Documentos de Académico
Documentos de Profesional
Documentos de Cultura
CONSTRUCCION DEL CERCO PERIMETRICO DEL CENTRO DE SALUD DEL DISTRITO EL TALLAN - PIURA
OBRA :
6 I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.301 100.00% 375.16 375.16 377.50 377.50 1.006 0.303
OBRA : CONSTRUCCION DEL CERCO PERIMETRICO DEL CENTRO DE SALUD DEL DISTRITO EL TALLAN - PIURA
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE EL TALLAN
UBICACIÓN : DISTRITO DE EL TALLAN
CONTRATISTA : INVERSIONES & SERVICIOS GARAY EIRL.
PRESUPUESTO CONTRATADO S/. 201,772.99
A V A N C E S
PRESUPUESTO SALDO ACTUAL
PARTIDA DESCRIPCION ANTERIOR ACTUAL ACUMULADO
UND METR. P.UNIT. PARCIAL METRADO MONTO METRADO MONTO METRADO MONTO % METRADO MONTO %
01.00.00 CERCO PERIMETRICO
01.01.00 OBRAS PROVISIONALES
01.01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M UND 1.00 818.47 818.47 1.00 818.47 0.00 0.00 1.00 818.47 100.00% 0.00 0.00 0.00%
01.01.02 ALQUILER DE ALMACEN PARA ALMACEN Y GUARDIANIA MES 2.00 150.00 300.00 1.50 225.00 0.50 75.00 2.00 300.00 100.00% 0.00 0.00 0.00%
01.01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPO GLB 1.00 1,000.00 1,000.00 1.00 1,000.00 0.00 0.00 1.00 1,000.00 100.00% 0.00 0.00 0.00%
01.01.04 DEPOSITO PARA ALMACENAR AGUA GLB 1.00 300.00 300.00 1.00 300.00 0.00 0.00 1.00 300.00 100.00% 0.00 0.00 0.00%
01.01.05 REUBICACION DE POSTE (PAGO A EMPRESA) UND 1.00 1,500.00 1,500.00 1.00 1,500.00 0.00 0.00 1.00 1,500.00 100.00% 0.00 0.00 0.00%
01.01.06 TALA Y RETIRO DE ARBOLES UND 1.00 133.43 133.43 1.00 133.43 0.00 0.00 1.00 133.43 100.00% 0.00 0.00 0.00%
01.01.07 SEÑALIZACION DE OBRA M 324.00 2.21 716.04 324.00 716.04 0.00 0.00 324.00 716.04 100.00% 0.00 0.00 0.00%
01.01.08 MEDIDAS DE MITIGACION AMBIENTAL DIA 15.00 37.18 557.70 10.00 371.80 5.00 185.90 15.00 557.70 100.00% 0.00 0.00 0.00%
01.02.00 TRABAJOS PRELIMINARES
01.02.01 LIMPIEZA MANUAL DE TERRENO CON PRESENCIA DE MALEZA Y VEGETACION M2 162.00 0.97 157.14 162.00 157.14 0.00 0.00 162.00 157.14 100.00% 0.00 0.00 0.00%
01.02.02 TRAZO, NIVEL Y REPLANTEO M2 162.00 0.93 150.66 162.00 150.66 0.00 0.00 162.00 150.66 100.00% 0.00 0.00 0.00%
01.02.03 DEMOLICION DE SARDINEL DE CONCRETO EXISTENTE M3 2.76 88.96 245.53 2.76 245.53 0.00 0.00 2.76 245.53 100.00% 0.00 0.00 0.00%
01.02.04 RETIRO DE CERCO DE PALOS Y ALAMBRE DE PUAS EXISTENTE ML 58.60 3.23 189.28 58.60 189.28 0.00 0.00 58.60 189.28 100.00% 0.00 0.00 0.00%
01.03.00 MOVIMIENTO DE TIERRAS
01.03.01 EXCAVACION DE ZANJAS PARA CIMIENTOS M3 183.02 21.82 3,993.50 183.02 3,993.50 0.00 0.00 183.02 3,993.50 100.00% 0.00 0.00 0.00%
01.03.02 CAPA ANTICONTAMINANTE E=10 CM. M3 16.01 66.38 1,062.74 16.01 1,062.74 0.00 0.00 16.01 1,062.74 100.00% 0.00 0.00 0.00%
