOLICION DE CUNETAS m3 6.26
06.01.04 REPOSICION DE CUNETAS m 591.90
06.01.05 ELIMINACION DE MATERIAL EXCEDENTE m3 144.27
06.02 ALCANTARILLAS TMC -
06.02.01 EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN m3 517.50
06.02.02 RELLENOS PARA ESTRUCTURAS m3 261.97
06.02.03 CONCRETO CLASE E (F'C=175 KG/CM2) m3 188.09
06.02.04 ENCOFRADO Y DESENCOFRADO m2 857.51
06.02.05 TUBERIA METALICA CORRUGADA CIRCULAR D=0.90 m m 173.65
06.02.09 TUBERIA METALICA CORRUGADA CIRCULAR D=0.90 m m 713.00
06.02.10 LIMPIEZA DE ALCANTARILLAS TMC EXISTENTES und 157.00
06.02.08 ELIMINACION DE MATERIAL EXCEDENTE m3 1,309.47
06.04 BADENES -
06.04.11 LIMPIEZA DE BADENES u 3.00
06.07 PONTONES 06.07
06.07.01 INSTALACION DE BARANDAS m 206.80
06.07.02 LIMPIEZA DE SUPERFICIES DE PUENTES DE CONCRETO m2 2,907.32
06.07.03 PINTADO DE ELEMENTOS DE PUENTES DE CONCRETO m2 2,907.32
06.07.04 REPARACION DE SUPERESTRUCTURAS DE CONCRETO m2 65.90
06.08 PUENTES -
06.08.01 INSTALACION DE BARANDAS m 462.00
RESUMEN DE METRADOS TRAMO 1
Descripción
06.08.02 LIMPIEZA DE SUPERFICIE DE PUENTES DE CONCRETO m2 3,057.30
06.08.03 PINTADO DE ELEMENTOS DE PUENTES DE CONCRETO m2 3,057.30
06.08.04 REPARACION SUPERFICIAL DE ELEMENTOS DE COCNRETO m2 78.00
06.08.05 LIMPIEZA DE SUPERFICIE DE DE PUENTES METALICOS m2 237.00
06.08.06 CONSERVACION DE LA PINTURA DE PUENTES METALICOS m2 237.00
06.08.07 LOSAS DE APROXIMACION m2 166.00
06.08.08 LIMPIEZA Y ENCAUZAMIENTO EN PUENTES Y PONTONES m3 1,308.35
06.08.09 ELIMINACION DE MATERIAL EXCEDENTE m3 1,308.35
07 SEÑALIZACION 07
07.01 MANTENIMIENTO DE SEÑALES u 31.00
07.02 RETIRO DE SEÑALES u 5.00
07.03 MARCAS EN EL PAVIMENTO m2 14,196.68
07.04 HITOS KILOMETRICOS u 70.00
07.05 POSTES DE SOPORTE DE SEÑALES DE CONCRETO u 372.00
07.06 SEÑAL PREVENTIVA 0.60m x 0.60m u 312.00
07.07 SEÑAL REGLAMENTARIA 0.90m x 0.60m u 60.00
07.08 POSTES DELINEADORES u 3,840.00
07.09 SEÑAL INFORMATIVA m2 38.99
07.10 ESTRUCTURA DE SOPORTE DE SEÑALES TIPO E-I u 14.00
07.11 ESTRUCTURA DE SOPORTE DE SEÑALES TIPO E-II u 18.00
07.12 GIBAS u 10.00
07.13 PINTADO DE PARAPETOS DE ALCANTARILLAS m2 164.84
07.14 GUARDAVIAS METALICAS m 2,403.00
08 PROTECCION AMBIENTAL 08
08.01 PROGRAMA DE SEÑALIZACION AMBIENTAL 08.01
08.01.01 SEÑALIZACION AMBIENTAL TEMPORAL u 100.00
08.01.02 SEÑALIZACION AMBIENTAL PERMANENTE m2 10.00
08.01.03 ESTRUCTURAS DE SOPORTE DE SEÑALES TIPO E-1 u 20.00
08.02 PROGRAMA DE MONITOREO AMBIENTAL 08.02
08.02.01 MONITOREO DE LA CALIDAD DEL AGUA pto 12.00
08.02.02 MONITOREO DE LA CALIDAD DEL AIRE pto 12.00
08.02.03 MONITOREO DE RUIDOS pto 12.00
08.03 PLAN DE CIERRE 08.03
08.03.01 ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE m3 150,995.00
08.03.02 READECUACION AMBIENTAL DEL DME m2 50,000.00
08.03.03 READECUACION AMBIENTAL DE CANTERAS DE RIO m2 5,000.00
08.03.04 READECUACION AMBIENTAL DE CANTERAS DE CERRO m2 5,000.00
08.03.05 REVEGETACION DE INSTALACIONES AUXILIARES, CAMPAMENTO, PLAN m2 80,000.00
RELACIÓN DE EQUIPO MÍNIMO
“Contrato De Gestión Vial Por Niveles De Servicio De La Red Vial Regional Alto
OBRA
Huallaga, Bajo Mayo Y Bajo Huallaga – San Martin"
“Contrato De Gestión Vial Por Niveles De Servicio De La Red Vial Regional Alto
OBRA
Huallaga, Bajo Mayo Y Bajo Huallaga – San Martin"
TRAMO : Ruta N° SM-105, Emp. 5NB (P. de Caynarachi) - Barranquita - Pelejo-Papaplaya
