MODULO TIPO 1 Y 2 REQUERIMIENTO N° 01 REQUERIMIENTO N° 02

SEMANA DEL LUNES 22/07 AL DOMINGO 28/07 SEMANA DEL LUNES 29 AL DOMINGO 04
MATERIALES ESTRUCTURAS CANTIDAD 151 und PEDIDO: 18-07-19 ENTREGA: 25-07-19 PEDIDO: 25-07-19 ENTREGA: 01-08-19
ITEM MATERIALES UNIDAD TIPO 1 TIPO 2 PRECIO UNIT. SUBTOTAL CANT. TOTAL TOTAL % CANT. TOTAL TOTAL
1 ALAMBRE NEGRO RECOCIDO N° 8 kg 1584.00 3502.00 S/ 3.65 S/ 18,563.90 1000.00 S/ 3,650.00 20% 1000.00 S/ 3,650.00
2 ALAMBRE NEGRO N° 16 kg 1296.00 1545.00 S/ 3.65 S/ 10,369.65 1000.00 S/ 3,650.00 35% 1000.00 S/ 3,650.00
3 VARILLA DE 1/2" und 1632.00 3708.00 S/ 24.20 S/ 129,228.00 2320.00 S/ 56,144.00 43% 0.00 S/ -
4 VARILLA DE 1/4" und 3312.00 5871.00 S/ 5.44 S/ 49,955.52 3096.00 S/ 16,842.24 34% 0.00 S/ -
5 VARILLA DE 3/8" und 864.00 2266.00 S/ 13.49 S/ 42,223.70 1248.00 S/ 16,835.52 40% 0.00 S/ -
6 CLAVOS PARA MADERA CON CABEZA DE 3" kg 144.00 309.00 S/ 3.80 S/ 1,721.40 90.00 S/ 342.00 20% 0.00 S/ -
7 CLAVOS PARA MADERA CON CABEZA DE 2";21/2" kg 624.00 1339.00 S/ 3.80 S/ 7,459.40 120.00 S/ 456.00 6% 0.00 S/ -
8 CLAVOS PARA MADERA CON CABEZA DE 4" kg 144.00 309.00 S/ 3.80 S/ 1,721.40 90.00 S/ 342.00 20% 0.00 S/ -
9 PIEDRA GRANDE DE 8" m3 240.00 515.00 S/ 10.00 S/ 7,550.00 0.00 S/ - 0% 100.00 S/ 1,000.00
10 GRAVILLA DE 1/2" m3 192.00 360.50 S/ 16.00 S/ 8,840.00 0.00 S/ - 0% 100.00 S/ 1,600.00
11 AFIRMADO m3 192.00 618.00 S/ 13.00 S/ 10,530.00 0.00 S/ - 0% 100.00 S/ 1,300.00
12 HORMIGON m3 768.00 1751.00 S/ 10.50 S/ 26,449.50 0.00 S/ - 0% 200.00 S/ 2,100.00
13 PIEDRA MEDIANA m3 48.00 103.00 S/ 16.00 S/ 2,416.00 0.00 S/ - 0% 100.00 S/ 1,600.00
14 ARENA GRUESA m3 192.00 309.00 S/ 14.00 S/ 7,014.00 0.00 S/ - 0% 100.00 S/ 1,400.00
16 CEMENTO PORTLAND TIPO I (42.5 kg) bol 2256.00 5665.00 S/ 19.80 S/ 156,835.80 0.00 S/ - 0% 750.00 S/ 14,850.00
17 LADRILLO PARA TECHO 8H DE 15X30X30 cm und. 8928.00 16995.00 S/ 1.92 S/ 49,772.16 0.00 S/ - 0% 2000.00 S/ 3,840.00
18 CEMENTO PORTLAND TIPO MS (42.5 kg) bol 2688.00 4841.00 S/ 21.00 S/ 158,109.00 0.00 S/ - 0% 750.00 S/ 15,750.00
S/. 688,759.43 S/ 98,261.76 S/ 50,740.00

