DEPARTAMENTO : HUANCAVELICA
PROVINCIA : TAYACAJA
DISTRITO : HUARIBAMBA
FECHA 10/2/2019
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
1.30 1.30
0+0.00 0.34 0.00
0+020.00 3.71 0.00 20.00 40.50 32.40 8.10 0.00 0.00 0.00 0.00 40.50 40.50 0.00 0.00 0.80
0+040.00 4.97 0.00 20.00 86.80 69.44 17.36 0.00 0.00 0.00 0.00 86.80 86.80 0.00 0.00 0.80
0+060.00 0.92 0.11 20.00 58.90 47.12 11.78 0.00 0.55 0.55 0.00 58.35 58.35 0.00 0.00 0.80
0+070.00 2.80 0.14 10.00 18.60 14.88 3.72 0.00 1.25 1.25 0.00 17.35 17.35 0.00 0.00 0.80
0+080.00 1.86 1.31 10.00 23.30 18.64 4.66 0.00 7.25 7.25 0.00 16.05 16.05 0.00 0.00 0.80
0+090.00 1.95 1.17 10.00 19.05 15.24 3.81 0.00 12.40 12.40 0.00 6.65 6.65 0.00 0.00 0.80
0+100.00 0.46 0.16 10.00 12.05 9.64 2.41 0.00 6.65 6.65 0.00 5.40 5.40 0.00 0.00 0.80
0+110.00 5.43 0.00 10.00 29.45 23.56 5.89 0.00 0.40 0.40 0.00 29.05 29.05 0.00 0.00 0.80
0+120.00 1.45 0.00 10.00 34.40 27.52 6.88 0.00 0.00 0.00 0.00 34.40 34.40 0.00 0.00 0.80
0+140.00 0.80 0.53 20.00 22.50 18.00 4.50 0.00 2.65 2.65 0.00 19.85 19.85 0.00 0.00 0.80
0+150.00 2.67 0.01 10.00 17.35 13.88 3.47 0.00 2.70 2.70 0.00 14.65 14.65 0.00 0.00 0.80
0+160.00 0.49 0.37 10.00 15.80 12.64 3.16 0.00 1.90 1.90 0.00 13.90 13.90 0.00 0.00 0.80
0+170.00 0.31 0.92 10.00 4.00 3.20 0.80 0.00 6.45 4.00 2.45 0.00 0.00 0.00 0.00 0.80
0+180.00 0.00 2.58 10.00 0.78 0.62 0.16 0.00 17.50 0.78 16.73 0.00 0.00 0.00 0.00 0.80
0+200.00 3.28 0.00 20.00 16.40 13.12 3.28 0.00 12.90 12.90 0.00 3.50 3.50 0.00 0.00 0.80
0+210.00 2.56 0.00 10.00 29.20 23.36 5.84 0.00 0.00 0.00 0.00 29.20 29.20 0.00 0.00 0.80
0+220.00 1.10 0.07 10.00 18.30 14.64 3.66 0.00 0.18 0.18 0.00 18.13 18.13 0.00 0.00 0.80
0+240.00 1.07 0.46 20.00 21.70 17.36 4.34 0.00 5.30 5.30 0.00 16.40 16.40 0.00 0.00 0.80
0+260.00 0.00 5.24 20.00 5.35 4.28 1.07 0.00 57.00 5.35 51.65 0.00 0.00 0.00 0.00 0.80
0+280.00 0.00 6.60 20.00 0.00 0.00 0.00 0.00 118.40 0.00 118.40 0.00 0.00 0.00 0.00 0.80
0+290.00 0.00 4.98 10.00 0.00 0.00 0.00 0.00 57.90 0.00 57.90 0.00 0.00 0.00 0.00 0.80
0+300.00 0.00 8.24 10.00 0.00 0.00 0.00 0.00 66.10 0.00 66.10 0.00 0.00 0.00 0.00 0.80
0+320.00 3.33 0.00 20.00 16.65 13.32 3.33 0.00 41.20 16.65 24.55 0.00 0.00 0.00 0.00 0.80
0+340.00 3.09 0.00 20.00 64.20 51.36 12.84 0.00 0.00 0.00 0.00 64.20 64.20 0.00 0.00 0.80
0+360.00 1.90 0.77 20.00 49.90 39.92 9.98 0.00 3.85 3.85 0.00 46.05 46.05 0.00 0.00 0.80
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
0+370.00 0.70 0.74 10.00 13.00 10.40 2.60 0.00 7.55 7.55 0.00 5.45 5.45 0.00 0.00 0.80
0+380.00 0.39 0.87 10.00 5.45 4.36 1.09 0.00 8.05 5.45 2.60 0.00 0.00 0.00 0.00 0.80
0+400.00 0.24 0.13 20.00 6.30 5.04 1.26 0.00 10.00 6.30 3.70 0.00 0.00 0.00 0.00 0.80
0+420.00 1.38 0.01 20.00 16.20 12.96 3.24 0.00 1.40 1.40 0.00 14.80 14.80 0.00 0.00 0.80
0+430.00 1.82 0.52 10.00 16.00 12.80 3.20 0.00 2.65 2.65 0.00 13.35 13.35 0.00 0.00 0.80
0+440.00 0.00 2.56 10.00 4.55 3.64 0.91 0.00 15.40 4.55 10.85 0.00 0.00 0.00 0.00 0.80
0+460.00 0.38 0.70 20.00 1.90 1.52 0.38 0.00 32.60 1.90 30.70 0.00 0.00 0.00 0.00 0.80
0+480.00 2.45 0.76 20.00 28.30 22.64 5.66 0.00 14.60 14.60 0.00 13.70 13.70 0.00 0.00 0.80
0+500.00 1.41 0.04 20.00 38.60 30.88 7.72 0.00 8.00 8.00 0.00 30.60 30.60 0.00 0.00 0.80
0+510.00 1.79 0.00 10.00 16.00 12.80 3.20 0.00 0.10 0.10 0.00 15.90 15.90 0.00 0.00 0.80
0+520.00 4.22 0.07 10.00 30.05 24.04 6.01 0.00 0.18 0.18 0.00 29.88 29.88 0.00 0.00 0.80
0+540.00 0.49 1.62 20.00 47.10 37.68 9.42 0.00 16.90 16.90 0.00 30.20 30.20 0.00 0.00 0.80
0+560.00 0.43 1.14 20.00 9.20 7.36 1.84 0.00 27.60 9.20 18.40 0.00 0.00 0.00 0.00 0.80
0+570.00 1.17 0.92 10.00 8.00 6.40 1.60 0.00 10.30 8.00 2.30 0.00 0.00 0.00 0.00 0.80
0+580.00 2.15 0.31 10.00 16.60 13.28 3.32 0.00 6.15 6.15 0.00 10.45 10.45 0.00 0.00 0.80
0+590.00 1.98 2.19 10.00 20.65 16.52 4.13 0.00 12.50 12.50 0.00 8.15 8.15 0.00 0.00 0.80
0+600.00 1.89 3.76 10.00 19.35 15.48 3.87 0.00 29.75 19.35 10.40 0.00 0.00 0.00 0.00 0.80
0+610.00 0.63 2.06 10.00 12.60 10.08 2.52 0.00 29.10 12.60 16.50 0.00 0.00 0.00 0.00 0.80
0+620.00 0.50 1.64 10.00 5.65 4.52 1.13 0.00 18.50 5.65 12.85 0.00 0.00 0.00 0.00 0.80
0+640.00 1.10 0.72 20.00 16.00 12.80 3.20 0.00 23.60 16.00 7.60 0.00 0.00 0.00 0.00 0.80
0+650.00 0.36 0.89 10.00 7.30 5.84 1.46 0.00 8.05 7.30 0.75 0.00 0.00 0.00 0.00 0.80
0+660.00 1.68 5.93 10.00 10.20 8.16 2.04 0.00 34.10 10.20 23.90 0.00 0.00 0.00 0.00 0.80
0+680.00 1.10 0.07 20.00 27.80 22.24 5.56 0.00 60.00 27.80 32.20 0.00 0.00 0.00 0.00 0.80
0+700.00 15.46 0.06 20.00 165.60 132.48 33.12 0.00 1.30 1.30 0.00 164.30 164.30 0.00 0.00 0.80
0+710.00 9.07 0.00 10.00 122.65 98.12 24.53 0.00 0.15 0.15 0.00 122.50 122.50 0.00 0.00 0.80
0+720.00 14.96 0.00 10.00 120.15 96.12 24.03 0.00 0.00 0.00 0.00 120.15 120.15 0.00 0.00 0.80
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
0+730.00 16.33 0.00 10.00 156.45 125.16 31.29 0.00 0.00 0.00 0.00 156.45 156.45 0.00 0.00 0.80
0+740.00 29.70 0.00 10.00 230.15 184.12 46.03 0.00 0.00 0.00 0.00 230.15 230.15 0.00 0.00 0.80
0+760.00 15.83 0.00 20.00 455.30 364.24 91.06 0.00 0.00 0.00 0.00 455.30 455.30 0.00 0.00 0.80
0+780.00 5.52 0.00 20.00 213.50 170.80 42.70 0.00 0.00 0.00 0.00 213.50 213.50 0.00 0.00 0.80
0+800.00 8.10 0.00 20.00 136.20 108.96 27.24 0.00 0.00 0.00 0.00 136.20 136.20 0.00 0.00 0.80
0+820.00 6.98 0.00 20.00 150.80 120.64 30.16 0.00 0.00 0.00 0.00 150.80 150.80 0.00 0.00 0.80
0+830.00 6.07 0.00 10.00 65.25 52.20 13.05 0.00 0.00 0.00 0.00 65.25 65.25 0.00 0.00 0.80
0+840.00 8.63 0.00 10.00 73.50 58.80 14.70 0.00 0.00 0.00 0.00 73.50 73.50 0.00 0.00 0.80
0+860.00 10.59 0.00 20.00 192.20 153.76 38.44 0.00 0.00 0.00 0.00 192.20 192.20 0.00 0.00 0.80
0+880.00 8.17 0.00 20.00 187.60 150.08 37.52 0.00 0.00 0.00 0.00 187.60 187.60 0.00 0.00 0.80
0+900.00 6.92 0.00 20.00 150.90 120.72 30.18 0.00 0.00 0.00 0.00 150.90 150.90 0.00 0.00 0.80
0+910.00 5.18 0.00 10.00 60.50 48.40 12.10 0.00 0.00 0.00 0.00 60.50 60.50 0.00 0.00 0.80
0+920.00 8.00 0.00 10.00 65.90 52.72 13.18 0.00 0.00 0.00 0.00 65.90 65.90 0.00 0.00 0.80
0+940.00 10.32 0.00 20.00 183.20 146.56 36.64 0.00 0.00 0.00 0.00 183.20 183.20 0.00 0.00 0.80
0+960.00 7.63 0.00 20.00 179.50 143.60 35.90 0.00 0.00 0.00 0.00 179.50 179.50 0.00 0.00 0.80
0+970.00 5.15 0.00 10.00 63.90 51.12 12.78 0.00 0.00 0.00 0.00 63.90 63.90 0.00 0.00 0.80
0+980.00 4.19 0.00 10.00 46.70 37.36 9.34 0.00 0.00 0.00 0.00 46.70 46.70 0.00 0.00 0.80
0+990.00 5.31 0.00 10.00 47.50 38.00 9.50 0.00 0.00 0.00 0.00 47.50 47.50 0.00 0.00 0.80
1+000.00 7.88 0.00 10.00 65.95 52.76 13.19 0.00 0.00 0.00 0.00 65.95 65.95 0.00 0.00 0.80
1+010.00 5.09 0.00 10.00 64.85 51.88 12.97 0.00 0.00 0.00 0.00 64.85 64.85 0.00 0.00 0.80
1+020.00 7.94 0.00 10.00 65.15 52.12 13.03 0.00 0.00 0.00 0.00 65.15 65.15 0.00 0.00 0.80
1+040.00 13.81 0.00 20.00 217.50 174.00 43.50 0.00 0.00 0.00 0.00 217.50 217.50 0.00 0.00 0.80
1+060.00 5.85 0.00 20.00 196.60 157.28 39.32 0.00 0.00 0.00 0.00 196.60 196.60 0.00 0.00 0.80
1+080.00 0.52 0.46 20.00 63.70 50.96 12.74 0.00 2.30 2.30 0.00 61.40 61.40 0.00 0.00 0.80
1+090.00 2.45 0.25 10.00 14.85 11.88 2.97 0.00 3.55 3.55 0.00 11.30 11.30 0.00 0.00 0.80
1+100.00 1.26 0.00 10.00 18.55 14.84 3.71 0.00 0.63 0.63 0.00 17.93 17.93 0.00 0.00 0.80
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
1+120.00 2.24 0.00 20.00 35.00 28.00 7.00 0.00 0.00 0.00 0.00 35.00 35.00 0.00 0.00 0.80
1+140.00 3.68 0.00 20.00 59.20 47.36 11.84 0.00 0.00 0.00 0.00 59.20 59.20 0.00 0.00 0.80
1+160.00 7.41 0.00 20.00 110.90 88.72 22.18 0.00 0.00 0.00 0.00 110.90 110.90 0.00 0.00 0.80
1+180.00 5.06 0.00 20.00 124.70 99.76 24.94 0.00 0.00 0.00 0.00 124.70 124.70 0.00 0.00 0.80
1+200.00 2.19 0.00 20.00 72.50 58.00 14.50 0.00 0.00 0.00 0.00 72.50 72.50 0.00 0.00 0.80
1+210.00 2.71 0.00 10.00 24.50 19.60 4.90 0.00 0.00 0.00 0.00 24.50 24.50 0.00 0.00 0.80
1+220.00 4.18 0.00 10.00 34.45 27.56 6.89 0.00 0.00 0.00 0.00 34.45 34.45 0.00 0.00 0.80
1+240.00 10.97 0.00 20.00 151.50 121.20 30.30 0.00 0.00 0.00 0.00 151.50 151.50 0.00 0.00 0.80
1+260.00 14.84 0.00 20.00 258.10 206.48 51.62 0.00 0.00 0.00 0.00 258.10 258.10 0.00 0.00 0.80
1+280.00 15.44 0.00 20.00 302.80 242.24 60.56 0.00 0.00 0.00 0.00 302.80 302.80 0.00 0.00 0.80
1+300.00 8.51 0.00 20.00 239.50 191.60 47.90 0.00 0.00 0.00 0.00 239.50 239.50 0.00 0.00 0.80
1+320.00 2.62 0.04 20.00 111.30 89.04 22.26 0.00 0.20 0.20 0.00 111.10 111.10 0.00 0.00 0.80
1+340.00 2.30 0.29 20.00 49.20 39.36 9.84 0.00 3.30 3.30 0.00 45.90 45.90 0.00 0.00 0.80
1+360.00 1.84 1.21 20.00 41.40 33.12 8.28 0.00 15.00 15.00 0.00 26.40 26.40 0.00 0.00 0.80
1+370.00 1.82 3.24 10.00 18.30 14.64 3.66 0.00 22.25 18.30 3.95 0.00 0.00 0.00 0.00 0.80
1+380.00 0.00 2.90 10.00 4.55 3.64 0.91 0.00 30.70 4.55 26.15 0.00 0.00 0.00 0.00 0.80
1+390.00 0.00 3.58 10.00 0.00 0.00 0.00 0.00 32.40 0.00 32.40 0.00 0.00 0.00 0.00 0.80
1+400.00 0.00 3.27 10.00 0.00 0.00 0.00 0.00 34.25 0.00 34.25 0.00 0.00 0.00 0.00 0.80
1+420.00 0.00 12.63 20.00 0.00 0.00 0.00 0.00 159.00 0.00 159.00 0.00 0.00 0.00 0.00 0.80
1+430.00 0.00 9.25 10.00 0.00 0.00 0.00 0.00 109.40 0.00 109.40 0.00 0.00 0.00 0.00 0.80
1+440.00 0.00 10.69 10.00 0.00 0.00 0.00 0.00 99.70 0.00 99.70 0.00 0.00 0.00 0.00 0.80
1+460.00 0.00 12.46 20.00 0.00 0.00 0.00 0.00 231.50 0.00 231.50 0.00 0.00 0.00 0.00 0.80
1+480.00 0.00 5.92 20.00 0.00 0.00 0.00 0.00 183.80 0.00 183.80 0.00 0.00 0.00 0.00 0.70
1+500.00 0.00 13.69 20.00 0.00 0.00 0.00 0.00 196.10 0.00 196.10 0.00 0.00 0.00 0.00 0.70
1+520.00 0.00 10.54 20.00 0.00 0.00 0.00 0.00 242.30 0.00 242.30 0.00 0.00 0.00 0.00 0.70
1+540.00 1.64 8.61 20.00 8.20 5.74 1.64 0.82 191.50 7.38 184.12 0.00 0.00 0.00 0.82 0.70
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
1+550.00 0.00 13.22 10.00 4.10 2.87 0.82 0.41 109.15 3.69 105.46 0.00 0.00 0.00 0.41 0.70
1+560.00 0.00 16.32 10.00 0.00 0.00 0.00 0.00 147.70 0.00 147.70 0.00 0.00 0.00 0.00 0.70
1+580.00 0.00 8.53 20.00 0.00 0.00 0.00 0.00 248.50 0.00 248.50 0.00 0.00 0.00 0.00 0.70
1+590.00 0.00 7.98 10.00 0.00 0.00 0.00 0.00 82.55 0.00 82.55 0.00 0.00 0.00 0.00 0.70
1+600.00 0.00 3.05 10.00 0.00 0.00 0.00 0.00 55.15 0.00 55.15 0.00 0.00 0.00 0.00 0.70
1+620.00 1.16 0.01 20.00 5.80 4.06 1.16 0.58 30.60 5.22 25.38 0.00 0.00 0.00 0.58 0.70
1+640.00 4.37 0.00 20.00 55.30 38.71 11.06 5.53 0.05 0.05 0.00 49.72 49.72 0.00 5.53 0.70
1+660.00 1.18 1.34 20.00 55.50 38.85 11.10 5.55 6.70 6.70 0.00 43.25 43.25 0.00 5.55 0.70
1+670.00 0.75 0.10 10.00 9.65 6.76 1.93 0.97 7.20 7.20 0.00 1.49 1.49 0.00 0.97 0.70
1+680.00 1.21 0.00 10.00 9.80 6.86 1.96 0.98 0.25 0.25 0.00 8.57 8.57 0.00 0.98 0.70
1+700.00 5.66 0.00 20.00 68.70 48.09 13.74 6.87 0.00 0.00 0.00 61.83 61.83 0.00 6.87 0.70
1+720.00 7.67 0.00 20.00 133.30 93.31 26.66 13.33 0.00 0.00 0.00 119.97 119.97 0.00 13.33 0.70
1+740.00 14.22 0.00 20.00 218.90 153.23 43.78 21.89 0.00 0.00 0.00 197.01 197.01 0.00 21.89 0.70
1+750.00 16.81 0.00 10.00 155.15 108.61 31.03 15.52 0.00 0.00 0.00 139.64 139.64 0.00 15.52 0.70
1+760.00 17.84 0.00 10.00 173.25 121.28 34.65 17.33 0.00 0.00 0.00 155.93 155.93 0.00 17.33 0.70
1+780.00 18.07 0.00 20.00 359.10 251.37 71.82 35.91 0.00 0.00 0.00 323.19 323.19 0.00 35.91 0.70
1+800.00 23.45 0.00 20.00 415.20 290.64 83.04 41.52 0.00 0.00 0.00 373.68 373.68 0.00 41.52 0.70
1+810.00 21.20 0.00 10.00 223.25 156.28 44.65 22.33 0.00 0.00 0.00 200.93 200.93 0.00 22.33 0.70
1+820.00 11.80 0.00 10.00 165.00 115.50 33.00 16.50 0.00 0.00 0.00 148.50 148.50 0.00 16.50 0.70
1+840.00 19.86 0.00 20.00 316.60 221.62 63.32 31.66 0.00 0.00 0.00 284.94 284.94 0.00 31.66 0.70
1+860.00 24.85 4.08 20.00 447.10 312.97 89.42 44.71 20.40 20.40 0.00 381.99 381.99 0.00 44.71 0.70
1+880.00 0.00 18.89 20.00 124.25 86.98 24.85 12.43 229.70 111.83 117.88 0.00 0.00 0.00 12.43 0.70
1+890.00 0.00 19.29 10.00 0.00 0.00 0.00 0.00 190.90 0.00 190.90 0.00 0.00 0.00 0.00 0.70
1+900.00 0.00 22.14 10.00 0.00 0.00 0.00 0.00 207.15 0.00 207.15 0.00 0.00 0.00 0.00 0.70
1+910.00 0.00 13.40 10.00 0.00 0.00 0.00 0.00 177.70 0.00 177.70 0.00 0.00 0.00 0.00 0.70
1+920.00 1.53 5.27 10.00 3.83 2.68 0.77 0.38 93.35 3.44 89.91 0.00 0.00 0.00 0.38 0.70
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
1+930.00 1.36 0.77 10.00 14.45 10.12 2.89 1.45 30.20 13.01 17.20 0.00 0.00 0.00 1.45 0.70
1+940.00 0.00 14.60 10.00 3.40 2.38 0.68 0.34 76.85 3.06 73.79 0.00 0.00 0.00 0.34 0.70
1+950.00 0.89 3.86 10.00 2.23 1.56 0.45 0.22 92.30 2.00 90.30 0.00 0.00 0.00 0.22 0.70
1+960.00 0.92 2.47 10.00 9.05 2.72 5.43 0.91 31.65 8.15 23.51 0.00 0.00 0.00 0.91 0.30
1+970.00 2.80 0.65 10.00 18.60 5.58 11.16 1.86 15.60 15.60 0.00 1.14 1.14 0.00 1.86 0.30
1+980.00 5.12 0.00 10.00 39.60 11.88 23.76 3.96 1.63 1.63 0.00 34.02 34.02 0.00 3.96 0.30
2+000.00 3.05 0.93 20.00 81.70 24.51 49.02 8.17 4.65 4.65 0.00 68.88 68.88 0.00 8.17 0.30
2+020.00 0.25 6.34 20.00 33.00 9.90 19.80 3.30 72.70 29.70 43.00 0.00 0.00 0.00 3.30 0.30
2+030.00 0.53 3.44 10.00 3.90 1.17 2.34 0.39 48.90 3.51 45.39 0.00 0.00 0.00 0.39 0.30
2+040.00 0.76 2.00 10.00 6.45 1.94 3.87 0.65 27.20 5.81 21.40 0.00 0.00 0.00 0.65 0.30
2+060.00 7.11 0.00 20.00 78.70 23.61 47.22 7.87 10.00 10.00 0.00 60.83 60.83 0.00 7.87 0.30
2+080.00 5.17 4.86 20.00 122.80 36.84 73.68 12.28 24.30 24.30 0.00 86.22 86.22 0.00 12.28 0.30
2+090.00 11.64 3.37 10.00 84.05 25.22 50.43 8.41 41.15 41.15 0.00 34.50 34.50 0.00 8.41 0.30
2+100.00 1.73 14.15 10.00 66.85 20.06 40.11 6.69 87.60 60.17 27.44 0.00 0.00 0.00 6.69 0.30
2+120.00 4.31 11.25 20.00 60.40 18.12 36.24 6.04 254.00 54.36 199.64 0.00 0.00 0.00 6.04 0.30
2+140.00 9.13 3.48 20.00 134.40 40.32 80.64 13.44 147.30 120.96 26.34 0.00 0.00 0.00 13.44 0.30
2+160.00 3.55 7.09 20.00 126.80 38.04 76.08 12.68 105.70 105.70 0.00 8.42 8.42 0.00 12.68 0.30
2+170.00 0.70 4.43 10.00 21.25 6.38 12.75 2.13 57.60 19.13 38.48 0.00 0.00 0.00 2.13 0.30
2+180.00 0.48 12.29 10.00 5.90 1.77 3.54 0.59 83.60 5.31 78.29 0.00 0.00 0.00 0.59 0.30
2+190.00 0.97 5.86 10.00 7.25 2.18 4.35 0.73 90.75 6.53 84.23 0.00 0.00 0.00 0.73 0.30
2+200.00 0.80 5.63 10.00 8.85 2.66 5.31 0.89 57.45 7.97 49.49 0.00 0.00 0.00 0.89 0.30
2+220.00 0.30 3.41 20.00 11.00 3.30 6.60 1.10 90.40 9.90 80.50 0.00 0.00 0.00 1.10 0.30
2+230.00 3.66 2.60 10.00 19.80 5.94 11.88 1.98 30.05 17.82 12.23 0.00 0.00 0.00 1.98 0.30
2+240.00 5.31 2.23 10.00 44.85 13.46 26.91 4.49 24.15 24.15 0.00 16.22 16.22 0.00 4.49 0.30
2+250.00 5.99 2.31 10.00 56.50 16.95 33.90 5.65 22.70 22.70 0.00 28.15 28.15 0.00 5.65 0.30
2+260.00 3.04 3.38 10.00 45.15 13.55 27.09 4.52 28.45 28.45 0.00 12.19 12.19 0.00 4.52 0.30
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
2+280.00 2.55 0.80 20.00 55.90 16.77 33.54 5.59 41.80 41.80 0.00 8.51 8.51 0.00 5.59 0.30
2+300.00 10.37 0.00 20.00 129.20 38.76 77.52 12.92 4.00 4.00 0.00 112.28 112.28 0.00 12.92 0.30
2+310.00 6.78 0.00 10.00 85.75 25.73 51.45 8.58 0.00 0.00 0.00 77.18 77.18 0.00 8.58 0.30
2+320.00 6.72 0.00 10.00 67.50 20.25 40.50 6.75 0.00 0.00 0.00 60.75 60.75 0.00 6.75 0.30
2+340.00 0.97 4.71 20.00 76.90 23.07 46.14 7.69 23.55 23.55 0.00 45.66 45.66 0.00 7.69 0.30
2+360.00 0.55 5.28 20.00 15.20 4.56 9.12 1.52 99.90 13.68 86.22 0.00 0.00 0.00 1.52 0.30
2+380.00 4.76 0.90 20.00 53.10 15.93 31.86 5.31 61.80 47.79 14.01 0.00 0.00 0.00 5.31 0.30
2+400.00 5.54 0.26 20.00 103.00 30.90 61.80 10.30 11.60 11.60 0.00 81.10 81.10 0.00 10.30 0.30
2+420.00 0.84 2.63 20.00 63.80 19.14 38.28 6.38 28.90 28.90 0.00 28.52 28.52 0.00 6.38 0.30
2+440.00 2.60 3.33 20.00 34.40 10.32 20.64 3.44 59.60 30.96 28.64 0.00 0.00 0.00 3.44 0.30
2+460.00 4.28 5.25 20.00 68.80 20.64 41.28 6.88 85.80 61.92 23.88 0.00 0.00 0.00 6.88 0.30
2+470.00 6.08 0.89 10.00 51.80 15.54 31.08 5.18 30.70 30.70 0.00 15.92 15.92 0.00 5.18 0.30
2+480.00 2.77 1.85 10.00 44.25 13.28 26.55 4.43 13.70 13.70 0.00 26.13 26.13 0.00 4.43 0.30
2+500.00 3.66 2.01 20.00 64.30 19.29 38.58 6.43 38.60 38.60 0.00 19.27 19.27 0.00 6.43 0.30
2+520.00 2.87 3.01 20.00 65.30 19.59 39.18 6.53 50.20 50.20 0.00 8.57 8.57 0.00 6.53 0.30
2+540.00 1.71 3.54 20.00 45.80 13.74 27.48 4.58 65.50 41.22 24.28 0.00 0.00 0.00 4.58 0.30
2+560.00 5.99 0.98 20.00 77.00 23.10 46.20 7.70 45.20 45.20 0.00 24.10 24.10 0.00 7.70 0.30
2+580.00 4.95 1.63 20.00 109.40 32.82 65.64 10.94 26.10 26.10 0.00 72.36 72.36 0.00 10.94 0.30
2+590.00 3.06 3.10 10.00 40.05 12.02 24.03 4.01 23.65 23.65 0.00 12.40 12.40 0.00 4.01 0.30
2+600.00 0.83 5.38 10.00 19.45 5.84 11.67 1.95 42.40 17.51 24.90 0.00 0.00 0.00 1.95 0.30
2+620.00 0.00 15.53 20.00 4.15 1.25 2.49 0.42 209.10 3.74 205.37 0.00 0.00 0.00 0.42 0.30
2+630.00 0.00 8.21 10.00 0.00 0.00 0.00 0.00 118.70 0.00 118.70 0.00 0.00 0.00 0.00 0.30
2+640.00 16.63 0.00 10.00 41.58 12.47 24.95 4.16 20.53 20.53 0.00 16.89 16.89 0.00 4.16 0.30
2+650.00 43.16 0.00 10.00 298.95 89.69 179.37 29.90 0.00 0.00 0.00 269.06 269.06 0.00 29.90 0.30
2+660.00 36.07 0.00 10.00 396.15 118.85 237.69 39.62 0.00 0.00 0.00 356.54 356.54 0.00 39.62 0.30
2+670.00 8.21 0.87 10.00 221.40 66.42 132.84 22.14 2.18 2.18 0.00 197.09 197.09 0.00 22.14 0.30
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
2+680.00 7.74 0.97 10.00 79.75 23.93 47.85 7.98 9.20 9.20 0.00 62.58 62.58 0.00 7.98 0.30
2+700.00 8.74 0.02 20.00 164.80 49.44 98.88 16.48 9.90 9.90 0.00 138.42 138.42 0.00 16.48 0.30
2+720.00 7.89 0.68 20.00 166.30 49.89 99.78 16.63 7.00 7.00 0.00 142.67 142.67 0.00 16.63 0.30
2+740.00 6.96 0.00 20.00 148.50 44.55 89.10 14.85 3.40 3.40 0.00 130.25 130.25 0.00 14.85 0.30
2+750.00 6.31 0.68 10.00 66.35 19.91 39.81 6.64 1.70 1.70 0.00 58.02 58.02 0.00 6.64 0.30
2+760.00 5.32 0.00 10.00 58.15 17.45 34.89 5.82 1.70 1.70 0.00 50.64 50.64 0.00 5.82 0.30
2+770.00 3.18 0.83 10.00 42.50 12.75 25.50 4.25 2.08 2.08 0.00 36.18 36.18 0.00 4.25 0.30
2+780.00 3.33 2.21 10.00 32.55 9.77 19.53 3.26 15.20 15.20 0.00 14.10 14.10 0.00 3.26 0.30
2+800.00 6.86 1.70 20.00 101.90 30.57 61.14 10.19 39.10 39.10 0.00 52.61 52.61 0.00 10.19 0.30
2+820.00 10.72 0.66 20.00 175.80 52.74 105.48 17.58 23.60 23.60 0.00 134.62 134.62 0.00 17.58 0.30
2+840.00 9.69 0.24 20.00 204.10 61.23 122.46 20.41 9.00 9.00 0.00 174.69 174.69 0.00 20.41 0.30
2+860.00 8.57 2.08 20.00 182.60 54.78 109.56 18.26 23.20 23.20 0.00 141.14 141.14 0.00 18.26 0.30
2+870.00 3.21 3.98 10.00 58.90 17.67 35.34 5.89 30.30 30.30 0.00 22.71 22.71 0.00 5.89 0.30
2+880.00 8.66 0.45 10.00 59.35 17.81 35.61 5.94 22.15 22.15 0.00 31.27 31.27 0.00 5.94 0.30
2+890.00 5.91 0.76 10.00 72.85 21.86 43.71 7.29 6.05 6.05 0.00 59.52 59.52 0.00 7.29 0.30
2+900.00 1.46 5.29 10.00 36.85 11.06 22.11 3.69 30.25 30.25 0.00 2.92 2.92 0.00 3.69 0.30
2+910.00 2.36 4.92 10.00 19.10 5.73 11.46 1.91 51.05 17.19 33.86 0.00 0.00 0.00 1.91 0.30
2+920.00 11.31 3.36 10.00 68.35 20.51 41.01 6.84 41.40 41.40 0.00 20.12 20.12 0.00 6.84 0.30
2+930.00 14.35 1.12 10.00 128.30 38.49 76.98 12.83 22.40 22.40 0.00 93.07 93.07 0.00 12.83 0.30
2+940.00 12.18 0.72 10.00 132.65 39.80 79.59 13.27 9.20 9.20 0.00 110.19 110.19 0.00 13.27 0.30
2+950.00 5.98 0.80 10.00 90.80 27.24 54.48 9.08 7.60 7.60 0.00 74.12 74.12 0.00 9.08 0.30
2+960.00 1.48 5.55 10.00 37.30 11.19 22.38 3.73 31.75 31.75 0.00 1.82 1.82 0.00 3.73 0.30
2+980.00 0.00 4.92 20.00 7.40 2.22 4.44 0.74 104.70 6.66 98.04 0.00 0.00 0.00 0.74 0.30
2+990.00 0.00 7.36 10.00 0.00 0.00 0.00 0.00 61.40 0.00 61.40 0.00 0.00 0.00 0.00 0.30
3+000.00 0.00 8.54 10.00 0.00 0.00 0.00 0.00 79.50 0.00 79.50 0.00 0.00 0.00 0.00 0.30
3+010.00 4.48 1.33 10.00 11.20 3.36 6.72 1.12 49.35 10.08 39.27 0.00 0.00 0.00 1.12 0.30
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
3+020.00 4.96 7.70 10.00 47.20 14.16 28.32 4.72 45.15 42.48 2.67 0.00 0.00 0.00 4.72 0.30
3+040.00 21.64 0.00 20.00 266.00 79.80 159.60 26.60 38.50 38.50 0.00 200.90 200.90 0.00 26.60 0.30
3+060.00 15.97 0.00 20.00 376.10 112.83 225.66 37.61 0.00 0.00 0.00 338.49 338.49 0.00 37.61 0.30
3+080.00 8.65 0.39 20.00 246.20 73.86 147.72 24.62 1.95 1.95 0.00 219.63 219.63 0.00 24.62 0.30
3+100.00 5.40 1.83 20.00 140.50 42.15 84.30 14.05 22.20 22.20 0.00 104.25 104.25 0.00 14.05 0.30
3+110.00 6.65 0.53 10.00 60.25 18.08 36.15 6.03 11.80 11.80 0.00 42.43 42.43 0.00 6.03 0.30
3+120.00 4.23 1.81 10.00 54.40 16.32 32.64 5.44 11.70 11.70 0.00 37.26 37.26 0.00 5.44 0.30
3+140.00 4.44 1.92 20.00 86.70 26.01 52.02 8.67 37.30 37.30 0.00 40.73 40.73 0.00 8.67 0.30
3+160.00 4.09 2.35 20.00 85.30 25.59 51.18 8.53 42.70 42.70 0.00 34.07 34.07 0.00 8.53 0.30
3+180.00 1.30 2.83 20.00 53.90 16.17 32.34 5.39 51.80 48.51 3.29 0.00 0.00 0.00 5.39 0.30
3+200.00 0.49 4.92 20.00 17.90 5.37 10.74 1.79 77.50 16.11 61.39 0.00 0.00 0.00 1.79 0.30
3+220.00 0.66 6.92 20.00 11.50 3.45 6.90 1.15 118.40 10.35 108.05 0.00 0.00 0.00 1.15 0.30
3+230.00 5.64 0.73 10.00 31.50 9.45 18.90 3.15 38.25 28.35 9.90 0.00 0.00 0.00 3.15 0.30
3+240.00 2.29 2.19 10.00 39.65 11.90 23.79 3.97 14.60 14.60 0.00 21.09 21.09 0.00 3.97 0.30
3+250.00 1.62 4.79 10.00 19.55 5.87 11.73 1.96 34.90 17.60 17.31 0.00 0.00 0.00 1.96 0.30
3+260.00 0.32 10.66 10.00 9.70 2.91 5.82 0.97 77.25 8.73 68.52 0.00 0.00 0.00 0.97 0.30
3+270.00 0.31 10.24 10.00 3.15 0.95 1.89 0.32 104.50 2.84 101.67 0.00 0.00 0.00 0.32 0.30
3+280.00 0.00 12.01 10.00 0.78 0.23 0.47 0.08 111.25 0.70 110.55 0.00 0.00 0.00 0.08 0.30
3+300.00 0.81 6.64 20.00 4.05 1.22 2.43 0.41 186.50 3.65 182.86 0.00 0.00 0.00 0.41 0.30
3+320.00 2.24 2.66 20.00 30.50 9.15 18.30 3.05 93.00 27.45 65.55 0.00 0.00 0.00 3.05 0.30
3+340.00 1.37 2.42 20.00 36.10 10.83 21.66 3.61 50.80 32.49 18.31 0.00 0.00 0.00 3.61 0.30
3+360.00 1.79 3.18 20.00 31.60 9.48 18.96 3.16 56.00 28.44 27.56 0.00 0.00 0.00 3.16 0.30
3+370.00 1.91 4.31 10.00 18.50 5.55 11.10 1.85 37.45 16.65 20.80 0.00 0.00 0.00 1.85 0.30
3+380.00 3.15 1.73 10.00 25.30 7.59 15.18 2.53 30.20 22.77 7.43 0.00 0.00 0.00 2.53 0.30
3+390.00 3.41 1.84 10.00 32.80 9.84 19.68 3.28 17.85 17.85 0.00 11.67 11.67 0.00 3.28 0.30
3+400.00 1.38 1.49 10.00 23.95 7.19 14.37 2.40 16.65 16.65 0.00 4.91 4.91 0.00 2.40 0.30
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
3+420.00 5.10 1.87 20.00 64.80 19.44 38.88 6.48 33.60 33.60 0.00 24.72 24.72 0.00 6.48 0.30
3+440.00 6.89 0.00 20.00 119.90 35.97 71.94 11.99 9.35 9.35 0.00 98.56 98.56 0.00 11.99 0.30
3+450.00 1.88 4.29 10.00 43.85 13.16 26.31 4.39 10.73 10.73 0.00 28.74 28.74 0.00 4.39 0.30
3+460.00 2.37 3.73 10.00 21.25 6.38 12.75 2.13 40.10 19.13 20.98 0.00 0.00 0.00 2.13 0.30
3+480.00 2.67 1.69 20.00 50.40 15.12 30.24 5.04 54.20 45.36 8.84 0.00 0.00 0.00 5.04 0.30
3+500.00 9.40 0.00 20.00 120.70 36.21 72.42 12.07 8.45 8.45 0.00 100.18 100.18 0.00 12.07 0.30
3+520.00 1.50 5.65 20.00 109.00 32.70 65.40 10.90 28.25 28.25 0.00 69.85 69.85 0.00 10.90 0.30
3+530.00 8.24 1.89 10.00 48.70 14.61 29.22 4.87 37.70 37.70 0.00 6.13 6.13 0.00 4.87 0.30
3+540.00 7.54 1.73 10.00 78.90 23.67 47.34 7.89 18.10 18.10 0.00 52.91 52.91 0.00 7.89 0.30
3+560.00 4.91 0.91 20.00 124.50 37.35 74.70 12.45 26.40 26.40 0.00 85.65 85.65 0.00 12.45 0.30
3+570.00 2.88 3.25 10.00 38.95 11.69 23.37 3.90 20.80 20.80 0.00 14.26 14.26 0.00 3.90 0.30
3+580.00 6.09 0.00 10.00 44.85 13.46 26.91 4.49 8.13 8.13 0.00 32.24 32.24 0.00 4.49 0.30
3+600.00 0.66 0.28 20.00 67.50 20.25 40.50 6.75 1.40 1.40 0.00 59.35 59.35 0.00 6.75 0.30
3+620.00 0.77 2.71 20.00 14.30 4.29 8.58 1.43 29.90 12.87 17.03 0.00 0.00 0.00 1.43 0.30
3+630.00 22.61 0.00 10.00 116.90 35.07 70.14 11.69 6.78 6.78 0.00 98.44 98.44 0.00 11.69 0.30
3+640.00 7.19 2.33 10.00 149.00 44.70 89.40 14.90 5.83 5.83 0.00 128.28 128.28 0.00 14.90 0.30
3+650.00 1.87 12.27 10.00 45.30 13.59 27.18 4.53 73.00 40.77 32.23 0.00 0.00 0.00 4.53 0.30
3+660.00 0.44 12.14 10.00 11.55 3.47 6.93 1.16 122.05 10.40 111.66 0.00 0.00 0.00 1.16 0.30
3+680.00 0.71 3.16 20.00 11.50 3.45 6.90 1.15 153.00 10.35 142.65 0.00 0.00 0.00 1.15 0.30
3+690.00 0.00 6.75 10.00 1.78 0.53 1.07 0.18 49.55 1.60 47.95 0.00 0.00 0.00 0.18 0.30
3+700.00 1.43 2.69 10.00 3.58 1.07 2.15 0.36 47.20 3.22 43.98 0.00 0.00 0.00 0.36 0.30
3+720.00 2.45 6.07 20.00 38.80 11.64 23.28 3.88 87.60 34.92 52.68 0.00 0.00 0.00 3.88 0.30
3+740.00 2.94 2.17 20.00 53.90 16.17 32.34 5.39 82.40 48.51 33.89 0.00 0.00 0.00 5.39 0.30
3+760.00 3.23 3.83 20.00 61.70 18.51 37.02 6.17 60.00 55.53 4.47 0.00 0.00 0.00 6.17 0.30
3+780.00 1.82 1.63 20.00 50.50 15.15 30.30 5.05 54.60 45.45 9.15 0.00 0.00 0.00 5.05 0.30
3+790.00 2.30 0.00 10.00 20.60 6.18 12.36 2.06 4.08 4.08 0.00 14.47 14.47 0.00 2.06 0.30
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
3+800.00 5.72 0.00 10.00 40.10 12.03 24.06 4.01 0.00 0.00 0.00 36.09 36.09 0.00 4.01 0.30
3+820.00 5.31 2.70 20.00 110.30 33.09 66.18 11.03 13.50 13.50 0.00 85.77 85.77 0.00 11.03 0.30
3+830.00 7.92 4.66 10.00 66.15 19.85 39.69 6.62 36.80 36.80 0.00 22.74 22.74 0.00 6.62 0.30
3+840.00 4.35 2.44 10.00 61.35 18.41 36.81 6.14 35.50 35.50 0.00 19.72 19.72 0.00 6.14 0.30
3+860.00 10.38 0.00 20.00 147.30 44.19 88.38 14.73 12.20 12.20 0.00 120.37 120.37 0.00 14.73 0.30
3+880.00 7.06 0.00 20.00 174.40 52.32 104.64 17.44 0.00 0.00 0.00 156.96 156.96 0.00 17.44 0.30
3+900.00 5.74 0.37 20.00 128.00 38.40 76.80 12.80 1.85 1.85 0.00 113.35 113.35 0.00 12.80 0.30
3+920.00 9.06 3.10 20.00 148.00 44.40 88.80 14.80 34.70 34.70 0.00 98.50 98.50 0.00 14.80 0.30
3+940.00 7.93 7.15 20.00 169.90 50.97 101.94 16.99 102.50 102.50 0.00 50.41 50.41 0.00 16.99 0.30
3+950.00 4.80 0.17 10.00 63.65 19.10 38.19 6.37 36.60 36.60 0.00 20.69 20.69 0.00 6.37 0.30
3+960.00 3.35 0.01 10.00 40.75 12.23 24.45 4.08 0.90 0.90 0.00 35.78 35.78 0.00 4.08 0.30
3+980.00 3.33 0.65 20.00 66.80 20.04 40.08 6.68 6.60 6.60 0.00 53.52 53.52 0.00 6.68 0.30
4+000.00 0.00 3.30 20.00 16.65 5.00 9.99 1.67 39.50 14.99 24.52 0.00 0.00 0.00 1.67 0.30
4+020.00 0.00 1.67 20.00 0.00 0.00 0.00 0.00 49.70 0.00 49.70 0.00 0.00 0.00 0.00 0.30
4+030.00 0.33 0.70 10.00 0.83 0.25 0.50 0.08 11.85 0.74 11.11 0.00 0.00 0.00 0.08 0.30
4+040.00 0.40 1.15 10.00 3.65 1.10 2.19 0.37 9.25 3.29 5.97 0.00 0.00 0.00 0.37 0.30
4+060.00 0.93 1.29 20.00 13.30 3.99 7.98 1.33 24.40 11.97 12.43 0.00 0.00 0.00 1.33 0.30
4+080.00 2.24 2.03 20.00 31.70 9.51 19.02 3.17 33.20 28.53 4.67 0.00 0.00 0.00 3.17 0.30
4+090.00 0.24 5.41 10.00 12.40 3.72 7.44 1.24 37.20 11.16 26.04 0.00 0.00 0.00 1.24 0.30
4+100.00 0.47 5.08 10.00 3.55 1.07 2.13 0.36 52.45 3.20 49.26 0.00 0.00 0.00 0.36 0.30