DEPARTAMENTO : SAN MARTIN
REGION : SAN MARTIN
PROVINCIA : LAMAS
DISTRITO : PONGO DE CAYNARACHI, BARRANQUITA, PELEJO Y PAPLAYA
TRAMO : 01
Nº VIAJES
PESO (TON) PESO Cama Cama Camion Semi-
EQUIPO CANTIDAD
UND TOTAL Baja Baja Plataforma Trailer
25 Ton. 18 Ton. 19 Ton. 35 Ton.
Distancia Velocidad
EQUIPO AUTOTRANSPORTADO CANTIDAD HM (S/.) HORAS PARCIAL (S/.)
(Km.) (Km./h)
NOTA :
El resto de Equipos sera transportado en los Volquetes o remolcado por los mismos.
Esta relación no es limitativa, debiendo el Contratista compatibilizarla con la de su propuesta, de tal manera de poder terminar la obra en el plazo planteado
El Seguro de Transporte cubre la movilizacion y desmovilizacion de los equipos transportados.
El Equipo de Topografia sera transportado en las camionetas.
JUSTIFICACIÓN DE METRADOS
“Contrato De Gestión Vial Por Niveles De Servicio De La Red Vial Regional Alto Huallaga,
OBRA
Bajo Mayo Y Bajo Huallaga – San Martin"
DEPARTAMENTO : SAN MARTIN
REGION : SAN MARTIN
PROVINCIA : LAMAS
DISTRITO : PONGO DE CAYNARACHI, BARRANQUITA, PELEJO Y PAPLAYA
TRAMO : 01
“Contrato De Gestión Vial Por Niveles De Servicio De La Red Vial Regional Alto Huallaga, Bajo Mayo Y
OBRA
Bajo Huallaga – San Martin"
PROGRESIVA
LARGO ANCHO AREA M2 AREA Ha
DEL Km AL Km
0+000 1+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
1+000 2+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
2+000 3+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
3+000 4+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
4+000 5+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
5+000 6+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
6+000 7+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
7+000 8+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
8+000 9+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
9+000 10+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
10+000 11+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
11+000 12+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
12+000 13+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
13+000 14+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
14+000 15+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
15+000 16+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
16+000 17+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
17+000 18+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
18+000 19+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
19+000 20+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
20+000 21+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
21+000 22+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
22+000 23+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
23+000 24+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
24+000 25+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
25+000 26+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
26+000 27+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
27+000 28+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
28+000 29+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
29+000 30+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
30+000 31+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
31+000 32+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
32+000 33+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
33+000 34+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
34+000 35+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
35+000 36+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
JUSTIFICACIÓN DE METRADOS
“Contrato De Gestión Vial Por Niveles De Servicio De La Red Vial Regional Alto Huallaga, Bajo Mayo Y
OBRA
Bajo Huallaga – San Martin"
PROGRESIVA
LARGO ANCHO AREA M2 AREA Ha
DEL Km AL Km
36+000 37+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
37+000 38+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
38+000 39+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
39+000 40+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
40+000 41+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
41+000 42+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
42+000 43+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
43+000 44+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
44+000 45+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
45+000 46+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
46+000 47+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
47+000 48+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
48+000 49+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
49+000 50+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
50+000 51+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
