CRONOGRAMA DE MANO DE OBRA

PROYECTO : MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E. Nº 80067 CÉSAR ARMESTAR VALVERDE - DISTRITO SIMBAL - TRUJILLO - LA LIBERTAD
DEPARTAMEN: LA LIBERTAD
PROVINCIA : TRUJILLO
DISTRITO : SIMBAL
FECHA : SEPTIEMBRE 2017

NRO. ORDEN DESCRIPCION UND CANTIDAD PRECIO (S/.) TOTAL MES 1 MES 2 MES 3

1 OPERARIO hh 46,205.7800 19.94 921,343.25 133,906.04 96,763.17 295340.43


2 OFICIAL hh 13565.28 16.34 221,656.68 32,215.10 23,279.28 71052.98
3 PEON hh 54,189.7900 14.67 794,964.22 115,538.38 83,490.34 254829.11
4 MANO DE OBRA ESPECIALIZADA - INSTALACIÓN DE GABINETE DISTRIB glb 2.0000 5,084.75 10,169.50 1,478.01 1,068.04 3259.88
GRAMA DE MANO DE OBRA

0067 CÉSAR ARMESTAR VALVERDE - DISTRITO SIMBAL - TRUJILLO - LA LIBERTAD

MES 4

142,800.74
34,354.99
123,213.01
1,576.19
CRONOGRAMA DE ADQUISICION DE MATERIALES

PROYECTO : MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E. Nº 80067 CÉSAR ARMESTAR VALVERDE - DISTRITO SIMBAL - TRUJILLO - LA
DEPARTAMEN: LA LIBERTAD
PROVINCIA : TRUJILLO
DISTRITO : SIMBAL
FECHA : SEPTIEMBRE 2017

NRO. ORDEN DESCRIPCION UND CANTIDAD PRECIO (S/.) TOTAL MES 1 MES 2 MES 3 MES 4

1 ASFALTO RC-250 gal 19.7400 16.95 334.59 48.63 35.14 107.25 51.86
2 NEXXT CABLE MANAGEMENT 19" 1 und 4 63.56 254.24 36.95 26.70 81.50 39.41
3 NET PARA VOLEY DE NYLON BLAN und 1.0000 426.53 426.53 61.99 44.80 136.73 66.11
4 ALAMBRE NEGRO RECOCIDO N° 8 kg 416.7400 3.00 1250.22 181.70 131.30 400.76 193.77
5 ALAMBRE NEGRO N° 16 kg 6,056.5300 4.50 27254.39 3,961.09 2,862.37 8736.51 4,224.21
6 ANGULO DE ACERO LIVIANO DE 1 1/2 pza 94.84 41.6 3945.34 573.41 414.36 1264.70 611.50
7 0.00 - - 0.00 -
8 ANGULO DE FIERRO 1 1/2"x 1 1/2"x 3 m 20 7.6 152.00 22.09 15.96 48.72 23.56
9 ANGULO DE FIERRO 2"x 2"x 3/16" m 33.2200 9.81 325.89 47.36 34.23 104.47 50.51
10 ACERO CORRUGADO fy = 4200 kg/c kg 95344.33 2.9 276498.56 40,185.70 29,038.99 88632.77 42,855.04
11 0.00 - - 0.00 -
12 ACERO kg 1.1000 2.65 2.92 0.42 0.31 0.94 0.45
13 CLAVOS PARA MADERA CON CABEZA kg 1.05 3.81 4.00 0.58 0.42 1.28 0.62
14 0.00 - - 0.00 -
15 CLAVOS CON CABEZA DE 2 1/2" ,3 Y kg 2,318.9600 4.50 10435.32 1,516.65 1,095.96 3345.09 1,617.39
16 MALLA DE ALAMBRE GALVANIZADO # m2 312.6600 18.50 5784.21 840.66 607.48 1854.15 896.51
17 0.00 - - 0.00 -
18 PLATINA DE FIERRO DE 1/2"x2" var 42.3500 25.00 1058.75 153.88 111.19 339.39 164.10
19 PLATINA DE FIERRO 3/16"X2 1/2 m 24.1500 3.50 84.53 12.29 8.88 27.10 13.10
20 PLATINA DE FIERRO 3/16"X2"x6m. m 63.4800 7.56 479.91 69.75 50.40 153.84 74.38
21 PLANCHA DE ACERO 6.4mm x 1.22 m. pln 0.3200 179.90 57.57 8.37 6.05 18.45 8.92
22 0.00 - - 0.00 -
23 PLANCHA DE ACERO LAF 1/16"x4'x8' und 0.41 166.34 68.20 9.91 7.16 21.86 10.57
CRONOGRAMA DE USO DE EQUIPOS

PROYECTO : MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E. Nº 80067 CÉSAR ARMESTAR VALVERDE - DISTRITO SIMBAL - TRUJILLO - LA LIBE
DEPARTAMEN: LA LIBERTAD
PROVINCIA : TRUJILLO
DISTRITO : SIMBAL
FECHA : SEPTIEMBRE 2017

