02.00 ESTRUCTURAS
02.01.01 EXCAVACION CIMIENTOS NFC -1.40m m3 77.09 S/. 114.50 S/. 8,826.44
02.01.02 EXCAVACION ZAPATAS NFZ -1.40m m3 1.37 S/. 114.50 S/. 156.29
02.01.03 RELLENO CON MATERIAL PROPIO NPT +0.36m C/PLANCHA VIBRADORA m3 5.65 S/. 78.37 S/. 443.14
C/AGUA
02.02 OBRAS DE CONCRETO SIMPLE
02.02.01 SOLADO e= 0.10m F´c= 100 Kg/cm2 m2 43.90 S/. 24.71 S/. 1,084.77
02.02.02 CIMIENTOS
02.02.02.01 CONCRETO CICLOPEO 1:10 c/30% PG - CEMENTO TIPO V m3 63.14 S/. 240.00 S/. 15,153.60
02.02.03 SOBRECIMIENTOS
02.02.03.01 CONCRETO CICLOPEO 1:8 c/Piedra Mediana m3 2.68 S/. 273.70 S/. 733.73
02.02.03.02 ENCOFRADO Y DESENCOFRADO m2 32.50 S/. 40.77 S/. 1,324.86
02.02.04 LOSA DE CIMENTACION
02.02.04.01 CONCRETO PREMEZCLADO F'c= 210 Kg/cm2 m3 27.56 S/. 325.00 S/. 14,267.50
02.03.01 ZAPATAS
02.03.01.01 ACERO CORRUGADO FY = 4200 KG/CM2 GRADO 60 kg 8.82 S/. 4.00 S/. 35.28
02.03.01.02 CONCRETO PREMEZCLADO F'c= 210 Kg/cm2 - CEMENTO TIPO V m3 0.54 S/. 240.00 S/. 129.36
02.03.05 COLUMNAS
02.03.05.01 ACERO CORRUGADO FY = 4200 KG/CM2 GRADO 60 kg 2,627.41 S/. 4.00 S/. 10,509.64
02.03.05.02 CONCRETO PREMEZCLADO F'c= 210 Kg/cm2 m3 16.51 S/. 313.99 S/. 5,183.97
02.03.05.03 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 257.41 S/. 76.71 S/. 19,745.92
02.03.08 VIGAS
02.03.08.01 ACERO CORRUGADO FY = 4200 KG/CM2 GRADO 60 kg 1,540.66 S/. 4.50 S/. 6,932.97
02.03.08.02 CONCRETO PREMEZCLADO F'c= 210 Kg/cm2 m3 14.44 S/. 293.60 S/. 4,239.58
02.03.08.03 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 122.63 S/. 67.81 S/. 8,315.54
02.04 VARIOS
CIMIENTOS
Cotas Veces Largo Ancho Area (m2)
A-A/1-7 1 16.23 0.50 8.12
A-B/5-6 1 1.40 0.50 0.70
B-B/1-3 1 4.68 0.50 2.34
B-C/1-2 1 1.89 0.50 0.95
B-C/4-5 2 0.37 0.50 0.37
B-C/5-6 1 2.45 0.50 1.23
C-C/3-5 1 4.01 0.50 2.01
C-D/3-5 1 1.76 0.50 0.88
C-D/4-6 1 1.30 0.50 0.65
C-D/5-7 1 2.70 0.50 1.35
C-D/6-7 1 0.20 0.50 0.10
D-D/3-6 1 5.34 0.50 2.67
E-E/1-7 1 16.75 0.50 8.38
1-1/A-C 1 3.31 0.50 1.66
2-2/B-C 1 1.25 0.50 0.63
3-3/A-C 1 3.04 0.50 1.52
3-4/C-D 1 2.21 0.50 1.11
3-4/D-E 1 2.31 0.50 1.16
4-4/C-D 1 0.86 0.50 0.43
4-5/C-D 1 0.66 0.50 0.33
4-5/C-D 1 0.75 0.50 0.38
5-5/B-C 1 3.43 0.50 1.72
5-6/A-B 2 0.30 0.50 0.30
5-6/A-C 1 1.41 0.50 0.71
5-6/A-D 1 5.68 0.50 2.84
5-6/D-E 1 2.81 0.50 1.41
7-7/C-E 1 4.00 0.50 2.00
45.89
3.81
1.87
MOVIMIENTO DE TIERRAS
AREA (m2) F. Esponj. PARCIAL (m3) TIPO DE EXCAV. EQUIPO / M.O.