51+000 52+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
52+000 53+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
53+000 54+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
54+000 55+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
55+000 56+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
56+000 57+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
57+000 58+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
58+000 59+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
59+000 60+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
60+000 61+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
61+000 62+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
62+000 63+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
63+000 64+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
64+000 65+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
65+000 66+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
66+000 67+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
67+000 68+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
68+000 69+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
69+000 70+000 1,000.00 2.00 A/L x 85 % 3,400.00 0.340
70+000 70+983 983.41 2.00 A/L x 85 % 3,343.61 0.334
JUSTIFICACIÓN DE METRADOS
“Contrato De Gestión Vial Por Niveles De Servicio De La Red Vial Regional Alto Huallaga, Bajo Mayo Y
OBRA
Bajo Huallaga – San Martin"
PROGRESIVA
LARGO ANCHO AREA M2 AREA Ha
DEL Km AL Km
TOTAL 241,343.61 24.13
JUSTIFICACIÓN DE METRADOS
0+250 0+750 500 6.33 0.55 1.15 3,165.00 1,740.75 5,380.50 1,740.75
0+750 1+200 450 6.33 0.55 0.15 2,848.50 1,566.68 1,993.95 1,566.68
2+250 3+250 1000 6.33 0.55 0.15 6,330.00 3,481.50 4,431.00 3,481.50
4+750 5+750 1000 6.33 0.55 0.15 6,330.00 3,481.50 4,431.00 3,481.50
7+250 7+750 500 6.33 0.55 0.15 3,165.00 1,740.75 2,215.50 1,740.75
7+750 8+750 1000 6.33 0.55 0.15 6,330.00 3,481.50 4,431.00 3,481.50
9+750 10+750 1000 6.33 0.55 0.15 6,330.00 3,481.50 4,431.00 3,481.50
11+750 12+250 500 6.33 0.55 0.15 3,165.00 1,740.75 2,215.50 1,740.75
14+250 17+250 3000 6.33 0.55 0.15 18,990.00 10,444.50 13,293.00 10,444.50
18+750 19+250 500 6.33 0.55 0.15 3,165.00 1,740.75 2,215.50 1,740.75
19+750 20+750 1000 6.33 0.55 0.15 6,330.00 3,481.50 4,431.00 3,481.50
21+250 23+250 2000 6.33 0.55 0.15 12,660.00 6,963.00 8,862.00 6,963.00
24+250 25+750 1500 6.33 0.55 0.15 9,495.00 5,222.25 6,646.50 5,222.25
26+250 27+250 1000 6.33 0.55 0.15 6,330.00 3,481.50 4,431.00 3,481.50
28+250 29+250 1000 6.33 0.55 0.15 6,330.00 3,481.50 4,431.00 3,481.50
29+250 29+750 500 6.33 0.55 0.15 3,165.00 1,740.75 2,215.50 1,740.75
31+250 32+250 1000 6.33 0.55 0.15 6,330.00 3,481.50 4,431.00 3,481.50
32+750 35+750 3000 6.33 0.55 0.15 18,990.00 10,444.50 13,293.00 10,444.50
36+250 37+750 1500 6.33 0.45 0.15 9,495.00 4,272.75 5,697.00 4,272.75
38+800 39+200 400 6.33 0.45 0.15 2,532.00 1,139.40 1,519.20 1,139.40
41+250 41+750 500 6.33 0.45 0.15 3,165.00 1,424.25 1,899.00 1,424.25
43+750 44+750 1000 6.03 0.45 0.15 6,030.00 2,713.50 3,618.00 2,713.50
45+250 46+250 1000 6.48 0.45 0.15 6,480.00 2,916.00 3,888.00 2,916.00
50+750 51+250 500 6.48 0.45 0.15 3,240.00 1,458.00 1,944.00 1,458.00
53+250 60+750 7500 6.48 0.65 0.15 48,600.00 31,590.00 38,880.00 31,590.00
61+750 62+250 500 6.48 0.65 0.15 3,240.00 2,106.00 2,592.00 2,106.00
63+250 68+750 5500 6.48 0.65 0.15 35,640.00 23,166.00 28,512.00 23,166.00
70+750 71+250 500.00 6.48 0.65 0.15 3,240.00 2,106.00 2,592.00 2,106.00
TOTALES 39,350.00 251,110.50 144,088.58 184,920.15 144,088.58
JUSTIFICACIÓN DE METRADOS
“Contrato De Gestión Vial Por Niveles De Servicio De La Red Vial Regional Alto
OBRA
Huallaga, Bajo Mayo Y Bajo Huallaga – San Martin"
“Contrato De Gestión Vial Por Niveles De Servicio De La Red Vial Regional Alto
OBRA
Huallaga, Bajo Mayo Y Bajo Huallaga – San Martin"
ANCHO ANCHO
TRAMO LONGITUD ESPESOR AREA VOLUMEN
SUP. INF.
DE A ML ML ML ML M2 M3
“Contrato De Gestión Vial Por Niveles De Servicio De La Red Vial Regional Alto Huallaga,
OBRA
Bajo Mayo Y Bajo Huallaga – San Martin"
05.01.00 CUNETAS
05.01.01 Limpieza y Encauzamiento de Cunetas sin Revestir
“Contrato De Gestión Vial Por Niveles De Servicio De La Red Vial Regional Alto Huallaga, Bajo Mayo Y
OBRA
Bajo Huallaga – San Martin"
IZQUIERDA DERECHA
PROGRESIVA LONGITUD PROGRESIVA LONGITUD
KM KM ML KM KM ML
0+820 - 0+890 70.00 54+120 - 54+185 65.00
62+120 - 62+150 30.00
05.01.00 CUNETAS
05.01.02 Limpieza y Encauzamiento de Cunetas Revestidas 9810.00
05.01.03 Reparacion de Cunetas 2943.00
05.01.05 Eliminación de mat. prov. de limpieza y encauzamiento de cunetas 185.00
“Contrato De Gestión Vial Por Niveles De Servicio De La Red Vial Regional Alto Huallaga, Bajo Mayo
OBRA
Y Bajo Huallaga – San Martin"
VOL.
