Documentos de Académico
Documentos de Profesional
Documentos de Cultura
MEJORAMIENTO DE LA INFRAESTRUCTURA DEL CENTRO CIVICO DEL DISTRITO DE VILAVILA, PROVINCIA DE LAMPA -
PROYECTO
PUNO
RENDIMIENTO UNITARIO
PATIDAS DESCRIPCION UND METRADO N° DE
CANT. UNIDAD CUADRIL
LAS
01 ESTRUCTURAS
01.01 OBRAS PROVISIONALES
01.01.01 OFICINA, ALMACEN Y CASETA DE GUARDIANIA glb 1.00 2,773.37 glb/día 1.00
01.01.02 CARTEL DE OBRA glb 1.00 811.47 glb/día 1.00
01.01.03 AGUA PARA LA CONSTRUCCIÓN mes 4.50 80.00 mes/día 1.00
01.01.04 CERCO PERIMETRICO PROVISIONAL m 15.95 148.39 m/día 1.00
01.01.05 ENERGÍA ELÉCTRICA PARA LA OBRA mes 4.50 80.00 mes/día 1.00
01.02 TRABAJOS PRELIMINARES
01.02.01 LIMPIEZA DEL TERRENO MANUAL m2 391.08 1.34 m2/día 12.00
01.02.02 TRAZO Y REPLANTEO m2 391.08 15.28 m2/día 1.00
01.03 MOVIMIENTO DE TIERRAS
01.03.01 EXCAVACION MANUAL m3 257.56 14.79 m3/día 1.00
01.03.02 RELLENO CON MATERIAL DE PRESTAMO CON EQUIPO LIVm3 103.12 72.93 m3/día 1.00
01.03.03 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA (m3 296.19 7.70 m3/día 5.00
01.04 OBRAS DE CONCRETO SIMPLE
01.04.01 SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-H m2 114.10 25.48 m2/día 1.00
01.04.02 SUB ZAPATA m3 57.05 120.28 m3/día 1.00
01.04.03 CIMENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGONm3 34.06 227.79 m3/día 1.00
01.04.04 CONCRETO 1:8 + 25% P.M. PARA SOBRECIMIENTOS m3 13.03 280.33 m3/día 1.00
01.04.05 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO m2 101.48 25.85 m2/día 1.00
01.05 OBRAS DE CONCRETO ARMADO
01.05.01 ZAPATAS
01.05.01.01 CONCRETO EN ZAPATAS f'c=175 kg/cm2 m3 57.05 305.92 m3/día 1.00
01.05.01.02 ACERO PARA ZAPATAS GRADO 60 kg 1,633.95 5.72 kg/día 10.00
01.05.02 VIGA DE CIMENTACION
01.05.02.01 CONCRETO EN VIGAS DE CIMENTACION f'c=210 kg/cm2 m3 13.86 342.76 m3/día 1.00
01.05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGA DE m2 96.58 26.31 m2/día 1.00
01.05.02.03 ACERO GRADO 60 EN VIGAS DE CIMENTACION kg 1,241.79 5.64 kg/día 15.00
01.05.03 COLUMNAS
01.05.03.01 CONCRETO EN COLUMNAS f'c=210 kg/cm2 m3 33.42 346.15 m3/día 1.00
01.05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAm2 295.66 26.31 m2/día 1.00
01.05.03.03 ACERO GRADO 60 EN COLUMNAS kg 5,098.49 5.65 kg/día 25.00
01.05.04 VIGAS
01.05.04.01 CONCRETO EN VIGAS f'c=210 kg/cm2 m3 44.93 349.88 m3/día 1.00
01.05.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 416.30 34.57 m2/día 1.00
01.05.04.03 ACERO GRADO 60 EN VIGAS kg 4,712.53 5.89 kg/día 25.00
01.05.05 LOSAS ALIGERADAS
01.05.05.01 CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 m3 49.16 367.26 m3/día 1.00
TABLA DE DATOS PARA PROGRAMACION
MEJORAMIENTO DE LA INFRAESTRUCTURA DEL CENTRO CIVICO DEL DISTRITO DE VILAVILA, PROVINCIA DE LAMPA -
PROYECTO
PUNO
RENDIMIENTO UNITARIO
PATIDAS DESCRIPCION UND METRADO N° DE