4+120.00 2.35 1.12 20.00 28.20 8.46 16.92 2.82 62.00 25.38 36.62 0.00 0.00 0.00 2.82 0.30
4+130.00 21.14 0.00 10.00 117.45 35.24 70.47 11.75 2.80 2.80 0.00 102.91 102.91 0.00 11.75 0.30
4+140.00 9.51 0.00 10.00 153.25 45.98 91.95 15.33 0.00 0.00 0.00 137.93 137.93 0.00 15.33 0.30
4+150.00 1.93 2.07 10.00 57.20 17.16 34.32 5.72 5.18 5.18 0.00 46.31 46.31 0.00 5.72 0.30
4+160.00 1.71 1.05 10.00 18.20 5.46 10.92 1.82 15.60 15.60 0.00 0.78 0.78 0.00 1.82 0.30
4+170.00 1.36 1.89 10.00 15.35 4.61 9.21 1.54 14.70 13.82 0.89 0.00 0.00 0.00 1.54 0.30
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
4+180.00 1.59 5.72 10.00 14.75 4.43 8.85 1.48 38.05 13.28 24.78 0.00 0.00 0.00 1.48 0.30
4+200.00 0.00 28.40 20.00 7.95 2.39 4.77 0.80 341.20 7.16 334.05 0.00 0.00 0.00 0.80 0.30
4+220.00 0.65 4.32 20.00 3.25 0.98 1.95 0.33 327.20 2.93 324.28 0.00 0.00 0.00 0.33 0.30
4+240.00 3.20 0.08 20.00 38.50 11.55 23.10 3.85 44.00 34.65 9.35 0.00 0.00 0.00 3.85 0.30
4+250.00 6.67 0.00 10.00 49.35 14.81 29.61 4.94 0.20 0.20 0.00 44.22 44.22 0.00 4.94 0.30
4+260.00 4.08 2.00 10.00 53.75 16.13 32.25 5.38 5.00 5.00 0.00 43.38 43.38 0.00 5.38 0.30
4+280.00 2.14 3.51 20.00 62.20 18.66 37.32 6.22 55.10 55.10 0.00 0.88 0.88 0.00 6.22 0.30
4+300.00 9.77 6.35 20.00 119.10 35.73 71.46 11.91 98.60 98.60 0.00 8.59 8.59 0.00 11.91 0.30
4+320.00 8.33 0.00 20.00 181.00 54.30 108.60 18.10 31.75 31.75 0.00 131.15 131.15 0.00 18.10 0.30
4+340.00 4.19 0.39 20.00 125.20 37.56 75.12 12.52 1.95 1.95 0.00 110.73 110.73 0.00 12.52 0.30
4+350.00 2.52 2.58 10.00 33.55 10.07 20.13 3.36 14.85 14.85 0.00 15.35 15.35 0.00 3.36 0.30
4+360.00 5.30 0.51 10.00 39.10 11.73 23.46 3.91 15.45 15.45 0.00 19.74 19.74 0.00 3.91 0.30
4+370.00 3.58 3.54 10.00 44.40 13.32 26.64 4.44 20.25 20.25 0.00 19.71 19.71 0.00 4.44 0.30
4+380.00 0.00 22.81 10.00 8.95 2.69 5.37 0.90 131.75 8.06 123.70 0.00 0.00 0.00 0.90 0.30
4+390.00 0.00 19.26 10.00 0.00 0.00 0.00 0.00 210.35 0.00 210.35 0.00 0.00 0.00 0.00 0.30
4+400.00 0.00 9.95 10.00 0.00 0.00 0.00 0.00 146.05 0.00 146.05 0.00 0.00 0.00 0.00 0.30
4+410.00 11.35 0.00 10.00 28.38 8.51 17.03 2.84 24.88 24.88 0.00 0.66 0.66 0.00 2.84 0.30
4+420.00 37.34 0.00 10.00 243.45 73.04 146.07 24.35 0.00 0.00 0.00 219.11 219.11 0.00 24.35 0.30
4+440.00 14.91 0.00 20.00 522.50 156.75 313.50 52.25 0.00 0.00 0.00 470.25 470.25 0.00 52.25 0.30
4+450.00 8.14 0.69 10.00 115.25 34.58 69.15 11.53 1.73 1.73 0.00 102.00 102.00 0.00 11.53 0.30
4+460.00 0.53 6.77 10.00 43.35 13.01 26.01 4.34 37.30 37.30 0.00 1.72 1.72 0.00 4.34 0.30
4+470.00 0.44 10.17 10.00 4.85 1.46 2.91 0.49 84.70 4.37 80.34 0.00 0.00 0.00 0.49 0.30
4+480.00 0.00 19.25 10.00 1.10 0.33 0.66 0.11 147.10 0.99 146.11 0.00 0.00 0.00 0.11 0.30
4+490.00 0.00 18.55 10.00 0.00 0.00 0.00 0.00 189.00 0.00 189.00 0.00 0.00 0.00 0.00 0.30
4+500.00 0.00 11.20 10.00 0.00 0.00 0.00 0.00 148.75 0.00 148.75 0.00 0.00 0.00 0.00 0.30
4+520.00 0.00 9.14 20.00 0.00 0.00 0.00 0.00 203.40 0.00 203.40 0.00 0.00 0.00 0.00 0.30
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
4+540.00 0.00 10.15 20.00 0.00 0.00 0.00 0.00 192.90 0.00 192.90 0.00 0.00 0.00 0.00 0.30
4+560.00 0.00 6.70 20.00 0.00 0.00 0.00 0.00 168.50 0.00 168.50 0.00 0.00 0.00 0.00 0.30
4+570.00 0.00 4.32 10.00 0.00 0.00 0.00 0.00 55.10 0.00 55.10 0.00 0.00 0.00 0.00 0.30
4+580.00 0.00 4.20 10.00 0.00 0.00 0.00 0.00 42.60 0.00 42.60 0.00 0.00 0.00 0.00 0.30
4+590.00 0.22 5.04 10.00 0.55 0.17 0.33 0.06 46.20 0.50 45.71 0.00 0.00 0.00 0.06 0.30
4+600.00 0.56 4.72 10.00 3.90 1.17 2.34 0.39 48.80 3.51 45.29 0.00 0.00 0.00 0.39 0.30
4+620.00 0.00 19.85 20.00 2.80 0.84 1.68 0.28 245.70 2.52 243.18 0.00 0.00 0.00 0.28 0.30
4+630.00 0.00 15.83 10.00 0.00 0.00 0.00 0.00 178.40 0.00 178.40 0.00 0.00 0.00 0.00 0.30
4+640.00 2.34 7.39 10.00 5.85 1.76 3.51 0.59 116.10 5.27 110.84 0.00 0.00 0.00 0.59 0.30
4+650.00 9.45 0.00 10.00 58.95 17.69 35.37 5.90 18.48 18.48 0.00 34.58 34.58 0.00 5.90 0.30
4+660.00 17.71 0.00 10.00 135.80 40.74 81.48 13.58 0.00 0.00 0.00 122.22 122.22 0.00 13.58 0.30
4+670.00 13.00 0.00 10.00 153.55 46.07 92.13 15.36 0.00 0.00 0.00 138.20 138.20 0.00 15.36 0.30
4+680.00 7.08 2.35 10.00 100.40 30.12 60.24 10.04 5.88 5.88 0.00 84.49 84.49 0.00 10.04 0.30
4+700.00 19.31 0.00 20.00 263.90 79.17 158.34 26.39 11.75 11.75 0.00 225.76 225.76 0.00 26.39 0.30
4+710.00 18.78 0.00 10.00 190.45 57.14 114.27 19.05 0.00 0.00 0.00 171.41 171.41 0.00 19.05 0.30
4+720.00 28.69 0.00 10.00 237.35 71.21 142.41 23.74 0.00 0.00 0.00 213.62 213.62 0.00 23.74 0.30
4+740.00 14.52 0.00 20.00 432.10 129.63 259.26 43.21 0.00 0.00 0.00 388.89 388.89 0.00 43.21 0.30
4+750.00 13.17 0.00 10.00 138.45 41.54 83.07 13.85 0.00 0.00 0.00 124.61 124.61 0.00 13.85 0.30
4+760.00 14.86 0.00 10.00 140.15 42.05 84.09 14.02 0.00 0.00 0.00 126.14 126.14 0.00 14.02 0.30
4+780.00 12.39 0.36 20.00 272.50 81.75 163.50 27.25 1.80 1.80 0.00 243.45 243.45 0.00 27.25 0.30
4+790.00 8.24 1.95 10.00 103.15 30.95 61.89 10.32 11.55 11.55 0.00 81.29 81.29 0.00 10.32 0.30
4+800.00 1.70 4.66 10.00 49.70 14.91 29.82 4.97 33.05 33.05 0.00 11.68 11.68 0.00 4.97 0.30
4+820.00 1.13 3.76 20.00 28.30 8.49 16.98 2.83 84.20 25.47 58.73 0.00 0.00 0.00 2.83 0.30
4+830.00 0.31 9.02 10.00 7.20 2.16 4.32 0.72 63.90 6.48 57.42 0.00 0.00 0.00 0.72 0.30
4+840.00 0.00 14.02 10.00 0.78 0.23 0.47 0.08 115.20 0.70 114.50 0.00 0.00 0.00 0.08 0.30
4+860.00 0.71 4.55 20.00 3.55 2.84 0.71 0.00 185.70 3.55 182.15 0.00 0.00 0.00 0.00 0.80
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
4+880.00 1.99 0.75 20.00 27.00 21.60 5.40 0.00 53.00 27.00 26.00 0.00 0.00 0.00 0.00 0.80
4+900.00 3.72 0.00 20.00 57.10 45.68 11.42 0.00 3.75 3.75 0.00 53.35 53.35 0.00 0.00 0.80
4+910.00 2.61 0.00 10.00 31.65 25.32 6.33 0.00 0.00 0.00 0.00 31.65 31.65 0.00 0.00 0.80
4+920.00 3.27 0.00 10.00 29.40 23.52 5.88 0.00 0.00 0.00 0.00 29.40 29.40 0.00 0.00 0.80
4+940.00 3.14 0.15 20.00 64.10 51.28 12.82 0.00 0.75 0.75 0.00 63.35 63.35 0.00 0.00 0.80
4+960.00 1.71 0.90 20.00 48.50 38.80 9.70 0.00 10.50 10.50 0.00 38.00 38.00 0.00 0.00 0.80
4+980.00 3.72 2.34 20.00 54.30 43.44 10.86 0.00 32.40 32.40 0.00 21.90 21.90 0.00 0.00 0.80
5+000.00 7.69 1.11 20.00 114.10 91.28 22.82 0.00 34.50 34.50 0.00 79.60 79.60 0.00 0.00 0.80
5+020.00 8.17 4.52 20.00 158.60 126.88 31.72 0.00 56.30 56.30 0.00 102.30 102.30 0.00 0.00 0.80
5+030.00 9.11 1.66 10.00 86.40 69.12 17.28 0.00 30.90 30.90 0.00 55.50 55.50 0.00 0.00 0.80
5+040.00 8.21 0.00 10.00 86.60 69.28 17.32 0.00 4.15 4.15 0.00 82.45 82.45 0.00 0.00 0.80
5+060.00 5.33 1.47 20.00 135.40 108.32 27.08 0.00 7.35 7.35 0.00 128.05 128.05 0.00 0.00 0.80
5+070.00 1.41 5.95 10.00 33.70 26.96 6.74 0.00 37.10 33.70 3.40 0.00 0.00 0.00 0.00 0.80
5+080.00 0.57 5.73 10.00 9.90 7.92 1.98 0.00 58.40 9.90 48.50 0.00 0.00 0.00 0.00 0.80
5+100.00 2.50 5.70 20.00 30.70 24.56 6.14 0.00 114.30 30.70 83.60 0.00 0.00 0.00 0.00 0.80
5+110.00 15.64 0.00 10.00 90.70 72.56 18.14 0.00 14.25 14.25 0.00 76.45 76.45 0.00 0.00 0.80
5+120.00 25.75 0.00 10.00 206.95 165.56 41.39 0.00 0.00 0.00 0.00 206.95 206.95 0.00 0.00 0.80
5+140.00 8.96 1.61 20.00 347.10 277.68 69.42 0.00 8.05 8.05 0.00 339.05 339.05 0.00 0.00 0.80
5+160.00 0.00 8.73 20.00 44.80 35.84 8.96 0.00 103.40 44.80 58.60 0.00 0.00 0.00 0.00 0.80
5+170.00 0.00 12.48 10.00 0.00 0.00 0.00 0.00 106.05 0.00 106.05 0.00 0.00 0.00 0.00 0.80
5+180.00 0.00 14.69 10.00 0.00 0.00 0.00 0.00 135.85 0.00 135.85 0.00 0.00 0.00 0.00 0.80
5+200.00 0.00 9.63 20.00 0.00 0.00 0.00 0.00 243.20 0.00 243.20 0.00 0.00 0.00 0.00 0.80
5+220.00 0.00 23.57 20.00 0.00 0.00 0.00 0.00 332.00 0.00 332.00 0.00 0.00 0.00 0.00 0.80
5+230.00 0.00 4.24 10.00 0.00 0.00 0.00 0.00 139.05 0.00 139.05 0.00 0.00 0.00 0.00 0.80
5+240.00 0.39 6.93 10.00 0.98 0.78 0.20 0.00 55.85 0.98 54.88 0.00 0.00 0.00 0.00 0.80
5+260.00 0.24 4.41 20.00 6.30 5.04 1.26 0.00 113.40 6.30 107.10 0.00 0.00 0.00 0.00 0.80
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
5+280.00 0.00 9.16 20.00 1.20 0.96 0.24 0.00 135.70 1.20 134.50 0.00 0.00 0.00 0.00 0.80
5+300.00 0.19 6.46 20.00 0.95 0.76 0.19 0.00 156.20 0.95 155.25 0.00 0.00 0.00 0.00 0.80
5+320.00 2.78 2.41 20.00 29.70 23.76 5.94 0.00 88.70 29.70 59.00 0.00 0.00 0.00 0.00 0.80
5+340.00 3.21 1.79 20.00 59.90 47.92 11.98 0.00 42.00 42.00 0.00 17.90 17.90 0.00 0.00 0.80
5+350.00 7.92 0.69 10.00 55.65 44.52 11.13 0.00 12.40 12.40 0.00 43.25 43.25 0.00 0.00 0.80
5+360.00 9.62 0.39 10.00 87.70 70.16 17.54 0.00 5.40 5.40 0.00 82.30 82.30 0.00 0.00 0.80
5+380.00 13.28 3.32 20.00 229.00 183.20 45.80 0.00 37.10 37.10 0.00 191.90 191.90 0.00 0.00 0.80
5+400.00 7.86 3.92 20.00 211.40 169.12 42.28 0.00 72.40 72.40 0.00 139.00 139.00 0.00 0.00 0.80
5+410.00 6.56 8.57 10.00 72.10 14.42 43.26 7.21 62.45 57.68 4.77 0.00 0.00 0.00 7.21 0.20
5+420.00 6.44 2.13 10.00 65.00 13.00 39.00 6.50 53.50 52.00 1.50 0.00 0.00 0.00 6.50 0.20
5+440.00 0.00 3.41 20.00 32.20 6.44 19.32 3.22 55.40 25.76 29.64 0.00 0.00 0.00 3.22 0.20
5+450.00 0.92 2.59 10.00 2.30 0.46 1.38 0.23 30.00 1.84 28.16 0.00 0.00 0.00 0.23 0.20
5+460.00 1.09 3.05 10.00 10.05 2.01 6.03 1.01 28.20 8.04 20.16 0.00 0.00 0.00 1.01 0.20
5+480.00 1.24 3.14 20.00 23.30 4.66 13.98 2.33 61.90 18.64 43.26 0.00 0.00 0.00 2.33 0.20
5+500.00 2.65 0.00 20.00 38.90 7.78 23.34 3.89 15.70 15.70 0.00 15.42 15.42 0.00 3.89 0.20
5+510.00 2.79 0.00 10.00 27.20 5.44 16.32 2.72 0.00 0.00 0.00 21.76 21.76 0.00 2.72 0.20
5+520.00 1.69 0.11 10.00 22.40 4.48 13.44 2.24 0.28 0.28 0.00 17.65 17.65 0.00 2.24 0.20
5+530.00 1.54 0.79 10.00 16.15 3.23 9.69 1.62 4.50 4.50 0.00 8.42 8.42 0.00 1.62 0.20
5+540.00 1.05 0.02 10.00 12.95 2.59 7.77 1.30 4.05 4.05 0.00 6.31 6.31 0.00 1.30 0.20
5+560.00 0.00 1.68 20.00 5.25 1.05 3.15 0.53 17.00 4.20 12.80 0.00 0.00 0.00 0.53 0.20
5+570.00 0.00 1.87 10.00 0.00 0.00 0.00 0.00 17.75 0.00 17.75 0.00 0.00 0.00 0.00 0.20
5+580.00 0.00 1.38 10.00 0.00 0.00 0.00 0.00 16.25 0.00 16.25 0.00 0.00 0.00 0.00 0.20
5+600.00 0.84 1.51 20.00 4.20 0.84 2.52 0.42 28.90 3.36 25.54 0.00 0.00 0.00 0.42 0.20
5+610.00 4.15 0.00 10.00 24.95 4.99 14.97 2.50 3.78 3.78 0.00 16.19 16.19 0.00 2.50 0.20
5+620.00 6.24 0.00 10.00 51.95 10.39 31.17 5.20 0.00 0.00 0.00 41.56 41.56 0.00 5.20 0.20
5+630.00 2.61 0.00 10.00 44.25 8.85 26.55 4.43 0.00 0.00 0.00 35.40 35.40 0.00 4.43 0.20
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
5+640.00 0.24 0.29 10.00 14.25 2.85 8.55 1.43 0.73 0.73 0.00 10.68 10.68 0.00 1.43 0.20
5+660.00 0.00 4.29 20.00 1.20 1.08 0.12 0.00 45.80 1.20 44.60 0.00 0.00 0.00 0.00 0.90
5+680.00 0.00 6.63 20.00 0.00 0.00 0.00 0.00 109.20 0.00 109.20 0.00 0.00 0.00 0.00 0.90
5+700.00 0.00 0.83 20.00 0.00 0.00 0.00 0.00 74.60 0.00 74.60 0.00 0.00 0.00 0.00 0.90
5+720.00 0.96 0.37 20.00 4.80 4.32 0.48 0.00 12.00 4.80 7.20 0.00 0.00 0.00 0.00 0.90
5+730.00 1.10 0.00 10.00 10.30 9.27 1.03 0.00 0.93 0.93 0.00 9.38 9.38 0.00 0.00 0.90
5+740.00 0.00 3.05 10.00 2.75 2.48 0.28 0.00 7.63 2.75 4.88 0.00 0.00 0.00 0.00 0.90
5+760.00 1.90 0.75 20.00 9.50 8.55 0.95 0.00 38.00 9.50 28.50 0.00 0.00 0.00 0.00 0.90
5+780.00 7.31 0.00 20.00 92.10 82.89 9.21 0.00 3.75 3.75 0.00 88.35 88.35 0.00 0.00 0.90
5+790.00 8.06 0.00 10.00 76.85 69.17 7.69 0.00 0.00 0.00 0.00 76.85 76.85 0.00 0.00 0.90
5+800.00 13.16 0.00 10.00 106.10 95.49 10.61 0.00 0.00 0.00 0.00 106.10 106.10 0.00 0.00 0.90
5+820.00 3.13 0.00 20.00 162.90 146.61 16.29 0.00 0.00 0.00 0.00 162.90 162.90 0.00 0.00 0.90
5+830.00 3.24 0.00 10.00 31.85 28.67 3.19 0.00 0.00 0.00 0.00 31.85 31.85 0.00 0.00 0.90
5+840.00 2.97 0.00 10.00 31.05 27.95 3.11 0.00 0.00 0.00 0.00 31.05 31.05 0.00 0.00 0.90
5+860.00 1.91 0.00 20.00 48.80 43.92 4.88 0.00 0.00 0.00 0.00 48.80 48.80 0.00 0.00 0.90
5+880.00 0.00 2.13 20.00 9.55 8.60 0.96 0.00 10.65 9.55 1.10 0.00 0.00 0.00 0.00 0.90
5+900.00 0.00 29.02 20.00 0.00 0.00 0.00 0.00 311.50 0.00 311.50 0.00 0.00 0.00 0.00 0.90
5+920.00 0.60 2.26 20.00 3.00 2.70 0.30 0.00 312.80 3.00 309.80 0.00 0.00 0.00 0.00 0.90
5+930.00 0.00 1.82 10.00 1.50 1.35 0.15 0.00 20.40 1.50 18.90 0.00 0.00 0.00 0.00 0.90
5+940.00 0.00 5.58 10.00 0.00 0.00 0.00 0.00 37.00 0.00 37.00 0.00 0.00 0.00 0.00 0.90
5+960.00 3.09 0.93 20.00 15.45 13.91 1.55 0.00 65.10 15.45 49.65 0.00 0.00 0.00 0.00 0.90
5+970.00 1.96 4.88 10.00 25.25 22.73 2.53 0.00 29.05 25.25 3.80 0.00 0.00 0.00 0.00 0.90
5+980.00 3.19 0.00 10.00 25.75 23.18 2.58 0.00 12.20 12.20 0.00 13.55 13.55 0.00 0.00 0.90
6+000.00 2.57 1.77 20.00 57.60 51.84 5.76 0.00 8.85 8.85 0.00 48.75 48.75 0.00 0.00 0.90
6+020.00 5.32 0.00 20.00 78.90 71.01 7.89 0.00 8.85 8.85 0.00 70.05 70.05 0.00 0.00 0.90
6+040.00 3.97 2.11 20.00 92.90 83.61 9.29 0.00 10.55 10.55 0.00 82.35 82.35 0.00 0.00 0.90
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
6+060.00 21.14 0.00 20.00 251.10 225.99 25.11 0.00 10.55 10.55 0.00 240.55 240.55 0.00 0.00 0.90
6+080.00 7.68 0.91 20.00 288.20 259.38 28.82 0.00 4.55 4.55 0.00 283.65 283.65 0.00 0.00 0.90
6+100.00 0.00 5.23 20.00 38.40 34.56 3.84 0.00 61.40 38.40 23.00 0.00 0.00 0.00 0.00 0.90
6+110.00 10.46 0.00 10.00 26.15 23.54 2.62 0.00 13.08 13.08 0.00 13.08 13.08 0.00 0.00 0.90
6+120.00 19.39 0.00 10.00 149.25 134.33 14.93 0.00 0.00 0.00 0.00 149.25 149.25 0.00 0.00 0.90
6+130.00 26.02 0.00 10.00 227.05 204.35 22.71 0.00 0.00 0.00 0.00 227.05 227.05 0.00 0.00 0.90
6+140.00 6.40 0.00 10.00 162.10 145.89 16.21 0.00 0.00 0.00 0.00 162.10 162.10 0.00 0.00 0.90
6+150.00 1.14 2.41 10.00 37.70 33.93 3.77 0.00 6.03 6.03 0.00 31.68 31.68 0.00 0.00 0.90
6+160.00 4.43 2.29 10.00 27.85 25.07 2.79 0.00 23.50 23.50 0.00 4.35 4.35 0.00 0.00 0.90
6+170.00 2.20 1.83 10.00 33.15 29.84 3.32 0.00 20.60 20.60 0.00 12.55 12.55 0.00 0.00 0.90
6+180.00 5.91 0.00 10.00 40.55 36.50 4.06 0.00 4.58 4.58 0.00 35.98 35.98 0.00 0.00 0.90
6+200.00 14.01 0.00 20.00 199.20 179.28 19.92 0.00 0.00 0.00 0.00 199.20 199.20 0.00 0.00 0.90
6+210.00 5.72 0.00 10.00 98.65 88.79 9.87 0.00 0.00 0.00 0.00 98.65 98.65 0.00 0.00 0.90
6+220.00 5.14 0.00 10.00 54.30 48.87 5.43 0.00 0.00 0.00 0.00 54.30 54.30 0.00 0.00 0.90
6+240.00 3.30 0.00 20.00 84.40 75.96 8.44 0.00 0.00 0.00 0.00 84.40 84.40 0.00 0.00 0.90
6+250.00 7.55 0.00 10.00 54.25 48.83 5.43 0.00 0.00 0.00 0.00 54.25 54.25 0.00 0.00 0.90
6+260.00 7.32 0.00 10.00 74.35 66.92 7.44 0.00 0.00 0.00 0.00 74.35 74.35 0.00 0.00 0.90
6+280.00 4.74 0.00 20.00 120.60 108.54 12.06 0.00 0.00 0.00 0.00 120.60 120.60 0.00 0.00 0.90
6+300.00 8.31 0.00 20.00 130.50 117.45 13.05 0.00 0.00 0.00 0.00 130.50 130.50 0.00 0.00 0.90
6+310.00 5.49 0.00 10.00 69.00 62.10 6.90 0.00 0.00 0.00 0.00 69.00 69.00 0.00 0.00 0.90
6+320.00 2.69 0.00 10.00 40.90 36.81 4.09 0.00 0.00 0.00 0.00 40.90 40.90 0.00 0.00 0.90
6+340.00 2.59 0.00 20.00 52.80 47.52 5.28 0.00 0.00 0.00 0.00 52.80 52.80 0.00 0.00 0.90
6+360.00 3.66 0.00 20.00 62.50 56.25 6.25 0.00 0.00 0.00 0.00 62.50 62.50 0.00 0.00 0.90
6+380.00 4.63 0.00 20.00 82.90 74.61 8.29 0.00 0.00 0.00 0.00 82.90 82.90 0.00 0.00 0.90
6+390.00 8.99 0.00 10.00 68.10 61.29 6.81 0.00 0.00 0.00 0.00 68.10 68.10 0.00 0.00 0.90
6+400.00 10.69 0.00 10.00 98.40 88.56 9.84 0.00 0.00 0.00 0.00 98.40 98.40 0.00 0.00 0.90
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
6+420.00 4.25 0.02 20.00 149.40 134.46 14.94 0.00 0.10 0.10 0.00 149.30 149.30 0.00 0.00 0.90
6+440.00 3.06 0.11 20.00 73.10 65.79 7.31 0.00 1.30 1.30 0.00 71.80 71.80 0.00 0.00 0.90
6+460.00 5.03 0.26 20.00 80.90 72.81 8.09 0.00 3.70 3.70 0.00 77.20 77.20 0.00 0.00 0.90
6+470.00 4.88 0.36 10.00 49.55 44.60 4.96 0.00 3.10 3.10 0.00 46.45 46.45 0.00 0.00 0.90
6+480.00 3.95 0.58 10.00 44.15 39.74 4.42 0.00 4.70 4.70 0.00 39.45 39.45 0.00 0.00 0.90
6+500.00 2.44 1.31 20.00 63.90 57.51 6.39 0.00 18.90 18.90 0.00 45.00 45.00 0.00 0.00 0.90
6+520.00 0.00 4.33 20.00 12.20 10.98 1.22 0.00 56.40 12.20 44.20 0.00 0.00 0.00 0.00 0.90
6+530.00 0.00 4.83 10.00 0.00 0.00 0.00 0.00 45.80 0.00 45.80 0.00 0.00 0.00 0.00 0.90
6+540.00 0.00 4.88 10.00 0.00 0.00 0.00 0.00 48.55 0.00 48.55 0.00 0.00 0.00 0.00 0.90
6+560.00 0.00 3.72 20.00 0.00 0.00 0.00 0.00 86.00 0.00 86.00 0.00 0.00 0.00 0.00 0.90
6+580.00 0.00 5.88 20.00 0.00 0.00 0.00 0.00 96.00 0.00 96.00 0.00 0.00 0.00 0.00 0.90
6+600.00 0.00 13.38 20.00 0.00 0.00 0.00 0.00 192.60 0.00 192.60 0.00 0.00 0.00 0.00 0.90
6+610.00 0.00 3.73 10.00 0.00 0.00 0.00 0.00 85.55 0.00 85.55 0.00 0.00 0.00 0.00 0.90
6+620.00 19.12 0.00 10.00 47.80 43.02 4.78 0.00 9.33 9.33 0.00 38.48 38.48 0.00 0.00 0.90
6+630.00 22.22 0.00 10.00 206.70 186.03 20.67 0.00 0.00 0.00 0.00 206.70 206.70 0.00 0.00 0.90
6+640.00 7.78 0.08 10.00 150.00 90.00 60.00 0.00 0.20 0.20 0.00 149.80 149.80 0.00 0.00 0.60
6+650.00 7.69 3.27 10.00 77.35 46.41 30.94 0.00 16.75 16.75 0.00 60.60 60.60 0.00 0.00 0.60
6+660.00 3.70 1.61 10.00 56.95 34.17 22.78 0.00 24.40 24.40 0.00 32.55 32.55 0.00 0.00 0.60
6+680.00 0.00 3.44 20.00 18.50 11.10 7.40 0.00 50.50 18.50 32.00 0.00 0.00 0.00 0.00 0.60
6+700.00 0.00 6.35 20.00 0.00 0.00 0.00 0.00 97.90 0.00 97.90 0.00 0.00 0.00 0.00 0.60
6+720.00 0.00 5.10 20.00 0.00 0.00 0.00 0.00 114.50 0.00 114.50 0.00 0.00 0.00 0.00 0.60
6+740.00 0.00 4.01 20.00 0.00 0.00 0.00 0.00 91.10 0.00 91.10 0.00 0.00 0.00 0.00 0.60
6+760.00 0.31 2.05 20.00 1.55 0.93 0.62 0.00 60.60 1.55 59.05 0.00 0.00 0.00 0.00 0.60
6+770.00 2.95 1.43 10.00 16.30 9.78 6.52 0.00 17.40 16.30 1.10 0.00 0.00 0.00 0.00 0.60
6+780.00 5.23 0.44 10.00 40.90 24.54 16.36 0.00 9.35 9.35 0.00 31.55 31.55 0.00 0.00 0.60
6+800.00 5.56 0.00 20.00 107.90 64.74 43.16 0.00 2.20 2.20 0.00 105.70 105.70 0.00 0.00 0.60
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
6+820.00 5.22 0.00 20.00 107.80 64.68 43.12 0.00 0.00 0.00 0.00 107.80 107.80 0.00 0.00 0.60
6+840.00 6.28 0.00 20.00 115.00 69.00 46.00 0.00 0.00 0.00 0.00 115.00 115.00 0.00 0.00 0.60
6+850.00 4.89 0.00 10.00 55.85 33.51 22.34 0.00 0.00 0.00 0.00 55.85 55.85 0.00 0.00 0.60
6+860.00 1.60 0.81 10.00 32.45 19.47 12.98 0.00 2.03 2.03 0.00 30.43 30.43 0.00 0.00 0.60
6+880.00 1.71 0.00 20.00 33.10 19.86 13.24 0.00 4.05 4.05 0.00 29.05 29.05 0.00 0.00 0.60
6+890.00 3.80 0.00 10.00 27.55 16.53 11.02 0.00 0.00 0.00 0.00 27.55 27.55 0.00 0.00 0.60
6+900.00 5.87 0.00 10.00 48.35 29.01 19.34 0.00 0.00 0.00 0.00 48.35 48.35 0.00 0.00 0.60
6+910.00 8.38 0.00 10.00 71.25 42.75 28.50 0.00 0.00 0.00 0.00 71.25 71.25 0.00 0.00 0.60
6+920.00 3.82 0.00 10.00 61.00 36.60 24.40 0.00 0.00 0.00 0.00 61.00 61.00 0.00 0.00 0.60
6+930.00 2.20 0.28 10.00 30.10 18.06 12.04 0.00 0.70 0.70 0.00 29.40 29.40 0.00 0.00 0.60
6+940.00 4.60 0.00 10.00 34.00 20.40 13.60 0.00 0.70 0.70 0.00 33.30 33.30 0.00 0.00 0.60
6+960.00 9.34 0.00 20.00 139.40 83.64 55.76 0.00 0.00 0.00 0.00 139.40 139.40 0.00 0.00 0.60
6+980.00 12.92 0.00 20.00 222.60 133.56 89.04 0.00 0.00 0.00 0.00 222.60 222.60 0.00 0.00 0.60
7+000.00 12.63 0.00 20.00 255.50 153.30 102.20 0.00 0.00 0.00 0.00 255.50 255.50 0.00 0.00 0.60
7+010.00 13.53 0.00 10.00 130.80 78.48 52.32 0.00 0.00 0.00 0.00 130.80 130.80 0.00 0.00 0.60
7+020.00 10.91 0.00 10.00 122.20 73.32 48.88 0.00 0.00 0.00 0.00 122.20 122.20 0.00 0.00 0.60
7+030.00 9.52 0.00 10.00 102.15 61.29 40.86 0.00 0.00 0.00 0.00 102.15 102.15 0.00 0.00 0.60
7+040.00 9.10 0.00 10.00 93.10 55.86 37.24 0.00 0.00 0.00 0.00 93.10 93.10 0.00 0.00 0.60
7+050.00 9.76 0.00 10.00 94.30 56.58 37.72 0.00 0.00 0.00 0.00 94.30 94.30 0.00 0.00 0.60
7+060.00 9.09 0.00 10.00 94.25 56.55 37.70 0.00 0.00 0.00 0.00 94.25 94.25 0.00 0.00 0.60
7+080.00 6.46 0.00 20.00 155.50 93.30 62.20 0.00 0.00 0.00 0.00 155.50 155.50 0.00 0.00 0.60
7+090.00 6.32 0.00 10.00 63.90 38.34 25.56 0.00 0.00 0.00 0.00 63.90 63.90 0.00 0.00 0.60
7+100.00 8.16 0.00 10.00 72.40 43.44 28.96 0.00 0.00 0.00 0.00 72.40 72.40 0.00 0.00 0.60
7+120.00 9.49 0.00 20.00 176.50 105.90 70.60 0.00 0.00 0.00 0.00 176.50 176.50 0.00 0.00 0.60
7+140.00 8.31 0.00 20.00 178.00 106.80 71.20 0.00 0.00 0.00 0.00 178.00 178.00 0.00 0.00 0.60
7+150.00 7.86 0.00 10.00 80.85 48.51 32.34 0.00 0.00 0.00 0.00 80.85 80.85 0.00 0.00 0.60
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
7+160.00 8.01 0.00 10.00 79.35 47.61 31.74 0.00 0.00 0.00 0.00 79.35 79.35 0.00 0.00 0.60
7+170.00 8.79 0.00 10.00 84.00 50.40 33.60 0.00 0.00 0.00 0.00 84.00 84.00 0.00 0.00 0.60
7+180.00 8.45 0.00 10.00 86.20 51.72 34.48 0.00 0.00 0.00 0.00 86.20 86.20 0.00 0.00 0.60
7+190.00 8.42 0.00 10.00 84.35 50.61 33.74 0.00 0.00 0.00 0.00 84.35 84.35 0.00 0.00 0.60
7+200.00 9.23 0.00 10.00 88.25 52.95 35.30 0.00 0.00 0.00 0.00 88.25 88.25 0.00 0.00 0.60
7+220.00 8.35 0.00 20.00 175.80 105.48 70.32 0.00 0.00 0.00 0.00 175.80 175.80 0.00 0.00 0.60
7+230.00 3.46 1.46 10.00 59.05 35.43 23.62 0.00 3.65 3.65 0.00 55.40 55.40 0.00 0.00 0.60
7+240.00 7.34 0.00 10.00 54.00 32.40 21.60 0.00 3.65 3.65 0.00 50.35 50.35 0.00 0.00 0.60
7+260.00 5.39 0.04 20.00 127.30 76.38 50.92 0.00 0.20 0.20 0.00 127.10 127.10 0.00 0.00 0.60
7+280.00 7.98 0.00 20.00 133.70 80.22 53.48 0.00 0.20 0.20 0.00 133.50 133.50 0.00 0.00 0.60
7+300.00 4.39 0.24 20.00 123.70 74.22 49.48 0.00 1.20 1.20 0.00 122.50 122.50 0.00 0.00 0.60
7+320.00 9.96 0.00 20.00 143.50 86.10 57.40 0.00 1.20 1.20 0.00 142.30 142.30 0.00 0.00 0.60
7+330.00 3.48 0.00 10.00 67.20 40.32 26.88 0.00 0.00 0.00 0.00 67.20 67.20 0.00 0.00 0.60
7+340.00 6.83 0.00 10.00 51.55 30.93 20.62 0.00 0.00 0.00 0.00 51.55 51.55 0.00 0.00 0.60
7+360.00 3.26 2.29 20.00 100.90 40.36 60.54 0.00 11.45 11.45 0.00 89.45 89.45 0.00 0.00 0.40
7+370.00 2.93 3.36 10.00 30.95 12.38 18.57 0.00 28.25 28.25 0.00 2.70 2.70 0.00 0.00 0.40
7+380.00 0.95 1.12 10.00 19.40 7.76 11.64 0.00 22.40 19.40 3.00 0.00 0.00 0.00 0.00 0.40
7+390.00 0.45 0.79 10.00 7.00 2.80 4.20 0.00 9.55 7.00 2.55 0.00 0.00 0.00 0.00 0.40
7+400.00 0.98 0.40 10.00 7.15 2.86 4.29 0.00 5.95 5.95 0.00 1.20 1.20 0.00 0.00 0.40
7+410.00 3.79 0.08 10.00 23.85 9.54 14.31 0.00 2.40 2.40 0.00 21.45 21.45 0.00 0.00 0.40
7+420.00 4.27 0.00 10.00 40.30 16.12 24.18 0.00 0.20 0.20 0.00 40.10 40.10 0.00 0.00 0.40
7+440.00 8.90 0.00 20.00 131.70 52.68 79.02 0.00 0.00 0.00 0.00 131.70 131.70 0.00 0.00 0.40
7+460.00 4.19 0.00 20.00 130.90 52.36 78.54 0.00 0.00 0.00 0.00 130.90 130.90 0.00 0.00 0.40
7+480.00 4.18 0.08 20.00 83.70 33.48 50.22 0.00 0.40 0.40 0.00 83.30 83.30 0.00 0.00 0.40
7+490.00 2.36 0.00 10.00 32.70 13.08 19.62 0.00 0.20 0.20 0.00 32.50 32.50 0.00 0.00 0.40
7+500.00 3.70 0.00 10.00 30.30 12.12 18.18 0.00 0.00 0.00 0.00 30.30 30.30 0.00 0.00 0.40
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
7+520.00 6.95 0.00 20.00 106.50 42.60 63.90 0.00 0.00 0.00 0.00 106.50 106.50 0.00 0.00 0.40
7+530.00 1.65 0.01 10.00 43.00 17.20 25.80 0.00 0.03 0.03 0.00 42.98 42.98 0.00 0.00 0.40
7+540.00 1.68 2.80 10.00 16.65 6.66 9.99 0.00 14.05 14.05 0.00 2.60 2.60 0.00 0.00 0.40
7+560.00 0.00 9.45 20.00 8.40 3.36 5.04 0.00 122.50 8.40 114.10 0.00 0.00 0.00 0.00 0.40
7+580.00 3.15 1.99 20.00 15.75 6.30 9.45 0.00 114.40 15.75 98.65 0.00 0.00 0.00 0.00 0.40
7+600.00 2.66 0.00 20.00 58.10 23.24 34.86 0.00 9.95 9.95 0.00 48.15 48.15 0.00 0.00 0.40
7+620.00 5.95 0.00 20.00 86.10 34.44 51.66 0.00 0.00 0.00 0.00 86.10 86.10 0.00 0.00 0.40
7+630.00 9.71 0.00 10.00 78.30 31.32 46.98 0.00 0.00 0.00 0.00 78.30 78.30 0.00 0.00 0.40
7+640.00 3.54 0.00 10.00 66.25 26.50 39.75 0.00 0.00 0.00 0.00 66.25 66.25 0.00 0.00 0.40
7+650.00 6.07 0.00 10.00 48.05 19.22 28.83 0.00 0.00 0.00 0.00 48.05 48.05 0.00 0.00 0.40
7+660.00 8.96 0.00 10.00 75.15 30.06 45.09 0.00 0.00 0.00 0.00 75.15 75.15 0.00 0.00 0.40
7+680.00 2.75 0.95 20.00 117.10 46.84 70.26 0.00 4.75 4.75 0.00 112.35 112.35 0.00 0.00 0.40
7+700.00 0.28 2.50 20.00 30.30 12.12 18.18 0.00 34.50 30.30 4.20 0.00 0.00 0.00 0.00 0.40
7+710.00 0.00 3.14 10.00 0.70 0.28 0.42 0.00 28.20 0.70 27.50 0.00 0.00 0.00 0.00 0.40
7+720.00 1.50 1.88 10.00 3.75 1.50 2.25 0.00 25.10 3.75 21.35 0.00 0.00 0.00 0.00 0.40
7+740.00 3.07 0.25 20.00 45.70 18.28 27.42 0.00 21.30 21.30 0.00 24.40 24.40 0.00 0.00 0.40
7+750.00 1.94 0.00 10.00 25.05 10.02 15.03 0.00 0.63 0.63 0.00 24.43 24.43 0.00 0.00 0.40
7+760.00 3.12 0.00 10.00 25.30 10.12 15.18 0.00 0.00 0.00 0.00 25.30 25.30 0.00 0.00 0.40
7+780.00 5.22 0.00 20.00 83.40 33.36 50.04 0.00 0.00 0.00 0.00 83.40 83.40 0.00 0.00 0.40
7+800.00 9.42 0.00 20.00 146.40 58.56 87.84 0.00 0.00 0.00 0.00 146.40 146.40 0.00 0.00 0.40
7+820.00 7.87 0.00 20.00 172.90 69.16 103.74 0.00 0.00 0.00 0.00 172.90 172.90 0.00 0.00 0.40
7+840.00 11.54 0.00 20.00 194.10 77.64 116.46 0.00 0.00 0.00 0.00 194.10 194.10 0.00 0.00 0.40
7+860.00 3.12 0.00 20.00 146.60 58.64 87.96 0.00 0.00 0.00 0.00 146.60 146.60 0.00 0.00 0.40
7+880.00 7.43 0.00 20.00 105.50 42.20 63.30 0.00 0.00 0.00 0.00 105.50 105.50 0.00 0.00 0.40
7+900.00 3.96 1.78 20.00 113.90 45.56 68.34 0.00 8.90 8.90 0.00 105.00 105.00 0.00 0.00 0.40
7+910.00 4.25 0.27 10.00 41.05 16.42 24.63 0.00 10.25 10.25 0.00 30.80 30.80 0.00 0.00 0.40
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
7+920.00 5.79 0.00 10.00 50.20 20.08 30.12 0.00 0.68 0.68 0.00 49.53 49.53 0.00 0.00 0.40
7+940.00 0.57 0.22 20.00 63.60 25.44 38.16 0.00 1.10 1.10 0.00 62.50 62.50 0.00 0.00 0.40
7+950.00 2.17 0.29 10.00 13.70 5.48 8.22 0.00 2.55 2.55 0.00 11.15 11.15 0.00 0.00 0.40
7+960.00 0.94 0.76 10.00 15.55 6.22 9.33 0.00 5.25 5.25 0.00 10.30 10.30 0.00 0.00 0.40
7+980.00 0.00 5.34 20.00 4.70 1.88 2.82 0.00 61.00 4.70 56.30 0.00 0.00 0.00 0.00 0.40
8+000.00 0.00 8.50 20.00 0.00 0.00 0.00 0.00 138.40 0.00 138.40 0.00 0.00 0.00 0.00 0.40
8+010.00 0.00 13.75 10.00 0.00 0.00 0.00 0.00 111.25 0.00 111.25 0.00 0.00 0.00 0.00 0.40
8+020.00 0.00 14.81 10.00 0.00 0.00 0.00 0.00 142.80 0.00 142.80 0.00 0.00 0.00 0.00 0.40
8+040.00 0.00 16.83 20.00 0.00 0.00 0.00 0.00 316.40 0.00 316.40 0.00 0.00 0.00 0.00 0.40
8+060.00 0.00 7.25 20.00 0.00 0.00 0.00 0.00 240.80 0.00 240.80 0.00 0.00 0.00 0.00 0.40
8+080.00 0.00 6.77 20.00 0.00 0.00 0.00 0.00 140.20 0.00 140.20 0.00 0.00 0.00 0.00 0.40
8+090.00 0.00 10.62 10.00 0.00 0.00 0.00 0.00 86.95 0.00 86.95 0.00 0.00 0.00 0.00 0.40
8+100.00 0.00 11.43 10.00 0.00 0.00 0.00 0.00 110.25 0.00 110.25 0.00 0.00 0.00 0.00 0.40
8+120.00 0.00 17.73 20.00 0.00 0.00 0.00 0.00 291.60 0.00 291.60 0.00 0.00 0.00 0.00 0.40
8+130.00 0.00 18.31 10.00 0.00 0.00 0.00 0.00 180.20 0.00 180.20 0.00 0.00 0.00 0.00 0.40