COORDENADAS INICIO COORDENADAS FIN LONGITUD PRGRESIVAS LADO LONGITUD LONGITUD
ELIMINACION
Y X Y X ML DE A ML 30% M3
-84.75146 -7.01037 -84.7507 -7.0101 90.00 0+501 0+578 D 77.00 23.10 8.00
-84.75103 -7.01020 -84.7505 -7.0100 53.00 0+547 0+604 I 57.00 17.10 5.00
-84.74270 -7.01252 -84.7425 -7.0127 30.00 1+516 1+544 D 28.00 8.40 3.00
-84.73821 -7.01298 -84.7378 -7.0128 45.00 1+978 2+024 D 46.00 13.80 3.00
-84.73336 -7.01248 -84.7327 -7.0125 70.00 2+476 2+546 I 70.00 21.00 8.00
-84.73055 -7.01317 -84.7293 -7.0127 130.00 2+770 2+898 I 128.00 38.40 5.00
-84.73076 -7.01316 -84.7302 -7.0131 60.00 2+748 2+807 D 59.00 17.70 9.00
-84.72875 -7.01256 -84.7281 -7.0123 65.00 2+959 3+030 D 71.00 21.30 7.00
-84.72844 -7.01240 -84.7281 -7.0122 40.00 2+994 3+030 I 36.00 10.80 2.00
-84.71959 -7.01124 -84.7189 -7.0111 75.00 3+997 4+066 I 69.00 20.70 2.00
-84.71666 -7.00885 -84.7167 -7.0079 108.00 4+479 4+597 D 118.00 35.40 4.00
-84.70776 -7.00173 -84.7077 -7.0016 25.00 5+753 5+769 I 16.00 4.80 2.00
-84.70780 -7.00183 -84.7077 -7.0016 22.00 5+742 5+769 D 27.00 8.10 4.00
-84.70726 -7.00108 -84.7068 -7.0009 47.00 5+837 5+881 D 44.00 13.20 2.00
-84.70715 -7.00103 -84.7069 -7.0009 33.00 5+848 5+881 I 33.00 9.90 2.00
-84.70041 -6.99318 -84.7005 -6.9929 32.00 6+927 6+960 D 33.00 9.90 2.00
-84.67772 -6.99614 -84.6774 -6.9961 37.00 9+956 9+985 D 29.00 8.70 2.00
-84.47892 -6.94040 -84.4788 -6.9400 40.00 36+105 36+143 D 38.00 11.40 7.00
-84.44107 -6.90700 -84.4407 -6.9068 45.00 41+753 41+796 D 43.00 12.90 2.00
-84.44107 -6.90700 -84.4407 -6.9068 45.00 49+710 49+812 I 102.00 30.60 2.00
-84.37622 -6.91957 -84.3759 -6.9205 105.00 50+608 50+795 I 187.00 56.10 15.00
-84.37622 -6.91957 -84.3759 -6.9205 105.00 50+615 50+803 D 188.00 56.40 10.00
-84.37000 -6.92458 -84.3689 -6.9261 185.00 53+550 53+761 D 211.00 63.30 20.00
-84.36996 -6.92464 -84.3689 -6.9262 186.00 53+587 53+827 I 240.00 72.00 10.00
-84.34640 -6.93169 -84.3455 -6.9320 80.00 53+776 54+029 D 253.00 75.90 13.00
-84.34605 -6.93180 -84.3444 -6.9323 240.00 54+000 54+325 I 325.00 97.50 13.00
-84.34423 -6.93236 -84.3440 -6.9327 45.00 54+167 55+504 D 1337.00 401.10
-84.34371 -6.93438 -84.3435 -6.9345 34.00 55+216 56+059 I 843.00 252.90
-84.34221 -6.93510 -84.3407 -6.9352 150.00 55+940 60+207 I 4267.00 1280.10
-84.33228 -6.93563 -84.3295 -6.9359 260.00 59+999 60+207 D 208.00 62.40 3.00
-84.32520 -6.93641 -84.3240 -6.9365 115.00 61+255 61+320 D 65.00 19.50 5.00
-84.28839 -6.92557 -84.2883 -6.9274 195.00 61+392 61+928 I 536.00 160.80 5.00
-84.28839 -6.92557 -84.2883 -6.9274 195.00 61+596 61+622 D 26.00 7.80 5.00
-84.27883 -6.93073 -84.2782 -6.9310 65.00 I 0.00 0.00 2.00
