Item Descripción Und.

Metrado
01 CREACION DE UNA LOSA DEPORTIVA, TRIBUNAS EN EL CASERIO DE CHOGUECALLA

01.01 LOSA DEPORTIVA


01.01.01 OBRAS PROVISIONALES
01.01.01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und 1.00
01.01.01.02 ALQUILER DE LOCAL PARA LA OBRA mes 2.00
01.01.02 TRABAJOS PRELIMINARES
01.01.02.01 LIMPIEZA DE TERRENO m2 1,102.00
01.01.02.02 TRAZO NIVELACION Y REPLANTEO m2 1,102.00
01.01.01.03 FLETE TERRESTRE glb 1.00
01.01.03 MOVIMIENTO DE TIERRAS
01.01.03.01 CORTE EN MATERIAL SEMIROCOSO CON MAQUINARIA m3 1,425.30
01.01.03.02 RELLENO CONPACTADO CON MATERIAL DE PRESTAMO CON EQUIPO LIVIANO m3 245.30
01.01.03.03 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE DE 6M3, D<5KM m3 1,475.00
01.01.04 CONCRETO SIMPLE
01.01.04.01 LOSA DEPORTIVA - CONCRETO EN LOSA F'C= 140 KG/CM2 m2 720.00
01.01.04.02 ENCOFRADO Y DESENCOFRADO DE LOSA DEPORTIVA m2 43.20
01.01.05 CARPINTERIA METALICA
01.01.05.01 ARCO DE FULBITO CON TABLERO DE BASQUET und 2.00
01.01.05.02 POSTE DE FIERRO Y NET PARA VOLEY und 2.00
01.01.06 PINTURA
01.01.06.01 PINTADO DE LAS MARCAS DE LOSA m 457.22
01.01.07 OTROS
01.01.07.01 JUNTA DE DILATACION EN PAVIMENTOS CON TEKNOPORT Y SELLADO CON ASFALTO E=1", m 132.00
H=0.15M
01.01.07.02 ENSAYO PROCTOR (COMPACTACION DEL SUELO) und 3.00
01.02 TRIBUNA
01.02.01 TRABAJOS PRELIMINARES
01.02.01.01 LIMPIEZA DE TERRENO m2 72.00
01.02.01.02 TRAZO NIVELACION Y REPLANTEO m2 72.00
01.02.02 MOVIMIENTO DE TIERRAS
01.02.02.01 CORTE EN TERRENO NORMAL m3 63.00
01.02.02.02 EXCAVACION PARA CIMIENTOS H=1.00M EN TERRENO NORMAL m3 5.40
01.02.02.03 RELLENO CONPACTADO CON MATERIAL DE PRESTAMO CON EQUIPO LIVIANO m3 8.40
01.02.03 CONCRETO SIMPLE
01.02.03.01 CIMIENTOS CORRIDOS MEZCLA C:H 1:10+30% PG m3 3.15
01.02.03.02 JUNTA DE CONSTRUCCION CON TEKNOPORT E=1" m 12.00
01.02.04 CONCRETO ARMADO
01.02.04.01 ESCALERAS - CONCRETO F'C=210 KG/CM2. m3 19.49
01.02.04.02 ESCALERAS - ENCOFRADO Y DESENCOFRADO m2 49.44
01.02.05 REVESTIMIENTOS
01.02.05.01 REVESTIMIENTO Y FORJADO DE GRADAS C/MORTERO 1:4 X 2CM. +PULIDO 1:2 X 1CM. m2 49.44

01.02.06 PINTURA
01.02.06.01 PINTURA EN ESCALERAS CON SMALTE (SOLO CONTRAPASOS Y COSTADOS ) m2 42.00
01.03 CERCO PERIMETRICO CON MALLAS
01.03.01 TRABAJOS PRELIMINARES
01.03.01.01 LIMPIEZA DE TERRENO m2 42.87
01.03.01.02 TRAZO NIVELACION Y REPLANTEO m2 42.87
01.03.02 MOVIMIENTO DE TIERRAS
01.03.02.01 EXCAVACION PARA CIMIENTOS H=1.00M EN TERRENO NORMAL m3 10.96
01.03.02.02 RELLENO CONPACTADO CON MATERIAL DE PRESTAMO CON EQUIPO LIVIANO m3 2.66
01.03.02.03 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA) m3 10.39
01.03.03 CONCRETO SIMPLE
01.03.03.01 CIMIENTOS CORRIDOS MEZCLA C:H 1:10+30% PG m3 10.96
01.03.04 CONCRETO ARMADO