8+140.00 0.00 16.95 10.00 0.00 0.00 0.00 0.00 176.30 0.00 176.30 0.00 0.00 0.00 0.00 0.40
8+150.00 0.00 13.59 10.00 0.00 0.00 0.00 0.00 152.70 0.00 152.70 0.00 0.00 0.00 0.00 0.40
8+160.00 0.00 10.27 10.00 0.00 0.00 0.00 0.00 119.30 0.00 119.30 0.00 0.00 0.00 0.00 0.40
8+180.00 0.00 7.77 20.00 0.00 0.00 0.00 0.00 180.40 0.00 180.40 0.00 0.00 0.00 0.00 0.40
8+200.00 0.00 6.18 20.00 0.00 0.00 0.00 0.00 139.50 0.00 139.50 0.00 0.00 0.00 0.00 0.40
8+220.00 0.00 3.34 20.00 0.00 0.00 0.00 0.00 95.20 0.00 95.20 0.00 0.00 0.00 0.00 0.40
8+240.00 3.12 0.00 20.00 15.60 6.24 9.36 0.00 16.70 15.60 1.10 0.00 0.00 0.00 0.00 0.40
8+260.00 7.43 0.00 20.00 105.50 42.20 63.30 0.00 0.00 0.00 0.00 105.50 105.50 0.00 0.00 0.40
8+280.00 8.98 0.00 20.00 164.10 65.64 98.46 0.00 0.00 0.00 0.00 164.10 164.10 0.00 0.00 0.40
8+290.00 10.22 0.00 10.00 96.00 38.40 57.60 0.00 0.00 0.00 0.00 96.00 96.00 0.00 0.00 0.40
8+300.00 8.55 0.00 10.00 93.85 37.54 56.31 0.00 0.00 0.00 0.00 93.85 93.85 0.00 0.00 0.40
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
8+310.00 1.45 1.14 10.00 50.00 20.00 30.00 0.00 2.85 2.85 0.00 47.15 47.15 0.00 0.00 0.40
8+320.00 0.11 0.47 10.00 7.80 3.12 4.68 0.00 8.05 7.80 0.25 0.00 0.00 0.00 0.00 0.40
8+340.00 0.00 2.23 20.00 0.55 0.22 0.33 0.00 27.00 0.55 26.45 0.00 0.00 0.00 0.00 0.40
8+360.00 0.00 3.37 20.00 0.00 0.00 0.00 0.00 56.00 0.00 56.00 0.00 0.00 0.00 0.00 0.40
8+370.00 0.00 5.58 10.00 0.00 0.00 0.00 0.00 44.75 0.00 44.75 0.00 0.00 0.00 0.00 0.40
8+380.00 0.00 4.93 10.00 0.00 0.00 0.00 0.00 52.55 0.00 52.55 0.00 0.00 0.00 0.00 0.40
8+400.00 0.00 4.38 20.00 0.00 0.00 0.00 0.00 93.10 0.00 93.10 0.00 0.00 0.00 0.00 0.40
8+410.00 0.36 2.08 10.00 0.90 0.36 0.54 0.00 32.30 0.90 31.40 0.00 0.00 0.00 0.00 0.40
8+420.00 0.50 2.58 10.00 4.30 1.72 2.58 0.00 23.30 4.30 19.00 0.00 0.00 0.00 0.00 0.40
8+440.00 0.00 2.75 20.00 2.50 1.00 1.50 0.00 53.30 2.50 50.80 0.00 0.00 0.00 0.00 0.40
8+450.00 0.33 0.85 10.00 0.83 0.33 0.50 0.00 18.00 0.83 17.18 0.00 0.00 0.00 0.00 0.40
8+460.00 1.29 0.02 10.00 8.10 3.24 4.86 0.00 4.35 4.35 0.00 3.75 3.75 0.00 0.00 0.40
8+480.00 6.72 0.00 20.00 80.10 32.04 48.06 0.00 0.10 0.10 0.00 80.00 80.00 0.00 0.00 0.40
8+500.00 2.10 1.63 20.00 88.20 35.28 52.92 0.00 8.15 8.15 0.00 80.05 80.05 0.00 0.00 0.40
8+520.00 0.00 2.14 20.00 10.50 4.20 6.30 0.00 37.70 10.50 27.20 0.00 0.00 0.00 0.00 0.40
8+540.00 0.00 3.70 20.00 0.00 0.00 0.00 0.00 58.40 0.00 58.40 0.00 0.00 0.00 0.00 0.40
8+560.00 0.18 2.63 20.00 0.90 0.36 0.54 0.00 63.30 0.90 62.40 0.00 0.00 0.00 0.00 0.40
8+580.00 0.44 0.15 20.00 6.20 2.48 3.72 0.00 27.80 6.20 21.60 0.00 0.00 0.00 0.00 0.40
8+600.00 6.14 0.00 20.00 65.80 26.32 39.48 0.00 0.75 0.75 0.00 65.05 65.05 0.00 0.00 0.40
8+620.00 11.83 0.00 20.00 179.70 71.88 107.82 0.00 0.00 0.00 0.00 179.70 179.70 0.00 0.00 0.40
8+640.00 15.17 0.00 20.00 270.00 108.00 162.00 0.00 0.00 0.00 0.00 270.00 270.00 0.00 0.00 0.40
8+650.00 13.41 0.00 10.00 142.90 57.16 85.74 0.00 0.00 0.00 0.00 142.90 142.90 0.00 0.00 0.40
8+660.00 12.48 0.00 10.00 129.45 51.78 77.67 0.00 0.00 0.00 0.00 129.45 129.45 0.00 0.00 0.40
8+670.00 9.97 0.00 10.00 112.25 44.90 67.35 0.00 0.00 0.00 0.00 112.25 112.25 0.00 0.00 0.40
8+680.00 9.75 0.00 10.00 98.60 39.44 59.16 0.00 0.00 0.00 0.00 98.60 98.60 0.00 0.00 0.40
8+700.00 0.00 1.70 20.00 48.75 19.50 29.25 0.00 8.50 8.50 0.00 40.25 40.25 0.00 0.00 0.40
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
8+720.00 0.00 6.61 20.00 0.00 0.00 0.00 0.00 83.10 0.00 83.10 0.00 0.00 0.00 0.00 0.40
8+730.00 0.00 8.83 10.00 0.00 0.00 0.00 0.00 77.20 0.00 77.20 0.00 0.00 0.00 0.00 0.40
8+740.00 0.00 6.95 10.00 0.00 0.00 0.00 0.00 78.90 0.00 78.90 0.00 0.00 0.00 0.00 0.40
8+760.00 0.28 3.09 20.00 1.40 0.56 0.84 0.00 100.40 1.40 99.00 0.00 0.00 0.00 0.00 0.40
8+770.00 0.69 2.53 10.00 4.85 1.94 2.91 0.00 28.10 4.85 23.25 0.00 0.00 0.00 0.00 0.40
8+780.00 0.00 3.27 10.00 1.73 0.69 1.04 0.00 29.00 1.73 27.28 0.00 0.00 0.00 0.00 0.40
8+800.00 0.00 3.71 20.00 0.00 0.00 0.00 0.00 69.80 0.00 69.80 0.00 0.00 0.00 0.00 0.40
8+820.00 3.88 0.00 20.00 19.40 7.76 11.64 0.00 18.55 18.55 0.00 0.85 0.85 0.00 0.00 0.40
8+830.00 2.34 0.00 10.00 31.10 12.44 18.66 0.00 0.00 0.00 0.00 31.10 31.10 0.00 0.00 0.40
8+840.00 1.26 0.72 10.00 18.00 7.20 10.80 0.00 1.80 1.80 0.00 16.20 16.20 0.00 0.00 0.40
8+860.00 0.00 2.05 20.00 6.30 2.52 3.78 0.00 27.70 6.30 21.40 0.00 0.00 0.00 0.00 0.40
8+870.00 0.00 4.27 10.00 0.00 0.00 0.00 0.00 31.60 0.00 31.60 0.00 0.00 0.00 0.00 0.40
8+880.00 0.00 3.85 10.00 0.00 0.00 0.00 0.00 40.60 0.00 40.60 0.00 0.00 0.00 0.00 0.40
8+900.00 0.29 1.18 20.00 1.45 0.58 0.87 0.00 50.30 1.45 48.85 0.00 0.00 0.00 0.00 0.40
8+920.00 0.00 5.96 20.00 1.45 0.58 0.87 0.00 71.40 1.45 69.95 0.00 0.00 0.00 0.00 0.40
8+940.00 0.63 0.32 20.00 3.15 1.26 1.89 0.00 62.80 3.15 59.65 0.00 0.00 0.00 0.00 0.40
8+950.00 5.50 0.00 10.00 30.65 12.26 18.39 0.00 0.80 0.80 0.00 29.85 29.85 0.00 0.00 0.40
8+960.00 3.01 0.06 10.00 42.55 17.02 25.53 0.00 0.15 0.15 0.00 42.40 42.40 0.00 0.00 0.40
8+980.00 2.42 0.00 20.00 54.30 21.72 32.58 0.00 0.30 0.30 0.00 54.00 54.00 0.00 0.00 0.40
9+000.00 5.66 0.00 20.00 80.80 32.32 48.48 0.00 0.00 0.00 0.00 80.80 80.80 0.00 0.00 0.40
9+010.00 8.05 0.00 10.00 68.55 27.42 41.13 0.00 0.00 0.00 0.00 68.55 68.55 0.00 0.00 0.40
9+020.00 11.49 0.00 10.00 97.70 39.08 58.62 0.00 0.00 0.00 0.00 97.70 97.70 0.00 0.00 0.40
9+040.00 3.31 0.00 20.00 148.00 59.20 88.80 0.00 0.00 0.00 0.00 148.00 148.00 0.00 0.00 0.40
9+060.00 2.85 0.01 20.00 61.60 24.64 36.96 0.00 0.05 0.05 0.00 61.55 61.55 0.00 0.00 0.40
9+080.00 0.00 3.89 20.00 14.25 5.70 8.55 0.00 39.00 14.25 24.75 0.00 0.00 0.00 0.00 0.40
9+100.00 0.00 7.54 20.00 0.00 0.00 0.00 0.00 114.30 0.00 114.30 0.00 0.00 0.00 0.00 0.40
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
9+110.00 0.00 7.51 10.00 0.00 0.00 0.00 0.00 75.25 0.00 75.25 0.00 0.00 0.00 0.00 0.40
9+120.00 0.00 5.81 10.00 0.00 0.00 0.00 0.00 66.60 0.00 66.60 0.00 0.00 0.00 0.00 0.40
9+140.00 0.00 3.06 20.00 0.00 0.00 0.00 0.00 88.70 0.00 88.70 0.00 0.00 0.00 0.00 0.40
9+160.00 0.83 0.12 20.00 4.15 1.66 2.49 0.00 31.80 4.15 27.65 0.00 0.00 0.00 0.00 0.40
9+180.00 7.15 0.00 20.00 79.80 31.92 47.88 0.00 0.60 0.60 0.00 79.20 79.20 0.00 0.00 0.40
9+190.00 6.37 0.00 10.00 67.60 27.04 40.56 0.00 0.00 0.00 0.00 67.60 67.60 0.00 0.00 0.40
9+200.00 4.28 0.00 10.00 53.25 21.30 31.95 0.00 0.00 0.00 0.00 53.25 53.25 0.00 0.00 0.40
9+220.00 2.98 0.00 20.00 72.60 29.04 43.56 0.00 0.00 0.00 0.00 72.60 72.60 0.00 0.00 0.40
9+240.00 2.25 0.19 20.00 52.30 20.92 31.38 0.00 0.95 0.95 0.00 51.35 51.35 0.00 0.00 0.40
9+260.00 1.71 0.00 20.00 39.60 15.84 23.76 0.00 0.95 0.95 0.00 38.65 38.65 0.00 0.00 0.40
9+280.00 1.66 0.00 20.00 33.70 13.48 20.22 0.00 0.00 0.00 0.00 33.70 33.70 0.00 0.00 0.40
9+300.00 1.17 0.00 20.00 28.30 11.32 16.98 0.00 0.00 0.00 0.00 28.30 28.30 0.00 0.00 0.40
9+320.00 3.78 0.00 20.00 49.50 19.80 29.70 0.00 0.00 0.00 0.00 49.50 49.50 0.00 0.00 0.40
9+330.00 7.10 0.00 10.00 54.40 21.76 32.64 0.00 0.00 0.00 0.00 54.40 54.40 0.00 0.00 0.40
9+340.00 2.38 0.18 10.00 47.40 18.96 28.44 0.00 0.45 0.45 0.00 46.95 46.95 0.00 0.00 0.40
9+360.00 8.18 0.00 20.00 105.60 42.24 63.36 0.00 0.90 0.90 0.00 104.70 104.70 0.00 0.00 0.40
9+370.00 20.73 0.00 10.00 144.55 57.82 86.73 0.00 0.00 0.00 0.00 144.55 144.55 0.00 0.00 0.40
9+380.00 10.42 0.00 10.00 155.75 62.30 93.45 0.00 0.00 0.00 0.00 155.75 155.75 0.00 0.00 0.40
9+390.00 10.43 0.00 10.00 104.25 41.70 62.55 0.00 0.00 0.00 0.00 104.25 104.25 0.00 0.00 0.40
9+400.00 7.03 0.00 10.00 87.30 34.92 52.38 0.00 0.00 0.00 0.00 87.30 87.30 0.00 0.00 0.40
9+420.00 14.15 0.00 20.00 211.80 84.72 127.08 0.00 0.00 0.00 0.00 211.80 211.80 0.00 0.00 0.40
9+430.00 9.57 0.04 10.00 118.60 47.44 71.16 0.00 0.10 0.10 0.00 118.50 118.50 0.00 0.00 0.40
9+440.00 0.00 5.55 10.00 23.93 9.57 14.36 0.00 27.95 23.93 4.03 0.00 0.00 0.00 0.00 0.40
9+450.00 0.00 6.47 10.00 0.00 0.00 0.00 0.00 60.10 0.00 60.10 0.00 0.00 0.00 0.00 0.40
9+460.00 1.21 6.63 10.00 3.03 1.21 1.82 0.00 65.50 3.03 62.48 0.00 0.00 0.00 0.00 0.40
9+470.00 1.65 6.04 10.00 14.30 5.72 8.58 0.00 63.35 14.30 49.05 0.00 0.00 0.00 0.00 0.40
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
9+480.00 1.89 5.90 10.00 17.70 7.08 10.62 0.00 59.70 17.70 42.00 0.00 0.00 0.00 0.00 0.40
9+500.00 0.00 2.90 20.00 9.45 3.78 5.67 0.00 88.00 9.45 78.55 0.00 0.00 0.00 0.00 0.40
9+520.00 3.97 37.56 20.00 19.85 7.94 11.91 0.00 404.60 19.85 384.75 0.00 0.00 0.00 0.00 0.40
9+540.00 3.62 0.62 20.00 75.90 30.36 45.54 0.00 381.80 75.90 305.90 0.00 0.00 0.00 0.00 0.40
9+550.00 18.39 0.00 10.00 110.05 44.02 66.03 0.00 1.55 1.55 0.00 108.50 108.50 0.00 0.00 0.40
9+560.00 5.22 0.00 10.00 118.05 47.22 70.83 0.00 0.00 0.00 0.00 118.05 118.05 0.00 0.00 0.40
9+580.00 6.17 0.00 20.00 113.90 45.56 68.34 0.00 0.00 0.00 0.00 113.90 113.90 0.00 0.00 0.40
9+600.00 11.64 0.00 20.00 178.10 71.24 106.86 0.00 0.00 0.00 0.00 178.10 178.10 0.00 0.00 0.40
9+620.00 3.77 0.31 20.00 154.10 61.64 92.46 0.00 1.55 1.55 0.00 152.55 152.55 0.00 0.00 0.40
9+630.00 13.37 1.24 10.00 85.70 34.28 51.42 0.00 7.75 7.75 0.00 77.95 77.95 0.00 0.00 0.40
9+640.00 6.49 2.50 10.00 99.30 39.72 59.58 0.00 18.70 18.70 0.00 80.60 80.60 0.00 0.00 0.40
9+660.00 2.54 1.69 20.00 90.30 36.12 54.18 0.00 41.90 41.90 0.00 48.40 48.40 0.00 0.00 0.40
9+670.00 15.88 0.00 10.00 92.10 36.84 55.26 0.00 4.23 4.23 0.00 87.88 87.88 0.00 0.00 0.40
9+680.00 7.42 0.00 10.00 116.50 46.60 69.90 0.00 0.00 0.00 0.00 116.50 116.50 0.00 0.00 0.40
9+690.00 15.42 0.00 10.00 114.20 45.68 68.52 0.00 0.00 0.00 0.00 114.20 114.20 0.00 0.00 0.40
9+700.00 2.71 1.11 10.00 90.65 36.26 54.39 0.00 2.78 2.78 0.00 87.88 87.88 0.00 0.00 0.40
9+720.00 1.51 0.90 20.00 42.20 16.88 25.32 0.00 20.10 20.10 0.00 22.10 22.10 0.00 0.00 0.40
9+730.00 0.00 2.38 10.00 3.78 1.51 2.27 0.00 16.40 3.78 12.63 0.00 0.00 0.00 0.00 0.40
9+740.00 0.00 1.40 10.00 0.00 0.00 0.00 0.00 18.90 0.00 18.90 0.00 0.00 0.00 0.00 0.40
9+760.00 1.86 0.01 20.00 9.30 3.72 5.58 0.00 14.10 9.30 4.80 0.00 0.00 0.00 0.00 0.40
9+770.00 2.18 0.00 10.00 20.20 8.08 12.12 0.00 0.03 0.03 0.00 20.18 20.18 0.00 0.00 0.40
9+780.00 2.04 0.00 10.00 21.10 8.44 12.66 0.00 0.00 0.00 0.00 21.10 21.10 0.00 0.00 0.40
9+800.00 0.91 1.89 20.00 29.50 11.80 17.70 0.00 9.45 9.45 0.00 20.05 20.05 0.00 0.00 0.40
9+810.00 0.78 3.31 10.00 8.45 6.76 1.69 0.00 26.00 8.45 17.55 0.00 0.00 0.00 0.00 0.80
9+820.00 2.83 0.00 10.00 18.05 14.44 3.61 0.00 8.28 8.28 0.00 9.78 9.78 0.00 0.00 0.80
9+840.00 6.55 0.00 20.00 93.80 75.04 18.76 0.00 0.00 0.00 0.00 93.80 93.80 0.00 0.00 0.80
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
9+850.00 2.57 0.12 10.00 45.60 36.48 9.12 0.00 0.30 0.30 0.00 45.30 45.30 0.00 0.00 0.80
9+860.00 0.00 8.99 10.00 6.43 5.14 1.29 0.00 45.55 6.43 39.13 0.00 0.00 0.00 0.00 0.80
9+870.00 0.00 10.19 10.00 0.00 0.00 0.00 0.00 95.90 0.00 95.90 0.00 0.00 0.00 0.00 0.80
9+880.00 0.40 0.87 10.00 1.00 0.80 0.20 0.00 55.30 1.00 54.30 0.00 0.00 0.00 0.00 0.80
9+890.00 4.61 0.00 10.00 25.05 20.04 5.01 0.00 2.18 2.18 0.00 22.88 22.88 0.00 0.00 0.80
9+900.00 1.36 0.24 10.00 29.85 23.88 5.97 0.00 0.60 0.60 0.00 29.25 29.25 0.00 0.00 0.80
9+910.00 3.95 0.00 10.00 26.55 21.24 5.31 0.00 0.60 0.60 0.00 25.95 25.95 0.00 0.00 0.80
9+920.00 2.94 0.00 10.00 34.45 27.56 6.89 0.00 0.00 0.00 0.00 34.45 34.45 0.00 0.00 0.80
9+940.00 2.61 0.00 20.00 55.50 44.40 11.10 0.00 0.00 0.00 0.00 55.50 55.50 0.00 0.00 0.80
9+960.00 5.23 0.00 20.00 78.40 62.72 15.68 0.00 0.00 0.00 0.00 78.40 78.40 0.00 0.00 0.80
9+980.00 0.59 0.00 20.00 58.20 46.56 11.64 0.00 0.00 0.00 0.00 58.20 58.20 0.00 0.00 0.80
9+990.00 0.00 1.47 10.00 1.48 1.18 0.30 0.00 3.68 1.48 2.20 0.00 0.00 0.00 0.00 0.80
10+000.00 0.00 2.20 10.00 0.00 0.00 0.00 0.00 18.35 0.00 18.35 0.00 0.00 0.00 0.00 0.80
10+020.00 0.00 1.77 20.00 0.00 0.00 0.00 0.00 39.70 0.00 39.70 0.00 0.00 0.00 0.00 0.80
10+040.00 0.30 0.01 20.00 1.50 1.20 0.30 0.00 17.80 1.50 16.30 0.00 0.00 0.00 0.00 0.80
10+050.00 0.15 0.17 10.00 2.25 1.80 0.45 0.00 0.90 0.90 0.00 1.35 1.35 0.00 0.00 0.80
10+060.00 0.26 0.57 10.00 2.05 1.64 0.41 0.00 3.70 2.05 1.65 0.00 0.00 0.00 0.00 0.80
10+070.00 5.54 0.38 10.00 29.00 23.20 5.80 0.00 4.75 4.75 0.00 24.25 24.25 0.00 0.00 0.80
10+080.00 6.15 0.00 10.00 58.45 46.76 11.69 0.00 0.95 0.95 0.00 57.50 57.50 0.00 0.00 0.80
10+090.00 6.62 0.00 10.00 63.85 51.08 12.77 0.00 0.00 0.00 0.00 63.85 63.85 0.00 0.00 0.80
10+100.00 0.50 1.00 10.00 35.60 28.48 7.12 0.00 2.50 2.50 0.00 33.10 33.10 0.00 0.00 0.80
10+110.00 1.69 0.00 10.00 10.95 8.76 2.19 0.00 2.50 2.50 0.00 8.45 8.45 0.00 0.00 0.80
10+120.00 2.16 0.00 10.00 19.25 15.40 3.85 0.00 0.00 0.00 0.00 19.25 19.25 0.00 0.00 0.80
10+140.00 2.15 2.78 20.00 43.10 34.48 8.62 0.00 13.90 13.90 0.00 29.20 29.20 0.00 0.00 0.80
10+150.00 1.68 6.77 10.00 19.15 15.32 3.83 0.00 47.75 19.15 28.60 0.00 0.00 0.00 0.00 0.80
10+160.00 1.18 0.09 10.00 14.30 11.44 2.86 0.00 34.30 14.30 20.00 0.00 0.00 0.00 0.00 0.80
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
10+180.00 1.98 0.00 20.00 31.60 25.28 6.32 0.00 0.45 0.45 0.00 31.15 31.15 0.00 0.00 0.80
10+190.00 1.56 0.00 10.00 17.70 14.16 3.54 0.00 0.00 0.00 0.00 17.70 17.70 0.00 0.00 0.80
10+200.00 1.97 0.00 10.00 17.65 14.12 3.53 0.00 0.00 0.00 0.00 17.65 17.65 0.00 0.00 0.80
10+220.00 0.67 0.07 20.00 26.40 21.12 5.28 0.00 0.35 0.35 0.00 26.05 26.05 0.00 0.00 0.80
10+240.00 3.15 0.00 20.00 38.20 30.56 7.64 0.00 0.35 0.35 0.00 37.85 37.85 0.00 0.00 0.80
10+250.00 1.62 0.54 10.00 23.85 19.08 4.77 0.00 1.35 1.35 0.00 22.50 22.50 0.00 0.00 0.80
10+260.00 0.90 0.52 10.00 12.60 10.08 2.52 0.00 5.30 5.30 0.00 7.30 7.30 0.00 0.00 0.80
10+280.00 1.60 0.00 20.00 25.00 20.00 5.00 0.00 2.60 2.60 0.00 22.40 22.40 0.00 0.00 0.80
10+290.00 3.11 0.00 10.00 23.55 18.84 4.71 0.00 0.00 0.00 0.00 23.55 23.55 0.00 0.00 0.80
10+300.00 0.52 0.74 10.00 18.15 14.52 3.63 0.00 1.85 1.85 0.00 16.30 16.30 0.00 0.00 0.80
10+320.00 0.69 0.00 20.00 12.10 1.21 2.42 8.47 3.70 3.63 0.07 0.00 0.00 0.00 8.47 0.10
10+330.00 5.19 0.00 10.00 29.40 2.94 5.88 20.58 0.00 0.00 0.00 8.82 8.82 0.00 20.58 0.10
10+340.00 1.18 0.11 10.00 31.85 3.19 6.37 22.30 0.28 0.28 0.00 9.28 9.28 0.00 22.30 0.10
10+360.00 0.14 0.36 20.00 13.20 1.32 2.64 9.24 4.70 3.96 0.74 0.00 0.00 0.00 9.24 0.10
10+380.00 0.49 0.22 20.00 6.30 0.63 1.26 4.41 5.80 1.89 3.91 0.00 0.00 0.00 4.41 0.10
10+400.00 2.86 0.00 20.00 33.50 3.35 6.70 23.45 1.10 1.10 0.00 8.95 8.95 0.00 23.45 0.10
10+410.00 3.37 0.00 10.00 31.15 3.12 6.23 21.81 0.00 0.00 0.00 9.35 9.35 0.00 21.81 0.10
10+420.00 1.41 0.00 10.00 23.90 2.39 4.78 16.73 0.00 0.00 0.00 7.17 7.17 0.00 16.73 0.10
10+440.00 1.46 2.78 20.00 28.70 2.87 5.74 20.09 13.90 8.61 5.29 0.00 0.00 0.00 20.09 0.10
10+450.00 2.30 5.06 10.00 18.80 1.88 3.76 13.16 39.20 5.64 33.56 0.00 0.00 0.00 13.16 0.10
10+460.00 0.85 2.68 10.00 15.75 1.58 3.15 11.03 38.70 4.73 33.98 0.00 0.00 0.00 11.03 0.10
10+480.00 1.04 0.00 20.00 18.90 1.89 3.78 13.23 13.40 5.67 7.73 0.00 0.00 0.00 13.23 0.10
10+490.00 2.75 0.00 10.00 18.95 1.90 3.79 13.27 0.00 0.00 0.00 5.69 5.69 0.00 13.27 0.10
10+500.00 2.71 0.00 10.00 27.30 2.73 5.46 19.11 0.00 0.00 0.00 8.19 8.19 0.00 19.11 0.10
10+520.00 6.04 0.00 20.00 87.50 8.75 17.50 61.25 0.00 0.00 0.00 26.25 26.25 0.00 61.25 0.10
10+540.00 6.76 0.00 20.00 128.00 12.80 25.60 89.60 0.00 0.00 0.00 38.40 38.40 0.00 89.60 0.10
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
10+550.00 19.45 0.00 10.00 131.05 13.11 26.21 91.74 0.00 0.00 0.00 39.32 39.32 0.00 91.74 0.10
10+560.00 9.87 0.00 10.00 146.60 14.66 29.32 102.62 0.00 0.00 0.00 43.98 43.98 0.00 102.62 0.10
10+580.00 2.07 0.79 20.00 119.40 11.94 23.88 83.58 3.95 3.95 0.00 31.87 31.87 0.00 83.58 0.10
10+590.00 0.33 1.38 10.00 12.00 1.20 2.40 8.40 10.85 3.60 7.25 0.00 0.00 0.00 8.40 0.10
10+600.00 0.00 9.35 10.00 0.83 0.08 0.17 0.58 53.65 0.25 53.40 0.00 0.00 0.00 0.58 0.10
10+620.00 0.00 20.34 20.00 0.00 0.00 0.00 0.00 296.90 0.00 296.90 0.00 0.00 0.00 0.00 0.10
10+640.00 0.00 19.83 20.00 0.00 0.00 0.00 0.00 401.70 0.00 401.70 0.00 0.00 0.00 0.00 0.10
10+650.00 0.00 18.12 10.00 0.00 0.00 0.00 0.00 189.75 0.00 189.75 0.00 0.00 0.00 0.00 0.10
10+660.00 0.00 15.91 10.00 0.00 0.00 0.00 0.00 170.15 0.00 170.15 0.00 0.00 0.00 0.00 0.30
10+670.00 0.00 14.13 10.00 0.00 0.00 0.00 0.00 150.20 0.00 150.20 0.00 0.00 0.00 0.00 0.30
10+680.00 0.00 14.87 10.00 0.00 0.00 0.00 0.00 145.00 0.00 145.00 0.00 0.00 0.00 0.00 0.30
10+690.00 0.00 13.36 10.00 0.00 0.00 0.00 0.00 141.15 0.00 141.15 0.00 0.00 0.00 0.00 0.30
10+700.00 0.00 11.44 10.00 0.00 0.00 0.00 0.00 124.00 0.00 124.00 0.00 0.00 0.00 0.00 0.30
10+720.00 0.00 2.59 20.00 0.00 0.00 0.00 0.00 140.30 0.00 140.30 0.00 0.00 0.00 0.00 0.30
10+730.00 1.63 0.02 10.00 4.08 1.22 2.85 0.00 13.05 4.08 8.98 0.00 0.00 0.00 0.00 0.30
10+740.00 9.21 0.00 10.00 54.20 16.26 37.94 0.00 0.05 0.05 0.00 54.15 54.15 0.00 0.00 0.30
10+760.00 6.37 0.00 20.00 155.80 46.74 109.06 0.00 0.00 0.00 0.00 155.80 155.80 0.00 0.00 0.30
10+780.00 1.39 1.50 20.00 77.60 23.28 54.32 0.00 7.50 7.50 0.00 70.10 70.10 0.00 0.00 0.30
10+800.00 0.29 3.53 20.00 16.80 5.04 11.76 0.00 50.30 16.80 33.50 0.00 0.00 0.00 0.00 0.30
10+820.00 0.00 3.53 20.00 1.45 0.44 1.02 0.00 70.60 1.45 69.15 0.00 0.00 0.00 0.00 0.30
10+830.00 0.35 2.81 10.00 0.88 0.26 0.61 0.00 31.70 0.88 30.83 0.00 0.00 0.00 0.00 0.30
10+840.00 1.78 0.60 10.00 10.65 3.20 7.46 0.00 17.05 10.65 6.40 0.00 0.00 0.00 0.00 0.30
10+860.00 4.56 0.00 20.00 63.40 19.02 44.38 0.00 3.00 3.00 0.00 60.40 60.40 0.00 0.00 0.30
10+880.00 0.00 6.28 20.00 22.80 6.84 15.96 0.00 31.40 22.80 8.60 0.00 0.00 0.00 0.00 0.30
10+900.00 0.00 10.20 20.00 0.00 0.00 0.00 0.00 164.80 0.00 164.80 0.00 0.00 0.00 0.00 0.30
10+920.00 0.00 7.28 20.00 0.00 0.00 0.00 0.00 174.80 0.00 174.80 0.00 0.00 0.00 0.00 0.30
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
10+930.00 0.00 5.92 10.00 0.00 0.00 0.00 0.00 66.00 0.00 66.00 0.00 0.00 0.00 0.00 0.30
10+940.00 0.46 3.74 10.00 1.15 0.35 0.81 0.00 48.30 1.15 47.15 0.00 0.00 0.00 0.00 0.30
10+950.00 0.00 4.14 10.00 1.15 0.35 0.81 0.00 39.40 1.15 38.25 0.00 0.00 0.00 0.00 0.30
10+960.00 0.00 3.22 10.00 0.00 0.00 0.00 0.00 36.80 0.00 36.80 0.00 0.00 0.00 0.00 0.30
10+970.00 0.00 2.60 10.00 0.00 0.00 0.00 0.00 29.10 0.00 29.10 0.00 0.00 0.00 0.00 0.30
10+980.00 0.00 1.31 10.00 0.00 0.00 0.00 0.00 19.55 0.00 19.55 0.00 0.00 0.00 0.00 0.30
11+000.00 2.04 0.00 20.00 10.20 3.06 7.14 0.00 6.55 6.55 0.00 3.65 3.65 0.00 0.00 0.30
11+010.00 2.83 0.00 10.00 24.35 7.31 17.05 0.00 0.00 0.00 0.00 24.35 24.35 0.00 0.00 0.30
11+020.00 2.15 0.00 10.00 24.90 24.90 17.43 0.00 0.00 0.00 0.00 42.33 42.33 0.00 0.00 1.00
11+040.00 0.64 0.04 20.00 27.90 27.90 19.53 0.00 0.20 0.20 0.00 47.23 47.23 0.00 0.00 1.00
11+050.00 2.05 0.00 10.00 13.45 13.45 0.00 0.00 0.10 0.10 0.00 13.35 13.35 0.00 0.00 1.00
11+060.00 2.16 0.00 10.00 21.05 21.05 0.00 0.00 0.00 0.00 0.00 21.05 21.05 0.00 0.00 1.00
11+080.00 2.12 0.00 20.00 42.80 42.80 0.00 0.00 0.00 0.00 0.00 42.80 42.80 0.00 0.00 1.00
11+090.00 0.58 0.10 10.00 13.50 13.50 0.00 0.00 0.25 0.25 0.00 13.25 13.25 0.00 0.00 1.00
11+100.00 0.30 1.16 10.00 4.40 4.40 0.00 0.00 6.30 4.40 1.90 0.00 0.00 0.00 0.00 1.00
11+120.00 2.18 0.78 20.00 24.80 24.80 0.00 0.00 19.40 19.40 0.00 5.40 5.40 0.00 0.00 1.00
11+140.00 0.00 3.95 20.00 10.90 10.90 0.00 0.00 47.30 10.90 36.40 0.00 0.00 0.00 0.00 1.00
11+160.00 0.99 0.15 20.00 4.95 4.95 0.00 0.00 41.00 4.95 36.05 0.00 0.00 0.00 0.00 1.00
11+170.00 4.77 0.00 10.00 28.80 28.80 0.00 0.00 0.38 0.38 0.00 28.43 28.43 0.00 0.00 1.00
11+180.00 6.15 0.00 10.00 54.60 54.60 0.00 0.00 0.00 0.00 0.00 54.60 54.60 0.00 0.00 1.00
11+200.00 4.57 0.00 20.00 107.20 107.20 0.00 0.00 0.00 0.00 0.00 107.20 107.20 0.00 0.00 1.00
11+220.00 3.04 0.73 20.00 76.10 76.10 0.00 0.00 3.65 3.65 0.00 72.45 72.45 0.00 0.00 1.00
11+240.00 0.29 0.49 20.00 33.30 33.30 0.00 0.00 12.20 12.20 0.00 21.10 21.10 0.00 0.00 1.00
11+260.00 0.85 0.12 20.00 11.40 11.40 0.00 0.00 6.10 6.10 0.00 5.30 5.30 0.00 0.00 1.00
11+270.00 0.76 1.23 10.00 8.05 8.05 0.00 0.00 6.75 6.75 0.00 1.30 1.30 0.00 0.00 1.00
11+280.00 0.00 2.34 10.00 1.90 1.90 0.00 0.00 17.85 1.90 15.95 0.00 0.00 0.00 0.00 1.00
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
11+300.00 0.00 0.82 20.00 0.00 0.00 0.00 0.00 31.60 0.00 31.60 0.00 0.00 0.00 0.00 1.00
11+320.00 2.09 0.00 20.00 10.45 10.45 0.00 0.00 4.10 4.10 0.00 6.35 6.35 0.00 0.00 1.00
11+340.00 2.51 0.00 20.00 46.00 46.00 0.00 0.00 0.00 0.00 0.00 46.00 46.00 0.00 0.00 1.00
11+360.00 0.03 0.08 20.00 25.40 25.40 0.00 0.00 0.40 0.40 0.00 25.00 25.00 0.00 0.00 1.00
11+380.00 0.00 1.17 20.00 0.15 0.15 0.00 0.00 12.50 0.15 12.35 0.00 0.00 0.00 0.00 1.00
11+390.00 0.69 0.08 10.00 1.73 1.73 0.00 0.00 6.25 1.73 4.53 0.00 0.00 0.00 0.00 1.00
11+400.00 2.86 0.00 10.00 17.75 17.75 0.00 0.00 0.20 0.20 0.00 17.55 17.55 0.00 0.00 1.00
11+410.00 5.46 0.00 10.00 41.60 41.60 0.00 0.00 0.00 0.00 0.00 41.60 41.60 0.00 0.00 1.00
11+420.00 2.87 0.00 10.00 41.65 41.65 0.00 0.00 0.00 0.00 0.00 41.65 41.65 0.00 0.00 1.00
11+430.00 3.12 0.18 10.00 29.95 29.95 0.00 0.00 0.45 0.45 0.00 29.50 29.50 0.00 0.00 1.00
11+440.00 3.10 0.00 10.00 31.10 31.10 0.00 0.00 0.45 0.45 0.00 30.65 30.65 0.00 0.00 1.00
11+460.00 1.67 0.00 20.00 47.70 47.70 0.00 0.00 0.00 0.00 0.00 47.70 47.70 0.00 0.00 1.00
11+480.00 1.38 0.00 20.00 30.50 30.50 0.00 0.00 0.00 0.00 0.00 30.50 30.50 0.00 0.00 1.00
11+500.00 0.67 0.00 20.00 20.50 20.50 0.00 0.00 0.00 0.00 0.00 20.50 20.50 0.00 0.00 1.00
11+520.00 1.31 0.00 20.00 19.80 19.80 0.00 0.00 0.00 0.00 0.00 19.80 19.80 0.00 0.00 1.00
11+540.00 0.55 7.22 20.00 18.60 18.60 0.00 0.00 36.10 18.60 17.50 0.00 0.00 0.00 0.00 1.00
11+560.00 2.92 0.00 20.00 34.70 34.70 0.00 0.00 36.10 34.70 1.40 0.00 0.00 0.00 0.00 1.00
11+580.00 0.43 1.29 20.00 33.50 33.50 0.00 0.00 6.45 6.45 0.00 27.05 27.05 0.00 0.00 1.00
11+600.00 0.16 2.74 20.00 5.90 5.90 0.00 0.00 40.30 5.90 34.40 0.00 0.00 0.00 0.00 1.00
11+610.00 0.98 1.29 10.00 5.70 5.70 0.00 0.00 20.15 5.70 14.45 0.00 0.00 0.00 0.00 1.00
11+620.00 1.82 0.10 10.00 14.00 14.00 0.00 0.00 6.95 6.95 0.00 7.05 7.05 0.00 0.00 1.00
11+630.00 1.63 0.00 10.00 17.25 17.25 0.00 0.00 0.25 0.25 0.00 17.00 17.00 0.00 0.00 1.00
11+640.00 0.59 0.20 10.00 11.10 11.10 0.00 0.00 0.50 0.50 0.00 10.60 10.60 0.00 0.00 1.00
11+660.00 0.33 0.01 20.00 9.20 9.20 0.00 0.00 2.10 2.10 0.00 7.10 7.10 0.00 0.00 1.00
11+680.00 0.94 4.66 20.00 12.70 12.70 0.00 0.00 46.70 12.70 34.00 0.00 0.00 0.00 0.00 1.00
11+700.00 2.25 0.00 20.00 31.90 31.90 0.00 0.00 23.30 23.30 0.00 8.60 8.60 0.00 0.00 1.00
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
11+720.00 2.75 0.00 20.00 50.00 50.00 0.00 0.00 0.00 0.00 0.00 50.00 50.00 0.00 0.00 1.00
11+740.00 2.71 0.00 20.00 54.60 54.60 0.00 0.00 0.00 0.00 0.00 54.60 54.60 0.00 0.00 1.00
11+760.00 0.23 4.08 20.00 29.40 29.40 0.00 0.00 20.40 20.40 0.00 9.00 9.00 0.00 0.00 1.00
11+780.00 2.60 0.00 20.00 28.30 28.30 0.00 0.00 20.40 20.40 0.00 7.90 7.90 0.00 0.00 1.00
11+800.00 2.36 0.26 20.00 49.60 49.60 0.00 0.00 1.30 1.30 0.00 48.30 48.30 0.00 0.00 1.00
11+820.00 1.37 0.00 20.00 37.30 37.30 0.00 0.00 1.30 1.30 0.00 36.00 36.00 0.00 0.00 1.00
11+840.00 1.19 0.54 20.00 25.60 25.60 0.00 0.00 2.70 2.70 0.00 22.90 22.90 0.00 0.00 1.00
11+850.00 3.44 0.00 10.00 23.15 23.15 0.00 0.00 1.35 1.35 0.00 21.80 21.80 0.00 0.00 1.00
11+860.00 1.70 0.00 10.00 25.70 25.70 0.00 0.00 0.00 0.00 0.00 25.70 25.70 0.00 0.00 1.00
11+880.00 0.05 0.08 20.00 17.50 17.50 0.00 0.00 0.40 0.40 0.00 17.10 17.10 0.00 0.00 1.00
11+900.00 3.35 0.00 20.00 34.00 34.00 0.00 0.00 0.40 0.40 0.00 33.60 33.60 0.00 0.00 1.00
11+920.00 3.41 0.00 20.00 67.60 67.60 0.00 0.00 0.00 0.00 0.00 67.60 67.60 0.00 0.00 1.00
11+930.00 1.99 0.51 10.00 27.00 27.00 0.00 0.00 1.28 1.28 0.00 25.73 25.73 0.00 0.00 1.00
11+940.00 2.29 0.01 10.00 21.40 21.40 0.00 0.00 2.60 2.60 0.00 18.80 18.80 0.00 0.00 1.00
11+950.00 2.46 0.00 10.00 23.75 23.75 0.00 0.00 0.03 0.03 0.00 23.73 23.73 0.00 0.00 1.00
11+960.00 0.00 0.46 10.00 6.15 6.15 0.00 0.00 1.15 1.15 0.00 5.00 5.00 0.00 0.00 1.00
11+980.00 0.00 3.21 20.00 0.00 0.00 0.00 0.00 36.70 0.00 36.70 0.00 0.00 0.00 0.00 1.00
12+000.00 0.00 1.93 20.00 0.00 0.00 0.00 0.00 51.40 0.00 51.40 0.00 0.00 0.00 0.00 1.00
12+020.00 0.14 0.53 20.00 0.70 0.70 0.00 0.00 24.60 0.70 23.90 0.00 0.00 0.00 0.00 1.00
12+030.00 1.47 0.00 10.00 8.05 8.05 0.00 0.00 1.33 1.33 0.00 6.73 6.73 0.00 0.00 1.00
12+040.00 3.25 0.00 10.00 23.60 23.60 0.00 0.00 0.00 0.00 0.00 23.60 23.60 0.00 0.00 1.00
12+060.00 0.64 0.00 20.00 38.90 38.90 0.00 0.00 0.00 0.00 0.00 38.90 38.90 0.00 0.00 1.00
12+070.00 0.21 0.45 10.00 4.25 4.25 0.00 0.00 1.13 1.13 0.00 3.13 3.13 0.00 0.00 1.00
12+080.00 0.00 1.07 10.00 0.53 0.53 0.00 0.00 7.60 0.53 7.08 0.00 0.00 0.00 0.00 1.00
12+090.00 0.23 0.87 10.00 0.58 0.58 0.00 0.00 9.70 0.58 9.13 0.00 0.00 0.00 0.00 1.00
12+100.00 0.00 0.94 10.00 0.58 0.58 0.00 0.00 9.05 0.58 8.48 0.00 0.00 0.00 0.00 1.00
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
12+110.00 0.00 1.53 10.00 0.00 0.00 0.00 0.00 12.35 0.00 12.35 0.00 0.00 0.00 0.00 1.00
12+120.00 0.94 0.81 10.00 2.35 2.35 0.00 0.00 11.70 2.35 9.35 0.00 0.00 0.00 0.00 1.00
12+130.00 2.60 0.48 10.00 17.70 17.70 0.00 0.00 6.45 6.45 0.00 11.25 11.25 0.00 0.00 1.00
12+140.00 3.79 1.13 10.00 31.95 31.95 0.00 0.00 8.05 8.05 0.00 23.90 23.90 0.00 0.00 1.00
12+150.00 0.00 2.25 10.00 9.48 9.48 0.00 0.00 16.90 9.48 7.43 0.00 0.00 0.00 0.00 1.00
12+160.00 0.00 7.65 10.00 0.00 0.00 0.00 0.00 49.50 0.00 49.50 0.00 0.00 0.00 0.00 1.00
12+180.00 0.00 4.88 20.00 0.00 0.00 0.00 0.00 125.30 0.00 125.30 0.00 0.00 0.00 0.00 1.00
12+190.00 0.00 3.24 10.00 0.00 0.00 0.00 0.00 40.60 0.00 40.60 0.00 0.00 0.00 0.00 1.00
12+200.00 0.00 2.99 10.00 0.00 0.00 0.00 0.00 31.15 0.00 31.15 0.00 0.00 0.00 0.00 1.00
12+220.00 0.00 1.62 20.00 0.00 0.00 0.00 0.00 46.10 0.00 46.10 0.00 0.00 0.00 0.00 1.00
12+240.00 0.88 0.00 20.00 4.40 4.40 0.00 0.00 8.10 4.40 3.70 0.00 0.00 0.00 0.00 1.00
12+250.00 2.10 0.00 10.00 14.90 14.90 0.00 0.00 0.00 0.00 0.00 14.90 14.90 0.00 0.00 1.00
12+260.00 2.34 0.00 10.00 22.20 22.20 0.00 0.00 0.00 0.00 0.00 22.20 22.20 0.00 0.00 1.00
12+280.00 1.57 0.00 20.00 39.10 39.10 0.00 0.00 0.00 0.00 0.00 39.10 39.10 0.00 0.00 1.00