01.03.03 RELLENO COMPACTADO MANUAL CON MATERIAL PROPIO M3 40.80 12.88 525.50 40.80 525.50 0.00 0.00 40.80 525.50 100.00% 0.00 0.00 0.00%
01.03.04 NIVELACION, REFINE Y COMPACTACION , PISON MANUAL M2 160.05 2.07 331.30 160.05 331.30 0.00 0.00 160.05 331.30 100.00% 0.00 0.00 0.00%
01.03.05 ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA, Dp = 2.5 Km. M3 174.25 7.20 1,254.60 174.25 1,254.60 0.00 0.00 174.25 1,254.60 100.00% 0.00 0.00 0.00%
01.04.00 OBRAS DE CONCRETO SIMPLE
01.04.01 CIMIENTOS CORRIDOS MEZCLA 1:10+30% P.G M3 112.04 155.32 17,402.05 112.04 17,402.05 -1.47 -228.32 110.57 17,173.73 98.69% 1.47 228.32 1.31%
01.05.00 OBRAS DE CONCRETO ARMADO
01.05.01 SOBRECIMIENTOS REFORZADOS
01.05.01.1 SOBRECIMIENTOS REFORZADOS, CONCRETO F´C=175 KG/CM2 M3 24.01 310.23 7,448.62 24.01 7,448.62 -0.32 -99.27 23.69 7,349.35 98.67% 0.32 99.27 1.33%
01.05.01.2 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS M2 320.10 29.80 9,538.98 320.10 9,538.98 -4.20 -125.16 315.90 9,413.82 98.69% 4.20 125.16 1.31%
01.05.01.3 ACERO FÝ=4200 KG/CM2 PARA SOBRECIMIENTOS KG 1,615.91 3.72 6,011.19 1,615.91 6,011.19 -21.28 -79.16 1,594.63 5,932.02 98.68% 21.28 79.16 1.32%
01.05.02 COLUMNAS
01.05.02.1 CONCRETO F'C=175 KG/CM2. COLUMNAS M3 11.45 326.23 3,735.33 10.00 3,262.30 1.45 473.03 11.45 3,735.33 100.00% 0.00 0.00 0.00%
01.05.02.2 ENCOFRADO Y DESENCOFRADO EN COLUMNAS M2 244.16 32.38 7,905.90 211.00 6,832.18 33.16 1,073.72 244.16 7,905.90 100.00% 0.00 0.00 0.00%
01.05.02.3 ACERO FÝ=4200 KG/CM2 EN COLUMNAS KG 2,289.06 3.72 8,515.30 2,289.06 8,515.30 0.00 0.00 2,289.06 8,515.30 100.00% 0.00 0.00 0.00%
AL
VALORIZACION DE AVANCE DE OBRA No. 03 31 AGOSTO DEL 2012
MES
OBRA : CONSTRUCCION DEL CERCO PERIMETRICO DEL CENTRO DE SALUD DEL DISTRITO EL TALLAN - PIURA
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE EL TALLAN
UBICACIÓN : DISTRITO DE EL TALLAN
CONTRATISTA : INVERSIONES & SERVICIOS GARAY EIRL.
PRESUPUESTO CONTRATADO S/. 201,772.99
A V A N C E S
PRESUPUESTO SALDO ACTUAL
PARTIDA DESCRIPCION ANTERIOR ACTUAL ACUMULADO
UND METR. P.UNIT. PARCIAL METRADO MONTO METRADO MONTO METRADO MONTO % METRADO MONTO %
01.05.03 VIGAS
01.05.03.1 CONCRETO EN VIGAS F'C=175 KG/CM2 M3 9.60 326.23 3,131.81 8.20 2,675.09 0.61 199.00 8.81 2,874.09 91.77% 0.79 257.72 8.23%
01.05.03.2 ENCOFRADO Y DESENCOFRADO EN VIGAS M2 127.98 39.29 5,028.33 110.00 4,321.90 7.54 296.25 117.54 4,618.15 91.84% 10.44 410.19 8.16%
01.05.03.3 ACERO FÝ=4200 KG/CM2 EN VIGAS KG 472.47 3.72 1,757.59 355.00 1,320.60 77.32 287.63 432.32 1,608.23 91.50% 40.15 149.36 8.50%
01.06.00 MUROS DE ALBAÑILERIA
01.06.01 MURO DE SOGA DE LADRILLO KING KONG 8X12X23 UNA CARAVISTA M2 813.85 43.19 35,150.18 720.00 31,096.80 20.77 897.06 740.77 31,993.86 91.02% 73.08 3,156.33 8.98%