CANT. UNIDAD CUADRIL
LAS
01.05.05.02 ENCOFRADO Y DESENCOFRADO PARA LOSAS ALIGERA m2 581.64 21.58 m2/día 1.00
01.05.05.03 ACERO GRADO 60 EN LOSAS ALIGERADAS kg 3,803.61 5.55 kg/día 25.00
01.05.05.04 LADRILLO HUECO DE ARCILLA 20X30X30 cm. PARA TE und 2,452.27 3.83 und/día 15.00
01.05.05.05 LADRILLO HUECO DE ARCILLA 15X30X30 cm. PARA TE und 2,392.79 3.62 und/día 15.00
TABLA DE DATOS PARA PROGRAMACION
MEJORAMIENTO DE LA INFRAESTRUCTURA DEL CENTRO CIVICO DEL DISTRITO DE VILAVILA, PROVINCIA DE LAMPA -
PROYECTO
PUNO
RENDIMIENTO UNITARIO
PATIDAS DESCRIPCION UND METRADO N° DE
CANT. UNIDAD CUADRIL
LAS
01.05.06 ESCALERAS
01.05.06.01 CONCRETO EN ESCALERAS f'c=210 kg/cm2 m3 6.15 349.88 m3/día 1.00
01.05.06.02 ENCOFRADO Y DESENCOFRADO DE ESCALERAS m2 37.70 24.17 m2/día 1.00
01.05.06.03 ACERO GRADO 60 EN ESCALERAS kg 248.63 5.55 kg/día 2.00
01.06 PRUEBAS DE LABORATORIO
01.06.01 CAPACIDAD PORTANTE DEL SUELO und 1.00 450.00 und/día 1.00
01.06.02 DISEÑO DEL MEZCLAS und 1.00 350.00 und/día 1.00
01.06.03 ROTURA DE BRIQUETAS und 10.00 30.00 und/día 1.00
02 ARQUITECTURA
02.01 MUROS Y TABIQUERIAS
02.01.01 MURO DE LADRILLO K.K. DE CABEZA 09X13X24 cm. CON m2 159.21 119.53 m2/día 1.00
02.01.02 MURO DE LADRILLO K.K. DE SOGA 09X13X24 cm. CON CE m2 555.19 88.27 m2/día 1.00
02.02 COBERTURAS
02.02.01 COBERTURA DE POLICARBONATO m2 21.05 90.00 m2/día 1.00
02.03 REVOQUES, ENLUCIDOS Y MOLDURAS
02.03.01 TARRAJEO EN EXTERIORES CON CEMENTO - ARENA m2 84.48 10.75 m2/día 1.00
02.03.02 TARRAJEO EN INTERIORES ACABADO CEMENTO ARENA m2 928.99 12.56 m2/día 1.00
02.03.03 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENT m2 218.42 18.89 m2/día 1.00
02.03.04 TARRAJEO DE SUPERFICIE DE VIGAS CON CEMENTO ARE m2 270.35 21.35 m2/día 1.00
02.03.05 TARRAJEO DE CIELORASO m2 202.00 24.38 m2/día 1.00
02.03.06 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VA m 260.62 8.03 m/día 1.00
02.03.07 BRUÑAS INTERIORES Y EXTERIORES DE 1 cm. m 537.50 1.73 m/día 1.00
02.04 CIELO RASOS
02.04.01 CIELO RASO SUSPENDIDO CON BALDOSAS DE FIBRA MINERA
m2 337.50 40.00 m2/día 1.00
02.05 PISOS Y PAVIMENTOS
02.05.01 FALSO PISO DE 4" DE CONCRETO 1:10 m2 22.48 49.37 m2/día 1.00
02.05.02 PISO DE MADERA AGUANO MACHIHEMBRADO DE 4"x3/4" Sm2 22.48 99.83 m2/día 1.00
02.05.03 FALSO PISO DE CONCRETO 1:10 PARA PISOS DE CEMEN m2 511.24 33.82 m2/día 1.00
02.05.04 PISO CERAMICO m2 451.26 62.52 m2/día 1.00
02.05.05 PISO DE CEMENTO PULIDO DE COLOR m2 161.06 9.77 m2/día 1.00
02.06 VEREDAS DE CONCRETO
02.06.01 VEREDA RIGIDA DE CONCRETO F'c=140 kg/cm2 E=10CM., Pm2 47.43 37.39 m2/día 1.00
02.06.02 ENCOFRADO Y DESENCOFRADO EN VEREDAS m2 4.56 9.24 m2/día 1.00
02.06.03 JUNTA ASFALTICA E=1" EN VEREDAS m 18.70 4.42 m/día 1.00
02.07 GRADERIOS
02.07.01 GRADERIOS CONCRETO f'c=175 kg/cm2 m3 0.33 320.96 m3/día 1.00