45.89 -1.20 77.09 CORTE C/M.O.
0.81 -1.20 1.37 CORTE C/M.O.
94.24 1.20 5.65 RELLENO C/M.O.
ZAPATAS
Elemento Veces Largo Ancho Area (m2)
Z-1 1.00 0.75 0.75 0.5625
Z-2 1.00 0.5 0.5 0.25
0.8125
DISEÑO TRASLAPE
DESCRIPCION DEL N° DE N° DE LONGITUD
FIERRO ELEMENTOS PIEZAS POR
TIPO Ø IGUALES IGUALES PIEZA(M)
ZAPATAS
CIMIENTOS
Cimiento C11,C7,C7,C1,C2,C3,C3,C7,C3,C9,C4,C5,C6,C8,C13,C7x5
SOBRECIMIENTOS
Cimiento C11,C7,C7,C1,C2,C3,C3,C7,C3,C9,C4,C5,C6,C8,C13,C7x5
LOSA DE ESTACIONAMIENTO/RAMPA/ESCALERAS
Peso (Kg./ml)
Total (Kgs.)
Desperdicios
Total (Kgs.) + desperdicios
varillas
METRADO DE ZAPATAS, CIMIENTOS Y SOBRECIMIENTOS
377.19
UESO / AISLAMIENTO IMPERMEABLE (m2) 377.19
LONGITUD POR Ø
6.00
2.10
10.92
LONGITUD POR Ø
14.25
4.41
3.15
4.80
4.86
18.20
14.00
TIPO DE
DESC. DIMENSIONES N° DE CONCRET
ELEMEN O
a b h PERIMETRO AREA TOS TIPO
Total
Desperdicios
Total+desp
52.68
ENCOFRADO concreto f´c =210 SOLADO (m2)
(m2) (m3) e=0.10
0.34
0
0.56
0.15
0
0.25
41
24.57
2.95
0.48
ENCOFRADO concreto f´c =210 SOLADO (m2)
(m2) (m3) e=0.10
0.60
1.06
2.46
1.82
0.76
1.01
0.72
6.21
47.53 41.81
10.00% 5.00%
47.53 0 43.9
DISEÑO
DEL
N° DE N° DE LONGITUD
FIERRO
ELEMENTOS PIEZAS POR
DESCRIPCION Ø IGUALES IGUALES PIEZA(M) TRASLAPE
COLUMNA C1
Piso 01 al Piso 02
B V 1/2" 1.00 8.00 8.00 0.45
φ 3/8"-1@.05, 6@.10, Rto@.15 O H 3/8" 1.00 20.00 0.82
φ 3/8"-1@.05, 6@.10, Rto@.15 O H 3/8" 1.00 20.00 1.38
COLUMNA C2
Piso 01 al Piso 02
B V 1/2" 1.00 14.00 8.00
φ 3/8"-1@.05, 6@.10, Rto@.15 O H 3/8" 1.00 20.00 2.26
φ 3/8"-1@.05, 6@.10, Rto@.15 O H 3/8" 1.00 20.00 1.58
φ 3/8"-1@.05, 6@.10, Rto@.15 O H 3/8" 2.00 20.00 0.96
φ 3/8"-1@.05, 6@.10, Rto@.15 S H 3/8" 1.00 20.00 0.27
COLUMNA C3
Piso 01 al Piso 02
B V 1/2" 1.00 10.00 8.00
B V 3/8" 1.00 8.00 8.00
φ 3/8"-1@.05, 6@.10, Rto@.15 O H 3/8" 1.00 20.00 0.68
φ 3/8"-1@.05, 6@.10, Rto@.15 O H 3/8" 2.00 20.00 0.98
φ 3/8"-1@.05, 6@.10, Rto@.15 O H 3/8" 1.00 20.00 2.32
φ 3/8"-1@.05, 6@.10, Rto@.15 S H 3/8" 1.00 20.00 0.27
COLUMNA C4
Piso 01 al Piso 02
B V 1/2" 1.00 12.00 8.00
φ 3/8"-1@.05, 6@.10, Rto@.15 O H 3/8" 1.00 20.00 1.68
φ 3/8"-1@.05, 6@.10, Rto@.15 O H 3/8" 1.00 20.00 1.28
φ 3/8"-1@.05, 6@.10, Rto@.15 O H 3/8" 1.00 20.00 0.72
