ITEM DESCRIPCIÓN DE PARTIDA UNID MET. P.U. P. TOTAL
MUROS Y TABIQUES DE ALBAÑILERÍA 20,592.88
1.00
1.01 Muro de cabeza ladrillo King kong con cemento-cal-arena m2 36.44 44.99 1,639.44
1.02 Muro de soga ladrillo King kong con cemento-cal-arena m2 270.30 70.12 18,953.44
CLIENTE MUNICIPALIDAD DISTRITAL DE CHAO
SUB PRESUPUEST ARQUITECTURA
FECHA 15/01/2019
PRESUPUESTO
ITEM DESCRIPCIÓN DE PARTIDA UNID MET. P.U. P. TOTAL
MUROS Y TABIQUES DE ALBAÑILERÍA 20,592.88
1.00
1.01 Muro de cabeza ladrillo King kong con cemento-cal-arena m2 36.44 44.99 1,639.44
1.02 Muro de soga ladrillo King kong con cemento-cal-arena m2 270.30 70.12 18,953.44
CLIENTE MUNICIPALIDAD DISTRITAL DE CHAO
SUB PRESUPUEST ARQUITECTURA
FECHA 15/01/2019
METRADOS POR MES
ITEM DESCRIPCIÓN DE PARTIDA UNID. MARZO ABRIL MAYO
MUROS Y TABIQUES DE ALBAÑILERÍA
1.00
1.01 Muro de cabeza ladrillo King kong con cemento-cal-arena m2 35.00 0.00 0.00
1.02 Muro de soga ladrillo King kong con cemento-cal-arena m2 250.00 20.30 0.00
2.00 REVOQUES Y ENLUCIDOS
2.01 Tarrajeo de muros acabado con cemento.arena m2 200.00 121.55 0.00
2.02 Tarrajeo de superficie de columnas con cemento-arena m2 100.00 57.47 0.00
2.03 Tarrajeo de superficie de vigas con cemento-arena m2 71.04 50.00 0.00
2.04 Vestidura de derrames en puertas, ventanas y otros m2 100.00 53.40 0.00
3.00 CIELORRASOS
3.01 Cielorrasos mezclacemento arena, e=1.5cm, mezcla 1:4 m2 250.00 59.75 0.00
4.00 PISOS Y PAVIMENTOS
4.01 Contrapiso de 48mm m2 150.00 126.30 0.00
4.02 Piso de cerámica de 40 x 40cm m2 0.00 150.00 126.30
5.00 CARPINTERÍA DE MADERA
5.01 Puertas de madera tableros rebajados de 4.5mm m2 0.00 0.00 15.54
6.00 CARPINTERÍA METÁLICA
6.01 Ventana de fierro m2 0.00 50.00 46.18
6.02 Suministro e instalación de pasamanos de F° G° de 2" x 3/4" m 0.00 0.00 20.88
7.00 CERRAJERÍA
7.01 Cerradura para puerta principal pesada Pza 0.00 0.00 6.00
7.02 Bisagra capuchina de 3 1/2" x 3 1/2" Pza 0.00 0.00 40.00
8.00 VIDRIOS, CRISTALES Y SIMILARES
8.01 Vidrios semidobles incoloro crudo M2 0.00 0.00 96.18
9.00 PINTURA
9.01 Pintura latex 02 manos en cielo raso y vigas m2 0.00 0.00 420.00
9.02 Pintura latex 02 manos interiores y exter. Inc. Columnas m2 0.00 0.00 490.00
10.00 VARIOS
10.01 Mobiliario para docente Unid. 0.00 0.00 4.00
10.02 Carpetas Unipersonales Unid. 0.00 0.00 120.00
10.03 Colocación de pizarra acrílicas de 1.20 x 2.40 Unid. 0.00 0.00 4.00
VALORIZACION Nº 01
OBRA : MEJORAMIENTO DEL SERVICIO EDUCATIVO IE Nª 82070 ABRAHAM VALDELOMAR DEL SECTOR NUEVO CHAO, DEL DISTRITO DE CHAO - VIRU - LA
LIBERTAD
CLIENTE MUNICIPALIDAD DISTRITAL DE CHAO
SUB PRESUP. ARQUITECTURA
FECHA Mar-19
SISTEMA CONTRAT.: PRECIOS UNITARIOS
PRESUPUESTO
ITEM DESCRIPCIÓN DE PARTIDA UNID MET. P.U. P. TOTAL ACUMULADO ANTERIOR
% MET.