12+300.00 2.12 0.00 20.00 36.90 36.90 0.00 0.00 0.00 0.00 0.00 36.90 36.90 0.00 0.00 1.00
12+310.00 2.93 0.00 10.00 25.25 25.25 0.00 0.00 0.00 0.00 0.00 25.25 25.25 0.00 0.00 1.00
12+320.00 0.58 0.00 10.00 17.55 17.55 0.00 0.00 0.00 0.00 0.00 17.55 17.55 0.00 0.00 1.00
12+330.00 0.00 0.56 10.00 1.45 1.45 0.00 0.00 1.40 1.40 0.00 0.05 0.05 0.00 0.00 1.00
12+340.00 0.20 0.31 10.00 0.50 0.50 0.00 0.00 4.35 0.50 3.85 0.00 0.00 0.00 0.00 1.00
12+360.00 0.23 0.18 20.00 4.30 4.30 0.00 0.00 4.90 4.30 0.60 0.00 0.00 0.00 0.00 1.00
12+370.00 1.22 0.19 10.00 7.25 7.25 0.00 0.00 1.85 1.85 0.00 5.40 5.40 0.00 0.00 1.00
12+380.00 3.19 0.00 10.00 22.05 22.05 0.00 0.00 0.48 0.48 0.00 21.58 21.58 0.00 0.00 1.00
12+400.00 12.36 0.00 20.00 155.50 155.50 0.00 0.00 0.00 0.00 0.00 155.50 155.50 0.00 0.00 1.00
12+410.00 20.35 0.00 10.00 163.55 163.55 0.00 0.00 0.00 0.00 0.00 163.55 163.55 0.00 0.00 1.00
12+420.00 6.30 0.00 10.00 133.25 133.25 0.00 0.00 0.00 0.00 0.00 133.25 133.25 0.00 0.00 1.00
12+430.00 4.31 0.00 10.00 53.05 53.05 0.00 0.00 0.00 0.00 0.00 53.05 53.05 0.00 0.00 1.00
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
12+440.00 4.27 0.00 10.00 42.90 42.90 0.00 0.00 0.00 0.00 0.00 42.90 42.90 0.00 0.00 1.00
12+450.00 5.97 0.00 10.00 51.20 51.20 0.00 0.00 0.00 0.00 0.00 51.20 51.20 0.00 0.00 1.00
12+460.00 9.67 0.00 10.00 78.20 78.20 0.00 0.00 0.00 0.00 0.00 78.20 78.20 0.00 0.00 1.00
12+480.00 12.59 0.00 20.00 222.60 222.60 0.00 0.00 0.00 0.00 0.00 222.60 222.60 0.00 0.00 1.00
12+500.00 15.74 0.00 20.00 283.30 283.30 0.00 0.00 0.00 0.00 0.00 283.30 283.30 0.00 0.00 1.00
12+510.00 7.40 0.03 10.00 115.70 115.70 0.00 0.00 0.08 0.08 0.00 115.63 115.63 0.00 0.00 1.00
12+520.00 0.37 8.94 10.00 38.85 38.85 0.00 0.00 44.85 38.85 6.00 0.00 0.00 0.00 0.00 1.00
12+540.00 0.00 7.55 20.00 1.85 1.85 0.00 0.00 164.90 1.85 163.05 0.00 0.00 0.00 0.00 1.00
12+550.00 0.00 7.62 10.00 0.00 0.00 0.00 0.00 75.85 0.00 75.85 0.00 0.00 0.00 0.00 1.00
12+560.00 0.00 8.26 10.00 0.00 0.00 0.00 0.00 79.40 0.00 79.40 0.00 0.00 0.00 0.00 1.00
12+570.00 0.00 7.11 10.00 0.00 0.00 0.00 0.00 76.85 0.00 76.85 0.00 0.00 0.00 0.00 1.00
12+580.00 0.00 5.36 10.00 0.00 0.00 0.00 0.00 62.35 0.00 62.35 0.00 0.00 0.00 0.00 1.00
12+600.00 0.00 1.47 20.00 0.00 0.00 0.00 0.00 68.30 0.00 68.30 0.00 0.00 0.00 0.00 1.00
12+620.00 0.42 0.03 20.00 2.10 2.10 0.00 0.00 15.00 2.10 12.90 0.00 0.00 0.00 0.00 1.00
12+640.00 3.80 0.00 20.00 42.20 42.20 0.00 0.00 0.15 0.15 0.00 42.05 42.05 0.00 0.00 1.00
12+650.00 4.31 0.00 10.00 40.55 40.55 0.00 0.00 0.00 0.00 0.00 40.55 40.55 0.00 0.00 1.00
12+660.00 5.95 0.00 10.00 51.30 51.30 0.00 0.00 0.00 0.00 0.00 51.30 51.30 0.00 0.00 1.00
12+680.00 11.16 0.00 20.00 171.10 171.10 0.00 0.00 0.00 0.00 0.00 171.10 171.10 0.00 0.00 1.00
12+690.00 11.42 0.00 10.00 112.90 112.90 0.00 0.00 0.00 0.00 0.00 112.90 112.90 0.00 0.00 1.00
12+700.00 4.96 0.00 10.00 81.90 81.90 0.00 0.00 0.00 0.00 0.00 81.90 81.90 0.00 0.00 1.00
12+720.00 8.91 0.00 20.00 138.70 138.70 0.00 0.00 0.00 0.00 0.00 138.70 138.70 0.00 0.00 1.00
12+740.00 8.88 0.00 20.00 177.90 177.90 0.00 0.00 0.00 0.00 0.00 177.90 177.90 0.00 0.00 1.00
12+750.00 12.37 0.00 10.00 106.25 106.25 0.00 0.00 0.00 0.00 0.00 106.25 106.25 0.00 0.00 1.00
12+760.00 7.67 0.00 10.00 100.20 100.20 0.00 0.00 0.00 0.00 0.00 100.20 100.20 0.00 0.00 1.00
12+770.00 0.53 1.40 10.00 41.00 41.00 0.00 0.00 3.50 3.50 0.00 37.50 37.50 0.00 0.00 1.00
12+780.00 2.81 0.00 10.00 16.70 16.70 0.00 0.00 3.50 3.50 0.00 13.20 13.20 0.00 0.00 1.00
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
12+790.00 1.94 0.00 10.00 23.75 23.75 0.00 0.00 0.00 0.00 0.00 23.75 23.75 0.00 0.00 1.00
12+800.00 3.34 0.00 10.00 26.40 26.40 0.00 0.00 0.00 0.00 0.00 26.40 26.40 0.00 0.00 1.00
12+810.00 4.59 0.00 10.00 39.65 39.65 0.00 0.00 0.00 0.00 0.00 39.65 39.65 0.00 0.00 1.00
12+820.00 6.26 0.00 10.00 54.25 54.25 0.00 0.00 0.00 0.00 0.00 54.25 54.25 0.00 0.00 1.00
12+840.00 4.49 0.00 20.00 107.50 107.50 0.00 0.00 0.00 0.00 0.00 107.50 107.50 0.00 0.00 1.00
12+850.00 2.08 0.00 10.00 32.85 32.85 0.00 0.00 0.00 0.00 0.00 32.85 32.85 0.00 0.00 1.00
12+860.00 0.73 0.26 10.00 14.05 14.05 0.00 0.00 0.65 0.65 0.00 13.40 13.40 0.00 0.00 1.00
12+880.00 1.15 0.00 20.00 18.80 18.80 0.00 0.00 1.30 1.30 0.00 17.50 17.50 0.00 0.00 1.00
12+900.00 0.78 6.44 20.00 19.30 19.30 0.00 0.00 32.20 19.30 12.90 0.00 0.00 0.00 0.00 1.00
12+920.00 0.43 0.95 20.00 12.10 12.10 0.00 0.00 73.90 12.10 61.80 0.00 0.00 0.00 0.00 1.00
12+940.00 0.51 0.56 20.00 9.40 9.40 0.00 0.00 15.10 9.40 5.70 0.00 0.00 0.00 0.00 1.00
12+960.00 2.46 0.00 20.00 29.70 29.70 0.00 0.00 2.80 2.80 0.00 26.90 26.90 0.00 0.00 1.00
12+970.00 2.60 0.03 10.00 25.30 25.30 0.00 0.00 0.08 0.08 0.00 25.23 25.23 0.00 0.00 1.00
12+980.00 4.35 0.00 10.00 34.75 34.75 0.00 0.00 0.08 0.08 0.00 34.68 34.68 0.00 0.00 1.00
13+000.00 1.95 0.29 20.00 63.00 63.00 0.00 0.00 1.45 1.45 0.00 61.55 61.55 0.00 0.00 1.00
13+020.00 1.14 0.93 20.00 30.90 30.90 0.00 0.00 12.20 12.20 0.00 18.70 18.70 0.00 0.00 1.00
13+030.00 3.42 0.00 10.00 22.80 22.80 0.00 0.00 2.33 2.33 0.00 20.48 20.48 0.00 0.00 1.00
13+040.00 3.59 0.00 10.00 35.05 35.05 0.00 0.00 0.00 0.00 0.00 35.05 35.05 0.00 0.00 1.00
13+060.00 2.78 0.00 20.00 63.70 63.70 0.00 0.00 0.00 0.00 0.00 63.70 63.70 0.00 0.00 1.00
13+070.00 5.35 0.00 10.00 40.65 40.65 0.00 0.00 0.00 0.00 0.00 40.65 40.65 0.00 0.00 1.00
13+080.00 4.54 0.16 10.00 49.45 49.45 0.00 0.00 0.40 0.40 0.00 49.05 49.05 0.00 0.00 1.00
13+100.00 4.76 0.00 20.00 93.00 93.00 0.00 0.00 0.80 0.80 0.00 92.20 92.20 0.00 0.00 1.00
13+110.00 1.02 0.36 10.00 28.90 28.90 0.00 0.00 0.90 0.90 0.00 28.00 28.00 0.00 0.00 1.00
13+120.00 0.86 0.90 10.00 9.40 9.40 0.00 0.00 6.30 6.30 0.00 3.10 3.10 0.00 0.00 1.00
13+140.00 1.96 0.97 20.00 28.20 28.20 0.00 0.00 18.70 18.70 0.00 9.50 9.50 0.00 0.00 1.00
13+150.00 2.22 1.23 10.00 20.90 20.90 0.00 0.00 11.00 11.00 0.00 9.90 9.90 0.00 0.00 1.00
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
13+160.00 2.51 0.31 10.00 23.65 23.65 0.00 0.00 7.70 7.70 0.00 15.95 15.95 0.00 0.00 1.00
13+180.00 0.00 2.85 20.00 12.55 12.55 0.00 0.00 31.60 12.55 19.05 0.00 0.00 0.00 0.00 1.00
13+190.00 0.00 6.31 10.00 0.00 0.00 0.00 0.00 45.80 0.00 45.80 0.00 0.00 0.00 0.00 1.00
13+200.00 0.00 2.75 10.00 0.00 0.00 0.00 0.00 45.30 0.00 45.30 0.00 0.00 0.00 0.00 1.00
13+220.00 1.63 0.00 20.00 8.15 8.15 0.00 0.00 13.75 8.15 5.60 0.00 0.00 0.00 0.00 1.00
13+230.00 4.99 0.00 10.00 33.10 33.10 0.00 0.00 0.00 0.00 0.00 33.10 33.10 0.00 0.00 1.00
13+240.00 4.05 0.00 10.00 45.20 45.20 0.00 0.00 0.00 0.00 0.00 45.20 45.20 0.00 0.00 1.00
13+260.00 4.85 0.00 20.00 89.00 89.00 0.00 0.00 0.00 0.00 0.00 89.00 89.00 0.00 0.00 1.00
13+280.00 1.91 0.00 20.00 67.60 67.60 0.00 0.00 0.00 0.00 0.00 67.60 67.60 0.00 0.00 1.00
13+290.00 0.93 1.07 10.00 14.20 14.20 0.00 0.00 2.68 2.68 0.00 11.53 11.53 0.00 0.00 1.00
13+300.00 1.26 0.00 10.00 10.95 10.95 0.00 0.00 2.68 2.68 0.00 8.28 8.28 0.00 0.00 1.00
13+310.00 2.19 0.00 10.00 17.25 17.25 0.00 0.00 0.00 0.00 0.00 17.25 17.25 0.00 0.00 1.00
13+320.00 2.68 0.00 10.00 24.35 24.35 0.00 0.00 0.00 0.00 0.00 24.35 24.35 0.00 0.00 1.00
13+340.00 4.61 0.00 20.00 72.90 72.90 0.00 0.00 0.00 0.00 0.00 72.90 72.90 0.00 0.00 1.00
13+360.00 4.69 0.00 20.00 93.00 93.00 0.00 0.00 0.00 0.00 0.00 93.00 93.00 0.00 0.00 1.00
13+380.00 7.54 0.00 20.00 122.30 122.30 0.00 0.00 0.00 0.00 0.00 122.30 122.30 0.00 0.00 1.00
13+400.00 5.86 0.00 20.00 134.00 134.00 0.00 0.00 0.00 0.00 0.00 134.00 134.00 0.00 0.00 1.00
13+420.00 5.23 0.00 20.00 110.90 110.90 0.00 0.00 0.00 0.00 0.00 110.90 110.90 0.00 0.00 1.00
13+440.00 1.94 0.00 20.00 71.70 71.70 0.00 0.00 0.00 0.00 0.00 71.70 71.70 0.00 0.00 1.00
13+460.00 5.59 0.00 20.00 75.30 75.30 0.00 0.00 0.00 0.00 0.00 75.30 75.30 0.00 0.00 1.00
13+480.00 8.60 0.00 20.00 141.90 141.90 0.00 0.00 0.00 0.00 0.00 141.90 141.90 0.00 0.00 1.00
13+500.00 14.55 0.00 20.00 231.50 231.50 0.00 0.00 0.00 0.00 0.00 231.50 231.50 0.00 0.00 1.00
13+520.00 11.33 0.59 20.00 258.80 258.80 0.00 0.00 2.95 2.95 0.00 255.85 255.85 0.00 0.00 1.00
13+540.00 20.19 0.00 20.00 315.20 315.20 0.00 0.00 2.95 2.95 0.00 312.25 312.25 0.00 0.00 1.00
13+560.00 41.37 0.00 20.00 615.60 615.60 0.00 0.00 0.00 0.00 0.00 615.60 615.60 0.00 0.00 1.00
13+580.00 33.97 0.00 20.00 753.40 753.40 0.00 0.00 0.00 0.00 0.00 753.40 753.40 0.00 0.00 1.00
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
13+590.00 18.86 0.00 10.00 264.15 264.15 0.00 0.00 0.00 0.00 0.00 264.15 264.15 0.00 0.00 1.00
13+600.00 6.88 0.00 10.00 128.70 128.70 0.00 0.00 0.00 0.00 0.00 128.70 128.70 0.00 0.00 1.00
13+620.00 3.86 0.06 20.00 107.40 107.40 0.00 0.00 0.30 0.30 0.00 107.10 107.10 0.00 0.00 1.00
13+640.00 8.01 0.00 20.00 118.70 118.70 0.00 0.00 0.30 0.30 0.00 118.40 118.40 0.00 0.00 1.00
13+660.00 15.82 0.00 20.00 238.30 238.30 0.00 0.00 0.00 0.00 0.00 238.30 238.30 0.00 0.00 1.00
13+680.00 16.27 0.00 20.00 320.90 320.90 0.00 0.00 0.00 0.00 0.00 320.90 320.90 0.00 0.00 1.00
13+690.00 12.53 0.00 10.00 144.00 144.00 0.00 0.00 0.00 0.00 0.00 144.00 144.00 0.00 0.00 1.00
13+700.00 13.85 0.00 10.00 131.90 131.90 0.00 0.00 0.00 0.00 0.00 131.90 131.90 0.00 0.00 1.00
13+720.00 29.24 0.00 20.00 430.90 430.90 0.00 0.00 0.00 0.00 0.00 430.90 430.90 0.00 0.00 1.00
13+740.00 16.34 0.00 20.00 455.80 455.80 0.00 0.00 0.00 0.00 0.00 455.80 455.80 0.00 0.00 1.00
13+760.00 23.67 0.00 20.00 400.10 400.10 0.00 0.00 0.00 0.00 0.00 400.10 400.10 0.00 0.00 1.00
13+770.00 24.65 0.00 10.00 241.60 241.60 0.00 0.00 0.00 0.00 0.00 241.60 241.60 0.00 0.00 1.00
13+780.00 22.82 0.00 10.00 237.35 237.35 0.00 0.00 0.00 0.00 0.00 237.35 237.35 0.00 0.00 1.00
13+790.00 16.72 0.00 10.00 197.70 197.70 0.00 0.00 0.00 0.00 0.00 197.70 197.70 0.00 0.00 1.00
13+800.00 8.64 0.00 10.00 126.80 126.80 0.00 0.00 0.00 0.00 0.00 126.80 126.80 0.00 0.00 1.00
13+820.00 3.10 0.00 20.00 117.40 117.40 0.00 0.00 0.00 0.00 0.00 117.40 117.40 0.00 0.00 1.00
13+840.00 3.04 0.00 20.00 61.40 61.40 0.00 0.00 0.00 0.00 0.00 61.40 61.40 0.00 0.00 1.00
13+860.00 2.06 0.00 20.00 51.00 51.00 0.00 0.00 0.00 0.00 0.00 51.00 51.00 0.00 0.00 1.00
13+880.00 1.59 0.00 20.00 36.50 36.50 0.00 0.00 0.00 0.00 0.00 36.50 36.50 0.00 0.00 1.00
13+890.00 3.07 0.05 10.00 23.30 23.30 0.00 0.00 0.13 0.13 0.00 23.18 23.18 0.00 0.00 1.00
13+900.00 5.45 0.00 10.00 42.60 42.60 0.00 0.00 0.13 0.13 0.00 42.48 42.48 0.00 0.00 1.00
13+910.00 2.61 0.31 10.00 40.30 40.30 0.00 0.00 0.78 0.78 0.00 39.53 39.53 0.00 0.00 1.00
13+920.00 3.88 0.00 10.00 32.45 32.45 0.00 0.00 0.78 0.78 0.00 31.68 31.68 0.00 0.00 1.00
13+930.00 0.00 3.44 10.00 9.70 9.70 0.00 0.00 8.60 8.60 0.00 1.10 1.10 0.00 0.00 1.00
13+940.00 0.00 6.32 10.00 0.00 0.00 0.00 0.00 48.80 0.00 48.80 0.00 0.00 0.00 0.00 1.00
13+960.00 0.00 5.36 20.00 0.00 0.00 0.00 0.00 116.80 0.00 116.80 0.00 0.00 0.00 0.00 1.00
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
13+970.00 0.44 6.14 10.00 1.10 1.10 0.00 0.00 57.50 1.10 56.40 0.00 0.00 0.00 0.00 1.00
13+980.00 1.63 2.24 10.00 10.35 10.35 0.00 0.00 41.90 10.35 31.55 0.00 0.00 0.00 0.00 1.00
13+990.00 6.33 0.00 10.00 39.80 39.80 0.00 0.00 5.60 5.60 0.00 34.20 34.20 0.00 0.00 1.00
14+000.00 8.38 0.00 10.00 73.55 73.55 0.00 0.00 0.00 0.00 0.00 73.55 73.55 0.00 0.00 1.00
14+010.00 20.70 0.00 10.00 145.40 145.40 0.00 0.00 0.00 0.00 0.00 145.40 145.40 0.00 0.00 1.00
14+020.00 20.73 0.00 10.00 207.15 207.15 0.00 0.00 0.00 0.00 0.00 207.15 207.15 0.00 0.00 1.00
14+030.00 9.35 0.00 10.00 150.40 150.40 0.00 0.00 0.00 0.00 0.00 150.40 150.40 0.00 0.00 1.00
14+040.00 4.18 0.00 10.00 67.65 67.65 0.00 0.00 0.00 0.00 0.00 67.65 67.65 0.00 0.00 1.00
14+050.00 1.98 6.15 10.00 30.80 30.80 0.00 0.00 15.38 15.38 0.00 15.43 15.43 0.00 0.00 1.00
14+060.00 1.79 2.71 10.00 18.85 18.85 0.00 0.00 44.30 18.85 25.45 0.00 0.00 0.00 0.00 1.00
14+080.00 5.50 0.00 20.00 72.90 72.90 0.00 0.00 13.55 13.55 0.00 59.35 59.35 0.00 0.00 1.00
14+100.00 2.67 0.00 20.00 81.70 81.70 0.00 0.00 0.00 0.00 0.00 81.70 81.70 0.00 0.00 1.00
14+120.00 1.78 0.00 20.00 44.50 44.50 0.00 0.00 0.00 0.00 0.00 44.50 44.50 0.00 0.00 1.00
14+140.00 1.52 2.82 20.00 33.00 33.00 0.00 0.00 14.10 14.10 0.00 18.90 18.90 0.00 0.00 1.00
14+150.00 1.59 1.08 10.00 15.55 15.55 0.00 0.00 19.50 15.55 3.95 0.00 0.00 0.00 0.00 1.00
14+160.00 0.46 0.83 10.00 10.25 10.25 0.00 0.00 9.55 9.55 0.00 0.70 0.70 0.00 0.00 1.00
14+180.00 0.21 4.14 20.00 6.70 6.70 0.00 0.00 49.70 6.70 43.00 0.00 0.00 0.00 0.00 1.00
14+190.00 2.01 0.26 10.00 11.10 11.10 0.00 0.00 22.00 11.10 10.90 0.00 0.00 0.00 0.00 1.00
14+200.00 2.06 0.00 10.00 20.35 20.35 0.00 0.00 0.65 0.65 0.00 19.70 19.70 0.00 0.00 1.00
14+220.00 5.64 0.00 20.00 77.00 77.00 0.00 0.00 0.00 0.00 0.00 77.00 77.00 0.00 0.00 1.00
14+230.00 4.72 0.00 10.00 51.80 51.80 0.00 0.00 0.00 0.00 0.00 51.80 51.80 0.00 0.00 1.00
14+240.00 3.41 0.00 10.00 40.65 40.65 0.00 0.00 0.00 0.00 0.00 40.65 40.65 0.00 0.00 1.00
14+250.00 2.85 0.00 10.00 31.30 31.30 0.00 0.00 0.00 0.00 0.00 31.30 31.30 0.00 0.00 1.00
14+260.00 2.74 0.00 10.00 27.95 27.95 0.00 0.00 0.00 0.00 0.00 27.95 27.95 0.00 0.00 1.00
14+280.00 3.48 0.00 20.00 62.20 62.20 0.00 0.00 0.00 0.00 0.00 62.20 62.20 0.00 0.00 1.00
14+300.00 1.35 1.02 20.00 48.30 48.30 0.00 0.00 5.10 5.10 0.00 43.20 43.20 0.00 0.00 1.00
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
14+310.00 1.92 0.60 10.00 16.35 16.35 0.00 0.00 8.10 8.10 0.00 8.25 8.25 0.00 0.00 1.00
14+320.00 4.84 0.00 10.00 33.80 33.80 0.00 0.00 1.50 1.50 0.00 32.30 32.30 0.00 0.00 1.00
14+330.00 5.15 0.00 10.00 49.95 49.95 0.00 0.00 0.00 0.00 0.00 49.95 49.95 0.00 0.00 1.00
14+340.00 5.50 0.00 10.00 53.25 53.25 0.00 0.00 0.00 0.00 0.00 53.25 53.25 0.00 0.00 1.00
14+360.00 10.39 0.00 20.00 158.90 158.90 0.00 0.00 0.00 0.00 0.00 158.90 158.90 0.00 0.00 1.00
14+370.00 13.66 0.00 10.00 120.25 120.25 0.00 0.00 0.00 0.00 0.00 120.25 120.25 0.00 0.00 1.00
14+380.00 7.42 0.00 10.00 105.40 105.40 0.00 0.00 0.00 0.00 0.00 105.40 105.40 0.00 0.00 1.00
14+400.00 1.89 0.03 20.00 93.10 93.10 0.00 0.00 0.15 0.15 0.00 92.95 92.95 0.00 0.00 1.00
14+410.00 0.87 0.05 10.00 13.80 13.80 0.00 0.00 0.40 0.40 0.00 13.40 13.40 0.00 0.00 1.00
14+420.00 1.90 0.00 10.00 13.85 13.85 0.00 0.00 0.13 0.13 0.00 13.73 13.73 0.00 0.00 1.00
14+440.00 9.41 0.60 20.00 113.10 113.10 0.00 0.00 3.00 3.00 0.00 110.10 110.10 0.00 0.00 1.00
14+450.00 6.48 3.66 10.00 79.45 79.45 0.00 0.00 21.30 21.30 0.00 58.15 58.15 0.00 0.00 1.00
14+460.00 16.78 0.00 10.00 116.30 116.30 0.00 0.00 9.15 9.15 0.00 107.15 107.15 0.00 0.00 1.00
14+480.00 26.77 0.00 20.00 435.50 435.50 0.00 0.00 0.00 0.00 0.00 435.50 435.50 0.00 0.00 1.00
14+500.00 63.51 0.00 20.00 902.80 902.80 0.00 0.00 0.00 0.00 0.00 902.80 902.80 0.00 0.00 1.00
14+510.00 6.24 0.80 10.00 348.75 348.75 0.00 0.00 2.00 2.00 0.00 346.75 346.75 0.00 0.00 1.00
14+520.00 0.01 2.48 10.00 31.25 31.25 0.00 0.00 16.40 16.40 0.00 14.85 14.85 0.00 0.00 1.00
14+540.00 2.27 3.05 20.00 22.80 22.80 0.00 0.00 55.30 22.80 32.50 0.00 0.00 0.00 0.00 1.00
14+550.00 0.58 1.81 10.00 14.25 14.25 0.00 0.00 24.30 14.25 10.05 0.00 0.00 0.00 0.00 1.00
14+560.00 5.31 2.50 10.00 29.45 29.45 0.00 0.00 21.55 21.55 0.00 7.90 7.90 0.00 0.00 1.00
14+580.00 0.00 19.09 20.00 26.55 26.55 0.00 0.00 215.90 26.55 189.35 0.00 0.00 0.00 0.00 1.00
14+590.00 0.00 15.34 10.00 0.00 0.00 0.00 0.00 172.15 0.00 172.15 0.00 0.00 0.00 0.00 1.00
14+600.00 0.00 6.27 10.00 0.00 0.00 0.00 0.00 108.05 0.00 108.05 0.00 0.00 0.00 0.00 1.00
14+620.00 0.00 10.46 20.00 0.00 0.00 0.00 0.00 167.30 0.00 167.30 0.00 0.00 0.00 0.00 1.00
14+640.00 0.00 5.34 20.00 0.00 0.00 0.00 0.00 158.00 0.00 158.00 0.00 0.00 0.00 0.00 1.00
14+650.00 0.00 9.70 10.00 0.00 0.00 0.00 0.00 75.20 0.00 75.20 0.00 0.00 0.00 0.00 1.00
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
14+660.00 0.00 7.81 10.00 0.00 0.00 0.00 0.00 87.55 0.00 87.55 0.00 0.00 0.00 0.00 1.00
14+670.00 0.65 2.61 10.00 1.63 1.63 0.00 0.00 52.10 1.63 50.48 0.00 0.00 0.00 0.00 1.00
14+680.00 0.37 1.56 10.00 5.10 5.10 0.00 0.00 20.85 5.10 15.75 0.00 0.00 0.00 0.00 1.00
14+700.00 0.18 0.85 20.00 5.50 5.50 0.00 0.00 24.10 5.50 18.60 0.00 0.00 0.00 0.00 1.00
14+710.00 0.02 0.61 10.00 1.00 1.00 0.00 0.00 7.30 1.00 6.30 0.00 0.00 0.00 0.00 1.00
14+720.00 0.62 0.17 10.00 3.20 3.20 0.00 0.00 3.90 3.20 0.70 0.00 0.00 0.00 0.00 1.00
14+740.00 3.00 0.00 20.00 36.20 36.20 0.00 0.00 0.85 0.85 0.00 35.35 35.35 0.00 0.00 1.00
14+760.00 2.48 0.81 20.00 54.80 54.80 0.00 0.00 4.05 4.05 0.00 50.75 50.75 0.00 0.00 1.00
14+780.00 0.24 2.62 20.00 27.20 27.20 0.00 0.00 34.30 27.20 7.10 0.00 0.00 0.00 0.00 1.00
14+790.00 0.35 4.43 10.00 2.95 2.95 0.00 0.00 35.25 2.95 32.30 0.00 0.00 0.00 0.00 1.00
14+800.00 3.12 1.85 10.00 17.35 17.35 0.00 0.00 31.40 17.35 14.05 0.00 0.00 0.00 0.00 1.00
14+820.00 4.98 0.00 20.00 81.00 81.00 0.00 0.00 9.25 9.25 0.00 71.75 71.75 0.00 0.00 1.00
14+840.00 7.90 0.00 20.00 128.80 128.80 0.00 0.00 0.00 0.00 0.00 128.80 128.80 0.00 0.00 1.00
14+860.00 19.59 0.00 20.00 274.90 274.90 0.00 0.00 0.00 0.00 0.00 274.90 274.90 0.00 0.00 1.00
14+880.00 10.65 0.00 20.00 302.40 302.40 0.00 0.00 0.00 0.00 0.00 302.40 302.40 0.00 0.00 1.00
14+900.00 2.46 0.00 20.00 131.10 131.10 0.00 0.00 0.00 0.00 0.00 131.10 131.10 0.00 0.00 1.00
14+920.00 3.68 0.01 20.00 61.40 61.40 0.00 0.00 0.05 0.05 0.00 61.35 61.35 0.00 0.00 1.00
14+940.00 5.53 0.00 20.00 92.10 92.10 0.00 0.00 0.05 0.05 0.00 92.05 92.05 0.00 0.00 1.00
14+950.00 2.47 0.00 10.00 40.00 40.00 0.00 0.00 0.00 0.00 0.00 40.00 40.00 0.00 0.00 1.00
14+960.00 1.26 0.23 10.00 18.65 18.65 0.00 0.00 0.58 0.58 0.00 18.08 18.08 0.00 0.00 1.00
14+980.00 0.08 0.11 20.00 13.40 13.40 0.00 0.00 3.40 3.40 0.00 10.00 10.00 0.00 0.00 1.00
15+000.00 1.71 0.00 20.00 17.90 17.90 0.00 0.00 0.55 0.55 0.00 17.35 17.35 0.00 0.00 1.00
15+020.00 3.86 0.00 20.00 55.70 55.70 0.00 0.00 0.00 0.00 0.00 55.70 55.70 0.00 0.00 1.00
15+040.00 4.13 0.00 20.00 79.90 79.90 0.00 0.00 0.00 0.00 0.00 79.90 79.90 0.00 0.00 1.00
15+060.00 4.87 0.00 20.00 90.00 90.00 0.00 0.00 0.00 0.00 0.00 90.00 90.00 0.00 0.00 1.00
15+080.00 4.59 0.00 20.00 94.60 94.60 0.00 0.00 0.00 0.00 0.00 94.60 94.60 0.00 0.00 1.00
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
15+100.00 6.26 0.00 20.00 108.50 108.50 0.00 0.00 0.00 0.00 0.00 108.50 108.50 0.00 0.00 1.00
15+120.00 3.77 0.00 20.00 100.30 100.30 0.00 0.00 0.00 0.00 0.00 100.30 100.30 0.00 0.00 1.00
15+140.00 4.07 0.00 20.00 78.40 78.40 0.00 0.00 0.00 0.00 0.00 78.40 78.40 0.00 0.00 1.00
15+160.00 5.26 0.00 20.00 93.30 93.30 0.00 0.00 0.00 0.00 0.00 93.30 93.30 0.00 0.00 1.00
15+180.00 2.83 0.34 20.00 80.90 80.90 0.00 0.00 1.70 1.70 0.00 79.20 79.20 0.00 0.00 1.00
15+200.00 2.53 0.00 20.00 53.60 53.60 0.00 0.00 1.70 1.70 0.00 51.90 51.90 0.00 0.00 1.00
15+220.00 2.62 0.00 20.00 51.50 51.50 0.00 0.00 0.00 0.00 0.00 51.50 51.50 0.00 0.00 1.00
15+230.00 3.85 0.00 10.00 32.35 32.35 0.00 0.00 0.00 0.00 0.00 32.35 32.35 0.00 0.00 1.00
15+240.00 6.16 0.00 10.00 50.05 50.05 0.00 0.00 0.00 0.00 0.00 50.05 50.05 0.00 0.00 1.00
15+250.00 0.60 2.01 10.00 33.80 33.80 0.00 0.00 5.03 5.03 0.00 28.78 28.78 0.00 0.00 1.00
15+260.00 0.83 2.38 10.00 7.15 7.15 0.00 0.00 21.95 7.15 14.80 0.00 0.00 0.00 0.00 1.00
15+280.00 0.00 0.68 20.00 4.15 4.15 0.00 0.00 30.60 4.15 26.45 0.00 0.00 0.00 0.00 1.00
15+300.00 0.59 5.72 20.00 2.95 2.95 0.00 0.00 64.00 2.95 61.05 0.00 0.00 0.00 0.00 1.00
15+320.00 6.86 0.00 20.00 74.50 74.50 0.00 0.00 28.60 28.60 0.00 45.90 45.90 0.00 0.00 1.00
15+330.00 5.04 0.00 10.00 59.50 59.50 0.00 0.00 0.00 0.00 0.00 59.50 59.50 0.00 0.00 1.00
15+340.00 2.69 0.00 10.00 38.65 38.65 0.00 0.00 0.00 0.00 0.00 38.65 38.65 0.00 0.00 1.00
15+360.00 3.07 0.25 20.00 57.60 57.60 0.00 0.00 1.25 1.25 0.00 56.35 56.35 0.00 0.00 1.00
15+380.00 3.57 0.34 20.00 66.40 66.40 0.00 0.00 5.90 5.90 0.00 60.50 60.50 0.00 0.00 1.00
15+400.00 16.97 0.00 20.00 205.40 205.40 0.00 0.00 1.70 1.70 0.00 203.70 203.70 0.00 0.00 1.00
15+410.00 28.50 0.00 10.00 227.35 227.35 0.00 0.00 0.00 0.00 0.00 227.35 227.35 0.00 0.00 1.00
15+420.00 35.11 0.00 10.00 318.05 318.05 0.00 0.00 0.00 0.00 0.00 318.05 318.05 0.00 0.00 1.00
15+440.00 6.46 0.00 20.00 415.70 415.70 0.00 0.00 0.00 0.00 0.00 415.70 415.70 0.00 0.00 1.00
15+460.00 2.55 3.99 20.00 90.10 90.10 0.00 0.00 19.95 19.95 0.00 70.15 70.15 0.00 0.00 1.00
15+480.00 4.12 0.43 20.00 66.70 66.70 0.00 0.00 44.20 44.20 0.00 22.50 22.50 0.00 0.00 1.00
15+490.00 4.39 0.04 10.00 42.55 42.55 0.00 0.00 2.35 2.35 0.00 40.20 40.20 0.00 0.00 1.00
15+500.00 4.64 0.04 10.00 45.15 45.15 0.00 0.00 0.40 0.40 0.00 44.75 44.75 0.00 0.00 1.00
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
15+520.00 3.09 1.20 20.00 77.30 77.30 0.00 0.00 12.40 12.40 0.00 64.90 64.90 0.00 0.00 1.00
15+540.00 1.84 0.55 20.00 49.30 49.30 0.00 0.00 17.50 17.50 0.00 31.80 31.80 0.00 0.00 1.00
15+560.00 2.92 0.03 20.00 47.60 47.60 0.00 0.00 5.80 5.80 0.00 41.80 41.80 0.00 0.00 1.00
15+570.00 5.15 0.00 10.00 40.35 40.35 0.00 0.00 0.08 0.08 0.00 40.28 40.28 0.00 0.00 1.00
15+580.00 4.63 0.00 10.00 48.90 48.90 0.00 0.00 0.00 0.00 0.00 48.90 48.90 0.00 0.00 1.00
15+590.00 4.56 0.00 10.00 45.95 45.95 0.00 0.00 0.00 0.00 0.00 45.95 45.95 0.00 0.00 1.00
15+600.00 4.23 0.00 10.00 43.95 43.95 0.00 0.00 0.00 0.00 0.00 43.95 43.95 0.00 0.00 1.00
15+620.00 2.30 0.21 20.00 65.30 65.30 0.00 0.00 1.05 1.05 0.00 64.25 64.25 0.00 0.00 1.00
15+640.00 2.09 3.48 20.00 43.90 43.90 0.00 0.00 36.90 36.90 0.00 7.00 7.00 0.00 0.00 1.00
15+660.00 5.64 0.00 20.00 77.30 77.30 0.00 0.00 17.40 17.40 0.00 59.90 59.90 0.00 0.00 1.00
15+680.00 13.96 0.00 20.00 196.00 196.00 0.00 0.00 0.00 0.00 0.00 196.00 196.00 0.00 0.00 1.00
15+700.00 10.46 0.00 20.00 244.20 244.20 0.00 0.00 0.00 0.00 0.00 244.20 244.20 0.00 0.00 1.00
15+720.00 3.38 0.00 20.00 138.40 138.40 0.00 0.00 0.00 0.00 0.00 138.40 138.40 0.00 0.00 1.00
15+740.00 7.45 2.28 20.00 108.30 108.30 0.00 0.00 11.40 11.40 0.00 96.90 96.90 0.00 0.00 1.00
15+750.00 3.42 7.93 10.00 54.35 54.35 0.00 0.00 51.05 51.05 0.00 3.30 3.30 0.00 0.00 1.00
15+760.00 1.73 11.70 10.00 25.75 25.75 0.00 0.00 98.15 25.75 72.40 0.00 0.00 0.00 0.00 1.00
15+780.00 4.28 0.06 20.00 60.10 60.10 0.00 0.00 117.60 60.10 57.50 0.00 0.00 0.00 0.00 1.00
15+790.00 8.11 0.00 10.00 61.95 61.95 0.00 0.00 0.15 0.15 0.00 61.80 61.80 0.00 0.00 1.00
15+800.00 4.88 0.00 10.00 64.95 64.95 0.00 0.00 0.00 0.00 0.00 64.95 64.95 0.00 0.00 1.00
15+820.00 6.45 0.00 20.00 113.30 113.30 0.00 0.00 0.00 0.00 0.00 113.30 113.30 0.00 0.00 1.00
15+830.00 5.00 0.00 10.00 57.25 57.25 0.00 0.00 0.00 0.00 0.00 57.25 57.25 0.00 0.00 1.00
15+840.00 5.16 1.68 10.00 50.80 50.80 0.00 0.00 4.20 4.20 0.00 46.60 46.60 0.00 0.00 1.00
15+860.00 10.25 0.00 20.00 154.10 154.10 0.00 0.00 8.40 8.40 0.00 145.70 145.70 0.00 0.00 1.00
15+870.00 9.14 0.00 10.00 96.95 96.95 0.00 0.00 0.00 0.00 0.00 96.95 96.95 0.00 0.00 1.00
15+880.00 7.94 0.00 10.00 85.40 85.40 0.00 0.00 0.00 0.00 0.00 85.40 85.40 0.00 0.00 1.00
15+900.00 4.19 1.42 20.00 121.30 121.30 0.00 0.00 7.10 7.10 0.00 114.20 114.20 0.00 0.00 1.00
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
15+920.00 6.07 0.00 20.00 102.60 102.60 0.00 0.00 7.10 7.10 0.00 95.50 95.50 0.00 0.00 1.00
15+940.00 8.35 0.00 20.00 144.20 144.20 0.00 0.00 0.00 0.00 0.00 144.20 144.20 0.00 0.00 1.00
15+960.00 4.14 0.03 20.00 124.90 124.90 0.00 0.00 0.15 0.15 0.00 124.75 124.75 0.00 0.00 1.00
15+980.00 10.17 2.00 20.00 143.10 143.10 0.00 0.00 20.30 20.30 0.00 122.80 122.80 0.00 0.00 1.00
15+990.00 2.80 6.09 10.00 64.85 64.85 0.00 0.00 40.45 40.45 0.00 24.40 24.40 0.00 0.00 1.00
16+000.00 2.18 5.15 10.00 24.90 24.90 0.00 0.00 56.20 24.90 31.30 0.00 0.00 0.00 0.00 1.00
16+010.00 13.48 5.15 10.00 78.30 78.30 0.00 0.00 51.50 51.50 0.00 26.80 26.80 0.00 0.00 1.00
16+020.00 9.64 2.94 10.00 115.60 115.60 0.00 0.00 40.45 40.45 0.00 75.15 75.15 0.00 0.00 1.00
16+040.00 4.48 2.45 20.00 141.20 141.20 0.00 0.00 53.90 53.90 0.00 87.30 87.30 0.00 0.00 1.00
16+060.00 0.98 2.10 20.00 54.60 54.60 0.00 0.00 45.50 45.50 0.00 9.10 9.10 0.00 0.00 1.00
16+080.00 1.59 2.10 20.00 25.70 25.70 0.00 0.00 42.00 25.70 16.30 0.00 0.00 0.00 0.00 1.00
16+100.00 7.76 0.00 20.00 93.50 93.50 0.00 0.00 10.50 10.50 0.00 83.00 83.00 0.00 0.00 1.00
16+120.00 8.21 0.00 20.00 159.70 159.70 0.00 0.00 0.00 0.00 0.00 159.70 159.70 0.00 0.00 1.00
16+140.00 4.81 0.22 20.00 130.20 130.20 0.00 0.00 1.10 1.10 0.00 129.10 129.10 0.00 0.00 1.00
16+160.00 4.10 0.00 20.00 89.10 89.10 0.00 0.00 1.10 1.10 0.00 88.00 88.00 0.00 0.00 1.00
16+180.00 2.76 0.41 20.00 68.60 68.60 0.00 0.00 2.05 2.05 0.00 66.55 66.55 0.00 0.00 1.00
16+200.00 3.24 0.00 20.00 60.00 60.00 0.00 0.00 2.05 2.05 0.00 57.95 57.95 0.00 0.00 1.00
16+210.00 3.66 0.00 10.00 34.50 34.50 0.00 0.00 0.00 0.00 0.00 34.50 34.50 0.00 0.00 1.00
16+220.00 3.64 0.35 10.00 36.50 36.50 0.00 0.00 0.88 0.88 0.00 35.63 35.63 0.00 0.00 1.00
16+240.00 4.42 0.17 20.00 80.60 80.60 0.00 0.00 5.20 5.20 0.00 75.40 75.40 0.00 0.00 1.00
16+260.00 7.26 0.00 20.00 116.80 116.80 0.00 0.00 0.85 0.85 0.00 115.95 115.95 0.00 0.00 1.00
16+280.00 7.80 0.00 20.00 150.60 150.60 0.00 0.00 0.00 0.00 0.00 150.60 150.60 0.00 0.00 1.00
16+300.00 5.59 0.00 20.00 133.90 133.90 0.00 0.00 0.00 0.00 0.00 133.90 133.90 0.00 0.00 1.00
16+320.00 5.74 0.22 20.00 113.30 113.30 0.00 0.00 1.10 1.10 0.00 112.20 112.20 0.00 0.00 1.00
16+340.00 6.31 0.87 20.00 120.50 120.50 0.00 0.00 10.90 10.90 0.00 109.60 109.60 0.00 0.00 1.00
16+360.00 10.53 0.00 20.00 168.40 168.40 0.00 0.00 4.35 4.35 0.00 164.05 164.05 0.00 0.00 1.00
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
16+380.00 0.94 1.07 20.00 114.70 114.70 0.00 0.00 5.35 5.35 0.00 109.35 109.35 0.00 0.00 1.00
16+400.00 1.06 1.53 20.00 20.00 20.00 0.00 0.00 26.00 20.00 6.00 0.00 0.00 0.00 0.00 1.00
16+420.00 0.86 3.30 20.00 19.20 19.20 0.00 0.00 48.30 19.20 29.10 0.00 0.00 0.00 0.00 1.00
16+440.00 4.29 0.00 20.00 51.50 51.50 0.00 0.00 16.50 16.50 0.00 35.00 35.00 0.00 0.00 1.00
16+450.00 3.49 0.00 10.00 38.90 38.90 0.00 0.00 0.00 0.00 0.00 38.90 38.90 0.00 0.00 1.00
16+460.00 1.58 0.43 10.00 25.35 25.35 0.00 0.00 1.08 1.08 0.00 24.28 24.28 0.00 0.00 1.00
16+480.00 3.90 0.00 20.00 54.80 54.80 0.00 0.00 2.15 2.15 0.00 52.65 52.65 0.00 0.00 1.00