-84.27760 -6.93134 -84.2765 -6.9294 520.00 I 0.00 0.00
-84.27618 -6.93236 -84.2758 -6.9322 50.00 D 0.00 0.00 3.00
9810.00 2943.00 185.00
JUSTIFICACIÓN DE METRADOS
05.00.00 OBRAS DE ARTE Y DRENAJE
05.01.00 CUNETAS
05.01.04 Cunetas Triangulares tipo I 45,320.00
“Contrato De Gestión Vial Por Niveles De Servicio De La Red Vial Regional Alto Huallaga, Bajo Mayo Y
OBRA
Bajo Huallaga – San Martin"
IZQUIERDA DERECHA
PROGRESIVA LONGITUD PROGRESIVA LONGITUD
KM KM ML KM KM ML
3+600 - 3+640 40.00
2+150 - 2+220 70.00 6+760 - 6+820 60.00
5+550 - 5+585 35.00 15+120 - 15+185 65.00
55+940 - 55+975 35.00 54+120 - 54+185 65.00
63+750 - 63+795 45.00 60+875 - 60+915 40.00
62+120 - 62+150 30.00
“Contrato De Gestión Vial Por Niveles De Servicio De La Red Vial Regional Alto Huallaga, Bajo Mayo Y Bajo
OBRA
Huallaga – San Martin"
“Contrato De Gestión Vial Por Niveles De Servicio De La Red Vial Regional Alto Huallaga, Bajo Mayo Y Bajo
OBRA
Huallaga – San Martin"
“Contrato De Gestión Vial Por Niveles De Servicio De La Red Vial Regional Alto Huallaga, Bajo
OBRA
Mayo Y Bajo Huallaga – San Martin"
7.20 1.00
JUSTIFICACIÓN DE METRADOS
05.03.00 BADENES
05.03.01 Limpieza de Badenes 3.00
“Contrato De Gestión Vial Por Niveles De Servicio De La Red Vial Regional Alto Huallaga, Bajo Mayo
OBRA
Y Bajo Huallaga – San Martin"
“Contrato De Gestión Vial Por Niveles De Servicio De La Red Vial Regional Alto Huallaga, Bajo Mayo Y Bajo Huallaga –
OBRA
San Martin"
RELACIÓN PONTONES
DESCRIPCION UBICACIÓN COORDENADAS PROG. LUZ ANCHO ALTURA CANTIDAD
Nº Obra de Arte Y X (Km) (ML) (ML) (ML) (UND.)
ELIMININACIO
N (UND.)
6.00
5.00
5.00
10.00
8.00
34.00
JUSTIFICACIÓN DE METRADOS
03.04.00 PONTONES
03.04.03 Madera Rolliza
“Contrato De Gestión Vial Por Niveles De Servicio De La Red Vial Regional Alto Huallaga, Bajo
OBRA
Mayo Y Bajo Huallaga – San Martin"
RELACIÓN PONTONES
DESCRIPCION UBICACIÓN LUZ ANCHO ALTURA METRADO
Nº Obra de Arte Progr. Km. (ML) (ML) (ML) (ML.)
276.00
JUSTIFICACIÓN DE METRADOS
05.05.00 PUENTES
05.05.01 Limpieza y Encauzamiento de Puentes 4.00
05.05.03 Eliminacion de Mat. Prov. De Limpieza y Encauzamiento de Puentes 632.55
“Contrato De Gestión Vial Por Niveles De Servicio De La Red Vial Regional Alto Huallaga, Bajo Mayo Y Bajo
OBRA
Huallaga – San Martin"
RELACIÓN PONTONES
DESCRIPCION UBICACIÓN COORDENADAS PROG. LUZ ANCHO ALTURA CANTIDAD ELIMININACIO
Nº Obra de Arte Y X (Km) (ML) (ML) (ML) (UND.) N (UND.)
“Contrato De Gestión Vial Por Niveles De Servicio De La Red Vial Regional Alto Huallaga, Bajo
OBRA
Mayo Y Bajo Huallaga – San Martin"
RELACIÓN PUENTES
DESCRIPCION UBICACIÓN LUZ ALTURA METRADO
FACTOR X ML
Nº Obra de Arte Progr. Km. (ML) (ML) (M2.)