01.07.00 REVOQUES, ENLUCIDOS Y MOLDURAS 0.00
01.07.01 TARRAJEO DE COLUMNAS, VIGAS Y SOBRECIMIENTOS M2 652.53 27.16 17,722.71 250.00 6,790.00 326.01 8,854.43 576.01 15,644.43 88.27% 76.52 2,078.28 11.73%
01.08.00 PINTURA
01.08.01 PINTURA EN COLUMNAS, VIGAS, SOBRECIMIENTOS Y MUROS EXTERIORES FRONTIS M2 1,270.46 6.09 7,737.10 0.00 0.00 1,255.26 7,644.53 1,255.26 7,644.53 98.80% 15.20 92.57 1.20%
01.09.00 VARIOS
01.09.01 JUNTA DE CONSTRUCCION CON TEKNOPORT M 96.00 5.73 550.08 72.00 412.56 24.00 137.52 96.00 550.08 100.00% 0.00 0.00 0.00%
02.00.00 PORTADA DE INGRESO
02.01.00 MOVIMIENTO DE TIERRAS
02.01.01 EXCAVACION DE ZANJAS PARA ZAPATAS M3 4.00 21.82 87.28 4.00 87.28 0.00 0.00 4.00 87.28 100.00% 0.00 0.00 0.00%
02.01.02 ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA, Dp = 2.5 Km. M3 4.80 7.20 34.56 4.80 34.56 0.00 0.00 4.80 34.56 100.00% 0.00 0.00 0.00%
02.02.00 OBRAS DE CONCRETO ARMADO
02.02.01 ZAPATAS
02.02.01.1 ZAPATAS, CONCRETO F'C= 175 KG/CM2 M3 1.82 317.33 577.54 0.00 0.00 1.82 577.54 1.82 577.54 100.00% 0.00 0.00 0.00%
02.02.01.2 ACERO FÝ=4200 KG/CM2 EN ZAPATAS KG 32.08 3.72 119.34 0.00 0.00 32.08 119.34 32.08 119.34 100.00% 0.00 0.00 0.00%
02.02.02 COLUMNAS
02.02.02.1 CONCRETO F'C=175 KG/CM2. COLUMNAS M3 0.68 326.23 221.84 0.00 0.00 0.68 221.84 0.68 221.84 100.00% 0.00 0.00 0.00%
02.02.02.2 ENCOFRADO Y DESENCOFRADO EN COLUMNAS M2 10.24 32.38 331.57 0.00 0.00 10.24 331.57 10.24 331.57 100.00% 0.00 0.00 0.00%
02.02.02.3 ACERO FÝ=4200 KG/CM2 EN COLUMNAS KG 121.41 3.72 451.65 0.00 0.00 121.41 451.65 121.41 451.65 100.00% 0.00 0.00 0.00%
02.02.03 VIGAS
02.02.03.1 CONCRETO EN VIGAS F'C=175 KG/CM2 M3 1.64 326.23 535.02 0.00 0.00 1.64 535.02 1.64 535.02 100.00% 0.00 0.00 0.00%
02.02.03.2 ENCOFRADO Y DESENCOFRADO EN VIGAS M2 9.23 39.29 362.65 0.00 0.00 9.23 362.65 9.23 362.65 100.00% 0.00 0.00 0.00%
02.02.03.3 ACERO FÝ=4200 KG/CM2 EN VIGAS KG 72.43 3.72 269.44 0.00 0.00 72.43 269.44 72.43 269.44 100.00% 0.00 0.00 0.00%
02.03.00 REVOQUES ENLUCIDOS Y MOLDURAS
02.03.01 TARRAJEO DE COLUMNAS, VIGAS Y SOBRECIMIENTOS M2 16.77 27.16 455.47 0.00 0.00 16.77 455.47 16.77 455.47 100.00% 0.00 0.00 0.00%
02.04.00 VEREDAS DE CONCRETO SIMPLE
02.04.01 CORTE DE TERRENO MANUAL A NIVEL DE SUBRASANTE M3 3.20 22.24 71.17 0.00 0.00 3.20 71.17 3.20 71.17 100.00% 0.00 0.00 0.00%
02.04.02 PERFILADO Y COMPACTACION DE SUBRASANTE EN VEREDAS M2 16.00 4.90 78.40 0.00 0.00 16.00 78.40 16.00 78.40 100.00% 0.00 0.00 0.00%
AL
VALORIZACION DE AVANCE DE OBRA No. 03 31 AGOSTO DEL 2012
MES
OBRA : CONSTRUCCION DEL CERCO PERIMETRICO DEL CENTRO DE SALUD DEL DISTRITO EL TALLAN - PIURA
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE EL TALLAN
UBICACIÓN : DISTRITO DE EL TALLAN
CONTRATISTA : INVERSIONES & SERVICIOS GARAY EIRL.