MANO DE OBRA UNIDAD TIPO 1 TIPO 2 PRECIO SUBTOTAL


COSTO DE MANO DE OBRA PARA CASITAS TIPO 1 und S/ 229,913.28 S/ 501,467.86 S/. 731,381.14 1.00 S/ 36,000.00 5% 1.00 S/ -

MODULO TIPO 1 Y 2 REQUERIMIENTO N° 01 REQUERIMIENTO N° 02


SEMANA DEL LUNES 22/07 AL DOMINGO 28/07 SEMANA DEL LUNES 29/07 AL DOMINGO 04/08
MATERIALES ESTRUCTURAS CANTIDAD 161 und PEDIDO: 18-07-19 ENTREGA: 25-07-19 PEDIDO: 25-07-19 ENTREGA: 01-08-19
ITEM MATERIALES UNIDAD TIPO 1 TIPO 2 PRECIO UNIT. SUBTOTAL CANT. TOTAL TOTAL % CANT. TOTAL TOTAL
1 ALAMBRE NEGRO RECOCIDO N° 8 kg 1980.00 3468.00 S/ 3.65 S/ 19,885.20 0.00 S/ - 0% 1000.00 S/ 3,650.00
2 ALAMBRE NEGRO N° 16 kg 1620.00 1530.00 S/ 3.65 S/ 11,497.50 0.00 S/ - 0% 1000.00 S/ 3,650.00
3 VARILLA DE 1/2" und 2040.00 3672.00 S/ 24.20 S/ 138,230.40 0.00 S/ - 0% 2320.00 S/ 56,144.00
4 VARILLA DE 1/4" und 4140.00 5814.00 S/ 5.44 S/ 54,149.76 0.00 S/ - 0% 3096.00 S/ 16,842.24
5 VARILLA DE 3/8" und 1080.00 2244.00 S/ 13.49 S/ 44,840.76 0.00 S/ - 0% 1248.00 S/ 16,835.52
6 CLAVOS PARA MADERA CON CABEZA DE 3" kg 180.00 306.00 S/ 3.80 S/ 1,846.80 0.00 S/ - 0% 90.00 S/ 342.00
7 CLAVOS PARA MADERA CON CABEZA DE 2";21/2" kg 780.00 1326.00 S/ 3.80 S/ 8,002.80 0.00 S/ - 0% 120.00 S/ 456.00
8 CLAVOS PARA MADERA CON CABEZA DE 4" kg 180.00 306.00 S/ 3.80 S/ 1,846.80 0.00 S/ - 0% 90.00 S/ 342.00
9 PIEDRA GRANDE DE 8" m3 300.00 510.00 S/ 10.00 S/ 8,100.00 0.00 S/ - 0% 100.00 S/ 1,000.00
10 GRAVILLA DE 1/2" m3 240.00 357.00 S/ 16.00 S/ 9,552.00 0.00 S/ - 0% 100.00 S/ 1,600.00
11 AFIRMADO m3 240.00 612.00 S/ 13.00 S/ 11,076.00 0.00 S/ - 0% 100.00 S/ 1,300.00
12 HORMIGON m3 960.00 1734.00 S/ 10.50 S/ 28,287.00 0.00 S/ - 0% 200.00 S/ 2,100.00
13 PIEDRA MEDIANA m3 60.00 102.00 S/ 16.00 S/ 2,592.00 0.00 S/ - 0% 100.00 S/ 1,600.00
14 ARENA GRUESA m3 240.00 306.00 S/ 14.00 S/ 7,644.00 0.00 S/ - 0% 100.00 S/ 1,400.00
16 CEMENTO PORTLAND TIPO I (42.5 kg) bol 2820.00 5610.00 S/ 19.80 S/ 166,914.00 0.00 S/ - 0% 750.00 S/ 14,850.00
17 LADRILLO PARA TECHO 8H DE 15X30X30 cm bol 11160.00 16830.00 S/ 1.92 S/ 53,740.80 0.00 S/ - 0% 2000.00 S/ 3,840.00
18 CEMENTO PORTLAND TIPO MS (42.5 kg) bol 3360.00 4794.00 S/ 21.00 S/ 171,234.00 0.00 S/ - 0% 750.00 S/ 15,750.00
S/. 739,439.82 S/ - S/ 141,701.76