170.80
JUSTIFICACIÓN DE METRADOS
03.06.00 ENCAUZAMIENTO DE CURSOS DE AGUA
03.06.01 Encauzamiento de cursos de agua.
“Contrato De Gestión Vial Por Niveles De Servicio De La Red Vial Regional Alto Huallaga, Bajo
OBRA
Mayo Y Bajo Huallaga – San Martin"
“Contrato De Gestión Vial Por Niveles De Servicio De La Red Vial Regional Alto Huallaga, Bajo Mayo Y
OBRA
Bajo Huallaga – San Martin"
“Contrato De Gestión Vial Por Niveles De Servicio De La Red Vial Regional Alto Huallaga, Bajo
OBRA
Mayo Y Bajo Huallaga – San Martin"
6.00
JUSTIFICACIÓN DE METRADOS
06.00.00 SEÑALIZACION
06.01.01 Mantenimiento de Señales
06.01.02 Marcas en el pavimento
06.01.03 Reparación / repos. de postes kilométricos
06.01.04 Señal preventiva 0.75m x 0.75m
06.01.05 Señal Reglamentaria
06.01.06 Señal informativa 0.75m x 0.60m
“Contrato De Gestión Vial Por Niveles De Servicio De La Red Vial Regional Alto
OBRA
Huallaga, Bajo Mayo Y Bajo Huallaga – San Martin"
DEPARTAMENTO : SAN MARTIN
REGION : SAN MARTIN
PROVINCIA : LAMAS
DISTRITO : PONGO DE CAYNARACHI, BARRANQUITA, PELEJO Y PAPLAYA
FECHA : 01
06.00.00 SEÑALIZACION
29 68+900 INFORMATIVA I 1.00
30 69+800 INFORMATIVA D 1.00
30.00
JUSTIFICACIÓN DE METRADOS
06.00.00 SEÑALIZACION
06.02.00 Marcas en el Pavimento
“Contrato De Gestión Vial Por Niveles De Servicio De La Red Vial Regional Alto
OBRA
Huallaga, Bajo Mayo Y Bajo Huallaga – San Martin"
DEPARTAMENTO : SAN MARTIN
REGION : SAN MARTIN
PROVINCIA : LAMAS
DISTRITO : PONGO DE CAYNARACHI, BARRANQUITA, PELEJO Y PAPLAYA
FECHA : 01
MARCAS EN EL PAVIMENTO
TRAMO LONGITUD SUPERFICIE METRADO
KM KM ML M2/KM M2
0+000 1+000 1000.00 0.2913 291.30
1+000 2+000 1000.00 0.2913 291.30
2+000 3+000 1000.00 0.2913 291.30
3+000 4+000 1000.00 0.2913 291.30
4+000 5+000 1000.00 0.2913 291.30
5+000 6+000 1000.00 0.2913 291.30
6+000 7+000 1000.00 0.2913 291.30
7+000 8+000 1000.00 0.2913 291.30
8+000 9+000 1000.00 0.2913 291.30
9+000 10+000 1000.00 0.2913 291.30
10+000 11+000 1000.00 0.2913 291.30
11+000 12+000 1000.00 0.2913 291.30
12+000 13+000 1000.00 0.2913 291.30
13+000 14+000 1000.00 0.2913 291.30
14+000 15+000 1000.00 0.2913 291.30
15+000 16+000 1000.00 0.2913 291.30
16+000 17+000 1000.00 0.2913 291.30
17+000 18+000 1000.00 0.2913 291.30
18+000 19+000 1000.00 0.2913 291.30
19+000 20+000 1000.00 0.2913 291.30
20+000 21+000 1000.00 0.2913 291.30
21+000 22+000 1000.00 0.2913 291.30
22+000 23+000 1000.00 0.2913 291.30
23+000 24+000 1000.00 0.2913 291.30
24+000 25+000 1000.00 0.2913 291.30
25+000 26+000 1000.00 0.2913 291.30
26+000 27+000 1000.00 0.2913 291.30
27+000 28+000 1000.00 0.2913 291.30
28+000 29+000 1000.00 0.2913 291.30
29+000 30+000 1000.00 0.2913 291.30
30+000 31+000 1000.00 0.2913 291.30
31+000 32+000 1000.00 0.2913 291.30
32+000 33+000 1000.00 0.2913 291.30
33+000 34+000 1000.00 0.2913 291.30
JUSTIFICACIÓN DE METRADOS
06.00.00 SEÑALIZACION
34+000 35+000 1000.00 0.2913 291.30
35+000 36+000 1000.00 0.2913 291.30
36+000 37+000 1000.00 0.2913 291.30