PRESUPUESTO CONTRATADO S/. 201,772.99
A V A N C E S
PRESUPUESTO SALDO ACTUAL
PARTIDA DESCRIPCION ANTERIOR ACTUAL ACUMULADO
UND METR. P.UNIT. PARCIAL METRADO MONTO METRADO MONTO METRADO MONTO % METRADO MONTO %
02.04.03 ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA, Dp = 2.5 Km. M3 3.84 7.20 27.65 0.00 0.00 3.84 27.65 3.84 27.65 100.00% 0.00 0.00 0.00%
02.04.04 BASE DE AFIRMADO COMPACTADO E=4" M2 16.00 8.57 137.12 0.00 0.00 16.00 137.12 16.00 137.12 100.00% 0.00 0.00 0.00%
02.04.05 ENCOFRADO Y DESENCOFRADO DE VEREDAS M2 3.20 25.18 80.58 0.00 0.00 3.20 80.58 3.20 80.58 100.00% 0.00 0.00 0.00%
02.04.06 VEREDA DE CONCRETO F'C=140 KG/CM2 E=4" INC. BRUÑADO M2 16.00 31.20 499.20 0.00 0.00 16.00 499.20 16.00 499.20 100.00% 0.00 0.00 0.00%
02.04.07 CONCRETO F'C=140 KG/CM2 UÑAS DE VEREDAS M3 0.60 268.18 160.91 0.00 0.00 0.60 160.91 0.60 160.91 100.00% 0.00 0.00 0.00%
02.04.08 CURADO QUIMICO DEL CONCRETO M2 16.00 1.78 28.48 0.00 0.00 16.00 28.48 16.00 28.48 100.00% 0.00 0.00 0.00%
02.04.09 JUNTAS DE DILATACION CON ASFALTO E=1! M 8.00 5.18 41.44 0.00 0.00 8.00 41.44 8.00 41.44 100.00% 0.00 0.00 0.00%
02.05.00 PINTURA
02.05.01 PINTURA EN COLUMNAS, VIGAS, SOBRECIMIENTOS Y MUROS EXTERIORES FRONTIS M2 12.98 6.09 79.05 0.00 0.00 12.98 79.05 12.98 79.05 100.00% 0.00 0.00 0.00%
02.06.00 CARPINTERIA METALICA
02.06.01 PORTON DE FIERRO DE 3.00 X 2.40 M. UND 1.00 2,966.10 2,966.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.00 2,966.10 100.00%
02.06.02 PUERTA DE FIERRO 0.90 X 2.40 M. UND 1.00 1,000.00 1,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.00 1,000.00 100.00%
02.07.00 VARIOS
02.07.01 JUNTA DE CONSTRUCCION CON TEKNOPORT M 6.40 5.73 36.67 0.00 0.00 6.40 36.67 6.40 36.67 100.00% 0.00 0.00 0.00%
02.07.02 PINTADO DE LOGOTIPO DE PUESTOS DE SALUD GLB 1.00 120.00 120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.00 120.00 100.00%
02.07.03 PLACA RECORDATORIA DE BRONCE UND 1.00 338.98 338.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.00 338.98 100.00%
02.07.04 FLETE DE MATERIALES AL DISTRITO DE EL TALLAN GLB 1.00 2,751.99 2,751.99 0.50 1,376.00 0.50 1,376.00 1.00 2,751.99 100.00% 0.00 0.00 0.00%
02.07.05 LIMPIEZA FINAL DE OBRA GLB 1.00 92.68 92.68 0.00 0.00 0.75 69.51 0.75 69.51 75.00% 0.25 23.17 25.00%
02.07.06 IMPLEMENTOS DE SEGURIDAD GLB 1.00 1,500.00 1,500.00 0.75 1,125.00 0.25 375.00 1.00 1,500.00 100.00% 0.00 0.00 0.00%
COSTO DIRECTO 158,327.84 121,225.40 25,977.86 147,203.24 11,124.61
GASTOS GENERALES 10.000% 15,832.78 12,122.54 2,597.79 14,720.32 1,112.46
UTILIDAD 10.000% 15,832.78 12,122.54 2,597.79 14,720.32 1,112.46
SUB TOTAL 189,993.40 145,470.48 31,173.44 176,643.88 13,349.53
FACTOR DE RELACION 90.0000% 170,994.06 130,923.43 28,056.10 158,979.49 12,014.58
I.G.V. 18.000% 30,778.93 23,566.22 5,050.10 28,616.31 2,162.62
TOTAL GENERAL 201,772.99 154,489.65 33,106.20 187,595.80 14,177.20
PORCENTAJE DE AVANCE DE OBRA % 76.57 16.41 92.97 7.03
DEDUCTIVO
1.47
0.32
4.20
21.28
SALDO
0.79 0.61
10.44 7.54
40.15 77.32
73.08 20.77
76.52 326.01
15.20 1255.26