MANO DE OBRA UNIDAD TIPO 1 TIPO 2 PRECIO SUBTOTAL


COSTO DE MANO DE OBRA PARA CASITAS TIPO 1 und S/ 287,391.60 S/ 496,599.24 S/. 783,990.84 1.00 S/ 38,400.00 5% 1.00 S/ -

COMBUSTIBLE 1400.00 17
MIENTO N° 02 REQUERIMIENTO N° 03 REQUERIMIENTO N° 04 SALDO
S 29 AL DOMINGO 04 SEMANA DEL LUNES 05/07 AL DOMINGO 11/08 SEMANA DEL LUNES 05/08 AL DOMINGO 11/08
ENTREGA: 01-08-19 PEDIDO: 01-08-19 ENTREGA: 08-08-19 PEDIDO: 07-08-19 ENTREGA: 14-08-19
% CANT. TOTAL TOTAL % CANT. TOTAL TOTAL %
20% 1000.00 S/ 3,650.00 20% S/ - 0% 2086.00
35% 1000.00 S/ 3,650.00 35% S/ - 0% -159.00
0% S/ - 0% 500.00 S/ 12,100.00 9% 2520.00
0% S/ - 0% 550.00 S/ 2,992.00 6% 5537.00
0% S/ - 0% 250.00 S/ 4,208,880.00 1055592500% 1632.00
0% 90.00 S/ 342.00 20% S/ - 0% 273.00
0% 120.00 S/ 456.00 6% S/ - 0% 1723.00
0% 90.00 S/ 342.00 20% S/ - 0% 273.00
13% 0.00 S/ - 0% 206.00 S/ 2,060.00 27% 449.00
18% 0.00 S/ - 0% 76.00 S/ 1,216.00 14% 376.50
12% 0.00 S/ - 0% S/ - 0% 710.00
8% 0.00 S/ - 0% 528.00 S/ 5,544.00 21% 1791.00
66% 0.00 S/ - 0% 40.00 S/ 640.00 26% 11.00
20% 0.00 S/ - 0% 66.00 S/ 924.00 13% 335.00
9% 0.00 S/ - 0% 1885.00 S/ 37,323.00 24% 5286.00
8% 0.00 S/ - 0% S/ - 0% 23923.00
10% 0.00 S/ - 0% 1151.00 S/ 24,171.00 15% 5628.00
S/ 8,440.00 S/ 4,295,850.00

871
0% 1.00 S/ 50,000.00 7%
126

MIENTO N° 02 REQUERIMIENTO N° 03 REQUERIMIENTO N° 04 SALDO


9/07 AL DOMINGO 04/08 SEMANA DEL LUNES 05/07 AL DOMINGO 11/08 SEMANA DEL LUNES 05/08 AL DOMINGO 11/08
ENTREGA: 01-08-19 PEDIDO: 01-08-19 ENTREGA: 08-08-19 PEDIDO: 07-08-19 ENTREGA: 14-08-19
% CANT. TOTAL TOTAL % CANT. TOTAL TOTAL %
18% 0.00 S/ - 0% S/ - #DIV/0! 4448.00
32% 0.00 S/ - 0% S/ - #DIV/0! 2150.00
41% 0.00 S/ - 0% 1500.00 S/ 36,300.00 26% 1892.00
31% 0.00 S/ - 0% 1500.00 S/ 8,160.00 15% 5358.00
38% 0.00 S/ - 0% 250.00 S/ - 0% 1826.00
19% 0.00 S/ - 0% S/ - 0% 396.00
6% 0.00 S/ - 0% S/ - 0% 1986.00
19% 0.00 S/ - 0% S/ - 0% 396.00
12% 0.00 S/ - 0% 160.00 S/ 1,600.00 20% 550.00
17% 0.00 S/ - 0% 50.00 S/ 800.00 8% 447.00
12% 0.00 S/ - 0% S/ - 0% 752.00
7% 0.00 S/ - 0% 343.00 S/ 3,601.50 13% 2151.00
62% 0.00 S/ - 0% 30.00 S/ 480.00 19% 32.00
18% 0.00 S/ - 0% 45.00 S/ 630.00 8% 401.00
9% 0.00 S/ - 0% 1225.00 S/ 24,255.00 15% 6455.00
7% 0.00 S/ - 0% S/ - 0% 25990.00
9% 0.00 S/ - 0% 749.00 S/ 15,729.00 9% 6655.00
S/ - S/ 91,555.50