02.07.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA GRADERIm2 1.02 23.15 m2/día 1.00
02.08 ZOCALOS Y CONTRAZOCALOS
TABLA DE DATOS PARA PROGRAMACION
MEJORAMIENTO DE LA INFRAESTRUCTURA DEL CENTRO CIVICO DEL DISTRITO DE VILAVILA, PROVINCIA DE LAMPA -
PROYECTO
PUNO
RENDIMIENTO UNITARIO
PATIDAS DESCRIPCION UND METRADO N° DE
CANT. UNIDAD CUADRIL
LAS
MEJORAMIENTO DE LA INFRAESTRUCTURA DEL CENTRO CIVICO DEL DISTRITO DE VILAVILA, PROVINCIA DE LAMPA -
PROYECTO
PUNO
RENDIMIENTO UNITARIO
PATIDAS DESCRIPCION UND METRADO N° DE
CANT. UNIDAD CUADRIL
LAS
03.03.07 YEE PVC SAP DE 4" und 10.00 13.86 und/día 1.00
03.03.08 YEE PVC SAL 4" X 2" und 5.00 12.31 und/día 1.00
03.03.09 CAJA DE REGISTRO DE DESAGUE 12" X 24" pza 2.00 86.98 pza/día 1.00
03.03.10 REGISTRO DE BRONCE 4" und 15.00 36.93 und/día 1.00
03.04 SISTEMA DE AGUA FRIA
03.04.01 SALIDA DE AGUA FRIA CON TUBERIA PVC SAP C-10 1/2" pto 5.00 51.49 pto/día 1.00
03.04.02 TUBERIA PVC SAP C-10 D=1/2" m 38.27 2.84 m/día 4.00
03.04.03 TUBERIA PVC SAP C-10 D=3/4 m 45.00 3.38 m/día 4.00
03.04.04 VALVULAS DE COMPUERTA DE BRONCE DE 1/2" glb 5.00 55.06 glb/día 1.00
03.04.05 TEE PVC-SAP 1/2"X1/2" und 18.00 11.26 und/día 1.00
03.04.06 CODO 90° PVC SAP 1/2" und 24.00 7.88 und/día 1.00
03.04.07 REDUCCIÓN PVC 3/4" A 1/2" und 5.00 9.88 und/día 1.00
03.04.08 TANQUE DE AGUA DE ETERNIT DE 1000 LITROS INCLUYE und 1.00 556.24 und/día 1.00
03.04.09 ESTRUCTURA METALICA PARA TANQUE ELEVADO glb 1.00 450.00 glb/día 1.00
04 INSTALACIONES ELECTRICAS
04.01 REDES Y ACCESORIOS
04.01.01 SALIDA PARA CENTRO DE LUZ pto 57.00 17.98 pto/día 1.00
04.01.02 SALIDA DE PARED TOMACORRIENTE pto 48.00 53.08 pto/día 1.00
04.01.03 INTERRUPTOR SIMPLE DE BAKELITA. pto 23.00 23.47 pto/día 1.00
04.01.04 INTERRUPTOR DOBLE DE BAKELITA. pto 12.00 26.47 pto/día 1.00
04.01.05 FLUORESCENTE LINEAL DE 3 X 40W (COMPLETO) und 35.00 223.68 und/día 1.00
04.01.06 CABLE ELECTRICO TW N° 10 m 315.00 4.04 m/día 6.00
04.01.07 CABLE ELECTRICO TW N° 12 m 420.00 3.62 m/día 10.00
04.01.08 TUBERIA DE PVC SAL 3/4" m 735.00 2.84 m/día 30.00
04.01.09 TABLERO GENERAL 2 X15A., 2 X 20A., 2 X30A., 2 X 40A. und 1.00 291.89 und/día 1.00
04.01.10 POZO DE PUESTA DE TIERRA und 1.00 1,151.65 und/día 1.00
05 VARIOS
05.01 TRANSPORTE DE MATERIALES A LA OBRA glb 1.00 3,000.00 glb/día 1.00
05.02 PLACA RECORDATORIA und 1.00 350.00 und/día 1.00
05.03 LIMPIEZA FINAL DE OBRA m2 361.22 0.66 m2/día 30.00
06 ADQUISICION DE MOBILIARIO Y EQUIPAMIENTO
06.01 MOBILIARIO glb 1.00 5,310.00 glb/día 1.00
06.02 EQUIPAMIENTO SALA DE USOS MULTIPLES glb 1.00 5,250.00 glb/día 1.00
OVINCIA DE LAMPA -
TIEMPO
EN DIAS
1.00
1.00
1.00
1.00
1.00
25.00
26.00
18.00
2.00
8.00
5.00
1.00
1.00
1.00
4.00
1.00
29.00
1.00
4.00
15.00
1.00
12.00
37.00
1.00
13.00
33.00
1.00
OVINCIA DE LAMPA -
TIEMPO
EN DIAS
27.00
28.00
43.00
45.00
