PROYECTO:
DIAMETR
TRAMO LONGITUD HAZEN-
LONGITUD TUBERIA DIAMETRO NOMINAL - O CAUDAL
TUBERIA INCLINADA MATERIAL WILLIAMS
NODO NODO (m) CLASE INTERIOR LPS
(m) C
INICIAL FINAL (mm)
TUB-1 CRP-1 CRP-2 203.48 207.50 TUB. PVC NTP 399.002 SP DN= 2" C-10 54.2 PVC 150 1.500
TUB-2 CRP-2 N-3 336.34 346.30 TUB. PVC NTP 399.002 SP DN= 2" C-10 54.2 PVC 150 1.500
TUB-3 N-4 N-1 389.10 393.98 TUB. PVC NTP 399.002 SP DN= 2" C-16 54.2 PVC 150 1.500
TUB-4 VA-1 RESERV. 250.72 251.09 TUB. PVC NTP 399.002 SP DN= 2" C-10 54.2 PVC 150 1.500
TUB-5 N-3 N-4 405.39 411.91 TUB. PVC NTP 399.002 SP DN= 2" C-16 54.2 PVC 150 1.500
TUB-6 N-1 VA-1 125.65 134.38 TUB. PVC NTP 399.002 SP DN= 2" C-10 54.2 PVC 150 1.500
D V8i.
AYACUCHO
PERDIDAD
VELOCIDAD(
DE CARGA
m/s)
(m/m)
0.65 0.016
0.65 0.016
0.65 0.016
0.65 0.016
0.65 0.016
0.65 0.016
LINEA DE CONDUCCION - OLIVOS
PROYECTO:
GRADIENTE HIDRAULICO
NODO ELEVACION (m) DEMANDA (L/s) PRESION (m H2O)
(m)
PROYECTO : 0
REGION: AYACUCHO
PPROVINCIA: CANGALLO
DISTRITO: OLIVOS
RESUMEN DE TUBERIAS NUEVAS EN LA RED DE DISTRIBUCION