NO ITEM SAT
HARGA VOL TOTAL BOBOT
UPAH
1 Bekisting Menerus Multiplek m2 30,000 67.76 2,032,800 2.47%
2 Galian Tanah > 1m M3 70,000 85.82 6,007,680 7.30%
3 Pasangan Batu Kali M3 150,000 42.61 6,392,100 7.77%
4 Pembesian £ dia. 12 mm M3 4,000 571.92 2,287,680 2.78%
5 Pembesian £ dia. 12 mm (Tanpa Kawat Beton) M3 2,950 30.78 90,788 0.11%
6 Pengecoran 1:3:5 M3 150,000 - - 0.00%
7 Pengecoran 1 : 2: 3 M3 150,000 3.98 596,520 0.72%
8 Plesteran Kamprot m2 50,000 - - 0.00%
9 Urug Pasir M3 85,000 - - 0.00%
10 Urugan Tanah & Pemadatan M3 85,000 51.85 4,407,420 5.36%
Upah Utama ###
Upah Pendukung 21,814,988 26.51%
Total Upah 21,814,988 26.51%
Printed On 11/04/2019
1/3
Prepared by QS
P
a
g
a
r
P
a
ANALISA SATUAN PEKERJAAN n
### - e
harus diisi l
RAP &
NO URAIAN PEKERJAAN SAT Volume
SAT. BAHAN BAHAN SAT. UPAH UPAH JUMLAH s
###
a
l
00 PEKERJAAN PEMBOBOKAN DAN PEMBONGKARAN ###
u
10 PEKERJAAN TANAH & PONDASI ###
r
Pasangan Batu Kali M³ 1.00 963,200 150,000 150,000 1,113,200
### a
Batu Kali M³ 1.20 500,000 600,000 ### n
Semen PC Type 1 @ 50 Kg Zak 3.26 70,000 228,200 ###
Pasir Pasang M³ 0.60 225,000 135,000 ### a
Galian Tanah > 1m M³ 1.00 70,000 70,000 70,000
###
i
r
Urugan Tanah & Pemadatan M³ 1.00 85,000 85,000 85,000
###
- ###
30 PEKERJAAN KONSTRUKSI BETON ###
Bekisting Menerus Multiplek M² 1.00 54,753 30,000 30,000 84,753
###
Triplek 9 mm M² 0.50 65,000 32,500 ###
Kayu Balok 4/6 - 4 m Kelas II (Bekisting/Bowplank) Btg 0.70 30,000 21,053 ###
Paku 2" Kg 0.05 24,000 1,200 ###
Pembesian £ dia. 12 mm Kg 1.00 17,300 4,000 4,000 21,300
###
Besi Beton £ Ø 12 mm Kg 1.05 16,000 16,800 ###
Kawat Beton/Bendrat Kg 0.02 25,000 500 ###
Pembesian £ dia. 12 mm (Tanpa Kawat Beton) Kg 1.00 16,800 2,950 2,950 ###
19,750
Besi Beton £ Ø 12 mm Kg 1.05 16,000 16,800 ###
Pengecoran 1 : 2: 3 M³ 1.00 261,000 150,000 150,000 411,000
###
Semen PC Type 1 @ 50 Kg Zak 6.70 70,000 469,000 ###
Pasir Beton/Cor M³ 0.82 250,000 205,000 ###
Split M³ 0.58 450,000 261,000 ###
Pengecoran 1:3:5 M³ 1.00 867,700 150,000 150,000 ###
1,017,700
Semen PC Type 1 @ 50 Kg Zak 4.36 70,000 305,200 ###
Pasir Beton/Cor M³ 0.63 250,000 157,500 ###
Split M³ 0.90 450,000 405,000 ###
###
Printed On 11/04/2019
2/3
Prepared by QS
###
BANGUNAN : PAGAR PANEL & SALURAN AIR Panjang Pagar : 423.3 M
LOKASI : #REF! Tinggi Pagar : 2.8 M
NO. GBR. : IVM/PGR/PBRO/KTR-PWK/17 Tinggi pondasi batu kali : M
HARGA : Rp 79,620,019
KONTRAKTOR :
Tanggal = 04-Nov-2019
HARGA JUMLAH
NO URAIAN PEKERJAAN SAT. VOL VOL SATUAN HARGA
Estimasi Kontraktor Rp. Rp.
Note = Volume di atas hanya sebagai panduan, kontraktor harus tetap menghitung ulang