37+000 38+000 1000.00 0.2913 291.30
38+000 39+000 1000.00 0.2913 291.30
39+000 40+000 1000.00 0.2913 291.30
40+000 41+000 1000.00 0.2913 291.30
41+000 42+000 1000.00 0.2913 291.30
42+000 43+000 1000.00 0.2913 291.30
43+000 44+000 1000.00 0.2913 291.30
44+000 45+000 1000.00 0.2913 291.30
45+000 46+000 1000.00 0.2913 291.30
46+000 47+000 1000.00 0.2913 291.30
47+000 48+000 1000.00 0.2913 291.30
48+000 49+000 1000.00 0.2913 291.30
49+000 50+000 1000.00 0.2913 291.30
50+000 51+000 1000.00 0.2913 291.30
51+000 52+000 1000.00 0.2913 291.30
52+000 53+000 1000.00 0.2913 291.30
53+000 54+000 1000.00 0.2913 291.30
54+000 55+000 1000.00 0.2913 291.30
55+000 56+000 1000.00 0.2913 291.30
56+000 57+000 1000.00 0.2913 291.30
57+000 58+000 1000.00 0.2913 291.30
58+000 59+000 1000.00 0.2913 291.30
59+000 60+000 1000.00 0.2913 291.30
60+000 61+000 1000.00 0.2913 291.30
61+000 62+000 1000.00 0.2913 291.30
62+000 63+000 1000.00 0.2913 291.30
63+000 64+000 1000.00 0.2913 291.30
64+000 65+000 1000.00 0.2913 291.30
65+000 66+000 1000.00 0.2913 291.30
66+000 67+000 1000.00 0.2913 291.30
67+000 68+000 1000.00 0.2913 291.30
68+000 69+000 1000.00 0.2913 291.30
69+000 70+000 1000.00 0.2913 291.30
70+000 71+000 1000.00 0.2913 291.30
20682.30
JUSTIFICACIÓN DE METRADOS
06.00.00 SEÑALIZACION
06.03.00 Repración/Reposic. Postes Kilométricos
“Contrato De Gestión Vial Por Niveles De Servicio De La Red Vial Regional Alto
OBRA
Huallaga, Bajo Mayo Y Bajo Huallaga – San Martin"
DEPARTAMENTO : SAN MARTIN
REGION : SAN MARTIN
PROVINCIA : LAMAS
DISTRITO : PONGO DE CAYNARACHI, BARRANQUITA, PELEJO Y PAPLAYA
FECHA : 01
06.00.00 SEÑALIZACION
05.04.00 Señal Preventiva
“Contrato De Gestión Vial Por Niveles De Servicio De La Red Vial Regional Alto
OBRA
Huallaga, Bajo Mayo Y Bajo Huallaga – San Martin"
DEPARTAMENTO : SAN MARTIN
REGION : SAN MARTIN
PROVINCIA : LAMAS
DISTRITO : PONGO DE CAYNARACHI, BARRANQUITA, PELEJO Y PAPLAYA
FECHA : 01
1 -- PREVENTIVAS -- 428.00
428.00
JUSTIFICACIÓN DE METRADOS
06.00.00 SEÑALIZACION
“Contrato De Gestión Vial Por Niveles De Servicio De La Red Vial Regional Alto
OBRA
Huallaga, Bajo Mayo Y Bajo Huallaga – San Martin"
DEPARTAMENTO : SAN MARTIN
REGION : SAN MARTIN
PROVINCIA : LAMAS
DISTRITO : PONGO DE CAYNARACHI, BARRANQUITA, PELEJO Y PAPLAYA
FECHA : 01
1 -- REGLAMENTARIA -- 212.00
212.00
“Contrato De Gestión Vial Por Niveles De Servicio De La Red Vial Regional Alto
OBRA
Huallaga, Bajo Mayo Y Bajo Huallaga – San Martin"
DEPARTAMENTO : SAN MARTIN
REGION : SAN MARTIN
PROVINCIA : LAMAS
DISTRITO : PONGO DE CAYNARACHI, BARRANQUITA, PELEJO Y PAPLAYA
FECHA : 01
1 -- INFORMATIVA -- 24.00
24.00
"Mantenimiento Periódico de la Carretera Departamental Emp. PE-5NB (Pongo de Caynarachi) - Barraquita; Tramo: Km. 00+000 - Km. 27+000"
MESES
ITEM DESCRIPCION PARCIAL MES 1 MES 2 MES 3 MES 4
S/. SEM 1 SEM 2 SEM 3 SEM 4 SEM 5 SEM 6 SEM 7 SEM 8 SEM 9 SEM 10 SEM 11 SEM 12 SEM 13 SEM 14 SEM 15 SEM 16
#REF! #REF!