111
0% 1.00 S/ 50,000.00 6%

82.35 27.45 292.8 S/ 8,037.65

TOTAL S/ 4,312,887.65
MODULO TIPO 1 Y 2 REQUERIMIENTO N° 01 REQUERIMIENTO N° 02
SEMANA DEL LUNES 05/08 AL DOMINGO 12/08 SEMANA DEL LUNES 29 AL DOMINGO 04
MATERIALES ARQUITECTURA CANTIDAD 151 und PEDIDO: 05-08-19 ENTREGA: 12-08-19 PEDIDO: 25-07-19 ENTREGA: 01-08-19
ITEM MATERIALES UNIDAD TIPO 1 TIPO 2 PRECIO UNIT. SUBTOTAL CANT. TOTAL TOTAL % CANT. TOTAL TOTAL
1 ARENA FINA m3 96.00 206.00 S/ 45.00 S/ 13,590.00 S/ - 0%
2 ARENA GRUESA m3 96.00 309.00 S/ 45.00 S/ 18,225.00 76.00 S/ 3,420.00 19%
3 CEMENTO PORTLAND TIPO I (42.5 kg) bol 720.00 1854.00 S/ 19.80 S/ 50,965.20 360.00 S/ 7,128.00 14%
4 PEGAMENTO PARA CERAMICO bol 144.00 309.00 S/ 14.20 S/ 6,432.60 S/ - 0%
5 CERAMICO COLOR BLANCO DE 0.30 X 0.30 m2 384.00 824.00 S/ 25.00 S/ 30,200.00 S/ - 0%
6 LADRILLO MAQUINADO KING KONG 18 HUECOS und 88320.00 217639.00 S/ 0.63 S/ 192,754.17 85000.00 S/ 53,550.00 28%
7 FRAGUA kg 96.00 206.00 S/ 3.50 S/ 1,057.00 S/ - 0%
8 CRUCETAS BOLSA 100 UNIDADES und 24.00 51.50 S/ 7.00 S/ 528.50 S/ - 0%
9 PINTURA LATEX Gal 16.80 36.05 S/ 12.00 S/ 634.20 S/ - 0%
10 SELLADOR Gal 36.00 77.25 S/ 12.00 S/ 1,359.00 S/ - 0%
11 LIJA N° 120 DE FIERRO PARA PARED und 67.20 144.20 S/ 1.76 S/ 372.06 S/ - 0%
S/. 316,117.73 S/ 64,098.00 S/ -