NRO. ORDEN DESCRIPCION UND CANTIDAD PRECIO (S/.) TOTAL MES 1 MES 2 MES 3 MES 4

TEODOLITO hm 150.1500 13.00 1,951.95 283.69 205.00 625.71 302.54


- - 0.00 -
NIVEL TOPOGRAFICO he 150.1500 10.00 1,501.50 218.22 157.69 481.31 232.72
HERRAMIENTAS MANUALES %mo 66,735.93 9,699.26 7,008.88 21392.48 10,343.53
ELECTROBOMBA 1/2 HP und 2.0000 195.95 391.90 56.96 41.16 125.63 60.74
GARGOLA DE CONCRETO F'C= 175 kg/cm und 5.0000 92.00 460.00 66.86 48.31 147.45 71.30
- - 0.00 -
COMPACTADORA VIBRATORIA TIPO PLAN hm 640.2200 45.00 28,809.90 4,187.17 3,025.73 9235.13 4,465.30
- - 0.00 -
EQUIPO OXICORTE he 198.5200 15.00 2,977.80 432.79 312.74 954.55 461.53
MARTILLO NEUMATICO DE 29 kg hm 700.1800 10.00 7,001.80 1,017.63 735.36 2244.46 1,085.22
COMPRESORA NEUMATICA 335-375 PCM - hm 700.1800 95.00 66,517.10 9,667.45 6,985.89 21322.33 10,309.61
- - 0.00 -
CARGADOR SOBRE LLANTAS DE 125-135 H hm 213.3300 181.97 38,819.66 5,641.97 4,077.00 12443.80 6,016.73
- - 0.00 -
CARGADOR SOBRE LLANTAS DE 125-155 H hm 1.7100 152.55 260.86 37.91 27.40 83.62 40.43
- - 0.00 -
EXCAVADORA hm 1.2200 380.86 464.65 67.53 48.80 148.95 72.02
106.5700 150.00 15,985.50
RETROEXCAVADORA SOBRE LLANTAS 58 H hm 2,323.30 1,678.86 5124.22 2,477.62
- - 0.00 -
RESUMEN DE CRONOGRAMA

PROYECTO : MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E. Nº 80067 CÉSAR ARMESTAR VALVERDE - DISTRITO SIM
DEPARTAMEN: LA LIBERTAD
PROVINCIA : TRUJILLO
DISTRITO : SIMBAL
FECHA : SEPTIEMBRE 2016

ITEM DESCRIPCIÓN TOTAL (S/.) 14 AL 30 DE 01 AL 31 DE


SEPTIEMBRE DEL OCTUBRE DE
2017 2017

001 MANO DE OBRA ### S/. 283,137.53 S/. 204,600.83

002 ADQUISICION DE MATERIALES ### S/. 355,957.73 S/. 257,222.16

003 USO DE EQUIPO ### S/. 53,104.31 S/. 38,374.24

004 EQUIPAMIENTO Y MOBILIARIO ### S/. 78,441.41 S/. 56,683.33

COSTO DIRECTO - EJECUCIÓN DE OBRA ### S/. 692,199.58 S/. 500,197.23

GASTOS GENERALES (10.00%) S/. 476,269.35 S/. 69,219.96 S/. 50,019.72


UTILIDADES(5.00%) S/. 238,134.67 S/. 34,609.98 S/. 25,009.86

SUB TOTAL - EJECUCIÓN DE OBRA ### S/. 796,029.51 S/. 575,226.81


IGV (18.00%) ### S/. 143,285.31 S/. 103,540.83

COSTO TOTAL ### S/. 1,031,875.69 S/. 745,653.97


UMEN DE CRONOGRAMA

MESTAR VALVERDE - DISTRITO SIMBAL - TRUJILLO - LA LIBERTAD

MESES
01 AL 30 DE 01 AL 31 DE 01 AL 31 DE 01 AL 28 DE 01 AL 31 DE 01 AL 28 DE ABRIL
NOVIEMBRE 2017 DICIEMBRE 2017 ENERO DEL 2017 FEBRERO DE 2017 MARZO DE 2017 DE 2017

S/. 624,482.39 S/. 301,944.93 S/. 42,760.86 S/. 249,732.61 S/. 151,039.97 S/. 90,434.54

S/. 785,093.14 S/. 379,602.20 S/. 53,758.53 S/. 313,961.39 S/. 189,885.96 S/. 113,693.41

S/. 117,125.79 S/. 56,631.76 S/. 8,020.08 S/. 46,839.00 S/. 28,328.54 S/. 16,961.59

S/. 173,008.78 S/. 83,651.88 S/. 11,846.62 S/. 69,186.79 S/. 41,844.64 S/. 25,054.30

S/. 1,526,701.31 S/. 738,178.89 S/. 104,539.46 S/. 610,532.99 S/. 369,254.47 S/. 221,089.55

S/. 152,670.13 S/. 73,817.89 S/. 10,453.95 S/. 61,053.30 S/. 36,925.45 S/. 22,108.95
S/. 76,335.07 S/. 36,908.94 S/. 5,226.97 S/. 30,526.65 S/. 18,462.72 S/. 11,054.48

S/. 1,755,706.51 S/. 848,905.72 S/. 120,220.38 S/. 702,112.94 S/. 424,642.64 S/. 254,252.98
S/. 316,027.17 S/. 152,803.03 S/. 21,639.67 S/. 126,380.33 S/. 76,435.68 S/. 45,765.54

S/. 2,275,884.04 S/. 1,100,417.97 S/. 155,839.06 S/. 910,133.69 S/. 550,454.99 S/. 329,582.59
S/. 7,099,842.00