01.01.00 Movilización y Desmovilización de Equipo 6,834.60 3,417.30 3,417.30
01.02.00 Campamento Provisional de la Obra 1,200.00 1,200.00
#REF! #REF! 633.84 633.84
#REF! #REF! 5,625.72 5,625.72
#REF! #REF! 7,220.62 1,805.16 1,805.16 1,805.16 1,805.16
#REF! #REF! 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
#REF! #REF! 16,013.89 1,143.85 1,143.85 1,143.85 1,143.85 1,143.85 1,143.85 1,143.85 1,143.85 1,143.85 1,143.85 1,143.85 1,143.85 1,143.85 1,143.85
#REF! #REF! 294,492.00 21,035.14 21,035.14 21,035.14 21,035.14 21,035.14 21,035.14 21,035.14 21,035.14 21,035.14 21,035.14 21,035.14 21,035.14 21,035.14 21,035.14
#REF! #REF! 127,523.09 8,501.54 8,501.54 8,501.54 8,501.54 8,501.54 8,501.54 8,501.54 8,501.54 8,501.54 8,501.54 8,501.54 8,501.54 8,501.54 8,501.54 8,501.54
#REF! #REF!
#REF! #REF!
#REF! #REF! 938.69 67.05 67.05 67.05 67.05 67.05 67.05 67.05 67.05 67.05 67.05 67.05 67.05 67.05 67.05
#REF! #REF!
#REF! #REF! 11,823.30 2,955.83 2,955.83 2,955.83 2,955.83
#REF! #REF!
#REF! #REF! 1,970.55 492.64 492.64 492.64 492.64
#REF! #REF!
#REF! #REF! 867.41 867.41
#REF! #REF! 1,044.52 522.26 522.26
#REF! #REF!
#REF! #REF! 1,542.50 385.63 385.63 385.63 385.63
#REF! #REF! 4,176.23 1,044.06 1,044.06 1,044.06 1,044.06
#REF! #REF! 696.04 174.01 174.01 174.01 174.01
COSTO DIRECTO 482,603.00 16,130.48 36,001.20 36,001.20 36,001.20 31,269.84 31,269.84 32,351.27 32,351.27 32,351.27 32,351.27 30,747.58 30,747.58 30,747.58 30,747.58 30,747.58 12,786.25
GASTOS GENERALES (11.064373% CD) 53,397.00 1,784.74 3,983.31 3,983.31 3,983.31 3,459.81 3,459.81 3,579.47 3,579.47 3,579.47 3,579.47 3,402.03 3,402.03 3,402.03 3,402.03 3,402.03 1,414.72
SUPERVISIÓN 14,000.00 875.00 875.00 875.00 875.00 875.00 875.00 875.00 875.00 875.00 875.00 875.00 875.00 875.00 875.00 875.00 875.00
TOTAL PRESUPUESTO 550,000.00 18,790.21 40,859.51 40,859.51 40,859.51 35,604.65 35,604.65 36,805.74 36,805.74 36,805.74 36,805.74 35,024.61 35,024.61 35,024.61 35,024.61 35,024.61 15,075.97
% DE AVANCE DE OBRA 100.00 3.42 7.43 7.43 7.43 6.47 6.47 6.69 6.69 6.69 6.69 6.37 6.37 6.37 6.37 6.37 2.74
% ACUM. DE AVANCE DE OBRA 100.00 3.42 10.85 18.27 25.70 6.47 12.95 19.64 26.33 6.69 13.38 19.75 26.12 6.37 12.74 19.10 21.85
% ACUM. MENSUAL DE AVANCE DE OBRA 100.00 25.70 26.33 26.12 21.85
CALCULO DE LA DISTANCIA MEDIA DE TRANSPORTE DE MATERIAL LIGANTE 20%
TRAMO: KM. 27+000 - KM. 32+000
“Contrato De Gestión Vial Por Niveles De Servicio De La Red Vial Regional Alto Huallaga, Bajo Mayo Y Bajo
OBRA
Huallaga – San Martin"
CALCULO DEL RENDIMIENTO DEL CAMION VOLQUETE PARA TRANSPORTE DE MATERIAL DE AFIRMADO
“Contrato De Gestión Vial Por Niveles De Servicio De La Red Vial Regional Alto Huallaga, Bajo Mayo Y Bajo
OBRA
Huallaga – San Martin"
Cantera Río
Nº02 KM. 16+200
CALCULO DEL RENDIMIENTO DEL CAMION VOLQUETE PARA TRANSPORTE DE MATERIAL DE AFIRMADO
“Contrato De Gestión Vial Por Niveles De Servicio De La Red Vial Regional Alto Huallaga, Bajo Mayo Y Bajo
OBRA
Huallaga – San Martin"
DEPARTAMENTO : SAN MARTIN
REGION : SAN MARTIN
PROVINCIA : LAMAS
DISTRITO : PONGO DE CAYNARACHI, BARRANQUITA, PELEJO Y PAPLAYA
FECHA : 01
Cantera Nº01
KM. 53+300
CALCULO DEL RENDIMIENTO DEL CAMION VOLQUETE PARA TRANSPORTE DE MATERIAL DE AFIRMADO