OVINCIA DE LAMPA -
TIEMPO
EN DIAS
1.00
2.00
23.00
1.00
1.00
1.00
2.00
7.00
1.00
8.00
74.00
12.00
13.00
9.00
33.00
311.00
9.00
1.00
1.00
16.00
8.00
17.00
2.00
1.00
5.00
1.00
1.00
OVINCIA DE LAMPA -
TIEMPO
EN DIAS
6.00
4.00
21.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
61.00
57.00
43.00
36.00
2.00
1.00
1.00
3.00
1.00
1.00
3.00
7.00
2.00
1.00
OVINCIA DE LAMPA -
TIEMPO
EN DIAS
1.00
1.00
1.00
1.00
1.00
4.00
4.00
1.00
2.00
4.00
1.00
1.00
1.00
4.00
1.00
1.00
1.00
1.00
13.00
12.00
9.00
1.00
1.00
1.00
1.00
19.00
1.00
1.00
CRONOGRAMA VALORIZADO DE OBRA
PROYECTO: MEJORAMIENTO DE LA INFRAESTRUCTURA DEL CENTRO CIVICO DEL DISTRITO DE VILAVILA, PROVINCIA DE LAMPA - PUNO
ENTIDAD: MUNICIPALIDAD DISTRITAL DE VILAVILA
01 ESTRUCTURAS 261,165.45
01.01.01 OFICINA, ALMACEN Y CASETA DE GUARDIANIA glb 1.00 2,773.37 2,773.37 1.00 2,773.37 100.00% 0.00 0.00 0.00% 0.00
01.01.02 CARTEL DE OBRA glb 1.00 811.48 811.48 1.00 811.48 100.00% 0.00 0.00 0.00% 0.00
01.01.03 AGUA PARA LA CONSTRUCCIÓN mes 4.50 80.00 360.00 0.50 40.00 11.11% 1.00 80.00 22.22% 1.00
01.01.04 CERCO PERIMETRICO PROVISIONAL m 15.95 148.39 2,366.82 15.95 2,366.82 100.00% 0.00 0.00 0.00% 0.00
01.01.05 ENERGÍA ELÉCTRICA PARA LA OBRA mes 4.50 80.00 360.00 0.50 40.00 11.11% 1.00 80.00 22.22% 1.00
01.02.01 LIMPIEZA DEL TERRENO MANUAL m2 391.08 1.34 524.05 391.08 524.05 100.00% 0.00 0.00 0.00% 0.00
01.02.02 TRAZO Y REPLANTEO m2 391.08 15.28 5,975.70 391.08 5,975.70 100.00% 0.00 0.00 0.00% 0.00
01.03.01 EXCAVACION MANUAL m3 187.84 14.79 2,778.15 187.84 2,778.15 100.00% 0.00 0.00 0.00% 0.00
01.03.02 RELLENO CON MATERIAL DE PRESTAMO CON EQUIPO LIVm3 94.99 72.93 6,927.62 0.00 0.00 0.00% 94.99 6,927.62 100.00% 0.00
01.03.03 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA (m3 216.01 7.70 1,663.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
01.04.01 SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-H m2 75.97 25.50 1,937.24 75.97 1,937.24 100.00% 0.00 0.00 0.00% 0.00
01.04.02 CIMENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGONm3 34.06 228.24 7,773.85 14.06 3,209.05 41.28% 20.00 4,564.80 58.72% 0.00
CRONOGRAMA VALORIZADO DE OBRA
PROYECTO: MEJORAMIENTO DE LA INFRAESTRUCTURA DEL CENTRO CIVICO DEL DISTRITO DE VILAVILA, PROVINCIA DE LAMPA - PUNO
ENTIDAD: MUNICIPALIDAD DISTRITAL DE VILAVILA
01.04.04 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO m2 101.48 25.85 2,623.26 0.00 0.00 0.00% 101.48 2,623.26 100.00% 0.00
01.05.01.01 CONCRETO EN ZAPATAS f'c=175 kg/cm2 m3 37.99 306.78 11,654.57 0.00 0.00 0.00% 37.99 11,654.57 100.00% 0.00
01.05.01.02 ACERO PARA ZAPATAS GRADO 60 kg 1,291.85 6.04 7,802.77 0.00 0.00 0.00% 1,291.85 7,802.77 100.00% 0.00
01.05.02.01 CONCRETO EN VIGAS DE CIMENTACION f'c=210 kg/cm2 m3 13.86 343.74 4,764.24 0.00 0.00 0.00% 13.86 4,764.24 100.00% 0.00