MANO DE OBRA UNIDAD TIPO 1 TIPO 2 PRECIO SUBTOTAL


COSTO DE MANO DE OBRA PARA CASITAS TIPO 1 und S/ 229,913.28 S/ 501,467.86 S/. 731,381.14 1.00 S/ 36,000.00 5% 1.00 S/ -

MODULO TIPO 1 Y 2 REQUERIMIENTO N° 01 REQUERIMIENTO N° 02


SEMANA DEL LUNES 05/08 AL DOMINGO 12/08 SEMANA DEL LUNES 29 AL DOMINGO 04
MATERIALES ARQUITECTURA CANTIDAD 161 und PEDIDO: 05-08-19 ENTREGA: 12-08-19 PEDIDO: 25-07-19 ENTREGA: 01-08-19
ITEM MATERIALES UNIDAD TIPO 1 TIPO 2 PRECIO UNIT. SUBTOTAL CANT. TOTAL TOTAL % CANT. TOTAL TOTAL
1 ARENA FINA m3 120.00 202.00 S/ 45.00 S/ 14,490.00 S/ - 0%
2 ARENA GRUESA m3 120.00 202.00 S/ 45.00 S/ 14,490.00 60.00 S/ 2,700.00 19%
3 CEMENTO PORTLAND TIPO I (42.5 kg) bol 900.00 1515.00 S/ 19.80 S/ 47,817.00 240.00 S/ 4,752.00 10%
4 PEGAMENTO PARA CERAMICO bol 180.00 303.00 S/ 14.20 S/ 6,858.60 S/ - 0%
5 CERAMICO COLOR BLANCO DE 0.30 X 0.30 m2 480.00 808.00 S/ 25.00 S/ 32,200.00 S/ - 0%
6 LADRILLO MAQUINADO KING KONG 18 HUECOS und 110400.00 185840.00 S/ 0.63 S/ 186,631.20 48000.00 S/ 30,240.00 16%
7 FRAGUA kg 120.00 202.00 S/ 3.50 S/ 1,127.00 S/ - 0%
8 CRUCETAS BOLSA 100 UNIDADES und 30.00 50.50 S/ 7.00 S/ 563.50 S/ - 0%
9 PINTURA LATEX Gal 21.00 35.35 S/ 12.00 S/ 676.20 S/ - 0%
10 SELLADOR Gal 45.00 75.75 S/ 12.00 S/ 1,449.00 S/ - 0%
11 LIJA N° 120 DE FIERRO PARA PARED und 84.00 141.40 S/ 1.76 S/ 396.70 S/ - 0%
S/. 306,699.20 S/ 37,692.00 S/ -

MANO DE OBRA UNIDAD TIPO 1 TIPO 2 PRECIO SUBTOTAL


COSTO DE MANO DE OBRA PARA CASITAS TIPO 1 und S/ 229,913.28 S/ 501,467.86 S/. 731,381.14 1.00 S/ 36,000.00 5% 1.00 S/ -
MIENTO N° 02 REQUERIMIENTO N° 03 REQUERIMIENTO N° 04 SALDO
S 29 AL DOMINGO 04 SEMANA DEL LUNES 05/07 AL DOMINGO 11/08 SEMANA DEL LUNES 05/08 AL DOMINGO 11/08
ENTREGA: 01-08-19 PEDIDO: 01-08-19 ENTREGA: 08-08-19 PEDIDO: 07-08-19 ENTREGA: 14-08-19
% CANT. TOTAL TOTAL % CANT. TOTAL TOTAL %
302.00
329.00
2214.00
453.00
1208.00
220959.00
302.00
75.50
52.85
113.25
211.40
S/ - S/ -

0% 1.00 S/ 50,000.00 7%

MIENTO N° 02 REQUERIMIENTO N° 03 REQUERIMIENTO N° 04 SALDO


S 29 AL DOMINGO 04 SEMANA DEL LUNES 05/07 AL DOMINGO 11/08 SEMANA DEL LUNES 05/08 AL DOMINGO 11/08
ENTREGA: 01-08-19 PEDIDO: 01-08-19 ENTREGA: 08-08-19 PEDIDO: 07-08-19 ENTREGA: 14-08-19
% CANT. TOTAL TOTAL % CANT. TOTAL TOTAL %
322.00
262.00
2175.00
483.00
1288.00
248240.00
322.00
80.50
56.35
120.75
225.40
S/ - S/ -

0% 1.00 S/ 50,000.00 7%
MATERIALES ESTRUCTURAS
CANTIDAD
UNIDAD
ITEM TOTAL
PIEDRA GRANDE DE 8" m3 250.00
GRAVILLA DE 1/2" m3 200.00
AFIRMADO m3 200.00
HORMIGON m3 800.00
PIEDRA MEDIANA m3 50.00
ARENA GRUESA m3 200.00
CEMENTO PORTLAND TIPO I (42.5 kg) bol 2350.00
LADRILLO PARA TECHO 8H DE 15X30X30 cm und 9300.00
CEMENTO PORTLAND TIPO MS (42.5 kg) bol 2800.00

NOTA : ESTOS MATERIALES SON PARA 50 CASAS.