Está en la página 1de 24

APLICACIÓN DE LA FORMULA POLINÓMICA

Fecha del Presupuesto: ABRIL 2019


Valorización del mes: AGOSTO 2019
Área Geografica No.: 3
CALCULO DEL COEFICIENTE DE REAJUSTE K
1 2 Ir del mes lo del mes Ir/lo K
SIMB. I.U.
COEF. INCID. % 3 4=3X2 5 6=5X2 7=4/6 1X7
J 47 0.308 100.00 582.52 58252.00 582.52 58252.00 1.000 0.308
ARH 0.109 72799.75 72892.80 0.999 0.109
A 4 10.80 1039.22 11223.58 1039.22 11223.58
R 5 35.10 420.58 14762.36 420.58 14762.36
H 38 54.10 865.32 46813.81 867.04 46906.86
LFM 0.125 79846.47 78728.49 1.014 0.127
L 2 9.80 526.55 5160.19 526.55 5160.19
F 3 18.90 501.98 9487.42 501.98 9487.42
M 43 71.30 914.43 65198.86 898.75 64080.88
CE 0.221 44207.54 44169.69 1.001 0.221
C 21 90.70 449.56 40775.09 449.56 40775.09
E 48 9.30 369.08 3432.44 365.01 3394.59
B 17 0.084 100.00 697.96 69796.00 702.73 70273.00 0.993 0.083
GU 39 0.153 100.00 448.81 44881.00 445.52 44552.00 1.007 0.154
K 1.002

ING. RESIDENTE
VALORIZACION MENSUAL MES AGOSTO DE OBRA
ANTERIOR
PROGRAMADO VALORIZACIÓN ACTUAL
ACUMULADO
ITEM DESCRIPCIÓN UNIDAD P.U.
METRADO COSTO METRADO COSTO METRADO COSTO

OE.2 ESTRUCTURAS

OE.2.1.2.1 EXCAVACIONES SIMPLES

OE.2.1.2.1.1 Excavación de zanja h=1.40m, en terreno arcilloso duro M3 30.94 38.50 1191.19 0.00 0.00 38.50 1191.19

OE.2.1.4 RELLENO

OE.2.1.4.1 Relleno con material propio M3 15.41 56.00 862.96 0.00 0.00 56.00 862.96

OE.2.1.6 ELIMINACION DE MATERIAL EXCEDENTE

OE.2.1.6.1 Eliminación de material excedente hasta una distancia de 30m M3 17.97 72.00 1293.84 0.00 0.00 72.00 1293.84

OE.2.2 OBRAS DE CONCRETO SIMPLE

OE.2.2.1 CIMIENTO CORRIDO

OE.2.2.1.1 Concreto ciclópeo; 1:10 + 30 % P.M. M3 166.91 275.00 45900.25 0.00 0.00 24.75 4131.02

OE.2.2.6 SOBRECIMIENTOS

OE.2.2.6.1 Sobrecimiento de 0.25m de ancho; 1:8 + 25% P.M. M3 242.21 144.00 34878.24

OE.2.2.9 FALSO PISO

OE.2.2.9.1 Falso piso de 2" mezcla de 1:12 M2 16.5 1,800.00 29700.00

OE.2.3.7.1 COLUMNAS

OE.2.3.7.1.1 Concreto en columnas f´c=175 kg/cm2 M3 398.38 420.00 167319.60

OE.2.3.7.1.2 Encofrado y desencofrado de columnas (típicas) M2 67.53 900.00 60777.00 0.00 0.00 90.00 6077.70
OE.2.3.8 VIGAS
OE.2.3.8.1 Concreto en vigas f´c=210 kg/cm2 M3 303.28 1300 394264.00
OE.2.3.9.2 LOSAS ALIGERADAS
OE.2.3.9.2.1 Concreto en losas f´c=210 kg/cm2 M3 284.04 900.00 255636.00

COSTO DIRECTO 991823.08 13556.71


GASTOS OPERATIVOS 3.99% C.D 3.99% 39573.74 540.91
1031396.82 14097.63
303.28 1300 394264.00
VALORIZACIÓN
SALDO
ACUMULADA
% AVANCE
METRADO COSTO METRADO COSTO