16+500.00 1.53 0.28 20.00 54.30 54.30 0.00 0.00 1.40 1.40 0.00 52.90 52.90 0.00 0.00 1.00
16+520.00 2.67 0.27 20.00 42.00 42.00 0.00 0.00 5.50 5.50 0.00 36.50 36.50 0.00 0.00 1.00
16+530.00 2.22 1.15 10.00 24.45 24.45 0.00 0.00 7.10 7.10 0.00 17.35 17.35 0.00 0.00 1.00
16+540.00 5.45 0.01 10.00 38.35 38.35 0.00 0.00 5.80 5.80 0.00 32.55 32.55 0.00 0.00 1.00
16+550.00 2.31 0.28 10.00 38.80 38.80 0.00 0.00 1.45 1.45 0.00 37.35 37.35 0.00 0.00 1.00
16+560.00 2.11 0.23 10.00 22.10 22.10 0.00 0.00 2.55 2.55 0.00 19.55 19.55 0.00 0.00 1.00
16+580.00 0.55 3.94 20.00 26.60 26.60 0.00 0.00 41.70 26.60 15.10 0.00 0.00 0.00 0.00 1.00
16+600.00 2.39 0.60 20.00 29.40 29.40 0.00 0.00 45.40 29.40 16.00 0.00 0.00 0.00 0.00 1.00
16+620.00 5.15 0.00 20.00 75.40 75.40 0.00 0.00 3.00 3.00 0.00 72.40 72.40 0.00 0.00 1.00
16+630.00 7.46 0.00 10.00 63.05 63.05 0.00 0.00 0.00 0.00 0.00 63.05 63.05 0.00 0.00 1.00
16+640.00 23.57 0.00 10.00 155.15 155.15 0.00 0.00 0.00 0.00 0.00 155.15 155.15 0.00 0.00 1.00
16+650.00 6.31 1.20 10.00 149.40 149.40 0.00 0.00 3.00 3.00 0.00 146.40 146.40 0.00 0.00 1.00
16+660.00 0.00 1.88 10.00 15.78 15.78 0.00 0.00 15.40 15.40 0.00 0.37 0.37 0.00 0.00 1.00
16+680.00 0.00 5.41 20.00 0.00 0.00 0.00 0.00 72.90 0.00 72.90 0.00 0.00 0.00 0.00 1.00
16+700.00 0.24 1.54 20.00 1.20 1.20 0.00 0.00 69.50 1.20 68.30 0.00 0.00 0.00 0.00 1.00
16+720.00 1.56 0.00 20.00 18.00 18.00 0.00 0.00 7.70 7.70 0.00 10.30 10.30 0.00 0.00 1.00
16+740.00 2.31 0.63 20.00 38.70 38.70 0.00 0.00 3.15 3.15 0.00 35.55 35.55 0.00 0.00 1.00
16+750.00 1.34 1.10 10.00 18.25 18.25 0.00 0.00 8.65 8.65 0.00 9.60 9.60 0.00 0.00 1.00
16+760.00 0.00 3.92 10.00 3.35 3.35 0.00 0.00 25.10 3.35 21.75 0.00 0.00 0.00 0.00 1.00
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
16+780.00 8.49 0.55 20.00 42.45 42.45 0.00 0.00 44.70 42.45 2.25 0.00 0.00 0.00 0.00 1.00
16+790.00 24.85 0.00 10.00 166.70 166.70 0.00 0.00 1.38 1.38 0.00 165.33 165.33 0.00 0.00 1.00
16+800.00 8.60 1.34 10.00 167.25 167.25 0.00 0.00 3.35 3.35 0.00 163.90 163.90 0.00 0.00 1.00
16+820.00 0.00 3.45 20.00 43.00 43.00 0.00 0.00 47.90 43.00 4.90 0.00 0.00 0.00 0.00 1.00
16+830.00 0.00 5.21 10.00 0.00 0.00 0.00 0.00 43.30 0.00 43.30 0.00 0.00 0.00 0.00 1.00
16+840.00 0.00 7.20 10.00 0.00 0.00 0.00 0.00 62.05 0.00 62.05 0.00 0.00 0.00 0.00 1.00
16+860.00 0.00 9.19 20.00 0.00 0.00 0.00 0.00 163.90 0.00 163.90 0.00 0.00 0.00 0.00 1.00
16+880.00 0.00 8.45 20.00 0.00 0.00 0.00 0.00 176.40 0.00 176.40 0.00 0.00 0.00 0.00 1.00
16+900.00 0.78 1.62 20.00 3.90 3.90 0.00 0.00 100.70 3.90 96.80 0.00 0.00 0.00 0.00 1.00
16+920.00 0.62 3.85 20.00 14.00 14.00 0.00 0.00 54.70 14.00 40.70 0.00 0.00 0.00 0.00 1.00
16+930.00 1.38 7.41 10.00 10.00 10.00 0.00 0.00 56.30 10.00 46.30 0.00 0.00 0.00 0.00 1.00
16+940.00 1.29 4.51 10.00 13.35 13.35 0.00 0.00 59.60 13.35 46.25 0.00 0.00 0.00 0.00 1.00
16+960.00 14.88 0.10 20.00 161.70 161.70 0.00 0.00 46.10 46.10 0.00 115.60 115.60 0.00 0.00 1.00
16+970.00 15.42 0.00 10.00 151.50 151.50 0.00 0.00 0.25 0.25 0.00 151.25 151.25 0.00 0.00 1.00
16+980.00 9.47 0.00 10.00 124.45 124.45 0.00 0.00 0.00 0.00 0.00 124.45 124.45 0.00 0.00 1.00
17+000.00 0.84 0.38 20.00 103.10 103.10 0.00 0.00 1.90 1.90 0.00 101.20 101.20 0.00 0.00 1.00
17+020.00 0.16 2.73 20.00 10.00 10.00 0.00 0.00 31.10 10.00 21.10 0.00 0.00 0.00 0.00 1.00
17+040.00 0.60 3.80 20.00 7.60 7.60 0.00 0.00 65.30 7.60 57.70 0.00 0.00 0.00 0.00 1.00
17+060.00 0.00 6.81 20.00 3.00 3.00 0.00 0.00 106.10 3.00 103.10 0.00 0.00 0.00 0.00 1.00
17+070.00 0.00 11.17 10.00 0.00 0.00 0.00 0.00 89.90 0.00 89.90 0.00 0.00 0.00 0.00 1.00
17+080.00 0.00 15.49 10.00 0.00 0.00 0.00 0.00 133.30 0.00 133.30 0.00 0.00 0.00 0.00 1.00
17+100.00 0.00 19.25 20.00 0.00 0.00 0.00 0.00 347.40 0.00 347.40 0.00 0.00 0.00 0.00 1.00
17+120.00 0.00 17.07 20.00 0.00 0.00 0.00 0.00 363.20 0.00 363.20 0.00 0.00 0.00 0.00 1.00
17+140.00 0.00 6.04 20.00 0.00 0.00 0.00 0.00 231.10 0.00 231.10 0.00 0.00 0.00 0.00 1.00
17+160.00 0.00 6.27 20.00 0.00 0.00 0.00 0.00 123.10 0.00 123.10 0.00 0.00 0.00 0.00 1.00
17+170.00 0.00 10.93 10.00 0.00 0.00 0.00 0.00 86.00 0.00 86.00 0.00 0.00 0.00 0.00 1.00
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
17+180.00 0.00 10.90 10.00 0.00 0.00 0.00 0.00 109.15 0.00 109.15 0.00 0.00 0.00 0.00 1.00
17+200.00 1.17 3.13 20.00 5.85 5.85 0.00 0.00 140.30 5.85 134.45 0.00 0.00 0.00 0.00 1.00
17+210.00 0.00 8.93 10.00 2.93 2.93 0.00 0.00 60.30 2.93 57.38 0.00 0.00 0.00 0.00 1.00
17+220.00 0.00 12.51 10.00 0.00 0.00 0.00 0.00 107.20 0.00 107.20 0.00 0.00 0.00 0.00 1.00
17+230.00 0.00 8.45 10.00 0.00 0.00 0.00 0.00 104.80 0.00 104.80 0.00 0.00 0.00 0.00 1.00
17+240.00 0.34 2.33 10.00 0.85 0.85 0.00 0.00 53.90 0.85 53.05 0.00 0.00 0.00 0.00 1.00
17+260.00 1.41 13.07 20.00 17.50 17.50 0.00 0.00 154.00 17.50 136.50 0.00 0.00 0.00 0.00 1.00
17+270.00 0.57 24.70 10.00 9.90 9.90 0.00 0.00 188.85 9.90 178.95 0.00 0.00 0.00 0.00 1.00
17+280.00 7.62 1.82 10.00 40.95 40.95 0.00 0.00 132.60 40.95 91.65 0.00 0.00 0.00 0.00 1.00
17+300.00 3.03 3.61 20.00 106.50 106.50 0.00 0.00 54.30 54.30 0.00 52.20 52.20 0.00 0.00 1.00
17+320.00 8.95 1.95 20.00 119.80 119.80 0.00 0.00 55.60 55.60 0.00 64.20 64.20 0.00 0.00 1.00
17+330.00 7.75 1.32 10.00 83.50 83.50 0.00 0.00 16.35 16.35 0.00 67.15 67.15 0.00 0.00 1.00
17+340.00 5.69 2.12 10.00 67.20 67.20 0.00 0.00 17.20 17.20 0.00 50.00 50.00 0.00 0.00 1.00
17+360.00 1.33 0.00 20.00 70.20 70.20 0.00 0.00 10.60 10.60 0.00 59.60 59.60 0.00 0.00 1.00
17+370.00 2.29 0.00 10.00 18.10 18.10 0.00 0.00 0.00 0.00 0.00 18.10 18.10 0.00 0.00 1.00
17+380.00 19.25 0.00 10.00 107.70 107.70 0.00 0.00 0.00 0.00 0.00 107.70 107.70 0.00 0.00 1.00
17+390.00 3.34 0.12 10.00 112.95 112.95 0.00 0.00 0.30 0.30 0.00 112.65 112.65 0.00 0.00 1.00
17+400.00 4.42 1.11 10.00 38.80 38.80 0.00 0.00 6.15 6.15 0.00 32.65 32.65 0.00 0.00 1.00
17+420.00 0.00 5.69 20.00 22.10 22.10 0.00 0.00 68.00 22.10 45.90 0.00 0.00 0.00 0.00 1.00
17+430.00 0.00 4.54 10.00 0.00 0.00 0.00 0.00 51.15 0.00 51.15 0.00 0.00 0.00 0.00 1.00
17+440.00 0.20 6.31 10.00 0.50 0.50 0.00 0.00 54.25 0.50 53.75 0.00 0.00 0.00 0.00 1.00
17+450.00 0.92 1.23 10.00 5.60 5.60 0.00 0.00 37.70 5.60 32.10 0.00 0.00 0.00 0.00 1.00
17+460.00 4.67 3.51 10.00 27.95 27.95 0.00 0.00 23.70 23.70 0.00 4.25 4.25 0.00 0.00 1.00
17+480.00 12.51 1.21 20.00 171.80 171.80 0.00 0.00 47.20 47.20 0.00 124.60 124.60 0.00 0.00 1.00
17+500.00 5.20 2.01 20.00 177.10 177.10 0.00 0.00 32.20 32.20 0.00 144.90 144.90 0.00 0.00 1.00
17+510.00 6.86 0.00 10.00 60.30 60.30 0.00 0.00 5.03 5.03 0.00 55.28 55.28 0.00 0.00 1.00
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
17+520.00 11.08 0.00 10.00 89.70 89.70 0.00 0.00 0.00 0.00 0.00 89.70 89.70 0.00 0.00 1.00
17+540.00 4.69 0.41 20.00 157.70 157.70 0.00 0.00 2.05 2.05 0.00 155.65 155.65 0.00 0.00 1.00
17+550.00 3.16 2.40 10.00 39.25 39.25 0.00 0.00 14.05 14.05 0.00 25.20 25.20 0.00 0.00 1.00
17+560.00 5.07 0.93 10.00 41.15 41.15 0.00 0.00 16.65 16.65 0.00 24.50 24.50 0.00 0.00 1.00
17+580.00 5.40 0.37 20.00 104.70 104.70 0.00 0.00 13.00 13.00 0.00 91.70 91.70 0.00 0.00 1.00
17+600.00 2.96 4.29 20.00 83.60 83.60 0.00 0.00 46.60 46.60 0.00 37.00 37.00 0.00 0.00 1.00
17+610.00 0.21 0.85 10.00 15.85 15.85 0.00 0.00 25.70 15.85 9.85 0.00 0.00 0.00 0.00 1.00
17+620.00 1.42 0.00 10.00 8.15 8.15 0.00 0.00 2.13 2.13 0.00 6.03 6.03 0.00 0.00 1.00
17+630.00 1.29 0.39 10.00 13.55 13.55 0.00 0.00 0.98 0.98 0.00 12.58 12.58 0.00 0.00 1.00
17+640.00 0.60 1.23 10.00 9.45 9.45 0.00 0.00 8.10 8.10 0.00 1.35 1.35 0.00 0.00 1.00
17+650.00 7.31 0.31 10.00 39.55 39.55 0.00 0.00 7.70 7.70 0.00 31.85 31.85 0.00 0.00 1.00
17+660.00 12.42 0.02 10.00 98.65 98.65 0.00 0.00 1.65 1.65 0.00 97.00 97.00 0.00 0.00 1.00
17+670.00 3.48 0.00 10.00 79.50 79.50 0.00 0.00 0.05 0.05 0.00 79.45 79.45 0.00 0.00 1.00
17+680.00 1.85 2.45 10.00 26.65 26.65 0.00 0.00 6.13 6.13 0.00 20.53 20.53 0.00 0.00 1.00
17+700.00 0.72 11.57 20.00 25.70 25.70 0.00 0.00 140.20 25.70 114.50 0.00 0.00 0.00 0.00 1.00
17+710.00 0.00 6.46 10.00 1.80 1.80 0.00 0.00 90.15 1.80 88.35 0.00 0.00 0.00 0.00 1.00
17+720.00 1.42 0.84 10.00 3.55 3.55 0.00 0.00 36.50 3.55 32.95 0.00 0.00 0.00 0.00 1.00
17+730.00 2.07 3.14 10.00 17.45 17.45 0.00 0.00 19.90 17.45 2.45 0.00 0.00 0.00 0.00 1.00
17+740.00 1.20 0.00 10.00 16.35 16.35 0.00 0.00 7.85 7.85 0.00 8.50 8.50 0.00 0.00 1.00
17+760.00 4.88 1.04 20.00 60.80 60.80 0.00 0.00 5.20 5.20 0.00 55.60 55.60 0.00 0.00 1.00
17+780.00 4.16 0.16 20.00 90.40 90.40 0.00 0.00 12.00 12.00 0.00 78.40 78.40 0.00 0.00 1.00
17+800.00 0.39 1.25 20.00 45.50 45.50 0.00 0.00 14.10 14.10 0.00 31.40 31.40 0.00 0.00 1.00
17+810.00 1.03 1.15 10.00 7.10 7.10 0.00 0.00 12.00 7.10 4.90 0.00 0.00 0.00 0.00 1.00
17+820.00 0.00 4.30 10.00 2.58 2.58 0.00 0.00 27.25 2.58 24.68 0.00 0.00 0.00 0.00 1.00
17+840.00 0.33 2.15 20.00 1.65 1.65 0.00 0.00 64.50 1.65 62.85 0.00 0.00 0.00 0.00 1.00
17+850.00 5.82 0.00 10.00 30.75 30.75 0.00 0.00 5.38 5.38 0.00 25.38 25.38 0.00 0.00 1.00
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
17+860.00 2.39 1.40 10.00 41.05 41.05 0.00 0.00 3.50 3.50 0.00 37.55 37.55 0.00 0.00 1.00
17+870.00 5.16 0.00 10.00 37.75 37.75 0.00 0.00 3.50 3.50 0.00 34.25 34.25 0.00 0.00 1.00
17+880.00 5.72 0.45 10.00 54.40 54.40 0.00 0.00 1.13 1.13 0.00 53.28 53.28 0.00 0.00 1.00
17+900.00 9.76 0.00 20.00 154.80 154.80 0.00 0.00 2.25 2.25 0.00 152.55 152.55 0.00 0.00 1.00
17+910.00 6.31 1.79 10.00 80.35 80.35 0.00 0.00 4.48 4.48 0.00 75.88 75.88 0.00 0.00 1.00
17+920.00 2.38 0.19 10.00 43.45 43.45 0.00 0.00 9.90 9.90 0.00 33.55 33.55 0.00 0.00 1.00
17+940.00 4.66 0.07 20.00 70.40 70.40 0.00 0.00 2.60 2.60 0.00 67.80 67.80 0.00 0.00 1.00
17+950.00 5.31 0.57 10.00 49.85 49.85 0.00 0.00 3.20 3.20 0.00 46.65 46.65 0.00 0.00 1.00
17+960.00 0.49 1.89 10.00 29.00 29.00 0.00 0.00 12.30 12.30 0.00 16.70 16.70 0.00 0.00 1.00
17+980.00 1.09 1.22 20.00 15.80 15.80 0.00 0.00 31.10 15.80 15.30 0.00 0.00 0.00 0.00 1.00
18+000.00 2.41 4.84 20.00 35.00 35.00 0.00 0.00 60.60 35.00 25.60 0.00 0.00 0.00 0.00 1.00
18+010.00 2.02 4.00 10.00 22.15 22.15 0.00 0.00 44.20 22.15 22.05 0.00 0.00 0.00 0.00 1.00
18+020.00 1.62 3.21 10.00 18.20 18.20 0.00 0.00 36.05 18.20 17.85 0.00 0.00 0.00 0.00 1.00
18+030.00 1.68 5.11 10.00 16.50 16.50 0.00 0.00 41.60 16.50 25.10 0.00 0.00 0.00 0.00 1.00
18+040.00 0.61 5.14 10.00 11.45 11.45 0.00 0.00 51.25 11.45 39.80 0.00 0.00 0.00 0.00 1.00
18+060.00 3.91 2.24 20.00 45.20 45.20 0.00 0.00 73.80 45.20 28.60 0.00 0.00 0.00 0.00 1.00
18+070.00 7.07 0.17 10.00 54.90 54.90 0.00 0.00 12.05 12.05 0.00 42.85 42.85 0.00 0.00 1.00
18+080.00 13.00 0.00 10.00 100.35 100.35 0.00 0.00 0.43 0.43 0.00 99.93 99.93 0.00 0.00 1.00
18+090.00 6.73 0.86 10.00 98.65 98.65 0.00 0.00 2.15 2.15 0.00 96.50 96.50 0.00 0.00 1.00
18+100.00 3.66 3.45 10.00 51.95 51.95 0.00 0.00 21.55 21.55 0.00 30.40 30.40 0.00 0.00 1.00
18+120.00 0.00 8.91 20.00 18.30 18.30 0.00 0.00 123.60 18.30 105.30 0.00 0.00 0.00 0.00 1.00
18+130.00 0.00 2.41 10.00 0.00 0.00 0.00 0.00 56.60 0.00 56.60 0.00 0.00 0.00 0.00 1.00
18+140.00 2.79 0.00 10.00 6.98 6.98 0.00 0.00 6.03 6.03 0.00 0.95 0.95 0.00 0.00 1.00
18+160.00 1.54 0.14 20.00 43.30 43.30 0.00 0.00 0.70 0.70 0.00 42.60 42.60 0.00 0.00 1.00
18+180.00 2.50 0.06 20.00 40.40 40.40 0.00 0.00 2.00 2.00 0.00 38.40 38.40 0.00 0.00 1.00
18+190.00 3.80 0.05 10.00 31.50 31.50 0.00 0.00 0.55 0.55 0.00 30.95 30.95 0.00 0.00 1.00
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
18+200.00 5.12 0.00 10.00 44.60 44.60 0.00 0.00 0.13 0.13 0.00 44.48 44.48 0.00 0.00 1.00
18+210.00 3.85 0.03 10.00 44.85 44.85 0.00 0.00 0.08 0.08 0.00 44.78 44.78 0.00 0.00 1.00
18+220.00 1.81 0.38 10.00 28.30 28.30 0.00 0.00 2.05 2.05 0.00 26.25 26.25 0.00 0.00 1.00
18+240.00 0.35 0.89 20.00 21.60 21.60 0.00 0.00 12.70 12.70 0.00 8.90 8.90 0.00 0.00 1.00
18+260.00 0.26 0.40 20.00 6.10 6.10 0.00 0.00 12.90 6.10 6.80 0.00 0.00 0.00 0.00 1.00
18+280.00 0.00 0.31 20.00 1.30 1.30 0.00 0.00 7.10 1.30 5.80 0.00 0.00 0.00 0.00 1.00
18+300.00 0.27 0.22 20.00 1.35 1.35 0.00 0.00 5.30 1.35 3.95 0.00 0.00 0.00 0.00 1.00
18+320.00 0.46 2.14 20.00 7.30 7.30 0.00 0.00 23.60 7.30 16.30 0.00 0.00 0.00 0.00 1.00
18+340.00 0.89 1.29 20.00 13.50 13.50 0.00 0.00 34.30 13.50 20.80 0.00 0.00 0.00 0.00 1.00
18+360.00 2.92 0.32 20.00 38.10 38.10 0.00 0.00 16.10 16.10 0.00 22.00 22.00 0.00 0.00 1.00
18+380.00 3.80 0.00 20.00 67.20 67.20 0.00 0.00 1.60 1.60 0.00 65.60 65.60 0.00 0.00 1.00
18+400.00 5.39 0.00 20.00 91.90 91.90 0.00 0.00 0.00 0.00 0.00 91.90 91.90 0.00 0.00 1.00
18+420.00 7.94 0.00 20.00 133.30 133.30 0.00 0.00 0.00 0.00 0.00 133.30 133.30 0.00 0.00 1.00
18+440.00 2.35 0.00 20.00 102.90 102.90 0.00 0.00 0.00 0.00 0.00 102.90 102.90 0.00 0.00 1.00
18+450.00 3.32 0.00 10.00 28.35 0.00 8.51 19.85 0.00 0.00 0.00 8.51 8.51 0.00 19.85 0.00
18+460.00 7.23 0.00 10.00 52.75 0.00 15.83 36.93 0.00 0.00 0.00 15.83 15.83 0.00 36.93 0.00
18+480.00 7.34 0.00 20.00 145.70 0.00 43.71 101.99 0.00 0.00 0.00 43.71 43.71 0.00 101.99 0.00
18+490.00 5.32 0.00 10.00 63.30 0.00 18.99 44.31 0.00 0.00 0.00 18.99 18.99 0.00 44.31 0.00
18+500.00 8.81 0.00 10.00 70.65 0.00 21.20 49.46 0.00 0.00 0.00 21.20 21.20 0.00 49.46 0.00
18+520.00 21.06 0.00 20.00 298.70 0.00 89.61 209.09 0.00 0.00 0.00 89.61 89.61 0.00 209.09 0.00
18+530.00 19.50 0.00 10.00 202.80 0.00 60.84 141.96 0.00 0.00 0.00 60.84 60.84 0.00 141.96 0.00
18+540.00 19.00 0.00 10.00 192.50 0.00 57.75 134.75 0.00 0.00 0.00 57.75 57.75 0.00 134.75 0.00
18+560.00 15.30 0.00 20.00 343.00 0.00 102.90 240.10 0.00 0.00 0.00 102.90 102.90 0.00 240.10 0.00
18+580.00 9.14 0.65 20.00 244.40 0.00 73.32 171.08 3.25 3.25 0.00 70.07 70.07 0.00 171.08 0.00
18+590.00 1.36 4.04 10.00 52.50 0.00 15.75 36.75 23.45 15.75 7.70 0.00 0.00 0.00 36.75 0.00
18+600.00 1.23 13.35 10.00 12.95 0.00 3.89 9.07 86.95 3.89 83.07 0.00 0.00 0.00 9.07 0.00
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
18+620.00 17.51 0.00 20.00 187.40 0.00 56.22 131.18 66.75 56.22 10.53 0.00 0.00 0.00 131.18 0.00
18+630.00 32.10 0.00 10.00 248.05 0.00 74.42 173.64 0.00 0.00 0.00 74.42 74.42 0.00 173.64 0.00
18+640.00 13.83 0.00 10.00 229.65 0.00 68.90 160.76 0.00 0.00 0.00 68.90 68.90 0.00 160.76 0.00
18+660.00 14.22 0.00 20.00 280.50 0.00 84.15 196.35 0.00 0.00 0.00 84.15 84.15 0.00 196.35 0.00
18+670.00 15.19 0.00 10.00 147.05 0.00 44.12 102.94 0.00 0.00 0.00 44.12 44.12 0.00 102.94 0.00
18+680.00 13.85 0.00 10.00 145.20 0.00 43.56 101.64 0.00 0.00 0.00 43.56 43.56 0.00 101.64 0.00
18+690.00 14.22 0.00 10.00 140.35 0.00 42.11 98.25 0.00 0.00 0.00 42.11 42.11 0.00 98.25 0.00
18+700.00 12.28 0.00 10.00 132.50 0.00 39.75 92.75 0.00 0.00 0.00 39.75 39.75 0.00 92.75 0.00
18+720.00 11.54 0.00 20.00 238.20 0.00 71.46 166.74 0.00 0.00 0.00 71.46 71.46 0.00 166.74 0.00
18+740.00 15.06 0.00 20.00 266.00 0.00 79.80 186.20 0.00 0.00 0.00 79.80 79.80 0.00 186.20 0.00
18+750.00 22.52 0.00 10.00 187.90 0.00 56.37 131.53 0.00 0.00 0.00 56.37 56.37 0.00 131.53 0.00
18+760.00 20.15 0.00 10.00 213.35 0.00 64.01 149.35 0.00 0.00 0.00 64.01 64.01 0.00 149.35 0.00
18+780.00 15.15 0.00 20.00 353.00 0.00 105.90 247.10 0.00 0.00 0.00 105.90 105.90 0.00 247.10 0.00
18+790.00 0.19 10.81 10.00 76.70 0.00 23.01 53.69 27.03 23.01 4.02 0.00 0.00 0.00 53.69 0.00
18+800.00 18.44 0.00 10.00 93.15 0.00 27.95 65.21 27.03 27.03 0.00 0.92 0.92 0.00 65.21 0.00
18+810.00 38.75 0.00 10.00 285.95 57.19 228.76 0.00 0.00 0.00 0.00 285.95 285.95 0.00 0.00 0.20
18+820.00 6.91 4.54 10.00 228.30 45.66 182.64 0.00 11.35 11.35 0.00 216.95 216.95 0.00 0.00 0.20
18+840.00 15.32 0.00 20.00 222.30 44.46 177.84 0.00 22.70 22.70 0.00 199.60 199.60 0.00 0.00 0.20
18+860.00 11.14 22.73 20.00 264.60 52.92 211.68 0.00 113.65 113.65 0.00 150.95 150.95 0.00 0.00 0.20
18+880.00 17.93 0.00 20.00 290.70 58.14 232.56 0.00 113.65 113.65 0.00 177.05 177.05 0.00 0.00 0.20
18+890.00 8.29 0.00 10.00 131.10 26.22 104.88 0.00 0.00 0.00 0.00 131.10 131.10 0.00 0.00 0.20
18+900.00 6.98 0.00 10.00 76.35 15.27 61.08 0.00 0.00 0.00 0.00 76.35 76.35 0.00 0.00 0.20
18+920.00 9.84 0.36 20.00 168.20 33.64 134.56 0.00 1.80 1.80 0.00 166.40 166.40 0.00 0.00 0.20
18+940.00 5.00 0.55 20.00 148.40 148.40 0.00 0.00 9.10 9.10 0.00 139.30 139.30 0.00 0.00 1.00
18+960.00 5.90 2.85 20.00 109.00 109.00 0.00 0.00 34.00 34.00 0.00 75.00 75.00 0.00 0.00 1.00
18+970.00 0.00 6.41 10.00 14.75 14.75 0.00 0.00 46.30 14.75 31.55 0.00 0.00 0.00 0.00 1.00
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
18+980.00 0.32 6.78 10.00 0.80 0.80 0.00 0.00 65.95 0.80 65.15 0.00 0.00 0.00 0.00 1.00
18+990.00 0.39 4.64 10.00 3.55 3.55 0.00 0.00 57.10 3.55 53.55 0.00 0.00 0.00 0.00 1.00
19+000.00 6.54 6.31 10.00 34.65 34.65 0.00 0.00 54.75 34.65 20.10 0.00 0.00 0.00 0.00 1.00
19+020.00 6.53 3.32 20.00 130.70 130.70 0.00 0.00 96.30 96.30 0.00 34.40 34.40 0.00 0.00 1.00
19+040.00 8.63 0.55 20.00 151.60 151.60 0.00 0.00 38.70 38.70 0.00 112.90 112.90 0.00 0.00 1.00
19+060.00 4.45 0.03 20.00 130.80 130.80 0.00 0.00 5.80 5.80 0.00 125.00 125.00 0.00 0.00 1.00
19+070.00 2.00 1.01 10.00 32.25 32.25 0.00 0.00 5.20 5.20 0.00 27.05 27.05 0.00 0.00 1.00
19+080.00 2.13 0.00 10.00 20.65 20.65 0.00 0.00 2.53 2.53 0.00 18.13 18.13 0.00 0.00 1.00
19+100.00 1.30 0.66 20.00 34.30 34.30 0.00 0.00 3.30 3.30 0.00 31.00 31.00 0.00 0.00 1.00
19+110.00 0.54 2.08 10.00 9.20 9.20 0.00 0.00 13.70 9.20 4.50 0.00 0.00 0.00 0.00 1.00
19+120.00 0.63 1.62 10.00 5.85 5.85 0.00 0.00 18.50 5.85 12.65 0.00 0.00 0.00 0.00 1.00
19+140.00 1.48 0.29 20.00 21.10 21.10 0.00 0.00 19.10 19.10 0.00 2.00 2.00 0.00 0.00 1.00
19+160.00 4.97 0.00 20.00 64.50 64.50 0.00 0.00 1.45 1.45 0.00 63.05 63.05 0.00 0.00 1.00
19+180.00 4.24 0.00 20.00 92.10 92.10 0.00 0.00 0.00 0.00 0.00 92.10 92.10 0.00 0.00 1.00
19+200.00 0.50 3.94 20.00 47.40 47.40 0.00 0.00 19.70 19.70 0.00 27.70 27.70 0.00 0.00 1.00
19+210.00 0.27 3.37 10.00 3.85 3.85 0.00 0.00 36.55 3.85 32.70 0.00 0.00 0.00 0.00 1.00
19+220.00 0.42 2.81 10.00 3.45 3.45 0.00 0.00 30.90 3.45 27.45 0.00 0.00 0.00 0.00 1.00
19+240.00 1.40 19.24 20.00 18.20 18.20 0.00 0.00 220.50 18.20 202.30 0.00 0.00 0.00 0.00 1.00
19+250.00 0.00 6.41 10.00 3.50 3.50 0.00 0.00 128.25 3.50 124.75 0.00 0.00 0.00 0.00 1.00
19+260.00 5.16 2.34 10.00 12.90 12.90 0.00 0.00 43.75 12.90 30.85 0.00 0.00 0.00 0.00 1.00
19+270.00 12.00 0.00 10.00 85.80 85.80 0.00 0.00 5.85 5.85 0.00 79.95 79.95 0.00 0.00 1.00
19+280.00 14.42 0.00 10.00 132.10 132.10 0.00 0.00 0.00 0.00 0.00 132.10 132.10 0.00 0.00 1.00
19+300.00 33.24 0.16 20.00 476.60 476.60 0.00 0.00 0.80 0.80 0.00 475.80 475.80 0.00 0.00 1.00
19+320.00 6.16 0.00 20.00 394.00 394.00 0.00 0.00 0.80 0.80 0.00 393.20 393.20 0.00 0.00 1.00
19+330.00 2.41 0.18 10.00 42.85 42.85 0.00 0.00 0.45 0.45 0.00 42.40 42.40 0.00 0.00 1.00
19+340.00 1.29 4.43 10.00 18.50 18.50 0.00 0.00 23.05 18.50 4.55 0.00 0.00 0.00 0.00 1.00
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
19+360.00 0.22 7.09 20.00 15.10 15.10 0.00 0.00 115.20 15.10 100.10 0.00 0.00 0.00 0.00 1.00
19+380.00 6.27 0.00 20.00 64.90 64.90 0.00 0.00 35.45 35.45 0.00 29.45 29.45 0.00 0.00 1.00
19+390.00 0.82 2.37 10.00 35.45 35.45 0.00 0.00 5.93 5.93 0.00 29.53 29.53 0.00 0.00 1.00
19+400.00 3.50 5.28 10.00 21.60 21.60 0.00 0.00 38.25 21.60 16.65 0.00 0.00 0.00 0.00 1.00
19+420.00 4.57 2.37 20.00 80.70 80.70 0.00 0.00 76.50 76.50 0.00 4.20 4.20 0.00 0.00 1.00
19+430.00 4.36 1.91 10.00 44.65 44.65 0.00 0.00 21.40 21.40 0.00 23.25 23.25 0.00 0.00 1.00
19+440.00 6.79 1.44 10.00 55.75 55.75 0.00 0.00 16.75 16.75 0.00 39.00 39.00 0.00 0.00 1.00
19+460.00 12.42 0.83 20.00 192.10 192.10 0.00 0.00 22.70 22.70 0.00 169.40 169.40 0.00 0.00 1.00
19+470.00 10.30 1.35 10.00 113.60 113.60 0.00 0.00 10.90 10.90 0.00 102.70 102.70 0.00 0.00 1.00
19+480.00 0.00 9.59 10.00 25.75 25.75 0.00 0.00 54.70 25.75 28.95 0.00 0.00 0.00 0.00 1.00
19+490.00 21.66 2.75 10.00 54.15 54.15 0.00 0.00 61.70 54.15 7.55 0.00 0.00 0.00 0.00 1.00
19+500.00 23.00 4.04 10.00 223.30 223.30 0.00 0.00 33.95 33.95 0.00 189.35 189.35 0.00 0.00 1.00
19+520.00 1.27 0.00 20.00 242.70 242.70 0.00 0.00 20.20 20.20 0.00 222.50 222.50 0.00 0.00 1.00
19+530.00 2.44 0.00 10.00 18.55 18.55 0.00 0.00 0.00 0.00 0.00 18.55 18.55 0.00 0.00 1.00
19+540.00 8.47 0.00 10.00 54.55 54.55 0.00 0.00 0.00 0.00 0.00 54.55 54.55 0.00 0.00 1.00
19+560.00 20.42 0.00 20.00 288.90 288.90 0.00 0.00 0.00 0.00 0.00 288.90 288.90 0.00 0.00 1.00
19+570.00 22.03 0.00 10.00 212.25 212.25 0.00 0.00 0.00 0.00 0.00 212.25 212.25 0.00 0.00 1.00
19+580.00 18.98 0.00 10.00 205.05 205.05 0.00 0.00 0.00 0.00 0.00 205.05 205.05 0.00 0.00 1.00
19+600.00 25.34 0.00 20.00 443.20 443.20 0.00 0.00 0.00 0.00 0.00 443.20 443.20 0.00 0.00 1.00
19+610.00 29.66 0.00 10.00 275.00 275.00 0.00 0.00 0.00 0.00 0.00 275.00 275.00 0.00 0.00 1.00
19+620.00 25.33 0.00 10.00 274.95 274.95 0.00 0.00 0.00 0.00 0.00 274.95 274.95 0.00 0.00 1.00
19+640.00 22.45 0.00 20.00 477.80 477.80 0.00 0.00 0.00 0.00 0.00 477.80 477.80 0.00 0.00 1.00
19+660.00 24.39 0.00 20.00 468.40 468.40 0.00 0.00 0.00 0.00 0.00 468.40 468.40 0.00 0.00 1.00
19+680.00 17.06 0.00 20.00 414.50 414.50 0.00 0.00 0.00 0.00 0.00 414.50 414.50 0.00 0.00 1.00
19+700.00 10.07 0.00 20.00 271.30 271.30 0.00 0.00 0.00 0.00 0.00 271.30 271.30 0.00 0.00 1.00
19+710.00 7.13 0.00 10.00 86.00 86.00 0.00 0.00 0.00 0.00 0.00 86.00 86.00 0.00 0.00 1.00
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
19+720.00 6.63 0.00 10.00 68.80 68.80 0.00 0.00 0.00 0.00 0.00 68.80 68.80 0.00 0.00 1.00
19+730.00 4.58 0.00 10.00 56.05 56.05 0.00 0.00 0.00 0.00 0.00 56.05 56.05 0.00 0.00 1.00
19+740.00 3.42 1.64 10.00 40.00 40.00 0.00 0.00 4.10 4.10 0.00 35.90 35.90 0.00 0.00 1.00
19+750.00 2.90 2.93 10.00 31.60 31.60 0.00 0.00 22.85 22.85 0.00 8.75 8.75 0.00 0.00 1.00
19+760.00 2.11 2.50 10.00 25.05 25.05 0.00 0.00 27.15 25.05 2.10 0.00 0.00 0.00 0.00 1.00
19+780.00 1.45 3.34 20.00 35.60 35.60 0.00 0.00 58.40 35.60 22.80 0.00 0.00 0.00 0.00 1.00
19+790.00 1.90 3.34 10.00 16.75 16.75 0.00 0.00 33.40 16.75 16.65 0.00 0.00 0.00 0.00 1.00
19+800.00 0.00 8.19 10.00 4.75 4.75 0.00 0.00 57.65 4.75 52.90 0.00 0.00 0.00 0.00 1.00
19+810.00 0.53 2.38 10.00 1.33 1.33 0.00 0.00 52.85 1.33 51.53 0.00 0.00 0.00 0.00 1.00
19+820.00 0.68 3.02 10.00 6.05 6.05 0.00 0.00 27.00 6.05 20.95 0.00 0.00 0.00 0.00 1.00
19+840.00 1.22 1.29 20.00 19.00 19.00 0.00 0.00 43.10 19.00 24.10 0.00 0.00 0.00 0.00 1.00
19+860.00 2.66 4.59 20.00 38.80 38.80 0.00 0.00 58.80 38.80 20.00 0.00 0.00 0.00 0.00 1.00
19+870.00 4.60 0.00 10.00 36.30 36.30 0.00 0.00 11.48 11.48 0.00 24.83 24.83 0.00 0.00 1.00
19+880.00 4.54 0.00 10.00 45.70 45.70 0.00 0.00 0.00 0.00 0.00 45.70 45.70 0.00 0.00 1.00
19+900.00 3.95 0.96 20.00 84.90 84.90 0.00 0.00 4.80 4.80 0.00 80.10 80.10 0.00 0.00 1.00
19+920.00 0.80 3.23 20.00 47.50 47.50 0.00 0.00 41.90 41.90 0.00 5.60 5.60 0.00 0.00 1.00
19+940.00 2.82 1.88 20.00 36.20 36.20 0.00 0.00 51.10 36.20 14.90 0.00 0.00 0.00 0.00 1.00
19+960.00 2.53 0.01 20.00 53.50 53.50 0.00 0.00 18.90 18.90 0.00 34.60 34.60 0.00 0.00 1.00
19+970.00 1.29 4.53 10.00 19.10 19.10 0.00 0.00 22.70 19.10 3.60 0.00 0.00 0.00 0.00 1.00
19+980.00 1.03 1.49 10.00 11.60 11.60 0.00 0.00 30.10 11.60 18.50 0.00 0.00 0.00 0.00 1.00
20+000.00 1.40 1.64 20.00 24.30 24.30 0.00 0.00 31.30 24.30 7.00 0.00 0.00 0.00 0.00 1.00
20+010.00 2.53 2.01 10.00 19.65 19.65 0.00 0.00 18.25 18.25 0.00 1.40 1.40 0.00 0.00 1.00
20+020.00 2.21 2.57 10.00 23.70 23.70 0.00 0.00 22.90 22.90 0.00 0.80 0.80 0.00 0.00 1.00
20+030.00 4.27 0.91 10.00 32.40 32.40 0.00 0.00 17.40 17.40 0.00 15.00 15.00 0.00 0.00 1.00
20+040.00 4.61 0.00 10.00 44.40 44.40 0.00 0.00 2.28 2.28 0.00 42.13 42.13 0.00 0.00 1.00
20+060.00 2.08 0.30 20.00 66.90 66.90 0.00 0.00 1.50 1.50 0.00 65.40 65.40 0.00 0.00 1.00
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
20+080.00 2.09 0.56 20.00 41.70 41.70 0.00 0.00 8.60 8.60 0.00 33.10 33.10 0.00 0.00 1.00
20+090.00 3.39 0.00 10.00 27.40 27.40 0.00 0.00 1.40 1.40 0.00 26.00 26.00 0.00 0.00 1.00
20+100.00 3.95 0.92 10.00 36.70 36.70 0.00 0.00 2.30 2.30 0.00 34.40 34.40 0.00 0.00 1.00
20+120.00 2.18 5.04 20.00 61.30 61.30 0.00 0.00 59.60 59.60 0.00 1.70 1.70 0.00 0.00 1.00
20+130.00 0.00 10.69 10.00 5.45 5.45 0.00 0.00 78.65 5.45 73.20 0.00 0.00 0.00 0.00 1.00
20+140.00 1.13 5.49 10.00 2.83 2.83 0.00 0.00 80.90 2.83 78.08 0.00 0.00 0.00 0.00 1.00
20+160.00 6.45 4.54 20.00 75.80 75.80 0.00 0.00 100.30 75.80 24.50 0.00 0.00 0.00 0.00 1.00
20+180.00 3.45 4.38 20.00 99.00 99.00 0.00 0.00 89.20 89.20 0.00 9.80 9.80 0.00 0.00 1.00
20+190.00 1.10 5.44 10.00 22.75 22.75 0.00 0.00 49.10 22.75 26.35 0.00 0.00 0.00 0.00 1.00
20+200.00 2.20 6.00 10.00 16.50 16.50 0.00 0.00 57.20 16.50 40.70 0.00 0.00 0.00 0.00 1.00
20+220.00 1.13 6.95 20.00 33.30 33.30 0.00 0.00 129.50 33.30 96.20 0.00 0.00 0.00 0.00 1.00
20+240.00 7.82 2.87 20.00 89.50 89.50 0.00 0.00 98.20 89.50 8.70 0.00 0.00 0.00 0.00 1.00
20+260.00 6.03 5.40 20.00 138.50 138.50 0.00 0.00 82.70 82.70 0.00 55.80 55.80 0.00 0.00 1.00
20+280.00 16.28 0.00 20.00 223.10 223.10 0.00 0.00 27.00 27.00 0.00 196.10 196.10 0.00 0.00 1.00
20+300.00 31.43 0.00 20.00 477.10 477.10 0.00 0.00 0.00 0.00 0.00 477.10 477.10 0.00 0.00 1.00
20+320.00 26.11 1.24 20.00 575.40 575.40 0.00 0.00 6.20 6.20 0.00 569.20 569.20 0.00 0.00 1.00
20+340.00 0.11 7.34 20.00 262.20 262.20 0.00 0.00 85.80 85.80 0.00 176.40 176.40 0.00 0.00 1.00
20+350.00 0.55 11.48 10.00 3.30 3.30 0.00 0.00 94.10 3.30 90.80 0.00 0.00 0.00 0.00 1.00
20+360.00 0.60 10.57 10.00 5.75 5.75 0.00 0.00 110.25 5.75 104.50 0.00 0.00 0.00 0.00 1.00
20+380.00 5.91 5.11 20.00 65.10 65.10 0.00 0.00 156.80 65.10 91.70 0.00 0.00 0.00 0.00 1.00
20+390.00 1.38 0.25 10.00 36.45 36.45 0.00 0.00 26.80 26.80 0.00 9.65 9.65 0.00 0.00 1.00
20+400.00 5.33 0.09 10.00 33.55 33.55 0.00 0.00 1.70 1.70 0.00 31.85 31.85 0.00 0.00 1.00
20+420.00 6.67 0.29 20.00 120.00 120.00 0.00 0.00 3.80 3.80 0.00 116.20 116.20 0.00 0.00 1.00
20+430.00 6.22 0.02 10.00 64.45 64.45 0.00 0.00 1.55 1.55 0.00 62.90 62.90 0.00 0.00 1.00
20+440.00 0.00 3.08 10.00 15.55 15.55 0.00 0.00 15.50 15.50 0.00 0.05 0.05 0.00 0.00 1.00
20+450.00 6.66 0.00 10.00 16.65 16.65 0.00 0.00 7.70 7.70 0.00 8.95 8.95 0.00 0.00 1.00