01.03.04.01 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 2.34


01.03.04.02 ACERO fy=4200 Kg/Cm2 EN COLUMNAS kg 1,793.32
01.03.04.03 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 96.30
01.03.05 CARPINTERIA METALICA
01.03.05.01 MALLA METALICA PROTECTORA m2 310.20
01.03.05.02 PUERTA DE FIERRO CON MALLA METALICA Y FIERRO CUADRADO DE 2"x2" Nº10 m2 10.08
01.04 MURO DE CONTENCION
01.04.01 TRABAJOS PRELIMINARES
01.04.01.01 LIMPIEZA DE TERRENO m2 80.00
01.04.01.02 TRAZO NIVELACION Y REPLANTEO m2 80.00
01.04.02 MOVIMIENTO DE TIERRAS
01.04.02.01 EXCAVACION PARA CIMIENTOS H=1.00M EN TERRENO NORMAL m3 254.20
01.04.02.02 RELLENO CONPACTADO CON MATERIAL DE PRESTAMO CON EQUIPO LIVIANO m3 313.85
01.04.02.03 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE DE 6M3, D<5KM m3 651.19
01.04.03 MURO DE CONTENCION
01.04.03.01 MURO DE CONTENCION- CONCRETO CICLOPEO C:H 1:8 + 25% P.M. m3 116.00
01.04.03.02 MURO DE CONTENCION - ENCOFRADO Y DESENCOFRADO m2 240.00
01.04.03.03 JUNTA DE CONSTRUCCION CON TEKNOPORT E=1" PARA MUROS m2 99.00
01.04.03.04 JUNTA CON ASFALTO E=1" m 99.00
01.04.03.05 DRENAJE EN MURO CON TUBERIA Ø 2" m 200.00
01.04.04 VARIOS
01.04.04.01 PRUEBA DE DISEÑO DE MEZCLA DE CONCRETO und 5.00
01.04.04.02 PRUEBA DE RESISTENCIA A LA COMPRESION DEL CONCRETO und 5.00
01.04.04.03 SEÑALIZACION DE OBRA DURANTE EJECUCION m 600.00
01.04.04.04 LIMPIEZA GENERAL DE OBRA m2 2,000.00
COSTO DIRECTO
Precio S/. Parcial S/.
290,944.72

134,371.40
1,248.82
592.82 592.82
328.00 656.00
23,117.18
1.82 2,005.64
1.62 1,785.24
19,326.30 19,326.30
69,794.00
4.00 5,701.20
52.33 12,836.55
34.75 51,256.25
28,860.19
39.00 28,080.00
18.06 780.19
7,397.06
3,045.45 6,090.90
653.08 1,306.16
2,496.42
5.46 2,496.42
1,457.73
5.13 677.16

260.19 780.57
15,105.76
247.68
1.82 131.04
1.62 116.64
2,546.24
30.32 1,910.16
36.39 196.51
52.33 439.57
550.81
168.46 530.65
1.68 20.16
8,188.93
221.64 4,319.76
78.26 3,869.17
1,950.90
39.46 1,950.90

1,621.20
38.60 1,621.20
42,405.09
147.47
1.82 78.02
1.62 69.45
673.10
36.39 398.83
52.33 139.20
13.00 135.07
1,846.32
168.46 1,846.32
14,621.79

381.16 891.91
4.41 7,908.54
60.45 5,821.34
25,116.41
70.04 21,726.41
336.31 3,390.00
99,062.47
275.20
1.82 145.60
1.62 129.60
48,302.96
36.39 9,250.34
52.33 16,423.77
34.75 22,628.85
47,002.81
207.99 24,126.84
63.37 15,208.80
10.53 1,042.47
3.30 326.70
31.49 6,298.00
3,481.50
205.00 1,025.00
20.50 102.50
0.89 534.00
0.91 1,820.00
290,944.72
PRESUPUESTO
Presupuesto 0201003 CREACION DE LOSA MULTIDEPORTIVA EN
CHOGUECALLA,DISTRITO DE CHURUBA
HUANUCO
Cliente MUNICIPALIDAD DISTRITAL DE CHURUBAMBA
Lugar HUANUCO-HUANUCO- CHURUBAMBA

Item Descripción Und.