COLUMNA C5
Piso 01 al Piso 02
B V 1/2" 1.00 6.00 8.00
φ 3/8"-1@.05, 6@.10, Rto@.15 O H 3/8" 1.00 20.00 0.76
DISEÑO
DEL
N° DE N° DE LONGITUD
FIERRO
ELEMENTOS PIEZAS POR
DESCRIPCION Ø IGUALES IGUALES PIEZA(M) TRASLAPE
COLUMNA C1
COLUMNA C6
Piso 01 al Piso 02
B V 5/8" 1.00 4.00 8.00
φ 3/8"-1@.05, 6@.10, Rto@.15 O H 3/8" 1.00 20.00 0.92
COLUMNA C7
Piso 01 al Piso 02
B V 1/2" 9.00 6.00 8.00
φ 3/8"-1@.05, 6@.10, Rto@.15 O H 3/8" 18.00 20.00 0.98
φ 3/8"-1@.05, 6@.10, Rto@.15 S H 3/8" 9.00 20.00 0.27
COLUMNA C8
Piso 01 al Piso 02
B V 1/2" 1.00 14.00 8.00
φ 3/8"-1@.05, 6@.10, Rto@.15 O H 3/8" 1.00 20.00 1.48
φ 3/8"-1@.05, 6@.10, Rto@.15 O H 3/8" 2.00 20.00 1.00
φ 3/8"-1@.05, 6@.10, Rto@.15 S H 3/8" 1.00 20.00 0.32
COLUMNA C9
Piso 01 al Piso 02
B V 1/2" 1.00 10.00 8.00
B V 3/8" 1.00 8.00 1.55
φ 3/8"-1@.05, 6@.10, Rto@.15 O H 3/8" 2.00 20.00 1.18
φ 3/8"-1@.05, 6@.10, Rto@.15 O H 3/8" 2.00 20.00 0.68
φ 3/8"-1@.05, 6@.10, Rto@.15 O H 3/8" 1.00 20.00 2.48
COLUMNA C10
Piso 01
B V 5/8" 1.00 15.00 4.78
φ 3/8"-1@.05, 6@.10, Rto@.15 O H 3/8" 1.00 12.00 1.20
φ 3/8"-1@.05, 6@.10, Rto@.15 O H 3/8" 1.00 12.00 1.80
φ 3/8"-1@.05, 6@.10, Rto@.15 O H 3/8" 1.00 12.00 1.18
Piso 02
B V 1/2" 1.00 14.00 4.78
φ 3/8"-1@.05, 6@.10, Rto@.15 O H 3/8" 1.00 12.00 1.58
φ 3/8"-1@.05, 6@.10, Rto@.15 O H 3/8" 1.00 12.00 1.02
DISEÑO
DEL
N° DE N° DE LONGITUD
FIERRO
ELEMENTOS PIEZAS POR
DESCRIPCION Ø IGUALES IGUALES PIEZA(M) TRASLAPE
COLUMNA C1
COLUMNA C11
Piso 01 al Piso 02
B V 5/8" 1.00 16.00 8.00
φ 3/8"-1@.05, 6@.10, Rto@.15 O H 3/8" 1.00 20.00 1.00
φ 3/8"-1@.05, 6@.10, Rto@.15 O H 3/8" 1.00 20.00 1.38
φ 3/8"-1@.05, 6@.10, Rto@.15 O H 3/8" 1.00 20.00 1.28
φ 3/8"-1@.05, 6@.10, Rto@.15 O H 3/8" 1.00 20.00 1.14
φ 3/8"-1@.05, 6@.10, Rto@.15 O H 3/8" 1.00 20.00 3.28
φ 3/8"-1@.05, 6@.10, Rto@.15 S H 3/8" 1.00 20.00 0.37
COLUMNA C12
Piso 01
B V 5/8" 1.00 6.00 4.78
φ 3/8"-1@.05, 6@.10, Rto@.15 O H 3/8" 1.00 12.00 1.28
COLUMNA C13
Piso 01 al Piso 02
B V 5/8" 1.00 8.00 8.00
B V 3/8" 1.00 10.00 8.00
φ 3/8"-1@.05, 6@.10, Rto@.15 O H 3/8" 2.00 20.00 0.84
φ 3/8"-1@.05, 6@.10, Rto@.15 O H 3/8" 1.00 20.00 3.38
Peso (Kg./ml)
Total (Kgs.)