38.50 1191.19 0.00 0.00 100%

56.00 862.96 0.00 0.00 100%

72.00 1293.84 0.00 0.00 100%

24.75 4131.02 250.25 41769.23 9%

90.00 6077.70 810.00 54699.30 10%


13556.71 978266.37
540.91 39032.83
14097.63 1017299.20 1.37

ING. RESIDENTE
VALORIZACION DEL MES DE AGOSTO
VALORIZACION DEL MES DE AGOSTO:
REAJUSTE:
VALORIZACION BRUTA:
VALORIZACION NETA:
MES DE AGOSTO VALORIZACION TECNICA
S/. 14,097.63
S/. 28.20
S/. 14,125.82
S/. 14,125.82
Recursos Humanos / Mano de Obra
Costo en Obra
Según Exp. Tec. Anterior
Precio Actual Mes Actual Acumulado Saldo
Item Categoria Acumulado
Unitario
Cant. Parcial Parcial Parcial
Precio (S/.) Parcial (S/.) hh/mes Cant. Cant. Cant. Cant.
hh/mes (S/.) (S/.) (S/.)
Costo Directo (Obreros)
Operario 3948 17.19 67866.12 17.19 0.00 0.00 97.92 1683.24 97.92 1683.24 3850.08
Oficial 3808 14.57 55482.56 14.57 0.00 0.00 123.84 1804.35 123.84 1804.35 3684.16
Peón 14074 13.12 184650.88 13.12 0.00 0.00 347.36 4557.3632 347.36 4557.36 13726.64
Operador de equipo liviano 2544 17.76 45181.44 17.76 0.00 0.00 7.92 140.66 7.92 140.66 2536.08
S/. 353181.00 0.00 8185.62 8185.62
(%) 100.00% 0.00% 2.32% 2.32%
Costo Indirecto (Empleados)
1.01 ING. RESIDENTE 4000 4 16000 4000 0.00 0.00 1.00 4000 1.00 4000.00 3.00
1.02 ALMACENERO 1600 3 4800 1600 0.00 0.00 1.00 1600 1.00 1600.00 2.00
1.03 ASISTENTE TÉCNICO 1500 3 4500 1500 0.00 0.00 1.00 1500 1.00 1500.00 2.00
1.03 GUARDIAN 1500 4 6000 1500 0.00 0.00 1.00 1500 1.00 1500.00 3.00
S/. 31300.00 0.00 8600.00 8600.00
(%) 100.00% 0.00% 27.48% 27.48%

ING. RESIDENTE
Saldo

Parcial
(S/.)

66182.88
53678.21
180093.52
45040.78
344995.38
97.68%

12000.00
3200.00
3000.00
4500.00
22700.00
72.52%
Recursos de Maquinaria y Equipos
Costo en Obra
Según Exp. Tec. Anterior
Maquinaria y/o Actual Mes Actual Acumulado Saldo
Item Precio Acumulado
Equipo
Cant. Unitario hh Parcial Parcial Parcial
Precio (S/.) Parcial (S/.) Cant. Cant. Cant. Cant.
hh/mes (S/.) (S/.) (S/.)
Costo Directo

Herramientas manuales 0.00


Mezcladora 9-11 P3 1328.32 9.71 12897.99 9.71 0.00 0.00 7.92 76.90 7.92 76.90 1320.40
S/. 12897.99 0.00 76.90 76.90
(%) 100.00% 0.00% 0.60% 0.60%
Costo Indirecto
2.01 CAMIONETA 4X4 3 400 1200 400.00 0.00 0.00 1 400 1.00 400.00 2.00

S/. 1200.00 0.00 400.00 400.00


(%) 100.00% 0.00% 33.33% 33.33%

ING. RESIDENTE
Saldo

Parcial
(S/.)

11577.59
11577.59
89.76%

800.00

800.00
66.67%
Recursos de Materiales y/o Insumos.
Según Exp. Tec. Costo en Obra
Anterior Pendiente
Actual Mes Actual Acumulado
Item Descripción Unidad Parcial Acumulado
Cant. P.U. S/. Parcial Parcial Parcial
S/. Cant. Cant. Cant. Cant.
(S/.) (S/.) (S/.)
Costo Directo
Cemento Portland Tipo I bls 17.2 437690.12 0.00 0.00 797.5 13717 797.50 13717.00 24649.60
25447.1

Hormigón m3 47 20449.55 0.00 0.00 228.25 10727.75 228.25 10727.75 206.85


435.096809

Piedra mediana m3 40 7584 0.00 0.00 132 5280 132.00 5280.00 57.60
189.6

Arena gruesa m3 35 48608 0.00 0.00 0.00 0.00 0.00 0.00 1388.80
1388.8

Piedra chancada de 1/2" m3 49.6 70184 0.00 0.00 0.00 0.00 0.00 0.00 1415.00
1415

Madera Tornillo P2 4.63 21501.72 0.00 0.00 464.4 2150.172 464.40 2150.17 4179.60
4644

Clavos de 3" Kg 6.5 994.5 0.00 0.00 15.3 99.45 15.30 99.45 137.70
153

Alambre negro #8 Kg 4.71 1271.7 0.00 0.00 27 127.17 27.00 127.17 243.00
270
S/. 608283.59 0.00 32101.54 32101.54
(%) 100.00% 0.00% 5.28% 5.28%
Costo Indirecto
3.01 Papel Bond 75 grs A-4 3 50 150 0.00 0.00 1.00 50 1.00 50.00 2.00

3.02 Lapicero Pilot 3 50 150 0.00 0.00 1.00 50 1.00 50.00 2.00

3.03 Tinta Hp 3 50 150 0.00 0.00 1.00 50 1.00 50.00 2.00


3.04 Archivador tipo palanca 3 50 150 0.00 0.00 1.00 50 1.00 50.00 2.00

S/. 600.00 0.00 200.00 200.00


(%) 100.00% 0.00% 33.33% 33.33%

ING. RESIDENTE
Pendiente

Parcial
(S/.)