01 CREACION DE UNA LOSA DEPORTIVA, TRIBUNAS EN EL CASERIO DE CHOGUECALLA

01.01 LOSA DEPORTIVA


01.01.01 OBRAS PROVISIONALES
01.01.01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und
01.01.01.02 ALQUILER DE LOCAL PARA LA OBRA mes
01.01.02 TRABAJOS PRELIMINARES
01.01.02.01 LIMPIEZA DE TERRENO m2
01.01.02.02 TRAZO NIVELACION Y REPLANTEO m2
01.01.01.03 FLETE TERRESTRE glb
01.01.03 MOVIMIENTO DE TIERRAS
01.01.03.01 CORTE EN MATERIAL SEMIROCOSO CON MAQUINARIA m3
01.01.03.02 RELLENO CONPACTADO CON MATERIAL DE PRESTAMO CON EQUIPO LIVIANO m3
01.01.03.03 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE DE 6M3, D<5KM m3
01.01.04 CONCRETO SIMPLE
01.01.04.01 LOSA DEPORTIVA - CONCRETO EN LOSA F'C= 140 KG/CM2 m2
01.01.04.02 ENCOFRADO Y DESENCOFRADO DE LOSA DEPORTIVA m2
01.01.05 CARPINTERIA METALICA
01.01.05.01 ARCO DE FULBITO CON TABLERO DE BASQUET und
01.01.05.02 POSTE DE FIERRO Y NET PARA VOLEY und
01.01.06 PINTURA
01.01.06.01 PINTADO DE LAS MARCAS DE LOSA m
01.01.07 OTROS
01.01.07.01 JUNTA DE DILATACION EN PAVIMENTOS CON TEKNOPORT Y SELLADO CON ASFALTO E=1", m
H=0.15M
01.01.07.02 ENSAYO PROCTOR (COMPACTACION DEL SUELO) und
01.02 TRIBUNA
01.02.01 TRABAJOS PRELIMINARES
01.02.01.01 LIMPIEZA DE TERRENO m2
01.02.01.02 TRAZO NIVELACION Y REPLANTEO m2
01.02.02 MOVIMIENTO DE TIERRAS
01.02.02.01 CORTE EN TERRENO NORMAL m3
01.02.02.02 EXCAVACION PARA CIMIENTOS H=1.00M EN TERRENO NORMAL m3
01.02.02.03 RELLENO CONPACTADO CON MATERIAL DE PRESTAMO CON EQUIPO LIVIANO m3
01.02.03 CONCRETO SIMPLE
01.02.03.01 CIMIENTOS CORRIDOS MEZCLA C:H 1:10+30% PG m3
01.02.03.02 JUNTA DE CONSTRUCCION CON TEKNOPORT E=1" m
01.02.04 CONCRETO ARMADO
01.02.04.01 ESCALERAS - CONCRETO F'C=210 KG/CM2. m3
01.02.04.02 ESCALERAS - ENCOFRADO Y DESENCOFRADO m2
01.02.05 REVESTIMIENTOS
01.02.05.01 REVESTIMIENTO Y FORJADO DE GRADAS C/MORTERO 1:4 X 2CM. +PULIDO 1:2 X 1CM. m2

01.02.06 PINTURA
01.02.06.01 PINTURA EN ESCALERAS CON SMALTE (SOLO CONTRAPASOS Y COSTADOS ) m2
COSTO DIRECTO
PRESUPUESTO
CREACION DE LOSA MULTIDEPORTIVA EN LA LOCALIDAD DE
CHOGUECALLA,DISTRITO DE CHURUBAMBA - HUANUCO -
HUANUCO

Metrado Precio S/. Parcial S/.


290,944.72

134,371.40
1,248.82
1.00 592.82 592.82
2.00 328.00 656.00
23,117.18
1,102.00 1.82 2,005.64
1,102.00 1.62 1,785.24
1.00 19,326.30 19,326.30
69,794.00
1,425.30 4.00 5,701.20
245.30 52.33 12,836.55
1,475.00 34.75 51,256.25
28,860.19
720.00 39.00 28,080.00
43.20 18.06 780.19
7,397.06
2.00 3,045.45 6,090.90
2.00 653.08 1,306.16
2,496.42
457.22 5.46 2,496.42
1,457.73
132.00 5.13 677.16

3.00 260.19 780.57


15,105.76
247.68
72.00 1.82 131.04
72.00 1.62 116.64
2,546.24
63.00 30.32 1,910.16
5.40 36.39 196.51
8.40 52.33 439.57
550.81
3.15 168.46 530.65
12.00 1.68 20.16
8,188.93
19.49 221.64 4,319.76
49.44 78.26 3,869.17
1,950.90
49.44 39.46 1,950.90

1,621.20
42.00 38.60 1,621.20
149,477.16