Desperdicios
Total (Kgs.) + desperdicios
varillas
METRADO DE COLUMNAS
LONGITUD
POR LONGITUD POR Ø
PIEZA
TOTAL (M) 1/4" 3/8" 1/2" 5/8" 3/4" 1" TIPO
TIPO DE
CONCRET concreto f´c
DIMENSIONES N° DE ENCOFRADO =210
O
ELEMEN
a b h PERIMETRO AREA TOS TIPO
DISEÑO
DEL
N° DE N° DE LONGITUD
FIERRO
ELEMENTOS PIEZAS POR
DESCRIPCION Ø IGUALES IGUALES PIEZA(M) TRASLAPE
COLUMNA DE AMARRE
Piso 01
B V 3/8" 20.00 4.00 4.30
Piso 02
B V 3/8" 6.00 4.00 3.20
Peso (Kg./ml)
Total (Kgs.)
Desperdicios
Total (Kgs.) + desperdicios
varillas
ACERO (Kg)
METRADO DE COLUMNETAS DE AMARRE CONCRETO (m3)
ENCOFRADO (m2)
LONGITUD
POR LONGITUD POR Ø DIMENSIONES
PIEZA
TOTAL (M) 1/4" 3/8" 1/2" 5/8" 3/4" 1" TIPO a
0.48 115.20 O
0.45 54.00 ____
0.48 34.56 O
0.48 17.28 ____
TIPO DE
CONCRET concreto f´c
DIMENSIONES N° DE ENCOFRADO =210
O
ELEMEN
b h PERIMETRO AREA TOS TIPO
DISEÑO
N° DE LONGITUD
DEL
ELEMEN N° DE LONGITUD POR LONGITUD POR
FIERRO
TOS PIEZAS POR TRASLA PIEZA
DESCRIPCION Ø IGUALES IGUALES PIEZA(M) PE TOTAL (M) 1/4" 3/8"
PRIMER PISO
Lavandería- Techo
LOSA - TECHO
φ 3/8" @.20 M 3/8" 2.00 14.00 3.03 3.03 84.84
φ 3/8" @.20 M 3/8" 2.00 4.00 1.03 1.03 8.24
φ 3/8" @.20 M 3/8" 2.00 7.00 1.48 1.48 20.72
φ 3/8" @.20 M 3/8" 2.00 3.00 0.71 0.71 4.26
Baños- Techo
LOSA - TECHO
φ 3/8" @.20 M 3/8" 4.00 13.00 2.81 2.81 146.12
φ 3/8" @.20 M 3/8" 4.00 5.00 1.16 1.16 23.20
φ 3/8" @.20 M 3/8" 4.00 9.00 2.02 2.02 72.72
φ 3/8" @.20 M 3/8" 4.00 3.00 0.71 0.71 8.52
SEGUNDO PISO
Baños- Techo
LOSA - TECHO
φ 3/8" @.20 M 3/8" 4.00 13.00 2.81 2.81 146.12
φ 3/8" @.20 M 3/8" 4.00 5.00 1.16 1.16 23.20
φ 3/8" @.20 M 3/8" 4.00 9.00 2.02 2.02 72.72
φ 3/8" @.20 M 3/8" 4.00 3.00 0.71 0.71 8.52
LONGITUD POR Ø
|¯¯|
|¯¯|
|¯¯|
|¯¯|
|¯¯|
|¯¯|
|¯¯|
|¯¯|
|¯¯|
|¯¯|
|¯¯|
|¯¯|
0 0.00 0 0
0.99 1.55 2.24 3.98
0 0 0 0
10.00% 10.00% 10.00% 12.00%
0 0 0 0
0 0 0 0
ACERO (Kg) 364.08
CONCRETO (m3) 1.35
ENCOFRADO (m2) 9.56
TIPO DE
CONCRET concreto f´c
DIMENSIONES N° DE ENCOFRADO =210
O
ELEMEN
a b h PERIMETRO AREA TOS TIPO
PAÑO 2 - P2
PAÑO 3 - P3
PAÑO 4 - P4
PAÑO 5 - P5
PAÑO 6 - P6
PAÑO 7 - P7
PAÑO 8 y 9 - P8 y P9
SEGUNDO PISO
PAÑO 10 - P10
PAÑO 11 - P11
PAÑO 12 - P12
PAÑO 13 - P13
PAÑO 14 - P14
PAÑO 15 - P15
PAÑO EN VOLADO
TOTAL
Peso (Kg./ml)
Total (Kgs.)