01.05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGA DE m2 96.58 26.31 2,541.02 0.00 0.00 0.00% 96.58 2,541.02 100.00% 0.00
01.05.02.03 ACERO GRADO 60 EN VIGAS DE CIMENTACION kg 1,241.79 5.96 7,401.07 0.00 0.00 0.00% 1,241.79 7,401.07 100.00% 0.00
01.05.03.01 CONCRETO EN COLUMNAS f'c=210 kg/cm2 m3 33.42 347.13 11,601.08 0.00 0.00 0.00% 33.42 11,601.08 100.00% 0.00
01.05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAm2 295.66 26.31 7,778.81 0.00 0.00 0.00% 295.66 7,778.81 100.00% 0.00
01.05.03.03 ACERO GRADO 60 EN COLUMNAS kg 5,098.49 5.97 30,437.99 0.00 0.00 0.00% 5,098.49 30,437.99 100.00% 0.00
01.05.04.01 CONCRETO EN VIGAS f'c=210 kg/cm2 m3 44.93 350.86 15,764.14 0.00 0.00 0.00% 0.00 0.00 0.00% 44.93
01.05.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 416.30 34.57 14,391.49 0.00 0.00 0.00% 0.00 0.00 0.00% 416.30
01.05.04.03 ACERO GRADO 60 EN VIGAS kg 4,712.53 6.21 29,264.81 0.00 0.00 0.00% 0.00 0.00 0.00% 4,712.53
CRONOGRAMA VALORIZADO DE OBRA
PROYECTO: MEJORAMIENTO DE LA INFRAESTRUCTURA DEL CENTRO CIVICO DEL DISTRITO DE VILAVILA, PROVINCIA DE LAMPA - PUNO
ENTIDAD: MUNICIPALIDAD DISTRITAL DE VILAVILA
01.05.05.01 CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 m3 49.16 368.24 18,102.68 0.00 0.00 0.00% 0.00 0.00 0.00% 25.16
01.05.05.02 ENCOFRADO Y DESENCOFRADO PARA LOSAS ALIGERA m2 581.64 21.58 12,551.79 0.00 0.00 0.00% 0.00 0.00 0.00% 581.64
01.05.05.03 ACERO GRADO 60 EN LOSAS ALIGERADAS kg 3,803.61 5.86 22,289.15 0.00 0.00 0.00% 0.00 0.00 0.00% 3,803.61
01.05.05.04 LADRILLO HUECO DE ARCILLA 15X30X30 cm. PARA TE und 4,845.06 3.83 18,556.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
01.05.06.01 CONCRETO EN ESCALERAS f'c=210 kg/cm2 m3 6.15 350.86 2,157.79 0.00 0.00 0.00% 0.00 0.00 0.00% 3.05
01.05.06.02 ENCOFRADO Y DESENCOFRADO DE ESCALERAS m2 37.70 24.17 911.21 37.70 0.00 0.00% 0.00 0.00 0.00% 20.00
01.05.06.03 ACERO GRADO 60 EN ESCALERAS kg 248.63 5.86 1,456.97 248.63 0.00 0.00% 0.00 0.00 0.00% 130.00
01.06.01 CAPACIDAD PORTANTE DEL SUELO und 1.00 550.00 550.00 1.00 550.00 100.00% 0.00 0.00 0.00% 0.00
01.06.02 DISEÑO DEL MEZCLAS und 1.00 350.00 350.00 1.00 350.00 100.00% 0.00 0.00 0.00% 0.00
01.06.03 ROTURA DE BRIQUETAS und 10.00 30.00 300.00 2.00 60.00 20.00% 2.00 60.00 20.00% 2.00
02 ARQUITECTURA 248,736.00
02.01.01 MURO DE LADRILLO K.K. DE CABEZA 09X13X24 cm. CON m2 159.21 119.58 19,038.33 0.00 0.00 0.00% 140.00 16,741.20 87.93% 19.21
02.01.02 MURO DE LADRILLO K.K. DE SOGA 09X13X24 cm. CON CE m2 555.19 88.32 49,034.38 0.00 0.00 0.00% 200.00 17,664.00 36.02% 355.19
02.03.01 TARRAJEO EN EXTERIORES CON CEMENTO - ARENA m2 84.48 10.76 909.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
02.03.02 TARRAJEO EN INTERIORES ACABADO CEMENTO ARENA m2 928.99 12.57 11,677.40 0.00 0.00 0.00% 0.00 0.00 0.00% 420.00