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
20+460.00 7.25 0.00 10.00 69.55 69.55 0.00 0.00 0.00 0.00 0.00 69.55 69.55 0.00 0.00 1.00
20+480.00 6.41 2.93 20.00 136.60 136.60 0.00 0.00 14.65 14.65 0.00 121.95 121.95 0.00 0.00 1.00
20+490.00 3.69 7.60 10.00 50.50 50.50 0.00 0.00 52.65 50.50 2.15 0.00 0.00 0.00 0.00 1.00
20+500.00 1.10 2.76 10.00 23.95 23.95 0.00 0.00 51.80 23.95 27.85 0.00 0.00 0.00 0.00 1.00
20+520.00 1.46 3.76 20.00 25.60 25.60 0.00 0.00 65.20 25.60 39.60 0.00 0.00 0.00 0.00 1.00
20+530.00 1.19 11.76 10.00 13.25 13.25 0.00 0.00 77.60 13.25 64.35 0.00 0.00 0.00 0.00 1.00
20+540.00 0.73 3.88 10.00 9.60 9.60 0.00 0.00 78.20 9.60 68.60 0.00 0.00 0.00 0.00 1.00
20+550.00 0.32 1.83 10.00 5.25 5.25 0.00 0.00 28.55 5.25 23.30 0.00 0.00 0.00 0.00 1.00
20+560.00 0.25 2.01 10.00 2.85 2.85 0.00 0.00 19.20 2.85 16.35 0.00 0.00 0.00 0.00 1.00
20+580.00 1.47 0.00 20.00 17.20 17.20 0.00 0.00 10.05 10.05 0.00 7.15 7.15 0.00 0.00 1.00
20+590.00 6.26 0.00 10.00 38.65 38.65 0.00 0.00 0.00 0.00 0.00 38.65 38.65 0.00 0.00 1.00
20+600.00 3.73 0.00 10.00 49.95 49.95 0.00 0.00 0.00 0.00 0.00 49.95 49.95 0.00 0.00 1.00
20+620.00 3.30 1.35 20.00 70.30 70.30 0.00 0.00 6.75 6.75 0.00 63.55 63.55 0.00 0.00 1.00
20+640.00 2.03 0.00 20.00 53.30 53.30 0.00 0.00 6.75 6.75 0.00 46.55 46.55 0.00 0.00 1.00
20+660.00 2.26 0.01 20.00 42.90 42.90 0.00 0.00 0.05 0.05 0.00 42.85 42.85 0.00 0.00 1.00
20+670.00 3.78 0.00 10.00 30.20 30.20 0.00 0.00 0.03 0.03 0.00 30.18 30.18 0.00 0.00 1.00
20+680.00 6.15 0.00 10.00 49.65 49.65 0.00 0.00 0.00 0.00 0.00 49.65 49.65 0.00 0.00 1.00
20+700.00 2.56 4.95 20.00 87.10 87.10 0.00 0.00 24.75 24.75 0.00 62.35 62.35 0.00 0.00 1.00
20+710.00 4.21 0.00 10.00 33.85 33.85 0.00 0.00 12.38 12.38 0.00 21.48 21.48 0.00 0.00 1.00
20+720.00 4.00 19.70 10.00 41.05 41.05 0.00 0.00 49.25 41.05 8.20 0.00 0.00 0.00 0.00 1.00
20+730.00 4.77 0.00 10.00 43.85 43.85 0.00 0.00 49.25 43.85 5.40 0.00 0.00 0.00 0.00 1.00
20+740.00 4.92 0.00 10.00 48.45 48.45 0.00 0.00 0.00 0.00 0.00 48.45 48.45 0.00 0.00 1.00
20+760.00 2.11 0.62 20.00 70.30 70.30 0.00 0.00 3.10 3.10 0.00 67.20 67.20 0.00 0.00 1.00
20+770.00 1.15 1.91 10.00 16.30 16.30 0.00 0.00 12.65 12.65 0.00 3.65 3.65 0.00 0.00 1.00
20+780.00 0.83 2.27 10.00 9.90 9.90 0.00 0.00 20.90 9.90 11.00 0.00 0.00 0.00 0.00 1.00
20+790.00 2.98 0.00 10.00 19.05 19.05 0.00 0.00 5.68 5.68 0.00 13.38 13.38 0.00 0.00 1.00
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
20+800.00 2.35 0.14 10.00 26.65 26.65 0.00 0.00 0.35 0.35 0.00 26.30 26.30 0.00 0.00 1.00
20+820.00 0.79 10.05 20.00 31.40 31.40 0.00 0.00 101.90 31.40 70.50 0.00 0.00 0.00 0.00 1.00
20+840.00 3.46 0.00 20.00 42.50 42.50 0.00 0.00 50.25 42.50 7.75 0.00 0.00 0.00 0.00 1.00
20+860.00 6.13 0.00 20.00 95.90 95.90 0.00 0.00 0.00 0.00 0.00 95.90 95.90 0.00 0.00 1.00
20+870.00 13.14 0.00 10.00 96.35 96.35 0.00 0.00 0.00 0.00 0.00 96.35 96.35 0.00 0.00 1.00
20+880.00 15.82 0.00 10.00 144.80 144.80 0.00 0.00 0.00 0.00 0.00 144.80 144.80 0.00 0.00 1.00
20+890.00 3.37 2.45 10.00 95.95 95.95 0.00 0.00 6.13 6.13 0.00 89.83 89.83 0.00 0.00 1.00
20+900.00 5.84 0.00 10.00 46.05 46.05 0.00 0.00 6.13 6.13 0.00 39.93 39.93 0.00 0.00 1.00
20+910.00 10.38 0.00 10.00 81.10 81.10 0.00 0.00 0.00 0.00 0.00 81.10 81.10 0.00 0.00 1.00
20+920.00 4.76 0.00 10.00 75.70 75.70 0.00 0.00 0.00 0.00 0.00 75.70 75.70 0.00 0.00 1.00
20+940.00 10.03 8.16 20.00 147.90 147.90 0.00 0.00 40.80 40.80 0.00 107.10 107.10 0.00 0.00 1.00
20+950.00 0.00 7.64 10.00 25.08 25.08 0.00 0.00 79.00 25.08 53.93 0.00 0.00 0.00 0.00 1.00
20+960.00 2.11 4.44 10.00 5.28 5.28 0.00 0.00 60.40 5.28 55.13 0.00 0.00 0.00 0.00 1.00
20+970.00 8.89 7.41 10.00 55.00 55.00 0.00 0.00 59.25 55.00 4.25 0.00 0.00 0.00 0.00 1.00
20+980.00 20.01 0.00 10.00 144.50 144.50 0.00 0.00 18.53 18.53 0.00 125.98 125.98 0.00 0.00 1.00
21+000.00 29.68 0.00 20.00 496.90 496.90 0.00 0.00 0.00 0.00 0.00 496.90 496.90 0.00 0.00 1.00
21+020.00 8.33 6.13 20.00 380.10 380.10 0.00 0.00 30.65 30.65 0.00 349.45 349.45 0.00 0.00 1.00
21+030.00 8.21 4.52 10.00 82.70 82.70 0.00 0.00 53.25 53.25 0.00 29.45 29.45 0.00 0.00 1.00
21+040.00 2.06 4.42 10.00 51.35 51.35 0.00 0.00 44.70 44.70 0.00 6.65 6.65 0.00 0.00 1.00
21+060.00 0.92 2.32 20.00 29.80 29.80 0.00 0.00 67.40 29.80 37.60 0.00 0.00 0.00 0.00 1.00
21+070.00 3.04 0.01 10.00 19.80 19.80 0.00 0.00 11.65 11.65 0.00 8.15 8.15 0.00 0.00 1.00
21+080.00 4.64 1.44 10.00 38.40 38.40 0.00 0.00 7.25 7.25 0.00 31.15 31.15 0.00 0.00 1.00
21+100.00 15.43 0.00 20.00 200.70 200.70 0.00 0.00 7.20 7.20 0.00 193.50 193.50 0.00 0.00 1.00
21+110.00 14.43 0.00 10.00 149.30 149.30 0.00 0.00 0.00 0.00 0.00 149.30 149.30 0.00 0.00 1.00
21+120.00 10.54 0.00 10.00 124.85 124.85 0.00 0.00 0.00 0.00 0.00 124.85 124.85 0.00 0.00 1.00
21+130.00 3.83 0.00 10.00 71.85 71.85 0.00 0.00 0.00 0.00 0.00 71.85 71.85 0.00 0.00 1.00
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
21+140.00 2.40 0.65 10.00 31.15 31.15 0.00 0.00 1.63 1.63 0.00 29.53 29.53 0.00 0.00 1.00
21+160.00 0.57 1.20 20.00 29.70 29.70 0.00 0.00 18.50 18.50 0.00 11.20 11.20 0.00 0.00 1.00
21+180.00 1.68 0.73 20.00 22.50 22.50 0.00 0.00 19.30 19.30 0.00 3.20 3.20 0.00 0.00 1.00
21+190.00 2.08 1.21 10.00 18.80 18.80 0.00 0.00 9.70 9.70 0.00 9.10 9.10 0.00 0.00 1.00
21+200.00 11.74 0.00 10.00 69.10 69.10 0.00 0.00 3.03 3.03 0.00 66.08 66.08 0.00 0.00 1.00
21+220.00 6.45 0.00 20.00 181.90 181.90 0.00 0.00 0.00 0.00 0.00 181.90 181.90 0.00 0.00 1.00
21+230.00 3.19 0.37 10.00 48.20 48.20 0.00 0.00 0.93 0.93 0.00 47.28 47.28 0.00 0.00 1.00
21+240.00 3.38 0.00 10.00 32.85 32.85 0.00 0.00 0.93 0.93 0.00 31.93 31.93 0.00 0.00 1.00
21+260.00 2.71 0.51 20.00 60.90 60.90 0.00 0.00 2.55 2.55 0.00 58.35 58.35 0.00 0.00 1.00
21+280.00 2.17 0.82 20.00 48.80 48.80 0.00 0.00 13.30 13.30 0.00 35.50 35.50 0.00 0.00 1.00
21+300.00 5.64 0.00 20.00 78.10 78.10 0.00 0.00 4.10 4.10 0.00 74.00 74.00 0.00 0.00 1.00
21+310.00 2.57 0.42 10.00 41.05 41.05 0.00 0.00 1.05 1.05 0.00 40.00 40.00 0.00 0.00 1.00
21+320.00 0.00 5.59 10.00 6.43 6.43 0.00 0.00 30.05 6.43 23.63 0.00 0.00 0.00 0.00 1.00
21+330.00 0.00 7.22 10.00 0.00 0.00 0.00 0.00 64.05 0.00 64.05 0.00 0.00 0.00 0.00 1.00
21+340.00 0.00 4.73 10.00 0.00 0.00 0.00 0.00 59.75 0.00 59.75 0.00 0.00 0.00 0.00 1.00
21+360.00 0.00 1.53 20.00 0.00 0.00 0.00 0.00 62.60 0.00 62.60 0.00 0.00 0.00 0.00 1.00
21+370.00 0.00 0.56 10.00 0.00 0.00 0.00 0.00 10.45 0.00 10.45 0.00 0.00 0.00 0.00 1.00
21+380.00 0.61 0.02 10.00 1.53 1.53 0.00 0.00 2.90 1.53 1.38 0.00 0.00 0.00 0.00 1.00
21+400.00 3.07 0.00 20.00 36.80 36.80 0.00 0.00 0.10 0.10 0.00 36.70 36.70 0.00 0.00 1.00
21+420.00 5.88 0.00 20.00 89.50 89.50 0.00 0.00 0.00 0.00 0.00 89.50 89.50 0.00 0.00 1.00
21+440.00 4.66 0.00 20.00 105.40 105.40 0.00 0.00 0.00 0.00 0.00 105.40 105.40 0.00 0.00 1.00
21+450.00 3.89 0.00 10.00 42.75 42.75 0.00 0.00 0.00 0.00 0.00 42.75 42.75 0.00 0.00 1.00
21+460.00 2.91 0.00 10.00 34.00 34.00 0.00 0.00 0.00 0.00 0.00 34.00 34.00 0.00 0.00 1.00
21+480.00 0.00 1.90 20.00 14.55 14.55 0.00 0.00 9.50 9.50 0.00 5.05 5.05 0.00 0.00 1.00
21+500.00 0.00 3.46 20.00 0.00 0.00 0.00 0.00 53.60 0.00 53.60 0.00 0.00 0.00 0.00 1.00
21+520.00 1.54 0.00 20.00 7.70 7.70 0.00 0.00 17.30 7.70 9.60 0.00 0.00 0.00 0.00 1.00
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
21+540.00 3.65 0.00 20.00 51.90 51.90 0.00 0.00 0.00 0.00 0.00 51.90 51.90 0.00 0.00 1.00
21+560.00 6.35 0.00 20.00 100.00 100.00 0.00 0.00 0.00 0.00 0.00 100.00 100.00 0.00 0.00 1.00
21+570.00 4.54 0.00 10.00 54.45 54.45 0.00 0.00 0.00 0.00 0.00 54.45 54.45 0.00 0.00 1.00
21+580.00 1.76 0.04 10.00 31.50 31.50 0.00 0.00 0.10 0.10 0.00 31.40 31.40 0.00 0.00 1.00
21+600.00 0.00 1.34 20.00 8.80 8.80 0.00 0.00 13.80 8.80 5.00 0.00 0.00 0.00 0.00 1.00
21+620.00 1.51 0.00 20.00 7.55 7.55 0.00 0.00 6.70 6.70 0.00 0.85 0.85 0.00 0.00 1.00
21+640.00 3.34 0.00 20.00 48.50 48.50 0.00 0.00 0.00 0.00 0.00 48.50 48.50 0.00 0.00 1.00
21+660.00 8.70 0.00 20.00 120.40 120.40 0.00 0.00 0.00 0.00 0.00 120.40 120.40 0.00 0.00 1.00
21+680.00 2.53 0.00 20.00 112.30 112.30 0.00 0.00 0.00 0.00 0.00 112.30 112.30 0.00 0.00 1.00
21+690.00 1.27 0.00 10.00 19.00 19.00 0.00 0.00 0.00 0.00 0.00 19.00 19.00 0.00 0.00 1.00
21+700.00 0.98 0.07 10.00 11.25 11.25 0.00 0.00 0.18 0.18 0.00 11.08 11.08 0.00 0.00 1.00
21+720.00 3.01 0.00 20.00 39.90 39.90 0.00 0.00 0.35 0.35 0.00 39.55 39.55 0.00 0.00 1.00
21+740.00 4.83 0.00 20.00 78.40 78.40 0.00 0.00 0.00 0.00 0.00 78.40 78.40 0.00 0.00 1.00
21+760.00 3.75 0.00 20.00 85.80 85.80 0.00 0.00 0.00 0.00 0.00 85.80 85.80 0.00 0.00 1.00
21+780.00 2.94 0.00 20.00 66.90 66.90 0.00 0.00 0.00 0.00 0.00 66.90 66.90 0.00 0.00 1.00
21+800.00 2.93 0.00 20.00 58.70 58.70 0.00 0.00 0.00 0.00 0.00 58.70 58.70 0.00 0.00 1.00
21+810.00 4.79 0.01 10.00 38.60 38.60 0.00 0.00 0.03 0.03 0.00 38.58 38.58 0.00 0.00 1.00
21+820.00 2.61 0.56 10.00 37.00 37.00 0.00 0.00 2.85 2.85 0.00 34.15 34.15 0.00 0.00 1.00
21+830.00 2.03 0.90 10.00 23.20 23.20 0.00 0.00 7.30 7.30 0.00 15.90 15.90 0.00 0.00 1.00
21+840.00 1.78 1.65 10.00 19.05 19.05 0.00 0.00 12.75 12.75 0.00 6.30 6.30 0.00 0.00 1.00
21+860.00 4.09 0.00 20.00 58.70 58.70 0.00 0.00 8.25 8.25 0.00 50.45 50.45 0.00 0.00 1.00
21+880.00 1.34 0.40 20.00 54.30 54.30 0.00 0.00 2.00 2.00 0.00 52.30 52.30 0.00 0.00 1.00
21+890.00 9.30 0.45 10.00 53.20 53.20 0.00 0.00 4.25 4.25 0.00 48.95 48.95 0.00 0.00 1.00
21+900.00 33.19 0.00 10.00 212.45 212.45 0.00 0.00 1.13 1.13 0.00 211.33 211.33 0.00 0.00 1.00
21+920.00 1.57 14.18 20.00 347.60 347.60 0.00 0.00 70.90 70.90 0.00 276.70 276.70 0.00 0.00 1.00
21+940.00 4.94 1.79 20.00 65.10 6.51 13.02 45.57 159.70 19.53 140.17 0.00 0.00 0.00 45.57 0.10
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
21+960.00 6.50 4.78 20.00 114.40 11.44 22.88 80.08 65.70 34.32 31.38 0.00 0.00 0.00 80.08 0.10
21+970.00 15.38 1.26 10.00 109.40 10.94 21.88 76.58 30.20 30.20 0.00 2.62 2.62 0.00 76.58 0.10
21+980.00 12.30 3.40 10.00 138.40 13.84 27.68 96.88 23.30 23.30 0.00 18.22 18.22 0.00 96.88 0.10
22+000.00 10.86 6.55 20.00 231.60 23.16 46.32 162.12 99.50 69.48 30.02 0.00 0.00 0.00 162.12 0.10
22+010.00 9.86 2.30 10.00 103.60 10.36 20.72 72.52 44.25 31.08 13.17 0.00 0.00 0.00 72.52 0.10
22+020.00 10.02 0.00 10.00 99.40 9.94 19.88 69.58 5.75 5.75 0.00 24.07 24.07 0.00 69.58 0.10
22+030.00 17.81 0.00 10.00 139.15 13.92 27.83 97.41 0.00 0.00 0.00 41.75 41.75 0.00 97.41 0.10
22+040.00 7.69 4.41 10.00 127.50 12.75 25.50 89.25 11.03 11.03 0.00 27.23 27.23 0.00 89.25 0.10
22+060.00 16.61 0.00 20.00 243.00 24.30 48.60 170.10 22.05 22.05 0.00 50.85 50.85 0.00 170.10 0.10
22+070.00 31.17 0.00 10.00 238.90 23.89 47.78 167.23 0.00 0.00 0.00 71.67 71.67 0.00 167.23 0.10
22+080.00 50.77 0.00 10.00 409.70 40.97 81.94 286.79 0.00 0.00 0.00 122.91 122.91 0.00 286.79 0.10
22+100.00 60.62 0.00 20.00 1,113.90 111.39 222.78 779.73 0.00 0.00 0.00 334.17 334.17 0.00 779.73 0.10
22+120.00 51.96 0.00 20.00 1,125.80 112.58 225.16 788.06 0.00 0.00 0.00 337.74 337.74 0.00 788.06 0.10
22+130.00 63.23 0.00 10.00 575.95 57.60 115.19 403.17 0.00 0.00 0.00 172.79 172.79 0.00 403.17 0.10
22+140.00 66.05 0.00 10.00 646.40 64.64 129.28 452.48 0.00 0.00 0.00 193.92 193.92 0.00 452.48 0.10
22+160.00 51.97 0.00 20.00 1,180.20 118.02 236.04 826.14 0.00 0.00 0.00 354.06 354.06 0.00 826.14 0.10
22+180.00 46.99 0.00 20.00 989.60 98.96 197.92 692.72 0.00 0.00 0.00 296.88 296.88 0.00 692.72 0.10
22+200.00 46.84 0.00 20.00 938.30 93.83 187.66 656.81 0.00 0.00 0.00 281.49 281.49 0.00 656.81 0.10
22+220.00 37.14 0.00 20.00 839.80 83.98 167.96 587.86 0.00 0.00 0.00 251.94 251.94 0.00 587.86 0.10
22+240.00 26.46 0.00 20.00 636.00 63.60 127.20 445.20 0.00 0.00 0.00 190.80 190.80 0.00 445.20 0.10
22+260.00 19.76 0.00 20.00 462.20 46.22 92.44 323.54 0.00 0.00 0.00 138.66 138.66 0.00 323.54 0.10
22+270.00 13.77 0.00 10.00 167.65 16.77 33.53 117.36 0.00 0.00 0.00 50.30 50.30 0.00 117.36 0.10
22+280.00 10.67 3.90 10.00 122.20 12.22 24.44 85.54 9.75 9.75 0.00 26.91 26.91 0.00 85.54 0.10
22+300.00 9.55 0.99 20.00 202.20 20.22 40.44 141.54 48.90 48.90 0.00 11.76 11.76 0.00 141.54 0.10
22+320.00 1.08 1.39 20.00 106.30 10.63 21.26 74.41 23.80 23.80 0.00 8.09 8.09 0.00 74.41 0.10
22+340.00 0.00 18.84 20.00 5.40 0.54 1.08 3.78 202.30 1.62 200.68 0.00 0.00 0.00 3.78 0.10
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
22+360.00 0.00 34.33 20.00 0.00 0.00 0.00 0.00 531.70 0.00 531.70 0.00 0.00 0.00 0.00 0.10
22+380.00 0.00 49.02 20.00 0.00 0.00 0.00 0.00 833.50 0.00 833.50 0.00 0.00 0.00 0.00 0.10
22+400.00 0.00 44.66 20.00 0.00 0.00 0.00 0.00 936.80 0.00 936.80 0.00 0.00 0.00 0.00 0.10
22+410.00 0.00 36.27 10.00 0.00 0.00 0.00 0.00 404.65 0.00 404.65 0.00 0.00 0.00 0.00 0.10
22+420.00 0.00 53.51 10.00 0.00 0.00 0.00 0.00 448.90 0.00 448.90 0.00 0.00 0.00 0.00 0.10
22+430.00 0.48 4.12 10.00 1.20 0.12 0.24 0.84 288.15 0.36 287.79 0.00 0.00 0.00 0.84 0.10
22+440.00 4.72 3.45 10.00 26.00 2.60 5.20 18.20 37.85 7.80 30.05 0.00 0.00 0.00 18.20 0.10
22+450.00 1.54 7.25 10.00 31.30 3.13 6.26 21.91 53.50 9.39 44.11 0.00 0.00 0.00 21.91 0.10
22+460.00 3.51 5.14 10.00 25.25 2.53 5.05 17.68 61.95 7.58 54.38 0.00 0.00 0.00 17.68 0.10
22+480.00 6.19 1.12 20.00 97.00 9.70 19.40 67.90 62.60 29.10 33.50 0.00 0.00 0.00 67.90 0.10
22+490.00 4.55 0.76 10.00 53.70 5.37 10.74 37.59 9.40 9.40 0.00 6.71 6.71 0.00 37.59 0.10
22+500.00 2.99 4.09 10.00 37.70 3.77 7.54 26.39 24.25 11.31 12.94 0.00 0.00 0.00 26.39 0.10
22+510.00 4.81 3.59 10.00 39.00 3.90 7.80 27.30 38.40 11.70 26.70 0.00 0.00 0.00 27.30 0.10
22+520.00 1.96 7.56 10.00 33.85 3.39 6.77 23.70 55.75 10.16 45.60 0.00 0.00 0.00 23.70 0.10
22+540.00 7.74 0.94 20.00 97.00 9.70 19.40 67.90 85.00 29.10 55.90 0.00 0.00 0.00 67.90 0.10
22+560.00 17.08 0.00 20.00 248.20 24.82 49.64 173.74 4.70 4.70 0.00 69.76 69.76 0.00 173.74 0.10
22+570.00 18.49 0.00 10.00 177.85 17.79 35.57 124.50 0.00 0.00 0.00 53.36 53.36 0.00 124.50 0.10
22+580.00 11.90 0.00 10.00 151.95 15.20 30.39 106.37 0.00 0.00 0.00 45.59 45.59 0.00 106.37 0.10
22+600.00 36.25 0.00 20.00 481.50 48.15 96.30 337.05 0.00 0.00 0.00 144.45 144.45 0.00 337.05 0.10
22+620.00 44.41 0.00 20.00 806.60 80.66 161.32 564.62 0.00 0.00 0.00 241.98 241.98 0.00 564.62 0.10
22+630.00 53.52 0.00 10.00 489.65 48.97 97.93 342.76 0.00 0.00 0.00 146.90 146.90 0.00 342.76 0.10
22+640.00 58.25 0.00 10.00 558.85 55.89 111.77 391.20 0.00 0.00 0.00 167.66 167.66 0.00 391.20 0.10
22+660.00 112.24 0.00 20.00 1,704.90 170.49 340.98 1,193.43 0.00 0.00 0.00 511.47 511.47 0.00 1,193.43 0.10
22+680.00 124.46 0.00 20.00 2,367.00 236.70 473.40 1,656.90 0.00 0.00 0.00 710.10 710.10 0.00 1,656.90 0.10
22+700.00 127.90 0.00 20.00 2,523.60 252.36 504.72 1,766.52 0.00 0.00 0.00 757.08 757.08 0.00 1,766.52 0.10
22+720.00 69.03 0.00 20.00 1,969.30 196.93 393.86 1,378.51 0.00 0.00 0.00 590.79 590.79 0.00 1,378.51 0.10
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
22+740.00 44.83 0.00 20.00 1,138.60 113.86 227.72 797.02 0.00 0.00 0.00 341.58 341.58 0.00 797.02 0.10
22+750.00 37.07 0.00 10.00 409.50 40.95 81.90 286.65 0.00 0.00 0.00 122.85 122.85 0.00 286.65 0.10
22+760.00 34.71 0.00 10.00 358.90 35.89 71.78 251.23 0.00 0.00 0.00 107.67 107.67 0.00 251.23 0.10
22+780.00 30.18 0.00 20.00 648.90 64.89 129.78 454.23 0.00 0.00 0.00 194.67 194.67 0.00 454.23 0.10
22+790.00 30.43 0.00 10.00 303.05 30.31 60.61 212.14 0.00 0.00 0.00 90.92 90.92 0.00 212.14 0.10
22+800.00 27.75 0.00 10.00 290.90 29.09 58.18 203.63 0.00 0.00 0.00 87.27 87.27 0.00 203.63 0.10
22+820.00 25.28 0.00 20.00 530.30 53.03 106.06 371.21 0.00 0.00 0.00 159.09 159.09 0.00 371.21 0.10
22+840.00 22.20 0.00 20.00 474.80 47.48 94.96 332.36 0.00 0.00 0.00 142.44 142.44 0.00 332.36 0.10
22+850.00 24.87 0.00 10.00 235.35 23.54 47.07 164.75 0.00 0.00 0.00 70.61 70.61 0.00 164.75 0.10
22+860.00 25.37 0.00 10.00 251.20 25.12 50.24 175.84 0.00 0.00 0.00 75.36 75.36 0.00 175.84 0.10
22+870.00 18.82 0.00 10.00 220.95 22.10 44.19 154.67 0.00 0.00 0.00 66.29 66.29 0.00 154.67 0.10
22+880.00 20.28 0.00 10.00 195.50 19.55 39.10 136.85 0.00 0.00 0.00 58.65 58.65 0.00 136.85 0.10
22+890.00 21.05 0.00 10.00 206.65 20.67 41.33 144.66 0.00 0.00 0.00 62.00 62.00 0.00 144.66 0.10
22+900.00 13.96 1.05 10.00 175.05 17.51 35.01 122.54 2.63 2.63 0.00 49.89 49.89 0.00 122.54 0.10
22+920.00 14.58 2.43 20.00 285.40 28.54 57.08 199.78 34.80 34.80 0.00 50.82 50.82 0.00 199.78 0.10
22+930.00 16.54 0.00 10.00 155.60 15.56 31.12 108.92 6.08 6.08 0.00 40.61 40.61 0.00 108.92 0.10
22+940.00 11.59 0.94 10.00 140.65 14.07 28.13 98.46 2.35 2.35 0.00 39.85 39.85 0.00 98.46 0.10
22+960.00 12.23 1.86 20.00 238.20 23.82 47.64 166.74 28.00 28.00 0.00 43.46 43.46 0.00 166.74 0.10
22+980.00 15.15 0.00 20.00 273.80 27.38 54.76 191.66 9.30 9.30 0.00 72.84 72.84 0.00 191.66 0.10
22+990.00 11.67 0.00 10.00 134.10 13.41 26.82 93.87 0.00 0.00 0.00 40.23 40.23 0.00 93.87 0.10
23+000.00 7.54 0.00 10.00 96.05 9.61 19.21 67.24 0.00 0.00 0.00 28.82 28.82 0.00 67.24 0.10
23+020.00 1.64 6.86 20.00 91.80 9.18 18.36 64.26 34.30 27.54 6.76 0.00 0.00 0.00 64.26 0.10
23+030.00 8.06 0.00 10.00 48.50 4.85 9.70 33.95 17.15 14.55 2.60 0.00 0.00 0.00 33.95 0.10
23+040.00 4.98 5.97 10.00 65.20 6.52 13.04 45.64 14.93 14.93 0.00 4.64 4.64 0.00 45.64 0.10
23+050.00 16.67 1.92 10.00 108.25 10.83 21.65 75.78 39.45 32.48 6.97 0.00 0.00 0.00 75.78 0.10
23+060.00 4.22 1.75 10.00 104.45 10.45 20.89 73.12 18.35 18.35 0.00 12.99 12.99 0.00 73.12 0.10
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
23+070.00 11.47 2.54 10.00 78.45 7.85 15.69 54.92 21.45 21.45 0.00 2.09 2.09 0.00 54.92 0.10
23+080.00 15.64 9.60 10.00 135.55 13.56 27.11 94.89 60.70 40.67 20.04 0.00 0.00 0.00 94.89 0.10
23+090.00 6.77 4.48 10.00 112.05 11.21 22.41 78.44 70.40 33.62 36.79 0.00 0.00 0.00 78.44 0.10
23+100.00 5.38 3.84 10.00 60.75 6.08 12.15 42.53 41.60 18.23 23.38 0.00 0.00 0.00 42.53 0.10
23+110.00 8.82 3.12 10.00 71.00 7.10 14.20 49.70 34.80 21.30 13.50 0.00 0.00 0.00 49.70 0.10
23+120.00 6.38 3.24 10.00 76.00 7.60 15.20 53.20 31.80 22.80 9.00 0.00 0.00 0.00 53.20 0.10
23+140.00 3.64 6.47 20.00 100.20 10.02 20.04 70.14 97.10 30.06 67.04 0.00 0.00 0.00 70.14 0.10
23+150.00 0.00 28.95 10.00 9.10 0.91 1.82 6.37 177.10 2.73 174.37 0.00 0.00 0.00 6.37 0.10
23+160.00 6.45 4.76 10.00 16.13 1.61 3.23 11.29 168.55 4.84 163.71 0.00 0.00 0.00 11.29 0.10
23+170.00 5.79 0.07 10.00 61.20 6.12 12.24 42.84 24.15 18.36 5.79 0.00 0.00 0.00 42.84 0.10
23+180.00 26.67 0.00 10.00 162.30 16.23 32.46 113.61 0.18 0.18 0.00 48.52 48.52 0.00 113.61 0.10
23+190.00 21.49 0.00 10.00 240.80 24.08 48.16 168.56 0.00 0.00 0.00 72.24 72.24 0.00 168.56 0.10
23+200.00 13.08 0.46 10.00 172.85 17.29 34.57 121.00 1.15 1.15 0.00 50.71 50.71 0.00 121.00 0.10
23+210.00 3.22 0.94 10.00 81.50 8.15 16.30 57.05 7.00 7.00 0.00 17.45 17.45 0.00 57.05 0.10
23+220.00 2.99 7.04 10.00 31.05 3.11 6.21 21.74 39.90 9.32 30.59 0.00 0.00 0.00 21.74 0.10
23+230.00 2.65 2.25 10.00 28.20 2.82 5.64 19.74 46.45 8.46 37.99 0.00 0.00 0.00 19.74 0.10
23+240.00 1.69 5.06 10.00 21.70 2.17 4.34 15.19 36.55 6.51 30.04 0.00 0.00 0.00 15.19 0.10
23+260.00 5.94 0.68 20.00 76.30 7.63 15.26 53.41 57.40 22.89 34.51 0.00 0.00 0.00 53.41 0.10
23+280.00 5.03 3.66 20.00 109.70 10.97 21.94 76.79 43.40 32.91 10.49 0.00 0.00 0.00 76.79 0.10
23+290.00 10.48 0.00 10.00 77.55 7.76 15.51 54.29 9.15 9.15 0.00 14.12 14.12 0.00 54.29 0.10
23+300.00 17.03 0.00 10.00 137.55 13.76 27.51 96.29 0.00 0.00 0.00 41.27 41.27 0.00 96.29 0.10
23+310.00 13.25 0.74 10.00 151.40 15.14 30.28 105.98 1.85 1.85 0.00 43.57 43.57 0.00 105.98 0.10
23+320.00 8.83 3.78 10.00 110.40 11.04 22.08 77.28 22.60 22.60 0.00 10.52 10.52 0.00 77.28 0.10
23+330.00 5.14 2.89 10.00 69.85 6.99 13.97 48.90 33.35 20.96 12.40 0.00 0.00 0.00 48.90 0.10
23+340.00 7.63 3.68 10.00 63.85 6.39 12.77 44.70 32.85 19.16 13.70 0.00 0.00 0.00 44.70 0.10
23+350.00 6.57 2.89 10.00 71.00 7.10 14.20 49.70 32.85 21.30 11.55 0.00 0.00 0.00 49.70 0.10
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
23+360.00 6.44 2.23 10.00 65.05 6.51 13.01 45.54 25.60 19.52 6.09 0.00 0.00 0.00 45.54 0.10
23+370.00 4.59 0.00 10.00 55.15 5.52 11.03 38.61 5.58 5.58 0.00 10.97 10.97 0.00 38.61 0.10
23+380.00 2.15 5.79 10.00 33.70 3.37 6.74 23.59 14.48 10.11 4.37 0.00 0.00 0.00 23.59 0.10
23+390.00 0.51 5.03 10.00 13.30 1.33 2.66 9.31 54.10 3.99 50.11 0.00 0.00 0.00 9.31 0.10
23+400.00 0.00 13.48 10.00 1.28 0.13 0.26 0.89 92.55 0.38 92.17 0.00 0.00 0.00 0.89 0.10
23+420.00 0.00 12.67 20.00 0.00 0.00 0.00 0.00 261.50 0.00 261.50 0.00 0.00 0.00 0.00 0.10
23+440.00 0.00 15.67 20.00 0.00 0.00 0.00 0.00 283.40 0.00 283.40 0.00 0.00 0.00 0.00 0.10
23+460.00 0.39 13.97 20.00 1.95 0.20 0.39 1.37 296.40 0.59 295.82 0.00 0.00 0.00 1.37 0.10
23+470.00 0.28 19.67 10.00 3.35 0.34 0.67 2.35 168.20 1.01 167.20 0.00 0.00 0.00 2.35 0.10
23+480.00 0.00 22.96 10.00 0.70 0.07 0.14 0.49 213.15 0.21 212.94 0.00 0.00 0.00 0.49 0.10
23+500.00 0.00 25.39 20.00 0.00 0.00 0.00 0.00 483.50 0.00 483.50 0.00 0.00 0.00 0.00 0.10
23+520.00 0.00 39.75 20.00 0.00 0.00 0.00 0.00 651.40 0.00 651.40 0.00 0.00 0.00 0.00 0.10
23+540.00 0.00 34.86 20.00 0.00 0.00 0.00 0.00 746.10 0.00 746.10 0.00 0.00 0.00 0.00 0.10
23+550.00 0.00 41.11 10.00 0.00 0.00 0.00 0.00 379.85 0.00 379.85 0.00 0.00 0.00 0.00 0.10
23+560.00 0.00 45.26 10.00 0.00 0.00 0.00 0.00 431.85 0.00 431.85 0.00 0.00 0.00 0.00 0.10
23+570.00 0.00 74.82 10.00 0.00 0.00 0.00 0.00 600.40 0.00 600.40 0.00 0.00 0.00 0.00 0.10
23+580.00 0.00 37.15 10.00 0.00 0.00 0.00 0.00 559.85 0.00 559.85 0.00 0.00 0.00 0.00 0.10
23+600.00 0.33 13.62 20.00 1.65 0.17 0.33 1.16 507.70 0.50 507.21 0.00 0.00 0.00 1.16 0.10
23+610.00 0.51 6.94 10.00 4.20 0.42 0.84 2.94 102.80 1.26 101.54 0.00 0.00 0.00 2.94 0.10
23+620.00 2.26 4.18 10.00 13.85 1.39 2.77 9.70 55.60 4.16 51.45 0.00 0.00 0.00 9.70 0.10
23+640.00 0.41 16.04 20.00 26.70 2.67 5.34 18.69 202.20 8.01 194.19 0.00 0.00 0.00 18.69 0.10
23+660.00 0.40 4.92 20.00 8.10 0.81 1.62 5.67 209.60 2.43 207.17 0.00 0.00 0.00 5.67 0.10
23+680.00 5.61 3.44 20.00 60.10 6.01 12.02 42.07 83.60 18.03 65.57 0.00 0.00 0.00 42.07 0.10
23+700.00 3.05 3.44 20.00 86.60 8.66 17.32 60.62 68.80 25.98 42.82 0.00 0.00 0.00 60.62 0.10
23+720.00 8.95 0.00 20.00 120.00 12.00 24.00 84.00 17.20 17.20 0.00 18.80 18.80 0.00 84.00 0.10
23+730.00 11.66 0.00 10.00 103.05 10.31 20.61 72.14 0.00 0.00 0.00 30.92 30.92 0.00 72.14 0.10
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
23+740.00 24.89 0.00 10.00 182.75 18.28 36.55 127.93 0.00 0.00 0.00 54.83 54.83 0.00 127.93 0.10
23+760.00 14.84 0.00 20.00 397.30 39.73 79.46 278.11 0.00 0.00 0.00 119.19 119.19 0.00 278.11 0.10
23+780.00 5.80 6.28 20.00 206.40 20.64 41.28 144.48 31.40 31.40 0.00 30.52 30.52 0.00 144.48 0.10
23+790.00 12.26 0.00 10.00 90.30 9.03 18.06 63.21 15.70 15.70 0.00 11.39 11.39 0.00 63.21 0.10
23+800.00 5.50 2.82 10.00 88.80 8.88 17.76 62.16 7.05 7.05 0.00 19.59 19.59 0.00 62.16 0.10
23+820.00 0.22 2.39 20.00 57.20 5.72 11.44 40.04 52.10 17.16 34.94 0.00 0.00 0.00 40.04 0.10
23+830.00 12.15 0.00 10.00 61.85 6.19 12.37 43.30 5.98 5.98 0.00 12.58 12.58 0.00 43.30 0.10
23+840.00 8.21 0.08 10.00 101.80 10.18 20.36 71.26 0.20 0.20 0.00 30.34 30.34 0.00 71.26 0.10
23+850.00 2.76 7.15 10.00 54.85 5.49 10.97 38.40 36.15 16.46 19.70 0.00 0.00 0.00 38.40 0.10
23+860.00 0.36 7.99 10.00 15.60 1.56 3.12 10.92 75.70 4.68 71.02 0.00 0.00 0.00 10.92 0.10
23+870.00 3.93 3.82 10.00 21.45 2.15 4.29 15.02 59.05 6.44 52.62 0.00 0.00 0.00 15.02 0.10
23+880.00 3.57 7.89 10.00 37.50 3.75 7.50 26.25 58.55 11.25 47.30 0.00 0.00 0.00 26.25 0.10
23+900.00 0.44 7.23 20.00 40.10 4.01 8.02 28.07 151.20 12.03 139.17 0.00 0.00 0.00 28.07 0.10
23+920.00 1.79 1.58 20.00 22.30 2.23 4.46 15.61 88.10 6.69 81.41 0.00 0.00 0.00 15.61 0.10
23+940.00 3.38 10.02 20.00 51.70 5.17 10.34 36.19 116.00 15.51 100.49 0.00 0.00 0.00 36.19 0.10
23+960.00 2.03 1.92 20.00 54.10 5.41 10.82 37.87 119.40 16.23 103.17 0.00 0.00 0.00 37.87 0.10
23+980.00 1.87 0.35 20.00 39.00 3.90 7.80 27.30 22.70 11.70 11.00 0.00 0.00 0.00 27.30 0.10
24+000.00 7.76 3.82 20.00 96.30 9.63 19.26 67.41 41.70 28.89 12.81 0.00 0.00 0.00 67.41 0.10
24+020.00 0.85 5.54 20.00 86.10 8.61 17.22 60.27 93.60 25.83 67.77 0.00 0.00 0.00 60.27 0.10
24+030.00 1.49 5.70 10.00 11.70 1.17 2.34 8.19 56.20 3.51 52.69 0.00 0.00 0.00 8.19 0.10
24+040.00 4.21 1.55 10.00 28.50 2.85 5.70 19.95 36.25 8.55 27.70 0.00 0.00 0.00 19.95 0.10
24+050.00 5.51 2.77 10.00 48.60 4.86 9.72 34.02 21.60 14.58 7.02 0.00 0.00 0.00 34.02 0.10
24+060.00 7.00 22.25 10.00 62.55 6.26 12.51 43.79 125.10 18.77 106.34 0.00 0.00 0.00 43.79 0.10
24+080.00 7.92 9.79 20.00 149.20 14.92 29.84 104.44 320.40 44.76 275.64 0.00 0.00 0.00 104.44 0.10
24+090.00 11.28 0.00 10.00 96.00 9.60 19.20 67.20 24.48 24.48 0.00 4.33 4.33 0.00 67.20 0.10
24+100.00 7.89 0.00 10.00 95.85 9.59 19.17 67.10 0.00 0.00 0.00 28.76 28.76 0.00 67.10 0.10
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
24+120.00 6.78 0.67 20.00 146.70 14.67 29.34 102.69 3.35 3.35 0.00 40.66 40.66 0.00 102.69 0.10
24+140.00 5.26 1.23 20.00 120.40 12.04 24.08 84.28 19.00 19.00 0.00 17.12 17.12 0.00 84.28 0.10
24+160.00 5.95 0.00 20.00 112.10 11.21 22.42 78.47 6.15 6.15 0.00 27.48 27.48 0.00 78.47 0.10
24+180.00 4.29 5.81 20.00 102.40 10.24 20.48 71.68 29.05 29.05 0.00 1.67 1.67 0.00 71.68 0.10
24+200.00 0.00 22.20 20.00 21.45 2.15 4.29 15.02 280.10 6.44 273.67 0.00 0.00 0.00 15.02 0.10
24+210.00 0.00 10.54 10.00 0.00 0.00 0.00 0.00 163.70 0.00 163.70 0.00 0.00 0.00 0.00 0.10
24+220.00 0.00 8.00 10.00 0.00 0.00 0.00 0.00 92.70 0.00 92.70 0.00 0.00 0.00 0.00 0.10
24+230.00 0.00 19.93 10.00 0.00 0.00 0.00 0.00 139.65 0.00 139.65 0.00 0.00 0.00 0.00 0.10
24+240.00 0.00 15.01 10.00 0.00 0.00 0.00 0.00 174.70 0.00 174.70 0.00 0.00 0.00 0.00 0.10
24+260.00 0.00 4.73 20.00 0.00 0.00 0.00 0.00 197.40 0.00 197.40 0.00 0.00 0.00 0.00 0.10
24+280.00 0.00 9.39 20.00 0.00 0.00 0.00 0.00 141.20 0.00 141.20 0.00 0.00 0.00 0.00 0.10
24+300.00 0.52 5.47 20.00 2.60 0.26 0.52 1.82 148.60 0.78 147.82 0.00 0.00 0.00 1.82 0.10
24+310.00 1.76 2.52 10.00 11.40 1.14 2.28 7.98 39.95 3.42 36.53 0.00 0.00 0.00 7.98 0.10
24+320.00 2.77 0.50 10.00 22.65 2.27 4.53 15.86 15.10 6.80 8.31 0.00 0.00 0.00 15.86 0.10