Desperdicios
Total (Kgs.) + desperdicios
varillas
METRADO DE LOSA ALIGERADA
LONGITUD POR Ø
30.48 ____
16.14 ____
5.64 ¯¯|
33.00 ____
5.12 ____
3.12 ʗ
31.12 ____
24.48 ____
45.20 ____
11.52 ¯¯|
6.64 ____
3.90 ʗ
51.26 ____
26.84 ____
55.77 ____
10.78 ¯¯|
58.30 ____
8.60 ____
3.12 ʗ
54.60 ____
33.90 ____
61.20 ____
14.80 ¯¯|
10.70 ____
2.86 ʗ
LONGITUD POR Ø
66.69 ____
17.20 ____
48.96 ____
7.84 ¯¯|
35.10 ____
19.40 ____
34.70 ____
9.80 ¯¯|
35.00 ____
33.90 ____
10.44 ____
18.60 ____
11.76 ¯¯|
21.90 ____
29.36 ____
20.40 ____
15.68 ¯¯|
27.72 ____
24.84 ____
36.81 ____
25.38 ¯¯|
7.52 ____
2.86 ʗ
LONGITUD POR Ø
47.60 ____
34.70 ____
55.90 ____
16.80 ¯¯|
27.50 ____
27.50 ____
7.82 ____
2.86 ʗ
67.45 ____
9.63 ____
9.63 ____
4.48 ____
9.63 ____
9.63 ____
5.00 ____
29.36 ____
47.04 ____
14.24 ¯¯|
48.96 ____
10.02 ____
3.90 ʗ
93.00 ____
40.68 ____
26.55 ____
26.55 ¯¯|
10.53 ____
LONGITUD POR Ø
7.56 ____
2.86 ʗ
51.30 ____
6.72 ____
16.32 ¯¯|
7.80 ____
TIPO DE
CONCRET
DIMENSIONES N° DE
O
ELEMEN
a b h PERIMETRO AREA TOS TIPO
Total
Desperdicios
Total+desp
concreto f´c
ENCOFRADO =210
0.76
8.49
0.35
1.23
13.64
0.56
1.30
14.42
0.60
1.52
16.86
0.53
concreto f´c
ENCOFRADO =210
6.26
8.69
0.32
0.82
9.11
0.51
0.53
5.86
0.20
0.67
7.46
0.28
1.12
12.40
0.46
concreto f´c
ENCOFRADO =210
1.55
17.27
0.53
0.11
1.19
0.17
0.11
1.26
0.19
2.02
22.39
0.70
0.98
10.89
concreto f´c
ENCOFRADO =210
0.51
0.17
1.93
0.07
151.86 25.11
10.00% 5.00%
167.05 26.37
DISEÑO
DEL
N° DE N° DE LONGITUD
FIERRO
ELEMENTOS PIEZAS POR
DESCRIPCION Ø IGUALES IGUALES PIEZA(M)
PRIMER PISO
V101
A s 1/2" 1.00 3.00 9.67
A i 1/2" 1.00 3.00 9.67
φ 3/8"-1@.05, 8@.10, Rto@.20 C H 3/8" 1.00 55.00 0.26
φ 3/8"-1@.05, 8@.10, Rto@.20 O 3/8" 1.00 55.00 0.64
V102
M s 5/8" 1.00 2.00 10.17
M i 5/8" 1.00 2.00 10.17
A s-i 3/8" 1.00 2.00 9.57
φ 3/8"-1@.05, 8@.10, Rto@.20 O 3/8" 1.00 57.00 0.79
V103
A s 1/2" 1.00 3.00 7.20
A i 1/2" 1.00 3.00 7.20
φ 3/8"-1@.05, 8@.10, Rto@.20 C H 3/8" 1.00 43.00 0.26
φ 3/8"-1@.05, 8@.10, Rto@.20 O 3/8" 1.00 43.00 0.64
V104 - INV
M s 5/8" 1.00 2.00 3.96
M i 5/8" 1.00 2.00 3.96
A s-i 3/8" 1.00 8.00 3.36
φ 3/8"-1@.05, 10@.10, Rto@.20 O 3/8" 1.00 28.00 1.19
V105 - INV.