MUROS Y TABIQUES DE ALBAÑILERÍA S/. 20,592.87
1.00
1.01 Muro de cabeza ladrillo King kong con cemento-cal-arena m2 36.44 S/. 44.99 S/. 1,639.44 0% 0.00
1.02 Muro de soga ladrillo King kong con cemento-cal-arena m2 270.30 S/. 70.12 S/. 18,953.44 0% 0.00
9.01 Pintura latex 02 manos en cielo raso y vigas m2 430.79 S/. 6.38 S/. 2,748.44 0% 0.00
9.02 Pintura latex 02 manos interiores y exter. Inc. Columnas m2 494.36 S/. 6.24 S/. 3,084.81 0% 0.00
10.01 Mobiliario para docente Unid. 4.00 S/. 355.95 S/. 1,423.80 0% 0.00
10.02 Carpetas Unipersonales Unid. 120.00 S/. 100.00 S/. 12,000.00 0% 0.00
10.03 Colocación de pizarra acrílicas de 1.20 x 2.40 Unid. 4.00 S/. 264.68 S/. 1,058.72 0% 0.00
COSTO DIRECTO S/. S/. 130,699.47
PRESUPUESTO CONTRATADO :
INICIO DE OBRA : 1/03/2019
PLAZO EJECUCION : 90 DIAS CALENDARIO
AVANCE SALDO
UMULADO ANTERIOR AVANCE ACTUAL ACUMULADO TOTAL
VALOR. % MET. VALOR. % MET. VALOR. % MET.
S/. - S/. 19,104.7 S/.19,104.65
S/. - 96.0% 35.00 S/. 1,574.65 96.0% 35.00 S/.1,574.65 4.0% 1.44
S/. - 92.5% 250.00 S/. 17,530.0 92.5% 250.00 S/.17,530.00 7.5% 20.30
S/.3,709.48 S/.3,709.48
S/.0.00 S/.0.00
S/.2,318.42 S/.2,318.42
S/.52,396.34 S/.52,396.34
S/.9,431.34 S/.9,431.34
S/.61,827.69 S/.61,827.69
SALDO
VALOR.
S/. 1,488.22
S/. 64.79
S/. 1,423.44
S/. 8,680.51
S/. 3,403.40
S/. 2,609.71
S/. 2,158.50
S/. 508.90
S/. 2,091.25
S/. 2,091.25
S/. 20,190.73
S/. 3,665.23
S/. 16,525.50
S/. 3,885.00
S/. 3,885.00
S/. 26,268.24
S/. 23,083.20
S/. 3,185.04
S/. 882.32
S/. 430.32
S/. 452.00
S/. 528.99
S/. 528.99
S/. 5,833.25
S/. 2,748.44
S/. 3,084.81
S/. 14,482.52
S/. 1,423.80
S/. 12,000.00
S/. 1,058.72
S/. 84,331.03
S/. 6,746.48
S/. -
S/. 4,216.55
S/. 95,294.06
S/. 17,152.93
S/. 112,446.99
VALORIZACION Nº 02
OBRA : MEJORAMIENTO DEL SERVICIO EDUCATIVO IE Nª 82070 ABRAHAM VALDELOMAR DEL SECTOR NUEVO CHAO, DEL DISTRITO DE CHAO - VIRU - LA LIBERTAD
CLIENTE MUNICIPALIDAD DISTRITAL DE CHAO
SUB PRESUP. ARQUITECTURA
FECHA Mar-19
SISTEMA CONTRAT.: PRECIOS UNITARIOS
PRESUPUESTO
ITEM DESCRIPCIÓN DE PARTIDA UNID MET. P.U. P. TOTAL ACUMULADO ANTERIOR
% MET.
MUROS Y TABIQUES DE ALBAÑILERÍA S/. 20,592.87
1.00
1.01 Muro de cabeza ladrillo King kong con cemento-cal-arena m2 36.44 S/. 44.99 S/. 1,639.44 96% 35.00
1.02 Muro de soga ladrillo King kong con cemento-cal-arena m2 270.30 S/. 70.12 S/. 18,953.44 92% 250.00
9.01 Pintura latex 02 manos en cielo raso y vigas m2 430.79 S/. 6.38 S/. 2,748.44 0% 0.00
9.02 Pintura latex 02 manos interiores y exter. Inc. Columnas m2 494.36 S/. 6.24 S/. 3,084.81 0% 0.00
10.01 Mobiliario para docente Unid. 4.00 S/. 355.95 S/. 1,423.80 0% 0.00
10.02 Carpetas Unipersonales Unid. 120.00 S/. 100.00 S/. 12,000.00 0% 0.00
10.03 Colocación de pizarra acrílicas de 1.20 x 2.40 Unid. 4.00 S/. 264.68 S/. 1,058.72 0% 0.00
COSTO DIRECTO S/. S/. 130,699.47
PRESUPUESTO CONTRATADO :
INICIO DE OBRA : 1/03/2019
PLAZO EJECUCION : 90 DIAS CALENDARIO
AVANCE SALDO
UMULADO ANTERIOR AVANCE ACTUAL ACUMULADO TOTAL
VALOR. % MET. VALOR. % MET. VALOR. % MET.