02.03.03 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENT m2 218.42 18.91 4,130.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
02.03.04 TARRAJEO DE SUPERFICIE DE VIGAS CON CEMENTO ARE m2 270.35 21.36 5,774.68 0.00 0.00 0.00% 0.00 0.00 0.00% 180.00
02.03.05 TARRAJEO DE CIELORASO m2 202.00 24.44 4,936.88 0.00 0.00 0.00% 0.00 0.00 0.00% 105.00
02.03.06 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VA m 260.62 8.03 2,092.78 0.00 0.00 0.00% 0.00 0.00 0.00% 100.00
02.03.07 BRUÑAS INTERIORES Y EXTERIORES DE 1 cm. m 537.50 1.73 929.88 0.00 0.00 0.00% 0.00 0.00 0.00% 200.00
02.05.01 FALSO PISO DE 4" DE CONCRETO 1:10 m2 22.48 49.45 1,111.64 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
02.05.02 PISO DE MADERA AGUANO MACHIHEMBRADO DE 4"x3/4" Sm2 22.48 99.83 2,244.18 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
02.05.03 FALSO PISO DE CONCRETO 1:10 PARA PISOS DE CEMEN m2 511.24 33.90 17,331.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
02.05.04 PISO CERAMICO m2 451.26 62.52 28,212.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
02.05.05 PISO DE CEMENTO PULIDO DE COLOR m2 161.06 9.78 1,575.17 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
02.06.02 ENCOFRADO Y DESENCOFRADO EN VEREDAS m2 4.56 9.24 42.13 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
02.06.03 JUNTA ASFALTICA E=1" EN VEREDAS m 18.70 4.42 82.65 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
02.07.01 GRADERIOS CONCRETO f'c=175 kg/cm2 m3 0.33 321.82 106.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
02.07.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA GRADERIm2 1.02 23.15 23.61 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
02.08.01 CONTRAZOCALO CEMENTO S/COLOREAR H = 20 CM m 41.69 8.05 335.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
02.08.02 CONTRAZOCALO DE MADERA AGUANO 3/4" X 4" RODON Dm 71.98 18.40 1,324.43 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
02.08.03 CONTRAZOCALO DE CERAMICO H=10CM. m2 173.09 8.34 1,443.57 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
02.08.04 ZOCALO DE CERAMICA 30 X 30 cm . m2 98.19 49.87 4,896.74 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
02.09.02 PASAMANO DE FIERRO m 29.04 120.00 3,484.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
02.10.01 PUERTA DE MADERA AGUANO TABLERO REBAJADO TIPO und 6.00 871.58 5,229.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
02.10.02 PUERTA DE MADERA AGUANO TABLERO REBAJADO TIPO und 1.00 841.58 841.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
02.10.03 PUERTA DE MADERA AGUANO TABLERO REBAJADO TIPO und 1.00 831.58 831.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
CRONOGRAMA VALORIZADO DE OBRA
PROYECTO: MEJORAMIENTO DE LA INFRAESTRUCTURA DEL CENTRO CIVICO DEL DISTRITO DE VILAVILA, PROVINCIA DE LAMPA - PUNO