24+330.00 3.11 3.00 10.00 29.40 2.94 5.88 20.58 17.50 8.82 8.68 0.00 0.00 0.00 20.58 0.10
24+340.00 4.59 1.01 10.00 38.50 3.85 7.70 26.95 20.05 11.55 8.50 0.00 0.00 0.00 26.95 0.10
24+360.00 6.44 2.54 20.00 110.30 11.03 22.06 77.21 35.50 33.09 2.41 0.00 0.00 0.00 77.21 0.10
24+380.00 5.04 3.72 20.00 114.80 11.48 22.96 80.36 62.60 34.44 28.16 0.00 0.00 0.00 80.36 0.10
24+400.00 5.44 0.00 20.00 104.80 10.48 20.96 73.36 18.60 18.60 0.00 12.84 12.84 0.00 73.36 0.10
24+410.00 8.71 0.00 10.00 70.75 7.08 14.15 49.53 0.00 0.00 0.00 21.23 21.23 0.00 49.53 0.10
24+420.00 14.02 0.00 10.00 113.65 90.92 22.73 0.00 0.00 0.00 0.00 113.65 113.65 0.00 0.00 0.80
24+430.00 8.64 2.29 10.00 113.30 90.64 22.66 0.00 5.73 5.73 0.00 107.58 107.58 0.00 0.00 0.80
24+440.00 6.82 5.59 10.00 77.30 61.84 15.46 0.00 39.40 39.40 0.00 37.90 37.90 0.00 0.00 0.80
24+450.00 7.44 8.94 10.00 71.30 57.04 14.26 0.00 72.65 71.30 1.35 0.00 0.00 0.00 0.00 0.80
24+460.00 6.74 11.46 10.00 70.90 56.72 14.18 0.00 102.00 70.90 31.10 0.00 0.00 0.00 0.00 0.80
24+470.00 4.62 2.76 10.00 56.80 45.44 11.36 0.00 71.10 56.80 14.30 0.00 0.00 0.00 0.00 0.80
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
24+480.00 11.39 0.00 10.00 80.05 64.04 16.01 0.00 6.90 6.90 0.00 73.15 73.15 0.00 0.00 0.80
24+490.00 7.46 0.00 10.00 94.25 75.40 18.85 0.00 0.00 0.00 0.00 94.25 94.25 0.00 0.00 0.80
24+500.00 5.75 0.17 10.00 66.05 52.84 13.21 0.00 0.43 0.43 0.00 65.63 65.63 0.00 0.00 0.80
24+520.00 0.27 11.79 20.00 60.20 48.16 12.04 0.00 119.60 60.20 59.40 0.00 0.00 0.00 0.00 0.80
24+540.00 8.02 0.39 20.00 82.90 66.32 16.58 0.00 121.80 82.90 38.90 0.00 0.00 0.00 0.00 0.80
24+550.00 0.01 4.41 10.00 40.15 32.12 8.03 0.00 24.00 24.00 0.00 16.15 16.15 0.00 0.00 0.80
24+560.00 0.00 9.43 10.00 0.03 0.02 0.01 0.00 69.20 0.03 69.18 0.00 0.00 0.00 0.00 0.80
24+570.00 0.00 17.07 10.00 0.00 0.00 0.00 0.00 132.50 0.00 132.50 0.00 0.00 0.00 0.00 0.80
24+580.00 0.00 15.38 10.00 0.00 0.00 0.00 0.00 162.25 0.00 162.25 0.00 0.00 0.00 0.00 0.80
24+600.00 1.38 10.13 20.00 6.90 5.52 1.38 0.00 255.10 6.90 248.20 0.00 0.00 0.00 0.00 0.80
24+620.00 3.45 4.59 20.00 48.30 38.64 9.66 0.00 147.20 48.30 98.90 0.00 0.00 0.00 0.00 0.80
24+630.00 3.24 0.26 10.00 33.45 26.76 6.69 0.00 24.25 24.25 0.00 9.20 9.20 0.00 0.00 0.80
24+640.00 4.26 0.00 10.00 37.50 30.00 7.50 0.00 0.65 0.65 0.00 36.85 36.85 0.00 0.00 0.80
24+660.00 3.28 0.67 20.00 75.40 60.32 15.08 0.00 3.35 3.35 0.00 72.05 72.05 0.00 0.00 0.80
24+670.00 5.36 0.07 10.00 43.20 34.56 8.64 0.00 3.70 3.70 0.00 39.50 39.50 0.00 0.00 0.80
24+680.00 4.39 0.00 10.00 48.75 39.00 9.75 0.00 0.18 0.18 0.00 48.58 48.58 0.00 0.00 0.80
24+690.00 3.00 0.03 10.00 36.95 29.56 7.39 0.00 0.08 0.08 0.00 36.88 36.88 0.00 0.00 0.80
24+700.00 1.45 1.12 10.00 22.25 17.80 4.45 0.00 5.75 5.75 0.00 16.50 16.50 0.00 0.00 0.80
24+720.00 1.03 1.91 20.00 24.80 19.84 4.96 0.00 30.30 24.80 5.50 0.00 0.00 0.00 0.00 0.80
24+740.00 5.50 0.00 20.00 65.30 52.24 13.06 0.00 9.55 9.55 0.00 55.75 55.75 0.00 0.00 0.80
24+750.00 5.28 0.56 10.00 53.90 43.12 10.78 0.00 1.40 1.40 0.00 52.50 52.50 0.00 0.00 0.80
24+760.00 3.29 2.34 10.00 42.85 34.28 8.57 0.00 14.50 14.50 0.00 28.35 28.35 0.00 0.00 0.80
24+780.00 0.00 4.51 20.00 16.45 13.16 3.29 0.00 68.50 16.45 52.05 0.00 0.00 0.00 0.00 0.80
24+800.00 1.18 0.43 20.00 5.90 4.72 1.18 0.00 49.40 5.90 43.50 0.00 0.00 0.00 0.00 0.80
24+810.00 2.88 0.00 10.00 20.30 16.24 4.06 0.00 1.08 1.08 0.00 19.23 19.23 0.00 0.00 0.80
24+820.00 4.19 0.00 10.00 35.35 28.28 7.07 0.00 0.00 0.00 0.00 35.35 35.35 0.00 0.00 0.80
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
24+830.00 6.18 0.00 10.00 51.85 41.48 10.37 0.00 0.00 0.00 0.00 51.85 51.85 0.00 0.00 0.80
24+840.00 6.18 0.00 10.00 61.80 49.44 12.36 0.00 0.00 0.00 0.00 61.80 61.80 0.00 0.00 0.80
24+850.00 2.86 0.36 10.00 45.20 36.16 9.04 0.00 0.90 0.90 0.00 44.30 44.30 0.00 0.00 0.80
24+860.00 2.83 0.07 10.00 28.45 22.76 5.69 0.00 2.15 2.15 0.00 26.30 26.30 0.00 0.00 0.80
24+870.00 5.26 0.00 10.00 40.45 32.36 8.09 0.00 0.18 0.18 0.00 40.28 40.28 0.00 0.00 0.80
24+880.00 2.23 0.00 10.00 37.45 29.96 7.49 0.00 0.00 0.00 0.00 37.45 37.45 0.00 0.00 0.80
24+890.00 0.29 0.57 10.00 12.60 10.08 2.52 0.00 1.43 1.43 0.00 11.18 11.18 0.00 0.00 0.80
24+900.00 0.11 0.51 10.00 2.00 1.60 0.40 0.00 5.40 2.00 3.40 0.00 0.00 0.00 0.00 0.80
24+910.00 0.00 2.47 10.00 0.28 0.22 0.06 0.00 14.90 0.28 14.63 0.00 0.00 0.00 0.00 0.80
24+920.00 0.00 1.06 10.00 0.00 0.00 0.00 0.00 17.65 0.00 17.65 0.00 0.00 0.00 0.00 0.80
24+930.00 6.68 0.00 10.00 16.70 13.36 3.34 0.00 2.65 2.65 0.00 14.05 14.05 0.00 0.00 0.80
24+940.00 5.47 0.21 10.00 60.75 48.60 12.15 0.00 0.53 0.53 0.00 60.23 60.23 0.00 0.00 0.80
24+960.00 0.24 0.90 20.00 57.10 45.68 11.42 0.00 11.10 11.10 0.00 46.00 46.00 0.00 0.00 0.80
24+980.00 0.00 1.16 20.00 1.20 0.96 0.24 0.00 20.60 1.20 19.40 0.00 0.00 0.00 0.00 0.80
25+000.00 3.12 0.00 20.00 15.60 12.48 3.12 0.00 5.80 5.80 0.00 9.80 9.80 0.00 0.00 0.80
25+010.00 3.90 0.00 10.00 35.10 28.08 7.02 0.00 0.00 0.00 0.00 35.10 35.10 0.00 0.00 0.80
25+020.00 8.73 0.00 10.00 63.15 50.52 12.63 0.00 0.00 0.00 0.00 63.15 63.15 0.00 0.00 0.80
25+030.00 19.46 0.00 10.00 140.95 112.76 28.19 0.00 0.00 0.00 0.00 140.95 140.95 0.00 0.00 0.80
25+040.00 15.04 0.00 10.00 172.50 138.00 34.50 0.00 0.00 0.00 0.00 172.50 172.50 0.00 0.00 0.80
25+060.00 6.57 1.84 20.00 216.10 172.88 43.22 0.00 9.20 9.20 0.00 206.90 206.90 0.00 0.00 0.80
25+080.00 5.79 1.50 20.00 123.60 98.88 24.72 0.00 33.40 33.40 0.00 90.20 90.20 0.00 0.00 0.80
25+090.00 5.21 0.00 10.00 55.00 44.00 11.00 0.00 3.75 3.75 0.00 51.25 51.25 0.00 0.00 0.80
25+100.00 4.04 0.00 10.00 46.25 37.00 9.25 0.00 0.00 0.00 0.00 46.25 46.25 0.00 0.00 0.80
25+120.00 1.95 1.82 20.00 59.90 47.92 11.98 0.00 9.10 9.10 0.00 50.80 50.80 0.00 0.00 0.80
25+140.00 0.00 9.00 20.00 9.75 7.80 1.95 0.00 108.20 9.75 98.45 0.00 0.00 0.00 0.00 0.80
25+160.00 3.80 0.00 20.00 19.00 15.20 3.80 0.00 45.00 19.00 26.00 0.00 0.00 0.00 0.00 0.80
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
25+180.00 5.00 0.00 20.00 88.00 70.40 17.60 0.00 0.00 0.00 0.00 88.00 88.00 0.00 0.00 0.80
25+200.00 0.33 1.12 20.00 53.30 42.64 10.66 0.00 5.60 5.60 0.00 47.70 47.70 0.00 0.00 0.80
25+210.00 5.83 0.06 10.00 30.80 24.64 6.16 0.00 5.90 5.90 0.00 24.90 24.90 0.00 0.00 0.80
25+220.00 0.56 0.91 10.00 31.95 25.56 6.39 0.00 4.85 4.85 0.00 27.10 27.10 0.00 0.00 0.80
25+240.00 0.91 0.56 20.00 14.70 11.76 2.94 0.00 14.70 14.70 0.00 0.00 0.00 0.00 0.00 0.80
25+260.00 3.84 0.01 20.00 47.50 38.00 9.50 0.00 5.70 5.70 0.00 41.80 41.80 0.00 0.00 0.80
25+280.00 3.32 0.53 20.00 71.60 57.28 14.32 0.00 5.40 5.40 0.00 66.20 66.20 0.00 0.00 0.80
25+300.00 5.24 0.47 20.00 85.60 68.48 17.12 0.00 10.00 10.00 0.00 75.60 75.60 0.00 0.00 0.80
25+320.00 0.32 0.56 20.00 55.60 44.48 11.12 0.00 10.30 10.30 0.00 45.30 45.30 0.00 0.00 0.80
25+330.00 2.27 0.06 10.00 12.95 10.36 2.59 0.00 3.10 3.10 0.00 9.85 9.85 0.00 0.00 0.80
25+340.00 1.77 0.47 10.00 20.20 16.16 4.04 0.00 2.65 2.65 0.00 17.55 17.55 0.00 0.00 0.80
25+360.00 0.42 0.03 20.00 21.90 17.52 4.38 0.00 5.00 5.00 0.00 16.90 16.90 0.00 0.00 0.80
25+370.00 3.60 0.31 10.00 20.10 16.08 4.02 0.00 1.70 1.70 0.00 18.40 18.40 0.00 0.00 0.80
25+380.00 0.21 0.35 10.00 19.05 15.24 3.81 0.00 3.30 3.30 0.00 15.75 15.75 0.00 0.00 0.80
25+390.00 0.52 3.12 10.00 3.65 2.92 0.73 0.00 17.35 3.65 13.70 0.00 0.00 0.00 0.00 0.80
25+400.00 3.76 0.00 10.00 21.40 17.12 4.28 0.00 7.80 7.80 0.00 13.60 13.60 0.00 0.00 0.80
25+410.00 9.81 0.04 10.00 67.85 54.28 13.57 0.00 0.10 0.10 0.00 67.75 67.75 0.00 0.00 0.80
25+420.00 2.63 1.34 10.00 62.20 49.76 12.44 0.00 6.90 6.90 0.00 55.30 55.30 0.00 0.00 0.80
25+440.00 0.98 2.05 20.00 36.10 28.88 7.22 0.00 33.90 33.90 0.00 2.20 2.20 0.00 0.00 0.80
25+450.00 11.49 2.44 10.00 62.35 49.88 12.47 0.00 22.45 22.45 0.00 39.90 39.90 0.00 0.00 0.80
25+460.00 4.47 0.00 10.00 79.80 63.84 15.96 0.00 6.10 6.10 0.00 73.70 73.70 0.00 0.00 0.80
25+470.00 8.28 0.00 10.00 63.75 51.00 12.75 0.00 0.00 0.00 0.00 63.75 63.75 0.00 0.00 0.80
25+480.00 1.88 0.66 10.00 50.80 40.64 10.16 0.00 1.65 1.65 0.00 49.15 49.15 0.00 0.00 0.80
25+490.00 12.14 0.00 10.00 70.10 56.08 14.02 0.00 1.65 1.65 0.00 68.45 68.45 0.00 0.00 0.80
25+500.00 4.60 0.44 10.00 83.70 66.96 16.74 0.00 1.10 1.10 0.00 82.60 82.60 0.00 0.00 0.80
25+520.00 0.37 3.37 20.00 49.70 39.76 9.94 0.00 38.10 38.10 0.00 11.60 11.60 0.00 0.00 0.80
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
25+540.00 0.75 0.36 20.00 11.20 8.96 2.24 0.00 37.30 11.20 26.10 0.00 0.00 0.00 0.00 0.80
25+560.00 1.16 6.74 20.00 19.10 15.28 3.82 0.00 71.00 19.10 51.90 0.00 0.00 0.00 0.00 0.80
25+570.00 7.32 0.00 10.00 42.40 33.92 8.48 0.00 16.85 16.85 0.00 25.55 25.55 0.00 0.00 0.80
25+580.00 19.54 0.00 10.00 134.30 107.44 26.86 0.00 0.00 0.00 0.00 134.30 134.30 0.00 0.00 0.80
25+590.00 37.45 0.00 10.00 284.95 227.96 56.99 0.00 0.00 0.00 0.00 284.95 284.95 0.00 0.00 0.80
25+600.00 19.85 0.00 10.00 286.50 229.20 57.30 0.00 0.00 0.00 0.00 286.50 286.50 0.00 0.00 0.80
25+610.00 1.69 0.05 10.00 107.70 86.16 21.54 0.00 0.13 0.13 0.00 107.58 107.58 0.00 0.00 0.80
25+620.00 2.56 0.00 10.00 21.25 17.00 4.25 0.00 0.13 0.13 0.00 21.13 21.13 0.00 0.00 0.80
25+640.00 2.06 1.42 20.00 46.20 36.96 9.24 0.00 7.10 7.10 0.00 39.10 39.10 0.00 0.00 0.80
25+660.00 6.10 0.00 20.00 81.60 65.28 16.32 0.00 7.10 7.10 0.00 74.50 74.50 0.00 0.00 0.80
25+670.00 8.41 2.11 10.00 72.55 58.04 14.51 0.00 5.28 5.28 0.00 67.28 67.28 0.00 0.00 0.80
25+680.00 2.58 12.06 10.00 54.95 43.96 10.99 0.00 70.85 54.95 15.90 0.00 0.00 0.00 0.00 0.80
25+700.00 0.55 9.21 20.00 31.30 25.04 6.26 0.00 212.70 31.30 181.40 0.00 0.00 0.00 0.00 0.80
25+720.00 2.37 7.54 20.00 29.20 23.36 5.84 0.00 167.50 29.20 138.30 0.00 0.00 0.00 0.00 0.80
25+740.00 7.16 0.00 20.00 95.30 76.24 19.06 0.00 37.70 37.70 0.00 57.60 57.60 0.00 0.00 0.80
25+760.00 3.24 2.50 20.00 104.00 83.20 20.80 0.00 12.50 12.50 0.00 91.50 91.50 0.00 0.00 0.80
25+780.00 0.21 21.52 20.00 34.50 27.60 6.90 0.00 240.20 34.50 205.70 0.00 0.00 0.00 0.00 0.80
25+790.00 0.00 7.05 10.00 0.53 0.42 0.11 0.00 142.85 0.53 142.33 0.00 0.00 0.00 0.00 0.80
25+800.00 7.47 0.00 10.00 18.68 14.94 3.74 0.00 17.63 17.63 0.00 1.05 1.05 0.00 0.00 0.80
25+810.00 16.21 0.00 10.00 118.40 94.72 23.68 0.00 0.00 0.00 0.00 118.40 118.40 0.00 0.00 0.80
25+820.00 23.74 0.00 10.00 199.75 159.80 39.95 0.00 0.00 0.00 0.00 199.75 199.75 0.00 0.00 0.80
25+830.00 3.19 0.14 10.00 134.65 107.72 26.93 0.00 0.35 0.35 0.00 134.30 134.30 0.00 0.00 0.80
25+840.00 4.80 2.45 10.00 39.95 31.96 7.99 0.00 12.95 12.95 0.00 27.00 27.00 0.00 0.00 0.80
25+860.00 2.46 7.57 20.00 72.60 58.08 14.52 0.00 100.20 72.60 27.60 0.00 0.00 0.00 0.00 0.80
25+870.00 6.44 3.20 10.00 44.50 35.60 8.90 0.00 53.85 44.50 9.35 0.00 0.00 0.00 0.00 0.80
25+880.00 4.77 5.42 10.00 56.05 44.84 11.21 0.00 43.10 43.10 0.00 12.95 12.95 0.00 0.00 0.80
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
25+890.00 4.45 3.41 10.00 46.10 36.88 9.22 0.00 44.15 44.15 0.00 1.95 1.95 0.00 0.00 0.80
25+900.00 2.21 1.27 10.00 33.30 26.64 6.66 0.00 23.40 23.40 0.00 9.90 9.90 0.00 0.00 0.80
25+910.00 2.08 0.95 10.00 21.45 17.16 4.29 0.00 11.10 11.10 0.00 10.35 10.35 0.00 0.00 0.80
25+920.00 4.53 0.00 10.00 33.05 26.44 6.61 0.00 2.38 2.38 0.00 30.68 30.68 0.00 0.00 0.80
25+930.00 4.75 0.00 10.00 46.40 37.12 9.28 0.00 0.00 0.00 0.00 46.40 46.40 0.00 0.00 0.80
25+940.00 3.52 0.01 10.00 41.35 33.08 8.27 0.00 0.03 0.03 0.00 41.33 41.33 0.00 0.00 0.80
25+960.00 0.89 1.75 20.00 44.10 35.28 8.82 0.00 17.60 17.60 0.00 26.50 26.50 0.00 0.00 0.80
25+970.00 0.74 2.04 10.00 8.15 6.52 1.63 0.00 18.95 8.15 10.80 0.00 0.00 0.00 0.00 0.80
25+980.00 1.24 3.94 10.00 9.90 7.92 1.98 0.00 29.90 9.90 20.00 0.00 0.00 0.00 0.00 0.80
25+990.00 2.80 0.15 10.00 20.20 16.16 4.04 0.00 20.45 20.20 0.25 0.00 0.00 0.00 0.00 0.80
26+000.00 2.70 5.87 10.00 27.50 22.00 5.50 0.00 30.10 27.50 2.60 0.00 0.00 0.00 0.00 0.80
26+010.00 5.34 0.00 10.00 40.20 32.16 8.04 0.00 14.68 14.68 0.00 25.53 25.53 0.00 0.00 0.80
26+020.00 4.46 0.00 10.00 49.00 39.20 9.80 0.00 0.00 0.00 0.00 49.00 49.00 0.00 0.00 0.80
26+040.00 2.62 2.86 20.00 70.80 56.64 14.16 0.00 14.30 14.30 0.00 56.50 56.50 0.00 0.00 0.80
26+050.00 1.32 3.18 10.00 19.70 15.76 3.94 0.00 30.20 19.70 10.50 0.00 0.00 0.00 0.00 0.80
26+060.00 6.85 1.44 10.00 40.85 32.68 8.17 0.00 23.10 23.10 0.00 17.75 17.75 0.00 0.00 0.80
26+080.00 2.37 0.65 20.00 92.20 73.76 18.44 0.00 20.90 20.90 0.00 71.30 71.30 0.00 0.00 0.80
26+100.00 2.80 0.00 20.00 51.70 41.36 10.34 0.00 3.25 3.25 0.00 48.45 48.45 0.00 0.00 0.80
26+120.00 5.03 0.58 20.00 78.30 62.64 15.66 0.00 2.90 2.90 0.00 75.40 75.40 0.00 0.00 0.80
26+130.00 6.82 0.90 10.00 59.25 47.40 11.85 0.00 7.40 7.40 0.00 51.85 51.85 0.00 0.00 0.80
26+140.00 5.99 0.00 10.00 64.05 51.24 12.81 0.00 2.25 2.25 0.00 61.80 61.80 0.00 0.00 0.80
26+150.00 2.21 3.24 10.00 41.00 32.80 8.20 0.00 8.10 8.10 0.00 32.90 32.90 0.00 0.00 0.80
26+160.00 0.00 5.06 10.00 5.53 4.42 1.11 0.00 41.50 5.53 35.98 0.00 0.00 0.00 0.00 0.80
26+180.00 8.53 4.22 20.00 42.65 34.12 8.53 0.00 92.80 42.65 50.15 0.00 0.00 0.00 0.00 0.80
26+200.00 7.78 2.24 20.00 163.10 130.48 32.62 0.00 64.60 64.60 0.00 98.50 98.50 0.00 0.00 0.80
26+210.00 1.78 1.02 10.00 47.80 38.24 9.56 0.00 16.30 16.30 0.00 31.50 31.50 0.00 0.00 0.80
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
26+220.00 3.75 1.55 10.00 27.65 22.12 5.53 0.00 12.85 12.85 0.00 14.80 14.80 0.00 0.00 0.80
26+230.00 3.25 2.41 10.00 35.00 28.00 7.00 0.00 19.80 19.80 0.00 15.20 15.20 0.00 0.00 0.80
26+240.00 6.96 2.70 10.00 51.05 40.84 10.21 0.00 25.55 25.55 0.00 25.50 25.50 0.00 0.00 0.80
26+260.00 8.00 5.22 20.00 149.60 119.68 29.92 0.00 79.20 79.20 0.00 70.40 70.40 0.00 0.00 0.80
26+270.00 6.29 4.99 10.00 71.45 57.16 14.29 0.00 51.05 51.05 0.00 20.40 20.40 0.00 0.00 0.80
26+280.00 4.37 7.83 10.00 53.30 42.64 10.66 0.00 64.10 53.30 10.80 0.00 0.00 0.00 0.00 0.80
26+290.00 1.49 8.37 10.00 29.30 23.44 5.86 0.00 81.00 29.30 51.70 0.00 0.00 0.00 0.00 0.80
26+300.00 6.21 1.58 10.00 38.50 30.80 7.70 0.00 49.75 38.50 11.25 0.00 0.00 0.00 0.00 0.80
26+320.00 4.82 0.00 20.00 110.30 88.24 22.06 0.00 7.90 7.90 0.00 102.40 102.40 0.00 0.00 0.80
26+340.00 5.95 0.21 20.00 107.70 86.16 21.54 0.00 1.05 1.05 0.00 106.65 106.65 0.00 0.00 0.80
26+350.00 0.56 0.60 10.00 32.55 26.04 6.51 0.00 4.05 4.05 0.00 28.50 28.50 0.00 0.00 0.80
26+360.00 12.55 0.00 10.00 65.55 52.44 13.11 0.00 1.50 1.50 0.00 64.05 64.05 0.00 0.00 0.80
26+380.00 11.12 0.00 20.00 236.70 189.36 47.34 0.00 0.00 0.00 0.00 236.70 236.70 0.00 0.00 0.80
26+400.00 8.77 0.00 20.00 198.90 159.12 39.78 0.00 0.00 0.00 0.00 198.90 198.90 0.00 0.00 0.80
26+410.00 13.19 0.95 10.00 109.80 87.84 21.96 0.00 2.38 2.38 0.00 107.43 107.43 0.00 0.00 0.80
26+420.00 9.84 3.06 10.00 115.15 92.12 23.03 0.00 20.05 20.05 0.00 95.10 95.10 0.00 0.00 0.80
26+430.00 10.74 3.36 10.00 102.90 82.32 20.58 0.00 32.10 32.10 0.00 70.80 70.80 0.00 0.00 0.80
26+440.00 5.47 7.45 10.00 81.05 64.84 16.21 0.00 54.05 54.05 0.00 27.00 27.00 0.00 0.00 0.80
26+460.00 1.72 3.85 20.00 71.90 57.52 14.38 0.00 113.00 71.90 41.10 0.00 0.00 0.00 0.00 0.80
26+470.00 10.57 1.76 10.00 61.45 49.16 12.29 0.00 28.05 28.05 0.00 33.40 33.40 0.00 0.00 0.80
26+480.00 5.47 3.22 10.00 80.20 64.16 16.04 0.00 24.90 24.90 0.00 55.30 55.30 0.00 0.00 0.80
26+500.00 9.39 0.00 20.00 148.60 118.88 29.72 0.00 16.10 16.10 0.00 132.50 132.50 0.00 0.00 0.80
26+510.00 5.76 0.00 10.00 75.75 60.60 15.15 0.00 0.00 0.00 0.00 75.75 75.75 0.00 0.00 0.80
26+520.00 4.76 0.00 10.00 52.60 42.08 10.52 0.00 0.00 0.00 0.00 52.60 52.60 0.00 0.00 0.80
26+540.00 5.01 0.00 20.00 97.70 78.16 19.54 0.00 0.00 0.00 0.00 97.70 97.70 0.00 0.00 0.80
26+550.00 4.81 0.00 10.00 49.10 9.82 34.37 4.91 0.00 0.00 0.00 44.19 44.19 0.00 4.91 0.20
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
26+560.00 7.32 0.00 10.00 60.65 12.13 42.46 6.07 0.00 0.00 0.00 54.59 54.59 0.00 6.07 0.20
26+580.00 8.11 0.00 20.00 154.30 30.86 108.01 15.43 0.00 0.00 0.00 138.87 138.87 0.00 15.43 0.20
26+600.00 3.03 2.70 20.00 111.40 22.28 77.98 11.14 13.50 13.50 0.00 86.76 86.76 0.00 11.14 0.20
26+610.00 5.49 1.98 10.00 42.60 8.52 29.82 4.26 23.40 23.40 0.00 14.94 14.94 0.00 4.26 0.20
26+620.00 8.67 0.01 10.00 70.80 14.16 49.56 7.08 9.95 9.95 0.00 53.77 53.77 0.00 7.08 0.20
26+640.00 13.71 0.00 20.00 223.80 44.76 156.66 22.38 0.05 0.05 0.00 201.37 201.37 0.00 22.38 0.20
26+650.00 5.17 3.09 10.00 94.40 18.88 66.08 9.44 7.73 7.73 0.00 77.24 77.24 0.00 9.44 0.20
26+660.00 11.23 0.00 10.00 82.00 16.40 57.40 8.20 7.73 7.73 0.00 66.08 66.08 0.00 8.20 0.20
26+680.00 2.91 4.12 20.00 141.40 28.28 98.98 14.14 20.60 20.60 0.00 106.66 106.66 0.00 14.14 0.20
26+690.00 0.00 26.48 10.00 7.28 1.46 5.09 0.73 153.00 6.55 146.45 0.00 0.00 0.00 0.73 0.20
26+700.00 0.76 4.33 10.00 1.90 0.38 1.33 0.19 154.05 1.71 152.34 0.00 0.00 0.00 0.19 0.20
26+710.00 22.35 0.00 10.00 115.55 23.11 80.89 11.56 10.83 10.83 0.00 93.17 93.17 0.00 11.56 0.20
26+720.00 46.95 0.00 10.00 346.50 69.30 242.55 34.65 0.00 0.00 0.00 311.85 311.85 0.00 34.65 0.20
26+740.00 6.26 0.00 20.00 532.10 106.42 372.47 53.21 0.00 0.00 0.00 478.89 478.89 0.00 53.21 0.20
26+760.00 1.89 3.78 20.00 81.50 16.30 57.05 8.15 18.90 18.90 0.00 54.45 54.45 0.00 8.15 0.20
26+780.00 7.97 0.02 20.00 98.60 19.72 69.02 9.86 38.00 38.00 0.00 50.74 50.74 0.00 9.86 0.20
26+790.00 9.69 1.22 10.00 88.30 17.66 61.81 8.83 6.20 6.20 0.00 73.27 73.27 0.00 8.83 0.20
26+800.00 5.30 0.00 10.00 74.95 14.99 52.47 7.50 3.05 3.05 0.00 64.41 64.41 0.00 7.50 0.20
26+820.00 10.22 0.00 20.00 155.20 31.04 108.64 15.52 0.00 0.00 0.00 139.68 139.68 0.00 15.52 0.20
26+830.00 8.61 0.71 10.00 94.15 18.83 65.91 9.42 1.78 1.78 0.00 82.96 82.96 0.00 9.42 0.20
26+840.00 6.72 2.88 10.00 76.65 15.33 53.66 7.67 17.95 17.95 0.00 51.04 51.04 0.00 7.67 0.20
26+860.00 1.58 11.91 20.00 83.00 16.60 58.10 8.30 147.90 74.70 73.20 0.00 0.00 0.00 8.30 0.20
26+870.00 6.16 0.00 10.00 38.70 7.74 27.09 3.87 29.78 29.78 0.00 5.06 5.06 0.00 3.87 0.20
26+880.00 9.06 0.00 10.00 76.10 15.22 53.27 7.61 0.00 0.00 0.00 68.49 68.49 0.00 7.61 0.20
26+890.00 61.38 0.00 10.00 352.20 70.44 246.54 35.22 0.00 0.00 0.00 316.98 316.98 0.00 35.22 0.20
26+900.00 17.86 0.00 10.00 396.20 79.24 277.34 39.62 0.00 0.00 0.00 356.58 356.58 0.00 39.62 0.20
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
26+920.00 8.29 0.00 20.00 261.50 52.30 183.05 26.15 0.00 0.00 0.00 235.35 235.35 0.00 26.15 0.20
26+940.00 12.74 0.00 20.00 210.30 42.06 147.21 21.03 0.00 0.00 0.00 189.27 189.27 0.00 21.03 0.20
26+960.00 6.54 0.00 20.00 192.80 38.56 134.96 19.28 0.00 0.00 0.00 173.52 173.52 0.00 19.28 0.20
26+970.00 13.10 0.00 10.00 98.20 19.64 68.74 9.82 0.00 0.00 0.00 88.38 88.38 0.00 9.82 0.20
26+980.00 6.43 0.00 10.00 97.65 19.53 68.36 9.77 0.00 0.00 0.00 87.89 87.89 0.00 9.77 0.20
26+990.00 5.98 0.00 10.00 62.05 12.41 43.44 6.21 0.00 0.00 0.00 55.85 55.85 0.00 6.21 0.20
27+000.00 7.46 0.00 10.00 67.20 13.44 47.04 6.72 0.00 0.00 0.00 60.48 60.48 0.00 6.72 0.20
27+020.00 6.28 0.00 20.00 137.40 27.48 96.18 13.74 0.00 0.00 0.00 123.66 123.66 0.00 13.74 0.20
27+040.00 3.22 2.19 20.00 95.00 19.00 66.50 9.50 10.95 10.95 0.00 74.55 74.55 0.00 9.50 0.20
27+050.00 3.17 2.57 10.00 31.95 6.39 22.37 3.20 23.80 23.80 0.00 4.96 4.96 0.00 3.20 0.20
27+060.00 6.31 0.00 10.00 47.40 9.48 33.18 4.74 6.43 6.43 0.00 36.24 36.24 0.00 4.74 0.20
27+080.00 5.93 0.00 20.00 122.40 24.48 85.68 12.24 0.00 0.00 0.00 110.16 110.16 0.00 12.24 0.20
27+090.00 6.32 0.00 10.00 61.25 12.25 42.88 6.13 0.00 0.00 0.00 55.13 55.13 0.00 6.13 0.20
27+100.00 5.13 0.00 10.00 57.25 11.45 40.08 5.73 0.00 0.00 0.00 51.53 51.53 0.00 5.73 0.20
27+120.00 5.96 0.00 20.00 110.90 22.18 77.63 11.09 0.00 0.00 0.00 99.81 99.81 0.00 11.09 0.20
27+130.00 6.10 0.00 10.00 60.30 12.06 42.21 6.03 0.00 0.00 0.00 54.27 54.27 0.00 6.03 0.20
27+140.00 8.59 0.00 10.00 73.45 14.69 51.42 7.35 0.00 0.00 0.00 66.11 66.11 0.00 7.35 0.20
27+160.00 5.30 0.00 20.00 138.90 27.78 97.23 13.89 0.00 0.00 0.00 125.01 125.01 0.00 13.89 0.20
27+170.00 4.70 0.00 10.00 50.00 10.00 35.00 5.00 0.00 0.00 0.00 45.00 45.00 0.00 5.00 0.20
27+180.00 3.91 0.00 10.00 43.05 8.61 30.14 4.31 0.00 0.00 0.00 38.75 38.75 0.00 4.31 0.20
27+190.00 3.36 0.00 10.00 36.35 7.27 25.45 3.64 0.00 0.00 0.00 32.72 32.72 0.00 3.64 0.20
27+200.00 4.73 0.00 10.00 40.45 8.09 28.32 4.05 0.00 0.00 0.00 36.41 36.41 0.00 4.05 0.20
27+210.00 3.57 0.00 10.00 41.50 8.30 29.05 4.15 0.00 0.00 0.00 37.35 37.35 0.00 4.15 0.20
27+220.00 2.07 0.08 10.00 28.20 5.64 19.74 2.82 0.20 0.20 0.00 25.18 25.18 0.00 2.82 0.20
27+240.00 2.21 0.73 20.00 42.80 8.56 29.96 4.28 8.10 8.10 0.00 30.42 30.42 0.00 4.28 0.20
27+250.00 4.32 0.00 10.00 32.65 6.53 22.86 3.27 1.83 1.83 0.00 27.56 27.56 0.00 3.27 0.20
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
27+260.00 5.60 0.05 10.00 49.60 9.92 34.72 4.96 0.13 0.13 0.00 44.52 44.52 0.00 4.96 0.20
27+270.00 5.51 1.32 10.00 55.55 11.11 38.89 5.56 6.85 6.85 0.00 43.15 43.15 0.00 5.56 0.20
27+280.00 12.50 0.00 10.00 90.05 18.01 63.04 9.01 3.30 3.30 0.00 77.75 77.75 0.00 9.01 0.20
27+290.00 11.11 0.30 10.00 118.05 23.61 82.64 11.81 0.75 0.75 0.00 105.50 105.50 0.00 11.81 0.20
27+300.00 9.91 0.48 10.00 105.10 21.02 73.57 10.51 3.90 3.90 0.00 90.69 90.69 0.00 10.51 0.20
27+320.00 4.34 0.43 20.00 142.50 28.50 99.75 14.25 9.10 9.10 0.00 119.15 119.15 0.00 14.25 0.20
27+340.00 3.74 0.00 20.00 80.80 16.16 56.56 8.08 2.15 2.15 0.00 70.57 70.57 0.00 8.08 0.20
27+350.00 2.56 0.24 10.00 31.50 6.30 22.05 3.15 0.60 0.60 0.00 27.75 27.75 0.00 3.15 0.20
27+360.00 3.43 0.00 10.00 29.95 5.99 20.97 3.00 0.60 0.60 0.00 26.36 26.36 0.00 3.00 0.20
27+370.00 10.42 0.00 10.00 69.25 13.85 48.48 6.93 0.00 0.00 0.00 62.33 62.33 0.00 6.93 0.20
27+380.00 9.98 0.00 10.00 102.00 20.40 71.40 10.20 0.00 0.00 0.00 91.80 91.80 0.00 10.20 0.20
27+390.00 3.47 0.00 10.00 67.25 13.45 47.08 6.73 0.00 0.00 0.00 60.53 60.53 0.00 6.73 0.20
27+400.00 8.37 0.00 10.00 59.20 11.84 41.44 5.92 0.00 0.00 0.00 53.28 53.28 0.00 5.92 0.20
27+420.00 8.04 0.00 20.00 164.10 32.82 114.87 16.41 0.00 0.00 0.00 147.69 147.69 0.00 16.41 0.20
27+430.00 8.29 0.00 10.00 81.65 16.33 57.16 8.17 0.00 0.00 0.00 73.49 73.49 0.00 8.17 0.20
27+440.00 8.62 0.00 10.00 84.55 16.91 59.19 8.46 0.00 0.00 0.00 76.10 76.10 0.00 8.46 0.20
27+460.00 9.66 0.00 20.00 182.80 36.56 127.96 18.28 0.00 0.00 0.00 164.52 164.52 0.00 18.28 0.20
27+470.00 16.53 0.00 10.00 130.95 26.19 91.67 13.10 0.00 0.00 0.00 117.86 117.86 0.00 13.10 0.20
27+480.00 12.24 0.00 10.00 143.85 28.77 100.70 14.39 0.00 0.00 0.00 129.47 129.47 0.00 14.39 0.20
27+490.00 6.46 0.00 10.00 93.50 18.70 65.45 9.35 0.00 0.00 0.00 84.15 84.15 0.00 9.35 0.20
27+500.00 15.55 0.00 10.00 110.05 22.01 77.04 11.01 0.00 0.00 0.00 99.05 99.05 0.00 11.01 0.20
27+520.00 6.03 0.93 20.00 215.80 43.16 151.06 21.58 4.65 4.65 0.00 189.57 189.57 0.00 21.58 0.20
27+540.00 2.27 5.63 20.00 83.00 16.60 58.10 8.30 65.60 65.60 0.00 9.10 9.10 0.00 8.30 0.20
27+550.00 3.10 7.72 10.00 26.85 5.37 18.80 2.69 66.75 24.17 42.59 0.00 0.00 0.00 2.69 0.20
27+560.00 7.40 0.24 10.00 52.50 10.50 36.75 5.25 39.80 39.80 0.00 7.45 7.45 0.00 5.25 0.20
27+570.00 10.84 0.00 10.00 91.20 18.24 63.84 9.12 0.60 0.60 0.00 81.48 81.48 0.00 9.12 0.20
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
27+580.00 4.87 0.00 10.00 78.55 15.71 54.99 7.86 0.00 0.00 0.00 70.70 70.70 0.00 7.86 0.20
27+600.00 3.15 0.09 20.00 80.20 16.04 56.14 8.02 0.45 0.45 0.00 71.73 71.73 0.00 8.02 0.20
27+610.00 9.63 0.10 10.00 63.90 12.78 44.73 6.39 0.95 0.95 0.00 56.56 56.56 0.00 6.39 0.20
27+620.00 1.15 0.60 10.00 53.90 10.78 37.73 5.39 3.50 3.50 0.00 45.01 45.01 0.00 5.39 0.20
27+640.00 13.67 0.73 20.00 148.20 29.64 103.74 14.82 13.30 13.30 0.00 120.08 120.08 0.00 14.82 0.20
27+660.00 9.76 0.00 20.00 234.30 46.86 164.01 23.43 3.65 3.65 0.00 207.22 207.22 0.00 23.43 0.20
27+670.00 16.46 0.00 10.00 131.10 26.22 91.77 13.11 0.00 0.00 0.00 117.99 117.99 0.00 13.11 0.20
27+680.00 24.74 0.00 10.00 206.00 41.20 144.20 20.60 0.00 0.00 0.00 185.40 185.40 0.00 20.60 0.20
27+700.00 20.19 0.00 20.00 449.30 89.86 314.51 44.93 0.00 0.00 0.00 404.37 404.37 0.00 44.93 0.20
27+720.00 13.39 0.00 20.00 335.80 67.16 235.06 33.58 0.00 0.00 0.00 302.22 302.22 0.00 33.58 0.20
27+740.00 10.96 0.00 20.00 243.50 48.70 170.45 24.35 0.00 0.00 0.00 219.15 219.15 0.00 24.35 0.20
27+760.00 15.61 0.00 20.00 265.70 53.14 185.99 26.57 0.00 0.00 0.00 239.13 239.13 0.00 26.57 0.20
27+770.00 4.42 0.00 10.00 100.15 20.03 70.11 10.02 0.00 0.00 0.00 90.14 90.14 0.00 10.02 0.20
27+780.00 2.40 0.05 10.00 34.10 6.82 23.87 3.41 0.13 0.13 0.00 30.57 30.57 0.00 3.41 0.20
27+790.00 1.36 1.20 10.00 18.80 3.76 13.16 1.88 6.25 6.25 0.00 10.67 10.67 0.00 1.88 0.20
27+800.00 4.44 4.07 10.00 29.00 5.80 20.30 2.90 26.35 26.10 0.25 0.00 0.00 0.00 2.90 0.20
27+810.00 3.42 6.43 10.00 39.30 7.86 27.51 3.93 52.50 35.37 17.13 0.00 0.00 0.00 3.93 0.20
27+820.00 0.00 13.70 10.00 8.55 1.71 5.99 0.86 100.65 7.70 92.96 0.00 0.00 0.00 0.86 0.20
27+840.00 0.00 14.74 20.00 0.00 0.00 0.00 0.00 284.40 0.00 284.40 0.00 0.00 0.00 0.00 0.20
27+850.00 0.00 16.39 10.00 0.00 0.00 0.00 0.00 155.65 0.00 155.65 0.00 0.00 0.00 0.00 0.20
27+860.00 0.00 15.15 10.00 0.00 0.00 0.00 0.00 157.70 0.00 157.70 0.00 0.00 0.00 0.00 0.20
27+870.00 0.00 10.11 10.00 0.00 0.00 0.00 0.00 126.30 0.00 126.30 0.00 0.00 0.00 0.00 0.20
27+880.00 6.47 2.21 10.00 16.18 3.24 11.32 1.62 61.60 14.56 47.04 0.00 0.00 0.00 1.62 0.20
27+890.00 2.78 1.93 10.00 46.25 9.25 32.38 4.63 20.70 20.70 0.00 20.93 20.93 0.00 4.63 0.20
27+900.00 6.57 1.31 10.00 46.75 9.35 32.73 4.68 16.20 16.20 0.00 25.88 25.88 0.00 4.68 0.20
27+910.00 1.38 1.36 10.00 39.75 7.95 27.83 3.98 13.35 13.35 0.00 22.43 22.43 0.00 3.98 0.20
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
27+920.00 4.25 1.29 10.00 28.15 5.63 19.71 2.82 13.25 13.25 0.00 12.09 12.09 0.00 2.82 0.20
27+940.00 9.93 0.26 20.00 141.80 28.36 99.26 14.18 15.50 15.50 0.00 112.12 112.12 0.00 14.18 0.20
27+950.00 6.07 0.02 10.00 80.00 16.00 56.00 8.00 1.40 1.40 0.00 70.60 70.60 0.00 8.00 0.20
27+960.00 10.80 0.00 10.00 84.35 16.87 59.05 8.44 0.05 0.05 0.00 75.87 75.87 0.00 8.44 0.20