S/. 19,104.65 S/.1,423.44 S/.20,528.09
S/. 1,574.65 0.0% 0.00 S/.0.00 96.0% 35.00 S/.1,574.65 4.0% 1.44
S/. 17,530.00 7.5% 20.30 S/.1,423.44 100.0% 270.30 S/.18,953.44 0.0% 0.00
S/.2,946.55 S/.6,656.03
S/.0.00 S/.0.00
S/.1,841.60 S/.4,160.02
S/.41,620.08 S/.94,016.42
S/.7,491.61 S/.16,922.96
S/.49,111.69 S/.110,939.38
SALDO
VALOR.
S/. 64.79
S/. 64.79
S/.0.00
S/.0.00
S/.0.00
S/.0.00
S/.0.00
S/.0.00
S/.0.00
S/.0.00
S/.7,554.00
S/.0.00
S/. 7,554.00
S/.3,885.00
S/.3,885.00
S/. 14,268.24
S/. 11,083.20
S/. 3,185.04
S/. 882.32
S/. 430.32
S/. 452.00
S/. 528.99
S/. 528.99
S/. 5,833.25
S/. 2,748.44
S/. 3,084.81
S/. 14,482.52
S/. 1,423.80
S/. 12,000.00
S/. 1,058.72
S/. 47,499.10
S/. 3,799.93
S/. -
S/. 2,374.96
S/. 53,673.98
S/. 9,661.32
S/. 63,335.30
VALORIZACION Nº 03
OBRA : MEJORAMIENTO DEL SERVICIO EDUCATIVO IE Nª 82070 ABRAHAM VALDELOMAR DEL SECTOR NUEVO CHAO, DEL DISTRITO DE CHAO - VIRU - LA LIBERTAD
CLIENTE MUNICIPALIDAD DISTRITAL DE CHAO
SUB PRESUP. ARQUITECTURA
FECHA Mar-19
SISTEMA CONTRAT.: PRECIOS UNITARIOS
PRESUPUESTO
ITEM DESCRIPCIÓN DE PARTIDA UNID MET. P.U. P. TOTAL ACUMULADO ANTERIOR
% MET.
MUROS Y TABIQUES DE ALBAÑILERÍA S/. 20,592.87
1.00
1.01 Muro de cabeza ladrillo King kong con cemento-cal-arena m2 36.44 S/. 44.99 S/. 1,639.44 96.0% 35.00
1.02 Muro de soga ladrillo King kong con cemento-cal-arena m2 270.30 S/. 70.12 S/. 18,953.44 100% 270.30
9.01 Pintura latex 02 manos en cielo raso y vigas m2 430.79 S/. 6.38 S/. 2,748.44 0% 0.00
9.02 Pintura latex 02 manos interiores y exter. Inc. Columnas m2 494.36 S/. 6.24 S/. 3,084.81 0% 0.00
10.01 Mobiliario para docente Unid. 4.00 S/. 355.95 S/. 1,423.80 0% 0.00
10.02 Carpetas Unipersonales Unid. 120.00 S/. 100.00 S/. 12,000.00 0% 0.00
10.03 Colocación de pizarra acrílicas de 1.20 x 2.40 Unid. 4.00 S/. 264.68 S/. 1,058.72 0% 0.00
COSTO DIRECTO S/. S/. 130,699.47
PRESUPUESTO CONTRATADO :
INICIO DE OBRA : 1/03/2019
PLAZO EJECUCION : 90 DIAS CALENDARIO
AVANCE SALDO
UMULADO ANTERIOR AVANCE ACTUAL ACUMULADO TOTAL
VALOR. % MET. VALOR. % MET. VALOR. % MET.
S/. 20,528.09 S/.0.00 S/.20,528.09
S/. 1,574.65 0.0% 0.00 S/.0.00 96.0% 35.00 S/.1,574.65 4.0% 1.44
S/. 18,953.44 0.0% 0.00 S/.0.00 100.0% 270.30 S/.18,953.44 0.0% 0.00
S/.3,787.06 S/.10,443.09
S/.0.00 S/.0.00
S/.2,366.91 S/.6,526.93
S/.53,492.24 S/.147,508.67
S/.9,628.60 S/.26,551.56
S/.63,120.85 S/.174,060.22
SALDO
VALOR.
S/. 64.79
S/. 64.79
S/.0.00
S/.0.00
S/.0.00
S/.0.00
S/.0.00
S/.0.00
S/.0.00
S/.0.00
S/.0.00
S/.0.00
S/.0.00
S/.0.00
S/.0.00
S/.0.00
S/.0.00
S/.0.00
S/.0.00
S/.0.00
S/.0.00
S/.0.00
S/.0.00
S/.96.05
S/.68.84
S/.27.21
S/.0.00
S/.0.00
S/.0.00
S/.0.00
S/. 160.83
S/. 12.87
S/. -
S/. 8.04
S/. 181.74
S/. 32.71
S/. 214.45