B s 5/8" 1.00 2.00 4.06
B i 5/8" 1.00 2.00 4.06
A s-i 3/8" 1.00 8.00 3.51
φ 3/8"-1@.05, 8@.10, Rto@.20 O 3/8" 1.00 20.00 1.19
V106
B s 3/4" 1.00 4.00 4.34
B i 5/8" 1.00 2.00 4.34
A s-i 3/8" 1.00 2.00 3.74
φ 3/8"-1@.05, 8@.10, Rto@.20 O 3/8" 1.00 28.00 0.79
V106A
DISEÑO
DEL
N° DE N° DE LONGITUD
FIERRO
ELEMENTOS PIEZAS POR
DESCRIPCION Ø IGUALES IGUALES PIEZA(M)
PRIMER PISO
B s 5/8" 1.00 2.00 1.31
B i 5/8" 1.00 2.00 1.31
A s-i 3/8" 1.00 2.00 1.38
φ 3/8"-1@.05, 8@.10, Rto@.20 O 3/8" 1.00 15.00 0.74
V107
B s 5/8" 1.00 2.00 5.00
B i 5/8" 1.00 2.00 5.00
A s-i 3/8" 1.00 2.00 5.28
φ 3/8"-1@.05, 11@.10, Rto@.20 O 3/8" 1.00 35.00 0.69
V108 - INV.
B s 5/8" 1.00 2.00 1.78
B i 5/8" 1.00 2.00 1.78
A s-i 3/8" 1.00 8.00 1.66
φ 3/8"-1@.05, 10@.10, Rto@.20 O 3/8" 1.00 20.00 1.19
V109 - INV.
B s 5/8" 1.00 2.00 4.11
B i 5/8" 1.00 2.00 4.11
A s-i 3/8" 1.00 8.00 3.56
φ 3/8"-1@.05, 8@.10, Rto@.20 O 3/8" 1.00 20.00 1.19
VS
A s 3/8" 1.00 2.00 51.98
A i 3/8" 1.00 2.00 51.98
φ 3/8"-1@.05, 6@.10, Rto@.20 O H 3/8" 1.00 267.00 0.49
VA
A s 1/2" 1.00 2.00 13.96
A i 1/2" 1.00 2.00 13.96
φ 3/8"-1@.05, 4@.08, Rto@.25 O H 3/8" 1.00 62.00 0.49
D-1
A s 1/2" 1.00 2.00 6.42
A i 1/2" 1.00 2.00 6.42
φ 3/8"-1@.05, 4@.08, Rto@.25 O H 3/8" 1.00 32.00 0.39
VS-1
A s 3/8" 1.00 2.00 5.47
A i 3/8" 1.00 2.00 5.47
φ 3/8"-1@.30 O H 3/8" 1.00 18.00 0.39
DISEÑO
DEL
N° DE N° DE LONGITUD
FIERRO
ELEMENTOS PIEZAS POR
DESCRIPCION Ø IGUALES IGUALES PIEZA(M)
PRIMER PISO
VS-2
A s 3/8" 1.00 2.00 3.29
A i 3/8" 1.00 2.00 3.29
φ 3/8"-1@.30 O H 3/8" 1.00 9.00 0.49
SEGUNDO PISO
V201
A s 1/2" 1.00 4.00 4.41
A i 1/2" 1.00 4.00 4.41
φ 3/8"-1@.05, 8@.10, Rto@.20 O H 3/8" 1.00 31.00 0.44
φ 3/8"-1@.05, 8@.10, Rto@.20 O H 3/8" 1.00 31.00 0.79
V203A
B s 5/8" 1.00 2.00 3.99
B i 5/8" 1.00 2.00 3.99
A s-i 3/8" 1.00 4.00 2.89
φ 3/8"-1@.05, 8@.10, Rto@.20 O 3/8" 1.00 10.00 0.89
V204
B s 5/8" 1.00 2.00 2.11
B i 5/8" 1.00 2.00 2.11
A s-i 3/8" 1.00 2.00 1.51
φ 3/8"-1@.05, 8@.10, Rto@.20 O 3/8" 1.00 10.00 0.64
V205
B s 5/8" 1.00 2.00 2.82
B i 5/8" 1.00 2.00 2.82
A s-i 3/8" 1.00 2.00 2.22
φ 3/8"-1@.05, 8@.10, Rto@.20 O 3/8" 1.00 10.00 0.64
V206
A s 5/8" 1.00 2.00 3.38
DISEÑO
DEL
N° DE N° DE LONGITUD
FIERRO
ELEMENTOS PIEZAS POR