ENTIDAD: MUNICIPALIDAD DISTRITAL DE VILAVILA
02.10.05 PUERTA DE MADERA AGUANO TABLERO REBAJADO TIPO und 5.00 801.58 4,007.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
02.10.06 PUERTA DE MADERA AGUANO TABLERO REBAJADO TIPO und 1.00 791.58 791.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
02.10.07 PUERTA DE MADERA AGUANO TABLERO REBAJADO TIPO und 1.00 921.58 921.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
02.10.08 PUERTA DE MADERA AGUANO TABLERO REBAJADO TIPO und 8.00 821.58 6,572.64 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
02.11.01 CERRADURA DOS GOLPES PARA PUERTAS INTERIOR und 24.00 75.54 1,812.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
02.12.01 VIDRIOS EN SISTEMA MODUGLAS 6mm, SEGUN DISEÑO p2 856.89 20.39 17,471.99 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
02.13.01 PINTURA EN MURO, COLUMNA Y DERRAMES (INT. Y EXT.) m2 1,005.26 17.77 17,863.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
02.13.02 PINTURA EN CIELO RAZO m2 575.98 13.42 7,729.65 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
02.13.03 PINTURA DE CONTRAZOCALO C/BARNIZ ECONOMICO m 71.98 2.05 147.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
03.01.01 INSTALACION - MONTAJE DE AGUAS PLUVIALES m 42.00 39.06 1,640.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
03.02.01 INODORO TANQUE BAJO BLANCO pza 11.00 333.97 3,673.67 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
CRONOGRAMA VALORIZADO DE OBRA
PROYECTO: MEJORAMIENTO DE LA INFRAESTRUCTURA DEL CENTRO CIVICO DEL DISTRITO DE VILAVILA, PROVINCIA DE LAMPA - PUNO
ENTIDAD: MUNICIPALIDAD DISTRITAL DE VILAVILA
03.02.03 DIVISIONES DE MELAMINA PARA BAÑOS A TODO COSTO I m2 41.31 14.00 578.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
03.03.01 SALIDA DESAGUE DE PVC SAL 2" pto 18.00 67.46 1,214.28 0.00 0.00 0.00% 0.00 0.00 0.00% 18.00
03.03.02 SALIDA DESAGUE DE PVC-SAL 4" pto 13.00 71.08 924.04 0.00 0.00 0.00% 0.00 0.00 0.00% 13.00
03.03.03 TUBERIA DE PVC SAL 2" m 33.08 12.90 426.73 0.00 0.00 0.00% 0.00 0.00 0.00% 33.08
03.03.04 TUBERIA DE PVC SAL 4" m 91.61 14.65 1,342.09 0.00 0.00 0.00% 0.00 0.00 0.00% 91.61
03.03.05 CODO 45° PVC SAP 4" und 13.00 10.38 134.94 0.00 0.00 0.00% 0.00 0.00 0.00% 13.00
03.03.06 SUMIDERO DE BRONCE ROSCADO 2" und 9.00 52.95 476.55 0.00 0.00 0.00% 0.00 0.00 0.00% 9.00
03.03.07 YEE PVC SAP DE 4" und 10.00 13.86 138.60 0.00 0.00 0.00% 0.00 0.00 0.00% 10.00
03.03.08 YEE PVC SAL 4" X 2" und 5.00 12.31 61.55 0.00 0.00 0.00% 0.00 0.00 0.00% 5.00
03.03.09 CAJA DE REGISTRO DE DESAGUE 12" X 24" pza 2.00 87.06 174.12 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00
03.03.10 REGISTRO DE BRONCE 4" und 15.00 36.93 553.95 0.00 0.00 0.00% 0.00 0.00 0.00% 15.00