423973.12

9721.80

2304.00

48608.00

70184.00

19351.55

895.05

1144.53

576182.05
94.72%

100.00

100.00

100.00
100.00

400.00
66.67%
Recursos de Servicios de Terceros y/o Sub Contratos.
Costo en Obra
Anterior
Actual Mes Actual Acumulado
Item Descripción Unidad Parcial Acumulado
Cant. P.U. S/.
S/. Parcial Parcial Parcial
Cant. Cant. Cant.
(S/.) (S/.) (S/.)
Costo Directo

S/.
(%)
Costo Indirecto
5.01 Ensayo densidad de campo base granular 1 300 300 0.00 0.00 1 300 1.00 300.00

5.02 Baner 3,60 x 2,40 mts, c/ marco de madera 1 300 300 0.00 0.00 1 300 1.00 300.00

S/. 600.00 0.00 600.00 600.00


(%) 100.00% 0.00% 100.00% 100.00%
ING. RESIDENTE
Pendiente

Parcial
Cant.
(S/.)

0.00 0.00

0.00 0.00

0.00
0.00%
NG. RESIDENTE
Otros Recursos.
Costo en Obra
Anterior
Actual Mes
Item Descripción Unidad Parcial Acumulado
Cant. P.U. S/. Parcial Parcial
S/. Cant. Cant.
(S/.) (S/.)
Costo Directo

S/.
(%)
Costo Indirecto
4.01 SEGURO SCTR 3 100 300 0.00 0.00 1.00 100

4.02 SEGUROS DE DAÑO A TERCEROS 3 110 330 0.00 0.00 1.00 110

4.03 ARTICULOS DE LIMPIEZA 3 100 300 0.00 0.00 1.00 100

4.04 AMORTIZ. DE EQUIPO DE INGENIERIA Y OFICINA 3 350 1050 0.00 0.00 1.00 350

4.05 TELEFONO DE INTERNET 3 200 600 0.00 0.00 1.00 200

4.06 SEGURO DE ACCIDENTE DE VIAJE 3 100 300 0.00 0.00 1.00 100

4.07 IMPREVISTOS 3 1000 3000 0.00 0.00 1.00 1000

S/. 5880.00 0.00 1960.00


(%) 100.00% 0.00% 33.33%
Pendiente
Actual Acumulado
Parcial Parcial
Cant. Cant.
(S/.) (S/.)

1.00 100.00 2.00 200.00

1.00 110.00 2.00 220.00

1.00 100.00 2.00 200.00

1.00 350.00 2.00 700.00

1.00 200.00 2.00 400.00

1.00 100.00 2.00 200.00

1.00 1000.00 2.00 2000.00

1960.00 3920.00
33.33% 66.67%
ING. RESIDENTE
Resumen de Recursos Empleados.
VALORIZACIÓN
Presupuesto Según
Descripción Anterior Del mes Actual Acumulado Saldo
Exp. Tec.
S/. (%) S/. (%) S/. (%) S/. (%)
COSTO DIRECTO 974362.58 0.00 0.00% 40364.06 4.14% 40364.06 4.14% 933998.52 95.86%

Mano de Obra 353181.00 0.00 0.00% 8185.62 2.32% 8185.62 2.32% 344995.38 97.68%
Materiales 608283.59 0.00 0.00% 32101.54 5.28% 32101.54 5.28% 576182.05 94.72%
Maquinaria y Equipo 12897.99 0.00 0.00% 76.90 0.60% 76.90 0.60% 12821.08 99.40%
Servicios/ Sub Contratos
Otros Recursos

COSTO INDIRECTO 39580.00 0.00 0.00% 11760.00 29.71% 11760.00 29.71% 27820.00 70.29%

Mano de Obra 31300.00 0.00 0.00% 8600.00 27.48% 8600.00 27.48% 22700.00 72.52%
Materiales 600.00 0.00 0.00% 200.00 33.33% 200.00 33.33% 400.00 66.67%
Maquinaria y Equipo 1200.00 0.00 0.00% 400.00 33.33% 400.00 33.33% 800.00 66.67%
Servicios/ Sub Contratos 600.00 0.00 0.00% 600.00 100.00% 600.00 100.00% 0.00 0.00%
Otros Recursos 5880.00 0.00 0.00% 1960.00 33.33% 1960.00 33.33% 3920.00 66.67%

TOTAL 1013942.58 0.00 0.00 52124.06 5.14% 52124.06 5.14% 961818.52 94.86%
100%

ING. RESIDENTE
Avance físico – financiero de la obra
FISICO 1er Mes 2do Mes 3er Mes 4to Mes Total
Programado
S/. 13,560.11
(Monto S/.)
(Porc. %) 1.37%
Ejecutado (Monto
S/. 13,560.11
S/.)
(Porc. %) 1.37%

FINANCIERO 1er Mes 2do Mes 3er Mes 4to Mes Total
Programado
S/. 13,560.11
(Monto S/.)
(Porc. %) 1.37%
Ejecutado (Monto
S/. 52,124.06
S/.)
(Porc. %) 5.14%

ING. RESIDENTE