27+980.00 8.25 0.00 20.00 190.50 38.10 133.35 19.05 0.00 0.00 0.00 171.45 171.45 0.00 19.05 0.20
28+000.00 10.49 0.00 20.00 187.40 37.48 131.18 18.74 0.00 0.00 0.00 168.66 168.66 0.00 18.74 0.20
28+020.00 7.69 0.00 20.00 181.80 36.36 127.26 18.18 0.00 0.00 0.00 163.62 163.62 0.00 18.18 0.20
28+040.00 1.05 2.41 20.00 87.40 17.48 61.18 8.74 12.05 12.05 0.00 66.61 66.61 0.00 8.74 0.20
28+050.00 4.32 2.78 10.00 26.85 5.37 18.80 2.69 25.95 24.17 1.79 0.00 0.00 0.00 2.69 0.20
28+060.00 0.97 5.25 10.00 26.45 5.29 18.52 2.65 40.15 23.81 16.35 0.00 0.00 0.00 2.65 0.20
28+070.00 0.68 3.63 10.00 8.25 1.65 5.78 0.83 44.40 7.43 36.98 0.00 0.00 0.00 0.83 0.20
28+080.00 1.33 3.55 10.00 10.05 2.01 7.04 1.01 35.90 9.05 26.86 0.00 0.00 0.00 1.01 0.20
28+090.00 3.13 2.06 10.00 22.30 4.46 15.61 2.23 28.05 20.07 7.98 0.00 0.00 0.00 2.23 0.20
28+100.00 3.53 0.22 10.00 33.30 6.66 23.31 3.33 11.40 11.40 0.00 18.57 18.57 0.00 3.33 0.20
28+120.00 9.46 0.00 20.00 129.90 25.98 90.93 12.99 1.10 1.10 0.00 115.81 115.81 0.00 12.99 0.20
28+140.00 7.75 0.03 20.00 172.10 34.42 120.47 17.21 0.15 0.15 0.00 154.74 154.74 0.00 17.21 0.20
28+150.00 6.33 0.46 10.00 70.40 14.08 49.28 7.04 2.45 2.45 0.00 60.91 60.91 0.00 7.04 0.20
28+160.00 9.09 0.00 10.00 77.10 15.42 53.97 7.71 1.15 1.15 0.00 68.24 68.24 0.00 7.71 0.20
28+170.00 9.15 0.18 10.00 91.20 18.24 63.84 9.12 0.45 0.45 0.00 81.63 81.63 0.00 9.12 0.20
28+180.00 11.23 0.00 10.00 101.90 20.38 71.33 10.19 0.45 0.45 0.00 91.26 91.26 0.00 10.19 0.20
28+190.00 11.61 0.00 10.00 114.20 22.84 79.94 11.42 0.00 0.00 0.00 102.78 102.78 0.00 11.42 0.20
28+200.00 6.84 0.31 10.00 92.25 18.45 64.58 9.23 0.78 0.78 0.00 82.25 82.25 0.00 9.23 0.20
28+220.00 1.65 0.12 20.00 84.90 16.98 59.43 8.49 4.30 4.30 0.00 72.11 72.11 0.00 8.49 0.20
28+240.00 2.86 0.00 20.00 45.10 9.02 31.57 4.51 0.60 0.60 0.00 39.99 39.99 0.00 4.51 0.20
28+260.00 8.67 0.18 20.00 115.30 23.06 80.71 11.53 0.90 0.90 0.00 102.87 102.87 0.00 11.53 0.20
28+280.00 4.28 2.82 20.00 129.50 25.90 90.65 12.95 30.00 30.00 0.00 86.55 86.55 0.00 12.95 0.20
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
28+300.00 5.89 2.18 20.00 101.70 71.19 20.34 10.17 50.00 50.00 0.00 41.53 41.53 0.00 10.17 0.70
28+320.00 2.75 6.10 20.00 86.40 60.48 17.28 8.64 82.80 77.76 5.04 0.00 0.00 0.00 8.64 0.70
28+340.00 1.42 4.95 20.00 41.70 29.19 8.34 4.17 110.50 37.53 72.97 0.00 0.00 0.00 4.17 0.70
28+360.00 3.34 3.70 20.00 47.60 33.32 9.52 4.76 86.50 42.84 43.66 0.00 0.00 0.00 4.76 0.70
28+380.00 4.56 0.48 20.00 79.00 55.30 15.80 7.90 41.80 41.80 0.00 29.30 29.30 0.00 7.90 0.70
28+400.00 2.00 0.64 20.00 65.60 45.92 13.12 6.56 11.20 11.20 0.00 47.84 47.84 0.00 6.56 0.70
28+410.00 3.75 0.38 10.00 28.75 20.13 5.75 2.88 5.10 5.10 0.00 20.78 20.78 0.00 2.88 0.70
28+420.00 2.20 1.93 10.00 29.75 20.83 5.95 2.98 11.55 11.55 0.00 15.23 15.23 0.00 2.98 0.70
28+440.00 5.51 0.14 20.00 77.10 53.97 15.42 7.71 20.70 20.70 0.00 48.69 48.69 0.00 7.71 0.70
28+460.00 5.01 0.02 20.00 105.20 73.64 21.04 10.52 1.60 1.60 0.00 93.08 93.08 0.00 10.52 0.70
28+470.00 3.50 0.01 10.00 42.55 29.79 8.51 4.26 0.15 0.15 0.00 38.15 38.15 0.00 4.26 0.70
28+480.00 6.62 0.00 10.00 50.60 35.42 10.12 5.06 0.03 0.03 0.00 45.52 45.52 0.00 5.06 0.70
28+500.00 4.67 0.00 20.00 112.90 79.03 22.58 11.29 0.00 0.00 0.00 101.61 101.61 0.00 11.29 0.70
28+520.00 3.00 2.93 20.00 76.70 53.69 15.34 7.67 14.65 14.65 0.00 54.38 54.38 0.00 7.67 0.70
28+540.00 4.34 1.53 20.00 73.40 51.38 14.68 7.34 44.60 44.60 0.00 21.46 21.46 0.00 7.34 0.70
28+550.00 1.58 1.63 10.00 29.60 20.72 5.92 2.96 15.80 15.80 0.00 10.84 10.84 0.00 2.96 0.70
28+560.00 4.44 0.01 10.00 30.10 21.07 6.02 3.01 8.20 8.20 0.00 18.89 18.89 0.00 3.01 0.70
28+570.00 4.79 0.04 10.00 46.15 32.31 9.23 4.62 0.25 0.25 0.00 41.29 41.29 0.00 4.62 0.70
28+580.00 0.09 0.82 10.00 24.40 17.08 4.88 2.44 4.30 4.30 0.00 17.66 17.66 0.00 2.44 0.70
28+590.00 0.00 1.31 10.00 0.23 0.16 0.05 0.02 10.65 0.20 10.45 0.00 0.00 0.00 0.02 0.70
28+600.00 1.46 0.61 10.00 3.65 2.56 0.73 0.37 9.60 3.29 6.32 0.00 0.00 0.00 0.37 0.70
28+610.00 0.42 1.25 10.00 9.40 6.58 1.88 0.94 9.30 8.46 0.84 0.00 0.00 0.00 0.94 0.70
28+620.00 2.05 1.92 10.00 12.35 8.65 2.47 1.24 15.85 11.12 4.74 0.00 0.00 0.00 1.24 0.70
28+630.00 2.69 0.83 10.00 23.70 16.59 4.74 2.37 13.75 13.75 0.00 7.58 7.58 0.00 2.37 0.70
28+640.00 1.26 0.63 10.00 19.75 13.83 3.95 1.98 7.30 7.30 0.00 10.48 10.48 0.00 1.98 0.70
28+660.00 4.93 0.00 20.00 61.90 43.33 12.38 6.19 3.15 3.15 0.00 52.56 52.56 0.00 6.19 0.70
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
28+680.00 5.53 0.00 20.00 104.60 73.22 20.92 10.46 0.00 0.00 0.00 94.14 94.14 0.00 10.46 0.70
28+700.00 2.72 0.00 20.00 82.50 57.75 16.50 8.25 0.00 0.00 0.00 74.25 74.25 0.00 8.25 0.70
28+710.00 6.83 0.00 10.00 47.75 33.43 9.55 4.78 0.00 0.00 0.00 42.98 42.98 0.00 4.78 0.70
28+720.00 7.96 0.00 10.00 73.95 51.77 14.79 7.40 0.00 0.00 0.00 66.56 66.56 0.00 7.40 0.70
28+730.00 7.72 0.00 10.00 78.40 54.88 15.68 7.84 0.00 0.00 0.00 70.56 70.56 0.00 7.84 0.70
28+740.00 9.05 0.00 10.00 83.85 58.70 16.77 8.39 0.00 0.00 0.00 75.47 75.47 0.00 8.39 0.70
28+760.00 2.66 0.68 20.00 117.10 81.97 23.42 11.71 3.40 3.40 0.00 101.99 101.99 0.00 11.71 0.70
28+780.00 11.47 0.00 20.00 141.30 98.91 28.26 14.13 3.40 3.40 0.00 123.77 123.77 0.00 14.13 0.70
28+800.00 12.09 0.52 20.00 235.60 164.92 47.12 23.56 2.60 2.60 0.00 209.44 209.44 0.00 23.56 0.70
28+820.00 0.00 7.60 20.00 60.45 42.32 12.09 6.05 81.20 54.41 26.80 0.00 0.00 0.00 6.05 0.70
28+830.00 0.00 11.23 10.00 0.00 0.00 0.00 0.00 94.15 0.00 94.15 0.00 0.00 0.00 0.00 0.70
28+840.00 0.34 7.94 10.00 0.85 0.60 0.17 0.09 95.85 0.77 95.09 0.00 0.00 0.00 0.09 0.70
28+860.00 5.24 0.08 20.00 55.80 39.06 11.16 5.58 80.20 50.22 29.98 0.00 0.00 0.00 5.58 0.70
28+880.00 4.45 0.00 20.00 96.90 67.83 19.38 9.69 0.40 0.40 0.00 86.81 86.81 0.00 9.69 0.70
28+900.00 0.20 3.25 20.00 46.50 32.55 9.30 4.65 16.25 16.25 0.00 25.60 25.60 0.00 4.65 0.70
28+920.00 0.00 1.88 20.00 1.00 0.70 0.20 0.10 51.30 0.90 50.40 0.00 0.00 0.00 0.10 0.70
28+940.00 0.26 0.81 20.00 1.30 0.91 0.26 0.13 26.90 1.17 25.73 0.00 0.00 0.00 0.13 0.70
28+960.00 1.08 0.29 20.00 13.40 9.38 2.68 1.34 11.00 11.00 0.00 1.06 1.06 0.00 1.34 0.70
28+970.00 1.76 0.03 10.00 14.20 9.94 2.84 1.42 1.60 1.60 0.00 11.18 11.18 0.00 1.42 0.70
28+980.00 2.57 1.03 10.00 21.65 15.16 4.33 2.17 5.30 5.30 0.00 14.19 14.19 0.00 2.17 0.70
29+000.00 4.79 0.00 20.00 73.60 51.52 14.72 7.36 5.15 5.15 0.00 61.09 61.09 0.00 7.36 0.70
29+020.00 5.75 0.00 20.00 105.40 73.78 21.08 10.54 0.00 0.00 0.00 94.86 94.86 0.00 10.54 0.70
29+030.00 3.29 0.00 10.00 45.20 31.64 9.04 4.52 0.00 0.00 0.00 40.68 40.68 0.00 4.52 0.70
29+040.00 1.08 0.82 10.00 21.85 15.30 4.37 2.19 2.05 2.05 0.00 17.62 17.62 0.00 2.19 0.70
29+050.00 0.36 0.42 10.00 7.20 5.04 1.44 0.72 6.20 6.20 0.00 0.28 0.28 0.00 0.72 0.70
29+060.00 0.88 0.10 10.00 6.20 4.34 1.24 0.62 2.60 2.60 0.00 2.98 2.98 0.00 0.62 0.70
METRADOS DE EXPLANACIONES
: CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA CHICCHICANCHA-PUTACCA-CARHUAC-
PROYEC
TO:
ANTIPAHUASIN-PITECC-PUCARAPATA-ACOCRA DISTRITO DE HUARIBAMBA PROV. DE TAYACAJA,
DPTO. DE HUANCAVELICA Depto. : HUANCAVELIC
RESPON. : Ing. Edgar ALARCON HUALLPA Provincia : TAYACAJA
FECHA : JUNIO-2013 Distrito : HUARIBAMBA
FORMULA Localidad : ACOCRA
AREAS (m2) VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3) Análisis P/Relleno Compensado
Eliminacion Clasificac
02.04 Relleno Propio Mat Corte Excedente de
Estaca Distancia (m) 02.01 02.02 Material a Material a Corte:
02.03 Total (MS+RS)
Corte Relleno Total Corte Material Roca compensar eliminar Sdo(MS+RS) +
Roca Fija Relleno Relleno DLP (Hasta 120 p/relleno Material
Suelto Suelta (MS+RS) (MS+RS) RF
Propio m) compensado Suelto
29+070.00 2.23 0.00 10.00 15.55 10.89 3.11 1.56 0.25 0.25 0.00 13.75 13.75 0.00 1.56 0.70
29+080.00 3.42 0.00 10.00 28.25 19.78 5.65 2.83 0.00 0.00 0.00 25.43 25.43 0.00 2.83 0.70
29+090.00 4.17 0.00 10.00 37.95 26.57 7.59 3.80 0.00 0.00 0.00 34.16 34.16 0.00 3.80 0.70
29+100.00 4.98 0.00 10.00 45.75 32.03 9.15 4.58 0.00 0.00 0.00 41.18 41.18 0.00 4.58 0.70
29+110.00 0.00 0.00 10.00 12.45 8.72 2.49 1.25 0.00 0.00 0.00 11.21 11.21 0.00 1.25 0.70
29+120.00 1.33 0.56 10.00 3.33 2.33 0.67 0.33 1.40 1.40 0.00 1.59 1.59 0.00 0.33 0.70
29+140.00 2.30 0.00 20.00 36.30 25.41 7.26 3.63 2.80 2.80 0.00 29.87 29.87 0.00 3.63 0.70
29+150.00 1.03 0.28 10.00 16.65 11.66 3.33 1.67 0.70 0.70 0.00 14.29 14.29 0.00 1.67 0.70
29+160.00 1.69 0.28 10.00 13.60 9.52 2.72 1.36 2.80 2.80 0.00 9.44 9.44 0.00 1.36 0.70
29+170.00 0.51 1.14 10.00 11.00 7.70 2.20 1.10 7.10 7.10 0.00 2.80 2.80 0.00 1.10 0.70
29+180.00 1.26 0.25 10.00 8.85 6.20 1.77 0.89 6.95 6.95 0.00 1.02 1.02 0.00 0.89 0.70
29+200.00 0.35 1.30 20.00 16.10 11.27 3.22 1.61 15.50 14.49 1.01 0.00 0.00 0.00 1.61 0.70
29+220.00 2.03 0.37 20.00 23.80 16.66 4.76 2.38 16.70 16.70 0.00 4.72 4.72 0.00 2.38 0.70
163,503.65 89,583.90 41,109.76 32,800.21 68,340.13 17,830.13 50,510.00 1,792.57
E EXPLANACIONES
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
: HUANCAVELICA
: TAYACAJA
: HUARIBAMBA
: ACOCRA
Clasificación de materiales
Roca
Roca Fija Total
Suelta
*******************************************************************************************************
*******************************************************************************************************
TOTAL: VC: VR:
42277.553 154594.894
*******************************************************************************************************
*******************************************************************************************************
VR VCo VRo Om
-----------------------------------------------------------------------------------------------------
0 40.5 0 40.5
0 86.8 0 127.3
0.55 58.9 0.55 185.65
1.25 18.6 1.25 203
7.25 23.3 7.25 219.05
12.4 19.05 12.4 225.7
6.65 12.05 6.65 231.1
0.4 29.45 0.4 260.15
0 34.4 0 294.55
2.65 22.5 2.65 314.4
2.7 17.35 2.7 329.05
1.9 15.8 1.9 342.95
6.45 4 6.45 340.5
17.5 0.775 17.5 323.775
12.9 16.4 12.9 327.275
0 29.2 0 356.475
0.175 18.3 0.175 374.6
5.3 21.7 5.3 391
57 5.35 57 339.35
118.4 0 118.4 220.95
57.9 0 57.9 163.05
66.1 0 66.1 96.95
41.2 16.65 41.2 72.4
0 64.2 0 136.6
3.85 49.9 3.85 182.65
7.55 13 7.55 188.1
8.05 5.45 8.05 185.5
10 6.3 10 181.8
1.4 16.2 1.4 196.6
2.65 16 2.65 209.95
15.4 4.55 15.4 199.1
32.6 1.9 32.6 168.4
14.6 28.3 14.6 182.1
8 38.6 8 212.7
0.1 16 0.1 228.6
0.175 30.05 0.175 258.475
16.9 47.1 16.9 288.675
27.6 9.2 27.6 270.275
10.3 8 10.3 267.975
6.15 16.6 6.15 278.425
12.5 20.65 12.5 286.575
92.75 19.35 92.75 213.175
225.7 12.6 225.7 0.075
350.75 5.65 350.75 -345.025
420.9 16 420.9 -749.925
8.05 7.3 8.05 -750.675
441.8 10.2 441.8 -1182.275
875.4 27.8 875.4 -2029.875
1.3 165.6 1.3 -1865.575
0.15 122.65 0.15 -1743.075
0 120.15 0 -1622.925
0 156.45 0 -1466.475
0 230.15 0 -1236.325
0 455.3 0 -781.025
0 213.5 0 -567.525
0 136.2 0 -431.325
0 150.8 0 -280.525
0 65.25 0 -215.275
0 73.5 0 -141.775
0 192.2 0 50.425
0 187.6 0 238.025
0 150.9 0 388.925
0 60.5 0 449.425
0 65.9 0 515.325
0 183.2 0 698.525
0 179.5 0 878.025
0 63.9 0 941.925
0 46.7 0 988.625
0 47.5 0 1036.125
0 65.95 0 1102.075
-----------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------
0 64.85 0 1166.925
0 65.15 0 1232.075
0 217.5 0 1449.575
0 196.6 0 1646.175
2.3 63.7 2.3 1707.575
3.55 14.85 3.55 1718.875
0.625 18.55 0.625 1736.8
0 35 0 1771.8
0 59.2 0 1831
0 110.9 0 1941.9
0 124.7 0 2066.6
0 72.5 0 2139.1
0 24.5 0 2163.6
0 34.45 0 2198.05
0 151.5 0 2349.55
0 258.1 0 2607.65
0 302.8 0 2910.45
0 239.5 0 3149.95
0.2 111.3 0.2 3261.05
3.3 49.2 3.3 3306.95
15 41.4 15 3333.35
22.25 18.3 22.25 3329.4
26.55 4.55 26.55 3307.4
24.3 0 24.3 3283.1
27 0 27 3256.1
152.4 0 152.4 3103.7
109.4 0 109.4 2994.3
99.7 0 99.7 2894.6
231.5 0 231.5 2663.1
218.3 0 218.3 2444.8
320.3 0 320.3 2124.5
333.3 0 333.3 1791.2
205.3 8.2 205.3 1594.1
127.9 4.1 127.9 1470.3
161.65 0 161.65 1308.65
251.4 0 251.4 1057.25
82.55 0 82.55 974.7
55.15 0 55.15 919.55
30.6 5.8 30.6 894.75
0.05 55.3 0.05 950
6.7 55.5 6.7 998.8
7.2 9.65 7.2 1001.25
0.25 9.8 0.25 1010.8
0 68.7 0 1079.5
0 133.3 0 1212.8
0 218.9 0 1431.7
0 155.15 0 1586.85
0 173.25 0 1760.1
0 359.1 0 2119.2
0 415.2 0 2534.4
0 223.25 0 2757.65
0 165 0 2922.65
0 316.6 0 3239.25
64.25 462 64.25 3637
424.9 131.7 424.9 3343.8
307.3 0 307.3 3036.5
284.35 0 284.35 2752.15
192.4 0 192.4 2559.75
93.5 3.825 93.5 2470.075
30.2 14.45 30.2 2454.325
98.6 3.4 98.6 2359.125
114.05 2.225 114.05 2247.3
31.65 9.05 31.65 2224.7
15.6 18.6 15.6 2227.7
1.625 39.6 1.625 2265.675
4.65 81.7 4.65 2342.725
-----------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------
72.7 33 72.7 2303.025
48.9 3.9 48.9 2258.025
27.2 6.45 27.2 2237.275
10 78.7 10 2305.975
49.6 122.8 49.6 2379.175
137.7 84.05 137.7 2325.525
298.8 66.85 298.8 2093.575
918.1 60.4 918.1 1235.875
740.7 134.4 740.7 629.575
320.2 126.8 320.2 436.175
48.4 21.25 48.4 409.025
50 5.9 50 364.925
48.4 7.25 48.4 323.775
41.75 8.85 41.75 290.875
84.5 11 84.5 217.375
17.45 19.8 17.45 219.725
14.4 44.85 14.4 250.175
11.7 56.5 11.7 294.975
16.9 45.15 16.9 323.225
42.6 55.9 42.6 336.525
9.95 129.2 9.95 455.775
0 85.75 0 541.525
0 67.5 0 609.025
23.55 76.9 23.55 662.375
99.9 15.2 99.9 577.675
58.1 53.1 58.1 572.675
7.9 103 7.9 667.775
28.9 63.8 28.9 702.675
126.8 34.4 126.8 610.275
153 68.8 153 526.075
29.8 51.05 29.8 547.325
18.35 43.5 18.35 572.475
50.7 64.3 50.7 586.075
52.2 65.3 52.2 599.175
66.5 45.8 66.5 578.475
45.2 77 45.2 610.275
26.1 109.4 26.1 693.575
23.65 40.05 23.65 709.975
42.4 19.45 42.4 687.025
1454.4 4.15 1454.4 -763.225
822.35 0 822.35 -1585.575
61.025 41.575 61.025 -1605.025
0 298.95 0 -1306.075
0 396.15 0 -909.925
1.3 221.4 1.3 -689.825
7.55 79.75 7.55 -617.625
14.7 163 14.7 -469.325
10.8 164.5 10.8 -315.625
3 148.5 3 -170.125
2.175 66.05 2.175 -106.25
2.175 57.85 2.175 -50.575
2.5 42.5 2.5 -10.575
20.6 32.55 20.6 1.375
40.3 101.9 40.3 62.975
15.7 169.4 15.7 216.675
15.4 192.5 15.4 393.775
20.3 175.3 20.3 548.775
19.1 57.85 19.1 587.525
15.4 57.4 15.4 629.525
5.8 70.55 5.8 694.275
1527.05 36.5 1527.05 -796.275
3326.2 19.1 3326.2 -4103.375
3550.85 68.35 3550.85 -7585.875
1751.15 128.3 1751.15 -9208.725
6.1 132.65 6.1 -9082.175
7.45 90.8 7.45 -8998.825
23.9 37.3 23.9 -8985.425
165.6 7.4 165.6 -9143.625
150.4 0 150.4 -9294.025
162.15 0 162.15 -9456.175
-----------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------
77.9 11.2 77.9 -9522.875
36.55 47.2 36.55 -9512.225
33.85 279 33.85 -9267.075
0 389.1 0 -8877.975
2.9 246.2 2.9 -8634.675
30.1 140.3 30.1 -8524.475
21.15 59.25 21.15 -8486.375
21.6 53.5 21.6 -8454.475
40.8 86.7 40.8 -8408.575
32.4 85.3 32.4 -8355.675
45.1 53.9 45.1 -8346.875
83.3 17.9 83.3 -8412.275
111.9 11.5 111.9 -8512.675
30.95 31.35 30.95 -8512.275
11 39.5 11 -8483.775
22.85 19.55 22.85 -8487.075
49.9 9.7 49.9 -8527.275
72.35 3.15 72.35 -8596.475
80 0.775 80 -8675.7
116.2 4.05 116.2 -8787.85
3933.9 30.5 3933.9 -12691.25
7925.4 36.1 7925.4 -20580.55
5132.9 31.6 5132.9 -25681.85
635.45 18.5 635.45 -26298.8
88.3 25.3 88.3 -26361.8
17.85 32.8 17.85 -26346.85
16.65 23.95 16.65 -26339.55
33.6 64.8 33.6 -26308.35
9.35 119.9 9.35 -26197.8
7.75 43.85 7.75 -26161.7
24.25 21.25 24.25 -26164.7
36 50.4 36 -26150.3
9.25 120.7 9.25 -26038.85
83.6 109 83.6 -26013.45
152.5 48.7 152.5 -26117.25
159.1 78.9 159.1 -26197.45
310.4 124.5 310.4 -26383.35
152.35 38.95 152.35 -26496.75
43.675 44.85 43.675 -26495.575
1.4 67.5 1.4 -26429.475
160.2 14.3 160.2 -26575.375
39.35 116.9 39.35 -26497.825
79.375 149 79.375 -26428.2
346.05 45.3 346.05 -26728.95
383.85 11.55 383.85 -27101.25
747.9 11.5 747.9 -27837.65
309.85 1.775 309.85 -28145.725
236 3.575 236 -28378.15
501.7 38.8 501.7 -28841.05
412.6 53.9 412.6 -29199.75
156.3 61.7 156.3 -29294.35
159.1 50.5 159.1 -29402.95
30.2 20.6 30.2 -29412.55
0 40.1 0 -29372.45
122.05 109.7 122.05 -29384.8
216.4 65.85 216.4 -29535.35
194.95 61.35 194.95 -29668.95
100.6 147.3 100.6 -29622.25
0 174.4 0 -29447.85
1.85 128 1.85 -29321.7
34.7 148 34.7 -29208.4
165.4 169.9 165.4 -29203.9
68.05 63.65 68.05 -29208.3
0.9 40.75 0.9 -29168.45
6.6 66.8 6.6 -29108.25
39.5 16.65 39.5 -29131.1
-----------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------
49.7 0 49.7 -29180.8
11.85 0.825 11.85 -29191.825
9.25 3.65 9.25 -29197.425
24.4 13.3 24.4 -29208.525
33.2 31.7 33.2 -29210.025
37.2 12.4 37.2 -29234.825
52.45 3.55 52.45 -29283.725
62 28.2 62 -29317.525
2.8 117.45 2.8 -29202.875
0 153.25 0 -29049.625
11.15 57.2 11.15 -29003.575
27.55 18.2 27.55 -29012.925
14.7 15.35 14.7 -29012.275
126.7 14.75 126.7 -29124.225
912.6 7.95 912.6 -30028.875
860.3 3.25 860.3 -30885.925
183 38.5 183 -31030.425
0.2 49.35 0.2 -30981.275
17.925 53.75 17.925 -30945.45
375.8 62.2 375.8 -31259.05
558.6 119.1 558.6 -31698.55
127.25 181 127.25 -31644.8
119.65 122.7 119.65 -31641.75
194.55 32.3 194.55 -31804
179.8 39 179.8 -31944.8
260.15 44.3 260.15 -32160.65
456.4 8.95 456.4 -32608.1
475.35 0 475.35 -33083.45
245.15 0 245.15 -33328.6
35.475 28.375 35.475 -33335.7
0 243.45 0 -33092.25
0 522.5 0 -32569.75
1.725 115.25 1.725 -32456.225
272.4 43.35 272.4 -32685.275
797.65 4.85 797.65 -33478.075
1331.15 1.1 1331.15 -34808.125
1561.05 0 1561.05 -36369.175
1527.65 0 1527.65 -37896.825
3849.2 0 3849.2 -41746.025
4625.3 0 4625.3 -46371.325
4611.7 0 4611.7 -50983.025
2598.75 0 2598.75 -53581.775
3152.85 0 3152.85 -56734.625
3565.4 0.55 3565.4 -60299.475
3928.25 3.9 3928.25 -64223.825
9544.1 2.8 9544.1 -73765.125
4555.8 0 4555.8 -78320.925
1955.8 5.35 1955.8 -80271.375
53.175 94.25 53.175 -80230.3
0 172.1 0 -80058.2
0 153.55 0 -79904.65
16.6 100.4 16.6 -79820.85
33.2 263.9 33.2 -79590.15
0 190.45 0 -79399.7
0 237.35 0 -79162.35
0 432.1 0 -78730.25
0 138.45 0 -78591.8
0 140.15 0 -78451.65
839.55 272.5 839.55 -79018.7
1942.3 103.15 1942.3 -80857.85
2577.1 49.7 2577.1 -83385.25
4517.4 28.3 4517.4 -87874.35
1585.65 7.2 1585.65 -89452.8
1530.75 0.775 1530.75 -90982.775
1528.9 3.55 1528.9 -92508.125
77.5 27 77.5 -92558.625
3.75 57.1 3.75 -92505.275
0 31.65 0 -92473.625
0 29.4 0 -92444.225
0.75 64.1 0.75 -92380.875
33.4 48.5 33.4 -92365.775
730.6 52.1 730.6 -93044.275
1521.7 109.4 1521.7 -94456.575
-----------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------
1312.3 156.1 1312.3 -95612.775
369 86.55 369 -95895.225
62.175 86.75 62.175 -95870.65
7.35 135.4 7.35 -95742.6
167.45 33.7 167.45 -95876.35
391.55 9.9 391.55 -96258
808.6 30.7 808.6 -97035.9
86.425 90.7 86.425 -97031.625
0 206.95 0 -96824.675
335.3 346.3 335.3 -96813.675
2126 44.4 2126 -98895.275
818.1 0 818.1 -99713.375
731.7 0 731.7 -100445.08
2131.3 0 2131.3 -102576.38
1000.6 0 1000.6 -103576.98
97.15 0 97.15 -103674.13
55.85 0.975 55.85 -103729
113.4 6.3 113.4 -103836.1
135.7 1.2 135.7 -103970.6
501.6 0.95 501.6 -104471.25
700.4 29.7 700.4 -105141.95
576.7 59.9 576.7 -105658.75
228.8 55.65 228.8 -105831.9
95.4 87.7 95.4 -105839.6
188.5 226.9 188.5 -105801.2
419.2 209.3 419.2 -106011.1
215.2 72.1 215.2 -106154.2
181.9 65 181.9 -106271.1
450.9 32.2 450.9 -106689.8
257.2 2.3 257.2 -106944.7
315 10.05 315 -107249.65
841.1 23.3 841.1 -108067.45
229.1 38.9 229.1 -108257.65
0 27.2 0 -108230.45
0.275 22.4 0.275 -108208.33
4.5 16.15 4.5 -108196.68
4.05 12.95 4.05 -108187.78
17 5.25 17 -108199.53
17.75 0 17.75 -108217.28
16.25 0 16.25 -108233.53
489.9 4.2 489.9 -108719.23
119.025 24.95 119.025 -108813.3
0 51.95 0 -108761.35
0 44.25 0 -108717.1
0.725 14.25 0.725 -108703.58
56.1 1.2 56.1 -108758.48
146.6 0 146.6 -108905.08
101.7 0 101.7 -109006.78
80.9 4.8 80.9 -109082.88
18.15 10.3 18.15 -109090.73
14.975 2.75 14.975 -109102.95
67.4 9.5 67.4 -109160.85
3.75 92.1 3.75 -109072.5
0 76.85 0 -108995.65
0 106.1 0 -108889.55
0 162.9 0 -108726.65
0 31.85 0 -108694.8
0 31.05 0 -108663.75
0 48.8 0 -108614.95
10.65 9.55 10.65 -108616.05
311.5 0 311.5 -108927.55
312.8 3 312.8 -109237.35
18.65 1.5 18.65 -109254.5
262.55 0 262.55 -109517.05
929.6 15.45 929.6 -110431.2
364.8 25.25 364.8 -110770.75
77.6 25.75 77.6 -110822.6
8.85 57.6 8.85 -110773.85
-----------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------
8.85 78.9 8.85 -110703.8
35.2 92.9 35.2 -110646.1
35.2 251.1 35.2 -110430.2
4.55 288.2 4.55 -110146.55
84.9 38.4 84.9 -110193.05
18.95 34.175 18.95 -110177.83
0 215.6 0 -109962.23
0 318.05 0 -109644.18
0 202.8 0 -109441.38
31.175 37.7 31.175 -109434.85
73.8 27.85 73.8 -109480.8
71.75 33.15 71.75 -109519.4
30.15 40.55 30.15 -109509
0 197.9 0 -109311.1
0 98 0 -109213.1
0 54.3 0 -109158.8
0 84.4 0 -109074.4
0 54.25 0 -109020.15
0 74.35 0 -108945.8
0 120.6 0 -108825.2
0 130.5 0 -108694.7
0 69 0 -108625.7
0 40.9 0 -108584.8
0 52.8 0 -108532
0 62.5 0 -108469.5
0 82.9 0 -108386.6
0 68.1 0 -108318.5
0 98.4 0 -108220.1
0.1 149.4 0.1 -108070.8
1.3 73.1 1.3 -107999
3.7 80.9 3.7 -107921.8
3.1 49.55 3.1 -107875.35
4.7 44.15 4.7 -107835.9
18.9 63.9 18.9 -107790.9
951.5 12.2 951.5 -108730.2
493.35 0 493.35 -109223.55
75.55 0 75.55 -109299.1
140 0 140 -109439.1
326.2 0 326.2 -109765.3
422.8 0 422.8 -110188.1
270.45 0 270.45 -110458.55
101.775 47.8 101.775 -110512.53
0 206.7 0 -110305.83
0.2 150 0.2 -110156.03
53.65 77.35 53.65 -110132.33
59.15 56.65 59.15 -110134.83
404.1 18.2 404.1 -110520.73
455.8 0 455.8 -110976.53
859.6 0 859.6 -111836.13
836.2 0 836.2 -112672.33
891.6 1.55 891.6 -113562.38
999.2 16.3 999.2 -114545.28
575.65 40.9 575.65 -115080.03
2.2 107.9 2.2 -114974.33
0 107.8 0 -114866.53
0 115 0 -114751.53
0 55.85 0 -114695.68
2.025 32.45 2.025 -114665.25
4.05 33.1 4.05 -114636.2
0 27.55 0 -114608.65
0 48.35 0 -114560.3
0 71.25 0 -114489.05
0 61 0 -114428.05
0.7 30.1 0.7 -114398.65
0.7 34 0.7 -114365.35
0 139.4 0 -114225.95
0 222.6 0 -114003.35
0 255.5 0 -113747.85
-----------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------
0 130.8 0 -113617.05
0 122.2 0 -113494.85
0 102.15 0 -113392.7
0 93.1 0 -113299.6
0 94.3 0 -113205.3
0 94.25 0 -113111.05
0 155.5 0 -112955.55
0 63.9 0 -112891.65
0 72.4 0 -112819.25
0 176.5 0 -112642.75
0 178 0 -112464.75
0 80.85 0 -112383.9
0 79.35 0 -112304.55
0 84 0 -112220.55
0 86.2 0 -112134.35
0 84.35 0 -112050
0 88.25 0 -111961.75
0 175.8 0 -111785.95
394.725 58.9 394.725 -112121.78
394.725 53.85 394.725 -112462.65
0.2 127.3 0.2 -112335.55
0.2 133.7 0.2 -112202.05
1.2 123.7 1.2 -112079.55
1.2 143.5 1.2 -111937.25
0 67.2 0 -111870.05
0 51.55 0 -111818.5
11.45 100.9 11.45 -111729.05
36.5 30.95 36.5 -111734.6
81.55 19.4 81.55 -111796.75
124.05 7 124.05 -111913.8
99.1 7.15 99.1 -112005.75
31.95 23.85 31.95 -112013.85
0.2 40.3 0.2 -111973.75
0 131.7 0 -111842.05
0 130.9 0 -111711.15
0.4 83.7 0.4 -111627.85
0.2 32.7 0.2 -111595.35
0 30.3 0 -111565.05
0 106.5 0 -111458.55
0.025 43 0.025 -111415.58
14.05 16.65 14.05 -111412.98
187.9 8.4 187.9 -111592.48
179.8 15.75 179.8 -111756.53
9.95 58.1 9.95 -111708.38
0 86.1 0 -111622.28
0 78.3 0 -111543.98
0 66.25 0 -111477.73
0 48.05 0 -111429.68
0 75.15 0 -111354.53
4.75 117.1 4.75 -111242.18
34.5 30.3 34.5 -111246.38
28.2 0.7 28.2 -111273.88
25.1 3.75 25.1 -111295.23
21.3 45.7 21.3 -111270.83
0.625 25.05 0.625 -111246.4
0 25.3 0 -111221.1
0 83.4 0 -111137.7
0 146.4 0 -110991.3
0 172.9 0 -110818.4
0 194.1 0 -110624.3
0 146.6 0 -110477.7
0 105.5 0 -110372.2
8.9 113.9 8.9 -110267.2
10.25 41.05 10.25 -110236.4
0.675 50.2 0.675 -110186.88
1.1 63.6 1.1 -110124.38
2.55 13.7 2.55 -110113.23
5.25 15.55 5.25 -110102.93
61 4.7 61 -110159.23
183.1 0 183.1 -110342.33
-----------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------
139.3 0 139.3 -110481.63
151.95 0 151.95 -110633.58
345.2 0 345.2 -110978.78
262.7 0 262.7 -111241.48
140.2 0 140.2 -111381.68
86.95 0 86.95 -111468.63
110.25 0 110.25 -111578.88
297.1 0 297.1 -111875.98
182.95 0 182.95 -112058.93
176.3 0 176.3 -112235.23
152.7 0 152.7 -112387.93
119.3 0 119.3 -112507.23
180.4 0 180.4 -112687.63
139.5 0 139.5 -112827.13
95.2 0 95.2 -112922.33
16.7 15.6 16.7 -112923.43
0 105.5 0 -112817.93
0 164.1 0 -112653.83
0 96 0 -112557.83
0 93.85 0 -112463.98
2.85 50 2.85 -112416.83
8.05 7.8 8.05 -112417.08
27 0.55 27 -112443.53
62.6 0 62.6 -112506.13
48.05 0 48.05 -112554.18
65 0 65 -112619.18
118 0 118 -112737.18
32.3 0.9 32.3 -112768.58
23.3 4.3 23.3 -112787.58
63.3 2.5 63.3 -112848.38
291.15 0.825 291.15 -113138.7
272.5 8.1 272.5 -113403.1
0.1 80.1 0.1 -113323.1
8.15 88.2 8.15 -113243.05
37.7 10.5 37.7 -113270.25
58.4 0 58.4 -113328.65
63.3 0.9 63.3 -113391.05
27.8 6.2 27.8 -113412.65
0.75 65.8 0.75 -113347.6
0 179.7 0 -113167.9
0 270 0 -112897.9
0 142.9 0 -112755
0 129.45 0 -112625.55
0 112.25 0 -112513.3
0 98.6 0 -112414.7
8.5 48.75 8.5 -112374.45
83.1 0 83.1 -112457.55
77.2 0 77.2 -112534.75
78.9 0 78.9 -112613.65
100.4 1.4 100.4 -112712.65
28.1 4.85 28.1 -112735.9
29 1.725 29 -112763.18
69.8 0 69.8 -112832.98
18.55 19.4 18.55 -112832.13
0 31.1 0 -112801.03
1.8 18 1.8 -112784.83
82.9 6.3 82.9 -112861.43
111.8 0 111.8 -112973.23
111.45 0 111.45 -113084.68
86.8 1.45 86.8 -113170.03
71.4 1.45 71.4 -113239.98
62.8 3.15 62.8 -113299.63
0.8 30.65 0.8 -113269.78
0.15 42.55 0.15 -113227.38
0.3 54.3 0.3 -113173.38
0 80.8 0 -113092.58
-----------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------
0 68.55 0 -113024.03
0 97.7 0 -112926.33
0 148 0 -112778.33
0.05 61.6 0.05 -112716.78
39 14.25 39 -112741.53
114.3 0 114.3 -112855.83
75.25 0 75.25 -112931.08
66.6 0 66.6 -112997.68
88.7 0 88.7 -113086.38
31.8 4.15 31.8 -113114.03
0.6 79.8 0.6 -113034.83
0 67.6 0 -112967.23
0 53.25 0 -112913.98
0 72.6 0 -112841.38
0.95 52.3 0.95 -112790.03
0.95 39.6 0.95 -112751.38
0 33.7 0 -112717.68
0 28.3 0 -112689.38
0 49.5 0 -112639.88
0 54.4 0 -112585.48
0.45 47.4 0.45 -112538.53
0.9 105.6 0.9 -112433.83
0 144.55 0 -112289.28
0 155.75 0 -112133.53
0 104.25 0 -112029.28
0 87.3 0 -111941.98
0 225.8 0 -111716.18
0.1 125.6 0.1 -111590.68
27.95 23.925 27.95 -111594.7
60.1 0 60.1 -111654.8
65.5 3.025 65.5 -111717.28
63.35 14.3 63.35 -111766.33
59.7 17.7 59.7 -111808.33
88 9.45 88 -111886.88
404.6 19.85 404.6 -112271.63
51.119 5.403 51.119 -112317.34
-----------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------
****************************************************
****************************************************
****************************************************
****************************************************