03.04.01 SALIDA DE AGUA FRIA CON TUBERIA PVC SAP C-10 1/2" pto 5.00 51.49 257.45 0.00 0.00 0.00% 0.00 0.00 0.00% 5.00
03.04.02 TUBERIA PVC SAP C-10 D=1/2" m 38.27 2.84 108.69 0.00 0.00 0.00% 0.00 0.00 0.00% 38.27
03.04.03 TUBERIA PVC SAP C-10 D=3/4 m 45.00 3.38 152.10 0.00 0.00 0.00% 0.00 0.00 0.00% 45.00
03.04.04 VALVULAS DE COMPUERTA DE BRONCE DE 1/2" glb 5.00 55.06 275.30 0.00 0.00 0.00% 0.00 0.00 0.00% 5.00
CRONOGRAMA VALORIZADO DE OBRA
PROYECTO: MEJORAMIENTO DE LA INFRAESTRUCTURA DEL CENTRO CIVICO DEL DISTRITO DE VILAVILA, PROVINCIA DE LAMPA - PUNO
ENTIDAD: MUNICIPALIDAD DISTRITAL DE VILAVILA
03.04.06 CODO 90° PVC SAP 1/2" und 24.00 7.88 189.12 0.00 0.00 0.00% 0.00 0.00 0.00% 24.00
03.04.07 REDUCCIÓN PVC 3/4" A 1/2" und 5.00 9.88 49.40 0.00 0.00 0.00% 0.00 0.00 0.00% 5.00
03.04.08 TANQUE DE AGUA DE ETERNIT DE 1000 LITROS INCLUYE und 1.00 556.24 556.24 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00
03.04.09 ESTRUCTURA METALICA PARA TANQUE ELEVADO glb 1.00 450.00 450.00 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00
04.01.01 SALIDA PARA CENTRO DE LUZ pto 57.00 17.98 1,024.86 0.00 0.00 0.00% 0.00 0.00 0.00% 37.00
04.01.02 SALIDA DE PARED TOMACORRIENTE pto 48.00 53.08 2,547.84 0.00 0.00 0.00% 0.00 0.00 0.00% 20.00
04.01.03 INTERRUPTOR SIMPLE DE BAKELITA. pto 23.00 23.47 539.81 0.00 0.00 0.00% 0.00 0.00 0.00% 15.00
04.01.04 INTERRUPTOR DOBLE DE BAKELITA. pto 12.00 26.47 317.64 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00
04.01.05 FLUORESCENTE LINEAL DE 3 X 40W (COMPLETO) und 35.00 223.68 7,828.80 0.00 0.00 0.00% 0.00 0.00 0.00% 20.00
04.01.06 CABLE ELECTRICO TW N° 10 m 315.00 4.04 1,272.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
04.01.07 CABLE ELECTRICO TW N° 12 m 420.00 3.62 1,520.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
04.01.08 TUBERIA DE PVC SAL 3/4" m 735.00 2.84 2,087.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
04.01.09 TABLERO GENERAL 2 X15A., 2 X 20A., 2 X30A., 2 X 40A. und 1.00 291.89 291.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
04.01.10 POZO DE PUESTA DE TIERRA und 1.00 1,151.65 1,151.65 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
05 VARIOS 5,838.41
CRONOGRAMA VALORIZADO DE OBRA
PROYECTO: MEJORAMIENTO DE LA INFRAESTRUCTURA DEL CENTRO CIVICO DEL DISTRITO DE VILAVILA, PROVINCIA DE LAMPA - PUNO
ENTIDAD: MUNICIPALIDAD DISTRITAL DE VILAVILA
05.02 PLACA RECORDATORIA und 1.00 500.00 500.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
05.03 LIMPIEZA FINAL DE OBRA m2 361.22 0.66 238.41 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
06.01 MOBILIARIO glb 1.00 5,310.00 5,310.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00
06.02 EQUIPAMIENTO SALA DE USOS MULTIPLES glb 1.00 5,250.00 5,250.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00