DESCRIPCION Ø IGUALES IGUALES PIEZA(M)
PRIMER PISO
A i 5/8" 1.00 2.00 3.38
φ 3/8"-1@.05, 8@.10, Rto@.20 O H 3/8" 1.00 10.00 0.49
V207
B s 5/8" 1.00 2.00 3.02
B i 5/8" 1.00 2.00 3.02
A s-i 3/8" 1.00 8.00 1.96
φ 3/8"-1@.05, 8@.10, Rto@.20 O 3/8" 1.00 20.00 1.19
V208
B s 5/8" 1.00 2.00 3.78
B i 5/8" 1.00 2.00 3.78
A s-i 3/8" 1.00 2.00 3.18
φ 3/8"-1@.05, 8@.10, Rto@.20 O 3/8" 1.00 10.00 0.69
V208A
B s 5/8" 1.00 2.00 1.31
B i 5/8" 1.00 2.00 1.31
A s-i 3/8" 1.00 2.00 1.38
φ 3/8"-1@.05, 8@.10, Rto@.20 O 3/8" 1.00 15.00 0.74
VS
A s 3/8" 1.00 2.00 34.80
A i 3/8" 1.00 2.00 34.80
φ 3/8"-1@.05, 6@.10, Rto@.20 O H 3/8" 1.00 181.00 0.49
VA
A s 1/2" 1.00 2.00 2.01
A i 1/2" 1.00 2.00 2.01
φ 3/8"-1@.05, 4@.08, Rto@.25 O H 3/8" 1.00 15.00 0.49
VA2
A s 1/2" 1.00 2.00 1.49
A i 1/2" 1.00 2.00 1.49
φ 3/8"-1@.05, 4@.08, Rto@.25 O H 3/8" 1.00 13.00 0.49
VT
A s 1/2" 1.00 3.00 2.06
A i 1/2" 1.00 3.00 2.06
φ 3/8"-1@.05, 8@.10, Rto@.20 O H 3/8" 2.00 19.00 0.44
DISEÑO
DEL
N° DE N° DE LONGITUD
FIERRO
ELEMENTOS PIEZAS POR
DESCRIPCION Ø IGUALES IGUALES PIEZA(M)
PRIMER PISO
Peso (Kg./ml)
Total (Kgs.)
Desperdicios
Total (Kgs.) + desperdicios
varillas
METRADO DE VIGAS
LONGITUD
POR LONGITUD POR Ø
PIEZA
TRASLAPE TOTAL (M) 6mm 1/4" 3/8" 1/2" 5/8" 3/4" 1" TIPO
TIPO DE
CONCRET concreto f´c
DIMENSIONES N° DE ENCOFRADO =210
O
ELEMEN
a b h PERIMETRO AREA TOS TIPO
Desperdicios 5.00%
Total+desp 122.63 14.44
Tip... TIPO "A" A ____
TIPO "B" B ¯¯|
TIPO "M" M |¯¯|
TIPO "O" O O
TIPO "Z" Z Z
TIPO "Q" Q Q
TIPO "C" C |¯
TPO "S" S Ƨ
TIPO "N" N _|¯¯|_
TIPO "X" X X
Direccion de Acero
V Acero en Vertical
H Acero en Horizontal
/ Acero Inclinado
d Varilla L anclaje
3/8" 12
1/2" 16
5/8" 20
3/4" 23
1" 31
L+25
Ø 6mm (0.006Ø 1/4" (2) Ø 8mm (0.008Ø 3/8" (3) Ø 12mm (0.0012)
6mm 1/4" 8mm 3/8" 12mm
diámetro Ø 6mm (0.006) Ø 1/4" (2) Ø 8mm (0.008) Ø 3/8" (3) Ø 12mm (0.0012)
kg/ml 0.216 0.250 0.409 0.560 0.895
% desperdicio 5.00% 5.00% 5.00% 5.00% 10.00%
traslapes (ml) 0.30 0.30 0.40 0.40 0.50
DESCRIPCIÓN % DESPERDICIO
CONCRETO 5
MORTERO 10
LADRILLO PARA MUROS 5
LADRILLO PARA TECHOS 5
LOSETA PARA PISOS 5
MAYÓLICA 5
CLAVOS 15
MADERA 10
ACERO DE REFUERZO
Ø 3/8" 3
Ø 1/2" 5
Ø 5/8" 7
Ø 3/4" 8
Ø 1" 10